# Modular Data Center Companies 2026: Vendors and AI Factory
Source: https://savrn.com/ai-index/categories/modular-data-center-companies
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCategories

## Modular AI factory providers and prefabricated data hall vendors

| # | Company | Product | Block size | Cooling | Power path | Lead time, as stated | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| 1 | [SAVRN](https://savrn.com/ai-index/companies/savrn) | SAVRN Atom (built by IntelliFlex) | 13.2 MW envelope, 8.8 MW of IT, 32 racks | Direct-to-chip liquid cooling on a sealed loop with dry heat rejection; no routine water draw | On-site fuel-cell baseload (Proton) with grid-forming storage, islanding and black start | Delivered as one finished block | Reference design; first deployments starting | [savrn.com](https://savrn.com/atom)[savrn.com](https://savrn.com/solutions/ai-factory) |
| 2 | Vertiv | MegaMod HDX prefabricated modular data center | Up to 10 MW per configuration | Hybrid liquid cooling for high-density AI racks | Integrated power distribution inside the prefabricated module | Up to 50% faster than a conventional build, per Vertiv (MegaMod CoolChip) | Shipping; HDX configurations announced January 2026 | [nasdaq.com](https://www.nasdaq.com/press-release/vertiv-introduces-new-modular-liquid-cooling-infrastructure-solution-support-high)[vertiv.com](https://www.vertiv.com/en-us/products-catalog/facilities-enclosures-and-racks/integrated-solutions/vertiv-megamod/) |
| 3 | Eaton with Flexnode | Prefabricated IT infrastructure for high-density data halls | 3.5 MW to 35 MW data halls | High power density halls; cooling per module | Eaton critical power backup, racks and cable management inside Flexnode modules | Deployment schedules reduced 35% on average, per the announcement | Announced January 28, 2026 | [businesswire.com](https://www.businesswire.com/news/home/20260128848275/en)[hpcwire.com](https://www.hpcwire.com/off-the-wire/eaton-expands-modular-data-center-offering-for-rapid-deployment-of-ai-factories/) |
| 4 | Schneider Electric | Prefabricated Modular EcoStruxure Pod Data Center | Pods up to 1 MW and beyond | Liquid cooling (Motivair by Schneider Electric in-rack) with high-power busway | High-power busway and NetShelter racks pre-assembled in the pod | Pre-designed and pre-assembled for rapid deployment, per Schneider Electric | Available globally since June 2025 | [businesswire.com](https://www.businesswire.com/news/home/20250619222300/en/schneider-electric-launches-new-data-centre-solutions-to-meet-challenges-of-high-density-ai-and-accelerated-compute-applications) |
| 5 | Delta Electronics | Prefabricated AI modular data center solution |  | Liquid cooling for AI racks | Integrated power infrastructure in the prefabricated module | IT build time cut by about 60%, per Delta | Launched at COMPUTEX, June 2026 | [deltapowersolutions.com](https://www.deltapowersolutions.com/en/mcis/news-2026-delta-debuts-prefa-ai-modular-data-center-at-computex-to-reduce-deployment-time-by-up-to-60percent.php) |
| 6 | [Crusoe](https://savrn.com/ai-index/companies/crusoe-energy) | Crusoe Spark modular AI factory units | 8 MW first phase at Snyder, Texas, scalable to 25 MW | Integrated cooling for the latest GPUs inside each portable unit | Power, cooling, remote monitoring, fire suppression and racks in one unit; Energy Vault powered site | Installation and commissioning measured in weeks, per Crusoe | Energy Vault framework agreement February 2026; Snyder Phase 1 targeted Q1 2027; Crusoe manufacturing facility announced March 2026 | [businesswire.com](https://businesswire.com/news/home/20260211881549/en/Energy-Vault-and-Crusoe-Announce-Strategic-Framework-Agreement-for-Deployment-of-Crusoe-Spark-Modular-AI-Factory-Units-to-Deliver-Crusoe-Cloud)[crusoe.ai](https://crusoe.ai/resources/newsroom/crusoe-announces-new-manufacturing-facility-to-produce-modular-ai-factories) |
| 7 | [HPE](https://savrn.com/ai-index/companies/hpe) | HPE AI Mod POD | Up to 1.5 MW per module | Direct liquid cooling native to the module | Module delivered with its power and cooling plant; HPE and third-party hardware supported | Delivered within a few months, per HPE | Available | [hpe.com](https://www.hpe.com/us/en/ai-mod-pod.html) |
| 8 | [SambaNova](https://savrn.com/ai-index/companies/sambanova) | SambaManaged modular token factory | 1 MW token factory, 100 racks, 1,600 chips |  |  |  | Offered as a managed deployment | [savrn.com](https://savrn.com/ai-index/companies/sambanova) |
| 9 | [Compass Datacenters (Northstar)](https://savrn.com/ai-index/companies/compass-datacenters) | Compass Quantum composite modular infrastructure |  |  |  | Rapidly deployable, per the acquisition coverage | Compass Quantum acquired by Northstar Technologies | [datacentremagazine.com](https://datacentremagazine.com/technology-and-ai/what-compass-quantum-could-mean-for-northstar-technologies) |

## Edge-scale modular AI data centers

Vendors whose block is sized for a single site at the edge: a parking lot, a wellhead, a base, a campus.

| # | Company | Product | Block size | Cooling | Power path | Lead time, as stated | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| 1 | Armada | Leviathan megawatt-scale modular data center; Galleon Forge One | Two 40-foot modules plus a 20-foot power unit, megawatt scale | High-density AI training and inference modules | Separate 20-foot power unit per Leviathan set | Continuous production from summer 2026 at a Johnson Controls factory in Arizona | $230 million Series B at a $2 billion valuation, May 2026 | [builtinsf.com](https://www.builtinsf.com/articles/armada-raises-230m-2b-valuation-20260520) |
| 2 | Flexnode | AI Anywhere modular edge data centers | Modules combine into 3.5 MW to 35 MW halls with Eaton | High power density modules | Eaton power backup, racks and cable management | Deployment schedules reduced 35% on average, per Eaton | Eaton collaboration announced January 2026 | [businesswire.com](https://www.businesswire.com/news/home/20260128848275/en)[datacenterfrontier.com](https://www.datacenterfrontier.com/podcast/article/55273882/podcast-on-the-frontier-of-modular-edge-ai-data-centers-with-flexnodes-andrew-lindsey) |

Questions this page answers

Which companies sell modular AI data centers in 2026?

The vendors on this page are SAVRN, Vertiv, Eaton with Flexnode, Schneider Electric, Delta Electronics, Crusoe, HPE, SambaNova, Compass Datacenters (Northstar), Armada, Flexnode. Each row names the product, the block size the vendor states and the source.

What is a prefabricated modular AI data center?

A data hall built in a factory as a finished block, with its racks, liquid cooling, power distribution and controls already installed, then shipped and set on a prepared site. The vendors here state block sizes from Pods up to 1 MW and beyond to 3.5 MW to 35 MW data halls.

What is a modular AI factory provider?

A vendor whose block is a complete AI factory rather than an empty data hall: compute, cooling and power delivered together, sized in megawatts of IT load. On this page those are SAVRN, Vertiv, Eaton with Flexnode, Schneider Electric, Delta Electronics, Crusoe, HPE, SambaNova, Compass Datacenters (Northstar).

How is the SAVRN Atom different from a prefabricated data hall?

The Atom is delivered as one finished block with its 32 liquid-cooled racks, direct-to-chip cooling, and the Proton fuel-cell power plant that runs it, so the block arrives with its own generation rather than waiting on a utility feed. It is built by IntelliFlex and documented on the Atom page.

Keep going

- [The SAVRN Atom, drawn module by module →](https://savrn.com/atom)
- [The Atom: the modular AI factory block →](https://savrn.com/solutions/ai-factory)
- [Modular AI campus: how six months beats a hyperscale build →](https://savrn.com/blog/modular-ai-campus)
- [Top neocloud GPU providers →](https://savrn.com/ai-index/categories/neocloud-gpu-providers)

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →