# SAVRN Index: EdgeConneX AI Infrastructure Profile
Source: https://savrn.com/ai-index/companies/edgeconnex
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCompanies

EdgeConneX was acquired by EQT in 2020 for approximately $2.5-3B, and Sixth Street took a minority strategic stake in September 2024. North American delay-specific disclosures were n.a. in the fetched record.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for EdgeConneX

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

5

Transactions naming EdgeConneX or one of its sites

Sources

9

Every cited page, listed below

Market

EdgeConneX is privately held, so there is no public market data to show.

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent, and guidance is what management expects. They sit side by side and are never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | reported | n.a. | n.a. North American delay-specific disclosures: n.a. |  |

Named sites

## Where EdgeConneX builds

No named site commitment is on record for EdgeConneX as of October 8, 2026. Its position shows in the transactions and facts below.

Financing

## Financing transactions

Transactions that name EdgeConneX as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| CPP Investments + EQT + EdgeConneXCPP Investments commitment into the EdgeConneX build-out; Sixth Street took a minority stake in 2024. CPP Investments announced the investment on 3 July 2026 and said the transaction had closed following customary approvals. EdgeConneX plans more than 10 GW of additional data centers | equity raise | $1.8B | Announced and closed 3 July 2026 | n.a. |  |
| EQT Infrastructure IV + EdgeConneX + EQTEQT's entry into data centers via EdgeConneX, which has since grown to 80 data centers across 50+ markets. | acquisition | n.a. | closing expected Q4 2020 | n.a. |  |
| Sixth Street + EQT + EdgeConneXSixth Street took a minority strategic stake in EdgeConneX in September 2024. | equity raise | n.a. | September 2024 | n.a. |  |
| EdgeConneX + EQT + Natixis + BBVAEQT-backed EdgeConneX is in talks with lenders including Natixis and BBVA on a letter of credit facility to guarantee up to $2.5 billion of power costs. The facility would help the company secure power for data center sites | debt facility | n.a. | Reported by Bloomberg 14 August 2026 | n.a. |  |
| CoreWeave + EdgeConneX + Bastrop CountyCoreWeave will lease Building 1 at EdgeConneX's Cedar Creek campus in Bastrop County, Texas, according to county tax abatement records reported by Community Impact. State records list the building as AUS02 with an estimated cost of $440 million | other | n.a. | Reported 27 July 2026 | EdgeConneX Cedar Creek campus (AUS02) (TX) |  |

The record

## Sourced facts on EdgeConneX

- Sixth Street took a minority strategic stake in EdgeConneX in September 2024.

Sources

## Sources for EdgeConneX

Every source cited on this page, once each.

- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/cpp-investments-to-pump-175-billion-into-eqt-and-edgeconnexs-ai-data-center-build-out/)
- newswire.ca[CPP Investments press release (Canada Newswire)](https://www.newswire.ca/news-releases/cpp-investments-partners-with-eqt-to-support-global-digital-infrastructure-growth-826226428.html)
- investmentexecutive.com[The Canadian Press via Investment Executive](https://www.investmentexecutive.com/news/cpp-investments-spends-2-4b-with-eqt-to-build-ai-infrastructure/)
- edgeconnex.com[EdgeConneX](https://www.edgeconnex.com/news/press-releases/eqt-infrastructure-to-acquire-leading-global-data-center-provider-edgeconnex/)
- crn.com[CRN](https://www.crn.com/news/data-center/edge-data-center-pioneer-edgeconnex-acquired-by-eqt)
- edgeconnex.com[EdgeConneX press release](https://www.edgeconnex.com/news/press-releases/eqt-welcomes-sixth-street-as-strategic-investor-in-edgeconnex/)
- bloomberg.com[Bloomberg](https://www.bloomberg.com/news/articles/2026-08-14/edgeconnex-seeks-2-5-billion-bank-pledge-for-data-center-power)
- datacenterdynamics.com[Data Center Dynamics](https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/)
- communityimpact.com[Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/)

Data center developer

## More in the Index

[Aligned Data Centers](https://savrn.com/ai-index/companies/aligned-data-centers)[Cloverleaf Infrastructure](https://savrn.com/ai-index/companies/cloverleaf-infrastructure)[Cologix](https://savrn.com/ai-index/companies/cologix)[Compass Datacenters](https://savrn.com/ai-index/companies/compass-datacenters)[CyrusOne](https://savrn.com/ai-index/companies/cyrusone)[DataBank](https://savrn.com/ai-index/companies/databank)[Digital Realty Trust](https://savrn.com/ai-index/companies/digital-realty)[Equinix](https://savrn.com/ai-index/companies/equinix)[Flexential](https://savrn.com/ai-index/companies/flexential)[H5 Data Centers](https://savrn.com/ai-index/companies/h5-data-centers)[Iron Mountain](https://savrn.com/ai-index/companies/iron-mountain)[Novva Data Centers](https://savrn.com/ai-index/companies/novva-data-centers)[Prime Data Centers](https://savrn.com/ai-index/companies/prime-data-centers)[QTS Realty Trust (Blackstone)](https://savrn.com/ai-index/companies/qts-realty-trust)[Rowan Digital Infrastructure](https://savrn.com/ai-index/companies/rowan-digital-infrastructure)[Sabey Data Centers](https://savrn.com/ai-index/companies/sabey-data-centers)[SB Energy](https://savrn.com/ai-index/companies/sb-energy)[STACK Infrastructure](https://savrn.com/ai-index/companies/stack-infrastructure)[Tract](https://savrn.com/ai-index/companies/tract)[Vantage Data Centers](https://savrn.com/ai-index/companies/vantage-data-centers)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)