# SAVRN Index: datacenterHawk AI Infrastructure Profile
Source: https://savrn.com/ai-index/companies/datacenterhawk
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCompanies

datacenterHawk is a data provider whose 1Q 2025 recap reported Northern Virginia planned development of 9.6 GW with utility limitations creating a bottleneck, North American market growth of 40% year over year, and vacancy below 1% in many North American markets with limited tenant optionality. Its 2Q 2025 recap reported non-major markets absorbing about 1,600 MW in 1H 2025 versus 1,425 MW in major markets, with Phoenix at 2.8 GW and Atlanta at 2.3 GW of planned capacity. Its data also underpins Avison Young's US colocation inventory figures.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for datacenterHawk

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

0

Transactions naming datacenterHawk or one of its sites

Sources

2

Every cited page, listed below

Market

datacenterHawk is privately held, so there is no public market data to show.

Spending

## Reported and guided spending

No reported or guided spending line is on record for datacenterHawk. Its position shows in the sites, transactions and facts below.

Named sites

## Where datacenterHawk builds

No named site commitment is on record for datacenterHawk as of October 8, 2026. That is normal for market intelligence and brokerage: the capital shows in the transactions below rather than on a site of its own.

Financing

## Financing transactions

No financing transaction on record names datacenterHawk or attaches to one of its sites as of October 8, 2026.

The record

## Sourced facts on datacenterHawk

- datacenterHawk reported Northern Virginia planned development of 9.6 GW with utility limitations creating a bottleneck in delivering space and power, North American market growth of 40% year over year, and vacancy below 1% in many North American markets with limited tenant optionality.
- In 1H 2025, non-major markets absorbed about 1,600 MW versus 1,425 MW in major markets, with Phoenix at 2.8 GW and Atlanta at 2.3 GW of planned capacity.

Sources

## Sources for datacenterHawk

Every source cited on this page, once each.

- datacenterhawk.com[datacenterHawk 1Q 2025 recap](https://datacenterhawk.com/resources/market-insights/1q-2025-data-center-market-recap)
- datacenterhawk.com[datacenterHawk 2Q 2025 recap](https://datacenterhawk.com/resources/market-insights/2q-2025-data-center-market-recap)

Market intelligence and brokerage

## More in the Index

[Avison Young](https://savrn.com/ai-index/companies/avison-young)[CBRE](https://savrn.com/ai-index/companies/cbre)[Colliers](https://savrn.com/ai-index/companies/colliers)[Cushman & Wakefield](https://savrn.com/ai-index/companies/cushman-wakefield)[Green Street](https://savrn.com/ai-index/companies/green-street)[JLL](https://savrn.com/ai-index/companies/jll)[Newmark](https://savrn.com/ai-index/companies/newmark)[Transwestern](https://savrn.com/ai-index/companies/transwestern)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)