ADIA, together with GIC, agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for ADIA

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

3

Transactions naming ADIA or one of its sites

Sources

4

Every cited page, listed below

Market

ADIA is a pension or sovereign investor with no traded shares.

Spending

## Reported and guided spending

No reported or guided spending line is on record for ADIA (Abu Dhabi Investment Authority). Its position shows in the sites, transactions and facts below.

Named sites

## Where ADIA builds

No named site commitment is on record for ADIA (Abu Dhabi Investment Authority) as of October 8, 2026. That is normal for pension and sovereign wealth: the capital shows in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name ADIA as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| ADIA + GIC + Vantage Data CentersADIA and GIC agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025. | jv equity | $1.6B | agreed September 2025; closing expected Q4 2025 | n.a. |  |
| Zelestra + Meta (PPA offtaker) + Canadian Imperial Bank of Commerce + BBVA + Societe GeneraleIndependent power producer Zelestra closed a US$350 million green credit facility from CIBC, BBVA and Societe Generale for the 203 MW Reclamation Solar project on former coal mining land in Gibson County, Indiana, which will fulfil a power purchase agreement with Meta. The project is under construction with commercial operation expected at the end of 2027. Zelestra said the financing brings its 2026 US project financing to US$1.14 billion; it has seven US PPAs with Meta. | debt facility | $350M | Financial close announced 7 October 2026 | n.a. |  |
| Cologix + Cologix Canadian Issuer Limited Partnership + KBRAKBRA published preliminary ratings on Cologix Canadian Issuer Limited Partnership Series 2026-1/2, the issuer's third Canadian data center ABS. The notes are secured by 21 operating data centers in Montreal, Toronto and Vancouver generating about $234.2 million of annualized revenue and $150.2 million of annualized adjusted NOI as of 31 March 2026 | abs | n.a. | KBRA preliminary ratings published 11 August 2026 | n.a. |  |

The record

## Sourced facts on ADIA

- ADIA and GIC agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025.

Sources

## Sources for ADIA

Every source cited on this page, once each.

- agbi.com[AGBI](https://www.agbi.com/tech/2025/09/adia-partners-in-1-6bn-deal-backing-us-data-centre-operator/)
- pv-tech.org[PV Tech](https://www.pv-tech.org/zelestra-closes-us350-million-financing-at-203mw-pv-plant-in-indiana-backed-by-meta/)
- pv-magazine-usa.com[pv magazine USA](https://pv-magazine-usa.com/2026/10/07/meta-backed-solar-project-on-reclaimed-indiana-coal-mine-secures-350-million/)
- finance.yahoo.com[Yahoo Finance (Business Wire)](https://finance.yahoo.com/markets/stocks/articles/kbra-publishes-preliminary-ratings-cologix-222200984.html)

Pension and sovereign wealth

## More in the Index

[CalPERS](https://savrn.com/ai-index/companies/calpers)[CDPQ / La Caisse](https://savrn.com/ai-index/companies/cdpq-la-caisse)[CPP Investments (CPPIB)](https://savrn.com/ai-index/companies/cpp-investments)[GIC](https://savrn.com/ai-index/companies/gic)[Kuwait Investment Authority](https://savrn.com/ai-index/companies/kuwait-investment-authority)[MGX](https://savrn.com/ai-index/companies/mgx)[Mubadala](https://savrn.com/ai-index/companies/mubadala)[Ontario Teachers' Pension Plan (OTPP)](https://savrn.com/ai-index/companies/otpp)[PSP Investments](https://savrn.com/ai-index/companies/psp-investments)[Qatar Investment Authority](https://savrn.com/ai-index/companies/qatar-investment-authority)[Temasek](https://savrn.com/ai-index/companies/temasek)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)