# SAVRN Index: Antin Infrastructure Partners
Source: https://savrn.com/ai-index/companies/antin
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCompanies

Antin (AUM over €33 billion, Flagship Fund V €10.2 billion) agreed on December 11, 2025 to acquire NorthC, a European enterprise colocation platform with more than 140MW of secured grid capacity, from DWS, with closing expected in H1 2026. Press reporting indicated the sale could fetch approximately €2 billion / $2.31 billion. Its disclosed data center platforms (NorthC, Pulsant) are European; North American data center investments 2023-2026 are n.a.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for Antin Infrastructure Partners

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

1

Transactions naming Antin Infrastructure Partners or one of its sites

Sources

2

Every cited page, listed below

Market

Antin Infrastructure Partners is listed outside the US. The listing is being confirmed against the exchange before market data appears here.

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent, and guidance is what management expects. They sit side by side and are never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| current | aum | n.a. | firm AUM exceeds €33 billion; Flagship Fund V closed at €10.2 billion (EUR figures, no USD conversion given) |  |

Named sites

## Where Antin Infrastructure Partners builds

No named site commitment is on record for Antin Infrastructure Partners as of October 8, 2026. That is normal for private equity and infrastructure: the capital shows in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name Antin Infrastructure Partners as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Antin + DWS (seller) + NorthCAntin agreed to acquire NorthC, a European enterprise colocation platform with more than 140MW of secured grid capacity, from DWS. | acquisition | ~$2.3B | agreed December 11, 2025; closing expected H1 2026 | n.a. |  |

The record

## Sourced facts on Antin Infrastructure Partners

- North American data center investments 2023-2026: n.a. Antin's disclosed data center platforms (NorthC, Pulsant) are European, though its Flagship strategy targets Europe and North America.
- The NorthC sale was contested between Antin and EQT and could fetch approximately €2 billion / $2.31 billion per press reporting.
- Pause exposure: n.a.

Sources

## Sources for Antin Infrastructure Partners

Every source cited on this page, once each.

- antin-ip.com[Antin](https://www.antin-ip.com/media/our-news/antin-to-acquire-northc-a-leading-european-enterprise-colocation-data-centre-platform-from-dws)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/antin-and-eqt-do-battle-for-control-of-northc-sale-could-fetch-2bn/)

Private equity and infrastructure

## More in the Index

[Apollo Global Management](https://savrn.com/ai-index/companies/apollo)[Ares Management](https://savrn.com/ai-index/companies/ares)[BlackRock / GIP / AI Infrastructure Partnership](https://savrn.com/ai-index/companies/blackrock-gip-aip)[Blackstone](https://savrn.com/ai-index/companies/blackstone)[Brookfield (BAM / Brookfield Infrastructure Partners)](https://savrn.com/ai-index/companies/brookfield)[Copenhagen Infrastructure Partners](https://savrn.com/ai-index/companies/cip)[DigitalBridge](https://savrn.com/ai-index/companies/digitalbridge)[EQT](https://savrn.com/ai-index/companies/eqt)[Global Infrastructure Partners (as a distinct platform)](https://savrn.com/ai-index/companies/gip)[I Squared Capital](https://savrn.com/ai-index/companies/i-squared)[IPI Partners / Blue Owl](https://savrn.com/ai-index/companies/ipi-blue-owl)[KKR](https://savrn.com/ai-index/companies/kkr)[Macquarie Asset Management](https://savrn.com/ai-index/companies/macquarie-am)[Oaktree Capital Management](https://savrn.com/ai-index/companies/oaktree)[Pensions & Sovereign Wealth Funds (CalPERS, CPPIB, CDPQ/La Caisse, OTPP, PSP, ADIA, GIC, Mubadala, MGX)](https://savrn.com/ai-index/companies/pensions-swfs)[Silver Lake](https://savrn.com/ai-index/companies/silver-lake)[Stonepeak](https://savrn.com/ai-index/companies/stonepeak)[The Carlyle Group](https://savrn.com/ai-index/companies/carlyle)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
