# SAVRN Index: JLL AI Infrastructure Profile
Source: https://savrn.com/ai-index/companies/jll
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCompanies

JLL's brokerage research tracks North American colocation supply and vacancy across 2025 and 2026. Its Midyear 2025 report put inventory at 15.5 GW with record-low 2.3% vacancy, its Year-End 2025 report tracked 39 GW of active capacity at 1% vacancy with a 35 GW construction pipeline, and its Midyear 2026 update held vacancy at 1% for a third consecutive year with more than 66 GW under construction. JLL frames the market as one where new demand cannot be served for roughly three years, with most tenants contracting for 2028 deliveries.

Updated October 25, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for JLL

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

1

Transactions naming JLL or one of its sites

Sources

7

Every cited page, listed below

MarketMarket data from TradingView, delayed

Loading NYSE:JLL from TradingView

Spending

## Reported and guided spending

No reported or guided spending line is on record for JLL. Its position shows in the sites, transactions and facts below.

Named sites

## Where JLL builds

No named site commitment is on record for JLL as of October 25, 2026. That is normal for market intelligence and brokerage: the capital shows in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name JLL as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Mapletree Industrial Trust + JLLMapletree Industrial Trust hired JLL to market a 22-property US data center portfolio across 15 states, preferring a single sale but open to individual assets. The portfolio has a 6.8-year weighted average lease term and tenants including HP, Equinix, Bank of America and Vanderbilt University. It is a little under half of Mapletree's 54 US data centers | other | n.a. | Reported by Bisnow, via The Real Deal 27 August 2026 | n.a. |  |

The record

## Sourced facts on JLL

- JLL's Midyear 2025 report put North American colocation inventory at 15.5 GW, vacancy at a record-low 2.3% (down from 3.0%), with 2.2 GW of H1 absorption, 1.6 GW of completions, 7.8 GW under construction at 73% preleased, and a 31.6 GW planned pipeline.
- At Year-End 2025 JLL tracked 39 GW of active North American capacity, roughly half leased and half hyperscaler-owned, vacancy at 1% for a second consecutive year, and a 35 GW construction pipeline of which 64% sits outside traditional mature markets.
- At Midyear 2026 JLL reported vacancy held at 1% for a third consecutive year, likely to remain near zero through 2028, with more than 66 GW under construction and available capacity limited to small, fragmented blocks, with most tenants contracting for 2028 deliveries.
- The atlas describes JLL's Midyear 2026 framing as the closest thing in the brokerage record to explicit frozen pipeline language, a market where new demand cannot be served for roughly three years.
- The four firms differ on vacancy because they define inventory differently: CBRE's 1.6% (H1 2025) and JLL's 2.3% cover colocation in primary or tracked markets, while Cushman's 4.2% covers a broader 43.4 GW Americas base including secondary markets. All four converge on the same conclusion: pre-commitment rates of 73% to 89% mean the pipeline is functionally sold before it is built, so any delay converts directly into unserved contracted demand.

Sources

## Sources for JLL

Every source cited on this page, once each.

- therealdeal.com[The Real Deal](https://therealdeal.com/national/2026/08/27/mapletree-eyeing-sale-of-nearly-two-dozen-data-centers/)
- jll.com[JLL Midyear 2025 report PDF](https://www.jll.com/content/dam/jllcom/en/amer/documents/reports/research-reports/25-insights-north-america-data-center-report-midyear-2025.pdf)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/jll-data-center-demand-in-north-america-continues-to-grow/)
- jll.com[JLL newsroom](https://www.jll.com/en-us/newsroom/jll-north-america-data-center-report-year-end-2025)
- jll.com[JLL market dynamics](https://www.jll.com/en-us/insights/market-dynamics/north-america-data-centers)
- cbre.com[CBRE](https://www.cbre.com/insights/reports/north-america-data-center-trends-h1-2025)
- cushmanwakefield.com[Cushman & Wakefield](https://www.cushmanwakefield.com/en/insights/americas-data-center-update)

Market intelligence and brokerage

## More in the Index

[Avison Young](https://savrn.com/ai-index/companies/avison-young)[CBRE](https://savrn.com/ai-index/companies/cbre)[Colliers](https://savrn.com/ai-index/companies/colliers)[Cushman & Wakefield](https://savrn.com/ai-index/companies/cushman-wakefield)[datacenterHawk](https://savrn.com/ai-index/companies/datacenterhawk)[Green Street](https://savrn.com/ai-index/companies/green-street)[Newmark](https://savrn.com/ai-index/companies/newmark)[Transwestern](https://savrn.com/ai-index/companies/transwestern)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
