Sabey operates more than 4 million sq ft across six US sites, including Quincy, Seattle and East Wenatchee, Washington, Ashburn, Virginia, and New York. Its Quincy campus completed a two-building, 85 MW expansion in 2023, and in Ashburn it broke ground on the final building of the 38-acre Intergate.Ashburn campus at 54 MW total. As of July 2026 it had roughly 8 MW available now across three sites and more than 70 MW coming online through 2027. The part notes Sabey is among the private developers with voluntary and incomplete disclosure.

Updated October 25, 2026Capital record from the Capital Atlas

Named sites

3

Site commitments on record for Sabey Data Centers

Disclosed site capital

$4.0B

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

139 MW

Named sites with a stated megawatt figure

Financing transactions

2

Transactions naming Sabey Data Centers or one of its sites

Sources

10

Every cited page, listed below

Market

Sabey Data Centers is privately held, so there is no public market data to show.

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent, and guidance is what management expects. They sit side by side and are never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | reported | n.a. | n.a. Private developer disclosure is voluntary and incomplete, producing n.a. entries at Sabey in particular |  |

Named sites

## Where Sabey Data Centers builds

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Sabey Decatur Township data centerIncentives approved 16 September 2026 | [Indiana](https://savrn.com/data-center-capital-atlas/indiana) | Indianapolis (Decatur Township), Marion County | $4.0B | n.a. | approved |  |
| Sabey Quincy campus, 2200 M St NElaunched 2011; expansion completed 2023 | [Washington](https://savrn.com/data-center-capital-atlas/washington) | Quincy, Grant | n.a. | 85 | operating |  |
| Sabey Intergate.Ashburn Building A14 MW available for pre-leasing by Q3 2026 | [Virginia](https://savrn.com/data-center-capital-atlas/virginia) | Ashburn | n.a. | 54 | construction |  |

Financing

## Financing transactions

Transactions that name Sabey Data Centers as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Ares Secondaries funds + Sabey Data Center Properties + Sabey Corporation + National Real Estate Advisors + Evercore + Citizens Capital Markets & AdvisoryAres Secondaries funds made a minority equity investment in Sabey Data Center Properties, jointly owned by Sabey Corporation and National Real Estate Advisors. The platform has six energized campuses, 251 MW of operating capacity including 76 MW of built powered shell, and over 4 million square feet. On 5 October 2026 Sabey Corporation and National Real Estate Advisors announced that Ares Secondaries funds expanded their investment in Sabey Data Center Properties, bringing Ares' total investment to more than $500 million. SDCP's campuses now total 275 MW, with an expansion pipeline expected to reach about 737 MW by 2033. | acquisition | ≥$500M | Announced 8 July 2026; follow-on commitment announced Monday 5 October 2026 (GlobeNewswire) | n.a. |  |
| Sabey Corporation + Indianapolis Metropolitan Development CommissionThe Indianapolis Metropolitan Development Commission approved $240 million in tax breaks for Sabey's $4 billion data center in Decatur Township. Sabey is set to become the city's second-largest taxpayer. One commissioner opposed | incentive | $240M | Approved 16 September 2026 | Sabey Decatur Township data center (IN) |  |

The record

## Sourced facts on Sabey Data Centers

- Sabey operates more than 4 million sq ft across six US sites, including Quincy, Seattle and East Wenatchee, Washington; Ashburn, Virginia; and New York.
- As of July 2026, Sabey had ~8 MW available now across three sites and more than 70 MW coming online through 2027, with 14 MW at SDC Ashburn available for pre-leasing by Q3 2026.

Sources

## Sources for Sabey Data Centers

Every source cited on this page, once each.

- ibj.com[Indianapolis Business Journal](https://www.ibj.com/articles/indy-approves-240-million-tax-break-for-data-center)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/sabey-to-bring-additional-capacity-online-at-two-washington-campuses/)
- intelligentcio.com[Intelligent CIO](https://www.intelligentcio.com/north-america/2025/07/10/sabey-data-centers-breaks-ground-on-final-phase-of-ashburn-campus-expansion/)
- datacentermap.com[DataCenterMap](https://www.datacentermap.com/usa/virginia/ashburn/intergate-ashburn/)
- finance.yahoo.com[Yahoo Finance (GlobeNewswire)](https://finance.yahoo.com/real-estate/articles/sabey-data-center-properties-welcomes-123000835.html)
- irei.com[Institutional Real Estate, Inc. (release), 5 October 2026](https://irei.com/news/sabey-data-center-properties-secures-additional-investment-from-ares-to-support-continued-growth/)
- telecompaper.com[Telecompaper, 5 October 2026](https://www.telecompaper.com/news/sabey-data-center-properties-secures-more-than-usd-500-mln-from-ares--1584718)
- manilatimes.net[Sabey and National release (GlobeNewswire via The Manila Times), 5 October 2026](https://www.manilatimes.net/2026/10/05/tmt-newswire/globenewswire/sabey-data-center-properties-secures-additional-investment-from-ares-to-support-continued-growth/2439091)
- markets.businessinsider.com[GlobeNewswire via Markets Insider](https://markets.businessinsider.com/news/stocks/sabey-data-center-properties-secures-additional-investment-from-ares-to-support-continued-growth-1036596932)
- datacenterdynamics.com[DCD, July 2026](https://www.datacenterdynamics.com/en/news/sabey-offering-more-capacity-and-power-at-six-us-data-centers/)

Data center developer

## More in the Index

[Aligned Data Centers](https://savrn.com/ai-index/companies/aligned-data-centers)[Cloverleaf Infrastructure](https://savrn.com/ai-index/companies/cloverleaf-infrastructure)[Cologix](https://savrn.com/ai-index/companies/cologix)[Compass Datacenters](https://savrn.com/ai-index/companies/compass-datacenters)[CyrusOne](https://savrn.com/ai-index/companies/cyrusone)[DataBank](https://savrn.com/ai-index/companies/databank)[Digital Realty Trust](https://savrn.com/ai-index/companies/digital-realty)[EdgeConneX](https://savrn.com/ai-index/companies/edgeconnex)[Equinix](https://savrn.com/ai-index/companies/equinix)[Flexential](https://savrn.com/ai-index/companies/flexential)[H5 Data Centers](https://savrn.com/ai-index/companies/h5-data-centers)[Iron Mountain](https://savrn.com/ai-index/companies/iron-mountain)[Novva Data Centers](https://savrn.com/ai-index/companies/novva-data-centers)[Prime Data Centers](https://savrn.com/ai-index/companies/prime-data-centers)[QTS Realty Trust (Blackstone)](https://savrn.com/ai-index/companies/qts-realty-trust)[Rowan Digital Infrastructure](https://savrn.com/ai-index/companies/rowan-digital-infrastructure)[SB Energy](https://savrn.com/ai-index/companies/sb-energy)[STACK Infrastructure](https://savrn.com/ai-index/companies/stack-infrastructure)[Tract](https://savrn.com/ai-index/companies/tract)[Vantage Data Centers](https://savrn.com/ai-index/companies/vantage-data-centers)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)