# SAVRN Index: Sesterce AI Infrastructure Profile
Source: https://savrn.com/ai-index/companies/sesterce
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

[SAVRN Index.](https://savrn.com/ai-index)

Explore the IndexCompanies

The brief's claimed $2 billion Sesterce commitment could not be confirmed; no fetched page states such a figure and it is recorded as n.a. The confirmable program is European-centric: 600MW of capacity by 2028 and 1.2GW by 2030, a Valence Data Center with 40,000 GPUs, EUR 450 million of infrastructure investment and EUR 1.8 billion including hardware, and a 1GW Sesterce SoftBank Bosquel campus in France. North American presence is limited to a listed EWR20 Datacenter in New York with no stated capacity, dollar figure, date, GPU count or customer.

Updated October 8, 2026Capital record from the Capital Atlas

Named sites

3

Site commitments on record for Sesterce

Disclosed site capital

n.a.

Named sites with a stated dollar figure. A floor, not a capex total

Disclosed capacity

1,000 MW

Named sites with a stated megawatt figure

Financing transactions

0

Transactions naming Sesterce or one of its sites

Sources

3

Every cited page, listed below

Market

Sesterce is privately held, so there is no public market data to show.

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent, and guidance is what management expects. They sit side by side and are never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | raise | n.a. | n.a., no confirmed $2B commitment; no fetched page states a $2 billion Sesterce commitment |  |

Named sites

## Where Sesterce builds

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Sesterce SoftBank Bosquel campuswith SoftBank | France | Bosquel | n.a. | 1,000 | announced |  |
| EWR20 Datacentern.a. | [New York](https://savrn.com/data-center-capital-atlas/new-york) | n.a. | n.a. | n.a. | announced |  |
| Valence Data Center | France | Valence | n.a. | n.a. | announced |  |

Financing

## Financing transactions

No financing transaction on record names Sesterce or attaches to one of its sites as of October 8, 2026.

The record

## Sourced facts on Sesterce

- Sesterce's stated European program includes 600MW by 2028, 1.2GW by 2030, 500,000 GPUs by 2028 and more than 1 million GPUs by 2030 across two Grand Est sites, and a 250MW / 200,000 GPU Southern France Supercomputer.
- Sesterce's corporate site lists a 1GW 'Sesterce SoftBank Bosquel' campus in France, 2GW of clean energy under long-term PPAs in Europe, 150 kW/rack designs, and SoftBank under 'Trusted by'.

Sources

## Sources for Sesterce

Every source cited on this page, once each.

- sesterce.com[Sesterce](https://www.sesterce.com/)
- sesterce.com[Sesterce](https://www.sesterce.com/project/ewr20)
- sesterce.com[Sesterce](https://www.sesterce.com/blog/sesterce-s-bold-vision)

NeoCloud

## More in the Index

[Applied Digital](https://savrn.com/ai-index/companies/applied-digital)[Bitdeer Technologies Group](https://savrn.com/ai-index/companies/bitdeer)[Cerebras Systems](https://savrn.com/ai-index/companies/cerebras)[Cipher Digital Inc.](https://savrn.com/ai-index/companies/cipher-digital)[Core Scientific](https://savrn.com/ai-index/companies/core-scientific)[CoreWeave](https://savrn.com/ai-index/companies/coreweave)[Corvex, Inc.](https://savrn.com/ai-index/companies/corvex)[Crusoe Energy](https://savrn.com/ai-index/companies/crusoe-energy)[Fluidstack](https://savrn.com/ai-index/companies/fluidstack)[Galaxy Digital Inc.](https://savrn.com/ai-index/companies/galaxy-digital)[Groq](https://savrn.com/ai-index/companies/groq)[Hut 8 Corp.](https://savrn.com/ai-index/companies/hut8)[IREN](https://savrn.com/ai-index/companies/iren)[Lambda (Lambda Labs)](https://savrn.com/ai-index/companies/lambda)[Nebius Group](https://savrn.com/ai-index/companies/nebius-group)[Nscale](https://savrn.com/ai-index/companies/nscale)[Poolside](https://savrn.com/ai-index/companies/poolside)[SambaNova Systems](https://savrn.com/ai-index/companies/sambanova)[TeraWulf](https://savrn.com/ai-index/companies/terawulf)[Together AI](https://savrn.com/ai-index/companies/together-ai)[Voltage Park](https://savrn.com/ai-index/companies/voltage-park)[Vultr](https://savrn.com/ai-index/companies/vultr)

Capital figures come from the [Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so each figure appears as its source states it and none are added into a single deployment number. Informational, not investment advice.

Sources

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Capital Atlas

Who is funding AI data centers: capital providers, named sites, financing transactions, and the blocked-and-delayed record, state by state and company by company.

[Open the atlas →](https://savrn.com/data-center-capital-atlas)

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

Open the watchlist →

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
