GIP's data center franchise predates the BlackRock acquisition: with KKR it completed the roughly $15 billion CyrusOne take-private in March 2022 when it managed over $81 billion. Post-acquisition GIP AUM exceeds $200 billion, and GIP led the $40 billion Aligned acquisition (about $21 billion of equity) alongside AIP and MGX. It remains CyrusOne's co-owner, including in the $1.05 billion CMBS financing on a Dallas-area asset.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for Global Infrastructure Partners

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

13

Transactions naming Global Infrastructure Partners or one of its sites

Sources

27

Every cited page, listed below

Market

Global Infrastructure Partners does not trade on its own. Part of BlackRock (NYSE:BLK).

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent, and guidance is what management expects. They sit side by side and are never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| post-BlackRock | aum | ≥$200B | GIP AUM exceeds $200 billion; over $81 billion at the CyrusOne close |  |

Named sites

## Where Global Infrastructure Partners builds

No named site commitment is on record for Global Infrastructure Partners (as a distinct platform) as of October 8, 2026. That is normal for private equity and infrastructure: the capital shows in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name Global Infrastructure Partners as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Meta Platforms, Inc.Meta sold $25.0 billion of senior unsecured notes in six tranches maturing from 2031 to 2066, for general corporate purposes. It is Meta's only SEC-registered note offering found in 2026 to date. | senior notes | $25.0B | Backfill (not previously recorded). Preliminary supplement filed 30 April 2026; final prospectus supplement filed 1 May 2026; settlement on or about 4 May 2026 | n.a. |  |
| KKR + GIP + CyrusOne + Global Infrastructure PartnersKKR and GIP completed the acquisition of CyrusOne when GIP AUM was over $81 billion. | acquisition | ~$15.0B | completed March 25, 2022 | n.a. |  |
| AES Corporation + Global Infrastructure Partners (BlackRock) + EQT Infrastructure + CalPERS + Qatar Investment AuthorityA consortium led by BlackRock's Global Infrastructure Partners and EQT, with CalPERS and the Qatar Investment Authority, received CFIUS clearance to acquire AES, parent of AES Ohio, with closing expected in late 2026 or early 2027 subject to remaining approvals. Ohio lawmakers and consumer advocates asked PUCO for local hearings, citing BlackRock's data center investments as a potential conflict given AES's data-center-driven load growth. | Take-private acquisition at $15 per share in cash | ~$10.7B | Agreed March 2026; PUCO staff recommended approval July 2026; CFIUS approval received Thursday 27 August 2026 and disclosed 28 August 2026 | n.a. |  |
| Riot Platforms + Undisclosed frontier AI labRiot signed a 20-year data center lease (through June 2048) with a leading frontier AI lab for 191 MW of critical IT capacity at its Rockdale campus. Delivery of 96 MW is expected by December 2027 and the full 191 MW by June 2028. Riot also disclosed a non-binding letter of intent for a proposed lease at its Corsicana facility. Bloomberg reported on 11 August 2026, citing people familiar with the matter, that the frontier AI lab tenant is Anthropic; Riot will build to the tenant's specifications and provide the building, power, cooling and operations while Anthropic supplies its own servers and chips. Riot has not named the tenant. | lease | ~$9.1B | Executed after 30 June 2026; announced 10 August 2026 | Rockdale campus AI data center (TX) |  |
| CleanSpark + Anviran, LLC (Meta subsidiary) + Meta Platforms (guarantor)CleanSpark signed a 20-year triple-net lease for 175 MW of critical IT load at Sandersville, Georgia, with deliveries expected to begin in Q4 2027. The tenant also executed a letter of intent and exclusivity arrangement covering CleanSpark's Texas portfolio of 718 acres and up to 885 MW. CleanSpark estimated landlord project costs of $10 million to $12 million per MW On 17 September 2026 CleanSpark disclosed the tenant as Anviran, LLC, a wholly owned subsidiary of Meta, with Meta guaranteeing rent and operating expenses. The investor presentation shows development cost of about $11.9 million per IT MW, rent commencing 30 November 2027 and about $330 million of average annual NOI, and CleanSpark proposed a $2.227 billion senior secured notes offering to fund the remaining Sandersville build. The 17 September 2026 investor presentation states a 3.0% annual rent escalator, rent commencement on 30 November 2027 and one 12-month option in addition to the two five-year extensions | lease | ≥$6.6B | Announced 14 July 2026 | CleanSpark Sandersville data center (GA) |  |
| Aligned Data Centers + AI Infrastructure Partnership + MGX + Global Infrastructure PartnersAfter closing the $40 billion acquisition of Aligned from Macquarie Asset Management, the AIP, MGX and GIP consortium plans to invest $5 billion in the company, primarily to expand capacity. Aligned has more than 6.4 GW of operational and planned capacity across the Americas, according to the report | equity raise | ~$5.0B | Reported by Bloomberg 21 July 2026, via The Real Deal | n.a. |  |
| Riot Platforms + Riot DC Logistics, LLC + Morgan Stanley Senior Funding, Inc.Riot subsidiary Riot DC Logistics, LLC entered a $573.0 million senior secured delayed-draw term loan with Morgan Stanley Senior Funding as administrative agent to fund long-lead equipment for the 191 MW Rockdale data center. The loan is secured by substantially all assets of the credit parties with no recourse to Riot Platforms. Riot described it as interim financing while an investment-grade credit backstop is finalized | debt facility | $573M | Credit agreement dated 10 August 2026 | Rockdale campus AI data center (TX) |  |
| Riot Platforms + GMO + Whinstoneand its parent, GMO Internet Group, Inc., (collectively, “GMO”) filed a complaint against Whinstone alleging breach of a colocation services agreement between GMO and Whinstone, which has since been terminated, seeking damages in excess of $ 150.0 million for lost profit and profit sharing payments GMO alleges it was owed from Whinstone. | other | $150M | Filed Aug 10, 2026 | n.a. |  |
| Riot Platforms + Advanced Micro Devices (AMD)Riot Platforms announced on 16 January 2026 the fee simple acquisition of the 200 acres in Milam County, Texas, on which it had operated under a ground lease, for total consideration of $96.0 million funded by selling about 1,080 bitcoin. It also signed a Data Center Lease and Services Agreement with AMD at Rockdale for an initial 25 MW of critical IT load delivered in phases from January to May 2026, with potential expansion to 200 MW. The Rockdale site has a 700 MW grid interconnection, and Riot cites 1.7 GW of approved power across Rockdale and Corsicana. | acquisition | ~$96M | Announced 16 January 2026 (Riot release, Form 8-K Exhibit 99.1) | Rockdale campus AI data center (TX) |  |
| BlackRock + Global Infrastructure PartnersCreated a combined infrastructure platform with approximately $170 billion of client AUM, around 600 employees and more than 300 investments. | acquisition | n.a. | completed October 1, 2024 | n.a. |  |
| CyrusOne + KKR + Global Infrastructure Partners + Goldman Sachs + Morgan StanleyKKR and GIP are preparing a possible U.S. IPO of CyrusOne as early as 2027 and have met banks including Goldman Sachs and Morgan Stanley. Plans are at an early stage | other | n.a. | Reported by Private Equity Wire 11 August 2026 | n.a. |  |
| ACS Group + Global Infrastructure Partners + BlackRock + CoravelACS and GIP launched Coravel as a 50-50 data center platform with a 1.7 GW development portfolio (1.2 GW IT) across Europe, the United States and Australia. Its first long-term hyperscaler agreement covers about 140 MW across three facilities on a Dallas-Fort Worth campus, with rights to about 100 MW more and service dates through 2028 | jv | n.a. | Announced 15 July 2026 | Coravel Dallas-Fort Worth campus (TX) |  |
| Meta Platforms + Apex Clean EnergyApex Clean Energy announced a power purchase agreement giving Meta exclusive rights to all environmental attributes associated with energy from the 144 MW Starling Solar project in Gonzales County, Texas, including all renewable energy credits. Apex said the project adds new generation to the ERCOT grid that would not have been built without Meta's commitment. It is the seventh transaction between the two companies, whose combined portfolio totals about 1,200 MW across Texas, Virginia, Illinois, Kansas and Iowa. Commercial operation is expected in 2027. | ppa | n.a. | Announced 16 September 2026 (Apex Clean Energy release); reported by trade press through 23 September 2026 | n.a. |  |

The record

## Sourced facts on Global Infrastructure Partners

- Aligned's North American footprint under GIP ownership spans Northern Virginia, Chicago, Dallas, Ohio, Phoenix and Salt Lake City.
- GIP is identified as CyrusOne's co-owner in the $1.05 billion CMBS financing.

Sources

## Sources for Global Infrastructure Partners

Every source cited on this page, once each.

- sec.gov[Meta final prospectus supplement, Form 424(b)(2) (SEC)](https://www.sec.gov/Archives/edgar/data/1326801/000119312526201738/d109954d424b2.htm)
- global-infra.com[Global Infrastructure Partners](https://www.global-infra.com/news/kkr-and-gip-complete-acquisition-of-cyrusone/)
- reuters.com[Reuters](https://www.reuters.com/business/kkr-global-infrastructure-partners-buy-cyrusone-15-bln-deal-2021-11-15/)
- wsj.com[Wall Street Journal](https://www.wsj.com/business/deals/cyrusone-to-be-sold-in-15-billion-deal-to-kkr-and-global-infrastructure-partners-11636984742)
- msn.com[Seeking Alpha via MSN](https://www.msn.com/en-us/money/economy/aes-corp-receives-cfius-approval-for-sale-to-consortium/ar-AA2b7AZG)
- msn.com[The Plain Dealer via MSN](https://www.msn.com/en-us/money/companies/data-center-investors-want-to-buy-ohio-s-public-utilities/ar-AA2aaNso)
- msn.com[The Cool Down via MSN](https://www.msn.com/en-us/news/other/ohio-lawmaker-seeks-hearings-on-107-billion-deal-to-take-aes-utility-private/ar-AA2aYcnv)
- riotplatforms.com[Riot Platforms](https://www.riotplatforms.com/riot-platforms-reports-second-quarter-2026-financial-results-and-strategic-highlights/)
- stocktitan.net[Stock Titan (Riot 8-K)](https://www.stocktitan.net/sec-filings/RIOT/8-k-riot-platforms-inc-reports-material-event-55bed99b80cf.html)
- the-decoder.com[The Decoder citing Bloomberg, 11 August 2026](https://the-decoder.com/anthropic-signs-9-1-billion-data-center-deal-with-bitcoin-miner-riot-platforms/)
- investors.cleanspark.com[CleanSpark](https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Secures-Twenty-Year-Lease-with-High-Investment-Grade-Global-Technology-Company-for-Data-Center-in-Sandersville-Georgia/default.aspx)
- sec.gov[SEC Form 8-K Exhibit 99.1 (CleanSpark Sandersville investor presentation)](https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_1.htm)
- sec.gov[SEC Form 8-K Exhibit 99.2 (CleanSpark)](https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_2.htm)
- 247wallst.com[24/7 Wall St.](https://247wallst.com/investing/2026/07/14/cleanspark-jumps-12-on-6-6b-data-center-lease-while-riot-mara-hut-8-edge-higher/)
- therealdeal.com[The Real Deal](https://therealdeal.com/texas/2026/07/21/blackrock-mgx-dumping-5b-into-aligned-data-centers/)
- dmagazine.com[D Magazine](https://www.dmagazine.com/business-economy/2026/07/blackrock-led-consortium-closes-40-billion-acquisition-of-aligned-data-centers/)
- sec.gov[SEC EDGAR (Riot Platforms 8-K)](https://www.sec.gov/Archives/edgar/data/1167419/000110465926097330/riot-20260810x8k.htm)
- sec.gov[SEC EDGAR 10-Q](https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm)
- sec.gov[Riot Platforms release (Form 8-K Exhibit 99.1), 16 January 2026](https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm)
- blackrock.com[BlackRock](https://www.blackrock.com/corporate/newsroom/media/press-releases/blackrock-completes-acquisition-of-global-infrastructure-partners)
- privateequitywire.co.uk[Private Equity Wire](https://www.privateequitywire.co.uk/kkr-and-gip-owned-cyrusone-weighs-5bn-ipo-as-data-centre-listings-gather-pace/)
- msn.com[Reuters (via MSN)](https://www.msn.com/en-in/news/other/data-centre-operator-cyrusone-plans-potential-2027-ipo-banks-pitch-for-roles-sources-say/ar-AA29Lxck)
- finance.yahoo.com[Yahoo Finance](https://finance.yahoo.com/technology/articles/acs-group-global-infrastructure-partners-140000714.html)
- apexcleanenergy.com[Apex Clean Energy release, 16 September 2026](https://www.apexcleanenergy.com/news/apex-and-meta-add-144-mw-of-texas-solar-to-long-standing-partnership/)
- powermag.com[POWER Magazine (press release)](https://www.powermag.com/apex-clean-energy-signs-ppa-with-meta-for-solar-power-from-texas-project/)
- aligneddc.com[Aligned](https://aligneddc.com/press-release/aip-mgx-and-blackrocks-gip-close-acquisition-of-aligned-data-centers/)
- kirkland.com[Kirkland & Ellis](https://www.kirkland.com/news/press-release/2026/05/kirkland-advises-kkr--and-gip-owned-cyrusone-on-1-05b-cmbs-financing)

Private equity and infrastructure

## More in the Index

[Antin Infrastructure Partners](https://savrn.com/ai-index/companies/antin)[Apollo Global Management](https://savrn.com/ai-index/companies/apollo)[Ares Management](https://savrn.com/ai-index/companies/ares)[BlackRock / GIP / AI Infrastructure Partnership](https://savrn.com/ai-index/companies/blackrock-gip-aip)[Blackstone](https://savrn.com/ai-index/companies/blackstone)[Brookfield (BAM / Brookfield Infrastructure Partners)](https://savrn.com/ai-index/companies/brookfield)[Copenhagen Infrastructure Partners](https://savrn.com/ai-index/companies/cip)[DigitalBridge](https://savrn.com/ai-index/companies/digitalbridge)[EQT](https://savrn.com/ai-index/companies/eqt)[I Squared Capital](https://savrn.com/ai-index/companies/i-squared)[IPI Partners / Blue Owl](https://savrn.com/ai-index/companies/ipi-blue-owl)[KKR](https://savrn.com/ai-index/companies/kkr)[Macquarie Asset Management](https://savrn.com/ai-index/companies/macquarie-am)[Oaktree Capital Management](https://savrn.com/ai-index/companies/oaktree)[Pensions & Sovereign Wealth Funds (CalPERS, CPPIB, CDPQ/La Caisse, OTPP, PSP, ADIA, GIC, Mubadala, MGX)](https://savrn.com/ai-index/companies/pensions-swfs)[Silver Lake](https://savrn.com/ai-index/companies/silver-lake)[Stonepeak](https://savrn.com/ai-index/companies/stonepeak)[The Carlyle Group](https://savrn.com/ai-index/companies/carlyle)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)