# SAVRN Index: CyrusOne AI Infrastructure Profile
Source: https://savrn.com/ai-index/companies/cyrusone
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCompanies

CyrusOne was acquired by KKR and Global Infrastructure Partners for $15B in 2021. Its 2025-1 ABS raised $575M against 13 data centers with $4.4B of appraised value, 61.7% concentrated in Northern Virginia. Its $500M+, 600 MW Sangamon County, Illinois campus was deferred by the county board in late 2025 before a conditional permitted use was approved in April 2026, its Aurora, Illinois facility drew resident noise complaints in the record supporting Aurora's moratorium, and it announced a roughly $2B, 1,200-acre US Army data center site in Utah in spring 2026.

Updated October 25, 2026Capital record from the Capital Atlas

Named sites

7

Site commitments on record for CyrusOne

Disclosed site capital

$5.7B

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

1,070 MW

Named sites with a stated megawatt figure

Financing transactions

9

Transactions naming CyrusOne or one of its sites

Sources

31

Every cited page, listed below

Market

CyrusOne is privately held, so there is no public market data to show.

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent, and guidance is what management expects. They sit side by side and are never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| 2025 | raise | $575M | 2025-1 ABS raised $575M against 13 data centers with $4.4B of appraised value, 61.7% concentrated in Northern Virginia |  |

Named sites

## Where CyrusOne builds

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| CyrusOne US Army data center site, Utahwith US Army | [Utah](https://savrn.com/data-center-capital-atlas/utah) | n.a. | ~$2.0B | n.a. | announced |  |
| CyrusOne Freestone County campus (Freestone Energy Center)with Constellation Energy, Calpine | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Fairfield, Freestone County | ~$1.5B | 380 | under construction |  |
| PointOne / CyrusOne data center, 4015 Lower Moncure Road (Phase I)with PointOne, Helix Ventures (developer) | [North Carolina](https://savrn.com/data-center-capital-atlas/north-carolina) | Sanford, Lee County | ≥$900M | 90 | approved |  |
| CyrusOne Sangamon County campus (Talkington Township)deferred late 2025; conditional permitted use approved April 2026 | [Illinois](https://savrn.com/data-center-capital-atlas/illinois) | Sangamon | ≥$500M | 600 | announced |  |
| CyrusOne Castroville data centerReported 18 July 2026 | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Castroville, Medina County | ~$500M | n.a. | under construction |  |
| CyrusOne DFW8 (9501 Asphalt Drive)Registered with TDLR 24 September 2026; reported by The Real Deal 28 September 2026 | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Fort Worth, Tarrant County | ~$257M | n.a. | proposed |  |
| CyrusOne Aurora facility (Eola and Diehl roads) | [Illinois](https://savrn.com/data-center-capital-atlas/illinois) | Aurora | n.a. | n.a. | operating |  |

Financing

## Financing transactions

Transactions that name CyrusOne as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| KKR + GIP + CyrusOne + Global Infrastructure PartnersKKR and GIP completed the acquisition of CyrusOne when GIP AUM was over $81 billion. | acquisition | ~$15.0B | completed March 25, 2022 | n.a. |  |
| CyrusOnePost-acquisition debt financing across a platform of over 55 data centers in the US and Europe. | debt facility | ~$9.7B | revolving credit facility completed in May | n.a. |  |
| CyrusOne + KKR + GIP + Kirkland & Ellis (counsel)Kirkland advised CyrusOne on a $1.25 billion SASB CMBS financing secured by a portfolio of six data centers in North Carolina, Ohio and Texas. Use of proceeds and property MW were not disclosed. This is a separate transaction from record cyrusone-cmbs-1050, which Kirkland announced on 20 May 2026 as a $1.05 billion loan secured by one property near Dallas (the DFW3 and DFW4 buildings in Allen, Texas, per Bisnow) | cmbs | $1.2B | Announced 20 July 2026 | n.a. |  |
| CyrusOne + CalpineDedicated-generation agreement anchoring the DFW10 campus adjacent to the Thad Hill Energy Center in Bosque County, Texas. | ppa | $1.2B | announced July 30, 2025; expected operational by Q4 2026 | CyrusOne DFW10 campus (Thad Hill Energy Center) (TX) |  |
| CyrusOne + KKR + GIPCMBS refinancing for KKR- and GIP-owned CyrusOne secured by its DFW3 and DFW4 data centers on Chelsea Boulevard in Allen, Texas, 76.5 MW combined, appraised at nearly $1.6 billion (66.8% loan to value) per the presale report cited by Bisnow. Separate from the $1.25 billion six-property CMBS in record cyrusone-cmbs-1250-2026 | other | $1.1B | Announced 20 May 2026 | n.a. |  |
| CyrusOneThe 2025-1 ABS raised $575M against 13 data centers with $4.4B of appraised value. | project bond | $575M | 2025 | n.a. |  |
| Constellation + CyrusOneCalpine LLC, a Constellation business unit, signed a 380 MW agreement with CyrusOne on 9 February 2026 to connect and serve a new data center adjacent to the Freestone Energy Center in Freestone County, Texas, and entered an exclusive agreement to provide power, grid connectivity and site infrastructure for a Phase 2 of an additional 380 MW. The agreements are in addition to 400 MW of Calpine-CyrusOne agreements at the Thad Hill Energy Center in Bosque County, Texas. | ppa | n.a. | reported February 9, 2026 | CyrusOne Freestone County campus (Freestone Energy Center) (TX) |  |
| CyrusOne + KKR + Global Infrastructure Partners + Goldman Sachs + Morgan StanleyKKR and GIP are preparing a possible U.S. IPO of CyrusOne as early as 2027 and have met banks including Goldman Sachs and Morgan Stanley. Plans are at an early stage | other | n.a. | Reported by Private Equity Wire 11 August 2026 | n.a. |  |
| Constellation Energy + CyrusOneNew Data Center Facility at Freestone Energy Center In the first quarter of 2026, we signed a new 380 MW agreement with Dallas-based CyrusOne, a leading global data center developer and operator, to connect and serve a new data center adjacent to the Freestone Energy Center, in Freestone County, Texas. | other | n.a. | Filed Aug 6, 2026 | n.a. |  |

The record

## Sourced facts on CyrusOne

- Activists meeting at Springfield's Lincoln Library on October 28 called for a six-month moratorium on zoning votes for the Sangamon County proposal, whose stated capacity is 600 MW.
- CyrusOne's Aurora, Illinois facility at Eola and Diehl roads drew resident noise complaints, including extended backup-generator operation during April repairs, in the record supporting Aurora's moratorium.

Sources

## Sources for CyrusOne

Every source cited on this page, once each.

- illinoistimes.com[Illinois Times](https://www.illinoistimes.com/news/divided-over-data-centers/)
- constellationenergy.com[Constellation Energy](https://www.constellationenergy.com/news/2026/02/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas.html)
- cyrusone.com[CyrusOne](https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas)
- reuters.com[Reuters](https://www.reuters.com/business/energy/constellation-energy-inks-380-megawatt-deal-with-cyrusone-2026-02-09/)
- datacenterdynamics.com[Data Center Dynamics](https://www.datacenterdynamics.com/en/news/cyrusone-files-to-develop-three-buildings-for-15bn-data-center-campus-in-fairfield-texas/)
- tdlr.texas.gov[TDLR TABS project TABS2026026013](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026026013)
- tdlr.texas.gov[TDLR TABS project TABS2026026016](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026026016)
- tdlr.texas.gov[TDLR TABS project TABS2026026017](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026026017)
- tdlr.texas.gov[TDLR TABS project TABS2026026904](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026026904)
- rantnc.com[The Rant (Sanford NC), 29 September 2026](https://rantnc.com/2026/09/29/planning-department-issues-data-center-permit/)
- springfieldbusinessjournal.com[Springfield Business Journal](https://www.springfieldbusinessjournal.com/news/data-center-plans-delayed/)
- constructionreviewonline.com[Construction Review](https://constructionreviewonline.com/sangamon-county-board-defers-vote-on-500-million-cyrusone-data-center/)
- finance.yahoo.com[Yahoo Finance (San Antonio Express-News)](https://finance.yahoo.com/technology/articles/dallas-company-plans-500m-data-150000158.html)
- cyrusone.com[CyrusOne Medina County project page](https://www.cyrusone.com/data-centers/north-america/medina-county)
- tdlr.texas.gov[TDLR TABS project TABS2027001907](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2027001907)
- therealdeal.com[The Real Deal, 28 September 2026](https://therealdeal.com/data/texas/2026/290m-north-texas-data-center-leads-week-in-construction/)
- chicagotribune.com[Chicago Tribune](https://www.chicagotribune.com/2025/09/26/aurora-temporarily-pauses-data-center-warehouse-development-approvals/)
- global-infra.com[Global Infrastructure Partners](https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/)
- reuters.com[Reuters](https://www.reuters.com/business/kkr-global-infrastructure-partners-buy-cyrusone-15-bln-deal-2021-11-15/)
- wsj.com[Wall Street Journal](https://www.wsj.com/business/deals/cyrusone-to-be-sold-in-15-billion-deal-to-kkr-and-global-infrastructure-partners-11636984742)
- cyrusone.com[CyrusOne](https://www.cyrusone.com/media-coverage-press-releases/cyrusone-secures-9-7-billion-in-new-debt-capital-to-fund-datacenter-growth)
- kirkland.com[Kirkland & Ellis](https://www.kirkland.com/news/press-release/2026/07/kirkland-ellis-advises-kkr-and-gip-owned-cyrusone-on-cmbs-financing)
- ifre.com[International Financing Review](https://www.ifre.com/deal/securitisation/2447891/cmbs-cyrusone-data-center-sasb-cone-2026-acd6-us1.25bn-priced)
- cyrusone.com[CyrusOne](https://www.cyrusone.com/resources/press-releases/cyrusone-and-calpine-announce-newhyperscale-data-center-development-in-texas)
- kirkland.com[Kirkland & Ellis](https://www.kirkland.com/news/press-release/2026/05/kirkland-advises-kkr--and-gip-owned-cyrusone-on-1-05b-cmbs-financing)
- bisnow.com[Bisnow](https://www.bisnow.com/news/dallas-ft-worth/data-center-capital-markets/cyrusone-lines-up-1b-cmbs-loan-for-two-data-centers-in-allen-134372)
- asreport.americanbanker.com[Asset Securitization Report](https://asreport.americanbanker.com/news/cyrusone-offers-575-million-in-abs-on-virginia-and-texas-data-centers)
- privateequitywire.co.uk[Private Equity Wire](https://www.privateequitywire.co.uk/kkr-and-gip-owned-cyrusone-weighs-5bn-ipo-as-data-centre-listings-gather-pace/)
- msn.com[Reuters (via MSN)](https://www.msn.com/en-in/news/other/data-centre-operator-cyrusone-plans-potential-2027-ipo-banks-pitch-for-roles-sources-say/ar-AA29Lxck)
- sec.gov[SEC EDGAR 10-Q](https://www.sec.gov/Archives/edgar/data/1868275/000186827526000104/ceg-20260630.htm)
- illinoistimes.com[CyrusOne responses filing](https://www.illinoistimes.com/wp-content/uploads/2025/11/CyrusOneResponses.pdf)

Data center developer

## More in the Index

[Aligned Data Centers](https://savrn.com/ai-index/companies/aligned-data-centers)[Cloverleaf Infrastructure](https://savrn.com/ai-index/companies/cloverleaf-infrastructure)[Cologix](https://savrn.com/ai-index/companies/cologix)[Compass Datacenters](https://savrn.com/ai-index/companies/compass-datacenters)[DataBank](https://savrn.com/ai-index/companies/databank)[Digital Realty Trust](https://savrn.com/ai-index/companies/digital-realty)[EdgeConneX](https://savrn.com/ai-index/companies/edgeconnex)[Equinix](https://savrn.com/ai-index/companies/equinix)[Flexential](https://savrn.com/ai-index/companies/flexential)[H5 Data Centers](https://savrn.com/ai-index/companies/h5-data-centers)[Iron Mountain](https://savrn.com/ai-index/companies/iron-mountain)[Novva Data Centers](https://savrn.com/ai-index/companies/novva-data-centers)[Prime Data Centers](https://savrn.com/ai-index/companies/prime-data-centers)[QTS Realty Trust (Blackstone)](https://savrn.com/ai-index/companies/qts-realty-trust)[Rowan Digital Infrastructure](https://savrn.com/ai-index/companies/rowan-digital-infrastructure)[Sabey Data Centers](https://savrn.com/ai-index/companies/sabey-data-centers)[SB Energy](https://savrn.com/ai-index/companies/sb-energy)[STACK Infrastructure](https://savrn.com/ai-index/companies/stack-infrastructure)[Tract](https://savrn.com/ai-index/companies/tract)[Vantage Data Centers](https://savrn.com/ai-index/companies/vantage-data-centers)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)