Eleven primary-sourced indicators, one composite index, read against what a GPU-hour actually bills as tokens. Supply tightness, equipment and power lead time, and demand and price confirmation, each scored 0 to 100 against a Balanced-to-Acute scale.

84.9scarcity index, 0 to 100
Scarcecurrent regime
11 of 11indicators observed this reading
2026-10-11as of
Three price bases, one GPU-hour

What the same scarcity reads against

The token index is the market's blended asking price. SAVRN's own basis and the frontier ceiling are read live from the SAVRN Index, not duplicated here. The scarcity-implied price is where the index says the token index is headed.

Token index
$1.08
Silicon Data LLM Token Expenditure Index
Silicon Data · 2026-09-09
Scarcity-implied
$2.55
Token index blended toward retail median by the scarcity score
Computed · 2026-10-11
Retail median
$2.81
On-prem / closed-private-network list prices, per GPU-hour basis
rent_inputs.json (unmapped) · 2026-10-11
SAVRN's own basis
$4.18
SemiAnalysis owner's-cost basis for Vera Rubin NVL72, read live from the SAVRN Index
ai-index /ai-index/api/scarcity-inputs · 2026-10-11
Frontier ceiling
$50.00
Highest tracked frontier list price, read live from the SAVRN Index
ai-index /ai-index/api/scarcity-inputs · 2026-10-11
Eleven indicators

What is actually scarce, group by group

Each indicator is scored 0 to 100 against a calibrated Balanced-to-Acute anchor, weighted, and rolled into the composite index above. Every value carries its own source.

Supply tightness

Group score 87.9
IndicatorValueAs ofScoreWeightSource
Primary-market vacancy 1.4% 2026-06-30 94.3 20% Source ↗
Under-construction capacity preleased 80.4% 2026-06-30 80.8 15% Source ↗
Months of available future capacity 6months 2026-06-30 85.7 10% Source ↗

Equipment & power lead time

Group score 82.7
IndicatorValueAs ofScoreWeightSource
Gas turbine order-to-delivery lead time 5years 2026-03-23 75.0 10% Source ↗
Gas turbine plant price 3000$/kW 2026-03-23 75.0 5% Source ↗
Power transformer unit cost vs 2019 77% 2025-08-31 77.0 5% Source ↗
GE Vernova gas backlog + slot reservations 116GW 2026-06-30 90.5 8% Source ↗
ERCOT large loads seeking interconnection 474GW 2026-06-30 94.2 7% Source ↗

Demand & price confirmation

Group score 82.3
IndicatorValueAs ofScoreWeightSource
Combined 2026 hyperscaler capex guidance 732.5$bn 2026-07-30 86.5 8% Source ↗
H100 rental rate index 2.64$/GPU-hr 2026-09-10 76.0 6% Source ↗
Colocation rent growth, 3–10 MW 8.3% 2026-06-30 83.0 6% Source ↗
Rent coverage

What share of a megawatt's annual output pays the rent

Two disclosed wholesale contracts, three throughput points, five price bases. Each cell is contract rent ÷ (price × tokens a megawatt produces in a year). Above 100% means the contract's own rent cannot be paid back by that basis at that throughput.

ContractThroughput pointToken indexScarcity-impliedSAVRNRetail medianFrontier
Oracle – OpenAI GB300 NVL72 @ 100 tok/s/user 76%32%20%29%2%
Oracle – OpenAI Vera Rubin NVL72 @ 100 tok/s/user 35%15%9%13%1%
Oracle – OpenAI GB300 NVL72, MLPerf throughput 12%5%3%5%0%
Monarch – Anthropic GB300 NVL72 @ 100 tok/s/user 92%39%24%35%2%
Monarch – Anthropic Vera Rubin NVL72 @ 100 tok/s/user 43%18%11%16%1%
Monarch – Anthropic GB300 NVL72, MLPerf throughput 15%6%4%6%0%

How the index is built. Each indicator scores linearly between a Balanced anchor and an Acute anchor, clipped 0 to 100. The composite index is the weighted average of every indicator actually observed this reading; a missing series drops out rather than counting as zero. Regime bands: Balanced under 40, Tight from 40, Scarce from 70, Acute from 85.

Where SAVRN's own numbers come from. The SAVRN and Frontier price bases are read live from the SAVRN Index's own tracked data, the same figures used throughout What AI Costs, not duplicated or separately estimated here.

Refreshed on a weekly schedule. Every value traces to a dated source with a verbatim excerpt; nothing is entered without one.

The SAVRN reference set

Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.
Check an address →