{"groups":{"policy:site-control":{"id":"policy:site-control","label":"Evidence of site control","tracker":"policy"},"policy:security":{"id":"policy:security","label":"Financial security","tracker":"policy"},"policy:curtailment":{"id":"policy:curtailment","label":"Emergency response","tracker":"policy"},"policy:emissions":{"id":"policy:emissions","label":"Emissions safeguards","tracker":"policy"},"policy:cost-allocation":{"id":"policy:cost-allocation","label":"Attributable-cost allocation","tracker":"policy"},"policy:departure":{"id":"policy:departure","label":"Departure / reduced-load protection","tracker":"policy"},"policy:supply-review":{"id":"policy:supply-review","label":"Water-supply review","tracker":"policy"},"policy:clean-energy":{"id":"policy:clean-energy","label":"Clean-energy service terms","tracker":"policy"},"policy:water-reporting":{"id":"policy:water-reporting","label":"Water-use reporting","tracker":"policy"},"policy:local-authority":{"id":"policy:local-authority","label":"Preserved local authority","tracker":"policy"},"policy:minimum-payment":{"id":"policy:minimum-payment","label":"Minimum payment commitments","tracker":"policy"},"policy:regulator-reporting":{"id":"policy:regulator-reporting","label":"Regulatory reporting","tracker":"policy"},"policy:environmental-review":{"id":"policy:environmental-review","label":"Environmental assessment","tracker":"policy"},"policy:permit-hold":{"id":"policy:permit-hold","label":"Interim permit restraint","tracker":"policy"},"restriction:local:enacted":{"id":"restriction:local:enacted","label":"Local restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:local:failed":{"id":"restriction:local:failed","label":"Local restriction records: failed (as recorded)","tracker":"moratorium"},"restriction:local:proposed":{"id":"restriction:local:proposed","label":"Local restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:local:pause":{"id":"restriction:local:pause","label":"Local restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:enacted":{"id":"restriction:states:enacted","label":"State restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:states:pause":{"id":"restriction:states:pause","label":"State restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:proposed":{"id":"restriction:states:proposed","label":"State restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:states:failed":{"id":"restriction:states:failed","label":"State restriction records: failed (as recorded)","tracker":"moratorium"},"water:reclaimed:enacted":{"id":"water:reclaimed:enacted","label":"Water reclaimed measures: enacted (as recorded)","tracker":"water"},"water:disclosure:enacted":{"id":"water:disclosure:enacted","label":"Water disclosure measures: enacted (as recorded)","tracker":"water"},"water:siting:vetoed":{"id":"water:siting:vetoed","label":"Water siting measures: vetoed (as recorded)","tracker":"water"},"water:reclaimed:failed":{"id":"water:reclaimed:failed","label":"Water reclaimed measures: failed (as recorded)","tracker":"water"},"water:incentive:proposed":{"id":"water:incentive:proposed","label":"Water incentive measures: proposed (as recorded)","tracker":"water"},"water:disclosure:proposed":{"id":"water:disclosure:proposed","label":"Water disclosure measures: proposed (as recorded)","tracker":"water"},"water:disclosure:vetoed":{"id":"water:disclosure:vetoed","label":"Water disclosure measures: vetoed (as recorded)","tracker":"water"},"water:closed-loop:proposed":{"id":"water:closed-loop:proposed","label":"Water closed-loop measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:failed":{"id":"water:closed-loop:failed","label":"Water closed-loop measures: failed (as recorded)","tracker":"water"},"water:disclosure:failed":{"id":"water:disclosure:failed","label":"Water disclosure measures: failed (as recorded)","tracker":"water"},"water:rate:failed":{"id":"water:rate:failed","label":"Water rate measures: failed (as recorded)","tracker":"water"},"water:siting:enacted":{"id":"water:siting:enacted","label":"Water siting measures: enacted (as recorded)","tracker":"water"},"water:study:proposed":{"id":"water:study:proposed","label":"Water study measures: proposed (as recorded)","tracker":"water"},"water:siting:proposed":{"id":"water:siting:proposed","label":"Water siting measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:enacted":{"id":"water:closed-loop:enacted","label":"Water closed-loop measures: enacted (as recorded)","tracker":"water"},"water:moratorium:enacted":{"id":"water:moratorium:enacted","label":"Water moratorium measures: enacted (as recorded)","tracker":"water"},"water:reclaimed:proposed":{"id":"water:reclaimed:proposed","label":"Water reclaimed measures: proposed (as recorded)","tracker":"water"},"water:moratorium:vetoed":{"id":"water:moratorium:vetoed","label":"Water moratorium measures: vetoed (as recorded)","tracker":"water"},"water:study:enacted":{"id":"water:study:enacted","label":"Water study measures: enacted (as recorded)","tracker":"water"},"water:moratorium:failed":{"id":"water:moratorium:failed","label":"Water moratorium measures: failed (as recorded)","tracker":"water"},"water:moratorium:proposed":{"id":"water:moratorium:proposed","label":"Water moratorium measures: proposed (as recorded)","tracker":"water"},"water:shield:enacted":{"id":"water:shield:enacted","label":"Water shield measures: enacted (as recorded)","tracker":"water"},"water:shield:failed":{"id":"water:shield:failed","label":"Water shield measures: failed (as recorded)","tracker":"water"},"water:siting:failed":{"id":"water:siting:failed","label":"Water siting measures: failed (as recorded)","tracker":"water"},"water:study:failed":{"id":"water:study:failed","label":"Water study measures: failed (as recorded)","tracker":"water"},"water:rate:enacted":{"id":"water:rate:enacted","label":"Water rate measures: enacted (as recorded)","tracker":"water"},"water:incentive:enacted":{"id":"water:incentive:enacted","label":"Water incentive measures: enacted (as recorded)","tracker":"water"},"delay:state_moratorium:withdrawn":{"id":"delay:state_moratorium:withdrawn","label":"Delay cause: state moratorium / withdrawn","tracker":"delay"},"delay:transformer_supply:delayed":{"id":"delay:transformer_supply:delayed","label":"Delay cause: transformer supply / delayed","tracker":"delay"},"delay:gas_pipeline_delay:delayed":{"id":"delay:gas_pipeline_delay:delayed","label":"Delay cause: gas pipeline delay / delayed","tracker":"delay"},"delay:corporate_realignment:withdrawn":{"id":"delay:corporate_realignment:withdrawn","label":"Delay cause: corporate realignment / withdrawn","tracker":"delay"},"delay:financing:withdrawn":{"id":"delay:financing:withdrawn","label":"Delay cause: financing / withdrawn","tracker":"delay"},"delay:environmental_review:litigation_active":{"id":"delay:environmental_review:litigation_active","label":"Delay cause: environmental review / litigation_active","tracker":"delay"},"delay:litigation:litigation_active":{"id":"delay:litigation:litigation_active","label":"Delay cause: litigation / litigation_active","tracker":"delay"},"delay:community_opposition:litigation_active":{"id":"delay:community_opposition:litigation_active","label":"Delay cause: community opposition / litigation_active","tracker":"delay"},"delay:zoning_denial:cancelled":{"id":"delay:zoning_denial:cancelled","label":"Delay cause: zoning denial / cancelled","tracker":"delay"},"delay:community_opposition:cancelled":{"id":"delay:community_opposition:cancelled","label":"Delay cause: community opposition / cancelled","tracker":"delay"},"delay:water_dispute:cancelled":{"id":"delay:water_dispute:cancelled","label":"Delay cause: water dispute / cancelled","tracker":"delay"},"delay:zoning_denial:litigation_active":{"id":"delay:zoning_denial:litigation_active","label":"Delay cause: zoning denial / litigation_active","tracker":"delay"},"delay:local_moratorium:litigation_active":{"id":"delay:local_moratorium:litigation_active","label":"Delay cause: local moratorium / litigation_active","tracker":"delay"},"delay:permit_denial:litigation_active":{"id":"delay:permit_denial:litigation_active","label":"Delay cause: permit denial / litigation_active","tracker":"delay"},"delay:community_opposition:withdrawn":{"id":"delay:community_opposition:withdrawn","label":"Delay cause: community opposition / withdrawn","tracker":"delay"},"delay:zoning_denial:withdrawn":{"id":"delay:zoning_denial:withdrawn","label":"Delay cause: zoning denial / withdrawn","tracker":"delay"},"delay:environmental_review:delayed":{"id":"delay:environmental_review:delayed","label":"Delay cause: environmental review / delayed","tracker":"delay"},"delay:community_opposition:delayed":{"id":"delay:community_opposition:delayed","label":"Delay cause: community opposition / delayed","tracker":"delay"},"delay:water_dispute:under_appeal":{"id":"delay:water_dispute:under_appeal","label":"Delay cause: water dispute / under_appeal","tracker":"delay"},"delay:community_opposition:under_appeal":{"id":"delay:community_opposition:under_appeal","label":"Delay cause: community opposition / under_appeal","tracker":"delay"},"delay:water_dispute:delayed":{"id":"delay:water_dispute:delayed","label":"Delay cause: water dispute / delayed","tracker":"delay"},"delay:local_moratorium:delayed":{"id":"delay:local_moratorium:delayed","label":"Delay cause: local moratorium / delayed","tracker":"delay"},"delay:litigation:cancelled":{"id":"delay:litigation:cancelled","label":"Delay cause: litigation / cancelled","tracker":"delay"},"delay:zoning_denial:delayed":{"id":"delay:zoning_denial:delayed","label":"Delay cause: zoning denial / delayed","tracker":"delay"},"delay:zoning_denial:under_appeal":{"id":"delay:zoning_denial:under_appeal","label":"Delay cause: zoning denial / under_appeal","tracker":"delay"},"delay:water_dispute:litigation_active":{"id":"delay:water_dispute:litigation_active","label":"Delay cause: water dispute / litigation_active","tracker":"delay"},"delay:environmental_review:cancelled":{"id":"delay:environmental_review:cancelled","label":"Delay cause: environmental review / cancelled","tracker":"delay"},"delay:litigation:under_appeal":{"id":"delay:litigation:under_appeal","label":"Delay cause: litigation / under_appeal","tracker":"delay"},"delay:community_opposition:approved_but_citywide_moratorium_pending":{"id":"delay:community_opposition:approved_but_citywide_moratorium_pending","label":"Delay cause: community opposition / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":{"id":"delay:proposed_moratorium:approved_but_citywide_moratorium_pending","label":"Delay cause: proposed moratorium / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:rezoning_denial_or_withdrawal:withdrawn":{"id":"delay:rezoning_denial_or_withdrawal:withdrawn","label":"Delay cause: rezoning denial or withdrawal / withdrawn","tracker":"delay"},"delay:rezoning_denial:rezoning_denied":{"id":"delay:rezoning_denial:rezoning_denied","label":"Delay cause: rezoning denial / rezoning_denied","tracker":"delay"},"delay:community_opposition:rezoning_denied":{"id":"delay:community_opposition:rezoning_denied","label":"Delay cause: community opposition / rezoning_denied","tracker":"delay"},"delay:litigation:active_litigation":{"id":"delay:litigation:active_litigation","label":"Delay cause: litigation / active_litigation","tracker":"delay"},"delay:permit_challenge:active_litigation":{"id":"delay:permit_challenge:active_litigation","label":"Delay cause: permit challenge / active_litigation","tracker":"delay"},"delay:community_opposition:approved_amid_opposition":{"id":"delay:community_opposition:approved_amid_opposition","label":"Delay cause: community opposition / approved_amid_opposition","tracker":"delay"},"delay:missed_milestones:development_agreement_expired":{"id":"delay:missed_milestones:development_agreement_expired","label":"Delay cause: missed milestones / development_agreement_expired","tracker":"delay"},"delay:financing_delay:development_agreement_expired":{"id":"delay:financing_delay:development_agreement_expired","label":"Delay cause: financing delay / development_agreement_expired","tracker":"delay"},"delay:unresolved_commitments:rezoning_denied":{"id":"delay:unresolved_commitments:rezoning_denied","label":"Delay cause: unresolved commitments / rezoning_denied","tracker":"delay"},"delay:county_moratorium:moratorium_in_force":{"id":"delay:county_moratorium:moratorium_in_force","label":"Delay cause: county moratorium / moratorium_in_force","tracker":"delay"},"delay:county_moratorium:moratorium_extended":{"id":"delay:county_moratorium:moratorium_extended","label":"Delay cause: county moratorium / moratorium_extended","tracker":"delay"},"delay:regulatory_review:regulatory_approval_pending":{"id":"delay:regulatory_review:regulatory_approval_pending","label":"Delay cause: regulatory review / regulatory_approval_pending","tracker":"delay"},"delay:power_allocation_dispute:regulatory_approval_pending":{"id":"delay:power_allocation_dispute:regulatory_approval_pending","label":"Delay cause: power allocation dispute / regulatory_approval_pending","tracker":"delay"},"delay:corporate_reassessment:construction_paused":{"id":"delay:corporate_reassessment:construction_paused","label":"Delay cause: corporate reassessment / construction_paused","tracker":"delay"},"delay:openai_relationship_change:construction_paused":{"id":"delay:openai_relationship_change:construction_paused","label":"Delay cause: openai relationship change / construction_paused","tracker":"delay"},"delay:tariff_costs:construction_paused":{"id":"delay:tariff_costs:construction_paused","label":"Delay cause: tariff costs / construction_paused","tracker":"delay"},"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: local moratorium / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: ballot initiative threat / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:signature_gathering":{"id":"delay:ballot_initiative_threat:signature_gathering","label":"Delay cause: ballot initiative threat / signature_gathering","tracker":"delay"},"delay:statewide_moratorium_push:signature_gathering":{"id":"delay:statewide_moratorium_push:signature_gathering","label":"Delay cause: statewide moratorium push / signature_gathering","tracker":"delay"},"delay:environmental_review_challenge:active_litigation":{"id":"delay:environmental_review_challenge:active_litigation","label":"Delay cause: environmental review challenge / active_litigation","tracker":"delay"},"delay:regulatory_collateral_dispute:active_litigation":{"id":"delay:regulatory_collateral_dispute:active_litigation","label":"Delay cause: regulatory collateral dispute / active_litigation","tracker":"delay"},"delay:corporate_reassessment:construction_partially_paused":{"id":"delay:corporate_reassessment:construction_partially_paused","label":"Delay cause: corporate reassessment / construction_partially_paused","tracker":"delay"},"delay:design_changes:construction_partially_paused":{"id":"delay:design_changes:construction_partially_paused","label":"Delay cause: design changes / construction_partially_paused","tracker":"delay"},"delay:community_opposition:under_council_consideration":{"id":"delay:community_opposition:under_council_consideration","label":"Delay cause: community opposition / under_council_consideration","tracker":"delay"},"delay:withdrawal:cancelled":{"id":"delay:withdrawal:cancelled","label":"Delay cause: withdrawal / cancelled","tracker":"delay"},"delay:village_infeasibility_finding:cancelled":{"id":"delay:village_infeasibility_finding:cancelled","label":"Delay cause: village infeasibility finding / cancelled","tracker":"delay"},"delay:litigation:construction_halted_by_court":{"id":"delay:litigation:construction_halted_by_court","label":"Delay cause: litigation / construction_halted_by_court","tracker":"delay"},"delay:environmental_review_inadequate:construction_halted_by_court":{"id":"delay:environmental_review_inadequate:construction_halted_by_court","label":"Delay cause: environmental review inadequate / construction_halted_by_court","tracker":"delay"},"delay:city_moratorium:active_litigation":{"id":"delay:city_moratorium:active_litigation","label":"Delay cause: city moratorium / active_litigation","tracker":"delay"},"delay:environmental_review_pending:final_decision_paused":{"id":"delay:environmental_review_pending:final_decision_paused","label":"Delay cause: environmental review pending / final_decision_paused","tracker":"delay"},"delay:city_moratorium:moratorium_in_force":{"id":"delay:city_moratorium:moratorium_in_force","label":"Delay cause: city moratorium / moratorium_in_force","tracker":"delay"},"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":{"id":"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial","label":"Delay cause: planning commission denial recommendation / planning_commission_recommended_denial","tracker":"delay"},"delay:community_opposition:opposed_planned":{"id":"delay:community_opposition:opposed_planned","label":"Delay cause: community opposition / opposed_planned","tracker":"delay"},"delay:city_council_resolution_against:opposed_planned":{"id":"delay:city_council_resolution_against:opposed_planned","label":"Delay cause: city council resolution against / opposed_planned","tracker":"delay"},"delay:rezoning_denial:rezoning_denied_then_litigation_settled":{"id":"delay:rezoning_denial:rezoning_denied_then_litigation_settled","label":"Delay cause: rezoning denial / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:litigation:rezoning_denied_then_litigation_settled":{"id":"delay:litigation:rezoning_denied_then_litigation_settled","label":"Delay cause: litigation / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:city_moratorium:moratorium_delay":{"id":"delay:city_moratorium:moratorium_delay","label":"Delay cause: city moratorium / moratorium_delay","tracker":"delay"},"delay:community_opposition:moratorium_delay":{"id":"delay:community_opposition:moratorium_delay","label":"Delay cause: community opposition / moratorium_delay","tracker":"delay"},"delay:community_opposition:rezoning_paused":{"id":"delay:community_opposition:rezoning_paused","label":"Delay cause: community opposition / rezoning_paused","tracker":"delay"},"delay:planning_commission_postponement:rezoning_paused":{"id":"delay:planning_commission_postponement:rezoning_paused","label":"Delay cause: planning commission postponement / rezoning_paused","tracker":"delay"},"delay:community_opposition:opposed_proposed":{"id":"delay:community_opposition:opposed_proposed","label":"Delay cause: community opposition / opposed_proposed","tracker":"delay"},"delay:transparency_concerns:opposed_proposed":{"id":"delay:transparency_concerns:opposed_proposed","label":"Delay cause: transparency concerns / opposed_proposed","tracker":"delay"},"delay:litigation:abandoned":{"id":"delay:litigation:abandoned","label":"Delay cause: litigation / abandoned","tracker":"delay"},"delay:community_opposition:abandoned":{"id":"delay:community_opposition:abandoned","label":"Delay cause: community opposition / abandoned","tracker":"delay"},"delay:china_ties_backlash:abandoned":{"id":"delay:china_ties_backlash:abandoned","label":"Delay cause: china ties backlash / abandoned","tracker":"delay"},"delay:wetlands_permit_suspended:active_litigation":{"id":"delay:wetlands_permit_suspended:active_litigation","label":"Delay cause: wetlands permit suspended / active_litigation","tracker":"delay"},"delay:community_opposition:opposed_pending_council_vote":{"id":"delay:community_opposition:opposed_pending_council_vote","label":"Delay cause: community opposition / opposed_pending_council_vote","tracker":"delay"},"delay:community_opposition:opposed_effectively_stalled":{"id":"delay:community_opposition:opposed_effectively_stalled","label":"Delay cause: community opposition / opposed_effectively_stalled","tracker":"delay"},"delay:petition_campaign:opposed_effectively_stalled":{"id":"delay:petition_campaign:opposed_effectively_stalled","label":"Delay cause: petition campaign / opposed_effectively_stalled","tracker":"delay"},"delay:public_notice_violation_alleged:active_litigation":{"id":"delay:public_notice_violation_alleged:active_litigation","label":"Delay cause: public notice violation alleged / active_litigation","tracker":"delay"},"delay:rezoning_denial:withdrawn":{"id":"delay:rezoning_denial:withdrawn","label":"Delay cause: rezoning denial / withdrawn","tracker":"delay"},"delay:no_secured_tenant:withdrawn":{"id":"delay:no_secured_tenant:withdrawn","label":"Delay cause: no secured tenant / withdrawn","tracker":"delay"},"delay:council_opposition:withdrawn":{"id":"delay:council_opposition:withdrawn","label":"Delay cause: council opposition / withdrawn","tracker":"delay"},"delay:eminent_domain_threat:active_litigation":{"id":"delay:eminent_domain_threat:active_litigation","label":"Delay cause: eminent domain threat / active_litigation","tracker":"delay"},"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":{"id":"delay:rezoning_denial:rezoning_rejected_moratorium_recommended","label":"Delay cause: rezoning denial / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":{"id":"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended","label":"Delay cause: county moratorium recommended / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:environmental_review_order:active_litigation":{"id":"delay:environmental_review_order:active_litigation","label":"Delay cause: environmental review order / active_litigation","tracker":"delay"},"delay:unpermitted_power_plant:active_litigation":{"id":"delay:unpermitted_power_plant:active_litigation","label":"Delay cause: unpermitted power plant / active_litigation","tracker":"delay"},"delay:community_opposition:under_construction_amid_scrutiny":{"id":"delay:community_opposition:under_construction_amid_scrutiny","label":"Delay cause: community opposition / under_construction_amid_scrutiny","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_scrutiny":{"id":"delay:transparency_concerns:under_construction_amid_scrutiny","label":"Delay cause: transparency concerns / under_construction_amid_scrutiny","tracker":"delay"},"delay:permit_denial:permit_denied":{"id":"delay:permit_denial:permit_denied","label":"Delay cause: permit denial / permit_denied","tracker":"delay"},"delay:community_opposition:permit_denied":{"id":"delay:community_opposition:permit_denied","label":"Delay cause: community opposition / permit_denied","tracker":"delay"},"delay:county_moratorium:permit_denied":{"id":"delay:county_moratorium:permit_denied","label":"Delay cause: county moratorium / permit_denied","tracker":"delay"},"delay:county_moratorium:approved_active_litigation":{"id":"delay:county_moratorium:approved_active_litigation","label":"Delay cause: county moratorium / approved_active_litigation","tracker":"delay"},"delay:litigation:approved_active_litigation":{"id":"delay:litigation:approved_active_litigation","label":"Delay cause: litigation / approved_active_litigation","tracker":"delay"},"delay:community_opposition:approved_active_litigation":{"id":"delay:community_opposition:approved_active_litigation","label":"Delay cause: community opposition / approved_active_litigation","tracker":"delay"},"delay:county_moratorium:delayed_amid_moratorium":{"id":"delay:county_moratorium:delayed_amid_moratorium","label":"Delay cause: county moratorium / delayed_amid_moratorium","tracker":"delay"},"delay:community_opposition:delayed_amid_moratorium":{"id":"delay:community_opposition:delayed_amid_moratorium","label":"Delay cause: community opposition / delayed_amid_moratorium","tracker":"delay"},"delay:public_outcry:tax_incentive_withdrawn":{"id":"delay:public_outcry:tax_incentive_withdrawn","label":"Delay cause: public outcry / tax_incentive_withdrawn","tracker":"delay"},"delay:tax_break_withdrawal:tax_incentive_withdrawn":{"id":"delay:tax_break_withdrawal:tax_incentive_withdrawn","label":"Delay cause: tax break withdrawal / tax_incentive_withdrawn","tracker":"delay"},"delay:permit_denial:denied_without_prejudice":{"id":"delay:permit_denial:denied_without_prejudice","label":"Delay cause: permit denial / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:denied_without_prejudice":{"id":"delay:community_opposition:denied_without_prejudice","label":"Delay cause: community opposition / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:under_construction_amid_opposition":{"id":"delay:community_opposition:under_construction_amid_opposition","label":"Delay cause: community opposition / under_construction_amid_opposition","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_opposition":{"id":"delay:transparency_concerns:under_construction_amid_opposition","label":"Delay cause: transparency concerns / under_construction_amid_opposition","tracker":"delay"},"delay:community_opposition:rumored_no_application_filed":{"id":"delay:community_opposition:rumored_no_application_filed","label":"Delay cause: community opposition / rumored_no_application_filed","tracker":"delay"},"delay:meeting_postponed:rumored_no_application_filed":{"id":"delay:meeting_postponed:rumored_no_application_filed","label":"Delay cause: meeting postponed / rumored_no_application_filed","tracker":"delay"},"delay:community_opposition:moratorium_in_force":{"id":"delay:community_opposition:moratorium_in_force","label":"Delay cause: community opposition / moratorium_in_force","tracker":"delay"},"delay:community_opposition:under_review_no_zoning_process":{"id":"delay:community_opposition:under_review_no_zoning_process","label":"Delay cause: community opposition / under_review_no_zoning_process","tracker":"delay"},"delay:no_local_zoning_framework:under_review_no_zoning_process":{"id":"delay:no_local_zoning_framework:under_review_no_zoning_process","label":"Delay cause: no local zoning framework / under_review_no_zoning_process","tracker":"delay"},"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":{"id":"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute","label":"Delay cause: regulatory transparency dispute / regulatory_disclosure_dispute","tracker":"delay"},"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":{"id":"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute","label":"Delay cause: ratepayer cost concerns / regulatory_disclosure_dispute","tracker":"delay"},"delay:noise_nuisance:active_litigation":{"id":"delay:noise_nuisance:active_litigation","label":"Delay cause: noise nuisance / active_litigation","tracker":"delay"},"delay:historic_preservation_conflict:permit_denied":{"id":"delay:historic_preservation_conflict:permit_denied","label":"Delay cause: historic preservation conflict / permit_denied","tracker":"delay"},"delay:community_opposition:under_construction_amid_water_concerns":{"id":"delay:community_opposition:under_construction_amid_water_concerns","label":"Delay cause: community opposition / under_construction_amid_water_concerns","tracker":"delay"},"delay:water_capacity_constraints:under_construction_amid_water_concerns":{"id":"delay:water_capacity_constraints:under_construction_amid_water_concerns","label":"Delay cause: water capacity constraints / under_construction_amid_water_concerns","tracker":"delay"},"delay:city_moratorium_partial_exemption:phase_vote_delayed":{"id":"delay:city_moratorium_partial_exemption:phase_vote_delayed","label":"Delay cause: city moratorium partial exemption / phase_vote_delayed","tracker":"delay"},"delay:planning_commission_delay:phase_vote_delayed":{"id":"delay:planning_commission_delay:phase_vote_delayed","label":"Delay cause: planning commission delay / phase_vote_delayed","tracker":"delay"},"delay:community_opposition:approved_expanded_amid_opposition":{"id":"delay:community_opposition:approved_expanded_amid_opposition","label":"Delay cause: community opposition / approved_expanded_amid_opposition","tracker":"delay"},"delay:noise_regulation_review:approved_expanded_amid_opposition":{"id":"delay:noise_regulation_review:approved_expanded_amid_opposition","label":"Delay cause: noise regulation review / approved_expanded_amid_opposition","tracker":"delay"},"delay:multi_year_construction_delay:delayed_extension_requested":{"id":"delay:multi_year_construction_delay:delayed_extension_requested","label":"Delay cause: multi year construction delay / delayed_extension_requested","tracker":"delay"},"delay:design_changes:delayed_extension_requested":{"id":"delay:design_changes:delayed_extension_requested","label":"Delay cause: design changes / delayed_extension_requested","tracker":"delay"},"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":{"id":"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums","label":"Delay cause: county moratorium neighboring / early_stage_amid_county_moratoriums","tracker":"delay"},"delay:regulatory_review:permitting_challenged":{"id":"delay:regulatory_review:permitting_challenged","label":"Delay cause: regulatory review / permitting_challenged","tracker":"delay"},"delay:environmental_petition:permitting_challenged":{"id":"delay:environmental_petition:permitting_challenged","label":"Delay cause: environmental petition / permitting_challenged","tracker":"delay"},"delay:utility_interconnection_timing:abandoned":{"id":"delay:utility_interconnection_timing:abandoned","label":"Delay cause: utility interconnection timing / abandoned","tracker":"delay"},"delay:withdrawal:abandoned":{"id":"delay:withdrawal:abandoned","label":"Delay cause: withdrawal / abandoned","tracker":"delay"},"delay:zoning_approval_challenge:active_litigation":{"id":"delay:zoning_approval_challenge:active_litigation","label":"Delay cause: zoning approval challenge / active_litigation","tracker":"delay"},"delay:litigation:zoning_request_paused_active_litigation":{"id":"delay:litigation:zoning_request_paused_active_litigation","label":"Delay cause: litigation / zoning_request_paused_active_litigation","tracker":"delay"},"delay:council_agenda_removal:zoning_request_paused_active_litigation":{"id":"delay:council_agenda_removal:zoning_request_paused_active_litigation","label":"Delay cause: council agenda removal / zoning_request_paused_active_litigation","tracker":"delay"},"delay:environmental_concerns:zoning_request_paused_active_litigation":{"id":"delay:environmental_concerns:zoning_request_paused_active_litigation","label":"Delay cause: environmental concerns / zoning_request_paused_active_litigation","tracker":"delay"},"delay:litigation:active_litigation_temporary_block":{"id":"delay:litigation:active_litigation_temporary_block","label":"Delay cause: litigation / active_litigation_temporary_block","tracker":"delay"},"delay:state_law_ownership_ban:active_litigation_temporary_block":{"id":"delay:state_law_ownership_ban:active_litigation_temporary_block","label":"Delay cause: state law ownership ban / active_litigation_temporary_block","tracker":"delay"},"delay:quorum_court_rejection:moratorium_exemption_rejected":{"id":"delay:quorum_court_rejection:moratorium_exemption_rejected","label":"Delay cause: quorum court rejection / moratorium_exemption_rejected","tracker":"delay"},"delay:county_moratorium_dispute:moratorium_exemption_rejected":{"id":"delay:county_moratorium_dispute:moratorium_exemption_rejected","label":"Delay cause: county moratorium dispute / moratorium_exemption_rejected","tracker":"delay"},"delay:litigation:active_litigation_records_dispute":{"id":"delay:litigation:active_litigation_records_dispute","label":"Delay cause: litigation / active_litigation_records_dispute","tracker":"delay"},"delay:public_records_dispute:active_litigation_records_dispute":{"id":"delay:public_records_dispute:active_litigation_records_dispute","label":"Delay cause: public records dispute / active_litigation_records_dispute","tracker":"delay"},"delay:litigation:delayed":{"id":"delay:litigation:delayed","label":"Delay cause: litigation / delayed","tracker":"delay"},"delay:permit_denial:delayed":{"id":"delay:permit_denial:delayed","label":"Delay cause: permit denial / delayed","tracker":"delay"},"delay:local_moratorium:cancelled":{"id":"delay:local_moratorium:cancelled","label":"Delay cause: local moratorium / cancelled","tracker":"delay"},"delay:tax_incentive_change:under_appeal":{"id":"delay:tax_incentive_change:under_appeal","label":"Delay cause: tax incentive change / under_appeal","tracker":"delay"},"delay:litigation:halted":{"id":"delay:litigation:halted","label":"Delay cause: litigation / halted","tracker":"delay"},"delay:environmental_review:halted":{"id":"delay:environmental_review:halted","label":"Delay cause: environmental review / halted","tracker":"delay"},"delay:local_moratorium:halted":{"id":"delay:local_moratorium:halted","label":"Delay cause: local moratorium / halted","tracker":"delay"},"delay:water_dispute:halted":{"id":"delay:water_dispute:halted","label":"Delay cause: water dispute / halted","tracker":"delay"},"delay:tax_incentive_change:halted":{"id":"delay:tax_incentive_change:halted","label":"Delay cause: tax incentive change / halted","tracker":"delay"},"delay:community_opposition:halted":{"id":"delay:community_opposition:halted","label":"Delay cause: community opposition / halted","tracker":"delay"},"delay:tax_incentive_change:litigation_active":{"id":"delay:tax_incentive_change:litigation_active","label":"Delay cause: tax incentive change / litigation_active","tracker":"delay"},"delay:corporate_realignment:delayed":{"id":"delay:corporate_realignment:delayed","label":"Delay cause: corporate realignment / delayed","tracker":"delay"},"delay:tax_incentive_change:cancelled":{"id":"delay:tax_incentive_change:cancelled","label":"Delay cause: tax incentive change / cancelled","tracker":"delay"},"delay:financing:litigation_active":{"id":"delay:financing:litigation_active","label":"Delay cause: financing / litigation_active","tracker":"delay"},"delay:state_moratorium:halted":{"id":"delay:state_moratorium:halted","label":"Delay cause: state moratorium / halted","tracker":"delay"},"delay:state_moratorium:litigation_active":{"id":"delay:state_moratorium:litigation_active","label":"Delay cause: state moratorium / litigation_active","tracker":"delay"},"delay:state_moratorium:cancelled":{"id":"delay:state_moratorium:cancelled","label":"Delay cause: state moratorium / cancelled","tracker":"delay"},"delay:water_dispute:withdrawn":{"id":"delay:water_dispute:withdrawn","label":"Delay cause: water dispute / withdrawn","tracker":"delay"},"delay:interconnection_queue:halted":{"id":"delay:interconnection_queue:halted","label":"Delay cause: interconnection queue / halted","tracker":"delay"},"delay:interconnection:cancelled":{"id":"delay:interconnection:cancelled","label":"Delay cause: interconnection / cancelled","tracker":"delay"},"delay:financing:cancelled":{"id":"delay:financing:cancelled","label":"Delay cause: financing / cancelled","tracker":"delay"},"delay:interconnection:denied":{"id":"delay:interconnection:denied","label":"Delay cause: interconnection / denied","tracker":"delay"},"delay:water:cancelled":{"id":"delay:water:cancelled","label":"Delay cause: water / cancelled","tracker":"delay"},"delay:water:denied":{"id":"delay:water:denied","label":"Delay cause: water / denied","tracker":"delay"},"delay:zoning_denial:halted":{"id":"delay:zoning_denial:halted","label":"Delay cause: zoning denial / halted","tracker":"delay"},"delay:permit_denial:halted":{"id":"delay:permit_denial:halted","label":"Delay cause: permit denial / halted","tracker":"delay"},"delay:council_vote_delay:final_vote_delayed":{"id":"delay:council_vote_delay:final_vote_delayed","label":"Delay cause: council vote delay / final_vote_delayed","tracker":"delay"},"delay:community_opposition:final_vote_delayed":{"id":"delay:community_opposition:final_vote_delayed","label":"Delay cause: community opposition / final_vote_delayed","tracker":"delay"},"utility:tariff:pending":{"id":"utility:tariff:pending","label":"Utility action: tariff / pending","tracker":"delay"},"utility:statement:pending":{"id":"utility:statement:pending","label":"Utility action: statement / pending","tracker":"delay"},"utility:tariff:contested":{"id":"utility:tariff:contested","label":"Utility action: tariff / contested","tracker":"delay"},"utility:other:pending":{"id":"utility:other:pending","label":"Utility action: other / pending","tracker":"delay"},"utility:tariff:approved":{"id":"utility:tariff:approved","label":"Utility action: tariff / approved","tracker":"delay"},"utility:rate case:approved":{"id":"utility:rate case:approved","label":"Utility action: rate case / approved","tracker":"delay"},"utility:special contract:approved":{"id":"utility:special contract:approved","label":"Utility action: special contract / approved","tracker":"delay"},"utility:rate case:pending":{"id":"utility:rate case:pending","label":"Utility action: rate case / pending","tracker":"delay"},"utility:special contract:denied":{"id":"utility:special contract:denied","label":"Utility action: special contract / denied","tracker":"delay"},"utility:statement:contested":{"id":"utility:statement:contested","label":"Utility action: statement / contested","tracker":"delay"},"utility:IRP:contested":{"id":"utility:IRP:contested","label":"Utility action: IRP / contested","tracker":"delay"},"utility:complaint:contested":{"id":"utility:complaint:contested","label":"Utility action: complaint / contested","tracker":"delay"},"utility:statement:approved":{"id":"utility:statement:approved","label":"Utility action: statement / approved","tracker":"delay"},"utility:IRP:pending":{"id":"utility:IRP:pending","label":"Utility action: IRP / pending","tracker":"delay"},"utility:special contract:pending":{"id":"utility:special contract:pending","label":"Utility action: special contract / pending","tracker":"delay"},"utility:other:approved":{"id":"utility:other:approved","label":"Utility action: other / approved","tracker":"delay"},"utility:other:contested":{"id":"utility:other:contested","label":"Utility action: other / contested","tracker":"delay"},"utility:IRP:approved":{"id":"utility:IRP:approved","label":"Utility action: IRP / approved","tracker":"delay"},"utility:tariff:denied":{"id":"utility:tariff:denied","label":"Utility action: tariff / denied","tracker":"delay"},"utility:certificate:approved":{"id":"utility:certificate:approved","label":"Utility action: certificate / approved","tracker":"delay"},"utility:policy:approved":{"id":"utility:policy:approved","label":"Utility action: policy / approved","tracker":"delay"},"utility:policy:effective":{"id":"utility:policy:effective","label":"Utility action: policy / effective","tracker":"delay"},"utility:tariff:effective":{"id":"utility:tariff:effective","label":"Utility action: tariff / effective","tracker":"delay"},"utility:policy:rejected":{"id":"utility:policy:rejected","label":"Utility action: policy / rejected","tracker":"delay"},"utility:policy:pending":{"id":"utility:policy:pending","label":"Utility action: policy / pending","tracker":"delay"},"utility:rate_case:pending":{"id":"utility:rate_case:pending","label":"Utility action: rate_case / pending","tracker":"delay"},"utility:other:denied":{"id":"utility:other:denied","label":"Utility action: other / denied","tracker":"delay"},"utility:other:effective":{"id":"utility:other:effective","label":"Utility action: other / effective","tracker":"delay"}},"warnings":[],"credits":["6abc Philadelphia","AEP Ohio Transmission Company (filed with Ohio Power Siting Board)","AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)","Alabama Reflector","Alaska Beacon","American Transmission Company LLC (filed with PSC of Wisconsin)","Americus Times-Recorder","Arizona Mirror","Arkansas Advocate","Axios Pro Energy","Bisnow","Bisnow National","Bradenton Herald","CNBC Technology","Cardinal News VA","Central Florida Public Media","Chesterfield County public permit records","Chicago Construction News","City of Atlanta public permit records","City of Austin issued construction permits open data","City of Buckeye public permit records","City of Chandler public permit records","City of Charlotte public permit records","City of Chicago building permits open data","City of Fort Worth public permit records","City of Goodyear public permit records","City of Hillsboro public permit records","City of Mesa building permits open data","City of Mesa public permit records","City of Minneapolis construction permits (CCS) open data","City of Papillion public permit records","City of Phoenix public permit records","City of Red Oak public permit records","City of Reno public permit records","City of San Antonio public permit records","City of Statesboro, Georgia","City of Temple, Texas","Clearfield City Council (Utah Public Notice Website)","Colorado Newsline","Colorado Public Radio","Congress.gov (Library of Congress, public domain)","ConstructConnect News","Construction Dive","CourtListener DataCenter Dockets","CourtListener Opinions","Data Center Dynamics","Data Center Dynamics news","DataCenterTracker.org, CC BY 4.0","Dominion Energy Virginia","EIN News","East Bay Insiders Newsletter","Energy Central","FOX19 | Cincinnati","FOX5 Vegas","FOX6 News Milwaukee","Facilities Dive","Fairfax County public permit records","Florida Phoenix","Georgia Department of Community Affairs","Georgia EPD air permit records","Georgia Recorder","GovTech","Greensboro News and Record","Grist","Idaho Capital Sun","Illinois EPA air permit records","Indiana Capital Chronicle","Indiana Department of Environmental Management","Indiana IDEM air permit records","InkFreeNews.com","Iowa Capital Dispatch","Iowa DNR air permit records","KERA News","KEYC News Now","KGW","KRON4","Kansas City MO city issued permits open data","Kansas Reflector","Kentucky Lantern","Law360","Law360 Energy","LegiScan (legiscan.com) and the state legislature","Lehigh Valley Planning Commission","Local News Matters","Loudoun County public permit records","Loudoun Times-Mirror","Louisiana DEQ air permit records","Louisiana Illuminator","Maine Morning Star","Maricopa County Air Quality Department air permit records","Maricopa County public permit records","Maryland Matters","Mecklenburg County public permit records","Michigan Advance","Mid Bay News","Missouri Independent","Montana Free Press","NBC Bay Area","NBC4 Washington","NC Newsline","Native News Online","Nebraska Examiner","Nevada Current","Nevada NDEP air permit records","New Hampshire Bulletin","New Mexico Environment Department","North Carolina DEQ Division of Air Quality air permit records","North Dakota Department of Environmental Quality","North Dakota Monitor","Ohio Capital Journal","Ohio EPA air permit records","Oklahoma DEQ air permit records","Oklahoma Voice","OpenStates v3 (openstates.org), CC BY 4.0","Oregon Capital Chronicle","Orlando Sentinel","Pennsylvania Capital-Star","Pennsylvania Department of Environmental Protection","Pennsylvania Office of Consumer Advocate (filed with PA PUC)","Pioneer Press","Prince William County public permit records","Public Service Commission of Wisconsin","Public record (Legistar Web API, Granicus)","Rhode Island Current","Route Fifty","SEC EDGAR company submissions, public domain","SEC EDGAR full-text search, public domain","Searchlight New Mexico","Smithfield Township, Monroe County, PA","Source New Mexico","South Carolina Department of Environmental Services","South Dakota Searchlight","Springfield Daily Citizen","Stafford County public permit records","Statesman Journal","Strisker data center notes","Tennessee Lookout","Texas Commission on Environmental Quality","Texas TCEQ air permit records","The Baltimore Banner","The Current (GA)","The Detroit News","The Hill Energy","The North State Journal","The Pantagraph","The Real Deal","The Register","The Texas Tribune","The Verge","Times-Standard","Town of Culpeper public permit records","Tuscaloosa Thread","U.S. EPA ECHO","Union-Bulletin","Uprise RI","Utah Division of Air Quality","Utah Division of Air Quality air permit records","Utah News Dispatch","Utah Public Radio","Utility Dive","Virginia Business","Virginia DEQ air permit records","Virginia Electric and Power Company (filed with Virginia SCC)","Virginia Mercury","Visalia Times-Delta","WBUR","WCPO 9 Cincinnati","WGLT","WHEC.com","WJON","WKYT","WLOS","WLUK","WPBF","WQCS","WRAL (NC)","WUNC News","WVPE","Washington County public permit records","Washington Ecology air permit records","Washington State SEPA Register public permit records","Washington State Standard","Washoe County public permit records","Wausau Pilot & Review","West Virginia Watch","Winston-Salem Journal","Wisconsin Department of Natural Resources","Wisconsin Examiner","Yale Daily News","citybiz","contracosta.news","ictnews.org","indianapublicradio.org","inkfreenews.com","lex18.com","mountaintimesoregon.com","newmedia-wi.com","newscentermaine.com","thegazette.com","tuscaloosathread.com","wcpo.com","www.cities929.com"],"omitted":{"unverified_or_pending":1013,"no_explicit_state":136},"revision":"8bbc0d7f56a15216","trackers":{"policy":{"label":"Policy provisions","url":"#policy-governance"},"moratorium":{"label":"Restrictions & moratoriums","url":"/data-center-moratorium-tracker"},"delay":{"label":"Delays & utility actions","url":"/data-center-delay-tracker"},"water":{"label":"Water measures","url":"/data-center-water-tracker"},"atlas":{"label":"Projects & capital","url":"/data-center-capital-atlas"},"permits":{"label":"Permits & facilities","url":"/data-center-permits-tracker"},"grid":{"label":"Grid operator rules","url":"/data-center-grid-operator-watchlist"}},"selected":{"id":"ND","name":"North Dakota","records":[{"id":"1d9db829ca00dfd8","state":"ND","tracker":"atlas","section":"sites","title":"Applied Digital Polaris Forge 1","summary":"Polaris Forge 1 in Ellendale, North Dakota is a 400MW campus expandable to 1GW, leased to CoreWeave. The first tranche of MAM funding followed a $375 million February 2025 Ellendale financing; construction status is inferred from staged build financing rather than stated directly.  $900 million allocated to the Ellendale campus under the $5 billion perpetual preferred facility 400MW campus expandable to 1GW","scope":"Record-specific: Ellendale","status":"construction","date":"facility executed October 7, 2025; first-tranche financing February 2025","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/130/applied-digital-and-macquarie-asset-management-execute","label":"Applied Digital"},{"url":"https://www.macquarie.com/au/en/about/company/macquarie-asset-management/insights/macquarie-asset-management-invests-in-applied-digital-and-aligned-data-centers.html","label":"Macquarie"},{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-secures-first-tranche-of-5bn-funding-from-macquarie/","label":"DCD"}],"parties":[{"role":"Entity","name":"macquarie-am"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8e3914b66baefa3e","state":"ND","tracker":"atlas","section":"sites","title":"Applied Digital Polaris Forge 3","summary":"A lease of roughly $7.5 billion base term, about $18.2 billion if all options are exercised, for 300MW of critical IT load with operations targeted for August 2027.  ~$7.5B base term (~$18.2B with options) 300MW critical IT / ~430MW utility","scope":"Record-specific:","status":"announced","date":"May 20, 2026","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/152/applied-digital-reaches-significant-milestone-surpassing-1","label":"APLD"}],"parties":[{"role":"Entity","name":"applied-digital"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a1830f40a53ba7f4","state":"ND","tracker":"atlas","section":"sites","title":"Harmony Energy Park data center (near the Bison Substation)","summary":"Minnesota-based Geronimo Power has filed for a conditional use permit for a data center at its Harmony Energy Park in Harmony Township, Cass County, near the Bison Substation north of Mapleton. The company says the campus would use 540 MW at peak, nearly twice Applied Digital's 280 MW Polaris Forge II near Harwood, on about 640 acres, with construction taking two to four years, closed-loop cooling and peak water use of 20,000 gallons a day. Township officials are awaiting a legal opinion on whether a former supervisor's undisclosed land sale to Geronimo could nullify earlier zoning changes. New generation; site includes a 200 MW solar farm Geronimo is building next to the Bison Substation and a planned 200 MW battery facility; Otter Tail Power large load tariff under North Dakota PSC review Not disclosed 540 MW at peak demand per Geronimo's project web page; about 640 acres","scope":"Record-specific: Harmony Township, north of Mapleton","status":"proposed","date":"Conditional use permit application filed; reported 29 September 2026 (North Dakota Monitor)","sources":[{"url":"https://www.yahoo.com/news/articles/2nd-fargo-area-data-center-222636152.html","label":"North Dakota Monitor (via Yahoo News), 29 September 2026"},{"url":"https://kfgo.com/2026/09/30/2nd-fargo-area-data-center-would-use-double-the-power-of-harwood-site/","label":"KFGO, 30 September 2026"}],"parties":[{"role":"Entity","name":"Geronimo Power"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ad4f6ef5f1cba4bd","state":"ND","tracker":"atlas","section":"at_risk","title":"Mercer County campus (530+ acres)","summary":"One-year moratorium","scope":"Record-specific: Mercer County, ND","status":"moratorium","date":"Mar 4 2026; dollar value n.a.","sources":[{"url":"https://www.interconnectedcapital.com/research/data-center-moratoriums","label":"Interconnected Capital"}],"parties":[{"role":"Developer","name":"NextEra / Boulevard Associates"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ff3e5c1db7b353b2","state":"ND","tracker":"atlas","section":"at_risk","title":"Morton County data center and cryptocurrency facility moratorium","summary":"Morton County scheduled a public hearing for 12 September 2024 on a moratorium on data centers, following a July 2024 moratorium on direct air capture facilities. The Bismarck Tribune reported that the county's moratorium on data centers and cryptocurrency facilities, adopted by resolution, was still in place when the commission approved a data center ordinance 4-1 on 10 September 2026. The commission considered lifting the moratorium that day, but staff said a notice period was required and expected it at the next meeting.","scope":"Record-specific: Morton County Commission","status":"moratorium","date":"Hearing 12 September 2024 (adoption date not stated in sources); still in place 10 September 2026 when a data center ordinance passed 4-1; lifting pending","sources":[{"url":"https://bismarcktribune.com/news/community/mandannews/article_0021219d-1629-47ff-a9b8-13bc11620613.html","label":"Bismarck Tribune"},{"url":"https://www.govtech.com/policy/morton-county-n-d-will-consider-data-center-moratorium","label":"Government Technology (Bismarck Tribune/TNS)"}],"parties":[{"role":"Developer","name":"n.a."}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"7cde03f82715c2ac","state":"ND","tracker":"atlas","section":"sites","title":"Polaris Forge 1","summary":"Polaris Forge 1 holds 400MW contracted to CoreWeave: a first ~100MW building operational since October 2025, a 150MW second building partially operational, and a 150MW third building under construction with a calendar-2027 ready-for-service date. Applied Digital reported Ready for Service for Phase 1 of Building 2 (75 MW) at Polaris Forge 1, bringing live campus capacity to 175 MW, and an MOU to assign the Building 4 lease to a CoreWeave subsidiary upon CoreWeave achieving an investment-grade rating. It also upsized its revolving credit facility to $430 million committed with a $120 million accordion. On 2 October 2026 Applied Digital said three further 25 MW data halls in the second phase of Building 2 are ready for service, completing Building 2's 150 MW and bringing operational critical IT load at Polaris Forge 1 to 250 MW of the 400 MW contracted.  ~$7B initial leases, ~$11B total with expansion 400 MW contracted; 250 MW operational as of 2 October 2026 (100 MW first building and 150 MW second building); 150 MW third building under construction","scope":"Record-specific: Ellendale","status":"operating","date":"Building 2 completed (250 MW operational) 2 October 2026; third building ready-for-service calendar 2027","sources":[{"url":"https://www.stocktitan.net/sec-filings/APLD/10-k-applied-digital-corp-files-annual-report-d66fc29f9461.html","label":"StockTitan 10-K summary"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-two-15-year-lease-agreements-with-coreweave","label":"APLD"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-announces-additional-150-mw-lease-with-coreweave","label":"APLD"},{"url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000044/apldq426earningsreleaseasf.htm","label":"SEC EDGAR (Applied Digital FY2026 Q4 press release, 27 July 2026)"},{"url":"https://markets.businessinsider.com/news/stocks/applied-digital-brings-an-additional-75-mw-of-ai-infrastructure-online-at-polaris-forge-1-1036593178","label":"Applied Digital release via GlobeNewswire (Markets Insider), 2 October 2026"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai","label":"Applied Digital release, 2 October 2026"},{"url":"https://finance.yahoo.com/technology/ai/articles/applied-digital-adds-75-mw-140100686.html","label":"Proactive (Yahoo Finance)"}],"parties":[{"role":"Entity","name":"applied-digital"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"97d80d1a7f545ce7","state":"ND","tracker":"atlas","section":"sites","title":"Polaris Forge 2","summary":"Polaris Forge 2 near Harwood, ND broke ground August 18, 2025 with an initial 200MW anticipated in H2 calendar 2026 and full capacity in early 2027, backed by a $5 billion hyperscaler lease.  $5B lease; $2.15B notes for the site initial 200MW anticipated H2 calendar 2026, full capacity early 2027; leased 200MW to an unnamed investment-grade hyperscaler","scope":"Record-specific: Harwood","status":"construction","date":"broke ground August 18, 2025","sources":[{"url":"https://www.stocktitan.net/sec-filings/APLD/10-k-applied-digital-corp-files-annual-report-d66fc29f9461.html","label":"StockTitan 10-K summary"},{"url":"https://www.cnbc.com/2025/10/22/applied-digital-signs-5-billion-ai-factory-lease-with-us-based-hyperscaler.html","label":"CNBC"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/146/applied-digital-announces-pricing-of-2-15-billion-senior-secured-notes","label":"APLD"}],"parties":[{"role":"Entity","name":"applied-digital"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"209f1f94b9e9695b","state":"ND","tracker":"atlas","section":"at_risk","title":"Project Fighting Pike data center (Critical Data House)","summary":"Critical Data House originally said its $10 billion, 450-acre Williston data center would operate by January 2027. No work has started since the city approved the subdivision plat on 25 March 2025, because the company cannot take clear title until more than 1,100 foreign investors in an abandoned development on the land, mostly in Malaysia and Singapore, are served under Hague Convention procedures. The company told the Williston Herald it now expects operations in late 2028 or early 2029, with a 20 to 24 month build once it holds title.","scope":"Record-specific: City of Williston (title acquisition under Hague Convention service)","status":"delayed","date":"Plat approved 25 March 2025; delay to late 2028 or early 2029 reported 17 September 2026; single outlet","sources":[{"url":"https://www.willistonherald.com/business/critical-data-house-provides-update-on-project-fighting-pike-progress","label":"Williston Herald, 17 September 2026"}],"parties":[{"role":"Developer","name":"Critical Data House"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"9ddcf3d259683ed8","state":"ND","tracker":"atlas","section":"sites","title":"Project Fighting Pike data center (southwest of U.S. Highway 2 and U.S. 85 Bypass)","summary":"Critical Data House originally said it would operate a $10 billion, 450-acre data center in Williston by January 2027. The Williston City Commission approved the subdivision plat on 25 March 2025, but the lot has sat vacant because the company has not obtained clear title: more than 1,100 investors, mainly in Malaysia and Singapore, put $18 million into an abandoned master planned community on the land and must be served under Hague Convention procedures. CEO Chris Hardin and local representative Dale Haugen told the Herald the project is still planned, with a 20 to 24 month build once title is in hand, and is not expected to be operational until late 2028 or early 2029. On-site generation, per the company's local representative $10 billion, as originally stated by Critical Data House (Williston Herald) Not disclosed; 450 acres","scope":"Record-specific: Williston","status":"announced","date":"Subdivision plat approved 25 March 2025; delay to late 2028 or early 2029 reported 17 September 2026; single outlet","sources":[{"url":"https://www.willistonherald.com/business/critical-data-house-provides-update-on-project-fighting-pike-progress","label":"Williston Herald, 17 September 2026"}],"parties":[{"role":"Entity","name":"Critical Data House"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"dbfaf8225d1ad4ae","state":"ND","tracker":"delay","section":"county_restrictions","title":"Barnes County","summary":"Six-month data center moratorium (In force).","scope":"county: Barnes County","status":"in_force","date":"2026-05-01","sources":[{"url":"https://newsdakota.com","label":"newsdakota.com"}],"parties":[{"role":"Authority","name":"City Council/Board of Supervisors"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"bd130d6595b26f7c","state":"ND","tracker":"delay","section":"utility_actions","title":"Basin Electric Power Cooperative","summary":"NextEra Energy Resources and Basin Electric Power Cooperative are considering jointly developing a 1,450-MW combined-cycle gas-fired power plant in North Dakota to serve a potential data center complex. They applied to the Southwest Power Pool’s fast-track interconnection study process to evaluate the project’s interconnection and transmission requirements through Basin Electric’s Large Load Commercial Program.","scope":"Record-specific: ND","status":"pending","date":null,"sources":[{"url":"https://www.utilitydive.com/news/nextera-basin-electric-data-center/807405/","label":"www.utilitydive.com"}],"parties":[{"role":"Named utility / authority","name":"Basin Electric Power Cooperative"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"13818be8b5347929","state":"ND","tracker":"delay","section":"county_restrictions","title":"Harmony Township (Cass County)","summary":"The Harmony Township Board voted unanimously on Tuesday, September 22, 2026 to hold a public hearing on a two-year zoning moratorium after residents petitioned to be heard. The motion covers all industrial-scale development, including solar, wind, data centers, battery storage, electric transmission lines and gas-fired generation, and would halt Geronimo Power's effort to build a data center in the township. About 50 people attended the meeting at the Mapleton Community Center. The hearing date is not stated.","scope":"township: Harmony Township (Cass County)","status":"proposed","date":"2026-09-22","sources":[{"url":"https://www.inforum.com/news/north-dakota/harmony-township-board-to-consider-2-year-data-center-moratorium","label":"www.inforum.com"}],"parties":[{"role":"Authority","name":"Harmony Township Board of Supervisors"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"87c530bb7d6a9ce4","state":"ND","tracker":"delay","section":"county_restrictions","title":"Mercer County","summary":"Mercer County Commission voted 3-2 for a one-year moratorium after NextEra subsidiary Boulevard Associates had been quietly acquiring land options on roughly 530 acres under NDA (proposed by NextEra Energy Resources). Commissioner Jamee Folk said 'We have so many questions and so many lies. We have ordinances to work out.' About 50 residents attended, most supporting the pause, citing lack of tran","scope":"county: Mercer County","status":"in_force","date":"2026-03-03","sources":[{"url":"https://www.kfyrtv.com/2026/03/04/mercer-county-issues-moratorium-data-centers/","label":"www.kfyrtv.com"},{"url":"https://www.inforum.com/news/north-dakota/data-center-concerns-rise-in-2nd-western-north-dakota-county-as-nextera-basin-eye-project","label":"www.inforum.com"},{"url":"https://www.dakotanewsnetwork.com/2026/03/04/mercer-county-commission-holds-meeting-on-data-centers","label":"www.dakotanewsnetwork.com"},{"url":"https://bismarcktribune.com/news/state-regional/government-politics/article_564db95a-eb0d-4750-9ec4-629b1b70c102.html","label":"bismarcktribune.com"},{"url":"https://www.kxnet.com/news/local-news/mercercounty-data-center-ordinance-planned/","label":"www.kxnet.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a5eca1de3c9120b9","state":"ND","tracker":"delay","section":"county_restrictions","title":"Morton County","summary":"Morton County adopted a moratorium on data centers and cryptocurrency mining facilities in September 2024. The moratorium prevents permitting of these facilities until the county establishes local zoning regulations. The action came alongside a moratorium on direct air carbon capture facilities (adopted July 2024) after controversy over a Colorado company's special use permit application. County o","scope":"county: Morton County","status":"in_force","date":"2024-09-01","sources":[{"url":"https://www.govtech.com/policy/morton-county-n-d-will-consider-data-center-moratorium","label":"www.govtech.com"},{"url":"https://bismarcktribune.com/news/community/mandannews/carbon-capture-data-center-moratorium-morton-county/article_71da3208-1d20-11ef-842b-c363d5088882.html","label":"bismarcktribune.com"},{"url":"https://bismarcktribune.com/news/state-regional/morton-county-hold-public-hearing-data-center-moratorium/article_c37d4074-58bb-11ef-bf47-03f5dd52259d.html","label":"bismarcktribune.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"00bb4706bedf497c","state":"ND","tracker":"delay","section":"county_restrictions","title":"Oliver County","summary":"Over 200 people packed the Betty Hagel Memorial Civic Center in Center, ND as Oliver County leaders debated a proposed moratorium on data centers and cryptocurrency mining. The Oliver County Commission voted 3-0 to adopt a moratorium on December 12, 2024, suspending development of all data centers and cryptocurrency mining facilities. The Planning & Zoning Board had previously passed the moratoriu","scope":"county: Oliver County","status":"expired","date":"2024-12-12","sources":[{"url":"https://bismarcktribune.com/news/state-regional/article_7008bcf1-5d9d-4007-96c7-a2f8bf697d75.html","label":"bismarcktribune.com"},{"url":"https://www.kxnet.com/news/local-news/debate-ignites-over-proposed-data-center-in-oliver-county/","label":"www.kxnet.com"},{"url":"https://olivercountynd.org/index.asp?SEC=AA1FE418-4509-4D80-9397-3CA011E32E88","label":"olivercountynd.org"},{"url":"https://bismarcktribune.com/news/state-regional/business/article_18bb7bd2-89bf-47ef-9a52-ce5e49524f38.html","label":"bismarcktribune.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5fe4251ab4cdcb1d","state":"ND","tracker":"moratorium","section":"local","title":"Morton County data center moratorium","summary":"Morton County adopted a moratorium on data centers and cryptocurrency mining facilities in September 2024. The moratorium prevents permitting of these facilities until the county establishes local zoning regulations. The action came alongside a moratorium on direct air carbon capture facilities (adopted July 2024) after controversy over a Colorado company's special use permit application. County officials stated the moratoriums aim to develop local land use protections for residents, not block development entirely.","scope":"Local: Morton County","status":"enacted","date":"2024-09","sources":[{"url":"https://www.govtech.com/policy/morton-county-n-d-will-consider-data-center-moratorium","label":"www.govtech.com"}],"parties":[{"role":"Jurisdiction","name":"Morton County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"10810ad90dae3c22","state":"ND","tracker":"moratorium","section":"states","title":"North Dakota's HB 1579, originally introduced to create a state siting process for large electricity users (50+ MW), was significantly amended","summary":"North Dakota's HB 1579, originally introduced to create a state siting process for large electricity users (50+ MW), was significantly amended, the siting process was stripped and replaced with a mandate for an interim legislative study on the impact of large energy consumers on the state's electrical grid. Passed House 89-3, Senate 46-0. Signed April 28, 2025. Signed into law on April 29, 2025.","scope":"State: North Dakota","status":"enacted","date":"2025-01","sources":[{"url":"https://ndlegis.gov/assembly/69-2025/regular/bill-overview/bo1579.html","label":"ndlegis.gov"}],"parties":[],"groups":["restriction:states:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b94dc16d48f67fd9","state":"ND","tracker":"moratorium","section":"local","title":"Oliver County data center moratorium (failed)","summary":"Over 200 people packed the Betty Hagel Memorial Civic Center in Center, ND as Oliver County leaders debated a proposed moratorium on data centers and cryptocurrency mining. The Oliver County Commission voted 3-0 to adopt a moratorium on December 12, 2024, suspending development of all data centers and cryptocurrency mining facilities. The Planning & Zoning Board had previously passed the moratorium unanimously. The purpose is to allow the county adequate time to conduct research and develop standards to guide future development. Nearby Mercer County also voted 3-2 to suspend data center development for one year, as concerns spread across western North Dakota. The project involves the Applied Digital proposal.","scope":"Local: Oliver County","status":"failed","date":"2024-12","sources":[{"url":"https://bismarcktribune.com/news/state-regional/article_7008bcf1-5d9d-4007-96c7-a2f8bf697d75.html","label":"bismarcktribune.com"}],"parties":[{"role":"Jurisdiction","name":"Oliver County"}],"groups":["restriction:local:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"da10b7684b67acdc","state":"ND","tracker":"moratorium","section":"local","title":"One-year data center moratorium (lifted)","summary":"A one-year moratorium adopted 3-2 on March 3, 2026 amid a NextEra/Basin Electric proposal was lifted in July 2026 after the county adopted permanent data center, wind and solar zoning ordinances.","scope":"Local: Mercer County","status":"failed","date":"2026-03","sources":[{"url":"https://www.centralnordak.com/articles/data-center-moratorium-lifted-in-mercer-county/","label":"www.centralnordak.com"}],"parties":[{"role":"Jurisdiction","name":"Mercer County"}],"groups":["restriction:local:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"06b00e83aed9df20","state":"ND","tracker":"moratorium","section":"states","title":"Penalties for data center nondisclosure agreements","summary":"Would have attached consequences for data center developers that enter nondisclosure agreements with public agencies or officials. A joint House-Senate policy committee gave it a do-not-pass recommendation on Sept. 2, 2026 after amending it to preserve confidentiality agreements for sensitive information, and the Senate rejected the bill 32 to 15 on Sept. 3, 2026 during a special session. Gov. Armstrong testified that existing transparency law was already sufficient.","scope":"State: North Dakota","status":"failed","date":"2026-09","sources":[{"url":"https://northdakotamonitor.com/2026/09/03/data-center-nondisclosure-bill-dies-in-north-dakota-senate-vote/","label":"northdakotamonitor.com"}],"parties":[],"groups":["restriction:states:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"37e09c9be2329183","state":"ND","tracker":"moratorium","section":"states","title":"Proposed temporary pause on data center permitting through June 2027","summary":"On September 2, 2026, during a special session, Rep. Gretchen Dobervich (D-Fargo) moved to introduce a bill led by Sen. Tim Mathern (D-Fargo) that would have paused data center permitting through June 2027. The House rejected the motion 68-25, and Senate Majority Leader David Hogue blocked consideration in the Senate, where adding bills to the special session required unanimous consent. The bill was never formally introduced. This is separate from SB 2406, a nondisclosure-agreement bill the Senate rejected 32-15.","scope":"State: North Dakota","status":"failed","date":"2026-09","sources":[{"url":"https://www.inforum.com/news/north-dakota/attempts-to-add-data-center-moratorium-to-north-dakota-special-session-fail","label":"www.inforum.com"}],"parties":[],"groups":["restriction:states:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"0867cb4ffce5c18b","state":"ND","tracker":"moratorium","section":"local","title":"Proposed two-year zoning moratorium covering data centers","summary":"On Sept. 22, 2026 the Harmony Township Board voted unanimously to hold a public hearing on a proposed two-year zoning moratorium on industrial-scale development, including data centers, solar, wind, battery storage, transmission lines and gas-fired generation. The proposal follows Geronimo Power's effort to build a data center in the township near Mapleton. The moratorium itself has not been adopted.","scope":"Local: Harmony Township (Cass County)","status":"proposed","date":"2026-09","sources":[{"url":"https://www.inforum.com/news/north-dakota/harmony-township-board-to-consider-2-year-data-center-moratorium","label":"www.inforum.com"}],"parties":[{"role":"Jurisdiction","name":"Harmony Township (Cass County)"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"45f55a5bdae7aa9c","state":"ND","tracker":"moratorium","section":"states","title":"Relating to a sales and use tax exemption for enterprise information technology equipment and computer software purchased for use in a qualified data center","summary":"North Dakota SB 2137 (67): Relating to a sales and use tax exemption for enterprise information technology equipment and computer software purchased for use in a qualified data center; and to provide an effective date. Last action 2021-04-23: Filed with Secretary Of State 04/22.","scope":"State: North Dakota","status":"failed","date":"2021-04","sources":[{"url":"http://www.ndlegis.gov/assembly/67-2021/regular/bill-overview/bo2137.html","label":"www.ndlegis.gov"}],"parties":[],"groups":["restriction:states:failed"],"attribution":"OpenStates v3 (openstates.org), CC BY 4.0","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"bc1c99050827355d","state":"ND","tracker":"moratorium","section":"states","title":"Relating to a sales and use tax exemption for enterprise information technology equipment and computer software purchased for use in a qualified data center","summary":"North Dakota SB 2155 (67): Relating to a sales and use tax exemption for enterprise information technology equipment and computer software purchased for use in a qualified data center; and to provide an effective date. Last action 2021-02-18: Second reading, failed to pass, yeas 1 nays 46.","scope":"State: North Dakota","status":"failed","date":"2021-02","sources":[{"url":"http://www.ndlegis.gov/assembly/67-2021/regular/bill-overview/bo2155.html","label":"www.ndlegis.gov"}],"parties":[],"groups":["restriction:states:failed"],"attribution":"OpenStates v3 (openstates.org), CC BY 4.0","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"918ec9976a6ebc76","state":"ND","tracker":"moratorium","section":"local","title":"Six-month data center moratorium","summary":"Commissioners placed a six-month moratorium on potential data centers (reported May 19, 2026) while the county sets development guidelines.","scope":"Local: Barnes County","status":"enacted","date":"2026-05","sources":[{"url":"https://www.newsdakota.com/2026/05/19/data-center-moratorium-on-barnes-county-commission-agenda/","label":"www.newsdakota.com"}],"parties":[{"role":"Jurisdiction","name":"Barnes County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"0f6ec788c872aecc","state":"ND","tracker":"permits","section":"air_permits","title":"APLD JAMESTOWN DATACENTER","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Jamestown","status":"Not recorded","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_sic=7374&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071785777","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a30e282b63a59ee9","state":"ND","tracker":"permits","section":"air_permits","title":"ELN Generation Plant (Applied Digital Corporation), 9663 87th Ave. SE","summary":"ND DEQ posted draft synthetic minor Permit to Construct ACP-18296 v1.0 for 60 emergency diesel generators backing up Applied Digital's Ellendale data center; the application was filed 4 Dec 2024 with modeling added 28 Jun 2025.","scope":"Facility: Ellendale","status":"Draft","date":null,"sources":[{"url":"https://www.deq.nd.gov/aq/Notices/ELN/DRAFTACP18296v10AQEA.pdf","label":"www.deq.nd.gov"}],"parties":[],"groups":[],"attribution":"North Dakota Department of Environmental Quality","provenance":"Published SAVRN record; source status retained, not newly reverified here."}],"groups":{"restriction:local:enacted":["918ec9976a6ebc76","5fe4251ab4cdcb1d"],"restriction:local:failed":["da10b7684b67acdc","b94dc16d48f67fd9"],"restriction:local:proposed":["0867cb4ffce5c18b"],"restriction:states:enacted":["10810ad90dae3c22"],"restriction:states:failed":["06b00e83aed9df20","37e09c9be2329183","45f55a5bdae7aa9c","bc1c99050827355d"],"utility:tariff:pending":["bd130d6595b26f7c"]},"grid":[{"name":"MISO","key":"MISO","rules":[{"title":"FERC Order to Show Cause on large-load integration (MISO)","summary":"FPA Section 206 order preliminarily finding the MISO tariff unjust and unreasonable because it lacks a consistent, transparent framework for large-load application, study, cost-transparency, co-location, and operational requirements. Defines 'Large Load' as a new commercial or industrial customer at a single site with peak load of 50 MW or greater, interconnecting above 69 kV, not part of a co-location arrangement. Required a generation-adequacy informational report by July 20, 2026 and a show-cause response by…","status":"Pending ,  held in abeyance (see abeyance entry)","date":"2026-06-18","sources":[{"url":"https://www.akingump.com/en/insights/blogs/speaking-energy/ferc-issues-show-cause-order-to-midcontinent-independent-system-operator-inc","label":"www.akingump.com"}]},{"title":"MISO generation-adequacy informational report (EL26-70)","summary":"Report required by the June 18 order on how MISO will ensure adequate generation for existing and new large loads. It acknowledged that concentrated, fast-moving large-load demand requires new tools and previewed two filings: a Zero-Injection GIA (then targeted on or about July 31, 2026) and a Large Load Parallel Study Process (targeted on or about end of September 2026). It stated the region is currently resource adequate.","status":"Filed","date":"2026-07-20","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"MISO abeyance motion and FERC grant ,  show-cause response deadline moved to November 16, 2026","summary":"MISO (like every RTO/ISO) moved on August 3, 2026 to hold the show-cause proceeding in abeyance for up to 90 days to develop Section 205 filings; American Municipal Power opposed. Per a docket tracker updated August 23, 2026, FERC granted full abeyance on August 14, 2026, resetting MISO's response to November 16, 2026 with answers due December 16, 2026. Consequence: MISO did NOT file a substantive show-cause response on August 17, 2026.","status":"Granted ,  proceeding in full abeyance; response due November 16, 2026, answers due December 16, 2026","date":"2026-08-03","sources":[{"url":"https://www.pranavaraparla.com/FERC-Orders-June-2026/","label":"www.pranavaraparla.com"}]},{"title":"Zero-Injection Generator Interconnection Agreement (ZGIA) tariff filing","summary":"Section 205(d) filing creating a fast-track interconnection path for generation co-located with large loads behind the same point of interconnection that will not inject power onto the transmission system (injection prevented beyond transient tolerance windows; POIs on the same voltage side of the same substation treated as electrically equivalent). Per the June 29, 2026 LLWG: ZGIA generators must register as market resources; associated loads are classified as firm NITS loads paying transmission on a gross…","status":"Filed ,  pending at FERC","date":"2026-08-18","sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-08-24/html/2026-17246.htm","label":"www.govinfo.gov"}]},{"title":"Large Load Parallel Study Process (planned tariff filing)","summary":"A new, expedited study process for large loads conducted outside MISO's regular interconnection queue, allowing concurrent rather than sequential study of new large loads and their associated ('devoted') generation. MISO also said it intends to develop a non-firm transmission service option for large loads. Developed through the Large Load Working Group, with meetings scheduled through November 2026.","status":"Proposed ,  pre-filing; announced in MISO's July 20, 2026 informational report","date":"2026-09","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Large Load Interconnection Reliability Requirements (LLWG-2026-3) tariff package","summary":"MISO-wide reliability requirements for large loads: hourly 168-hour forecasts updated hourly plus 5-minute forecasts covering 6 hours; real-time SCADA/ICCP telemetry (MW, MVAR, voltage, breaker status); PMUs at each point of withdrawal streaming IEEE C37.118 data; ramp-rate limits, voltage/frequency ride-through, and remote-disconnect capability; new tariff definitions for computational load, large load customer, and points of withdrawal. Generation over 20 MVA behind the same POI needs individual, un-netted…","status":"Tariff language drafted; filing not independently confirmed","date":"2026-06-29","sources":[{"url":"https://cdn.misoenergy.org/20260716%20LLWG%20Item%2001c%20Minutes%2020260629769037.pdf","label":"cdn.misoenergy.org"}]},{"title":"Expedited Resource Addition Study (ERAS) ,  generation fast lane","summary":"Expedited interconnection track for shovel-ready generation addressing resource adequacy, including generation serving large-load growth; MISO began its first ERAS review with 6.1 GW of projects, about 70% gas. A third-party tracker lists ERAS as sunsetting August 31, 2027 or at a 68-project cap. MISO's large-load page pairs ERAS with Expedited Project Review (EPR) for accelerating transmission solutions.","status":"Approved/operating; first cycle reviewing 6.1 GW (~70% gas)","date":"2025-06","sources":[{"url":"https://www.utilitydive.com/news/miso-eras-fast-track-interconnection-study-gas/806747/","label":"www.utilitydive.com"}]},{"title":"Attachment GGG (Merchant HVDC Connection Procedures) and Improvements (PAC-2024-6)","summary":"Attachment GGG is MISO's connection-only procedure for merchant HVDC ties: it establishes safe physical interconnection while separating physical connection from injection rights and transmission service. MISO targeted a tariff/BPM filing in Q2-Q3 2026 with FERC action and implementation expected Q4 2026. The connection-only construct has been referenced in MISO's large-load interconnection policy discussions (January 21, 2026 PAC), making it a template of interest for load-only connections.","status":"Active ,  'FERC' phase on MISO dashboard (last modified August 12, 2026)","date":"2026-05-12","sources":[{"url":"https://www.misoenergy.org/engage/MISO-Dashboard/attachment-ggg-improvements/","label":"www.misoenergy.org"}]},{"title":"2026/27 Planning Resource Auction results","summary":"Annualized capacity prices fell ~42% to $116-126/MW-day across MISO's zones (from $212-217/MW-day for 2025/26). Summer-season prices cleared at $424.30/MW-day in North/Central, $384.10 in Arkansas/Mississippi, $412.10 in Louisiana/Texas (down from $666.50 footprint-wide). Driven by a 4% increase in offered capacity including 12.2 GW of accredited solar (up 59%).","status":"Final ,  all zones cleared, no shortfalls","date":"2026-04-28","sources":[{"url":"https://www.misoenergy.org/meet-miso/media-center/2026---news-releases/misos-planning-resource-auction-shows-sufficient-capacity-for-coming-year","label":"www.misoenergy.org"}]},{"title":"2026 OMS-MISO Resource Adequacy Survey","summary":"Members plan record additions averaging ~15 GW/year of new accredited summer capacity over five years (~100 GW of new supply by 2032; ~60% wind/solar/storage, ~40% gas), against 5.1%/year load growth. Projected surpluses above the planning reserve margin: summer 2028 +11.5 GW, summer 2031 up to +39 GW (November-forecast basis); the April-forecast basis shows materially lower margins. Record 99.5% survey participation.","status":"Published","date":"2026-06-03","sources":[{"url":"https://www.utilitydive.com/news/oms-miso-survey-resource-outlook-generation/821973/","label":"www.utilitydive.com"}]},{"title":"State commissions' complaint against LRTP Tranche 2.1 benefits/cost allocation","summary":"Utility commissions from Arkansas, Louisiana, Mississippi, Montana and North Dakota asked FERC to undo the Tranche 2.1 Multi-Value Project designation, alleging MISO's modeling overstated benefits. MISO, six other state commissions, multiple utilities, the Data Center Coalition, and the governor of Iowa opposed the complaint and sought dismissal. Outcome directly affects cost allocation for the 765 kV backbone that would serve large-load growth.","status":"Pending ,  no FERC merits ruling found as of 2026-08-24","date":"2025-07-30","sources":[{"url":"https://www.utilitydive.com/news/ferc-complaint-mvp-multi-value-project-transmission/756411/","label":"www.utilitydive.com"}]},{"title":"FERC rulemaking: Interconnection of Large Loads to the Interstate Transmission System","summary":"The Secretary of Energy initiated a rulemaking in October 2025 to facilitate timely large-load interconnection ('speed to power'). FERC's June 18, 2026 response was six tailored show cause orders (including EL26-70 for MISO) rather than a single national rule, while keeping the RM26-4 docket open. Binds all six RTO/ISO regions' reform schedules.","status":"Open rulemaking docket; FERC chose targeted Section 206 show-cause orders over an immediate generic rule","date":"2026-06-18","sources":[{"url":"https://www.ferc.gov/rm26-4","label":"www.ferc.gov"}]}]},{"name":"SPP","key":"SPP","rules":[{"title":"High Impact Large Load (HILL) study process, HILLGA, and Load Limited Resource Interconnection Service (LLRIS)","summary":"Creates a HILL load category ,  new or increased commercial/industrial load of 10 MW+ at ≤69 kV or 50 MW+ at >69 kV at a single site (electric storage excluded) ,  with a 90-day study-and-approval path to interconnection agreements for loads paired with new or existing generation. HILLs must provide real-time telemetry, give the transmission operator remote-disconnect capability, hold ramp rates to no more than 20 MW/minute unless otherwise directed, install a PMU at customer expense, and meet ride-through…","status":"approved / effective (unanimous; Commissioner Rosner concurrence; compliance filing due within 30 days)","date":"2025-10-24","sources":[{"url":"https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf","label":"spp.org"}]},{"title":"Conditional High Impact Large Load Service (CHILLS) ,  non-firm bridge transmission service","summary":"Adds a new as-available, non-firm transmission service letting customers serving HILLs take energy transfers to designated delivery points, subject to curtailment and interruption when the system is constrained or during emergency conditions, until designated resources and/or network upgrades supporting long-term firm service are in place. Maximum term is seven years, intended to push customers to complete firm-service arrangements through existing tariff processes. FERC found CHILLS just and reasonable given…","status":"approved / effective","date":"2026-02-10","sources":[{"url":"https://spp.org/documents/76880/20260605_order%20-%20revisions%20to%20add%20the%20conditional%20high%20impact%20large%20load%20service_er26-1323.pdf","label":"spp.org"}]},{"title":"Expedited Resource Adequacy Study (ERAS) ,  one-time fast-track generation interconnection process","summary":"One-time expedited interconnection framework for generation needed for member resource adequacy, adopted in response to queue backlogs and projected capacity deficits. As of SPP's July 2026 informational reports, 36 active requests totaling ~13.3 GW are in the process, with Generator Interconnection Agreement negotiation/execution expected in September 2026. Thermal resources lead the ERAS mix, followed by hybrid projects.","status":"approved / in execution (36 requests ~13.3 GW; GIAs anticipated September 2026)","date":"2025-07-21","sources":[{"url":"https://www.spp.org/documents/74369/20250721_order%20accepting%20tariff%20revisions%20subject%20to%20condition%20-%20expediated%20resource%20adequacy%20study_er25-2296-000.pdf","label":"www.spp.org"}]},{"title":"FERC Section 206 show cause order on large and co-located loads (one of six issued to all RTOs/ISOs)","summary":"FERC preliminarily found SPP's OATT appears unjust, unreasonable, or unduly discriminatory and directed SPP and 22 named transmission owners to either show cause or propose remedies on four gaps: (a) no requirement to evaluate alternative transmission technologies (GETs) or memorialize ongoing operational requirements in a transmission service agreement; (b) transparency on network upgrade costs, a pro forma cost recovery agreement, and a crediting mechanism to prevent cost shifting; (c) rates/terms for…","status":"pending (SPP filed its 30-day informational report July 20, 2026; the 60-day show-cause response deadline passed Aug 17, 2026 ,  contents not yet…","date":"2026-06-18","sources":[{"url":"https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf","label":"spp.org"}]},{"title":"SPP informational report on resource adequacy for large loads (EL26-68 compliance)","summary":"SPP argued its existing framework ,  ERAS, Provisional Load Process (Attachment AX), HILL/HILLGA, CHILLS, Peak Demand Assessment, and the Consolidated Planning Process ,  collectively addresses resource adequacy for new large loads and that no immediate tariff overhaul is required. Reported all 65 Load Responsible Entities met summer 2026 resource adequacy requirements, with the East Balancing Authority Area holding a 17.1% reserve margin (~5,752 MW excess capacity).","status":"Filed","date":"2026-07-20","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Price Adaptive Load / Price Adaptive Load Service (PAL/PALS) market participation model","summary":"A new market participation model and non-firm transmission service for flexible, price-responsive large loads willing to curtail, developed partly in response to the EL26-68 show cause order's directive on flexible-load services. A draft Schedule 16 would assign PALS the lowest non-firm curtailment priority ,  curtailed before other non-firm customers and well before firm service. Target FERC filing on or before November 16, 2026.","status":"proposed / in stakeholder development","date":"2026","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Seasonal planning reserve margins ,  36% winter / 16% summer","summary":"Load Responsible Entities must hold capacity of at least 36% above winter peak (first separately defined winter PRM) and 16% above summer peak, up from the prior 15% requirement in effect since 2023. The summer PRM is scheduled to rise to 17% in 2029. These requirements bind the capacity that must back any new large load served by an LRE.","status":"approved / effective","date":"2026","sources":[{"url":"https://www.spp.org/news-list/spp-board-approves-new-planning-reserve-margins-to-protect-against-high-winter-summer-use/","label":"www.spp.org"}]},{"title":"Consolidated Planning Process (CPP) ,  merged transmission/interconnection/load planning","summary":"Consolidates SPP's transmission planning, generator interconnection, and (large) load processes into a single planning framework, adopted in response to historic load growth, queue backlogs, escalating network-upgrade costs, and project withdrawals. First Interconnection Cluster Study queue window opened 30 days after the effective date; initial GRID-C rate publication expected by end of 2026.","status":"approved / effective; first CPP planning cycle concludes 2028","date":"2026-03-13","sources":[{"url":"https://www.hklaw.com/en/insights/publications/2026/03/ferc-approves-spps-consolidated-planning-process","label":"www.hklaw.com"}]},{"title":"CHILLS refinement revision requests RR767 / RR768","summary":"RR767 clarifies how CHILL-related curtailment commitments must be defined, sequenced, and made operationally feasible; RR768 accommodates planned outages of generators supporting a CHILL while preserving SPP's ability to curtail for reliability. SPP is also developing refinements on resource commitment sequencing and minimum curtailment ramp rates.","status":"Proposed","date":"2026","sources":[{"url":"https://epeconsulting.com/epe-intelligence/news/accelerating-project-opportunity-new-chills-tariff-revisions-in-spp-provide-critical-flexibility","label":"epeconsulting.com"}]}]}],"grid_note":"SPP is the primary balancing authority (west/central incl. Basin, MDU, WAPA); eastern ND (Xcel Fargo, Otter Tail, Minnkota area) is MISO ,  per ND Legislative Council/OpenEI.","grid_operators":["SPP","MISO"],"counts":{"moratorium":10,"delay":6,"atlas":9,"permits":2},"record_count":27},"states":[{"id":"AL","name":"Alabama","groups":{"restriction:local:enacted":["b754e99ab4330e15","decd6891258f47ef","f0af2bd58075bd01","acf788f0940c151f","5d2b5e02877a6db1","86b6b59a0f9f25d6","c4e0ec1c77b375f6","f54b7627480545ea","e01160ee3d027689","a5568f503c16796e","672a4451f57ed71f","130f0e56bf60745e","4985760687f3ce84","03643fb450f0e606","e03f681545f8685d","7e09fb347db9cc56","3eaa5dec8cc4f32e"],"restriction:local:failed":["c8b4ae70216bc13d"],"restriction:states:proposed":["e7f13067c265e602"],"water:moratorium:enacted":["fe369e5b2f828936"],"delay:litigation:active_litigation":["588eb0c7ad945e8c"],"delay:zoning_approval_challenge:active_litigation":["588eb0c7ad945e8c"],"delay:litigation:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:council_agenda_removal:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:environmental_concerns:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"utility:statement:pending":["11c4e5e5098ce897"],"utility:special contract:pending":["6d50a85ed575ad70","ea51d9bfa3f2aef7"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":19,"water":1,"delay":17,"atlas":28,"permits":3},"record_count":68},{"id":"AK","name":"Alaska","groups":{"restriction:local:enacted":["a3bdbc7a2f903071"],"restriction:local:proposed":["1b1fd599ecf09004"],"restriction:local:failed":["14fcd2107dd36027"],"restriction:states:failed":["70bf8b65e5240449"],"delay:interconnection:cancelled":["cbda12242cdda058"],"delay:community_opposition:cancelled":["cbda12242cdda058"],"delay:financing:cancelled":["cbda12242cdda058"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":4,"delay":2,"atlas":1},"record_count":7},{"id":"AZ","name":"Arizona","groups":{"restriction:local:enacted":["efe1b1646b346c07","a90bced96e18e77a","a6281e2e804f5a60","1d398d0ae1a21d5b","641d11706e6d4289"],"restriction:local:proposed":["543df422425e5d64"],"restriction:states:enacted":["341f659a40d6be88","8c611b34dae73c14","1e866041a2d45903"],"restriction:states:proposed":["add216a01080fe60","226daa2040f1d307"],"restriction:states:failed":["1b22a852fb3cd3d6","6300ce595ef5d0af","fe22b44843f73aaa"],"water:closed-loop:enacted":["869ef8ac67db8830"],"water:siting:enacted":["e4c543ec417de650","bf9111175cdcc2be"],"water:study:enacted":["c002da5fb08b6601"],"water:moratorium:enacted":["5706e495e387c218"],"delay:zoning_denial:cancelled":["3a372b9b02a89621","717671bd9cdc167f"],"delay:water_dispute:cancelled":["3a372b9b02a89621"],"delay:community_opposition:cancelled":["3a372b9b02a89621"],"delay:community_opposition:litigation_active":["b1a04c91d82be6c4"],"delay:water_dispute:delayed":["f0fd3f3d4688462e"],"delay:community_opposition:delayed":["f0fd3f3d4688462e"],"delay:zoning_denial:under_appeal":["cb82a5cd61fb9cec"],"delay:tax_incentive_change:under_appeal":["cb82a5cd61fb9cec"],"delay:zoning_denial:withdrawn":["5567ed106330c2df"],"delay:community_opposition:withdrawn":["5567ed106330c2df"],"utility:other:pending":["5d17a79f01d2eb63"],"utility:tariff:pending":["1da26df1fe5c13a0"],"utility:rate case:pending":["5b45806c6fb887c7","d2b222dc47567225"],"utility:special contract:approved":["d3d18ed766abfecd","44611b67548fe3db"],"utility:tariff:approved":["f2a114901b242afc"],"utility:special contract:pending":["aa4d78d10d987248"],"utility:statement:pending":["0dcfef71df5fb811"],"utility:other:approved":["03326890e794e215"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":14,"water":5,"delay":29,"atlas":21,"permits":63},"record_count":132},{"id":"AR","name":"Arkansas","groups":{"restriction:local:enacted":["ccd17d0cc78e8f6b","24be15d78831b997","2976edbd642bc5ee","165be2cac366e40a","c321161246656575","11b2b2b4357c9b9a","f1fcd0a91c9b364f","cc8edc44497c00b0"],"restriction:local:failed":["7a3c89981993bc87","f0d3a1dde3ddedd3"],"restriction:states:proposed":["24cb87919949138b"],"restriction:states:failed":["669f43bd9db94313","4cd8f4567d93ecf7"],"water:disclosure:failed":["b599e881f9e16713","460013ff73ea7911"],"water:siting:enacted":["d25f62e8d2b28025"],"water:disclosure:vetoed":["34510ed612779eb7"],"delay:litigation:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:state_law_ownership_ban:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:quorum_court_rejection:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:county_moratorium_dispute:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:litigation:active_litigation_records_dispute":["a103b1f5c7cb3114"],"delay:public_records_dispute:active_litigation_records_dispute":["a103b1f5c7cb3114"],"utility:statement:approved":["36a2338551fca4bf"],"utility:tariff:approved":["f43b05ef42c2b01e"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":13,"water":4,"delay":17,"atlas":10,"permits":2},"record_count":46},{"id":"CA","name":"California","groups":{"restriction:local:enacted":["a25de67269df0ed1","5709c4b5b56bdcb7","2a076a8efdfced43","09ce6bf92df9e75f","846b44fb44875a68","c8bffaf8e914e126","d3f536e572c853c0","e6f878bf8f23af8a","0bc1904215c57133","91ff35645c472dbe","188c7c4f44c8536f","2e31d9e1a9cca3fe","c6bb03e1b77debf9","1df245d5ecbbe1dd","106240b9c12fa638","71e0bfc997caca17","e8632d627b1772a4","7c6238e16f306088","055c2fca846ffbb0","4db95272d4d0b3b9","c0ec3d7f70d99734","9749538c1593f5cd","396ad9209089e80b","8aa7be7faae30500","dbd84a0fba7823d9","4297fa613aade787","1ed97d6ba694c7ec"],"restriction:local:proposed":["ea295658dff6c100","4d8d1ffdf12217a7","0552f5d218785acb","566895b8839e5229","558caf6ac46fd86a","aafdf3f00fd02036","1447a768a8032ada","8f8c47d0520b6675","07dc420f28cea720","cc095341ed505538","96c02fe3f2b69d63"],"restriction:local:failed":["4c7a6aab7028e4cf","6c0f45a31c38dd96","60a1fd085fb7faa2"],"restriction:local:pause":["9441b074827051cd"],"restriction:states:enacted":["b138c8f25c6a1df9","6cd48a1a9e3b6e42","e04ce361015d10b8","997e47cb2efa0fb1","a99eee6a8346d803","f8de3ea100d5a73c","36821d2782e3a288","b175ffb656ec4e09"],"restriction:states:failed":["9a181689208d061f"],"water:disclosure:proposed":["6018757e291cf1cf"],"water:disclosure:enacted":["f1363de6a8051f4c","0542c8536ced8e81","d192c59c767e1959"],"water:moratorium:enacted":["1cc46a341cdc3ef8","455741d01ef09906","490cb87c459dd8d3","b85c5b51cdf4ca84","2d55ff4b663fe464"],"water:moratorium:proposed":["7dd1832dd7f10e5b","d430cf80aec173de"],"water:incentive:enacted":["4a4855c312ff4655"],"water:siting:enacted":["0f9ba6aedeacc0f2"],"delay:litigation:litigation_active":["df264e03425ec97a"],"delay:permit_denial:litigation_active":["df264e03425ec97a"],"delay:local_moratorium:delayed":["81e21ec7e868a8a0"],"delay:water_dispute:delayed":["81e21ec7e868a8a0"],"delay:community_opposition:delayed":["81e21ec7e868a8a0","14833b21d81cfae2"],"delay:litigation:delayed":["8f4ba499ed265bb0"],"delay:permit_denial:delayed":["8f4ba499ed265bb0"],"delay:local_moratorium:cancelled":["e6ef57967971f34b"],"delay:community_opposition:cancelled":["e6ef57967971f34b","60ad802b8bf4ce26"],"delay:community_opposition:withdrawn":["dabaa0d9ca40c829"],"utility:other:pending":["2331af1293597280","65708bfad2e82891"],"utility:tariff:pending":["9365b7af7942c436","345f48017f0b0304"],"utility:statement:pending":["686efa78facdadc1","c9e2f082eb03806e"],"utility:tariff:contested":["d8dc8b595b9287b9"],"utility:IRP:pending":["2c217c66f5f9e73f"],"utility:special contract:approved":["e9224e475fe0078d"],"utility:special contract:pending":["a93460236987d2aa"],"utility:tariff:approved":["77fc87a9cbbc5266"]},"grid_operators":["CAISO","NON-RTO"],"counts":{"moratorium":51,"water":13,"delay":52,"atlas":42,"permits":18},"record_count":176},{"id":"CO","name":"Colorado","groups":{"restriction:local:enacted":["d20e86908dbdc520","7e23b2c472790666","b680584b86f47325","27892c65296bbedd","4057677a34555f38","611f35a83bc2affd","079b59e4fdf63d21","a78ac9d55cc5b6e7","72aaf79dce28835b","8c94de22f0407e5e","fafd70f2e092776b","b7f34202c64479ce","68d895f0c2ab0e74","9ef574abef591c91","73177d5333c4eddd","025c6d645640e09f","2c25069cf664aaf3"],"restriction:local:proposed":["180c78e281f128cd","e516a7d3e6cb6124"],"restriction:local:failed":["1224f46eadf9763d"],"restriction:states:failed":["804810ef9bbbcba8","8bb8b6f98d15d82f"],"water:siting:enacted":["1a50144d2155e77c","b03afdefabd7d0fe"],"water:moratorium:enacted":["da5550e87bcd99b9"],"delay:local_moratorium:halted":["9cef3b22115f1c92"],"delay:community_opposition:delayed":["a38043d281f78904"],"delay:litigation:delayed":["a38043d281f78904"],"delay:tax_incentive_change:litigation_active":["75f9d2abb9fb3326"],"delay:local_moratorium:delayed":["346f7ed881ecaa83"],"utility:tariff:pending":["959a6c65c1b74f30","59050cc9ea65018e","7d2e982178725742"],"utility:IRP:approved":["c4287797ac10652c"],"utility:tariff:denied":["c0672975e176ca01"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":22,"water":3,"delay":27,"atlas":26,"permits":35},"record_count":113},{"id":"CT","name":"Connecticut","groups":{"restriction:local:enacted":["6e1a2316302287f7","576ae2d483109634","f7bc5e6a64694fc6","afa7c0bb25faeb00","0642f9a9d449638b"],"restriction:states:failed":["717698e42ef6e901","e135ad979d2fc395"],"water:disclosure:proposed":["7a7d2e991305affc"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":7,"water":1,"delay":4,"atlas":5,"permits":1},"record_count":18},{"id":"DE","name":"Delaware","groups":{"restriction:local:proposed":["d3ed82824472253c"],"restriction:local:enacted":["20667d2af7bb1915","349d8f4e1160a386","e6b800970826b7ff"],"restriction:states:enacted":["f79088b84dfb570b","f797bd58db306835","00d385fc78b43d3c"],"restriction:states:failed":["8e1aedf35862eb28"],"delay:zoning_denial:halted":["5fef84a0dc8a6ea7"],"delay:community_opposition:halted":["5fef84a0dc8a6ea7"],"utility:tariff:pending":["5c2aae85d73c5722","7d3ea4d67fa68520","db8fb22803e36edc","5b6e0fabe7643de5","a3ef5c98705ce81a"],"utility:tariff:contested":["17240088860f9cd6"],"utility:policy:effective":["c3275bc79925ea23"]},"grid_operators":["PJM"],"counts":{"moratorium":8,"delay":14,"atlas":4,"permits":3},"record_count":29},{"id":"FL","name":"Florida","groups":{"restriction:local:proposed":["3c6d8b831356d465","e8b089b79a0f9026","7425d7591ce9c05a","e1b9861a123c1037","eff63eaba9c47d23","5b481baefebc87d9","a5e933035ad808b1","fac9127296bbb451","81e7440dc92c2b86","92a8872884499683"],"restriction:local:enacted":["a5503fc35c328f46","23c7119619365d48","8b07f1ffc26fabaf","3d8300137881558a","73505e05af5a93eb","f81b18c1e2c17955","930a54e75fe30dbf","a6dde620b7e76c37","55f91fe7e81d73f9","256ea0475a8abfbc","3d3d3059a4680f72","d7dcf42909108795","81d807032f719371","e068dd6b5ef9a080","2309ccbc3d286709","6056ac6cc19512a9","7143529782427cf5","089c1610e25cae54","6519ee70858d723f","10e7ec4ad55643e8","9d86ef4ad5bda00b","664c54df9091c973","05af516c4516ea5a","f5948f47a6af75c6","983f2c993373327d","06dc3cba02451c3d","c1218a13301328fe","b404521e586a3d39"],"restriction:local:failed":["3cabceedb3599796","cea30c117def2cca","3eec78ad6ec41fba","b3455f9b6eb27513"],"restriction:states:enacted":["bd1baf5ebba563ea","0481f85a9e1d5f2a"],"restriction:states:failed":["8cb4a715971a72e5","3ba747e753788cc7","04d2addc80c5d977"],"water:reclaimed:enacted":["41fb56a04133f262"],"water:moratorium:proposed":["edf34b85cb944f74","1cd10774835a9376","ad733fa464deef93"],"water:moratorium:enacted":["2940ba1eefc2e616","9b3a0316ced968a7","209a4247fb52b5dd"],"delay:community_opposition:cancelled":["8e40e6f05855c417"],"delay:water_dispute:cancelled":["8e40e6f05855c417"],"delay:zoning_denial:cancelled":["8e40e6f05855c417"],"delay:permit_denial:denied_without_prejudice":["a96919e42e70568c"],"delay:community_opposition:denied_without_prejudice":["a96919e42e70568c"],"delay:county_moratorium:moratorium_in_force":["a80ab26a0223aab0"],"delay:community_opposition:under_construction_amid_opposition":["30167fbd092c1632"],"delay:transparency_concerns:under_construction_amid_opposition":["30167fbd092c1632"],"delay:community_opposition:rumored_no_application_filed":["f2412c254c9be527"],"delay:meeting_postponed:rumored_no_application_filed":["f2412c254c9be527"],"utility:tariff:pending":["8decf641f8a25d7d","a3c4a2035b1bbdae"],"utility:tariff:approved":["e302a349f266e980","6e774dbc7dc0ad70"],"utility:other:pending":["49d867567171c0f6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":47,"water":7,"delay":35,"atlas":45,"permits":3},"record_count":137},{"id":"GA","name":"Georgia","groups":{"policy:cost-allocation":["8dcc4b156d460b66"],"policy:minimum-payment":["90114ff524521a31"],"restriction:local:enacted":["83b7e8e76b5ee0bc","c702f3e21493eb78","f01b7f9bb899e3d6","f7d299ad7a92bf12","3bbce17db7406e29","d82372162bbd6160","85de3463c47701a1","7086dae6422907ad","754cf92f96c529a3","c7572839bf1e65ec","0f457e9b1f07b13c","cde0de75b390a38c","190ca6042402e496","b7df742790192976","18d1622ef7bf1615","91cb94f80ea44672","8b31abcd9fbd53f1","25670f673645fec9","a263b272f78d0c97","c968b3ce64dc6e50","94471cc36a302f4d","d8321a4a32d96fe5","d6fd85ec434dbb95","e92bfd601e97e81a","b442425bf5306c01","0a299b6f3e4f8a71","97f3ce24746ab390","75bf8ea8521c54fa","0a88eeaf1510a872","b85fe594520520c1","90a000efae4eb640","c5f545916c737149","7718b91252a0926a","dea0bc58f5667b0f","31c097aea2e6b922","e07ddb442cda946c","8e0052e65c172653","8c1646131950febb","05cc6246e1b41c7f","f7dbcf4c51bf6858","a0256947e3545780","8a2dd9e2691ff06f","9f541b9254ba4673"],"restriction:local:failed":["0abc00ddccf55a33","2bc57eb4e3e90e1f","701836b773fb0b9f","69a87b66a5ff3dc2","c86da04ebcb107b1","496e8e5d89e48f9e","e1f3ad4472027620","6e2cdff1c98b89c0"],"restriction:local:proposed":["c2f04f5b50afc543","0fb52176825fcefa","cb9ce96499427440"],"restriction:states:proposed":["8f9aa89848bde366"],"restriction:states:failed":["e9f083814e55fed7","9c1953c2716db6dd","40cfc9d1ff50d003","6a4a691d7908a952","1f42995802ab1e14","1b3fd31a366bf4bd","a9baa8b690070329","30d8a643dc1032e6","35836125f8f5c6e9"],"water:disclosure:proposed":["763ca1cd9c5aab65"],"water:siting:enacted":["dfcc4d38d0110edd","e2e353fc1545946a"],"water:siting:proposed":["1054015276abc18b"],"water:closed-loop:enacted":["de00fb52546e6f23"],"water:disclosure:enacted":["2ad2d7c1dd2cabd0"],"delay:permit_denial:permit_denied":["1f36ddedf54f3fd4"],"delay:community_opposition:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:approved_active_litigation":["d0f8256ac51fab90"],"delay:litigation:approved_active_litigation":["d0f8256ac51fab90"],"delay:community_opposition:approved_active_litigation":["d0f8256ac51fab90"],"delay:county_moratorium:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:community_opposition:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:county_moratorium:moratorium_in_force":["dc2902692d6491a1"],"delay:public_outcry:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:tax_break_withdrawal:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:community_opposition:cancelled":["2a4ab4968e918d44"],"delay:interconnection:cancelled":["1de43b4a847f9aa8"],"delay:financing:cancelled":["1de43b4a847f9aa8"],"delay:interconnection:denied":["2661c3858a5d582c"],"delay:zoning_denial:halted":["07d5ce26e3298956"],"delay:community_opposition:halted":["07d5ce26e3298956"],"utility:tariff:approved":["51165aeea3b5c521"],"utility:rate case:approved":["858fc088c06ae5c6"],"utility:other:pending":["7eacf8103d2cde93","725643f3b4745c90"],"utility:statement:pending":["83d8f442e8f028cc","613ee18634340b67"]},"grid_operators":["NON-RTO"],"counts":{"policy":2,"moratorium":64,"water":6,"delay":70,"atlas":70,"permits":91},"record_count":303},{"id":"HI","name":"Hawaii","groups":{"restriction:local:proposed":["28597eb2f2e2356b"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":1},"record_count":1},{"id":"ID","name":"Idaho","groups":{"restriction:local:enacted":["95089721b56ee774","fe1a183a87096ad9","cfe65746b5a0f7e3"],"restriction:local:failed":["93f06396ad555ba2"],"restriction:states:enacted":["276f9be7f349fc75"],"restriction:states:proposed":["cefda14587a887e9","f7f09ea72ca4e50b"],"restriction:states:failed":["9c8a456a09d32f23","89b3c3ec88bdbc77","46828f9c28d595d2"],"water:siting:enacted":["d9479381dd39426b"],"delay:litigation:under_appeal":["6c2c455020d0272b"],"delay:corporate_realignment:delayed":["7e9cb32e4e8d817f"],"utility:other:pending":["7cf4e8e8f3a38458"],"utility:tariff:approved":["e898000ea6ecc3d6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":10,"water":1,"delay":9,"atlas":3,"permits":1},"record_count":24},{"id":"IL","name":"Illinois","groups":{"restriction:local:failed":["1688237928438d39"],"restriction:local:enacted":["ca8eaa4fae2c852a","6f07a6763fa734a0","09ae1486502886e8","5bd418f017328c7c","06b72d07cd1c49ac","0c47dab15c0d2f8b","0af9b2178b92e9d5","a63897e78f332f95","9c11e0fbe25fcdd9","dff4c418b6ff66a4","4dbd1742ac88cba6","98cdcd339817f68e","95fb3d3156498f12","15e7d96176c192b0","4ada4d4ff9e7b794","9f441a6e33f21096","91816e044ae91d73","606804a7751c5741"],"restriction:local:proposed":["c658effcd8a8404b","e742ed625e62ce6f","a952290a81b198a4","5b9ee8080b2a9ab7"],"restriction:states:pause":["d15586bf00803a21"],"restriction:states:proposed":["2de67be693a93ad7"],"restriction:states:failed":["6456aa7bb0b23688"],"water:disclosure:proposed":["8a7dc5bdfec701e7"],"water:moratorium:enacted":["080dab59c19bd690","2a07c1558296be02","e635d05e2074a570"],"water:disclosure:enacted":["dc2475a676fa62ca"],"delay:litigation:litigation_active":["fea0362f66d7ce4d"],"delay:community_opposition:litigation_active":["fea0362f66d7ce4d"],"delay:zoning_denial:litigation_active":["fea0362f66d7ce4d"],"delay:litigation:active_litigation":["9e23d3ec3c2afc8f","73e7e2b4984b632d","180053263745dfcc"],"delay:wetlands_permit_suspended:active_litigation":["9e23d3ec3c2afc8f"],"delay:community_opposition:opposed_pending_council_vote":["e132605bfcfb961d"],"delay:community_opposition:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:petition_campaign:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:city_moratorium:moratorium_in_force":["58cf33c3ebe468f0"],"delay:public_notice_violation_alleged:active_litigation":["73e7e2b4984b632d","180053263745dfcc"],"delay:rezoning_denial:withdrawn":["035003b98053fc06"],"delay:no_secured_tenant:withdrawn":["035003b98053fc06"],"delay:council_opposition:withdrawn":["035003b98053fc06"],"delay:water:cancelled":["46efd12bf3ea6dcb"],"delay:financing:cancelled":["46efd12bf3ea6dcb"],"utility:rate case:approved":["37ab93fd8b57c77e"],"utility:tariff:approved":["1543e61fc24998f6"]},"grid_operators":["PJM","MISO"],"counts":{"moratorium":26,"water":5,"delay":42,"atlas":40,"permits":60},"record_count":173},{"id":"IN","name":"Indiana","groups":{"policy:minimum-payment":["bf784d50ec22157b"],"policy:departure":["03586139e9d09948"],"policy:security":["19c77af74e853a13"],"policy:regulator-reporting":["dde07ed35b93f0c9"],"restriction:local:enacted":["963b8c0256246b3b","8eac5106889da9ac","183f5e5fde8b2c9e","a7e5ebb04d58be95","f4c86ae66329b23b","a3e5e35d93d700fd","a444b64740435e08","3a39e47da83f24be","c7133c46e29c6d69","5e41da92046a9bcb","ff803a94b802fe31","7db5ead22195b986","998bd34f448ab467","9e2594c01650c7f4","837d5ad2452c9a6c","42d0a19e60e69b3f","7a052f9efca8b303","5be45e17d6ec7513","c1be058ee36c4738","a86775303cb769f2","bba265c36e34c00f","ee5f8620c8465f3d","736410e487973794","faaee5c934ec1ecb","ee6a98915d4cd96d","678dfff8b193d0a3","0e6064d1c5503319"],"restriction:local:proposed":["e66e435a43f67c04","7467dd109abc68e3","fed5ec0ec8852137","c73095088bd90160","b24ea3f72d09cb82"],"restriction:local:failed":["845faec2de5f43fc"],"restriction:local:pause":["4d96d9bb18ac4024"],"restriction:states:enacted":["227139621030dba6"],"restriction:states:failed":["eea922145c00d1a8"],"water:moratorium:enacted":["2e6ca318ecd03dd0"],"water:siting:failed":["b35eb608d2415382"],"delay:community_opposition:cancelled":["bb2ed0971e6302ac"],"delay:zoning_denial:cancelled":["bb2ed0971e6302ac"],"delay:litigation:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:community_opposition:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial_or_withdrawal:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial:rezoning_denied":["d11979032cadd398","569435ce3fe609dd"],"delay:community_opposition:rezoning_denied":["d11979032cadd398"],"delay:litigation:active_litigation":["c5e676669917e797"],"delay:permit_challenge:active_litigation":["c5e676669917e797"],"delay:community_opposition:approved_amid_opposition":["6d8bec92336deeb0"],"delay:missed_milestones:development_agreement_expired":["27c39d9347a1192e"],"delay:financing_delay:development_agreement_expired":["27c39d9347a1192e"],"delay:unresolved_commitments:rezoning_denied":["569435ce3fe609dd"],"delay:county_moratorium:moratorium_in_force":["33af90259cf95dde"],"delay:county_moratorium:moratorium_extended":["6e309bb5ef6dcc2b"],"utility:tariff:approved":["4b48c2fabeec119f","fa98544ba5e059ad","6b0503ca135ba204"],"utility:special contract:pending":["113a466c8203c668"]},"grid_operators":["MISO","PJM"],"counts":{"policy":4,"moratorium":36,"water":2,"delay":51,"atlas":50,"permits":12},"record_count":155},{"id":"IA","name":"Iowa","groups":{"restriction:local:enacted":["6ec7f0571c9f0b36","b997268fd2bd8a07","a3d89d9d748c79e5","ece6aca21720a05a","b53022fa847d859d","2265266858f1808d","d2821404eb9b773b","e429297830c5c85e","2c27ac27b47a53de","8ce23138e1f0ecbd","0e74326bb2038903","245488a7b0f0baed","4ec7c3f119f63571","5d574b2e962d112d","57926d8a3b16421b","6873275732caceab","6572038f8fb6515a","09dabb3487e83177","fc20843db6b3c777","ab4c1a0e46a2c211","f73ca7c24ea9ea51","48355f233539620f","e170f696214b321f","8f8fd51101db1cc6","c5304dad0e04e811","75a122be02ae0d9d"],"restriction:local:failed":["0fa0b840766c8a19","c263db1bebb5e27f","a131c04ede50c5f6"],"restriction:states:enacted":["9e83b550b15760aa"],"restriction:states:proposed":["639d23fdd3311f98","262084f7a02f3ad2","e2e155d413c48eda"],"water:disclosure:failed":["304d0cab55c6bd68","e3e82ac6f5792d65"],"water:rate:failed":["42f37d1bced6be18"],"water:closed-loop:failed":["b47e084956bfc26a"],"water:closed-loop:proposed":["24ce35cf4b42f743"],"delay:multi_year_construction_delay:delayed_extension_requested":["4ce223b15edc681a"],"delay:design_changes:delayed_extension_requested":["4ce223b15edc681a"],"delay:county_moratorium:moratorium_in_force":["679ae4b13385d757"],"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":["12e1cb598a859683"],"delay:zoning_denial:delayed":["8e0bc83eff50a9de"],"delay:community_opposition:delayed":["8e0bc83eff50a9de"],"utility:tariff:approved":["a9a9512892558d03"],"utility:other:approved":["3046845ad149fe7d"],"utility:special contract:approved":["e59432224488c63a"],"utility:special contract:pending":["48182dc47986bf11"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":33,"water":5,"delay":37,"atlas":22,"permits":21},"record_count":118},{"id":"KS","name":"Kansas","groups":{"restriction:local:enacted":["092e69a7498ed6f4","c5d6b2d241f5cc17","5d6e924e754d82a1","d65aa07eb73bb390","2b56b5bc78d3d2c2","779bf14e695b30f3","46ebfe654cb98769","6b3d06b7e6d5546b","3e6f9643e146e802","a03f8a97d54da728","88a8f8a97b3eb631","5c9d3499ff80e6d7","61d91d35faaab6ce","49d229995410fd72","4654c90eb016ce15"],"restriction:local:proposed":["3989c573db251ea1","c49b85a22488877d"],"restriction:local:failed":["50ea4020ea582738"],"restriction:states:enacted":["2ee674af511b50f4"],"restriction:states:failed":["f13da72ca930c823","b3815616ed614981","c1154548fbef7c6e","8db95808ba8ac8e5","69b27b03dc718361"],"water:closed-loop:failed":["4eb2bfa0c2e15d57"],"delay:community_opposition:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:noise_regulation_review:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:water:cancelled":["70833cef331617f1"],"delay:community_opposition:cancelled":["7d838f4833d1b349"],"delay:financing:cancelled":["7d838f4833d1b349"],"utility:tariff:approved":["f77ece2de2ac70fa","3ba852096f736178","1dface436cf210c2"],"utility:tariff:pending":["3e89a8aa0948bcc5"],"utility:other:pending":["aead86c34e456420","7fee508d92451cef"],"utility:other:contested":["fe3448ceb67c13bb"]},"grid_operators":["SPP"],"counts":{"moratorium":24,"water":1,"delay":23,"atlas":20,"permits":3},"record_count":71},{"id":"KY","name":"Kentucky","groups":{"restriction:local:enacted":["a26d4b9555d02fc3","4a7e0503c84a18fb","068617b3ee7c1e34","27a0ce76b943a447","65fd1df9f999e56d","9b96e5de0e107e49","7206025d4f188dc5","a3f8e60045a8e496","3be8e5e1324a2209","ef0ceaa96e4124a9","b8c035523c2353d3","59ddefe2d22f34aa","bcf7474f970300a6","3b2a3d6c317e1650","a1acef1340d31231","a5a9aea1171b918a","baf08a5fdb9be408","626ca6058bcfe492","bcc91f5729167578","ad6f059e45735cb0","c9ad189fcf915368","78d859810fda2f18","971b3f19c633ffe9","0d7d376001869f9f","7cfc5e2b338d1914","0d5a0d6559c93531","341751834d403210","0cd0db1bab37a48b","a1b25cbc5a439391","6dbd46ac8566eabd","f6c91c535f7eae69"],"restriction:local:proposed":["f68fb746468a09f9","e795d08b5d2d9c0b","c509add78042616b"],"restriction:states:enacted":["77733d81d9d3baed"],"restriction:states:failed":["9900fddb93bcc64d"],"delay:rezoning_denial:rezoning_denied":["e55329fac133bb24"],"delay:community_opposition:rezoning_denied":["e55329fac133bb24"],"delay:city_moratorium:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"delay:no_local_zoning_framework:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"utility:special contract:denied":["253d0f130a165e15"],"utility:tariff:contested":["ae68fdeac34bbc8d"],"utility:other:contested":["42fead8f4bce2aaa"],"utility:tariff:approved":["801dfc830fd07245","4f7f2aea34be5c96","d0cda138d452d757"]},"grid_operators":["NON-RTO","PJM","MISO"],"counts":{"moratorium":36,"delay":39,"atlas":28,"permits":2},"record_count":105},{"id":"LA","name":"Louisiana","groups":{"restriction:local:failed":["082df063713becdd","337eff2a8faaedc2"],"restriction:local:enacted":["450b6661aa0aa3ae"],"restriction:states:enacted":["9ba2486256f256c2","144e7d01d58cef74"],"water:disclosure:enacted":["03f274e9a5dce14c"],"water:disclosure:failed":["f7cd1c9b5f782122"],"water:study:failed":["28f58e0cdd0b7e0e"],"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"utility:tariff:approved":["eff42b274f0be9ef","a83e236f50a73f18"],"utility:rate case:pending":["c65e9e2d95997fa6"],"utility:tariff:pending":["69e0ffd4849ee579","88fc6caa48aac8b2"],"utility:statement:pending":["457342b4fea42a74"],"utility:other:pending":["4a0bb7e423217973"],"utility:other:approved":["61067a61b636c781"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":5,"water":3,"delay":15,"atlas":9,"permits":1},"record_count":33},{"id":"ME","name":"Maine","groups":{"restriction:local:enacted":["ecd5966d9b342311","c36961854ebd6ca7","a4804efbc073f070","d766badde34909ee","3d017e2610e8d02c","b9330f5763dfe845","b2a8fec20ddd4e17","f5a714682b29daa5","8d49ab7b7f89d04b","27b044f270dad65f","be26656565cc2456"],"restriction:local:proposed":["6aff9b58bac5e8f3","ebf579b381f356dd","0afc065fdda3c091","b0ec262465eb00f1","8149b851eb2d0584","e3f47f6089a0ee71","3acc511d9da72bf5","fe1e50be7095ea83"],"restriction:states:enacted":["fe74bf6eed39dbcb","7d62f3ffa4427f55"],"restriction:states:failed":["4e5deea3e7dff0be","0ab980856a66fe1d","a3a43b954eba3113"],"water:moratorium:vetoed":["297d93ad9da5f26a"],"delay:state_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:local_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:water:denied":["922b3fd62f9c070b"]},"grid_operators":["ISO-NE","NON-RTO"],"counts":{"moratorium":24,"water":1,"delay":17,"atlas":19},"record_count":61},{"id":"MD","name":"Maryland","groups":{"restriction:local:enacted":["348298ff6f51a691","08097815a98470c5","4deb89713fe98326","8f74fbbd8993b148","3afe4fa64e87f546","8730de2c9ff67503","c73fe44c03df38ae","8dda8813a9c298d6","764a5ea5baee0c4d","6617f7b48c44c942","a8f91eecf6abf3b5","0afbbaf26cf8f904","83ff2804204a626d","9c034ea2bef0ece8","3373477ac1ec4f02","62bac4f016f1945b","11d1a89900718a96","eb36aed04afe9d8a","499348363c3b81ea","6f9687423e2dc4e7","dc1acf38d039ac19"],"restriction:local:proposed":["265e093c1f9eb417","755b1c07e83184e1","08ca97e19dc7abb4","3e8bbaa7cd3afe15"],"restriction:states:enacted":["17348e6b8d304518","b044300e1a2b5236"],"restriction:states:proposed":["5e23b6297efd7527"],"restriction:states:failed":["3c99947280200b8d","1fcccf76e9b86359","cf6793fd2c12b7d5","f1a32ee4fda04c94"],"water:study:enacted":["558d1f7246d3e647"],"water:moratorium:proposed":["e3bd79694db1db39"],"delay:litigation:litigation_active":["27582584bea51673"],"delay:local_moratorium:litigation_active":["27582584bea51673"],"delay:community_opposition:litigation_active":["27582584bea51673"],"delay:zoning_denial:withdrawn":["5aa3c5c167a2712e"],"delay:community_opposition:withdrawn":["5aa3c5c167a2712e"],"utility:statement:pending":["96ed3e4e28dc5f46"],"utility:tariff:pending":["b5a5ebb9845972c4"],"utility:tariff:contested":["151f94517d5bd763"],"utility:other:pending":["eecc4c5501407ced","de3593715e5e8754","b1f2cd97d9cd0cd1","246625aeebba0d27","e8088afeef1bad4c"],"utility:complaint:contested":["1f79c8153170b0cd"],"utility:policy:approved":["d89063b61a861688"]},"grid_operators":["PJM"],"counts":{"moratorium":32,"water":2,"delay":31,"atlas":22,"permits":12},"record_count":99},{"id":"MA","name":"Massachusetts","groups":{"restriction:local:enacted":["9dfd357ee1d1d79e","6fc10604ec34d46e","f0730563712dc086","e2b170911a980baf","443c78d2d2548652","51aa3706f59d3551","9a147c3e16821a2a","37641c80d5d22ef5","3bcf5029dee4b702"],"restriction:local:proposed":["6df99955fb5274ef","e88057500b5af5a2","251bed6de274003a","4e469b93e2617726","f9879ca8a354d99f","cbe95c8b12548c20","d3546c56fc54089d"],"restriction:states:enacted":["dbbfb14cd16be3f9"],"restriction:states:pause":["187e9da595e7eb96"],"restriction:states:failed":["8472091318232e86"],"water:siting:enacted":["c4f434d0074d8012"],"water:siting:proposed":["12f4ef4de2542657"],"delay:litigation:litigation_active":["655e83c186a87988","2493de70fabc445c"],"delay:environmental_review:litigation_active":["655e83c186a87988"],"delay:community_opposition:litigation_active":["2493de70fabc445c"],"delay:community_opposition:delayed":["27d4f05a55fdde9e"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":19,"water":2,"delay":10,"atlas":9,"permits":3},"record_count":43},{"id":"MI","name":"Michigan","groups":{"restriction:local:proposed":["c78ca68312691303","728e3efd8cbaccb2","f81a68f97adf08c0"],"restriction:local:enacted":["e6998880993aa177","b2511715ae4b990f","e1921072a7125833","98f07a32bbf38bd8","6f83b57549342f0e","2212cea497a5e376","6b17b974dff83ac6","0b835486e1c6675b","248845e3115d1b28","0e4058dda626a25d","576d5da42d138d11","bcdc28bfc405e76e","8408b058fbc315db","5d171a2ab62f7804","dc13381e1263b1fd","09e923cf2b67c07f","987c61998db8747a","1b63965c95a1e946","29918b3b1beffe19","99eeb7d2511ceb55","7bb3ee3000662f52","a0e759d085ba7e52","0d0e24de27bbc37a","2b9943a276289d6a","ee9073c9ad75a86f","9a62b17a98e57199","be5f41b4ec785373","ac7d9bd4ffd00f9e","9cecaa0a00ab43e5","1cb30633bb851922","f1c6da2f0000273a","ca9c48eee9e1d1a5","b70d22d7ae290b7d","c2d9415cc3e16da6","3828b0e2eec67db3","7e420db8d37c15f5","98cdd231fea86e2f","e8f1f476cf2c431f","c35e7a7d7cee74a5","e55663914c7c7dcb","33d2ea51a8acf987","51c80939f7496063","aaefdc75bd8c4aeb","911a6b9444bd1607","a7b6b76bf5329d54"],"restriction:local:failed":["516ad57aeb1648fc","b3ad7b9e668b591e","33b46a0d012daefc","3d03aba3f1700469","82599d14f4fba0f6"],"restriction:states:proposed":["a7533c1f529edc2d","6b7ffd32f765b5a4","456ce7c5d8d8f323","91c4adfd115bdb5d","c8d7e8822cffe0b7","98d30a9bf813c747","e816819481689635"],"water:disclosure:proposed":["c32c25eaa98e91c6","8bcea3f333be2510","905756b51034ebc2"],"water:siting:enacted":["d5816002c74cef1d","a2249bcfc2597539"],"water:closed-loop:proposed":["f8e09c679ee0460a"],"water:disclosure:enacted":["225876463f5c6047"],"delay:water_dispute:delayed":["1a7a2592e25c74aa"],"delay:local_moratorium:delayed":["1a7a2592e25c74aa"],"delay:community_opposition:opposed_planned":["90620f2ccd2b9bdd"],"delay:city_council_resolution_against:opposed_planned":["90620f2ccd2b9bdd"],"delay:rezoning_denial:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:litigation:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:city_moratorium:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:rezoning_paused":["cc32421f495a41b9"],"delay:planning_commission_postponement:rezoning_paused":["cc32421f495a41b9"],"delay:community_opposition:opposed_proposed":["8155ffe35c87d600"],"delay:transparency_concerns:opposed_proposed":["8155ffe35c87d600"],"delay:litigation:abandoned":["b9b9b57ad82d9568"],"delay:community_opposition:abandoned":["b9b9b57ad82d9568"],"delay:china_ties_backlash:abandoned":["b9b9b57ad82d9568"],"utility:tariff:approved":["630e6b38a0b9bb35"],"utility:special contract:approved":["cd42a1000e119f0e","50f9ae193de9e4a3"],"utility:tariff:denied":["a850b2486651c1d3"],"utility:tariff:pending":["5bc36f6821c8abbf"],"utility:policy:approved":["54c782b0ead7889e"]},"grid_operators":["MISO","PJM"],"counts":{"moratorium":60,"water":7,"delay":91,"atlas":55,"permits":1},"record_count":214},{"id":"MN","name":"Minnesota","groups":{"policy:cost-allocation":["0e9cef0d480c11c6"],"policy:departure":["96d76c523368de3c"],"policy:supply-review":["fa129260c9a1191c"],"policy:clean-energy":["5b0759b74511376b"],"restriction:local:enacted":["b739365ff698ee0a","d80387aab9ef2c1b","c3cc4eb6dd8578c2","0dc094cdf13edec8","5aa9e70c1a21d1c7","3fba111c587a7167","199bf867a340507d","d26a44d5312532d6","8e5e33fb9390f491","5ab133e795e83aed","385a484f3217fe24","793265102ee5e04c","35608fd55ce01e87","4fcdd676bd44f6aa","d1abcacd61245c1f","45935f6103775172","db3bb10a74b42708","ba8faf4607030280","8e02e3b0e7618f3a","3f4d995fd6fa4cfb"],"restriction:states:enacted":["2ab863890b12fdcb"],"restriction:states:proposed":["86e0d1d3835c9be9","c61b092c34b879a0","22e3f68246b5a4cc","797e76275710b3d8","7143edd8de397ba4","89d199639f253ee5"],"restriction:states:failed":["d0a94e01d35c42d4","3e22495abb3596c7","e2236d557902ae56","a3cf11f7c0f5a8bf","dfab67689c609a1b","23cc1180dbd6e5d9","eaed289a984419ff"],"water:moratorium:enacted":["e18e98913f2987dd","e11834d93a5792ed"],"water:shield:failed":["edb4285bd2e6d496","48bbbf542eb24d6c"],"water:siting:failed":["9c0626855c13a619"],"water:closed-loop:proposed":["bec7c68e6812d46b"],"water:siting:enacted":["f02889f2df50210d"],"delay:environmental_review:litigation_active":["51ba402b96b22669"],"delay:litigation:litigation_active":["51ba402b96b22669","2eb3d7b7efd8d959"],"delay:local_moratorium:litigation_active":["2eb3d7b7efd8d959"],"delay:litigation:construction_halted_by_court":["3e814c29543f4a91"],"delay:environmental_review_inadequate:construction_halted_by_court":["3e814c29543f4a91"],"delay:litigation:active_litigation":["6afa0ca47b947af4","f52d37a4709f02d3"],"delay:city_moratorium:active_litigation":["6afa0ca47b947af4"],"delay:environmental_review_challenge:active_litigation":["f52d37a4709f02d3"],"delay:environmental_review_pending:final_decision_paused":["452d128b99f4b891"],"delay:city_moratorium:moratorium_in_force":["7af8f1a65d714f3c"],"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":["796fdc6d59ce947f"],"delay:community_opposition:withdrawn":["7565837e009abac3"],"delay:council_vote_delay:final_vote_delayed":["800f8019c1868fa1"],"delay:community_opposition:final_vote_delayed":["800f8019c1868fa1"],"utility:tariff:approved":["0669b1659a0e805f"],"utility:tariff:pending":["bdec46fd73a2cf42","8fe5290a1832e86c"],"utility:tariff:contested":["2b6636adee0c7012"],"utility:other:pending":["049d9ec6a4db5efc"]},"grid_operators":["MISO","SPP"],"counts":{"policy":4,"moratorium":34,"water":7,"delay":31,"atlas":30,"permits":7},"record_count":113},{"id":"MS","name":"Mississippi","groups":{"restriction:local:enacted":["ecef92d17dfc1c52"],"restriction:states:failed":["ebb062a18af2c39e","4ed51c6c792fa708","e4e4ee9189096b02"],"water:siting:enacted":["5a06d81d34bea26d"],"delay:litigation:active_litigation":["4063038ccfbba534"],"delay:unpermitted_power_plant:active_litigation":["4063038ccfbba534"],"delay:noise_nuisance:active_litigation":["4063038ccfbba534"]},"grid_operators":["MISO","NON-RTO"],"counts":{"moratorium":4,"water":1,"delay":4,"atlas":12,"permits":1},"record_count":22},{"id":"MO","name":"Missouri","groups":{"restriction:local:enacted":["d90eaac4fe51359a","176fecd092621295","204232d5f8ca8df3","79b2a4ad0fec8c24","7017a935b3b7ecbc","85d940e773175229","f803c38f884f6aa0","de0764506bff684b","08196d135c493f63","8d67875968fb64f7","bed91c8df00c2c5a","21f8768f48599598","14bf3311c27da66b","9d5e52899f706d27","f5c0d2e49453bac0","8e6ecd071b72033d","c6cf03998a9e63c8","a9eede6ea17f0f0b"],"restriction:local:failed":["96f484a5795f8aff"],"restriction:states:proposed":["2195fea337e09dc1"],"restriction:states:failed":["79f07d9601a68a2d"],"water:siting:proposed":["fecf28fd776e3f17"],"water:closed-loop:enacted":["f922a9cc8df7f6f1"],"water:closed-loop:proposed":["c842f3220a560928"],"delay:permit_denial:permit_denied":["b6e024ff51469e78"],"delay:historic_preservation_conflict:permit_denied":["b6e024ff51469e78"],"delay:community_opposition:permit_denied":["b6e024ff51469e78"],"delay:county_moratorium:moratorium_in_force":["d74c3761e71266b9"],"delay:community_opposition:moratorium_in_force":["d74c3761e71266b9"],"delay:interconnection:cancelled":["8cb756be5b7ae3a9"],"delay:water:cancelled":["8cb756be5b7ae3a9"],"utility:tariff:contested":["8de24874c642dcbd","f91605a21f63d072","d9c3570921a04363"],"utility:rate case:pending":["082924cd33e117e5"],"utility:tariff:pending":["7394fb772ac183e9","faf8561206d5bf0f"]},"grid_operators":["MISO","SPP","NON-RTO"],"counts":{"moratorium":21,"water":3,"delay":32,"atlas":33,"permits":25},"record_count":114},{"id":"MT","name":"Montana","groups":{"restriction:local:proposed":["9243773c369f1ecf"],"restriction:local:enacted":["8d6ef72e11d1fccd","3ecba2b53f87c88c"],"utility:tariff:pending":["6dcfac3c7c1172f6"],"utility:tariff:contested":["d367203d6f870b27"]},"grid_operators":["NON-RTO","SPP","MISO"],"counts":{"moratorium":3,"delay":6,"atlas":9},"record_count":18},{"id":"NE","name":"Nebraska","groups":{"restriction:local:enacted":["d3d7827f878ed2cf","c57a91902ce91633","4674af901736f5cc","e196b29819de5c9a","135d7b8ca90eebf7","d568851b5061cdaf","81440ae3fafa3d75","e8af315b45a1acfc","08fcf1d2b6f49514","160252554036f1ad","32303ecaa9e0a2ad"],"restriction:local:proposed":["affd265938fabf3b","8c97d016dfddfc1b"],"restriction:local:failed":["1d8ae470cf5d925b"],"restriction:states:enacted":["230cce9838d45d24","e688676c3ac0f747"],"restriction:states:failed":["67b1ace6369704fd","50fd44805485a090","ff2913405faf7657","8d77947d7b8a528f"],"water:study:enacted":["fe6d9f80cee7122e"],"utility:other:approved":["32c8b9ae8d888b6c"],"utility:statement:pending":["4af3c2798acdbf21"],"utility:rate case:pending":["1e47741959ff4b29"],"utility:tariff:approved":["823eb52c6feaee82"],"utility:policy:effective":["c01aa91e1a04b36d"]},"grid_operators":["SPP"],"counts":{"moratorium":20,"water":1,"delay":32,"atlas":13,"permits":22},"record_count":88},{"id":"NV","name":"Nevada","groups":{"restriction:local:enacted":["333dd9b87e58bcbb","b9a69bbde96b5385","55b16953865e48f5","37f2d1d5eb3e2cea","5b58a9e336830633","6773b1cfaaba1346","935d2182c6d74d12"],"restriction:local:failed":["402c12e2dbad57ba"],"restriction:states:enacted":["619839655d751fb6"],"water:moratorium:proposed":["e61948237d868f0e"],"water:moratorium:enacted":["279be78d9d551bf8"],"water:incentive:enacted":["efec6184955a1086"],"delay:water_dispute:under_appeal":["d29280cf2b0521a1"],"delay:community_opposition:under_appeal":["d29280cf2b0521a1"],"delay:litigation:halted":["a81117457f2cb354"],"delay:environmental_review:halted":["a81117457f2cb354"],"delay:litigation:litigation_active":["114d5609ed0f4f35"],"delay:local_moratorium:halted":["5c9d9715723ce0bb"],"utility:tariff:approved":["a7207409cc3dfd45"],"utility:other:approved":["fb307da5f358f615"]},"grid_operators":["NON-RTO","CAISO"],"counts":{"moratorium":9,"water":3,"delay":22,"atlas":20,"permits":18},"record_count":72},{"id":"NH","name":"New Hampshire","groups":{"restriction:local:proposed":["e63e233025fc94fe","b44152b5d37d167b"],"restriction:local:enacted":["d80de2562936a0f7","92290f0a7d985a7f","36c9c8099e12dd15"],"restriction:states:proposed":["5a9909b17dfc57b4","02f0a87d99437f9b"],"restriction:states:failed":["ea8860685576e23e"],"delay:community_opposition:withdrawn":["c1a6706de3454167"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":4,"atlas":5,"permits":3},"record_count":20},{"id":"NJ","name":"New Jersey","groups":{"restriction:local:enacted":["73ec87cfb0aa92d2","9c00fd42521991f9","a384a032bef8e970","124a77e04ac821ec","f23cd51e2cc7cb7f","238c6e78c54a4877","3af6dd3170f1aa82","714725f2229b99d0","08f19d7681319c4d","8cf681d798655aaf","20d0aeda361ce61b","a2b1b417fb0a76fc","face92012462a2a7","968c4f50d3bde674","ceb24ddecb59d86b","3a5c452ca6841c71","742e4aac2483f4af","80f6f1b93985f9f7","c95d899c60e09eb6","7c69fc6032dd27e8","60c1835a0012ce53","054f376e8df396e6","64e87a1ece4414b3","1b9d7255dcc00d88","e3e0f29d691690ec","01b12fb419074edd","c74b23df8b93a3f0","db82850c96b7a694","9844557ef3af937a","559fbafe318ed5ac","0c592d7ddda2c6ac","a784c9eec1d5c3f7","5fb4b28c2b68eccd","ea304a4830a80fb4","fe372a70ddf19936","48334bde9c2fa0b9","d177f8f0171343b7","62a91ee8ab340642","ebd8ee2e6043e34f","39ed97a814dde3a9","3a432a805dccac1c","50b87b303123480f","9a18c03c18a10dd4","b3ca39b6b1630160"],"restriction:local:pause":["1a9db0d9060caea1"],"restriction:local:proposed":["ae409fafdf46bd29","f884ab9b88fff31b","927a7a3ac1c78482","d95561001f914447","7be184c2d2a57e2b","0e8c72bfcc16a39e","8820df8f26c39fea","78d39318109dd5e8","fd2b054d547ea766","df9befec2a94c308"],"restriction:states:enacted":["4df967540ce38c86","30be08e4be6ac9ca","68de33fe969f9287","0438d1ace3661698"],"restriction:states:proposed":["f19c1038b15c7609","d12af38fe29d843e"],"restriction:states:failed":["f915c938338285f1"],"water:disclosure:vetoed":["800fd0cd4f6bebba"],"water:siting:proposed":["45f1ccb950a71b8a","a375aa38a4210e7c"],"water:disclosure:proposed":["0cf376028b422204","36230e1c7c9edac6","c77115dfc059c958","de400f891c588542","6998a87b3e02ca11"],"water:study:proposed":["a7495217b70ef1e5","9cef65942ed49967","bced9687293104ba"],"water:disclosure:failed":["59ae5b971166ac3c","791cdd88090bef4e","1908cf4216d925bc","073e65e826df6c51","378fb181ac8f016c","60262597b91c5af0"],"water:study:failed":["f640ec3294e3f1f2"],"delay:zoning_denial:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4"],"delay:litigation:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:local_moratorium:litigation_active":["b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:community_opposition:litigation_active":["b617e293b82d2ac4"],"utility:tariff:pending":["f28161bfc2c29f8c","3620e96459726891","1a6ae3c2ad122164"],"utility:statement:pending":["2e9ea8571e10d078","7a11205dc76a67a6"],"utility:tariff:approved":["296ea913839e1b58"],"utility:other:contested":["5c1b494458632232"],"utility:policy:effective":["3af8bf166bd3c54d"]},"grid_operators":["PJM"],"counts":{"moratorium":62,"water":18,"delay":72,"atlas":65,"permits":18},"record_count":235},{"id":"NM","name":"New Mexico","groups":{"restriction:local:failed":["818109db81472817","f9afe907073e0002"],"restriction:local:enacted":["297204240678eb0e","9ff51438652ddf60","59bea7e940d70194","ada7aa80e60c9320","5eb7f0ff789e43fa"],"restriction:local:proposed":["8ddb604cc82e2c35","b6fb3ebcb7f6c50f"],"restriction:states:proposed":["a99720a3bb94fcaf","78568f32702491ba","b4b3d5817b49728f"],"delay:litigation:litigation_active":["f3a0c010a8f35a41"],"delay:zoning_denial:litigation_active":["f3a0c010a8f35a41"],"delay:community_opposition:litigation_active":["f3a0c010a8f35a41"],"delay:financing:litigation_active":["f3a0c010a8f35a41"],"utility:other:contested":["8ef259cb295588bc"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":12,"delay":12,"atlas":10,"permits":7},"record_count":41},{"id":"NY","name":"New York","groups":{"policy:environmental-review":["71f511e90d956ca8"],"policy:permit-hold":["4c560e212a74545e"],"policy:supply-review":["ab3c1a20557c8b23"],"restriction:local:enacted":["77679a7c3332c853","a787c81c1d3730a4","cdc22ba5f2f05b59","b14b8ef8ed1860cc","8cca37bd22e9d7b5","4975cfd97e76b52d","bd582af96f35230a","5ffdbe85acc1bde0","a1694e06d983606d","8981b39c54144dc6","d0967cbc5048c7de","210debbc0355f8ce","f47af1d0c2261335","b9f412d2266126c0","723df3b34c814ee8","cebe672bdd456765","edbfc6143edc2bdf","8a9e37cabb7d8067","59d414cbb6a42f77","17aedba2bb3f2d87","2e58841b837a406b","0e1022291bffc7b7","12dd3a35361949ae","3511a027b56d7d7d"],"restriction:local:proposed":["dcd7ff846525f0e1","08c437cc51d4c950","789641906952093a","28bc949979bb83db","111d81838fa01dde","3e58cfc1f209b083","7ae98bc62927c82c","9137cf580ba6858a"],"restriction:local:failed":["cb6d8c82049c8acb"],"restriction:states:enacted":["869f08a4a1fa556c"],"restriction:states:pause":["841d22380b00ad01"],"restriction:states:proposed":["b7ba31aec1fafd00","47c9cf15c60d51b3","daaf6dec95bd6ec2","07d737c4acf173d7"],"water:moratorium:enacted":["8fc3c7d9b9ff9ba8"],"water:reclaimed:proposed":["4ee636f9337e1806"],"delay:environmental_review:delayed":["51347b4b64fa9e01"],"delay:community_opposition:delayed":["51347b4b64fa9e01"],"delay:state_moratorium:halted":["293beafa3fa06f20"],"delay:local_moratorium:halted":["293beafa3fa06f20","77e9bf4bd7aac210","ee2c0366ee0ef429"],"delay:litigation:litigation_active":["e81eb7c91736a32a"],"delay:state_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:local_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:zoning_denial:litigation_active":["e81eb7c91736a32a"],"utility:other:pending":["57638a6f961a13ac","1552fe1a118cce4c","e654e6cbee2e4334","6cf999b790c4a9a6","5b7294bb9bbf171f","a15e9c634f236eaf"],"utility:tariff:pending":["acb3338b2c56b00c","637843fba8961a3b","f4e2166ff0723f1e"],"utility:tariff:approved":["d8fdd2247363f439"],"utility:other:approved":["4b76df05fa507106"],"utility:statement:pending":["85d4d00b457a99fb"]},"grid_operators":["NYISO"],"counts":{"policy":3,"moratorium":39,"water":2,"delay":41,"atlas":26,"permits":4},"record_count":115},{"id":"NC","name":"North Carolina","groups":{"restriction:local:enacted":["0878148bce531a65","26626f41150f13d7","5d4e94286383e811","45843231657d4577","b767f9b8778c3e9c","0425c77f21429fc9","160ecb6859daba38","f700899151bd3d13","afaf001e2ddc7c0f","9125956ad212eba6","1e5e7d19256112cb","de170f5d806a8488","7e05882bb14eba58","d5446d1a27d68afb","66d7df4ef7713b17","a96570a4d8c02995","03d509191d6a1bb8","d3b97dbcfb4cc458","11b4b426a5a3adeb","9730db9306df2eda","f7b5b5059f3d9a76","a7863b1a8d95a6f9","e6debd81c60b3074","72b422fc810eeab3","6bfcfb56a94aa399","0fe95e27742d2793","7f7b78e8dd0072a4","3ab16e9b6bda0047","58f61d5e2dcac367","901f12fcfb423655","77ad5d31685db4d2","13de2569fd40eab9","2c3f7f7d7474e8df","047fa125450d5c53","d7d45ef0e253b55d","2aa6e2ef54433db5","076a69b4395ac51c","aeb0772ca82eb874","49ad917ecc3002cf","c355e8d58e082040","1eeb09c2f8b5063f","37a1cf7995845834","2bd64ffed6dec4b3","17d8cc51d6a5711f"],"restriction:local:proposed":["84efe8243d6504bc","181bd4b518b2cfed","b83f8907c29714e9","8294c67374182bdf","8b259a9fdb940566"],"restriction:local:failed":["928488ab5100d192","aafc220952d6a48c","e3fad9e4ae5cae83","b68811b610a11964"],"restriction:states:proposed":["f10a82ce8ce07853","2bf52937fb8640a7","d91aa188fd06f5e0"],"restriction:states:failed":["35ebc5f44dd67c98","ccde728219226db1","857477e095526aaf"],"water:moratorium:enacted":["b9f652a9b7c4b011"],"water:moratorium:proposed":["38d2bf42e833778a"],"water:closed-loop:proposed":["ad8e73dba358f034"],"delay:community_opposition:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:zoning_denial:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:litigation:litigation_active":["26de238e0f400d29"],"delay:local_moratorium:litigation_active":["26de238e0f400d29"],"delay:community_opposition:delayed":["886117a42038f872"],"utility:tariff:approved":["3733629beaf1ada1"],"utility:statement:contested":["8f109ead8aab43d0"],"utility:statement:pending":["5338dfae87b7a6f7"],"utility:tariff:pending":["535ff2bea70f7e1e"],"utility:other:pending":["36e711f6271a98a9","b8438dca9b49aebd"],"utility:tariff:contested":["1a0900299d02d68d","f4c8c4668d869233"],"utility:rate_case:pending":["45ffc3ccaa151b55"],"utility:other:denied":["7d51d5e504430b5e"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":59,"water":3,"delay":67,"atlas":44,"permits":34},"record_count":207},{"id":"ND","name":"North Dakota","groups":{"restriction:local:enacted":["918ec9976a6ebc76","5fe4251ab4cdcb1d"],"restriction:local:failed":["da10b7684b67acdc","b94dc16d48f67fd9"],"restriction:local:proposed":["0867cb4ffce5c18b"],"restriction:states:enacted":["10810ad90dae3c22"],"restriction:states:failed":["06b00e83aed9df20","37e09c9be2329183","45f55a5bdae7aa9c","bc1c99050827355d"],"utility:tariff:pending":["bd130d6595b26f7c"]},"grid_operators":["SPP","MISO"],"counts":{"moratorium":10,"delay":6,"atlas":9,"permits":2},"record_count":27},{"id":"OH","name":"Ohio","groups":{"policy:cost-allocation":["55634d9b0e3dbe0d"],"restriction:local:enacted":["461dc19405784392","691815701a1e7b84","407f6a32f3a3a0ae","1d451c4d01991061","c05d611c3e7dd8d5","303593cae196f587","7a83cf56d52a963c","7fc064d20dc788bd","a7e5c5aec188366b","7ce6031118cad4fd","8f219dc030624cd2","950d5e0e199dfb22","c2b95d5838587ff4","9ba6b9b9692b4708","d72f4489e825fef2","940b6159ab502612","f0c97f968bab3081","405f1ab18b45cec2","8542695ddd9b5b30","7026f0fd2b5bc6f0","ca89ad24dc656f79","978214f7dd1d9d8f","c1bda0acec337164","730091555169da66","3b3d27d4919f1e77","a96013d0b5b1c9a2","d8f63ab9b450228a","cc6ca7b31398d910","306d3fab23b96651","f394a0eb7801b57b","0ac4ec70dc0bb4ba","6cbf93fd3792d38e","c0aba8a27555a0c0","d533d9f7cdfc603d","ea2a114d10a3194e","61fe898c9107f2ba","4b26ee4f418c3dd5","cccc5aef83beacac","f1d5c9a4b6023b27","4fbd89f670532629","421b341a093f14c9","53701fd2f75ff500","23811974e54dcac2","b90f5b1569114026","ca5208c669ad2550","ecf81cf135cd7c41","fe4bc2e21abc7fd0","c636f6e8fe61d8bc","70667db94a767cf0","d3ccdcc868a68902","0fc759bfa86292c3","12369281bb53a55f","5f2de78e4e2f9413","2321a1c503022d33","bc140f9d0778a158","88cd458bc7993ab1","e281827c22b8aaa6","904259f746e7f001","668044e9a5218b84","e526f703d4ba3d40","406582468189cd53","e560f4fc1b2d48cf","15eda7648a7da254","1ea75a7e46cea951","8c428e28c6fa59b7","94595b6204b14f34","a795c2b6fa5fb605","a91e87e8e532a81a","0f566e9f055d874d","a3338ba4c589f2a1","024a636c91c52568"],"restriction:local:failed":["941a2b27ff9dd2f9","f0125c1f3d577939","1984235e10d07864","47e7f50ceb79bde2"],"restriction:local:proposed":["329efb5b9ab278b2","fe3263d096bb1d42","f0c8462ea6d10a36","5d2dc1ac11a37fd0"],"restriction:states:enacted":["a33e963e7ed0f3f9"],"restriction:states:pause":["aac6bd4ca937a3a1","790d7df967d13e33"],"restriction:states:proposed":["9791d6ee8a159714","5bb7dbbf3f54e1f6","076c38b44f191708","35dfe120e8f90c81","a4f886faea465453","f67274b3d1ca79e3","b0b20187a84ac61b"],"water:siting:enacted":["1fc784371ef77c63"],"water:closed-loop:proposed":["d9a55d5bd1815a7a"],"water:disclosure:proposed":["07d5958ebc0e2919"],"water:siting:proposed":["af9b7989afe0d6ff"],"water:moratorium:enacted":["b03281ae45156609"],"water:rate:enacted":["f38675b9d14c3301"],"water:shield:failed":["31cb3e61422ae705"],"delay:community_opposition:delayed":["6041ee70dd8ec4f2","33619bda345609b8"],"delay:regulatory_review:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:power_allocation_dispute:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:corporate_reassessment:construction_paused":["ec84904200576a9f"],"delay:openai_relationship_change:construction_paused":["ec84904200576a9f"],"delay:tariff_costs:construction_paused":["ec84904200576a9f"],"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:signature_gathering":["738d37cb16e4b52b"],"delay:statewide_moratorium_push:signature_gathering":["738d37cb16e4b52b"],"delay:local_moratorium:halted":["8924323156a513a6"],"delay:community_opposition:halted":["8924323156a513a6"],"utility:tariff:approved":["b119f3dad60e8067","b0b7b5e3ba42091a","feb6e8ebba7bc21b","d471fb8c04d4d42b","e688652c63a8603c","3b0d6703179b004f"],"utility:tariff:pending":["4e7c1eaf6aefd563","8d64014cf73ea8c5","33358a52bdbff1e9"],"utility:tariff:denied":["d77af2ba4e087bb7"],"utility:rate case:pending":["1f4f51f2805cd230","4e52d117f119a0ab"],"utility:other:pending":["8867995dfeac8af8"]},"grid_operators":["PJM"],"counts":{"policy":1,"moratorium":89,"water":7,"delay":156,"atlas":100,"permits":15},"record_count":368},{"id":"OK","name":"Oklahoma","groups":{"restriction:local:enacted":["50b51ab105de1694","4d5225243a046a38","42183c5f0e187ec9","2da276ac2eced4b7","409936f3ff16ca77","fd3e3e400e15bcb3","311f0b103dd1c20a","e11236c60dcb019b","af39a5a9b91cf374","80850e3b3240130d","6d6d4b47a1f08094","fd7e05f695b792fb","57bfec0310076c02","ac38ecc9080693a4"],"restriction:states:enacted":["5ce11b610f2019f8"],"restriction:states:failed":["c5ac0e3ebaec0fff","df4a0cf535656562"],"water:closed-loop:enacted":["f01e9c7f92ad912f"],"water:disclosure:failed":["4cffe4be712b7fee"],"delay:community_opposition:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:water_capacity_constraints:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:city_moratorium_partial_exemption:phase_vote_delayed":["d2464a0059b2da36"],"delay:planning_commission_delay:phase_vote_delayed":["d2464a0059b2da36"],"delay:community_opposition:opposed_proposed":["d6d03051edf8cadd"],"delay:transparency_concerns:opposed_proposed":["d6d03051edf8cadd"],"delay:water:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:community_opposition:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:financing:cancelled":["b81165f74fca6c9b"],"utility:complaint:contested":["6a0e62dd608338b3"],"utility:tariff:pending":["0244a5050bd89f54","d23c9de2ed780784","369b25b59f1044b0","8caf179819a91899","b44407ade651e171"],"utility:tariff:approved":["7c0393e3288507ab"],"utility:policy:effective":["533edea4d22fcfc3"]},"grid_operators":["SPP"],"counts":{"moratorium":17,"water":2,"delay":29,"atlas":25,"permits":34},"record_count":107},{"id":"OR","name":"Oregon","groups":{"policy:cost-allocation":["ec3aab8c8e487810"],"policy:minimum-payment":["09b69a3ac7ed320c"],"policy:clean-energy":["573b7be7282c24e9"],"policy:regulator-reporting":["82e5b2896507c105"],"restriction:local:enacted":["c46ac99932456879","bfb08271f1889aa3","406a4fe8c580044d"],"restriction:local:proposed":["9fecbaadfc504d91","55072e55f3993603","c167670c15d2c9ec"],"restriction:local:failed":["2217c7fce49a6fcb"],"restriction:states:enacted":["4266a70286a34bc9","fd7d68ca06671d0b"],"restriction:states:pause":["b05de37e3bed5008","0bb7ee781820adb4"],"restriction:states:proposed":["1d87e7ca35d788e4","97e59a9c63be62e9"],"water:moratorium:enacted":["f436cd79501cb106"],"delay:litigation:litigation_active":["189ec25f09c73d30"],"delay:local_moratorium:halted":["fc7ac8c5e0c9a3e0"],"delay:water_dispute:halted":["fc7ac8c5e0c9a3e0"],"delay:tax_incentive_change:halted":["fc7ac8c5e0c9a3e0"],"delay:community_opposition:cancelled":["508cd09772361d44"],"utility:tariff:approved":["8f26d54b8098d83a","933a75515edac858","919ed293cccce0b5"],"utility:other:approved":["fd904a85f9f038d0"],"utility:tariff:pending":["90bff93d506e12d8"],"utility:other:pending":["500c12c6d84c5535"]},"grid_operators":["NON-RTO"],"counts":{"policy":4,"moratorium":13,"water":1,"delay":16,"atlas":8,"permits":28},"record_count":70},{"id":"PA","name":"Pennsylvania","groups":{"restriction:local:enacted":["38de5bf25db60ea6","a07e0f5e3b200bbb","e0e19b054c78ba90","d57a038848981525","08cc6d470b3f20a4","786ec40f80121492","9d46b0435161c347","7f0801a61ac6bdc8","e91f573252606528","30d8d8996a24365c","7a05632963af26b7","0525ead7d8196b60","c49102319b7d9c26","828f9f1b7a9fc4d8","7e498adfb9cf36be","30e2226befeb9e41","d01de37fe2c38608","3ef85431f6a82760","50a74ef750ecebc2","86690394ec34fe0d","f4098716a0ee721b","2f1f35aee33b8d1b","0b7ff980380eafa0","a80d24e122853bfe","83bf5bc987c8973d","b4f499936ec56461","b3ea3d581da9a606","71a38b1ed5950ad1","e191001ca64a606d","f9511193a66cd3bc"],"restriction:local:failed":["491849e21df0aa97"],"restriction:local:proposed":["04f7d83298b30de7","f979d0fdee3f9fa3"],"restriction:local:pause":["533afd77cfc5eebb"],"restriction:states:enacted":["7f4af8a87d95c544","7471943bfacd9b79"],"restriction:states:proposed":["6aa38b3ad7bc8095","30479ff8f518235c","2f437f53e7c38048","535c2efca50b83dc","1b368eec31f98fde","5442b108786851c0","f486ff97ce82e49d","7739eeecd45bc5b3","a5f21a3c4a91636e","a4c98945f6116fb9","122b2ca8ea2dce4c"],"restriction:states:failed":["291e4c7a5a21088d","9a687477c380a153","9ab4c50b87f3e567","c916da28feddac2f","a879ae6745a42d11","ce6deddc6f7620a6","d3752761d30cd8b6"],"water:disclosure:enacted":["71b44216bc39b316","19977f7326ae5f36"],"water:disclosure:proposed":["ce335eca213a335f","268f6575720b3e76"],"water:siting:proposed":["e6cd4c87af287f2e","ec0986faeb616e79","02edb086bcb4ec16"],"water:study:enacted":["7e7071bf9f2d7636"],"water:siting:enacted":["f4b911f9a8638b44"],"water:closed-loop:proposed":["ecec2267314e711d"],"delay:zoning_denial:under_appeal":["221a7177ef54c146"],"delay:community_opposition:under_appeal":["221a7177ef54c146"],"delay:litigation:under_appeal":["221a7177ef54c146"],"delay:litigation:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:cancelled":["72fbfc95e6717af4"],"delay:zoning_denial:cancelled":["72fbfc95e6717af4"],"delay:community_opposition:delayed":["91270d77ce33c433","b79613921282641a"],"utility:tariff:approved":["4c72868c8e004412","c89690d0346c7890","ac3f1efb2976fc5b"],"utility:rate case:approved":["e934571677cf1704"],"utility:other:pending":["fbc1615a2aea7504","84096c1cd33d1c29"],"utility:tariff:pending":["6ccd7eecfb420cbd","03f4e94591ffe708"],"utility:tariff:effective":["d4a74e67bb8dc281"],"utility:policy:pending":["04bd0eb54a15c158"]},"grid_operators":["PJM"],"counts":{"moratorium":54,"water":10,"delay":84,"atlas":53,"permits":21},"record_count":222},{"id":"RI","name":"Rhode Island","groups":{"restriction:local:enacted":["ed259525eb90ab6d","dab8ece38c5fb9d5","09f9a1112ca9bb16","8758bf36db37de62"],"restriction:local:proposed":["9c9aa6a6cab87eae"],"restriction:states:proposed":["39109139e4499da1"],"restriction:states:failed":["87b18404613879e9","1ca1db6d54c60804"],"delay:zoning_denial:litigation_active":["09f90dd4b212e592"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":6,"atlas":5},"record_count":19},{"id":"SC","name":"South Carolina","groups":{"restriction:local:enacted":["58631f91fad85e5b","b8911b8723010e16","f7b981d36cb76fc6","ead5aac6d1de0198","28116638b206c684","e712a9602d7fc092","17168f8283569007","3fbf04d4d1abbc30","b5c702b7d9d268b1","31c3c407ecaa9b02","08d501a7dce90945","bfe556ca5819bf38","65163505f47f6e65"],"restriction:local:proposed":["d522fdfd4fa7adac","9e6a95af9b1a6338","5e3217c2394c85d9"],"restriction:local:failed":["ead4c3dd6bcf23b7"],"restriction:states:proposed":["70456b2f17fa016f","1bd520760aca35e7","dfe1a31d8cfe99e5"],"restriction:states:failed":["d7cf8717beef89cd"],"water:closed-loop:proposed":["836cb4c1add36778"],"water:siting:proposed":["d5588d305d72ed31"],"water:moratorium:proposed":["feaa74b8ade8d152","e0c20f860681a471"],"water:disclosure:failed":["2a360b96adeac4a5"],"water:closed-loop:enacted":["c4c6394d78cf14cf"],"water:moratorium:enacted":["83129110381c2b8d"],"delay:regulatory_review:permitting_challenged":["ebbc3548ee675c57"],"delay:environmental_petition:permitting_challenged":["ebbc3548ee675c57"],"delay:utility_interconnection_timing:abandoned":["59d31c90f99a8e27"],"delay:withdrawal:abandoned":["59d31c90f99a8e27"],"delay:county_moratorium:moratorium_in_force":["4fd68a1a4d95ecf1"],"delay:permit_denial:halted":["2a19530b645b4515"],"delay:local_moratorium:halted":["2a19530b645b4515"],"delay:community_opposition:halted":["2a19530b645b4515"],"utility:tariff:approved":["a6a9b54dc2f7e887","4acfdfc6ae530074"],"utility:rate case:approved":["836e8495e0094213"],"utility:other:effective":["4650a698f603d88c"],"utility:other:contested":["5976280cf4e599c1"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":21,"water":7,"delay":30,"atlas":22,"permits":3},"record_count":83},{"id":"SD","name":"South Dakota","groups":{"policy:cost-allocation":["e1de11c16d8239a6"],"policy:departure":["b87c8e5ab20d7865"],"policy:supply-review":["5f04413f1e1d314b"],"policy:water-reporting":["3d0987d18045023f"],"policy:local-authority":["d5abe6128808804e"],"restriction:local:failed":["0c5ecfaba5561367"],"restriction:local:proposed":["5a5f4731708d3508"],"restriction:local:enacted":["127e547bdcf06887"],"restriction:states:enacted":["e69882d4dd9dec56","e0c13222b8896f55"],"restriction:states:proposed":["d2cb3118b636a794"],"restriction:states:failed":["3ddf71976e354659"],"water:disclosure:enacted":["95158506706fb5b4"]},"grid_operators":["SPP","MISO"],"counts":{"policy":5,"moratorium":7,"water":1,"delay":4,"atlas":4,"permits":1},"record_count":22},{"id":"TN","name":"Tennessee","groups":{"restriction:local:enacted":["15608211c6ca3581","307b38ee1b228384","23049879ff0a5d1c","7cebe8d5c67147c3","747d1db6063c1a74","51b2b9b3a961b6ab","de659fa3e365eec8","33552bf4e80b18ee","730a5f5d55050cb7","087bbbb5a483b776","0137c4ed47954709","8272522f979f7008","9d632430d6a03021","78dbb699f219d0d0","1f546cb2797f996d","c43fd1c858232412","b97b3954b1b0949c","d68b3a39798f9791","f0bb509eaf3c5b2f","a431da7d7f705e27","048501d4a5383269","8cb4602a6ee8dcbd","af28772857e3903f","3e19367856e206f1","241a6f9524fa5b55","54976e44fee3018e","ebeae99d6b6421df","0d02b8ce1211373d","492d17cc76c60e58"],"restriction:local:proposed":["c72ff700a8b5e0fe","a5263d6dfaed1a21","05ec77d83a2fb722"],"restriction:states:enacted":["3c219120a612265b"],"restriction:states:proposed":["963831dc8907e951"],"restriction:states:failed":["640e5053d7ed492c","2f485290fc876c3d"],"water:reclaimed:proposed":["34047d55aaad8568"],"water:disclosure:failed":["3024f2dbcb00785c","7932fbffdf71a9e7"],"water:siting:proposed":["95d5d77e861f2e1a"],"water:moratorium:proposed":["51b30007138592e5"],"water:closed-loop:proposed":["bdc557047de3e52b","3b9e61fb1da5de65"],"delay:local_moratorium:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:active_litigation":["f23f3210c5447afd","9783ae8705aab3e7"],"delay:city_moratorium:active_litigation":["f23f3210c5447afd"],"delay:eminent_domain_threat:active_litigation":["f23f3210c5447afd"],"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:environmental_review_order:active_litigation":["9783ae8705aab3e7"],"delay:unpermitted_power_plant:active_litigation":["9783ae8705aab3e7"],"delay:community_opposition:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"delay:transparency_concerns:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"utility:tariff:pending":["b63a0876c6c743c3","af3b47ccdb7cb94a"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":36,"water":7,"delay":38,"atlas":29,"permits":5},"record_count":115},{"id":"TX","name":"Texas","groups":{"policy:site-control":["170b3631ad48f5a9"],"policy:security":["1deb6f4ebbbba3d4"],"policy:curtailment":["56b017e8edee0f3b"],"policy:emissions":["e17cedb3112fd488"],"restriction:local:enacted":["cb4fae95f6ec62e9","226d9579a44729dd","8725a51570228ad5","9cd0e5a2740b6579","49d98f654070e13e","5a6631afcf14f245","1526c144af9c4197","bfaeb2b05925f9bf"],"restriction:local:proposed":["aa120245d3cde2b5","4bbd796802e5b2a9","29dbbc44e88a23f5","d4ddebe26453aec0","fd40bfb18bd582d1","e3d9ca006093dd8c","347c664b42d6867c","f141990e3f9ddb5c"],"restriction:local:failed":["4cf9e86df26cb47f","036f9e40cb83532e","8fbbd5e4d1430368","0148c0779dde3d94","c154399207131e2f"],"restriction:states:enacted":["35fcd20bf3d4a4e3","07b7360c48f3c46e","98ec338e6e03cba0"],"restriction:states:pause":["707703d5f96368d1","41c39b9ee7a58df2","9607cd1000488b0d"],"restriction:states:proposed":["8d85cc66b1113104"],"water:study:proposed":["97674740d6ace3d0"],"water:siting:proposed":["ce0a82530ed2e6c2","617e27c4c491786f"],"water:closed-loop:enacted":["a3bc163e4fc8a78f","b41ba038f3b958e1"],"water:closed-loop:proposed":["0711b71f0ca0c23e","0026ba717d68569a"],"water:shield:enacted":["f512098faa3bf9c4"],"water:siting:enacted":["0d07fe0b0e4fa3bb"],"water:disclosure:enacted":["f4c280b4acf60e61","4fe0a4491af0e56e","ab5ef43c0bd56795","18fff3b222f896e1"],"water:moratorium:enacted":["23aaebd91e78f209"],"delay:state_moratorium:withdrawn":["a8fe02f84bc4a666"],"delay:transformer_supply:delayed":["a60e9b00093891d5"],"delay:gas_pipeline_delay:delayed":["87485593349454ff"],"delay:corporate_realignment:withdrawn":["15ca382a6f880e9f"],"delay:financing:withdrawn":["15ca382a6f880e9f"],"delay:zoning_denial:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:cancelled":["9832792554ff4c9d"],"delay:community_opposition:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:withdrawn":["0581ab61da4d6697"],"delay:community_opposition:withdrawn":["0581ab61da4d6697","adfb727c5dd4e1cc"],"delay:litigation:litigation_active":["792ce5aec9329c29","109278a363838f96","f27cb758664748d7"],"delay:community_opposition:litigation_active":["792ce5aec9329c29","109278a363838f96"],"delay:corporate_realignment:delayed":["0120772c7188f042"],"delay:community_opposition:delayed":["168b4298a9ab289d","f7513e35f7c721c0","2e380fe2f7f014dc"],"delay:litigation:under_appeal":["f08287b22f91f244"],"delay:local_moratorium:litigation_active":["f27cb758664748d7"],"delay:zoning_denial:delayed":["2e380fe2f7f014dc"],"delay:interconnection_queue:halted":["d5e9430ff55efa0d"],"delay:zoning_denial:withdrawn":["adfb727c5dd4e1cc"],"utility:tariff:approved":["75dc99c20658fe92","aed4fabd0e2dc51c","9a879f558b598ed3"],"utility:rate case:pending":["3af74a147ed90618"],"utility:other:pending":["234c8b4fd863479c","b540667ef8b17e0f","0b11ccddef1877eb","99a349313213c782","87c2bcaca8770a64","ca36e7d667fd52d5","624c21796e30622a","6218dc8d9c2c19aa","a068f88c8918edb0"],"utility:special contract:pending":["85e644b149d44cc3"],"utility:tariff:pending":["179ce9c6749195ff","ecc5b89ff5cb7890"],"utility:statement:pending":["d04486225e3fbb69"],"utility:other:approved":["0b929d848501d87d"],"utility:certificate:approved":["f70bcf2339f86b49"],"utility:policy:rejected":["c7c2a7a3b4cd9ee5"],"utility:policy:effective":["ad4e34e0dfe00af1"]},"grid_operators":["ERCOT","SPP","MISO","NON-RTO"],"counts":{"policy":4,"moratorium":28,"water":14,"delay":83,"atlas":135,"permits":127},"record_count":391},{"id":"UT","name":"Utah","groups":{"restriction:local:enacted":["fe8d104f8d67e17c","093e457d95e139ba","a73c33aad89fd8c4","d39140513b342349","0c19d0bfb2b41666","be172ab12b60089d","7272dd8d9cbcbd97","2c4637d21201bc5a"],"restriction:local:pause":["6689ae5de85fb884"],"restriction:states:enacted":["161bb7df391f5393","29634d18789600f9"],"water:disclosure:enacted":["aa23c2f90b922d2f"],"water:siting:enacted":["92181bfbd0f092dc"],"delay:local_moratorium:litigation_active":["43fe8f06c251d00a"],"delay:zoning_denial:litigation_active":["43fe8f06c251d00a"],"delay:community_opposition:litigation_active":["43fe8f06c251d00a"],"delay:tax_incentive_change:cancelled":["9a747679a42936ff"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":11,"water":2,"delay":16,"atlas":23,"permits":16},"record_count":68},{"id":"VT","name":"Vermont","groups":{"restriction:local:enacted":["fd5d7c35a8a164d5","ffd4551238ee66c3","24609fa0cc03fd6d"],"restriction:states:failed":["a22c89dd88f7805b"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":4,"delay":1,"atlas":3},"record_count":8},{"id":"VA","name":"Virginia","groups":{"policy:water-reporting":["d2e1f34ebb87db96"],"policy:regulator-reporting":["a2d7165da9c4273d"],"restriction:local:enacted":["5d1933a50e2fffa9","d9c9702f7193a5d0","00ea8549bf7d9107","5e8fa08848e7ea49","b612281109895776","a8439ee49b85f3b9","cb1ee56619c41591","fc8930e333e47393","33da24b96e9450aa","3c8c47c48655c7c2"],"restriction:local:failed":["c0313d873e52c337"],"restriction:local:proposed":["1fb124f1d0600aad"],"restriction:states:enacted":["07bca14c6c769cd9","822881c141b55b58","1bc4820da2e184d8","260f9d0fdac1fb1d"],"restriction:states:proposed":["115a01cddaaebb83","81387474427b857f","de3a5a259065cee6","d9698a681bcb77d1","1ccb96de87be8c20","6f2fd99dffb3ee19","5fbcc9b83d0cea89","5286a63674ab303e"],"restriction:states:failed":["96a928bdb916449a","82304cb623ce2fd1","1c2b5c27f2a20646"],"water:disclosure:enacted":["236efd0b5ce918b3","ea2fc9f0f2561dd5","1bb0eef74b265bbc"],"water:siting:vetoed":["fc6a89d84ea3761e"],"water:reclaimed:failed":["7c9863297abb29b6"],"water:incentive:proposed":["30149d37cde17dd5"],"water:study:enacted":["4d9a8e7a99e3e39b"],"water:disclosure:failed":["133af645ccadb7ec"],"water:siting:enacted":["13c66e32329bf4c9"],"water:disclosure:proposed":["739c2b83e1630596"],"delay:zoning_denial:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","ae2116cf001391ca","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b"],"delay:community_opposition:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b","b0af2cf0f00c0c33","0093933737713687"],"delay:water_dispute:cancelled":["b654fcba5611c495","c24066658a7c87b0"],"delay:litigation:cancelled":["b2f708f236602e8d","3059b79f61908e3d"],"delay:community_opposition:delayed":["2a92789be1587ada","dc394d8881dcfd7f","d7fec75934b138bd","4ef289628ac834d5"],"delay:litigation:litigation_active":["01bbee83623720b2","e5c30ca57b2dbc24","dcf5dbffe665442a","85cd3631575a5bdf","1832912b622cc7ca","e7ee0387e9522f52"],"delay:community_opposition:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:zoning_denial:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:community_opposition:litigation_active":["dcf5dbffe665442a"],"delay:zoning_denial:delayed":["ba73fb104a300b67","dc394d8881dcfd7f","d7fec75934b138bd"],"delay:zoning_denial:under_appeal":["f8a6c494d6a909f4"],"delay:community_opposition:under_appeal":["f8a6c494d6a909f4"],"delay:water_dispute:litigation_active":["85cd3631575a5bdf"],"delay:zoning_denial:litigation_active":["e7ee0387e9522f52"],"delay:environmental_review:cancelled":["3059b79f61908e3d"],"utility:tariff:approved":["c2935488c1650819","39c6440688564d5b","87a87dde118e582a"],"utility:IRP:contested":["1d207f181f290a4a","9ba1e9a7df265951","7f6e112a0c84fe66"],"utility:tariff:contested":["d5ac5227a2747fcf","b3484cb6d3aad2da"],"utility:rate case:pending":["7a09881b3efc53a9"],"utility:other:pending":["cb40a9cac60f8cec","925eb6e874d3a48f","53aeac44973adb8a"],"utility:statement:pending":["95c8534650ed9b12"],"utility:tariff:pending":["17c7d5340af6b949"],"utility:other:contested":["e0efcc5e95491272"],"utility:rate case:approved":["2d9b62ed5a5a8c85"]},"grid_operators":["PJM","NON-RTO"],"counts":{"policy":2,"moratorium":27,"water":10,"delay":88,"atlas":73,"permits":642},"record_count":842},{"id":"WA","name":"Washington","groups":{"restriction:local:enacted":["9f5f2923e39b9be8","d4e7ad9cf08df51e","a0fc2d121a678362","0b3a9ecd7c2478dc","de683906483b8fe5","d6189396d865dfc1","a4d0a0075eb42622","844f1f18ded0ca1c","50cb86e7f24d5c8a","5f99587cd1f4762d","e207b014a5280c8e","abcdda3f927a1476","31a8daed20fe189e","af832be8ade36360","510f60e365739621","7eb7d0c92f5f8dd9","5565880179e00904","c8eaae4e91fc4247","4f498d7e9f152136","29f8e05bf47f65e4"],"restriction:states:enacted":["13d139ecdc65b4b1","b6f7e9b035c67d69"],"restriction:states:proposed":["73392c07183451a2","d65bf66b10bb27dc","d97ae6ca24475af1"],"restriction:states:failed":["b0d11e81f4e16dea","fc47b1de08dff922","383388e3142065cd"],"water:moratorium:enacted":["6455f69859c340a2"],"delay:community_opposition:halted":["8ced64a3cbb11f6c"],"delay:local_moratorium:halted":["0d03a9c2805d05b6","2fc49a0ff709020e"],"delay:community_opposition:delayed":["887cc460e5eb83f6"],"utility:tariff:pending":["c168cf070187ea92"],"utility:other:pending":["611e6f5599ef718f","8c8130676232d1c6"],"utility:statement:pending":["4ed38cff9678ccf0","4b866a2091ab3ecc"],"utility:tariff:approved":["325a6b7ee8b34e77"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":28,"water":1,"delay":22,"atlas":30,"permits":13},"record_count":94},{"id":"WV","name":"West Virginia","groups":{"water:disclosure:failed":["8cf5514f4b5ff375"],"delay:community_opposition:delayed":["4124cb9080c91f7c"],"utility:IRP:pending":["a67a61284873a2b2","8da91197a3806bcc"],"utility:special contract:pending":["39679c94f0d7f830"],"utility:other:contested":["c12d842abe5446ff","040b3c446bff4aee","5e6fb296651a928a","6f948a872911044f","0ae82e92301e638b"]},"grid_operators":["PJM"],"counts":{"water":1,"delay":12,"atlas":7},"record_count":20},{"id":"WI","name":"Wisconsin","groups":{"restriction:local:enacted":["197cdb77aa511062","c32fbb4074e34eba","9fa928579bf6e19b","1ef57a5ad557563c","d383195f7d8cd078","07b5a8ef15cadf6b","0a3550a0b812064e","2f12caa1fa8a1620","4efd296b41cadd58","502234e3282fa94d","98de8d31bfd06c50","9baf377f17b48199","2b2ac1debfbe57ca","aee74a04d13b1375","02ac37032bda8131","375f029130348bd2","6e56afd4aed59791","893a3aae04278c40","7650d4a5b8a48f92","e18b7a4b7fbc1df5","b56152d653914388","b916df50f4c51b94","5a64d5c33607de67","643f527e927e4058","7b1745a42047131e","e09c79ad3db16d88","734fd94028341ac3","69f22ea5aa3e34d3","1a270a98a4fa2e6d","d41ed6223bfeed81","112e1e1079c890e9","844ad5858c872078","47a591fadc2e8900","f7cf8bb4ab48824a"],"restriction:local:failed":["0c67dadae5dac0e9"],"restriction:local:proposed":["e66086d4c7d49f01","c8953b5f4533a4b5","68e48cc43363c3ba","f04d2abd046f97a9","1eae3d6650182a35"],"restriction:states:enacted":["5db6a8a411191d98"],"restriction:states:proposed":["d9aeb06afb1cc48b"],"restriction:states:failed":["a7f7ac4ffcf569cf","e87712374a5a9bb6","1fa055042bc56cba","bf5f897298b22196"],"water:moratorium:failed":["dabd0296a8769724"],"water:disclosure:proposed":["52d3503b7b7a29d2"],"water:disclosure:failed":["3d11e7d09b3698e1"],"water:moratorium:proposed":["0d06b92b967fdc00"],"water:siting:proposed":["4157cf76b6d65b0a"],"delay:environmental_review:litigation_active":["debb467bcb4d5430"],"delay:litigation:litigation_active":["debb467bcb4d5430"],"delay:community_opposition:litigation_active":["debb467bcb4d5430"],"delay:litigation:active_litigation":["e199a6213982873d"],"delay:environmental_review_challenge:active_litigation":["e199a6213982873d"],"delay:regulatory_collateral_dispute:active_litigation":["e199a6213982873d"],"delay:corporate_reassessment:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:design_changes:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:community_opposition:under_council_consideration":["28e37770792b4c08"],"delay:withdrawal:cancelled":["ea733b19fc76a19b"],"delay:village_infeasibility_finding:cancelled":["ea733b19fc76a19b"],"delay:interconnection:denied":["fd3e6fff23dec30a"],"delay:water:cancelled":["6b688ff399652711"],"delay:community_opposition:cancelled":["6b688ff399652711"],"delay:financing:cancelled":["6b688ff399652711"],"utility:special contract:approved":["c0e0e62ba225486e"],"utility:tariff:approved":["477299baafe80b07","8b74b857f211fa23","9d22a2aeb195e4fc","124399acbd7a554c"],"utility:tariff:pending":["dde2390c69924c91","4b8f10b414687805","7d0c020f1825cea4"],"utility:rate case:pending":["fbf33f025d17bc1f"],"utility:other:pending":["8f81691272c2cefc"]},"grid_operators":["MISO"],"counts":{"moratorium":46,"water":5,"delay":59,"atlas":44,"permits":6},"record_count":160},{"id":"WY","name":"Wyoming","groups":{"restriction:local:failed":["d0485054fd79e820"],"restriction:local:proposed":["3ed10f6e2d7fa4f4"],"restriction:states:failed":["be934bcf6dde21e3"],"utility:tariff:pending":["b1729fb79f6ff5af"],"utility:tariff:approved":["48ce507193eae507","2e0818019f3d14fe","103e672184e6c568"],"utility:other:pending":["b06ef4aba51b6d71"],"utility:special contract:pending":["31c5bf9bd2103358"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":3,"delay":10,"atlas":13,"permits":4},"record_count":30}]}