SambaNova closed the first tranche of a $1 billion Series F at an $11 billion valuation led by General Atlantic in July 2026, after a $350 million round in February 2026 led by Vista that included Intel, and a $676 million round in April 2021 at more than $5 billion. Its deployment model is SambaManaged, a modular offering scaling to a 1MW token factory with 100 racks and 1,600 chips. North American site names and MW are n.a., and no customer contract value is disclosed.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

0

Site commitments on record for SambaNova Systems

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

n.a.

Named sites with a stated megawatt figure

Financing transactions

3

Transactions naming SambaNova Systems or one of its sites

Prices tracked

1

From SAVRN's research capture of Sep 10, 2026

Sources

3

Every cited page, listed below

Market

SambaNova Systems is privately held, so there is no public market data to show.

Spending

## Reported and guided spending

No reported or guided spending line is on record for SambaNova Systems. Its position shows in the sites, transactions and facts below.

Named sites

## Where SambaNova Systems builds

No named site commitment is on record for SambaNova Systems as of October 8, 2026. Its position shows in the transactions and facts below.

Financing

## Financing transactions

Transactions that name SambaNova Systems as a party or attach to one of its named sites. Amounts are as stated, and overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| SambaNova + General AtlanticSeries F led by General Atlantic. | equity raise | $1.0B | first tranche closed July 8, 2026 | n.a. |  |
| SambaNovaSambaNova's 2021 round, per Reuters. | equity raise | ≥$676M | April 2021 | n.a. |  |
| SambaNova + Vista + IntelRound preceding the Series F. | equity raise | $350M | February 2026 | n.a. |  |

The record

## Sourced facts on SambaNova Systems

- SambaManaged scales to a 1MW 'token factory' with 100 racks and 1,600 chips; each SambaRack holds 16 SN40L RDU chips at 10kW air-cooled, deployable in 90 days.
- SambaNova claims a 'major US public company' customer running DeepSeek-class models, with no contract value disclosed; NA site names and MW are n.a.

Tracked prices

## SambaNova Systems prices

Every price the Index tracks for SambaNova Systems, in the provider's own words beside a normalized figure, with the date it was last checked. [What AI Costs](https://savrn.com/ai-index/pricing) compares them across the market.

| Seller | Model | Input | Cached input | Output | [Revenue per GPU-hour at list](https://savrn.com/ai-index/pricing/gpus/vera-rubin#token-value) | Other published prices | Change | Checked |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| SambaNova | gpt-oss-120b | $0.22 | n.a. | $0.59 | n.a. | None published | No change | ResearchOct 21, 2026[cloud.sambanova.ai ↗](https://cloud.sambanova.ai/plans/pricing) |

Revenue per GPU-hour is SAVRN's calculation, not a price any seller charges: the 6.83 million input and 0.85 million output tokens one Vera Rubin GPU handles in an hour in CoreWeave's measured test, billed at this model's list prices. It puts a token price beside a GPU rental price; it says nothing about how fast this model actually runs.

Sources

## Sources for SambaNova Systems

Every source cited on this page, once each.

- reuters.com[Reuters](https://www.reuters.com/business/finance/ai-chip-startup-sambanova-valued-11-billion-1-billion-funding-round-2026-07-08/)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/sambanova-launches-turnkey-ai-inference-offering-for-data-centers/)
- cloud.sambanova.ai[cloud.sambanova.ai](https://cloud.sambanova.ai/plans/pricing)

NeoCloud

## More in the Index

[Applied Digital](https://savrn.com/ai-index/companies/applied-digital)[Bitdeer Technologies Group](https://savrn.com/ai-index/companies/bitdeer)[Cerebras Systems](https://savrn.com/ai-index/companies/cerebras)[Cipher Digital Inc.](https://savrn.com/ai-index/companies/cipher-digital)[Core Scientific](https://savrn.com/ai-index/companies/core-scientific)[CoreWeave](https://savrn.com/ai-index/companies/coreweave)[Corvex, Inc.](https://savrn.com/ai-index/companies/corvex)[Crusoe Energy](https://savrn.com/ai-index/companies/crusoe-energy)[Fluidstack](https://savrn.com/ai-index/companies/fluidstack)[Galaxy Digital Inc.](https://savrn.com/ai-index/companies/galaxy-digital)[Groq](https://savrn.com/ai-index/companies/groq)[Hut 8 Corp.](https://savrn.com/ai-index/companies/hut8)[IREN](https://savrn.com/ai-index/companies/iren)[Lambda (Lambda Labs)](https://savrn.com/ai-index/companies/lambda)[Nebius Group](https://savrn.com/ai-index/companies/nebius-group)[Nscale](https://savrn.com/ai-index/companies/nscale)[Poolside](https://savrn.com/ai-index/companies/poolside)[Sesterce](https://savrn.com/ai-index/companies/sesterce)[TeraWulf](https://savrn.com/ai-index/companies/terawulf)[Together AI](https://savrn.com/ai-index/companies/together-ai)[Voltage Park](https://savrn.com/ai-index/companies/voltage-park)[Vultr](https://savrn.com/ai-index/companies/vultr)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)