{"groups":{"policy:site-control":{"id":"policy:site-control","label":"Evidence of site control","tracker":"policy"},"policy:security":{"id":"policy:security","label":"Financial security","tracker":"policy"},"policy:curtailment":{"id":"policy:curtailment","label":"Emergency response","tracker":"policy"},"policy:emissions":{"id":"policy:emissions","label":"Emissions safeguards","tracker":"policy"},"policy:cost-allocation":{"id":"policy:cost-allocation","label":"Attributable-cost allocation","tracker":"policy"},"policy:departure":{"id":"policy:departure","label":"Departure / reduced-load protection","tracker":"policy"},"policy:supply-review":{"id":"policy:supply-review","label":"Water-supply review","tracker":"policy"},"policy:clean-energy":{"id":"policy:clean-energy","label":"Clean-energy service terms","tracker":"policy"},"policy:water-reporting":{"id":"policy:water-reporting","label":"Water-use reporting","tracker":"policy"},"policy:local-authority":{"id":"policy:local-authority","label":"Preserved local authority","tracker":"policy"},"policy:minimum-payment":{"id":"policy:minimum-payment","label":"Minimum payment commitments","tracker":"policy"},"policy:regulator-reporting":{"id":"policy:regulator-reporting","label":"Regulatory reporting","tracker":"policy"},"policy:environmental-review":{"id":"policy:environmental-review","label":"Environmental assessment","tracker":"policy"},"policy:permit-hold":{"id":"policy:permit-hold","label":"Interim permit restraint","tracker":"policy"},"restriction:local:enacted":{"id":"restriction:local:enacted","label":"Local restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:local:failed":{"id":"restriction:local:failed","label":"Local restriction records: failed (as recorded)","tracker":"moratorium"},"restriction:local:proposed":{"id":"restriction:local:proposed","label":"Local restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:local:pause":{"id":"restriction:local:pause","label":"Local restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:enacted":{"id":"restriction:states:enacted","label":"State restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:states:pause":{"id":"restriction:states:pause","label":"State restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:proposed":{"id":"restriction:states:proposed","label":"State restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:states:failed":{"id":"restriction:states:failed","label":"State restriction records: failed (as recorded)","tracker":"moratorium"},"water:reclaimed:enacted":{"id":"water:reclaimed:enacted","label":"Water reclaimed measures: enacted (as recorded)","tracker":"water"},"water:disclosure:enacted":{"id":"water:disclosure:enacted","label":"Water disclosure measures: enacted (as recorded)","tracker":"water"},"water:siting:vetoed":{"id":"water:siting:vetoed","label":"Water siting measures: vetoed (as recorded)","tracker":"water"},"water:reclaimed:failed":{"id":"water:reclaimed:failed","label":"Water reclaimed measures: failed (as recorded)","tracker":"water"},"water:incentive:proposed":{"id":"water:incentive:proposed","label":"Water incentive measures: proposed (as recorded)","tracker":"water"},"water:disclosure:proposed":{"id":"water:disclosure:proposed","label":"Water disclosure measures: proposed (as recorded)","tracker":"water"},"water:disclosure:vetoed":{"id":"water:disclosure:vetoed","label":"Water disclosure measures: vetoed (as recorded)","tracker":"water"},"water:closed-loop:proposed":{"id":"water:closed-loop:proposed","label":"Water closed-loop measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:failed":{"id":"water:closed-loop:failed","label":"Water closed-loop measures: failed (as recorded)","tracker":"water"},"water:disclosure:failed":{"id":"water:disclosure:failed","label":"Water disclosure measures: failed (as recorded)","tracker":"water"},"water:rate:failed":{"id":"water:rate:failed","label":"Water rate measures: failed (as recorded)","tracker":"water"},"water:siting:enacted":{"id":"water:siting:enacted","label":"Water siting measures: enacted (as recorded)","tracker":"water"},"water:study:proposed":{"id":"water:study:proposed","label":"Water study measures: proposed (as recorded)","tracker":"water"},"water:siting:proposed":{"id":"water:siting:proposed","label":"Water siting measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:enacted":{"id":"water:closed-loop:enacted","label":"Water closed-loop measures: enacted (as recorded)","tracker":"water"},"water:moratorium:enacted":{"id":"water:moratorium:enacted","label":"Water moratorium measures: enacted (as recorded)","tracker":"water"},"water:reclaimed:proposed":{"id":"water:reclaimed:proposed","label":"Water reclaimed measures: proposed (as recorded)","tracker":"water"},"water:moratorium:vetoed":{"id":"water:moratorium:vetoed","label":"Water moratorium measures: vetoed (as recorded)","tracker":"water"},"water:study:enacted":{"id":"water:study:enacted","label":"Water study measures: enacted (as recorded)","tracker":"water"},"water:moratorium:failed":{"id":"water:moratorium:failed","label":"Water moratorium measures: failed (as recorded)","tracker":"water"},"water:moratorium:proposed":{"id":"water:moratorium:proposed","label":"Water moratorium measures: proposed (as recorded)","tracker":"water"},"water:shield:enacted":{"id":"water:shield:enacted","label":"Water shield measures: enacted (as recorded)","tracker":"water"},"water:shield:failed":{"id":"water:shield:failed","label":"Water shield measures: failed (as recorded)","tracker":"water"},"water:siting:failed":{"id":"water:siting:failed","label":"Water siting measures: failed (as recorded)","tracker":"water"},"water:study:failed":{"id":"water:study:failed","label":"Water study measures: failed (as recorded)","tracker":"water"},"water:rate:enacted":{"id":"water:rate:enacted","label":"Water rate measures: enacted (as recorded)","tracker":"water"},"water:incentive:enacted":{"id":"water:incentive:enacted","label":"Water incentive measures: enacted (as recorded)","tracker":"water"},"delay:state_moratorium:withdrawn":{"id":"delay:state_moratorium:withdrawn","label":"Delay cause: state moratorium / withdrawn","tracker":"delay"},"delay:transformer_supply:delayed":{"id":"delay:transformer_supply:delayed","label":"Delay cause: transformer supply / delayed","tracker":"delay"},"delay:gas_pipeline_delay:delayed":{"id":"delay:gas_pipeline_delay:delayed","label":"Delay cause: gas pipeline delay / delayed","tracker":"delay"},"delay:corporate_realignment:withdrawn":{"id":"delay:corporate_realignment:withdrawn","label":"Delay cause: corporate realignment / withdrawn","tracker":"delay"},"delay:financing:withdrawn":{"id":"delay:financing:withdrawn","label":"Delay cause: financing / withdrawn","tracker":"delay"},"delay:environmental_review:litigation_active":{"id":"delay:environmental_review:litigation_active","label":"Delay cause: environmental review / litigation_active","tracker":"delay"},"delay:litigation:litigation_active":{"id":"delay:litigation:litigation_active","label":"Delay cause: litigation / litigation_active","tracker":"delay"},"delay:community_opposition:litigation_active":{"id":"delay:community_opposition:litigation_active","label":"Delay cause: community opposition / litigation_active","tracker":"delay"},"delay:zoning_denial:cancelled":{"id":"delay:zoning_denial:cancelled","label":"Delay cause: zoning denial / cancelled","tracker":"delay"},"delay:community_opposition:cancelled":{"id":"delay:community_opposition:cancelled","label":"Delay cause: community opposition / cancelled","tracker":"delay"},"delay:water_dispute:cancelled":{"id":"delay:water_dispute:cancelled","label":"Delay cause: water dispute / cancelled","tracker":"delay"},"delay:zoning_denial:litigation_active":{"id":"delay:zoning_denial:litigation_active","label":"Delay cause: zoning denial / litigation_active","tracker":"delay"},"delay:local_moratorium:litigation_active":{"id":"delay:local_moratorium:litigation_active","label":"Delay cause: local moratorium / litigation_active","tracker":"delay"},"delay:permit_denial:litigation_active":{"id":"delay:permit_denial:litigation_active","label":"Delay cause: permit denial / litigation_active","tracker":"delay"},"delay:community_opposition:withdrawn":{"id":"delay:community_opposition:withdrawn","label":"Delay cause: community opposition / withdrawn","tracker":"delay"},"delay:zoning_denial:withdrawn":{"id":"delay:zoning_denial:withdrawn","label":"Delay cause: zoning denial / withdrawn","tracker":"delay"},"delay:environmental_review:delayed":{"id":"delay:environmental_review:delayed","label":"Delay cause: environmental review / delayed","tracker":"delay"},"delay:community_opposition:delayed":{"id":"delay:community_opposition:delayed","label":"Delay cause: community opposition / delayed","tracker":"delay"},"delay:water_dispute:under_appeal":{"id":"delay:water_dispute:under_appeal","label":"Delay cause: water dispute / under_appeal","tracker":"delay"},"delay:community_opposition:under_appeal":{"id":"delay:community_opposition:under_appeal","label":"Delay cause: community opposition / under_appeal","tracker":"delay"},"delay:water_dispute:delayed":{"id":"delay:water_dispute:delayed","label":"Delay cause: water dispute / delayed","tracker":"delay"},"delay:local_moratorium:delayed":{"id":"delay:local_moratorium:delayed","label":"Delay cause: local moratorium / delayed","tracker":"delay"},"delay:litigation:cancelled":{"id":"delay:litigation:cancelled","label":"Delay cause: litigation / cancelled","tracker":"delay"},"delay:zoning_denial:delayed":{"id":"delay:zoning_denial:delayed","label":"Delay cause: zoning denial / delayed","tracker":"delay"},"delay:zoning_denial:under_appeal":{"id":"delay:zoning_denial:under_appeal","label":"Delay cause: zoning denial / under_appeal","tracker":"delay"},"delay:water_dispute:litigation_active":{"id":"delay:water_dispute:litigation_active","label":"Delay cause: water dispute / litigation_active","tracker":"delay"},"delay:environmental_review:cancelled":{"id":"delay:environmental_review:cancelled","label":"Delay cause: environmental review / cancelled","tracker":"delay"},"delay:litigation:under_appeal":{"id":"delay:litigation:under_appeal","label":"Delay cause: litigation / under_appeal","tracker":"delay"},"delay:community_opposition:approved_but_citywide_moratorium_pending":{"id":"delay:community_opposition:approved_but_citywide_moratorium_pending","label":"Delay cause: community opposition / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":{"id":"delay:proposed_moratorium:approved_but_citywide_moratorium_pending","label":"Delay cause: proposed moratorium / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:rezoning_denial_or_withdrawal:withdrawn":{"id":"delay:rezoning_denial_or_withdrawal:withdrawn","label":"Delay cause: rezoning denial or withdrawal / withdrawn","tracker":"delay"},"delay:rezoning_denial:rezoning_denied":{"id":"delay:rezoning_denial:rezoning_denied","label":"Delay cause: rezoning denial / rezoning_denied","tracker":"delay"},"delay:community_opposition:rezoning_denied":{"id":"delay:community_opposition:rezoning_denied","label":"Delay cause: community opposition / rezoning_denied","tracker":"delay"},"delay:litigation:active_litigation":{"id":"delay:litigation:active_litigation","label":"Delay cause: litigation / active_litigation","tracker":"delay"},"delay:permit_challenge:active_litigation":{"id":"delay:permit_challenge:active_litigation","label":"Delay cause: permit challenge / active_litigation","tracker":"delay"},"delay:community_opposition:approved_amid_opposition":{"id":"delay:community_opposition:approved_amid_opposition","label":"Delay cause: community opposition / approved_amid_opposition","tracker":"delay"},"delay:missed_milestones:development_agreement_expired":{"id":"delay:missed_milestones:development_agreement_expired","label":"Delay cause: missed milestones / development_agreement_expired","tracker":"delay"},"delay:financing_delay:development_agreement_expired":{"id":"delay:financing_delay:development_agreement_expired","label":"Delay cause: financing delay / development_agreement_expired","tracker":"delay"},"delay:unresolved_commitments:rezoning_denied":{"id":"delay:unresolved_commitments:rezoning_denied","label":"Delay cause: unresolved commitments / rezoning_denied","tracker":"delay"},"delay:county_moratorium:moratorium_in_force":{"id":"delay:county_moratorium:moratorium_in_force","label":"Delay cause: county moratorium / moratorium_in_force","tracker":"delay"},"delay:county_moratorium:moratorium_extended":{"id":"delay:county_moratorium:moratorium_extended","label":"Delay cause: county moratorium / moratorium_extended","tracker":"delay"},"delay:regulatory_review:regulatory_approval_pending":{"id":"delay:regulatory_review:regulatory_approval_pending","label":"Delay cause: regulatory review / regulatory_approval_pending","tracker":"delay"},"delay:power_allocation_dispute:regulatory_approval_pending":{"id":"delay:power_allocation_dispute:regulatory_approval_pending","label":"Delay cause: power allocation dispute / regulatory_approval_pending","tracker":"delay"},"delay:corporate_reassessment:construction_paused":{"id":"delay:corporate_reassessment:construction_paused","label":"Delay cause: corporate reassessment / construction_paused","tracker":"delay"},"delay:openai_relationship_change:construction_paused":{"id":"delay:openai_relationship_change:construction_paused","label":"Delay cause: openai relationship change / construction_paused","tracker":"delay"},"delay:tariff_costs:construction_paused":{"id":"delay:tariff_costs:construction_paused","label":"Delay cause: tariff costs / construction_paused","tracker":"delay"},"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: local moratorium / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: ballot initiative threat / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:signature_gathering":{"id":"delay:ballot_initiative_threat:signature_gathering","label":"Delay cause: ballot initiative threat / signature_gathering","tracker":"delay"},"delay:statewide_moratorium_push:signature_gathering":{"id":"delay:statewide_moratorium_push:signature_gathering","label":"Delay cause: statewide moratorium push / signature_gathering","tracker":"delay"},"delay:environmental_review_challenge:active_litigation":{"id":"delay:environmental_review_challenge:active_litigation","label":"Delay cause: environmental review challenge / active_litigation","tracker":"delay"},"delay:regulatory_collateral_dispute:active_litigation":{"id":"delay:regulatory_collateral_dispute:active_litigation","label":"Delay cause: regulatory collateral dispute / active_litigation","tracker":"delay"},"delay:corporate_reassessment:construction_partially_paused":{"id":"delay:corporate_reassessment:construction_partially_paused","label":"Delay cause: corporate reassessment / construction_partially_paused","tracker":"delay"},"delay:design_changes:construction_partially_paused":{"id":"delay:design_changes:construction_partially_paused","label":"Delay cause: design changes / construction_partially_paused","tracker":"delay"},"delay:community_opposition:under_council_consideration":{"id":"delay:community_opposition:under_council_consideration","label":"Delay cause: community opposition / under_council_consideration","tracker":"delay"},"delay:withdrawal:cancelled":{"id":"delay:withdrawal:cancelled","label":"Delay cause: withdrawal / cancelled","tracker":"delay"},"delay:village_infeasibility_finding:cancelled":{"id":"delay:village_infeasibility_finding:cancelled","label":"Delay cause: village infeasibility finding / cancelled","tracker":"delay"},"delay:litigation:construction_halted_by_court":{"id":"delay:litigation:construction_halted_by_court","label":"Delay cause: litigation / construction_halted_by_court","tracker":"delay"},"delay:environmental_review_inadequate:construction_halted_by_court":{"id":"delay:environmental_review_inadequate:construction_halted_by_court","label":"Delay cause: environmental review inadequate / construction_halted_by_court","tracker":"delay"},"delay:city_moratorium:active_litigation":{"id":"delay:city_moratorium:active_litigation","label":"Delay cause: city moratorium / active_litigation","tracker":"delay"},"delay:environmental_review_pending:final_decision_paused":{"id":"delay:environmental_review_pending:final_decision_paused","label":"Delay cause: environmental review pending / final_decision_paused","tracker":"delay"},"delay:city_moratorium:moratorium_in_force":{"id":"delay:city_moratorium:moratorium_in_force","label":"Delay cause: city moratorium / moratorium_in_force","tracker":"delay"},"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":{"id":"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial","label":"Delay cause: planning commission denial recommendation / planning_commission_recommended_denial","tracker":"delay"},"delay:community_opposition:opposed_planned":{"id":"delay:community_opposition:opposed_planned","label":"Delay cause: community opposition / opposed_planned","tracker":"delay"},"delay:city_council_resolution_against:opposed_planned":{"id":"delay:city_council_resolution_against:opposed_planned","label":"Delay cause: city council resolution against / opposed_planned","tracker":"delay"},"delay:rezoning_denial:rezoning_denied_then_litigation_settled":{"id":"delay:rezoning_denial:rezoning_denied_then_litigation_settled","label":"Delay cause: rezoning denial / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:litigation:rezoning_denied_then_litigation_settled":{"id":"delay:litigation:rezoning_denied_then_litigation_settled","label":"Delay cause: litigation / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:city_moratorium:moratorium_delay":{"id":"delay:city_moratorium:moratorium_delay","label":"Delay cause: city moratorium / moratorium_delay","tracker":"delay"},"delay:community_opposition:moratorium_delay":{"id":"delay:community_opposition:moratorium_delay","label":"Delay cause: community opposition / moratorium_delay","tracker":"delay"},"delay:community_opposition:rezoning_paused":{"id":"delay:community_opposition:rezoning_paused","label":"Delay cause: community opposition / rezoning_paused","tracker":"delay"},"delay:planning_commission_postponement:rezoning_paused":{"id":"delay:planning_commission_postponement:rezoning_paused","label":"Delay cause: planning commission postponement / rezoning_paused","tracker":"delay"},"delay:community_opposition:opposed_proposed":{"id":"delay:community_opposition:opposed_proposed","label":"Delay cause: community opposition / opposed_proposed","tracker":"delay"},"delay:transparency_concerns:opposed_proposed":{"id":"delay:transparency_concerns:opposed_proposed","label":"Delay cause: transparency concerns / opposed_proposed","tracker":"delay"},"delay:litigation:abandoned":{"id":"delay:litigation:abandoned","label":"Delay cause: litigation / abandoned","tracker":"delay"},"delay:community_opposition:abandoned":{"id":"delay:community_opposition:abandoned","label":"Delay cause: community opposition / abandoned","tracker":"delay"},"delay:china_ties_backlash:abandoned":{"id":"delay:china_ties_backlash:abandoned","label":"Delay cause: china ties backlash / abandoned","tracker":"delay"},"delay:wetlands_permit_suspended:active_litigation":{"id":"delay:wetlands_permit_suspended:active_litigation","label":"Delay cause: wetlands permit suspended / active_litigation","tracker":"delay"},"delay:community_opposition:opposed_pending_council_vote":{"id":"delay:community_opposition:opposed_pending_council_vote","label":"Delay cause: community opposition / opposed_pending_council_vote","tracker":"delay"},"delay:community_opposition:opposed_effectively_stalled":{"id":"delay:community_opposition:opposed_effectively_stalled","label":"Delay cause: community opposition / opposed_effectively_stalled","tracker":"delay"},"delay:petition_campaign:opposed_effectively_stalled":{"id":"delay:petition_campaign:opposed_effectively_stalled","label":"Delay cause: petition campaign / opposed_effectively_stalled","tracker":"delay"},"delay:public_notice_violation_alleged:active_litigation":{"id":"delay:public_notice_violation_alleged:active_litigation","label":"Delay cause: public notice violation alleged / active_litigation","tracker":"delay"},"delay:rezoning_denial:withdrawn":{"id":"delay:rezoning_denial:withdrawn","label":"Delay cause: rezoning denial / withdrawn","tracker":"delay"},"delay:no_secured_tenant:withdrawn":{"id":"delay:no_secured_tenant:withdrawn","label":"Delay cause: no secured tenant / withdrawn","tracker":"delay"},"delay:council_opposition:withdrawn":{"id":"delay:council_opposition:withdrawn","label":"Delay cause: council opposition / withdrawn","tracker":"delay"},"delay:eminent_domain_threat:active_litigation":{"id":"delay:eminent_domain_threat:active_litigation","label":"Delay cause: eminent domain threat / active_litigation","tracker":"delay"},"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":{"id":"delay:rezoning_denial:rezoning_rejected_moratorium_recommended","label":"Delay cause: rezoning denial / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":{"id":"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended","label":"Delay cause: county moratorium recommended / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:environmental_review_order:active_litigation":{"id":"delay:environmental_review_order:active_litigation","label":"Delay cause: environmental review order / active_litigation","tracker":"delay"},"delay:unpermitted_power_plant:active_litigation":{"id":"delay:unpermitted_power_plant:active_litigation","label":"Delay cause: unpermitted power plant / active_litigation","tracker":"delay"},"delay:community_opposition:under_construction_amid_scrutiny":{"id":"delay:community_opposition:under_construction_amid_scrutiny","label":"Delay cause: community opposition / under_construction_amid_scrutiny","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_scrutiny":{"id":"delay:transparency_concerns:under_construction_amid_scrutiny","label":"Delay cause: transparency concerns / under_construction_amid_scrutiny","tracker":"delay"},"delay:permit_denial:permit_denied":{"id":"delay:permit_denial:permit_denied","label":"Delay cause: permit denial / permit_denied","tracker":"delay"},"delay:community_opposition:permit_denied":{"id":"delay:community_opposition:permit_denied","label":"Delay cause: community opposition / permit_denied","tracker":"delay"},"delay:county_moratorium:permit_denied":{"id":"delay:county_moratorium:permit_denied","label":"Delay cause: county moratorium / permit_denied","tracker":"delay"},"delay:county_moratorium:approved_active_litigation":{"id":"delay:county_moratorium:approved_active_litigation","label":"Delay cause: county moratorium / approved_active_litigation","tracker":"delay"},"delay:litigation:approved_active_litigation":{"id":"delay:litigation:approved_active_litigation","label":"Delay cause: litigation / approved_active_litigation","tracker":"delay"},"delay:community_opposition:approved_active_litigation":{"id":"delay:community_opposition:approved_active_litigation","label":"Delay cause: community opposition / approved_active_litigation","tracker":"delay"},"delay:county_moratorium:delayed_amid_moratorium":{"id":"delay:county_moratorium:delayed_amid_moratorium","label":"Delay cause: county moratorium / delayed_amid_moratorium","tracker":"delay"},"delay:community_opposition:delayed_amid_moratorium":{"id":"delay:community_opposition:delayed_amid_moratorium","label":"Delay cause: community opposition / delayed_amid_moratorium","tracker":"delay"},"delay:public_outcry:tax_incentive_withdrawn":{"id":"delay:public_outcry:tax_incentive_withdrawn","label":"Delay cause: public outcry / tax_incentive_withdrawn","tracker":"delay"},"delay:tax_break_withdrawal:tax_incentive_withdrawn":{"id":"delay:tax_break_withdrawal:tax_incentive_withdrawn","label":"Delay cause: tax break withdrawal / tax_incentive_withdrawn","tracker":"delay"},"delay:permit_denial:denied_without_prejudice":{"id":"delay:permit_denial:denied_without_prejudice","label":"Delay cause: permit denial / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:denied_without_prejudice":{"id":"delay:community_opposition:denied_without_prejudice","label":"Delay cause: community opposition / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:under_construction_amid_opposition":{"id":"delay:community_opposition:under_construction_amid_opposition","label":"Delay cause: community opposition / under_construction_amid_opposition","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_opposition":{"id":"delay:transparency_concerns:under_construction_amid_opposition","label":"Delay cause: transparency concerns / under_construction_amid_opposition","tracker":"delay"},"delay:community_opposition:rumored_no_application_filed":{"id":"delay:community_opposition:rumored_no_application_filed","label":"Delay cause: community opposition / rumored_no_application_filed","tracker":"delay"},"delay:meeting_postponed:rumored_no_application_filed":{"id":"delay:meeting_postponed:rumored_no_application_filed","label":"Delay cause: meeting postponed / rumored_no_application_filed","tracker":"delay"},"delay:community_opposition:moratorium_in_force":{"id":"delay:community_opposition:moratorium_in_force","label":"Delay cause: community opposition / moratorium_in_force","tracker":"delay"},"delay:community_opposition:under_review_no_zoning_process":{"id":"delay:community_opposition:under_review_no_zoning_process","label":"Delay cause: community opposition / under_review_no_zoning_process","tracker":"delay"},"delay:no_local_zoning_framework:under_review_no_zoning_process":{"id":"delay:no_local_zoning_framework:under_review_no_zoning_process","label":"Delay cause: no local zoning framework / under_review_no_zoning_process","tracker":"delay"},"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":{"id":"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute","label":"Delay cause: regulatory transparency dispute / regulatory_disclosure_dispute","tracker":"delay"},"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":{"id":"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute","label":"Delay cause: ratepayer cost concerns / regulatory_disclosure_dispute","tracker":"delay"},"delay:noise_nuisance:active_litigation":{"id":"delay:noise_nuisance:active_litigation","label":"Delay cause: noise nuisance / active_litigation","tracker":"delay"},"delay:historic_preservation_conflict:permit_denied":{"id":"delay:historic_preservation_conflict:permit_denied","label":"Delay cause: historic preservation conflict / permit_denied","tracker":"delay"},"delay:community_opposition:under_construction_amid_water_concerns":{"id":"delay:community_opposition:under_construction_amid_water_concerns","label":"Delay cause: community opposition / under_construction_amid_water_concerns","tracker":"delay"},"delay:water_capacity_constraints:under_construction_amid_water_concerns":{"id":"delay:water_capacity_constraints:under_construction_amid_water_concerns","label":"Delay cause: water capacity constraints / under_construction_amid_water_concerns","tracker":"delay"},"delay:city_moratorium_partial_exemption:phase_vote_delayed":{"id":"delay:city_moratorium_partial_exemption:phase_vote_delayed","label":"Delay cause: city moratorium partial exemption / phase_vote_delayed","tracker":"delay"},"delay:planning_commission_delay:phase_vote_delayed":{"id":"delay:planning_commission_delay:phase_vote_delayed","label":"Delay cause: planning commission delay / phase_vote_delayed","tracker":"delay"},"delay:community_opposition:approved_expanded_amid_opposition":{"id":"delay:community_opposition:approved_expanded_amid_opposition","label":"Delay cause: community opposition / approved_expanded_amid_opposition","tracker":"delay"},"delay:noise_regulation_review:approved_expanded_amid_opposition":{"id":"delay:noise_regulation_review:approved_expanded_amid_opposition","label":"Delay cause: noise regulation review / approved_expanded_amid_opposition","tracker":"delay"},"delay:multi_year_construction_delay:delayed_extension_requested":{"id":"delay:multi_year_construction_delay:delayed_extension_requested","label":"Delay cause: multi year construction delay / delayed_extension_requested","tracker":"delay"},"delay:design_changes:delayed_extension_requested":{"id":"delay:design_changes:delayed_extension_requested","label":"Delay cause: design changes / delayed_extension_requested","tracker":"delay"},"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":{"id":"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums","label":"Delay cause: county moratorium neighboring / early_stage_amid_county_moratoriums","tracker":"delay"},"delay:regulatory_review:permitting_challenged":{"id":"delay:regulatory_review:permitting_challenged","label":"Delay cause: regulatory review / permitting_challenged","tracker":"delay"},"delay:environmental_petition:permitting_challenged":{"id":"delay:environmental_petition:permitting_challenged","label":"Delay cause: environmental petition / permitting_challenged","tracker":"delay"},"delay:utility_interconnection_timing:abandoned":{"id":"delay:utility_interconnection_timing:abandoned","label":"Delay cause: utility interconnection timing / abandoned","tracker":"delay"},"delay:withdrawal:abandoned":{"id":"delay:withdrawal:abandoned","label":"Delay cause: withdrawal / abandoned","tracker":"delay"},"delay:zoning_approval_challenge:active_litigation":{"id":"delay:zoning_approval_challenge:active_litigation","label":"Delay cause: zoning approval challenge / active_litigation","tracker":"delay"},"delay:litigation:zoning_request_paused_active_litigation":{"id":"delay:litigation:zoning_request_paused_active_litigation","label":"Delay cause: litigation / zoning_request_paused_active_litigation","tracker":"delay"},"delay:council_agenda_removal:zoning_request_paused_active_litigation":{"id":"delay:council_agenda_removal:zoning_request_paused_active_litigation","label":"Delay cause: council agenda removal / zoning_request_paused_active_litigation","tracker":"delay"},"delay:environmental_concerns:zoning_request_paused_active_litigation":{"id":"delay:environmental_concerns:zoning_request_paused_active_litigation","label":"Delay cause: environmental concerns / zoning_request_paused_active_litigation","tracker":"delay"},"delay:litigation:active_litigation_temporary_block":{"id":"delay:litigation:active_litigation_temporary_block","label":"Delay cause: litigation / active_litigation_temporary_block","tracker":"delay"},"delay:state_law_ownership_ban:active_litigation_temporary_block":{"id":"delay:state_law_ownership_ban:active_litigation_temporary_block","label":"Delay cause: state law ownership ban / active_litigation_temporary_block","tracker":"delay"},"delay:quorum_court_rejection:moratorium_exemption_rejected":{"id":"delay:quorum_court_rejection:moratorium_exemption_rejected","label":"Delay cause: quorum court rejection / moratorium_exemption_rejected","tracker":"delay"},"delay:county_moratorium_dispute:moratorium_exemption_rejected":{"id":"delay:county_moratorium_dispute:moratorium_exemption_rejected","label":"Delay cause: county moratorium dispute / moratorium_exemption_rejected","tracker":"delay"},"delay:litigation:active_litigation_records_dispute":{"id":"delay:litigation:active_litigation_records_dispute","label":"Delay cause: litigation / active_litigation_records_dispute","tracker":"delay"},"delay:public_records_dispute:active_litigation_records_dispute":{"id":"delay:public_records_dispute:active_litigation_records_dispute","label":"Delay cause: public records dispute / active_litigation_records_dispute","tracker":"delay"},"delay:litigation:delayed":{"id":"delay:litigation:delayed","label":"Delay cause: litigation / delayed","tracker":"delay"},"delay:permit_denial:delayed":{"id":"delay:permit_denial:delayed","label":"Delay cause: permit denial / delayed","tracker":"delay"},"delay:local_moratorium:cancelled":{"id":"delay:local_moratorium:cancelled","label":"Delay cause: local moratorium / cancelled","tracker":"delay"},"delay:tax_incentive_change:under_appeal":{"id":"delay:tax_incentive_change:under_appeal","label":"Delay cause: tax incentive change / under_appeal","tracker":"delay"},"delay:litigation:halted":{"id":"delay:litigation:halted","label":"Delay cause: litigation / halted","tracker":"delay"},"delay:environmental_review:halted":{"id":"delay:environmental_review:halted","label":"Delay cause: environmental review / halted","tracker":"delay"},"delay:local_moratorium:halted":{"id":"delay:local_moratorium:halted","label":"Delay cause: local moratorium / halted","tracker":"delay"},"delay:water_dispute:halted":{"id":"delay:water_dispute:halted","label":"Delay cause: water dispute / halted","tracker":"delay"},"delay:tax_incentive_change:halted":{"id":"delay:tax_incentive_change:halted","label":"Delay cause: tax incentive change / halted","tracker":"delay"},"delay:community_opposition:halted":{"id":"delay:community_opposition:halted","label":"Delay cause: community opposition / halted","tracker":"delay"},"delay:tax_incentive_change:litigation_active":{"id":"delay:tax_incentive_change:litigation_active","label":"Delay cause: tax incentive change / litigation_active","tracker":"delay"},"delay:corporate_realignment:delayed":{"id":"delay:corporate_realignment:delayed","label":"Delay cause: corporate realignment / delayed","tracker":"delay"},"delay:tax_incentive_change:cancelled":{"id":"delay:tax_incentive_change:cancelled","label":"Delay cause: tax incentive change / cancelled","tracker":"delay"},"delay:financing:litigation_active":{"id":"delay:financing:litigation_active","label":"Delay cause: financing / litigation_active","tracker":"delay"},"delay:state_moratorium:halted":{"id":"delay:state_moratorium:halted","label":"Delay cause: state moratorium / halted","tracker":"delay"},"delay:state_moratorium:litigation_active":{"id":"delay:state_moratorium:litigation_active","label":"Delay cause: state moratorium / litigation_active","tracker":"delay"},"delay:state_moratorium:cancelled":{"id":"delay:state_moratorium:cancelled","label":"Delay cause: state moratorium / cancelled","tracker":"delay"},"delay:water_dispute:withdrawn":{"id":"delay:water_dispute:withdrawn","label":"Delay cause: water dispute / withdrawn","tracker":"delay"},"delay:interconnection_queue:halted":{"id":"delay:interconnection_queue:halted","label":"Delay cause: interconnection queue / halted","tracker":"delay"},"delay:interconnection:cancelled":{"id":"delay:interconnection:cancelled","label":"Delay cause: interconnection / cancelled","tracker":"delay"},"delay:financing:cancelled":{"id":"delay:financing:cancelled","label":"Delay cause: financing / cancelled","tracker":"delay"},"delay:interconnection:denied":{"id":"delay:interconnection:denied","label":"Delay cause: interconnection / denied","tracker":"delay"},"delay:water:cancelled":{"id":"delay:water:cancelled","label":"Delay cause: water / cancelled","tracker":"delay"},"delay:water:denied":{"id":"delay:water:denied","label":"Delay cause: water / denied","tracker":"delay"},"delay:zoning_denial:halted":{"id":"delay:zoning_denial:halted","label":"Delay cause: zoning denial / halted","tracker":"delay"},"delay:permit_denial:halted":{"id":"delay:permit_denial:halted","label":"Delay cause: permit denial / halted","tracker":"delay"},"delay:council_vote_delay:final_vote_delayed":{"id":"delay:council_vote_delay:final_vote_delayed","label":"Delay cause: council vote delay / final_vote_delayed","tracker":"delay"},"delay:community_opposition:final_vote_delayed":{"id":"delay:community_opposition:final_vote_delayed","label":"Delay cause: community opposition / final_vote_delayed","tracker":"delay"},"utility:tariff:pending":{"id":"utility:tariff:pending","label":"Utility action: tariff / pending","tracker":"delay"},"utility:statement:pending":{"id":"utility:statement:pending","label":"Utility action: statement / pending","tracker":"delay"},"utility:tariff:contested":{"id":"utility:tariff:contested","label":"Utility action: tariff / contested","tracker":"delay"},"utility:other:pending":{"id":"utility:other:pending","label":"Utility action: other / pending","tracker":"delay"},"utility:tariff:approved":{"id":"utility:tariff:approved","label":"Utility action: tariff / approved","tracker":"delay"},"utility:rate case:approved":{"id":"utility:rate case:approved","label":"Utility action: rate case / approved","tracker":"delay"},"utility:special contract:approved":{"id":"utility:special contract:approved","label":"Utility action: special contract / approved","tracker":"delay"},"utility:rate case:pending":{"id":"utility:rate case:pending","label":"Utility action: rate case / pending","tracker":"delay"},"utility:special contract:denied":{"id":"utility:special contract:denied","label":"Utility action: special contract / denied","tracker":"delay"},"utility:statement:contested":{"id":"utility:statement:contested","label":"Utility action: statement / contested","tracker":"delay"},"utility:IRP:contested":{"id":"utility:IRP:contested","label":"Utility action: IRP / contested","tracker":"delay"},"utility:complaint:contested":{"id":"utility:complaint:contested","label":"Utility action: complaint / contested","tracker":"delay"},"utility:statement:approved":{"id":"utility:statement:approved","label":"Utility action: statement / approved","tracker":"delay"},"utility:IRP:pending":{"id":"utility:IRP:pending","label":"Utility action: IRP / pending","tracker":"delay"},"utility:special contract:pending":{"id":"utility:special contract:pending","label":"Utility action: special contract / pending","tracker":"delay"},"utility:other:approved":{"id":"utility:other:approved","label":"Utility action: other / approved","tracker":"delay"},"utility:other:contested":{"id":"utility:other:contested","label":"Utility action: other / contested","tracker":"delay"},"utility:IRP:approved":{"id":"utility:IRP:approved","label":"Utility action: IRP / approved","tracker":"delay"},"utility:tariff:denied":{"id":"utility:tariff:denied","label":"Utility action: tariff / denied","tracker":"delay"},"utility:certificate:approved":{"id":"utility:certificate:approved","label":"Utility action: certificate / approved","tracker":"delay"},"utility:policy:approved":{"id":"utility:policy:approved","label":"Utility action: policy / approved","tracker":"delay"},"utility:policy:effective":{"id":"utility:policy:effective","label":"Utility action: policy / effective","tracker":"delay"},"utility:tariff:effective":{"id":"utility:tariff:effective","label":"Utility action: tariff / effective","tracker":"delay"},"utility:policy:rejected":{"id":"utility:policy:rejected","label":"Utility action: policy / rejected","tracker":"delay"},"utility:policy:pending":{"id":"utility:policy:pending","label":"Utility action: policy / pending","tracker":"delay"},"utility:rate_case:pending":{"id":"utility:rate_case:pending","label":"Utility action: rate_case / pending","tracker":"delay"},"utility:other:denied":{"id":"utility:other:denied","label":"Utility action: other / denied","tracker":"delay"},"utility:other:effective":{"id":"utility:other:effective","label":"Utility action: other / effective","tracker":"delay"}},"warnings":[],"credits":["6abc Philadelphia","AEP Ohio Transmission Company (filed with Ohio Power Siting Board)","AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)","Alabama Reflector","Alaska Beacon","American Transmission Company LLC (filed with PSC of Wisconsin)","Americus Times-Recorder","Arizona Mirror","Arkansas Advocate","Axios Pro Energy","Bisnow","Bisnow National","Bradenton Herald","CNBC Technology","Cardinal News VA","Central Florida Public Media","Chesterfield County public permit records","Chicago Construction News","City of Atlanta public permit records","City of Austin issued construction permits open data","City of Buckeye public permit records","City of Chandler public permit records","City of Charlotte public permit records","City of Chicago building permits open data","City of Fort Worth public permit records","City of Goodyear public permit records","City of Hillsboro public permit records","City of Mesa building permits open data","City of Mesa public permit records","City of Minneapolis construction permits (CCS) open data","City of Papillion public permit records","City of Phoenix public permit records","City of Red Oak public permit records","City of Reno public permit records","City of San Antonio public permit records","City of Statesboro, Georgia","City of Temple, Texas","Clearfield City Council (Utah Public Notice Website)","Colorado Newsline","Colorado Public Radio","Congress.gov (Library of Congress, public domain)","ConstructConnect News","Construction Dive","CourtListener DataCenter Dockets","CourtListener Opinions","Data Center Dynamics","Data Center Dynamics news","DataCenterTracker.org, CC BY 4.0","Dominion Energy Virginia","EIN News","East Bay Insiders Newsletter","Energy Central","FOX19 | Cincinnati","FOX5 Vegas","FOX6 News Milwaukee","Facilities Dive","Fairfax County public permit records","Florida Phoenix","Georgia Department of Community Affairs","Georgia EPD air permit records","Georgia Recorder","GovTech","Greensboro News and Record","Grist","Idaho Capital Sun","Illinois EPA air permit records","Indiana Capital Chronicle","Indiana Department of Environmental Management","Indiana IDEM air permit records","InkFreeNews.com","Iowa Capital Dispatch","Iowa DNR air permit records","KERA News","KEYC News Now","KGW","KRON4","Kansas City MO city issued permits open data","Kansas Reflector","Kentucky Lantern","Law360","Law360 Energy","LegiScan (legiscan.com) and the state legislature","Lehigh Valley Planning Commission","Local News Matters","Loudoun County public permit records","Loudoun Times-Mirror","Louisiana DEQ air permit records","Louisiana Illuminator","Maine Morning Star","Maricopa County Air Quality Department air permit records","Maricopa County public permit records","Maryland Matters","Mecklenburg County public permit records","Michigan Advance","Mid Bay News","Missouri Independent","Montana Free Press","NBC Bay Area","NBC4 Washington","NC Newsline","Native News Online","Nebraska Examiner","Nevada Current","Nevada NDEP air permit records","New Hampshire Bulletin","New Mexico Environment Department","North Carolina DEQ Division of Air Quality air permit records","North Dakota Department of Environmental Quality","North Dakota Monitor","Ohio Capital Journal","Ohio EPA air permit records","Oklahoma DEQ air permit records","Oklahoma Voice","OpenStates v3 (openstates.org), CC BY 4.0","Oregon Capital Chronicle","Orlando Sentinel","Pennsylvania Capital-Star","Pennsylvania Department of Environmental Protection","Pennsylvania Office of Consumer Advocate (filed with PA PUC)","Pioneer Press","Prince William County public permit records","Public Service Commission of Wisconsin","Public record (Legistar Web API, Granicus)","Rhode Island Current","Route Fifty","SEC EDGAR company submissions, public domain","SEC EDGAR full-text search, public domain","Searchlight New Mexico","Smithfield Township, Monroe County, PA","Source New Mexico","South Carolina Department of Environmental Services","South Dakota Searchlight","Springfield Daily Citizen","Stafford County public permit records","Statesman Journal","Strisker data center notes","Tennessee Lookout","Texas Commission on Environmental Quality","Texas TCEQ air permit records","The Baltimore Banner","The Current (GA)","The Detroit News","The Hill Energy","The North State Journal","The Pantagraph","The Real Deal","The Register","The Texas Tribune","The Verge","Times-Standard","Town of Culpeper public permit records","Tuscaloosa Thread","U.S. EPA ECHO","Union-Bulletin","Uprise RI","Utah Division of Air Quality","Utah Division of Air Quality air permit records","Utah News Dispatch","Utah Public Radio","Utility Dive","Virginia Business","Virginia DEQ air permit records","Virginia Electric and Power Company (filed with Virginia SCC)","Virginia Mercury","Visalia Times-Delta","WBUR","WCPO 9 Cincinnati","WGLT","WHEC.com","WJON","WKYT","WLOS","WLUK","WPBF","WQCS","WRAL (NC)","WUNC News","WVPE","Washington County public permit records","Washington Ecology air permit records","Washington State SEPA Register public permit records","Washington State Standard","Washoe County public permit records","Wausau Pilot & Review","West Virginia Watch","Winston-Salem Journal","Wisconsin Department of Natural Resources","Wisconsin Examiner","Yale Daily News","citybiz","contracosta.news","ictnews.org","indianapublicradio.org","inkfreenews.com","lex18.com","mountaintimesoregon.com","newmedia-wi.com","newscentermaine.com","thegazette.com","tuscaloosathread.com","wcpo.com","www.cities929.com"],"omitted":{"unverified_or_pending":1013,"no_explicit_state":136},"revision":"8bbc0d7f56a15216","trackers":{"policy":{"label":"Policy provisions","url":"#policy-governance"},"moratorium":{"label":"Restrictions & moratoriums","url":"/data-center-moratorium-tracker"},"delay":{"label":"Delays & utility actions","url":"/data-center-delay-tracker"},"water":{"label":"Water measures","url":"/data-center-water-tracker"},"atlas":{"label":"Projects & capital","url":"/data-center-capital-atlas"},"permits":{"label":"Permits & facilities","url":"/data-center-permits-tracker"},"grid":{"label":"Grid operator rules","url":"/data-center-grid-operator-watchlist"}},"selected":{"id":"DE","name":"Delaware","records":[{"id":"99d57ccc98d30195","state":"DE","tracker":"atlas","section":"at_risk","title":"Harrington conditional-use ordinance rejection","summary":"City council members voted unanimously on 17 August 2026 to reject an ordinance that would have added data centers as a conditional use in the city's manufacturing zone. Without the amendment, data centers cannot be built in Harrington, including a proposed 24 MW facility at the former Harrington Logistics building. Residents cited water, sewer and electrical infrastructure capacity and noise. Reporting notes the developer had offered the city $1 million.","scope":"Record-specific: City of Harrington, Kent County","status":"rejected","date":"Rejected 17 August 2026","sources":[{"url":"https://www.delawarepublic.org/science-health-tech/2026-08-18/harrington-shoots-down-ordinance-that-would-allow-data-centers-in-city-limits","label":"Delaware Public Media"},{"url":"https://spotlightdelaware.org/2026/08/19/harrington-denies-data-center-proposal-despite-a-1-million-offer/","label":"Spotlight Delaware"},{"url":"https://delawarebusinesstimes.com/news/harrington-data-center/","label":"Delaware Business Times"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b73c7e97cef39dba","state":"DE","tracker":"atlas","section":"at_risk","title":"New Castle County data center moratorium","summary":"New Castle County, Delaware, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated March 2026. Council voted 12-0 for zoning regulations: 1,000-foot residential buffer (500 ft with noise study), closed-loop cooling required, energy-efficient backup generators, decommissioning funds; existing projects exempt. The measure has no end date by design.","scope":"Record-specific: New Castle County","status":"moratorium","date":"Enacted March 2026","sources":[{"url":"https://www.delawarepublic.org/politics-government/2026-03-11/new-castle-county-council-unanimously-approves-data-center-regulations-after-hours-long-meeting","label":"delawarepublic.org"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"4f08bf43e25c3228","state":"DE","tracker":"atlas","section":"at_risk","title":"Project Washington data center (Delaware City)","summary":"Delaware Environmental Secretary Greg Patterson ruled the Project Washington plans would violate the Coastal Zone Act, and a state board upheld the decision. Starwood appealed to Delaware Superior Court but voluntarily withdrew the appeal in early July 2026, two days after the legislature passed stricter data center bills. With no remaining challenge, the project cannot proceed under its current design. A Starwood spokesman said the company is still seeking a pathway forward.","scope":"Record-specific: State of Delaware (Coastal Zone Act)","status":"withdrawn","date":"Appeal withdrawn early July 2026; reported 28 August 2026","sources":[{"url":"https://spotlightdelaware.org/2026/08/28/delaware-city-data-center-will-not-move-forward-under-current-plans/","label":"Spotlight Delaware"}],"parties":[{"role":"Developer","name":"Starwood Digital Ventures"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3b2bda19ec027799","state":"DE","tracker":"atlas","section":"at_risk","title":"White Clay Center data center campus (Newark)","summary":"New Castle County Councilman Tim Sheldon said he brokered a nonbinding handshake deal under which developer Shelbourne agreed to pause the data center plan and consider other uses for the site. An email dated 10 June 2026 from the developer's attorney agreed to the pause, conditioned on county approval of an exploratory plan that would grandfather the land under prior zoning rules. The developer retains the legal right to build a data center.","scope":"Record-specific: New Castle County","status":"paused","date":"Pause agreed by email 10 June 2026; reported 2 July 2026. Reported by Spotlight Delaware","sources":[{"url":"https://spotlightdelaware.org/2026/07/02/county-councilman-says-newark-data-center-plan-paused-after-deal/","label":"Spotlight Delaware"}],"parties":[{"role":"Developer","name":"Shelbourne"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"131c14675ceddc8b","state":"DE","tracker":"delay","section":"county_restrictions","title":"City of Harrington (Kent County)","summary":"At its Monday, August 17, 2026 meeting the council unanimously rejected a zoning code change that would have added data centers as a conditional use in manufacturing zones. The change was sought for a proposed 24 MW data center at the former Harrington Logistics cold storage building and had been tabled about 10 months earlier so council could study data centers. Council members cited water supply, electricity prices, and noise and light. The developer had offered about $1 million in contributions through a draft community benefits agreement.","scope":"city: City of Harrington (Kent County)","status":"denied","date":"2026-08-17","sources":[{"url":"https://www.delawarepublic.org/science-health-tech/2026-08-18/harrington-shoots-down-ordinance-that-would-allow-data-centers-in-city-limits","label":"www.delawarepublic.org"},{"url":"https://spotlightdelaware.org/2026/08/19/harrington-denies-data-center-proposal-despite-a-1-million-offer/","label":"spotlightdelaware.org"}],"parties":[{"role":"Authority","name":"Harrington City Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"c42c06e8cf0cf6f5","state":"DE","tracker":"delay","section":"jurisdictional_actions","title":"Delaware (statewide)","summary":"Signed August 26, 2026. HB 445 requires large energy-use facilities to produce or secure 100 percent of their required power, including a renewable energy component, so that new demand does not strain the public grid. HB 233 establishes a separate utility rate class for large energy consumers such as data centers, requires them to pay the full cost of infrastructure upgrades rather than shifting those costs to residential and small business customers, and places them first in line for disconnection during grid emergencies unless they supply their own power. HB 310 removes eligibility for large energy-use facilities to receive job-creation business tax credits and license fee reductions. SB 326 imposes limits and oversight on non-mandatory utility capital expenditures recoverable from standard residential ratepayers. HB 445 appears to be the strictest state-level power mandate on data centers enacted in the United States to date. Delaware and New Jersey enacted data center cost-shift packages within twenty-four hours of each other.","scope":"state: Delaware (statewide)","status":"enacted","date":"2026-08-26","sources":[{"url":"https://news.delaware.gov/2026/08/26/governor-matt-meyer-signs-energy-consumer-protection-legislation/","label":"news.delaware.gov"}],"parties":[{"role":"Authority","name":"Governor Matt Meyer / Delaware General Assembly"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"c3275bc79925ea23","state":"DE","tracker":"delay","section":"utility_actions","title":"Delaware electric utilities (statewide - HB 233, HB 445, HB 310, SB 326)","summary":"Governor Matt Meyer signed four energy bills on August 26, 2026, all effective immediately. HB 233 creates a separate utility rate class for large energy-use facilities such as data centers, requires them to pay the full cost of infrastructure upgrades, and makes them the first to be disconnected in a grid emergency unless they supply their own generation. HB 445 requires large energy-use facilities to produce or procure 100% of their power, including a share of clean energy. HB 310 bars them from job-creation business tax credits and license fee reductions. SB 326 limits and adds oversight of non-mandatory capital spending that utilities such as Delmarva Power can recover from residential customers.","scope":"Record-specific: DE","status":"effective","date":"2026-08-26","sources":[{"url":"https://news.delaware.gov/2026/08/26/governor-matt-meyer-signs-energy-consumer-protection-legislation/","label":"news.delaware.gov"},{"url":"https://www.stoel.com/insights/reports/energy-regulatory-updates/september-2-2026","label":"www.stoel.com"}],"parties":[{"role":"Named utility / authority","name":"Delaware electric utilities (statewide - HB 233, HB 445, HB 310, SB 326)"}],"groups":["utility:policy:effective"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5b6e0fabe7643de5","state":"DE","tracker":"delay","section":"utility_actions","title":"Delmarva Power","summary":"Delmarva Power proposed a large-load tariff. Stakeholders agreed to raise the eligibility threshold from 25 MW to 50 MW and exclude existing customers, while the Joint Agencies urged more stringent requirements.","scope":"Record-specific: DE","status":"pending","date":null,"sources":[{"url":"https://sea-ee.com/in-comments-on-delmarva-powers-proposed-large-load-tariff-stakeholders-agree-to-raise-eligibility-threshold-from-25-mw-to-50-mw-exclude-existing-customers-joint-agencies-urge-more-stringen/","label":"sea-ee.com"}],"parties":[{"role":"Named utility / authority","name":"Delmarva Power"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a3ef5c98705ce81a","state":"DE","tracker":"delay","section":"utility_actions","title":"Delmarva Power","summary":"The Delaware Public Service Commission opened docket 25-0826 to develop an interim large-load tariff for Delmarva Power customers using 25 MW or more, following a joint petition from PSC staff and the Division of the Public Advocate. The PSC also paused interconnection of new large-load facilities in Delmarva territory until the tariff is established.","scope":"Record-specific: DE","status":"pending","date":null,"sources":[{"url":"https://delawarelive.com/data-center-and-cost-drive-delaware-energy-policy/","label":"delawarelive.com"}],"parties":[{"role":"Named utility / authority","name":"Delmarva Power"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"7d3ea4d67fa68520","state":"DE","tracker":"delay","section":"utility_actions","title":"Delmarva Power & Light","summary":"The Delaware Division of the Public Advocate and Delaware Public Service Commission Staff petitioned the Commission to establish a large load tariff requiring facilities such as data centers to pay their share of energy infrastructure costs. The Commission opened a docket and paused interconnection of new large load facilities in Delmarva territory until the tariff is established.","scope":"Record-specific: DE","status":"pending","date":"2025-09-03","sources":[{"url":"https://depsc.delaware.gov/2025/10/14/delaware-psc-opens-docket-for-large-load-tariff-pauses-interconnections/","label":"depsc.delaware.gov"}],"parties":[{"role":"Named utility / authority","name":"Delmarva Power & Light"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5c2aae85d73c5722","state":"DE","tracker":"delay","section":"utility_actions","title":"Delmarva Power & Light Company","summary":"The Delaware Public Service Commission opened a docket to establish a large-load tariff for customers with monthly maximum demand of 25 MW or greater. Commission Staff must conduct stakeholder workshops, after which DPL must file revised tariff pages before interconnecting any new qualifying large-load customer.","scope":"Record-specific: DE","status":"pending","date":"2025-09-03","sources":[{"url":"https://depsc.delaware.gov/wp-content/uploads/sites/54/2025/09/Regular-Item-5d-Docket-25-0826-Order-10816-09-03-2025.pdf","label":"depsc.delaware.gov"}],"parties":[{"role":"Named utility / authority","name":"Delmarva Power & Light Company"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"db8fb22803e36edc","state":"DE","tracker":"delay","section":"utility_actions","title":"Delmarva Power and Light","summary":"Delmarva Power proposed a tariff to the Delaware Public Service Commission for large-load electric customers using more than 25 megawatts. The proposal would require grid-impact studies, detailed energy-use projections, and 10-year financial guarantees from large energy users.","scope":"Record-specific: DE","status":"pending","date":"2025-12-19","sources":[{"url":"https://thedailyrecord.com/2025/12/23/delmarva-power-large-load-electric-rates-delaware/","label":"thedailyrecord.com"}],"parties":[{"role":"Named utility / authority","name":"Delmarva Power and Light"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"17240088860f9cd6","state":"DE","tracker":"delay","section":"utility_actions","title":"Delmarva Power and Light Company","summary":"Commission staff and the Division of the Public Advocate petitioned for Delmarva Power to create a tariff for customers with monthly maximum demand of 25 megawatts or more. Delmarva Power proposed a large-demand service class, GS-LD, and an application process for customers with projected loads of at least 50 megawatts.","scope":"Record-specific: DE","status":"contested","date":"2025-08-28","sources":[{"url":"https://fastdemocracy.com/video-details/de_2026-02-26T08-59-40_joint_DelawarePublicServiceCommissionPUBLICCOMMENTSESSIONFEBRUARY262026DOCKET250826_/","label":"fastdemocracy.com"}],"parties":[{"role":"Named utility / authority","name":"Delmarva Power and Light Company"}],"groups":["utility:tariff:contested"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"84aea1fb47985278","state":"DE","tracker":"delay","section":"county_restrictions","title":"Dover","summary":"Proposed 18-month pause on data center reviews (Proposed). Update 2026-09-30: Dover City Council advanced an ordinance that would place an 18-month moratorium on AI data center applications inside city limits. An amendment passed unanimously at a September council meeting, and final action is scheduled for October 12, 2026. The city has received no formal applications but has fielded inquiries. The event date shown is the report date because the source does not state the exact September meeting date. Next date: 2026-10-12. (Previously recorded as pending, dated 2026-08-01.)","scope":"city: Dover","status":"pending","date":"2026-09-30","sources":[{"url":"https://spotlightdelaware.org","label":"spotlightdelaware.org"},{"url":"https://www.delawarepublic.org/politics-government/2026-09-30/dover-passes-temporary-ban-on-ai-data-centers","label":"www.delawarepublic.org"}],"parties":[{"role":"Authority","name":"Local government"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5fef84a0dc8a6ea7","state":"DE","tracker":"delay","section":"projects","title":"Harrington Logistics Building Data Center (Maguire Hayden)","summary":"The Harrington City Council unanimously rejected on August 17, 2026 the zoning change needed to allow a proposed 24 MW data center at the former Harrington Logistics cold storage building, despite a draft community benefits agreement offering about $1 million. The developer's attorney said there were no additional plans for the site and it may be returned to the bank.","scope":"Record-specific: Harrington (Kent County)","status":"halted","date":"2026-08-17","sources":[{"url":"https://spotlightdelaware.org/2026/08/19/harrington-denies-data-center-proposal-despite-a-1-million-offer/","label":"spotlightdelaware.org"},{"url":"https://www.delawarepublic.org/science-health-tech/2026-08-18/harrington-shoots-down-ordinance-that-would-allow-data-centers-in-city-limits","label":"www.delawarepublic.org"}],"parties":[{"role":"Operator","name":"Maguire Hayden"}],"groups":["delay:zoning_denial:halted","delay:community_opposition:halted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a3c1d5d31144555c","state":"DE","tracker":"delay","section":"county_restrictions","title":"New Castle County","summary":"In New Castle County, Delaware, Starwood Digital Ventures proposed 'Project Washington,' a $10 billion, 1.2GW datacenter on 580 acres near Delaware City. The facility would consume as much power as approximately 1 million homes, nearly twice all housing units in Delaware. Consumer advocates predict power bills could rise $70/month. Delaware's DNREC denied the Coastal Zone permit, ruling the projec","scope":"county: New Castle County","status":"in_force","date":"2026-02-04","sources":[{"url":"https://www.delawarepublic.org/science-health-tech/2026-02-25/starwood-appeals-denial-of-permit-for-data-center-in-ncc","label":"www.delawarepublic.org"},{"url":"https://delawarebusinesstimes.com/news/new-castle-data-center-campus/","label":"delawarebusinesstimes.com"},{"url":"https://www.sierraclub.org/delaware/data-centers","label":"www.sierraclub.org"},{"url":"https://delawarebusinesstimes.com/news/starwood-appeals-coastal-zone-permit-denial/","label":"delawarebusinesstimes.com"},{"url":"https://www.delawarepublic.org/show/the-green/2025-10-24/as-delaware-mulls-plans-for-massive-data-center-worries-persist-over-electric-rates","label":"www.delawarepublic.org"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d1b4ad80b5b465c1","state":"DE","tracker":"delay","section":"county_restrictions","title":"New Castle County","summary":"New Castle County Council passed 12-0 (with one absent) first-of-their-kind data center regulations after 7 months of debate. Requires 1,000-foot buffer from residential zones (reducible to 500 ft with noise study), bans open-loop water cooling (unless using reclaimed water). Notably exempts projects already in the development pipeline, including Starwood's Project Washington. Effective March 19,","scope":"county: New Castle County","status":"in_force","date":"2026-03-11","sources":[{"url":"https://spotlightdelaware.org/2026/03/19/new-data-center-regulations-go-into-effect-but-not-for-del-city-proposal/","label":"spotlightdelaware.org"},{"url":"https://www.delawarepublic.org/politics-government/2026-03-11/new-castle-county-council-unanimously-approves-data-center-regulations-after-hours-long-meeting","label":"www.delawarepublic.org"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"705c858a5eb7de78","state":"DE","tracker":"delay","section":"county_restrictions","title":"Newark","summary":"Verdantas/Shelbourne proposed an 847,000 sq ft data center complex on a 44-acre site at the White Clay Center Industrial Park off Ogletown Road in Newark, DE. The proposal would demolish seven existing buildings and replace them with a three-building data center campus. Site is owned by NY-based Shelbourne (8M sq ft commercial real estate portfolio). The location is outside Delaware's Coastal Zone","scope":"county: Newark","status":"in_force","date":"2026-01-30","sources":[{"url":"https://www.newarkpostonline.com/news/data-center-complex-proposed-near-newark/article_25f31b5b-71d7-4975-9ace-213c3dbf35ff.html","label":"www.newarkpostonline.com"},{"url":"https://www.datacenterdynamics.com/en/news/verdantas-proposes-new-data-center-in-newark-delaware/","label":"www.datacenterdynamics.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"f797bd58db306835","state":"DE","tracker":"moratorium","section":"states","title":"100% new energy requirement for large energy-use facilities","summary":"Signed by Gov. Matt Meyer on Aug. 26, 2026. Requires large energy-use facilities such as data centers to produce or secure 100 percent of their required power (bring your own generation).","scope":"State: Delaware","status":"enacted","date":"2026-08","sources":[{"url":"https://news.delaware.gov/2026/08/28/governor-matt-meyer-signs-energy-consumer-protection-legislation/","label":"news.delaware.gov"}],"parties":[],"groups":["restriction:states:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"349d8f4e1160a386","state":"DE","tracker":"moratorium","section":"local","title":"County moratorium on data centers with no end date","summary":"LC26-06: data centers permitted only in Limited Industrial and General Industrial zones in unincorporated areas; 300-foot residential buffer, 6-foot vegetative buffers, noise limits, written utility capacity documentation required; county attorney reviewing viability of a complete ban. The measure has no end date by design.","scope":"Local: Kent County","status":"enacted","date":"2026-07","sources":[{"url":"https://spotlightdelaware.org/2026/07/23/kent-county-adopts-data-center-regulations-may-consider-future-ban/","label":"spotlightdelaware.org"}],"parties":[{"role":"Jurisdiction","name":"Kent County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e6b800970826b7ff","state":"DE","tracker":"moratorium","section":"local","title":"County moratorium on data centers with no end date","summary":"Council voted 12-0 for zoning regulations: 1,000-foot residential buffer (500 ft with noise study), closed-loop cooling required, energy-efficient backup generators, decommissioning funds; existing projects exempt. The measure has no end date by design.","scope":"Local: New Castle County","status":"enacted","date":"2026-03","sources":[{"url":"https://www.delawarepublic.org/politics-government/2026-03-11/new-castle-county-council-unanimously-approves-data-center-regulations-after-hours-long-meeting","label":"www.delawarepublic.org"}],"parties":[{"role":"Jurisdiction","name":"New Castle County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8e1aedf35862eb28","state":"DE","tracker":"moratorium","section":"states","title":"Defeated statewide moratorium on data centers","summary":"SB 353: statewide moratorium on permits for 100+ MW data centers through Jan 31, 2027; motion to suspend rules failed 6-15 in the Senate. Legislature passed a restrictions package (HB 233/HB 445/HB 310/SB 326) instead. The measure has no documented term.","scope":"State: Delaware","status":"failed","date":"2026-06","sources":[{"url":"https://legis.delaware.gov/BillDetail/143681","label":"legis.delaware.gov"}],"parties":[],"groups":["restriction:states:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"00d385fc78b43d3c","state":"DE","tracker":"moratorium","section":"states","title":"Large energy-use facilities barred from job-creation tax credits","summary":"Gov. Matt Meyer signed HB 310 on Aug. 26, 2026, as part of a four-bill energy consumer protection package. It prohibits large energy-use facilities such as data centers from receiving the state's job-creation tax credits.","scope":"State: Delaware","status":"enacted","date":"2026-08","sources":[{"url":"https://news.delaware.gov/2026/08/28/governor-matt-meyer-signs-energy-consumer-protection-legislation/","label":"news.delaware.gov"}],"parties":[],"groups":["restriction:states:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"f79088b84dfb570b","state":"DE","tracker":"moratorium","section":"states","title":"Large energy-use facilities bear their own infrastructure costs","summary":"House Substitute 1 for HB 233 was signed by Gov. Matt Meyer on Aug. 26, 2026 (Chapter 85:440). It requires a separate utility rate class for large energy-use facilities of 20 MW or more, such as data centers, so infrastructure and capacity costs are not shifted to other customers.","scope":"State: Delaware","status":"enacted","date":"2026-08","sources":[{"url":"https://legis.delaware.gov/BillDetail/143381","label":"legis.delaware.gov"}],"parties":[],"groups":["restriction:states:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d3ed82824472253c","state":"DE","tracker":"moratorium","section":"local","title":"Proposed 18-month pause on data center reviews","summary":"Dover City Council discussed the proposed 18-month moratorium on data center applications at its meeting in the week of September 28, 2026 and unanimously passed an amendment to define the term data center more clearly. The moratorium itself has not been adopted. Final action is scheduled for the October 12, 2026 City Council meeting.","scope":"Local: Dover","status":"proposed","date":"2026-09","sources":[{"url":"https://www.delawarepublic.org/politics-government/2026-09-30/dover-passes-temporary-ban-on-ai-data-centers","label":"www.delawarepublic.org"}],"parties":[{"role":"Jurisdiction","name":"Dover"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"20667d2af7bb1915","state":"DE","tracker":"moratorium","section":"local","title":"Rejection of ordinance allowing data centers","summary":"The City Council voted unanimously on Aug. 18, 2026 to reject an ordinance that would have allowed data centers as a conditional use in the manufacturing zone, citing water, sewer, electricity and noise concerns.","scope":"Local: Harrington","status":"enacted","date":"2026-08","sources":[{"url":"https://www.wboc.com/news/harrington-city-council-rejects-data-center-ordinance-after-heated-community-meeting/article_360166e6-ffde-4dd3-b229-a4c0e3d5438a.html","label":"www.wboc.com"}],"parties":[{"role":"Jurisdiction","name":"Harrington"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b97aae632c19ee47","state":"DE","tracker":"permits","section":"air_permits","title":"COMPUTER SCIENCES CORPORATION","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Newark","status":"Operating","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_sic=7374&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110001736649","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"62f0cf855ec917c9","state":"DE","tracker":"permits","section":"air_permits","title":"JP MORGAN CHASE - 4001 GOVERNOR PRINTZ BLVD","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Wilmington","status":"Operating","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_sic=7374&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110017764187","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"58fca6a034c41dd6","state":"DE","tracker":"permits","section":"air_permits","title":"JP MORGAN CHASE - BEAR CHRISTIANA ROAD","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Bear","status":"Operating","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_sic=7374&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110017764196","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."}],"groups":{"restriction:local:proposed":["d3ed82824472253c"],"restriction:local:enacted":["20667d2af7bb1915","349d8f4e1160a386","e6b800970826b7ff"],"restriction:states:enacted":["f79088b84dfb570b","f797bd58db306835","00d385fc78b43d3c"],"restriction:states:failed":["8e1aedf35862eb28"],"delay:zoning_denial:halted":["5fef84a0dc8a6ea7"],"delay:community_opposition:halted":["5fef84a0dc8a6ea7"],"utility:tariff:pending":["5c2aae85d73c5722","7d3ea4d67fa68520","db8fb22803e36edc","5b6e0fabe7643de5","a3ef5c98705ce81a"],"utility:tariff:contested":["17240088860f9cd6"],"utility:policy:effective":["c3275bc79925ea23"]},"grid":[{"name":"PJM","key":"PJM","rules":[{"title":"PJM Interim Resource Adequacy Service (IRAS), Large Load Registry, and Bring Your Own New Capacity filing","summary":"Defines a New Large Load as end-use demand entering service or adding incremental demand after June 1, 2027 with cumulative peak demand of at least 50 MW at a single electrical site (affiliated facilities within one mile treated as one location). New Large Loads that do not bring qualifying capacity under Bring Your Own New Capacity (new generation, uprates, surplus interconnection service, repowering/fuel conversions, storage, certain demand resources and DER aggregations) take IRAS: their unsupported demand is…","status":"Pending at FERC; comments due 5 p.m. ET Sept. 3, 2026; requested effective date Oct. 12, 2026","date":"2026-08-13","sources":[{"url":"https://www.federalregister.gov/documents/2026/08/18/2026-16808/combined-notice-of-filings-2","label":"www.federalregister.gov"}]},{"title":"PJM Reliability Backstop Procurement (RBP)","summary":"One-time special capacity procurement to address the shortfall against the 1-in-10 reliability requirement identified in the 2028/2029 Base Residual Auction (target equals that shortfall, excluding FRR load and supply, and adjusts downward for bilateral contracts and self-supply secured by new large loads through PJM's matchmaking RFP launched June 9, 2026). States determine which retail customers may fund the program, with limited opt-out mechanics developed at stakeholder request. PJM's July 14, 2026 auction…","status":"Pending at FERC; one-time procurement with central bid window Sept. 30 - Oct. 21, 2026 and results due by Dec. 2, 2026, before the next Base…","date":"2026-07-31","sources":[{"url":"https://www.pjm.com/pjmfiles/directory/etariff/FercDockets/9806/20260731-er26-3380-000.pdf","label":"www.pjm.com"}]},{"title":"FERC show-cause order to PJM on large-load interconnection (FPA Section 206)","summary":"FERC preliminarily found RTO/ISO tariffs may be unjust, unreasonable, or unduly discriminatory because they lack features needed to timely, reliably, and safely interconnect and serve new large loads. PJM's order is tailored: a four-item directive list covering transmission service application/study processes, cost-shift prevention and transparency, and flexible-load transmission services, limited to large loads NOT co-located with generation (co-location in PJM was addressed separately in EL25-49). PJM's…","status":"Pending; PJM 30-day informational report filed July 2026; substantive show-cause response was due Aug. 17, 2026; interested-party responses due 30…","date":"2026-06-18","sources":[{"url":"https://www.foley.com/insights/publications/2026/06/ferc-issues-six-tailored-show-cause-orders-to-accelerate-large-load-interconnection/","label":"www.foley.com"}]},{"title":"FERC order directing PJM co-located load tariff reform","summary":"FERC found PJM's tariff unjust and unreasonable for lacking clarity and consistency on rates, terms, and conditions for co-location arrangements (generation serving data centers and other large loads at the plant site). It directed a 30-day compliance filing (due Jan. 20, 2026) on provisional and surplus interconnection service for generators serving co-located load, and a 60-day compliance filing (due Feb. 16, 2026) setting specific terms for co-location, including three transmission service options for…","status":"Order effective; compliance process ongoing through 2026","date":"2025-12-18","sources":[{"url":"https://www.bdlaw.com/publications/ferc-orders-pjm-to-create-clear-rules-for-co-located-data-centers-and-large-loads/","label":"www.bdlaw.com"}]},{"title":"FERC order on PJM co-location compliance filing (accepting in part, rejecting in part)","summary":"FERC accepted in part and rejected in part PJM's co-location compliance filing, validated PJM's general direction toward structured co-located load service, and established rates, terms, and conditions for the new transmission services (Firm Contract Demand, Non-Firm Contract Demand, and interim service) while finding no service product fully finalized. This order was issued the same day as the EL26-67 show-cause order, which carved co-location out of PJM's show-cause directives because it is being handled in…","status":"Further PJM compliance filing directed within 60 days (i.e., by mid-August 2026)","date":"2026-06-18","sources":[{"url":"https://www.hklaw.com/en/insights/publications/2026/06/ferc-advances-new-oversight-framework-for-large-loads","label":"www.hklaw.com"}]},{"title":"PJM Expedited Interconnection Track (EIT)","summary":"Temporary fast-track interconnection for up to 10 state-sponsored, shovel-ready, high-capacity generation projects. All EIT projects must have a commercial operation date within three years and be online by 2030. PJM cites the EIT in its EL26-67 informational report as a supply-acceleration measure responsive to data-center-driven load growth.","status":"Approved/effective; protested by NRDC and others during the proceeding","date":"2026-06-09","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Talen-Amazon Susquehanna co-location saga (amended ISA rejection and front-of-meter restructuring)","summary":"FERC rejected (2-1, Commissioners Christie and See in the majority, then-Chairman Phillips dissenting) the amended ISA that would have raised co-located load at Talen's Susquehanna nuclear plant serving an AWS data center from 300 MW to 480 MW, holding PJM had not justified the non-conforming provisions; FERC reaffirmed on rehearing in April 2025. On June 11, 2025 Talen and Amazon restructured as a 1,920-MW front-of-the-meter PPA running through 2042 (deliveries ramping to 840-1,200 MW by 2029 and 1,680-1,920 MW…","status":"Resolved outside FERC: converted to a front-of-the-meter PPA not requiring FERC ISA approval","date":"2024-11-01","sources":[{"url":"https://www.utilitydive.com/news/ferc-interconnection-isa-talen-amazon-data-center-susquehanna-exelon/731841/","label":"www.utilitydive.com"}]},{"title":"Capacity auction price records driven by data-center load (2025/26 through 2028/29 Base Residual Auctions)","summary":"2025/26 BRA cleared at a then-record $269.92/MW-day (~$14.7B total). 2026/27 BRA cleared at the $329.17/MW-day cap, 134,311 MW procured, $16.1B total (PJM estimated ~$389/MW-day absent the cap; retail bill impact 1.5-5%), with forecast peak growth of ~5,500 MW driven primarily by data centers. 2027/28 BRA (Dec. 2025) cleared at the $333.44/MW-day cap, ~$16.4B, ~6,500 MW short of the reliability requirement ,  the first RTO-wide shortfall in PJM history; the Independent Market Monitor's Jan. 2026 report attributed…","status":"Cleared/final; price collar (FERC-approved cap and floor agreed with the 13 PJM states) applies for four auctions, third consecutive collared…","date":"2024-07-30","sources":[{"url":"https://www.utilitydive.com/news/pjm-interconnection-capacity-auction-prices/753798/","label":"www.utilitydive.com"}]},{"title":"DOE emergency orders during July 2026 heat wave (data-center curtailment authority)","summary":"During the heat wave that produced PJM's 168,158 MW all-time peak on July 2, 2026, the Department of Energy issued two emergency orders allowing PJM to curtail data centers and waive certain power plant pollution limits. Forced generation outages ran 18,100-19,400 MW over July 2-4, above the ~12,800 MW average of recent top-10 peak days.","status":"Issued (emergency orders, time-limited)","date":"2026-07","sources":[{"url":"https://www.utilitydive.com/news/heat-wave-tests-power-grid-pjm-anticipates-new-record/824329/","label":"www.utilitydive.com"}]}]}],"grid_note":"Entire state in PJM (Delmarva Power).","grid_operators":["PJM"],"counts":{"moratorium":8,"delay":14,"atlas":4,"permits":3},"record_count":29},"states":[{"id":"AL","name":"Alabama","groups":{"restriction:local:enacted":["b754e99ab4330e15","decd6891258f47ef","f0af2bd58075bd01","acf788f0940c151f","5d2b5e02877a6db1","86b6b59a0f9f25d6","c4e0ec1c77b375f6","f54b7627480545ea","e01160ee3d027689","a5568f503c16796e","672a4451f57ed71f","130f0e56bf60745e","4985760687f3ce84","03643fb450f0e606","e03f681545f8685d","7e09fb347db9cc56","3eaa5dec8cc4f32e"],"restriction:local:failed":["c8b4ae70216bc13d"],"restriction:states:proposed":["e7f13067c265e602"],"water:moratorium:enacted":["fe369e5b2f828936"],"delay:litigation:active_litigation":["588eb0c7ad945e8c"],"delay:zoning_approval_challenge:active_litigation":["588eb0c7ad945e8c"],"delay:litigation:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:council_agenda_removal:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:environmental_concerns:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"utility:statement:pending":["11c4e5e5098ce897"],"utility:special contract:pending":["6d50a85ed575ad70","ea51d9bfa3f2aef7"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":19,"water":1,"delay":17,"atlas":28,"permits":3},"record_count":68},{"id":"AK","name":"Alaska","groups":{"restriction:local:enacted":["a3bdbc7a2f903071"],"restriction:local:proposed":["1b1fd599ecf09004"],"restriction:local:failed":["14fcd2107dd36027"],"restriction:states:failed":["70bf8b65e5240449"],"delay:interconnection:cancelled":["cbda12242cdda058"],"delay:community_opposition:cancelled":["cbda12242cdda058"],"delay:financing:cancelled":["cbda12242cdda058"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":4,"delay":2,"atlas":1},"record_count":7},{"id":"AZ","name":"Arizona","groups":{"restriction:local:enacted":["efe1b1646b346c07","a90bced96e18e77a","a6281e2e804f5a60","1d398d0ae1a21d5b","641d11706e6d4289"],"restriction:local:proposed":["543df422425e5d64"],"restriction:states:enacted":["341f659a40d6be88","8c611b34dae73c14","1e866041a2d45903"],"restriction:states:proposed":["add216a01080fe60","226daa2040f1d307"],"restriction:states:failed":["1b22a852fb3cd3d6","6300ce595ef5d0af","fe22b44843f73aaa"],"water:closed-loop:enacted":["869ef8ac67db8830"],"water:siting:enacted":["e4c543ec417de650","bf9111175cdcc2be"],"water:study:enacted":["c002da5fb08b6601"],"water:moratorium:enacted":["5706e495e387c218"],"delay:zoning_denial:cancelled":["3a372b9b02a89621","717671bd9cdc167f"],"delay:water_dispute:cancelled":["3a372b9b02a89621"],"delay:community_opposition:cancelled":["3a372b9b02a89621"],"delay:community_opposition:litigation_active":["b1a04c91d82be6c4"],"delay:water_dispute:delayed":["f0fd3f3d4688462e"],"delay:community_opposition:delayed":["f0fd3f3d4688462e"],"delay:zoning_denial:under_appeal":["cb82a5cd61fb9cec"],"delay:tax_incentive_change:under_appeal":["cb82a5cd61fb9cec"],"delay:zoning_denial:withdrawn":["5567ed106330c2df"],"delay:community_opposition:withdrawn":["5567ed106330c2df"],"utility:other:pending":["5d17a79f01d2eb63"],"utility:tariff:pending":["1da26df1fe5c13a0"],"utility:rate case:pending":["5b45806c6fb887c7","d2b222dc47567225"],"utility:special contract:approved":["d3d18ed766abfecd","44611b67548fe3db"],"utility:tariff:approved":["f2a114901b242afc"],"utility:special contract:pending":["aa4d78d10d987248"],"utility:statement:pending":["0dcfef71df5fb811"],"utility:other:approved":["03326890e794e215"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":14,"water":5,"delay":29,"atlas":21,"permits":63},"record_count":132},{"id":"AR","name":"Arkansas","groups":{"restriction:local:enacted":["ccd17d0cc78e8f6b","24be15d78831b997","2976edbd642bc5ee","165be2cac366e40a","c321161246656575","11b2b2b4357c9b9a","f1fcd0a91c9b364f","cc8edc44497c00b0"],"restriction:local:failed":["7a3c89981993bc87","f0d3a1dde3ddedd3"],"restriction:states:proposed":["24cb87919949138b"],"restriction:states:failed":["669f43bd9db94313","4cd8f4567d93ecf7"],"water:disclosure:failed":["b599e881f9e16713","460013ff73ea7911"],"water:siting:enacted":["d25f62e8d2b28025"],"water:disclosure:vetoed":["34510ed612779eb7"],"delay:litigation:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:state_law_ownership_ban:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:quorum_court_rejection:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:county_moratorium_dispute:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:litigation:active_litigation_records_dispute":["a103b1f5c7cb3114"],"delay:public_records_dispute:active_litigation_records_dispute":["a103b1f5c7cb3114"],"utility:statement:approved":["36a2338551fca4bf"],"utility:tariff:approved":["f43b05ef42c2b01e"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":13,"water":4,"delay":17,"atlas":10,"permits":2},"record_count":46},{"id":"CA","name":"California","groups":{"restriction:local:enacted":["a25de67269df0ed1","5709c4b5b56bdcb7","2a076a8efdfced43","09ce6bf92df9e75f","846b44fb44875a68","c8bffaf8e914e126","d3f536e572c853c0","e6f878bf8f23af8a","0bc1904215c57133","91ff35645c472dbe","188c7c4f44c8536f","2e31d9e1a9cca3fe","c6bb03e1b77debf9","1df245d5ecbbe1dd","106240b9c12fa638","71e0bfc997caca17","e8632d627b1772a4","7c6238e16f306088","055c2fca846ffbb0","4db95272d4d0b3b9","c0ec3d7f70d99734","9749538c1593f5cd","396ad9209089e80b","8aa7be7faae30500","dbd84a0fba7823d9","4297fa613aade787","1ed97d6ba694c7ec"],"restriction:local:proposed":["ea295658dff6c100","4d8d1ffdf12217a7","0552f5d218785acb","566895b8839e5229","558caf6ac46fd86a","aafdf3f00fd02036","1447a768a8032ada","8f8c47d0520b6675","07dc420f28cea720","cc095341ed505538","96c02fe3f2b69d63"],"restriction:local:failed":["4c7a6aab7028e4cf","6c0f45a31c38dd96","60a1fd085fb7faa2"],"restriction:local:pause":["9441b074827051cd"],"restriction:states:enacted":["b138c8f25c6a1df9","6cd48a1a9e3b6e42","e04ce361015d10b8","997e47cb2efa0fb1","a99eee6a8346d803","f8de3ea100d5a73c","36821d2782e3a288","b175ffb656ec4e09"],"restriction:states:failed":["9a181689208d061f"],"water:disclosure:proposed":["6018757e291cf1cf"],"water:disclosure:enacted":["f1363de6a8051f4c","0542c8536ced8e81","d192c59c767e1959"],"water:moratorium:enacted":["1cc46a341cdc3ef8","455741d01ef09906","490cb87c459dd8d3","b85c5b51cdf4ca84","2d55ff4b663fe464"],"water:moratorium:proposed":["7dd1832dd7f10e5b","d430cf80aec173de"],"water:incentive:enacted":["4a4855c312ff4655"],"water:siting:enacted":["0f9ba6aedeacc0f2"],"delay:litigation:litigation_active":["df264e03425ec97a"],"delay:permit_denial:litigation_active":["df264e03425ec97a"],"delay:local_moratorium:delayed":["81e21ec7e868a8a0"],"delay:water_dispute:delayed":["81e21ec7e868a8a0"],"delay:community_opposition:delayed":["81e21ec7e868a8a0","14833b21d81cfae2"],"delay:litigation:delayed":["8f4ba499ed265bb0"],"delay:permit_denial:delayed":["8f4ba499ed265bb0"],"delay:local_moratorium:cancelled":["e6ef57967971f34b"],"delay:community_opposition:cancelled":["e6ef57967971f34b","60ad802b8bf4ce26"],"delay:community_opposition:withdrawn":["dabaa0d9ca40c829"],"utility:other:pending":["2331af1293597280","65708bfad2e82891"],"utility:tariff:pending":["9365b7af7942c436","345f48017f0b0304"],"utility:statement:pending":["686efa78facdadc1","c9e2f082eb03806e"],"utility:tariff:contested":["d8dc8b595b9287b9"],"utility:IRP:pending":["2c217c66f5f9e73f"],"utility:special contract:approved":["e9224e475fe0078d"],"utility:special contract:pending":["a93460236987d2aa"],"utility:tariff:approved":["77fc87a9cbbc5266"]},"grid_operators":["CAISO","NON-RTO"],"counts":{"moratorium":51,"water":13,"delay":52,"atlas":42,"permits":18},"record_count":176},{"id":"CO","name":"Colorado","groups":{"restriction:local:enacted":["d20e86908dbdc520","7e23b2c472790666","b680584b86f47325","27892c65296bbedd","4057677a34555f38","611f35a83bc2affd","079b59e4fdf63d21","a78ac9d55cc5b6e7","72aaf79dce28835b","8c94de22f0407e5e","fafd70f2e092776b","b7f34202c64479ce","68d895f0c2ab0e74","9ef574abef591c91","73177d5333c4eddd","025c6d645640e09f","2c25069cf664aaf3"],"restriction:local:proposed":["180c78e281f128cd","e516a7d3e6cb6124"],"restriction:local:failed":["1224f46eadf9763d"],"restriction:states:failed":["804810ef9bbbcba8","8bb8b6f98d15d82f"],"water:siting:enacted":["1a50144d2155e77c","b03afdefabd7d0fe"],"water:moratorium:enacted":["da5550e87bcd99b9"],"delay:local_moratorium:halted":["9cef3b22115f1c92"],"delay:community_opposition:delayed":["a38043d281f78904"],"delay:litigation:delayed":["a38043d281f78904"],"delay:tax_incentive_change:litigation_active":["75f9d2abb9fb3326"],"delay:local_moratorium:delayed":["346f7ed881ecaa83"],"utility:tariff:pending":["959a6c65c1b74f30","59050cc9ea65018e","7d2e982178725742"],"utility:IRP:approved":["c4287797ac10652c"],"utility:tariff:denied":["c0672975e176ca01"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":22,"water":3,"delay":27,"atlas":26,"permits":35},"record_count":113},{"id":"CT","name":"Connecticut","groups":{"restriction:local:enacted":["6e1a2316302287f7","576ae2d483109634","f7bc5e6a64694fc6","afa7c0bb25faeb00","0642f9a9d449638b"],"restriction:states:failed":["717698e42ef6e901","e135ad979d2fc395"],"water:disclosure:proposed":["7a7d2e991305affc"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":7,"water":1,"delay":4,"atlas":5,"permits":1},"record_count":18},{"id":"DE","name":"Delaware","groups":{"restriction:local:proposed":["d3ed82824472253c"],"restriction:local:enacted":["20667d2af7bb1915","349d8f4e1160a386","e6b800970826b7ff"],"restriction:states:enacted":["f79088b84dfb570b","f797bd58db306835","00d385fc78b43d3c"],"restriction:states:failed":["8e1aedf35862eb28"],"delay:zoning_denial:halted":["5fef84a0dc8a6ea7"],"delay:community_opposition:halted":["5fef84a0dc8a6ea7"],"utility:tariff:pending":["5c2aae85d73c5722","7d3ea4d67fa68520","db8fb22803e36edc","5b6e0fabe7643de5","a3ef5c98705ce81a"],"utility:tariff:contested":["17240088860f9cd6"],"utility:policy:effective":["c3275bc79925ea23"]},"grid_operators":["PJM"],"counts":{"moratorium":8,"delay":14,"atlas":4,"permits":3},"record_count":29},{"id":"FL","name":"Florida","groups":{"restriction:local:proposed":["3c6d8b831356d465","e8b089b79a0f9026","7425d7591ce9c05a","e1b9861a123c1037","eff63eaba9c47d23","5b481baefebc87d9","a5e933035ad808b1","fac9127296bbb451","81e7440dc92c2b86","92a8872884499683"],"restriction:local:enacted":["a5503fc35c328f46","23c7119619365d48","8b07f1ffc26fabaf","3d8300137881558a","73505e05af5a93eb","f81b18c1e2c17955","930a54e75fe30dbf","a6dde620b7e76c37","55f91fe7e81d73f9","256ea0475a8abfbc","3d3d3059a4680f72","d7dcf42909108795","81d807032f719371","e068dd6b5ef9a080","2309ccbc3d286709","6056ac6cc19512a9","7143529782427cf5","089c1610e25cae54","6519ee70858d723f","10e7ec4ad55643e8","9d86ef4ad5bda00b","664c54df9091c973","05af516c4516ea5a","f5948f47a6af75c6","983f2c993373327d","06dc3cba02451c3d","c1218a13301328fe","b404521e586a3d39"],"restriction:local:failed":["3cabceedb3599796","cea30c117def2cca","3eec78ad6ec41fba","b3455f9b6eb27513"],"restriction:states:enacted":["bd1baf5ebba563ea","0481f85a9e1d5f2a"],"restriction:states:failed":["8cb4a715971a72e5","3ba747e753788cc7","04d2addc80c5d977"],"water:reclaimed:enacted":["41fb56a04133f262"],"water:moratorium:proposed":["edf34b85cb944f74","1cd10774835a9376","ad733fa464deef93"],"water:moratorium:enacted":["2940ba1eefc2e616","9b3a0316ced968a7","209a4247fb52b5dd"],"delay:community_opposition:cancelled":["8e40e6f05855c417"],"delay:water_dispute:cancelled":["8e40e6f05855c417"],"delay:zoning_denial:cancelled":["8e40e6f05855c417"],"delay:permit_denial:denied_without_prejudice":["a96919e42e70568c"],"delay:community_opposition:denied_without_prejudice":["a96919e42e70568c"],"delay:county_moratorium:moratorium_in_force":["a80ab26a0223aab0"],"delay:community_opposition:under_construction_amid_opposition":["30167fbd092c1632"],"delay:transparency_concerns:under_construction_amid_opposition":["30167fbd092c1632"],"delay:community_opposition:rumored_no_application_filed":["f2412c254c9be527"],"delay:meeting_postponed:rumored_no_application_filed":["f2412c254c9be527"],"utility:tariff:pending":["8decf641f8a25d7d","a3c4a2035b1bbdae"],"utility:tariff:approved":["e302a349f266e980","6e774dbc7dc0ad70"],"utility:other:pending":["49d867567171c0f6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":47,"water":7,"delay":35,"atlas":45,"permits":3},"record_count":137},{"id":"GA","name":"Georgia","groups":{"policy:cost-allocation":["8dcc4b156d460b66"],"policy:minimum-payment":["90114ff524521a31"],"restriction:local:enacted":["83b7e8e76b5ee0bc","c702f3e21493eb78","f01b7f9bb899e3d6","f7d299ad7a92bf12","3bbce17db7406e29","d82372162bbd6160","85de3463c47701a1","7086dae6422907ad","754cf92f96c529a3","c7572839bf1e65ec","0f457e9b1f07b13c","cde0de75b390a38c","190ca6042402e496","b7df742790192976","18d1622ef7bf1615","91cb94f80ea44672","8b31abcd9fbd53f1","25670f673645fec9","a263b272f78d0c97","c968b3ce64dc6e50","94471cc36a302f4d","d8321a4a32d96fe5","d6fd85ec434dbb95","e92bfd601e97e81a","b442425bf5306c01","0a299b6f3e4f8a71","97f3ce24746ab390","75bf8ea8521c54fa","0a88eeaf1510a872","b85fe594520520c1","90a000efae4eb640","c5f545916c737149","7718b91252a0926a","dea0bc58f5667b0f","31c097aea2e6b922","e07ddb442cda946c","8e0052e65c172653","8c1646131950febb","05cc6246e1b41c7f","f7dbcf4c51bf6858","a0256947e3545780","8a2dd9e2691ff06f","9f541b9254ba4673"],"restriction:local:failed":["0abc00ddccf55a33","2bc57eb4e3e90e1f","701836b773fb0b9f","69a87b66a5ff3dc2","c86da04ebcb107b1","496e8e5d89e48f9e","e1f3ad4472027620","6e2cdff1c98b89c0"],"restriction:local:proposed":["c2f04f5b50afc543","0fb52176825fcefa","cb9ce96499427440"],"restriction:states:proposed":["8f9aa89848bde366"],"restriction:states:failed":["e9f083814e55fed7","9c1953c2716db6dd","40cfc9d1ff50d003","6a4a691d7908a952","1f42995802ab1e14","1b3fd31a366bf4bd","a9baa8b690070329","30d8a643dc1032e6","35836125f8f5c6e9"],"water:disclosure:proposed":["763ca1cd9c5aab65"],"water:siting:enacted":["dfcc4d38d0110edd","e2e353fc1545946a"],"water:siting:proposed":["1054015276abc18b"],"water:closed-loop:enacted":["de00fb52546e6f23"],"water:disclosure:enacted":["2ad2d7c1dd2cabd0"],"delay:permit_denial:permit_denied":["1f36ddedf54f3fd4"],"delay:community_opposition:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:approved_active_litigation":["d0f8256ac51fab90"],"delay:litigation:approved_active_litigation":["d0f8256ac51fab90"],"delay:community_opposition:approved_active_litigation":["d0f8256ac51fab90"],"delay:county_moratorium:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:community_opposition:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:county_moratorium:moratorium_in_force":["dc2902692d6491a1"],"delay:public_outcry:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:tax_break_withdrawal:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:community_opposition:cancelled":["2a4ab4968e918d44"],"delay:interconnection:cancelled":["1de43b4a847f9aa8"],"delay:financing:cancelled":["1de43b4a847f9aa8"],"delay:interconnection:denied":["2661c3858a5d582c"],"delay:zoning_denial:halted":["07d5ce26e3298956"],"delay:community_opposition:halted":["07d5ce26e3298956"],"utility:tariff:approved":["51165aeea3b5c521"],"utility:rate case:approved":["858fc088c06ae5c6"],"utility:other:pending":["7eacf8103d2cde93","725643f3b4745c90"],"utility:statement:pending":["83d8f442e8f028cc","613ee18634340b67"]},"grid_operators":["NON-RTO"],"counts":{"policy":2,"moratorium":64,"water":6,"delay":70,"atlas":70,"permits":91},"record_count":303},{"id":"HI","name":"Hawaii","groups":{"restriction:local:proposed":["28597eb2f2e2356b"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":1},"record_count":1},{"id":"ID","name":"Idaho","groups":{"restriction:local:enacted":["95089721b56ee774","fe1a183a87096ad9","cfe65746b5a0f7e3"],"restriction:local:failed":["93f06396ad555ba2"],"restriction:states:enacted":["276f9be7f349fc75"],"restriction:states:proposed":["cefda14587a887e9","f7f09ea72ca4e50b"],"restriction:states:failed":["9c8a456a09d32f23","89b3c3ec88bdbc77","46828f9c28d595d2"],"water:siting:enacted":["d9479381dd39426b"],"delay:litigation:under_appeal":["6c2c455020d0272b"],"delay:corporate_realignment:delayed":["7e9cb32e4e8d817f"],"utility:other:pending":["7cf4e8e8f3a38458"],"utility:tariff:approved":["e898000ea6ecc3d6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":10,"water":1,"delay":9,"atlas":3,"permits":1},"record_count":24},{"id":"IL","name":"Illinois","groups":{"restriction:local:failed":["1688237928438d39"],"restriction:local:enacted":["ca8eaa4fae2c852a","6f07a6763fa734a0","09ae1486502886e8","5bd418f017328c7c","06b72d07cd1c49ac","0c47dab15c0d2f8b","0af9b2178b92e9d5","a63897e78f332f95","9c11e0fbe25fcdd9","dff4c418b6ff66a4","4dbd1742ac88cba6","98cdcd339817f68e","95fb3d3156498f12","15e7d96176c192b0","4ada4d4ff9e7b794","9f441a6e33f21096","91816e044ae91d73","606804a7751c5741"],"restriction:local:proposed":["c658effcd8a8404b","e742ed625e62ce6f","a952290a81b198a4","5b9ee8080b2a9ab7"],"restriction:states:pause":["d15586bf00803a21"],"restriction:states:proposed":["2de67be693a93ad7"],"restriction:states:failed":["6456aa7bb0b23688"],"water:disclosure:proposed":["8a7dc5bdfec701e7"],"water:moratorium:enacted":["080dab59c19bd690","2a07c1558296be02","e635d05e2074a570"],"water:disclosure:enacted":["dc2475a676fa62ca"],"delay:litigation:litigation_active":["fea0362f66d7ce4d"],"delay:community_opposition:litigation_active":["fea0362f66d7ce4d"],"delay:zoning_denial:litigation_active":["fea0362f66d7ce4d"],"delay:litigation:active_litigation":["9e23d3ec3c2afc8f","73e7e2b4984b632d","180053263745dfcc"],"delay:wetlands_permit_suspended:active_litigation":["9e23d3ec3c2afc8f"],"delay:community_opposition:opposed_pending_council_vote":["e132605bfcfb961d"],"delay:community_opposition:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:petition_campaign:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:city_moratorium:moratorium_in_force":["58cf33c3ebe468f0"],"delay:public_notice_violation_alleged:active_litigation":["73e7e2b4984b632d","180053263745dfcc"],"delay:rezoning_denial:withdrawn":["035003b98053fc06"],"delay:no_secured_tenant:withdrawn":["035003b98053fc06"],"delay:council_opposition:withdrawn":["035003b98053fc06"],"delay:water:cancelled":["46efd12bf3ea6dcb"],"delay:financing:cancelled":["46efd12bf3ea6dcb"],"utility:rate case:approved":["37ab93fd8b57c77e"],"utility:tariff:approved":["1543e61fc24998f6"]},"grid_operators":["PJM","MISO"],"counts":{"moratorium":26,"water":5,"delay":42,"atlas":40,"permits":60},"record_count":173},{"id":"IN","name":"Indiana","groups":{"policy:minimum-payment":["bf784d50ec22157b"],"policy:departure":["03586139e9d09948"],"policy:security":["19c77af74e853a13"],"policy:regulator-reporting":["dde07ed35b93f0c9"],"restriction:local:enacted":["963b8c0256246b3b","8eac5106889da9ac","183f5e5fde8b2c9e","a7e5ebb04d58be95","f4c86ae66329b23b","a3e5e35d93d700fd","a444b64740435e08","3a39e47da83f24be","c7133c46e29c6d69","5e41da92046a9bcb","ff803a94b802fe31","7db5ead22195b986","998bd34f448ab467","9e2594c01650c7f4","837d5ad2452c9a6c","42d0a19e60e69b3f","7a052f9efca8b303","5be45e17d6ec7513","c1be058ee36c4738","a86775303cb769f2","bba265c36e34c00f","ee5f8620c8465f3d","736410e487973794","faaee5c934ec1ecb","ee6a98915d4cd96d","678dfff8b193d0a3","0e6064d1c5503319"],"restriction:local:proposed":["e66e435a43f67c04","7467dd109abc68e3","fed5ec0ec8852137","c73095088bd90160","b24ea3f72d09cb82"],"restriction:local:failed":["845faec2de5f43fc"],"restriction:local:pause":["4d96d9bb18ac4024"],"restriction:states:enacted":["227139621030dba6"],"restriction:states:failed":["eea922145c00d1a8"],"water:moratorium:enacted":["2e6ca318ecd03dd0"],"water:siting:failed":["b35eb608d2415382"],"delay:community_opposition:cancelled":["bb2ed0971e6302ac"],"delay:zoning_denial:cancelled":["bb2ed0971e6302ac"],"delay:litigation:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:community_opposition:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial_or_withdrawal:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial:rezoning_denied":["d11979032cadd398","569435ce3fe609dd"],"delay:community_opposition:rezoning_denied":["d11979032cadd398"],"delay:litigation:active_litigation":["c5e676669917e797"],"delay:permit_challenge:active_litigation":["c5e676669917e797"],"delay:community_opposition:approved_amid_opposition":["6d8bec92336deeb0"],"delay:missed_milestones:development_agreement_expired":["27c39d9347a1192e"],"delay:financing_delay:development_agreement_expired":["27c39d9347a1192e"],"delay:unresolved_commitments:rezoning_denied":["569435ce3fe609dd"],"delay:county_moratorium:moratorium_in_force":["33af90259cf95dde"],"delay:county_moratorium:moratorium_extended":["6e309bb5ef6dcc2b"],"utility:tariff:approved":["4b48c2fabeec119f","fa98544ba5e059ad","6b0503ca135ba204"],"utility:special contract:pending":["113a466c8203c668"]},"grid_operators":["MISO","PJM"],"counts":{"policy":4,"moratorium":36,"water":2,"delay":51,"atlas":50,"permits":12},"record_count":155},{"id":"IA","name":"Iowa","groups":{"restriction:local:enacted":["6ec7f0571c9f0b36","b997268fd2bd8a07","a3d89d9d748c79e5","ece6aca21720a05a","b53022fa847d859d","2265266858f1808d","d2821404eb9b773b","e429297830c5c85e","2c27ac27b47a53de","8ce23138e1f0ecbd","0e74326bb2038903","245488a7b0f0baed","4ec7c3f119f63571","5d574b2e962d112d","57926d8a3b16421b","6873275732caceab","6572038f8fb6515a","09dabb3487e83177","fc20843db6b3c777","ab4c1a0e46a2c211","f73ca7c24ea9ea51","48355f233539620f","e170f696214b321f","8f8fd51101db1cc6","c5304dad0e04e811","75a122be02ae0d9d"],"restriction:local:failed":["0fa0b840766c8a19","c263db1bebb5e27f","a131c04ede50c5f6"],"restriction:states:enacted":["9e83b550b15760aa"],"restriction:states:proposed":["639d23fdd3311f98","262084f7a02f3ad2","e2e155d413c48eda"],"water:disclosure:failed":["304d0cab55c6bd68","e3e82ac6f5792d65"],"water:rate:failed":["42f37d1bced6be18"],"water:closed-loop:failed":["b47e084956bfc26a"],"water:closed-loop:proposed":["24ce35cf4b42f743"],"delay:multi_year_construction_delay:delayed_extension_requested":["4ce223b15edc681a"],"delay:design_changes:delayed_extension_requested":["4ce223b15edc681a"],"delay:county_moratorium:moratorium_in_force":["679ae4b13385d757"],"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":["12e1cb598a859683"],"delay:zoning_denial:delayed":["8e0bc83eff50a9de"],"delay:community_opposition:delayed":["8e0bc83eff50a9de"],"utility:tariff:approved":["a9a9512892558d03"],"utility:other:approved":["3046845ad149fe7d"],"utility:special contract:approved":["e59432224488c63a"],"utility:special contract:pending":["48182dc47986bf11"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":33,"water":5,"delay":37,"atlas":22,"permits":21},"record_count":118},{"id":"KS","name":"Kansas","groups":{"restriction:local:enacted":["092e69a7498ed6f4","c5d6b2d241f5cc17","5d6e924e754d82a1","d65aa07eb73bb390","2b56b5bc78d3d2c2","779bf14e695b30f3","46ebfe654cb98769","6b3d06b7e6d5546b","3e6f9643e146e802","a03f8a97d54da728","88a8f8a97b3eb631","5c9d3499ff80e6d7","61d91d35faaab6ce","49d229995410fd72","4654c90eb016ce15"],"restriction:local:proposed":["3989c573db251ea1","c49b85a22488877d"],"restriction:local:failed":["50ea4020ea582738"],"restriction:states:enacted":["2ee674af511b50f4"],"restriction:states:failed":["f13da72ca930c823","b3815616ed614981","c1154548fbef7c6e","8db95808ba8ac8e5","69b27b03dc718361"],"water:closed-loop:failed":["4eb2bfa0c2e15d57"],"delay:community_opposition:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:noise_regulation_review:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:water:cancelled":["70833cef331617f1"],"delay:community_opposition:cancelled":["7d838f4833d1b349"],"delay:financing:cancelled":["7d838f4833d1b349"],"utility:tariff:approved":["f77ece2de2ac70fa","3ba852096f736178","1dface436cf210c2"],"utility:tariff:pending":["3e89a8aa0948bcc5"],"utility:other:pending":["aead86c34e456420","7fee508d92451cef"],"utility:other:contested":["fe3448ceb67c13bb"]},"grid_operators":["SPP"],"counts":{"moratorium":24,"water":1,"delay":23,"atlas":20,"permits":3},"record_count":71},{"id":"KY","name":"Kentucky","groups":{"restriction:local:enacted":["a26d4b9555d02fc3","4a7e0503c84a18fb","068617b3ee7c1e34","27a0ce76b943a447","65fd1df9f999e56d","9b96e5de0e107e49","7206025d4f188dc5","a3f8e60045a8e496","3be8e5e1324a2209","ef0ceaa96e4124a9","b8c035523c2353d3","59ddefe2d22f34aa","bcf7474f970300a6","3b2a3d6c317e1650","a1acef1340d31231","a5a9aea1171b918a","baf08a5fdb9be408","626ca6058bcfe492","bcc91f5729167578","ad6f059e45735cb0","c9ad189fcf915368","78d859810fda2f18","971b3f19c633ffe9","0d7d376001869f9f","7cfc5e2b338d1914","0d5a0d6559c93531","341751834d403210","0cd0db1bab37a48b","a1b25cbc5a439391","6dbd46ac8566eabd","f6c91c535f7eae69"],"restriction:local:proposed":["f68fb746468a09f9","e795d08b5d2d9c0b","c509add78042616b"],"restriction:states:enacted":["77733d81d9d3baed"],"restriction:states:failed":["9900fddb93bcc64d"],"delay:rezoning_denial:rezoning_denied":["e55329fac133bb24"],"delay:community_opposition:rezoning_denied":["e55329fac133bb24"],"delay:city_moratorium:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"delay:no_local_zoning_framework:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"utility:special contract:denied":["253d0f130a165e15"],"utility:tariff:contested":["ae68fdeac34bbc8d"],"utility:other:contested":["42fead8f4bce2aaa"],"utility:tariff:approved":["801dfc830fd07245","4f7f2aea34be5c96","d0cda138d452d757"]},"grid_operators":["NON-RTO","PJM","MISO"],"counts":{"moratorium":36,"delay":39,"atlas":28,"permits":2},"record_count":105},{"id":"LA","name":"Louisiana","groups":{"restriction:local:failed":["082df063713becdd","337eff2a8faaedc2"],"restriction:local:enacted":["450b6661aa0aa3ae"],"restriction:states:enacted":["9ba2486256f256c2","144e7d01d58cef74"],"water:disclosure:enacted":["03f274e9a5dce14c"],"water:disclosure:failed":["f7cd1c9b5f782122"],"water:study:failed":["28f58e0cdd0b7e0e"],"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"utility:tariff:approved":["eff42b274f0be9ef","a83e236f50a73f18"],"utility:rate case:pending":["c65e9e2d95997fa6"],"utility:tariff:pending":["69e0ffd4849ee579","88fc6caa48aac8b2"],"utility:statement:pending":["457342b4fea42a74"],"utility:other:pending":["4a0bb7e423217973"],"utility:other:approved":["61067a61b636c781"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":5,"water":3,"delay":15,"atlas":9,"permits":1},"record_count":33},{"id":"ME","name":"Maine","groups":{"restriction:local:enacted":["ecd5966d9b342311","c36961854ebd6ca7","a4804efbc073f070","d766badde34909ee","3d017e2610e8d02c","b9330f5763dfe845","b2a8fec20ddd4e17","f5a714682b29daa5","8d49ab7b7f89d04b","27b044f270dad65f","be26656565cc2456"],"restriction:local:proposed":["6aff9b58bac5e8f3","ebf579b381f356dd","0afc065fdda3c091","b0ec262465eb00f1","8149b851eb2d0584","e3f47f6089a0ee71","3acc511d9da72bf5","fe1e50be7095ea83"],"restriction:states:enacted":["fe74bf6eed39dbcb","7d62f3ffa4427f55"],"restriction:states:failed":["4e5deea3e7dff0be","0ab980856a66fe1d","a3a43b954eba3113"],"water:moratorium:vetoed":["297d93ad9da5f26a"],"delay:state_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:local_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:water:denied":["922b3fd62f9c070b"]},"grid_operators":["ISO-NE","NON-RTO"],"counts":{"moratorium":24,"water":1,"delay":17,"atlas":19},"record_count":61},{"id":"MD","name":"Maryland","groups":{"restriction:local:enacted":["348298ff6f51a691","08097815a98470c5","4deb89713fe98326","8f74fbbd8993b148","3afe4fa64e87f546","8730de2c9ff67503","c73fe44c03df38ae","8dda8813a9c298d6","764a5ea5baee0c4d","6617f7b48c44c942","a8f91eecf6abf3b5","0afbbaf26cf8f904","83ff2804204a626d","9c034ea2bef0ece8","3373477ac1ec4f02","62bac4f016f1945b","11d1a89900718a96","eb36aed04afe9d8a","499348363c3b81ea","6f9687423e2dc4e7","dc1acf38d039ac19"],"restriction:local:proposed":["265e093c1f9eb417","755b1c07e83184e1","08ca97e19dc7abb4","3e8bbaa7cd3afe15"],"restriction:states:enacted":["17348e6b8d304518","b044300e1a2b5236"],"restriction:states:proposed":["5e23b6297efd7527"],"restriction:states:failed":["3c99947280200b8d","1fcccf76e9b86359","cf6793fd2c12b7d5","f1a32ee4fda04c94"],"water:study:enacted":["558d1f7246d3e647"],"water:moratorium:proposed":["e3bd79694db1db39"],"delay:litigation:litigation_active":["27582584bea51673"],"delay:local_moratorium:litigation_active":["27582584bea51673"],"delay:community_opposition:litigation_active":["27582584bea51673"],"delay:zoning_denial:withdrawn":["5aa3c5c167a2712e"],"delay:community_opposition:withdrawn":["5aa3c5c167a2712e"],"utility:statement:pending":["96ed3e4e28dc5f46"],"utility:tariff:pending":["b5a5ebb9845972c4"],"utility:tariff:contested":["151f94517d5bd763"],"utility:other:pending":["eecc4c5501407ced","de3593715e5e8754","b1f2cd97d9cd0cd1","246625aeebba0d27","e8088afeef1bad4c"],"utility:complaint:contested":["1f79c8153170b0cd"],"utility:policy:approved":["d89063b61a861688"]},"grid_operators":["PJM"],"counts":{"moratorium":32,"water":2,"delay":31,"atlas":22,"permits":12},"record_count":99},{"id":"MA","name":"Massachusetts","groups":{"restriction:local:enacted":["9dfd357ee1d1d79e","6fc10604ec34d46e","f0730563712dc086","e2b170911a980baf","443c78d2d2548652","51aa3706f59d3551","9a147c3e16821a2a","37641c80d5d22ef5","3bcf5029dee4b702"],"restriction:local:proposed":["6df99955fb5274ef","e88057500b5af5a2","251bed6de274003a","4e469b93e2617726","f9879ca8a354d99f","cbe95c8b12548c20","d3546c56fc54089d"],"restriction:states:enacted":["dbbfb14cd16be3f9"],"restriction:states:pause":["187e9da595e7eb96"],"restriction:states:failed":["8472091318232e86"],"water:siting:enacted":["c4f434d0074d8012"],"water:siting:proposed":["12f4ef4de2542657"],"delay:litigation:litigation_active":["655e83c186a87988","2493de70fabc445c"],"delay:environmental_review:litigation_active":["655e83c186a87988"],"delay:community_opposition:litigation_active":["2493de70fabc445c"],"delay:community_opposition:delayed":["27d4f05a55fdde9e"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":19,"water":2,"delay":10,"atlas":9,"permits":3},"record_count":43},{"id":"MI","name":"Michigan","groups":{"restriction:local:proposed":["c78ca68312691303","728e3efd8cbaccb2","f81a68f97adf08c0"],"restriction:local:enacted":["e6998880993aa177","b2511715ae4b990f","e1921072a7125833","98f07a32bbf38bd8","6f83b57549342f0e","2212cea497a5e376","6b17b974dff83ac6","0b835486e1c6675b","248845e3115d1b28","0e4058dda626a25d","576d5da42d138d11","bcdc28bfc405e76e","8408b058fbc315db","5d171a2ab62f7804","dc13381e1263b1fd","09e923cf2b67c07f","987c61998db8747a","1b63965c95a1e946","29918b3b1beffe19","99eeb7d2511ceb55","7bb3ee3000662f52","a0e759d085ba7e52","0d0e24de27bbc37a","2b9943a276289d6a","ee9073c9ad75a86f","9a62b17a98e57199","be5f41b4ec785373","ac7d9bd4ffd00f9e","9cecaa0a00ab43e5","1cb30633bb851922","f1c6da2f0000273a","ca9c48eee9e1d1a5","b70d22d7ae290b7d","c2d9415cc3e16da6","3828b0e2eec67db3","7e420db8d37c15f5","98cdd231fea86e2f","e8f1f476cf2c431f","c35e7a7d7cee74a5","e55663914c7c7dcb","33d2ea51a8acf987","51c80939f7496063","aaefdc75bd8c4aeb","911a6b9444bd1607","a7b6b76bf5329d54"],"restriction:local:failed":["516ad57aeb1648fc","b3ad7b9e668b591e","33b46a0d012daefc","3d03aba3f1700469","82599d14f4fba0f6"],"restriction:states:proposed":["a7533c1f529edc2d","6b7ffd32f765b5a4","456ce7c5d8d8f323","91c4adfd115bdb5d","c8d7e8822cffe0b7","98d30a9bf813c747","e816819481689635"],"water:disclosure:proposed":["c32c25eaa98e91c6","8bcea3f333be2510","905756b51034ebc2"],"water:siting:enacted":["d5816002c74cef1d","a2249bcfc2597539"],"water:closed-loop:proposed":["f8e09c679ee0460a"],"water:disclosure:enacted":["225876463f5c6047"],"delay:water_dispute:delayed":["1a7a2592e25c74aa"],"delay:local_moratorium:delayed":["1a7a2592e25c74aa"],"delay:community_opposition:opposed_planned":["90620f2ccd2b9bdd"],"delay:city_council_resolution_against:opposed_planned":["90620f2ccd2b9bdd"],"delay:rezoning_denial:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:litigation:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:city_moratorium:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:rezoning_paused":["cc32421f495a41b9"],"delay:planning_commission_postponement:rezoning_paused":["cc32421f495a41b9"],"delay:community_opposition:opposed_proposed":["8155ffe35c87d600"],"delay:transparency_concerns:opposed_proposed":["8155ffe35c87d600"],"delay:litigation:abandoned":["b9b9b57ad82d9568"],"delay:community_opposition:abandoned":["b9b9b57ad82d9568"],"delay:china_ties_backlash:abandoned":["b9b9b57ad82d9568"],"utility:tariff:approved":["630e6b38a0b9bb35"],"utility:special contract:approved":["cd42a1000e119f0e","50f9ae193de9e4a3"],"utility:tariff:denied":["a850b2486651c1d3"],"utility:tariff:pending":["5bc36f6821c8abbf"],"utility:policy:approved":["54c782b0ead7889e"]},"grid_operators":["MISO","PJM"],"counts":{"moratorium":60,"water":7,"delay":91,"atlas":55,"permits":1},"record_count":214},{"id":"MN","name":"Minnesota","groups":{"policy:cost-allocation":["0e9cef0d480c11c6"],"policy:departure":["96d76c523368de3c"],"policy:supply-review":["fa129260c9a1191c"],"policy:clean-energy":["5b0759b74511376b"],"restriction:local:enacted":["b739365ff698ee0a","d80387aab9ef2c1b","c3cc4eb6dd8578c2","0dc094cdf13edec8","5aa9e70c1a21d1c7","3fba111c587a7167","199bf867a340507d","d26a44d5312532d6","8e5e33fb9390f491","5ab133e795e83aed","385a484f3217fe24","793265102ee5e04c","35608fd55ce01e87","4fcdd676bd44f6aa","d1abcacd61245c1f","45935f6103775172","db3bb10a74b42708","ba8faf4607030280","8e02e3b0e7618f3a","3f4d995fd6fa4cfb"],"restriction:states:enacted":["2ab863890b12fdcb"],"restriction:states:proposed":["86e0d1d3835c9be9","c61b092c34b879a0","22e3f68246b5a4cc","797e76275710b3d8","7143edd8de397ba4","89d199639f253ee5"],"restriction:states:failed":["d0a94e01d35c42d4","3e22495abb3596c7","e2236d557902ae56","a3cf11f7c0f5a8bf","dfab67689c609a1b","23cc1180dbd6e5d9","eaed289a984419ff"],"water:moratorium:enacted":["e18e98913f2987dd","e11834d93a5792ed"],"water:shield:failed":["edb4285bd2e6d496","48bbbf542eb24d6c"],"water:siting:failed":["9c0626855c13a619"],"water:closed-loop:proposed":["bec7c68e6812d46b"],"water:siting:enacted":["f02889f2df50210d"],"delay:environmental_review:litigation_active":["51ba402b96b22669"],"delay:litigation:litigation_active":["51ba402b96b22669","2eb3d7b7efd8d959"],"delay:local_moratorium:litigation_active":["2eb3d7b7efd8d959"],"delay:litigation:construction_halted_by_court":["3e814c29543f4a91"],"delay:environmental_review_inadequate:construction_halted_by_court":["3e814c29543f4a91"],"delay:litigation:active_litigation":["6afa0ca47b947af4","f52d37a4709f02d3"],"delay:city_moratorium:active_litigation":["6afa0ca47b947af4"],"delay:environmental_review_challenge:active_litigation":["f52d37a4709f02d3"],"delay:environmental_review_pending:final_decision_paused":["452d128b99f4b891"],"delay:city_moratorium:moratorium_in_force":["7af8f1a65d714f3c"],"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":["796fdc6d59ce947f"],"delay:community_opposition:withdrawn":["7565837e009abac3"],"delay:council_vote_delay:final_vote_delayed":["800f8019c1868fa1"],"delay:community_opposition:final_vote_delayed":["800f8019c1868fa1"],"utility:tariff:approved":["0669b1659a0e805f"],"utility:tariff:pending":["bdec46fd73a2cf42","8fe5290a1832e86c"],"utility:tariff:contested":["2b6636adee0c7012"],"utility:other:pending":["049d9ec6a4db5efc"]},"grid_operators":["MISO","SPP"],"counts":{"policy":4,"moratorium":34,"water":7,"delay":31,"atlas":30,"permits":7},"record_count":113},{"id":"MS","name":"Mississippi","groups":{"restriction:local:enacted":["ecef92d17dfc1c52"],"restriction:states:failed":["ebb062a18af2c39e","4ed51c6c792fa708","e4e4ee9189096b02"],"water:siting:enacted":["5a06d81d34bea26d"],"delay:litigation:active_litigation":["4063038ccfbba534"],"delay:unpermitted_power_plant:active_litigation":["4063038ccfbba534"],"delay:noise_nuisance:active_litigation":["4063038ccfbba534"]},"grid_operators":["MISO","NON-RTO"],"counts":{"moratorium":4,"water":1,"delay":4,"atlas":12,"permits":1},"record_count":22},{"id":"MO","name":"Missouri","groups":{"restriction:local:enacted":["d90eaac4fe51359a","176fecd092621295","204232d5f8ca8df3","79b2a4ad0fec8c24","7017a935b3b7ecbc","85d940e773175229","f803c38f884f6aa0","de0764506bff684b","08196d135c493f63","8d67875968fb64f7","bed91c8df00c2c5a","21f8768f48599598","14bf3311c27da66b","9d5e52899f706d27","f5c0d2e49453bac0","8e6ecd071b72033d","c6cf03998a9e63c8","a9eede6ea17f0f0b"],"restriction:local:failed":["96f484a5795f8aff"],"restriction:states:proposed":["2195fea337e09dc1"],"restriction:states:failed":["79f07d9601a68a2d"],"water:siting:proposed":["fecf28fd776e3f17"],"water:closed-loop:enacted":["f922a9cc8df7f6f1"],"water:closed-loop:proposed":["c842f3220a560928"],"delay:permit_denial:permit_denied":["b6e024ff51469e78"],"delay:historic_preservation_conflict:permit_denied":["b6e024ff51469e78"],"delay:community_opposition:permit_denied":["b6e024ff51469e78"],"delay:county_moratorium:moratorium_in_force":["d74c3761e71266b9"],"delay:community_opposition:moratorium_in_force":["d74c3761e71266b9"],"delay:interconnection:cancelled":["8cb756be5b7ae3a9"],"delay:water:cancelled":["8cb756be5b7ae3a9"],"utility:tariff:contested":["8de24874c642dcbd","f91605a21f63d072","d9c3570921a04363"],"utility:rate case:pending":["082924cd33e117e5"],"utility:tariff:pending":["7394fb772ac183e9","faf8561206d5bf0f"]},"grid_operators":["MISO","SPP","NON-RTO"],"counts":{"moratorium":21,"water":3,"delay":32,"atlas":33,"permits":25},"record_count":114},{"id":"MT","name":"Montana","groups":{"restriction:local:proposed":["9243773c369f1ecf"],"restriction:local:enacted":["8d6ef72e11d1fccd","3ecba2b53f87c88c"],"utility:tariff:pending":["6dcfac3c7c1172f6"],"utility:tariff:contested":["d367203d6f870b27"]},"grid_operators":["NON-RTO","SPP","MISO"],"counts":{"moratorium":3,"delay":6,"atlas":9},"record_count":18},{"id":"NE","name":"Nebraska","groups":{"restriction:local:enacted":["d3d7827f878ed2cf","c57a91902ce91633","4674af901736f5cc","e196b29819de5c9a","135d7b8ca90eebf7","d568851b5061cdaf","81440ae3fafa3d75","e8af315b45a1acfc","08fcf1d2b6f49514","160252554036f1ad","32303ecaa9e0a2ad"],"restriction:local:proposed":["affd265938fabf3b","8c97d016dfddfc1b"],"restriction:local:failed":["1d8ae470cf5d925b"],"restriction:states:enacted":["230cce9838d45d24","e688676c3ac0f747"],"restriction:states:failed":["67b1ace6369704fd","50fd44805485a090","ff2913405faf7657","8d77947d7b8a528f"],"water:study:enacted":["fe6d9f80cee7122e"],"utility:other:approved":["32c8b9ae8d888b6c"],"utility:statement:pending":["4af3c2798acdbf21"],"utility:rate case:pending":["1e47741959ff4b29"],"utility:tariff:approved":["823eb52c6feaee82"],"utility:policy:effective":["c01aa91e1a04b36d"]},"grid_operators":["SPP"],"counts":{"moratorium":20,"water":1,"delay":32,"atlas":13,"permits":22},"record_count":88},{"id":"NV","name":"Nevada","groups":{"restriction:local:enacted":["333dd9b87e58bcbb","b9a69bbde96b5385","55b16953865e48f5","37f2d1d5eb3e2cea","5b58a9e336830633","6773b1cfaaba1346","935d2182c6d74d12"],"restriction:local:failed":["402c12e2dbad57ba"],"restriction:states:enacted":["619839655d751fb6"],"water:moratorium:proposed":["e61948237d868f0e"],"water:moratorium:enacted":["279be78d9d551bf8"],"water:incentive:enacted":["efec6184955a1086"],"delay:water_dispute:under_appeal":["d29280cf2b0521a1"],"delay:community_opposition:under_appeal":["d29280cf2b0521a1"],"delay:litigation:halted":["a81117457f2cb354"],"delay:environmental_review:halted":["a81117457f2cb354"],"delay:litigation:litigation_active":["114d5609ed0f4f35"],"delay:local_moratorium:halted":["5c9d9715723ce0bb"],"utility:tariff:approved":["a7207409cc3dfd45"],"utility:other:approved":["fb307da5f358f615"]},"grid_operators":["NON-RTO","CAISO"],"counts":{"moratorium":9,"water":3,"delay":22,"atlas":20,"permits":18},"record_count":72},{"id":"NH","name":"New Hampshire","groups":{"restriction:local:proposed":["e63e233025fc94fe","b44152b5d37d167b"],"restriction:local:enacted":["d80de2562936a0f7","92290f0a7d985a7f","36c9c8099e12dd15"],"restriction:states:proposed":["5a9909b17dfc57b4","02f0a87d99437f9b"],"restriction:states:failed":["ea8860685576e23e"],"delay:community_opposition:withdrawn":["c1a6706de3454167"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":4,"atlas":5,"permits":3},"record_count":20},{"id":"NJ","name":"New Jersey","groups":{"restriction:local:enacted":["73ec87cfb0aa92d2","9c00fd42521991f9","a384a032bef8e970","124a77e04ac821ec","f23cd51e2cc7cb7f","238c6e78c54a4877","3af6dd3170f1aa82","714725f2229b99d0","08f19d7681319c4d","8cf681d798655aaf","20d0aeda361ce61b","a2b1b417fb0a76fc","face92012462a2a7","968c4f50d3bde674","ceb24ddecb59d86b","3a5c452ca6841c71","742e4aac2483f4af","80f6f1b93985f9f7","c95d899c60e09eb6","7c69fc6032dd27e8","60c1835a0012ce53","054f376e8df396e6","64e87a1ece4414b3","1b9d7255dcc00d88","e3e0f29d691690ec","01b12fb419074edd","c74b23df8b93a3f0","db82850c96b7a694","9844557ef3af937a","559fbafe318ed5ac","0c592d7ddda2c6ac","a784c9eec1d5c3f7","5fb4b28c2b68eccd","ea304a4830a80fb4","fe372a70ddf19936","48334bde9c2fa0b9","d177f8f0171343b7","62a91ee8ab340642","ebd8ee2e6043e34f","39ed97a814dde3a9","3a432a805dccac1c","50b87b303123480f","9a18c03c18a10dd4","b3ca39b6b1630160"],"restriction:local:pause":["1a9db0d9060caea1"],"restriction:local:proposed":["ae409fafdf46bd29","f884ab9b88fff31b","927a7a3ac1c78482","d95561001f914447","7be184c2d2a57e2b","0e8c72bfcc16a39e","8820df8f26c39fea","78d39318109dd5e8","fd2b054d547ea766","df9befec2a94c308"],"restriction:states:enacted":["4df967540ce38c86","30be08e4be6ac9ca","68de33fe969f9287","0438d1ace3661698"],"restriction:states:proposed":["f19c1038b15c7609","d12af38fe29d843e"],"restriction:states:failed":["f915c938338285f1"],"water:disclosure:vetoed":["800fd0cd4f6bebba"],"water:siting:proposed":["45f1ccb950a71b8a","a375aa38a4210e7c"],"water:disclosure:proposed":["0cf376028b422204","36230e1c7c9edac6","c77115dfc059c958","de400f891c588542","6998a87b3e02ca11"],"water:study:proposed":["a7495217b70ef1e5","9cef65942ed49967","bced9687293104ba"],"water:disclosure:failed":["59ae5b971166ac3c","791cdd88090bef4e","1908cf4216d925bc","073e65e826df6c51","378fb181ac8f016c","60262597b91c5af0"],"water:study:failed":["f640ec3294e3f1f2"],"delay:zoning_denial:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4"],"delay:litigation:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:local_moratorium:litigation_active":["b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:community_opposition:litigation_active":["b617e293b82d2ac4"],"utility:tariff:pending":["f28161bfc2c29f8c","3620e96459726891","1a6ae3c2ad122164"],"utility:statement:pending":["2e9ea8571e10d078","7a11205dc76a67a6"],"utility:tariff:approved":["296ea913839e1b58"],"utility:other:contested":["5c1b494458632232"],"utility:policy:effective":["3af8bf166bd3c54d"]},"grid_operators":["PJM"],"counts":{"moratorium":62,"water":18,"delay":72,"atlas":65,"permits":18},"record_count":235},{"id":"NM","name":"New Mexico","groups":{"restriction:local:failed":["818109db81472817","f9afe907073e0002"],"restriction:local:enacted":["297204240678eb0e","9ff51438652ddf60","59bea7e940d70194","ada7aa80e60c9320","5eb7f0ff789e43fa"],"restriction:local:proposed":["8ddb604cc82e2c35","b6fb3ebcb7f6c50f"],"restriction:states:proposed":["a99720a3bb94fcaf","78568f32702491ba","b4b3d5817b49728f"],"delay:litigation:litigation_active":["f3a0c010a8f35a41"],"delay:zoning_denial:litigation_active":["f3a0c010a8f35a41"],"delay:community_opposition:litigation_active":["f3a0c010a8f35a41"],"delay:financing:litigation_active":["f3a0c010a8f35a41"],"utility:other:contested":["8ef259cb295588bc"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":12,"delay":12,"atlas":10,"permits":7},"record_count":41},{"id":"NY","name":"New York","groups":{"policy:environmental-review":["71f511e90d956ca8"],"policy:permit-hold":["4c560e212a74545e"],"policy:supply-review":["ab3c1a20557c8b23"],"restriction:local:enacted":["77679a7c3332c853","a787c81c1d3730a4","cdc22ba5f2f05b59","b14b8ef8ed1860cc","8cca37bd22e9d7b5","4975cfd97e76b52d","bd582af96f35230a","5ffdbe85acc1bde0","a1694e06d983606d","8981b39c54144dc6","d0967cbc5048c7de","210debbc0355f8ce","f47af1d0c2261335","b9f412d2266126c0","723df3b34c814ee8","cebe672bdd456765","edbfc6143edc2bdf","8a9e37cabb7d8067","59d414cbb6a42f77","17aedba2bb3f2d87","2e58841b837a406b","0e1022291bffc7b7","12dd3a35361949ae","3511a027b56d7d7d"],"restriction:local:proposed":["dcd7ff846525f0e1","08c437cc51d4c950","789641906952093a","28bc949979bb83db","111d81838fa01dde","3e58cfc1f209b083","7ae98bc62927c82c","9137cf580ba6858a"],"restriction:local:failed":["cb6d8c82049c8acb"],"restriction:states:enacted":["869f08a4a1fa556c"],"restriction:states:pause":["841d22380b00ad01"],"restriction:states:proposed":["b7ba31aec1fafd00","47c9cf15c60d51b3","daaf6dec95bd6ec2","07d737c4acf173d7"],"water:moratorium:enacted":["8fc3c7d9b9ff9ba8"],"water:reclaimed:proposed":["4ee636f9337e1806"],"delay:environmental_review:delayed":["51347b4b64fa9e01"],"delay:community_opposition:delayed":["51347b4b64fa9e01"],"delay:state_moratorium:halted":["293beafa3fa06f20"],"delay:local_moratorium:halted":["293beafa3fa06f20","77e9bf4bd7aac210","ee2c0366ee0ef429"],"delay:litigation:litigation_active":["e81eb7c91736a32a"],"delay:state_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:local_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:zoning_denial:litigation_active":["e81eb7c91736a32a"],"utility:other:pending":["57638a6f961a13ac","1552fe1a118cce4c","e654e6cbee2e4334","6cf999b790c4a9a6","5b7294bb9bbf171f","a15e9c634f236eaf"],"utility:tariff:pending":["acb3338b2c56b00c","637843fba8961a3b","f4e2166ff0723f1e"],"utility:tariff:approved":["d8fdd2247363f439"],"utility:other:approved":["4b76df05fa507106"],"utility:statement:pending":["85d4d00b457a99fb"]},"grid_operators":["NYISO"],"counts":{"policy":3,"moratorium":39,"water":2,"delay":41,"atlas":26,"permits":4},"record_count":115},{"id":"NC","name":"North Carolina","groups":{"restriction:local:enacted":["0878148bce531a65","26626f41150f13d7","5d4e94286383e811","45843231657d4577","b767f9b8778c3e9c","0425c77f21429fc9","160ecb6859daba38","f700899151bd3d13","afaf001e2ddc7c0f","9125956ad212eba6","1e5e7d19256112cb","de170f5d806a8488","7e05882bb14eba58","d5446d1a27d68afb","66d7df4ef7713b17","a96570a4d8c02995","03d509191d6a1bb8","d3b97dbcfb4cc458","11b4b426a5a3adeb","9730db9306df2eda","f7b5b5059f3d9a76","a7863b1a8d95a6f9","e6debd81c60b3074","72b422fc810eeab3","6bfcfb56a94aa399","0fe95e27742d2793","7f7b78e8dd0072a4","3ab16e9b6bda0047","58f61d5e2dcac367","901f12fcfb423655","77ad5d31685db4d2","13de2569fd40eab9","2c3f7f7d7474e8df","047fa125450d5c53","d7d45ef0e253b55d","2aa6e2ef54433db5","076a69b4395ac51c","aeb0772ca82eb874","49ad917ecc3002cf","c355e8d58e082040","1eeb09c2f8b5063f","37a1cf7995845834","2bd64ffed6dec4b3","17d8cc51d6a5711f"],"restriction:local:proposed":["84efe8243d6504bc","181bd4b518b2cfed","b83f8907c29714e9","8294c67374182bdf","8b259a9fdb940566"],"restriction:local:failed":["928488ab5100d192","aafc220952d6a48c","e3fad9e4ae5cae83","b68811b610a11964"],"restriction:states:proposed":["f10a82ce8ce07853","2bf52937fb8640a7","d91aa188fd06f5e0"],"restriction:states:failed":["35ebc5f44dd67c98","ccde728219226db1","857477e095526aaf"],"water:moratorium:enacted":["b9f652a9b7c4b011"],"water:moratorium:proposed":["38d2bf42e833778a"],"water:closed-loop:proposed":["ad8e73dba358f034"],"delay:community_opposition:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:zoning_denial:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:litigation:litigation_active":["26de238e0f400d29"],"delay:local_moratorium:litigation_active":["26de238e0f400d29"],"delay:community_opposition:delayed":["886117a42038f872"],"utility:tariff:approved":["3733629beaf1ada1"],"utility:statement:contested":["8f109ead8aab43d0"],"utility:statement:pending":["5338dfae87b7a6f7"],"utility:tariff:pending":["535ff2bea70f7e1e"],"utility:other:pending":["36e711f6271a98a9","b8438dca9b49aebd"],"utility:tariff:contested":["1a0900299d02d68d","f4c8c4668d869233"],"utility:rate_case:pending":["45ffc3ccaa151b55"],"utility:other:denied":["7d51d5e504430b5e"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":59,"water":3,"delay":67,"atlas":44,"permits":34},"record_count":207},{"id":"ND","name":"North Dakota","groups":{"restriction:local:enacted":["918ec9976a6ebc76","5fe4251ab4cdcb1d"],"restriction:local:failed":["da10b7684b67acdc","b94dc16d48f67fd9"],"restriction:local:proposed":["0867cb4ffce5c18b"],"restriction:states:enacted":["10810ad90dae3c22"],"restriction:states:failed":["06b00e83aed9df20","37e09c9be2329183","45f55a5bdae7aa9c","bc1c99050827355d"],"utility:tariff:pending":["bd130d6595b26f7c"]},"grid_operators":["SPP","MISO"],"counts":{"moratorium":10,"delay":6,"atlas":9,"permits":2},"record_count":27},{"id":"OH","name":"Ohio","groups":{"policy:cost-allocation":["55634d9b0e3dbe0d"],"restriction:local:enacted":["461dc19405784392","691815701a1e7b84","407f6a32f3a3a0ae","1d451c4d01991061","c05d611c3e7dd8d5","303593cae196f587","7a83cf56d52a963c","7fc064d20dc788bd","a7e5c5aec188366b","7ce6031118cad4fd","8f219dc030624cd2","950d5e0e199dfb22","c2b95d5838587ff4","9ba6b9b9692b4708","d72f4489e825fef2","940b6159ab502612","f0c97f968bab3081","405f1ab18b45cec2","8542695ddd9b5b30","7026f0fd2b5bc6f0","ca89ad24dc656f79","978214f7dd1d9d8f","c1bda0acec337164","730091555169da66","3b3d27d4919f1e77","a96013d0b5b1c9a2","d8f63ab9b450228a","cc6ca7b31398d910","306d3fab23b96651","f394a0eb7801b57b","0ac4ec70dc0bb4ba","6cbf93fd3792d38e","c0aba8a27555a0c0","d533d9f7cdfc603d","ea2a114d10a3194e","61fe898c9107f2ba","4b26ee4f418c3dd5","cccc5aef83beacac","f1d5c9a4b6023b27","4fbd89f670532629","421b341a093f14c9","53701fd2f75ff500","23811974e54dcac2","b90f5b1569114026","ca5208c669ad2550","ecf81cf135cd7c41","fe4bc2e21abc7fd0","c636f6e8fe61d8bc","70667db94a767cf0","d3ccdcc868a68902","0fc759bfa86292c3","12369281bb53a55f","5f2de78e4e2f9413","2321a1c503022d33","bc140f9d0778a158","88cd458bc7993ab1","e281827c22b8aaa6","904259f746e7f001","668044e9a5218b84","e526f703d4ba3d40","406582468189cd53","e560f4fc1b2d48cf","15eda7648a7da254","1ea75a7e46cea951","8c428e28c6fa59b7","94595b6204b14f34","a795c2b6fa5fb605","a91e87e8e532a81a","0f566e9f055d874d","a3338ba4c589f2a1","024a636c91c52568"],"restriction:local:failed":["941a2b27ff9dd2f9","f0125c1f3d577939","1984235e10d07864","47e7f50ceb79bde2"],"restriction:local:proposed":["329efb5b9ab278b2","fe3263d096bb1d42","f0c8462ea6d10a36","5d2dc1ac11a37fd0"],"restriction:states:enacted":["a33e963e7ed0f3f9"],"restriction:states:pause":["aac6bd4ca937a3a1","790d7df967d13e33"],"restriction:states:proposed":["9791d6ee8a159714","5bb7dbbf3f54e1f6","076c38b44f191708","35dfe120e8f90c81","a4f886faea465453","f67274b3d1ca79e3","b0b20187a84ac61b"],"water:siting:enacted":["1fc784371ef77c63"],"water:closed-loop:proposed":["d9a55d5bd1815a7a"],"water:disclosure:proposed":["07d5958ebc0e2919"],"water:siting:proposed":["af9b7989afe0d6ff"],"water:moratorium:enacted":["b03281ae45156609"],"water:rate:enacted":["f38675b9d14c3301"],"water:shield:failed":["31cb3e61422ae705"],"delay:community_opposition:delayed":["6041ee70dd8ec4f2","33619bda345609b8"],"delay:regulatory_review:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:power_allocation_dispute:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:corporate_reassessment:construction_paused":["ec84904200576a9f"],"delay:openai_relationship_change:construction_paused":["ec84904200576a9f"],"delay:tariff_costs:construction_paused":["ec84904200576a9f"],"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:signature_gathering":["738d37cb16e4b52b"],"delay:statewide_moratorium_push:signature_gathering":["738d37cb16e4b52b"],"delay:local_moratorium:halted":["8924323156a513a6"],"delay:community_opposition:halted":["8924323156a513a6"],"utility:tariff:approved":["b119f3dad60e8067","b0b7b5e3ba42091a","feb6e8ebba7bc21b","d471fb8c04d4d42b","e688652c63a8603c","3b0d6703179b004f"],"utility:tariff:pending":["4e7c1eaf6aefd563","8d64014cf73ea8c5","33358a52bdbff1e9"],"utility:tariff:denied":["d77af2ba4e087bb7"],"utility:rate case:pending":["1f4f51f2805cd230","4e52d117f119a0ab"],"utility:other:pending":["8867995dfeac8af8"]},"grid_operators":["PJM"],"counts":{"policy":1,"moratorium":89,"water":7,"delay":156,"atlas":100,"permits":15},"record_count":368},{"id":"OK","name":"Oklahoma","groups":{"restriction:local:enacted":["50b51ab105de1694","4d5225243a046a38","42183c5f0e187ec9","2da276ac2eced4b7","409936f3ff16ca77","fd3e3e400e15bcb3","311f0b103dd1c20a","e11236c60dcb019b","af39a5a9b91cf374","80850e3b3240130d","6d6d4b47a1f08094","fd7e05f695b792fb","57bfec0310076c02","ac38ecc9080693a4"],"restriction:states:enacted":["5ce11b610f2019f8"],"restriction:states:failed":["c5ac0e3ebaec0fff","df4a0cf535656562"],"water:closed-loop:enacted":["f01e9c7f92ad912f"],"water:disclosure:failed":["4cffe4be712b7fee"],"delay:community_opposition:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:water_capacity_constraints:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:city_moratorium_partial_exemption:phase_vote_delayed":["d2464a0059b2da36"],"delay:planning_commission_delay:phase_vote_delayed":["d2464a0059b2da36"],"delay:community_opposition:opposed_proposed":["d6d03051edf8cadd"],"delay:transparency_concerns:opposed_proposed":["d6d03051edf8cadd"],"delay:water:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:community_opposition:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:financing:cancelled":["b81165f74fca6c9b"],"utility:complaint:contested":["6a0e62dd608338b3"],"utility:tariff:pending":["0244a5050bd89f54","d23c9de2ed780784","369b25b59f1044b0","8caf179819a91899","b44407ade651e171"],"utility:tariff:approved":["7c0393e3288507ab"],"utility:policy:effective":["533edea4d22fcfc3"]},"grid_operators":["SPP"],"counts":{"moratorium":17,"water":2,"delay":29,"atlas":25,"permits":34},"record_count":107},{"id":"OR","name":"Oregon","groups":{"policy:cost-allocation":["ec3aab8c8e487810"],"policy:minimum-payment":["09b69a3ac7ed320c"],"policy:clean-energy":["573b7be7282c24e9"],"policy:regulator-reporting":["82e5b2896507c105"],"restriction:local:enacted":["c46ac99932456879","bfb08271f1889aa3","406a4fe8c580044d"],"restriction:local:proposed":["9fecbaadfc504d91","55072e55f3993603","c167670c15d2c9ec"],"restriction:local:failed":["2217c7fce49a6fcb"],"restriction:states:enacted":["4266a70286a34bc9","fd7d68ca06671d0b"],"restriction:states:pause":["b05de37e3bed5008","0bb7ee781820adb4"],"restriction:states:proposed":["1d87e7ca35d788e4","97e59a9c63be62e9"],"water:moratorium:enacted":["f436cd79501cb106"],"delay:litigation:litigation_active":["189ec25f09c73d30"],"delay:local_moratorium:halted":["fc7ac8c5e0c9a3e0"],"delay:water_dispute:halted":["fc7ac8c5e0c9a3e0"],"delay:tax_incentive_change:halted":["fc7ac8c5e0c9a3e0"],"delay:community_opposition:cancelled":["508cd09772361d44"],"utility:tariff:approved":["8f26d54b8098d83a","933a75515edac858","919ed293cccce0b5"],"utility:other:approved":["fd904a85f9f038d0"],"utility:tariff:pending":["90bff93d506e12d8"],"utility:other:pending":["500c12c6d84c5535"]},"grid_operators":["NON-RTO"],"counts":{"policy":4,"moratorium":13,"water":1,"delay":16,"atlas":8,"permits":28},"record_count":70},{"id":"PA","name":"Pennsylvania","groups":{"restriction:local:enacted":["38de5bf25db60ea6","a07e0f5e3b200bbb","e0e19b054c78ba90","d57a038848981525","08cc6d470b3f20a4","786ec40f80121492","9d46b0435161c347","7f0801a61ac6bdc8","e91f573252606528","30d8d8996a24365c","7a05632963af26b7","0525ead7d8196b60","c49102319b7d9c26","828f9f1b7a9fc4d8","7e498adfb9cf36be","30e2226befeb9e41","d01de37fe2c38608","3ef85431f6a82760","50a74ef750ecebc2","86690394ec34fe0d","f4098716a0ee721b","2f1f35aee33b8d1b","0b7ff980380eafa0","a80d24e122853bfe","83bf5bc987c8973d","b4f499936ec56461","b3ea3d581da9a606","71a38b1ed5950ad1","e191001ca64a606d","f9511193a66cd3bc"],"restriction:local:failed":["491849e21df0aa97"],"restriction:local:proposed":["04f7d83298b30de7","f979d0fdee3f9fa3"],"restriction:local:pause":["533afd77cfc5eebb"],"restriction:states:enacted":["7f4af8a87d95c544","7471943bfacd9b79"],"restriction:states:proposed":["6aa38b3ad7bc8095","30479ff8f518235c","2f437f53e7c38048","535c2efca50b83dc","1b368eec31f98fde","5442b108786851c0","f486ff97ce82e49d","7739eeecd45bc5b3","a5f21a3c4a91636e","a4c98945f6116fb9","122b2ca8ea2dce4c"],"restriction:states:failed":["291e4c7a5a21088d","9a687477c380a153","9ab4c50b87f3e567","c916da28feddac2f","a879ae6745a42d11","ce6deddc6f7620a6","d3752761d30cd8b6"],"water:disclosure:enacted":["71b44216bc39b316","19977f7326ae5f36"],"water:disclosure:proposed":["ce335eca213a335f","268f6575720b3e76"],"water:siting:proposed":["e6cd4c87af287f2e","ec0986faeb616e79","02edb086bcb4ec16"],"water:study:enacted":["7e7071bf9f2d7636"],"water:siting:enacted":["f4b911f9a8638b44"],"water:closed-loop:proposed":["ecec2267314e711d"],"delay:zoning_denial:under_appeal":["221a7177ef54c146"],"delay:community_opposition:under_appeal":["221a7177ef54c146"],"delay:litigation:under_appeal":["221a7177ef54c146"],"delay:litigation:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:cancelled":["72fbfc95e6717af4"],"delay:zoning_denial:cancelled":["72fbfc95e6717af4"],"delay:community_opposition:delayed":["91270d77ce33c433","b79613921282641a"],"utility:tariff:approved":["4c72868c8e004412","c89690d0346c7890","ac3f1efb2976fc5b"],"utility:rate case:approved":["e934571677cf1704"],"utility:other:pending":["fbc1615a2aea7504","84096c1cd33d1c29"],"utility:tariff:pending":["6ccd7eecfb420cbd","03f4e94591ffe708"],"utility:tariff:effective":["d4a74e67bb8dc281"],"utility:policy:pending":["04bd0eb54a15c158"]},"grid_operators":["PJM"],"counts":{"moratorium":54,"water":10,"delay":84,"atlas":53,"permits":21},"record_count":222},{"id":"RI","name":"Rhode Island","groups":{"restriction:local:enacted":["ed259525eb90ab6d","dab8ece38c5fb9d5","09f9a1112ca9bb16","8758bf36db37de62"],"restriction:local:proposed":["9c9aa6a6cab87eae"],"restriction:states:proposed":["39109139e4499da1"],"restriction:states:failed":["87b18404613879e9","1ca1db6d54c60804"],"delay:zoning_denial:litigation_active":["09f90dd4b212e592"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":6,"atlas":5},"record_count":19},{"id":"SC","name":"South Carolina","groups":{"restriction:local:enacted":["58631f91fad85e5b","b8911b8723010e16","f7b981d36cb76fc6","ead5aac6d1de0198","28116638b206c684","e712a9602d7fc092","17168f8283569007","3fbf04d4d1abbc30","b5c702b7d9d268b1","31c3c407ecaa9b02","08d501a7dce90945","bfe556ca5819bf38","65163505f47f6e65"],"restriction:local:proposed":["d522fdfd4fa7adac","9e6a95af9b1a6338","5e3217c2394c85d9"],"restriction:local:failed":["ead4c3dd6bcf23b7"],"restriction:states:proposed":["70456b2f17fa016f","1bd520760aca35e7","dfe1a31d8cfe99e5"],"restriction:states:failed":["d7cf8717beef89cd"],"water:closed-loop:proposed":["836cb4c1add36778"],"water:siting:proposed":["d5588d305d72ed31"],"water:moratorium:proposed":["feaa74b8ade8d152","e0c20f860681a471"],"water:disclosure:failed":["2a360b96adeac4a5"],"water:closed-loop:enacted":["c4c6394d78cf14cf"],"water:moratorium:enacted":["83129110381c2b8d"],"delay:regulatory_review:permitting_challenged":["ebbc3548ee675c57"],"delay:environmental_petition:permitting_challenged":["ebbc3548ee675c57"],"delay:utility_interconnection_timing:abandoned":["59d31c90f99a8e27"],"delay:withdrawal:abandoned":["59d31c90f99a8e27"],"delay:county_moratorium:moratorium_in_force":["4fd68a1a4d95ecf1"],"delay:permit_denial:halted":["2a19530b645b4515"],"delay:local_moratorium:halted":["2a19530b645b4515"],"delay:community_opposition:halted":["2a19530b645b4515"],"utility:tariff:approved":["a6a9b54dc2f7e887","4acfdfc6ae530074"],"utility:rate case:approved":["836e8495e0094213"],"utility:other:effective":["4650a698f603d88c"],"utility:other:contested":["5976280cf4e599c1"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":21,"water":7,"delay":30,"atlas":22,"permits":3},"record_count":83},{"id":"SD","name":"South Dakota","groups":{"policy:cost-allocation":["e1de11c16d8239a6"],"policy:departure":["b87c8e5ab20d7865"],"policy:supply-review":["5f04413f1e1d314b"],"policy:water-reporting":["3d0987d18045023f"],"policy:local-authority":["d5abe6128808804e"],"restriction:local:failed":["0c5ecfaba5561367"],"restriction:local:proposed":["5a5f4731708d3508"],"restriction:local:enacted":["127e547bdcf06887"],"restriction:states:enacted":["e69882d4dd9dec56","e0c13222b8896f55"],"restriction:states:proposed":["d2cb3118b636a794"],"restriction:states:failed":["3ddf71976e354659"],"water:disclosure:enacted":["95158506706fb5b4"]},"grid_operators":["SPP","MISO"],"counts":{"policy":5,"moratorium":7,"water":1,"delay":4,"atlas":4,"permits":1},"record_count":22},{"id":"TN","name":"Tennessee","groups":{"restriction:local:enacted":["15608211c6ca3581","307b38ee1b228384","23049879ff0a5d1c","7cebe8d5c67147c3","747d1db6063c1a74","51b2b9b3a961b6ab","de659fa3e365eec8","33552bf4e80b18ee","730a5f5d55050cb7","087bbbb5a483b776","0137c4ed47954709","8272522f979f7008","9d632430d6a03021","78dbb699f219d0d0","1f546cb2797f996d","c43fd1c858232412","b97b3954b1b0949c","d68b3a39798f9791","f0bb509eaf3c5b2f","a431da7d7f705e27","048501d4a5383269","8cb4602a6ee8dcbd","af28772857e3903f","3e19367856e206f1","241a6f9524fa5b55","54976e44fee3018e","ebeae99d6b6421df","0d02b8ce1211373d","492d17cc76c60e58"],"restriction:local:proposed":["c72ff700a8b5e0fe","a5263d6dfaed1a21","05ec77d83a2fb722"],"restriction:states:enacted":["3c219120a612265b"],"restriction:states:proposed":["963831dc8907e951"],"restriction:states:failed":["640e5053d7ed492c","2f485290fc876c3d"],"water:reclaimed:proposed":["34047d55aaad8568"],"water:disclosure:failed":["3024f2dbcb00785c","7932fbffdf71a9e7"],"water:siting:proposed":["95d5d77e861f2e1a"],"water:moratorium:proposed":["51b30007138592e5"],"water:closed-loop:proposed":["bdc557047de3e52b","3b9e61fb1da5de65"],"delay:local_moratorium:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:active_litigation":["f23f3210c5447afd","9783ae8705aab3e7"],"delay:city_moratorium:active_litigation":["f23f3210c5447afd"],"delay:eminent_domain_threat:active_litigation":["f23f3210c5447afd"],"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:environmental_review_order:active_litigation":["9783ae8705aab3e7"],"delay:unpermitted_power_plant:active_litigation":["9783ae8705aab3e7"],"delay:community_opposition:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"delay:transparency_concerns:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"utility:tariff:pending":["b63a0876c6c743c3","af3b47ccdb7cb94a"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":36,"water":7,"delay":38,"atlas":29,"permits":5},"record_count":115},{"id":"TX","name":"Texas","groups":{"policy:site-control":["170b3631ad48f5a9"],"policy:security":["1deb6f4ebbbba3d4"],"policy:curtailment":["56b017e8edee0f3b"],"policy:emissions":["e17cedb3112fd488"],"restriction:local:enacted":["cb4fae95f6ec62e9","226d9579a44729dd","8725a51570228ad5","9cd0e5a2740b6579","49d98f654070e13e","5a6631afcf14f245","1526c144af9c4197","bfaeb2b05925f9bf"],"restriction:local:proposed":["aa120245d3cde2b5","4bbd796802e5b2a9","29dbbc44e88a23f5","d4ddebe26453aec0","fd40bfb18bd582d1","e3d9ca006093dd8c","347c664b42d6867c","f141990e3f9ddb5c"],"restriction:local:failed":["4cf9e86df26cb47f","036f9e40cb83532e","8fbbd5e4d1430368","0148c0779dde3d94","c154399207131e2f"],"restriction:states:enacted":["35fcd20bf3d4a4e3","07b7360c48f3c46e","98ec338e6e03cba0"],"restriction:states:pause":["707703d5f96368d1","41c39b9ee7a58df2","9607cd1000488b0d"],"restriction:states:proposed":["8d85cc66b1113104"],"water:study:proposed":["97674740d6ace3d0"],"water:siting:proposed":["ce0a82530ed2e6c2","617e27c4c491786f"],"water:closed-loop:enacted":["a3bc163e4fc8a78f","b41ba038f3b958e1"],"water:closed-loop:proposed":["0711b71f0ca0c23e","0026ba717d68569a"],"water:shield:enacted":["f512098faa3bf9c4"],"water:siting:enacted":["0d07fe0b0e4fa3bb"],"water:disclosure:enacted":["f4c280b4acf60e61","4fe0a4491af0e56e","ab5ef43c0bd56795","18fff3b222f896e1"],"water:moratorium:enacted":["23aaebd91e78f209"],"delay:state_moratorium:withdrawn":["a8fe02f84bc4a666"],"delay:transformer_supply:delayed":["a60e9b00093891d5"],"delay:gas_pipeline_delay:delayed":["87485593349454ff"],"delay:corporate_realignment:withdrawn":["15ca382a6f880e9f"],"delay:financing:withdrawn":["15ca382a6f880e9f"],"delay:zoning_denial:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:cancelled":["9832792554ff4c9d"],"delay:community_opposition:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:withdrawn":["0581ab61da4d6697"],"delay:community_opposition:withdrawn":["0581ab61da4d6697","adfb727c5dd4e1cc"],"delay:litigation:litigation_active":["792ce5aec9329c29","109278a363838f96","f27cb758664748d7"],"delay:community_opposition:litigation_active":["792ce5aec9329c29","109278a363838f96"],"delay:corporate_realignment:delayed":["0120772c7188f042"],"delay:community_opposition:delayed":["168b4298a9ab289d","f7513e35f7c721c0","2e380fe2f7f014dc"],"delay:litigation:under_appeal":["f08287b22f91f244"],"delay:local_moratorium:litigation_active":["f27cb758664748d7"],"delay:zoning_denial:delayed":["2e380fe2f7f014dc"],"delay:interconnection_queue:halted":["d5e9430ff55efa0d"],"delay:zoning_denial:withdrawn":["adfb727c5dd4e1cc"],"utility:tariff:approved":["75dc99c20658fe92","aed4fabd0e2dc51c","9a879f558b598ed3"],"utility:rate case:pending":["3af74a147ed90618"],"utility:other:pending":["234c8b4fd863479c","b540667ef8b17e0f","0b11ccddef1877eb","99a349313213c782","87c2bcaca8770a64","ca36e7d667fd52d5","624c21796e30622a","6218dc8d9c2c19aa","a068f88c8918edb0"],"utility:special contract:pending":["85e644b149d44cc3"],"utility:tariff:pending":["179ce9c6749195ff","ecc5b89ff5cb7890"],"utility:statement:pending":["d04486225e3fbb69"],"utility:other:approved":["0b929d848501d87d"],"utility:certificate:approved":["f70bcf2339f86b49"],"utility:policy:rejected":["c7c2a7a3b4cd9ee5"],"utility:policy:effective":["ad4e34e0dfe00af1"]},"grid_operators":["ERCOT","SPP","MISO","NON-RTO"],"counts":{"policy":4,"moratorium":28,"water":14,"delay":83,"atlas":135,"permits":127},"record_count":391},{"id":"UT","name":"Utah","groups":{"restriction:local:enacted":["fe8d104f8d67e17c","093e457d95e139ba","a73c33aad89fd8c4","d39140513b342349","0c19d0bfb2b41666","be172ab12b60089d","7272dd8d9cbcbd97","2c4637d21201bc5a"],"restriction:local:pause":["6689ae5de85fb884"],"restriction:states:enacted":["161bb7df391f5393","29634d18789600f9"],"water:disclosure:enacted":["aa23c2f90b922d2f"],"water:siting:enacted":["92181bfbd0f092dc"],"delay:local_moratorium:litigation_active":["43fe8f06c251d00a"],"delay:zoning_denial:litigation_active":["43fe8f06c251d00a"],"delay:community_opposition:litigation_active":["43fe8f06c251d00a"],"delay:tax_incentive_change:cancelled":["9a747679a42936ff"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":11,"water":2,"delay":16,"atlas":23,"permits":16},"record_count":68},{"id":"VT","name":"Vermont","groups":{"restriction:local:enacted":["fd5d7c35a8a164d5","ffd4551238ee66c3","24609fa0cc03fd6d"],"restriction:states:failed":["a22c89dd88f7805b"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":4,"delay":1,"atlas":3},"record_count":8},{"id":"VA","name":"Virginia","groups":{"policy:water-reporting":["d2e1f34ebb87db96"],"policy:regulator-reporting":["a2d7165da9c4273d"],"restriction:local:enacted":["5d1933a50e2fffa9","d9c9702f7193a5d0","00ea8549bf7d9107","5e8fa08848e7ea49","b612281109895776","a8439ee49b85f3b9","cb1ee56619c41591","fc8930e333e47393","33da24b96e9450aa","3c8c47c48655c7c2"],"restriction:local:failed":["c0313d873e52c337"],"restriction:local:proposed":["1fb124f1d0600aad"],"restriction:states:enacted":["07bca14c6c769cd9","822881c141b55b58","1bc4820da2e184d8","260f9d0fdac1fb1d"],"restriction:states:proposed":["115a01cddaaebb83","81387474427b857f","de3a5a259065cee6","d9698a681bcb77d1","1ccb96de87be8c20","6f2fd99dffb3ee19","5fbcc9b83d0cea89","5286a63674ab303e"],"restriction:states:failed":["96a928bdb916449a","82304cb623ce2fd1","1c2b5c27f2a20646"],"water:disclosure:enacted":["236efd0b5ce918b3","ea2fc9f0f2561dd5","1bb0eef74b265bbc"],"water:siting:vetoed":["fc6a89d84ea3761e"],"water:reclaimed:failed":["7c9863297abb29b6"],"water:incentive:proposed":["30149d37cde17dd5"],"water:study:enacted":["4d9a8e7a99e3e39b"],"water:disclosure:failed":["133af645ccadb7ec"],"water:siting:enacted":["13c66e32329bf4c9"],"water:disclosure:proposed":["739c2b83e1630596"],"delay:zoning_denial:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","ae2116cf001391ca","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b"],"delay:community_opposition:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b","b0af2cf0f00c0c33","0093933737713687"],"delay:water_dispute:cancelled":["b654fcba5611c495","c24066658a7c87b0"],"delay:litigation:cancelled":["b2f708f236602e8d","3059b79f61908e3d"],"delay:community_opposition:delayed":["2a92789be1587ada","dc394d8881dcfd7f","d7fec75934b138bd","4ef289628ac834d5"],"delay:litigation:litigation_active":["01bbee83623720b2","e5c30ca57b2dbc24","dcf5dbffe665442a","85cd3631575a5bdf","1832912b622cc7ca","e7ee0387e9522f52"],"delay:community_opposition:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:zoning_denial:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:community_opposition:litigation_active":["dcf5dbffe665442a"],"delay:zoning_denial:delayed":["ba73fb104a300b67","dc394d8881dcfd7f","d7fec75934b138bd"],"delay:zoning_denial:under_appeal":["f8a6c494d6a909f4"],"delay:community_opposition:under_appeal":["f8a6c494d6a909f4"],"delay:water_dispute:litigation_active":["85cd3631575a5bdf"],"delay:zoning_denial:litigation_active":["e7ee0387e9522f52"],"delay:environmental_review:cancelled":["3059b79f61908e3d"],"utility:tariff:approved":["c2935488c1650819","39c6440688564d5b","87a87dde118e582a"],"utility:IRP:contested":["1d207f181f290a4a","9ba1e9a7df265951","7f6e112a0c84fe66"],"utility:tariff:contested":["d5ac5227a2747fcf","b3484cb6d3aad2da"],"utility:rate case:pending":["7a09881b3efc53a9"],"utility:other:pending":["cb40a9cac60f8cec","925eb6e874d3a48f","53aeac44973adb8a"],"utility:statement:pending":["95c8534650ed9b12"],"utility:tariff:pending":["17c7d5340af6b949"],"utility:other:contested":["e0efcc5e95491272"],"utility:rate case:approved":["2d9b62ed5a5a8c85"]},"grid_operators":["PJM","NON-RTO"],"counts":{"policy":2,"moratorium":27,"water":10,"delay":88,"atlas":73,"permits":642},"record_count":842},{"id":"WA","name":"Washington","groups":{"restriction:local:enacted":["9f5f2923e39b9be8","d4e7ad9cf08df51e","a0fc2d121a678362","0b3a9ecd7c2478dc","de683906483b8fe5","d6189396d865dfc1","a4d0a0075eb42622","844f1f18ded0ca1c","50cb86e7f24d5c8a","5f99587cd1f4762d","e207b014a5280c8e","abcdda3f927a1476","31a8daed20fe189e","af832be8ade36360","510f60e365739621","7eb7d0c92f5f8dd9","5565880179e00904","c8eaae4e91fc4247","4f498d7e9f152136","29f8e05bf47f65e4"],"restriction:states:enacted":["13d139ecdc65b4b1","b6f7e9b035c67d69"],"restriction:states:proposed":["73392c07183451a2","d65bf66b10bb27dc","d97ae6ca24475af1"],"restriction:states:failed":["b0d11e81f4e16dea","fc47b1de08dff922","383388e3142065cd"],"water:moratorium:enacted":["6455f69859c340a2"],"delay:community_opposition:halted":["8ced64a3cbb11f6c"],"delay:local_moratorium:halted":["0d03a9c2805d05b6","2fc49a0ff709020e"],"delay:community_opposition:delayed":["887cc460e5eb83f6"],"utility:tariff:pending":["c168cf070187ea92"],"utility:other:pending":["611e6f5599ef718f","8c8130676232d1c6"],"utility:statement:pending":["4ed38cff9678ccf0","4b866a2091ab3ecc"],"utility:tariff:approved":["325a6b7ee8b34e77"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":28,"water":1,"delay":22,"atlas":30,"permits":13},"record_count":94},{"id":"WV","name":"West Virginia","groups":{"water:disclosure:failed":["8cf5514f4b5ff375"],"delay:community_opposition:delayed":["4124cb9080c91f7c"],"utility:IRP:pending":["a67a61284873a2b2","8da91197a3806bcc"],"utility:special contract:pending":["39679c94f0d7f830"],"utility:other:contested":["c12d842abe5446ff","040b3c446bff4aee","5e6fb296651a928a","6f948a872911044f","0ae82e92301e638b"]},"grid_operators":["PJM"],"counts":{"water":1,"delay":12,"atlas":7},"record_count":20},{"id":"WI","name":"Wisconsin","groups":{"restriction:local:enacted":["197cdb77aa511062","c32fbb4074e34eba","9fa928579bf6e19b","1ef57a5ad557563c","d383195f7d8cd078","07b5a8ef15cadf6b","0a3550a0b812064e","2f12caa1fa8a1620","4efd296b41cadd58","502234e3282fa94d","98de8d31bfd06c50","9baf377f17b48199","2b2ac1debfbe57ca","aee74a04d13b1375","02ac37032bda8131","375f029130348bd2","6e56afd4aed59791","893a3aae04278c40","7650d4a5b8a48f92","e18b7a4b7fbc1df5","b56152d653914388","b916df50f4c51b94","5a64d5c33607de67","643f527e927e4058","7b1745a42047131e","e09c79ad3db16d88","734fd94028341ac3","69f22ea5aa3e34d3","1a270a98a4fa2e6d","d41ed6223bfeed81","112e1e1079c890e9","844ad5858c872078","47a591fadc2e8900","f7cf8bb4ab48824a"],"restriction:local:failed":["0c67dadae5dac0e9"],"restriction:local:proposed":["e66086d4c7d49f01","c8953b5f4533a4b5","68e48cc43363c3ba","f04d2abd046f97a9","1eae3d6650182a35"],"restriction:states:enacted":["5db6a8a411191d98"],"restriction:states:proposed":["d9aeb06afb1cc48b"],"restriction:states:failed":["a7f7ac4ffcf569cf","e87712374a5a9bb6","1fa055042bc56cba","bf5f897298b22196"],"water:moratorium:failed":["dabd0296a8769724"],"water:disclosure:proposed":["52d3503b7b7a29d2"],"water:disclosure:failed":["3d11e7d09b3698e1"],"water:moratorium:proposed":["0d06b92b967fdc00"],"water:siting:proposed":["4157cf76b6d65b0a"],"delay:environmental_review:litigation_active":["debb467bcb4d5430"],"delay:litigation:litigation_active":["debb467bcb4d5430"],"delay:community_opposition:litigation_active":["debb467bcb4d5430"],"delay:litigation:active_litigation":["e199a6213982873d"],"delay:environmental_review_challenge:active_litigation":["e199a6213982873d"],"delay:regulatory_collateral_dispute:active_litigation":["e199a6213982873d"],"delay:corporate_reassessment:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:design_changes:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:community_opposition:under_council_consideration":["28e37770792b4c08"],"delay:withdrawal:cancelled":["ea733b19fc76a19b"],"delay:village_infeasibility_finding:cancelled":["ea733b19fc76a19b"],"delay:interconnection:denied":["fd3e6fff23dec30a"],"delay:water:cancelled":["6b688ff399652711"],"delay:community_opposition:cancelled":["6b688ff399652711"],"delay:financing:cancelled":["6b688ff399652711"],"utility:special contract:approved":["c0e0e62ba225486e"],"utility:tariff:approved":["477299baafe80b07","8b74b857f211fa23","9d22a2aeb195e4fc","124399acbd7a554c"],"utility:tariff:pending":["dde2390c69924c91","4b8f10b414687805","7d0c020f1825cea4"],"utility:rate case:pending":["fbf33f025d17bc1f"],"utility:other:pending":["8f81691272c2cefc"]},"grid_operators":["MISO"],"counts":{"moratorium":46,"water":5,"delay":59,"atlas":44,"permits":6},"record_count":160},{"id":"WY","name":"Wyoming","groups":{"restriction:local:failed":["d0485054fd79e820"],"restriction:local:proposed":["3ed10f6e2d7fa4f4"],"restriction:states:failed":["be934bcf6dde21e3"],"utility:tariff:pending":["b1729fb79f6ff5af"],"utility:tariff:approved":["48ce507193eae507","2e0818019f3d14fe","103e672184e6c568"],"utility:other:pending":["b06ef4aba51b6d71"],"utility:special contract:pending":["31c5bf9bd2103358"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":3,"delay":10,"atlas":13,"permits":4},"record_count":30}]}