{"groups":{"policy:site-control":{"id":"policy:site-control","label":"Evidence of site control","tracker":"policy"},"policy:security":{"id":"policy:security","label":"Financial security","tracker":"policy"},"policy:curtailment":{"id":"policy:curtailment","label":"Emergency response","tracker":"policy"},"policy:emissions":{"id":"policy:emissions","label":"Emissions safeguards","tracker":"policy"},"policy:cost-allocation":{"id":"policy:cost-allocation","label":"Attributable-cost allocation","tracker":"policy"},"policy:departure":{"id":"policy:departure","label":"Departure / reduced-load protection","tracker":"policy"},"policy:supply-review":{"id":"policy:supply-review","label":"Water-supply review","tracker":"policy"},"policy:clean-energy":{"id":"policy:clean-energy","label":"Clean-energy service terms","tracker":"policy"},"policy:water-reporting":{"id":"policy:water-reporting","label":"Water-use reporting","tracker":"policy"},"policy:local-authority":{"id":"policy:local-authority","label":"Preserved local authority","tracker":"policy"},"policy:minimum-payment":{"id":"policy:minimum-payment","label":"Minimum payment commitments","tracker":"policy"},"policy:regulator-reporting":{"id":"policy:regulator-reporting","label":"Regulatory reporting","tracker":"policy"},"policy:environmental-review":{"id":"policy:environmental-review","label":"Environmental assessment","tracker":"policy"},"policy:permit-hold":{"id":"policy:permit-hold","label":"Interim permit restraint","tracker":"policy"},"restriction:local:enacted":{"id":"restriction:local:enacted","label":"Local restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:local:failed":{"id":"restriction:local:failed","label":"Local restriction records: failed (as recorded)","tracker":"moratorium"},"restriction:local:proposed":{"id":"restriction:local:proposed","label":"Local restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:local:pause":{"id":"restriction:local:pause","label":"Local restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:enacted":{"id":"restriction:states:enacted","label":"State restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:states:pause":{"id":"restriction:states:pause","label":"State restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:proposed":{"id":"restriction:states:proposed","label":"State restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:states:failed":{"id":"restriction:states:failed","label":"State restriction records: failed (as recorded)","tracker":"moratorium"},"water:reclaimed:enacted":{"id":"water:reclaimed:enacted","label":"Water reclaimed measures: enacted (as recorded)","tracker":"water"},"water:disclosure:enacted":{"id":"water:disclosure:enacted","label":"Water disclosure measures: enacted (as recorded)","tracker":"water"},"water:siting:vetoed":{"id":"water:siting:vetoed","label":"Water siting measures: vetoed (as recorded)","tracker":"water"},"water:reclaimed:failed":{"id":"water:reclaimed:failed","label":"Water reclaimed measures: failed (as recorded)","tracker":"water"},"water:incentive:proposed":{"id":"water:incentive:proposed","label":"Water incentive measures: proposed (as recorded)","tracker":"water"},"water:disclosure:proposed":{"id":"water:disclosure:proposed","label":"Water disclosure measures: proposed (as recorded)","tracker":"water"},"water:disclosure:vetoed":{"id":"water:disclosure:vetoed","label":"Water disclosure measures: vetoed (as recorded)","tracker":"water"},"water:closed-loop:proposed":{"id":"water:closed-loop:proposed","label":"Water closed-loop measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:failed":{"id":"water:closed-loop:failed","label":"Water closed-loop measures: failed (as recorded)","tracker":"water"},"water:disclosure:failed":{"id":"water:disclosure:failed","label":"Water disclosure measures: failed (as recorded)","tracker":"water"},"water:rate:failed":{"id":"water:rate:failed","label":"Water rate measures: failed (as recorded)","tracker":"water"},"water:siting:enacted":{"id":"water:siting:enacted","label":"Water siting measures: enacted (as recorded)","tracker":"water"},"water:study:proposed":{"id":"water:study:proposed","label":"Water study measures: proposed (as recorded)","tracker":"water"},"water:siting:proposed":{"id":"water:siting:proposed","label":"Water siting measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:enacted":{"id":"water:closed-loop:enacted","label":"Water closed-loop measures: enacted (as recorded)","tracker":"water"},"water:moratorium:enacted":{"id":"water:moratorium:enacted","label":"Water moratorium measures: enacted (as recorded)","tracker":"water"},"water:reclaimed:proposed":{"id":"water:reclaimed:proposed","label":"Water reclaimed measures: proposed (as recorded)","tracker":"water"},"water:moratorium:vetoed":{"id":"water:moratorium:vetoed","label":"Water moratorium measures: vetoed (as recorded)","tracker":"water"},"water:study:enacted":{"id":"water:study:enacted","label":"Water study measures: enacted (as recorded)","tracker":"water"},"water:moratorium:failed":{"id":"water:moratorium:failed","label":"Water moratorium measures: failed (as recorded)","tracker":"water"},"water:moratorium:proposed":{"id":"water:moratorium:proposed","label":"Water moratorium measures: proposed (as recorded)","tracker":"water"},"water:shield:enacted":{"id":"water:shield:enacted","label":"Water shield measures: enacted (as recorded)","tracker":"water"},"water:shield:failed":{"id":"water:shield:failed","label":"Water shield measures: failed (as recorded)","tracker":"water"},"water:siting:failed":{"id":"water:siting:failed","label":"Water siting measures: failed (as recorded)","tracker":"water"},"water:study:failed":{"id":"water:study:failed","label":"Water study measures: failed (as recorded)","tracker":"water"},"water:rate:enacted":{"id":"water:rate:enacted","label":"Water rate measures: enacted (as recorded)","tracker":"water"},"water:incentive:enacted":{"id":"water:incentive:enacted","label":"Water incentive measures: enacted (as recorded)","tracker":"water"},"delay:state_moratorium:withdrawn":{"id":"delay:state_moratorium:withdrawn","label":"Delay cause: state moratorium / withdrawn","tracker":"delay"},"delay:transformer_supply:delayed":{"id":"delay:transformer_supply:delayed","label":"Delay cause: transformer supply / delayed","tracker":"delay"},"delay:gas_pipeline_delay:delayed":{"id":"delay:gas_pipeline_delay:delayed","label":"Delay cause: gas pipeline delay / delayed","tracker":"delay"},"delay:corporate_realignment:withdrawn":{"id":"delay:corporate_realignment:withdrawn","label":"Delay cause: corporate realignment / withdrawn","tracker":"delay"},"delay:financing:withdrawn":{"id":"delay:financing:withdrawn","label":"Delay cause: financing / withdrawn","tracker":"delay"},"delay:environmental_review:litigation_active":{"id":"delay:environmental_review:litigation_active","label":"Delay cause: environmental review / litigation_active","tracker":"delay"},"delay:litigation:litigation_active":{"id":"delay:litigation:litigation_active","label":"Delay cause: litigation / litigation_active","tracker":"delay"},"delay:community_opposition:litigation_active":{"id":"delay:community_opposition:litigation_active","label":"Delay cause: community opposition / litigation_active","tracker":"delay"},"delay:zoning_denial:cancelled":{"id":"delay:zoning_denial:cancelled","label":"Delay cause: zoning denial / cancelled","tracker":"delay"},"delay:community_opposition:cancelled":{"id":"delay:community_opposition:cancelled","label":"Delay cause: community opposition / cancelled","tracker":"delay"},"delay:water_dispute:cancelled":{"id":"delay:water_dispute:cancelled","label":"Delay cause: water dispute / cancelled","tracker":"delay"},"delay:zoning_denial:litigation_active":{"id":"delay:zoning_denial:litigation_active","label":"Delay cause: zoning denial / litigation_active","tracker":"delay"},"delay:local_moratorium:litigation_active":{"id":"delay:local_moratorium:litigation_active","label":"Delay cause: local moratorium / litigation_active","tracker":"delay"},"delay:permit_denial:litigation_active":{"id":"delay:permit_denial:litigation_active","label":"Delay cause: permit denial / litigation_active","tracker":"delay"},"delay:community_opposition:withdrawn":{"id":"delay:community_opposition:withdrawn","label":"Delay cause: community opposition / withdrawn","tracker":"delay"},"delay:zoning_denial:withdrawn":{"id":"delay:zoning_denial:withdrawn","label":"Delay cause: zoning denial / withdrawn","tracker":"delay"},"delay:environmental_review:delayed":{"id":"delay:environmental_review:delayed","label":"Delay cause: environmental review / delayed","tracker":"delay"},"delay:community_opposition:delayed":{"id":"delay:community_opposition:delayed","label":"Delay cause: community opposition / delayed","tracker":"delay"},"delay:water_dispute:under_appeal":{"id":"delay:water_dispute:under_appeal","label":"Delay cause: water dispute / under_appeal","tracker":"delay"},"delay:community_opposition:under_appeal":{"id":"delay:community_opposition:under_appeal","label":"Delay cause: community opposition / under_appeal","tracker":"delay"},"delay:water_dispute:delayed":{"id":"delay:water_dispute:delayed","label":"Delay cause: water dispute / delayed","tracker":"delay"},"delay:local_moratorium:delayed":{"id":"delay:local_moratorium:delayed","label":"Delay cause: local moratorium / delayed","tracker":"delay"},"delay:litigation:cancelled":{"id":"delay:litigation:cancelled","label":"Delay cause: litigation / cancelled","tracker":"delay"},"delay:zoning_denial:delayed":{"id":"delay:zoning_denial:delayed","label":"Delay cause: zoning denial / delayed","tracker":"delay"},"delay:zoning_denial:under_appeal":{"id":"delay:zoning_denial:under_appeal","label":"Delay cause: zoning denial / under_appeal","tracker":"delay"},"delay:water_dispute:litigation_active":{"id":"delay:water_dispute:litigation_active","label":"Delay cause: water dispute / litigation_active","tracker":"delay"},"delay:environmental_review:cancelled":{"id":"delay:environmental_review:cancelled","label":"Delay cause: environmental review / cancelled","tracker":"delay"},"delay:litigation:under_appeal":{"id":"delay:litigation:under_appeal","label":"Delay cause: litigation / under_appeal","tracker":"delay"},"delay:community_opposition:approved_but_citywide_moratorium_pending":{"id":"delay:community_opposition:approved_but_citywide_moratorium_pending","label":"Delay cause: community opposition / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":{"id":"delay:proposed_moratorium:approved_but_citywide_moratorium_pending","label":"Delay cause: proposed moratorium / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:rezoning_denial_or_withdrawal:withdrawn":{"id":"delay:rezoning_denial_or_withdrawal:withdrawn","label":"Delay cause: rezoning denial or withdrawal / withdrawn","tracker":"delay"},"delay:rezoning_denial:rezoning_denied":{"id":"delay:rezoning_denial:rezoning_denied","label":"Delay cause: rezoning denial / rezoning_denied","tracker":"delay"},"delay:community_opposition:rezoning_denied":{"id":"delay:community_opposition:rezoning_denied","label":"Delay cause: community opposition / rezoning_denied","tracker":"delay"},"delay:litigation:active_litigation":{"id":"delay:litigation:active_litigation","label":"Delay cause: litigation / active_litigation","tracker":"delay"},"delay:permit_challenge:active_litigation":{"id":"delay:permit_challenge:active_litigation","label":"Delay cause: permit challenge / active_litigation","tracker":"delay"},"delay:community_opposition:approved_amid_opposition":{"id":"delay:community_opposition:approved_amid_opposition","label":"Delay cause: community opposition / approved_amid_opposition","tracker":"delay"},"delay:missed_milestones:development_agreement_expired":{"id":"delay:missed_milestones:development_agreement_expired","label":"Delay cause: missed milestones / development_agreement_expired","tracker":"delay"},"delay:financing_delay:development_agreement_expired":{"id":"delay:financing_delay:development_agreement_expired","label":"Delay cause: financing delay / development_agreement_expired","tracker":"delay"},"delay:unresolved_commitments:rezoning_denied":{"id":"delay:unresolved_commitments:rezoning_denied","label":"Delay cause: unresolved commitments / rezoning_denied","tracker":"delay"},"delay:county_moratorium:moratorium_in_force":{"id":"delay:county_moratorium:moratorium_in_force","label":"Delay cause: county moratorium / moratorium_in_force","tracker":"delay"},"delay:county_moratorium:moratorium_extended":{"id":"delay:county_moratorium:moratorium_extended","label":"Delay cause: county moratorium / moratorium_extended","tracker":"delay"},"delay:regulatory_review:regulatory_approval_pending":{"id":"delay:regulatory_review:regulatory_approval_pending","label":"Delay cause: regulatory review / regulatory_approval_pending","tracker":"delay"},"delay:power_allocation_dispute:regulatory_approval_pending":{"id":"delay:power_allocation_dispute:regulatory_approval_pending","label":"Delay cause: power allocation dispute / regulatory_approval_pending","tracker":"delay"},"delay:corporate_reassessment:construction_paused":{"id":"delay:corporate_reassessment:construction_paused","label":"Delay cause: corporate reassessment / construction_paused","tracker":"delay"},"delay:openai_relationship_change:construction_paused":{"id":"delay:openai_relationship_change:construction_paused","label":"Delay cause: openai relationship change / construction_paused","tracker":"delay"},"delay:tariff_costs:construction_paused":{"id":"delay:tariff_costs:construction_paused","label":"Delay cause: tariff costs / construction_paused","tracker":"delay"},"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: local moratorium / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: ballot initiative threat / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:signature_gathering":{"id":"delay:ballot_initiative_threat:signature_gathering","label":"Delay cause: ballot initiative threat / signature_gathering","tracker":"delay"},"delay:statewide_moratorium_push:signature_gathering":{"id":"delay:statewide_moratorium_push:signature_gathering","label":"Delay cause: statewide moratorium push / signature_gathering","tracker":"delay"},"delay:environmental_review_challenge:active_litigation":{"id":"delay:environmental_review_challenge:active_litigation","label":"Delay cause: environmental review challenge / active_litigation","tracker":"delay"},"delay:regulatory_collateral_dispute:active_litigation":{"id":"delay:regulatory_collateral_dispute:active_litigation","label":"Delay cause: regulatory collateral dispute / active_litigation","tracker":"delay"},"delay:corporate_reassessment:construction_partially_paused":{"id":"delay:corporate_reassessment:construction_partially_paused","label":"Delay cause: corporate reassessment / construction_partially_paused","tracker":"delay"},"delay:design_changes:construction_partially_paused":{"id":"delay:design_changes:construction_partially_paused","label":"Delay cause: design changes / construction_partially_paused","tracker":"delay"},"delay:community_opposition:under_council_consideration":{"id":"delay:community_opposition:under_council_consideration","label":"Delay cause: community opposition / under_council_consideration","tracker":"delay"},"delay:withdrawal:cancelled":{"id":"delay:withdrawal:cancelled","label":"Delay cause: withdrawal / cancelled","tracker":"delay"},"delay:village_infeasibility_finding:cancelled":{"id":"delay:village_infeasibility_finding:cancelled","label":"Delay cause: village infeasibility finding / cancelled","tracker":"delay"},"delay:litigation:construction_halted_by_court":{"id":"delay:litigation:construction_halted_by_court","label":"Delay cause: litigation / construction_halted_by_court","tracker":"delay"},"delay:environmental_review_inadequate:construction_halted_by_court":{"id":"delay:environmental_review_inadequate:construction_halted_by_court","label":"Delay cause: environmental review inadequate / construction_halted_by_court","tracker":"delay"},"delay:city_moratorium:active_litigation":{"id":"delay:city_moratorium:active_litigation","label":"Delay cause: city moratorium / active_litigation","tracker":"delay"},"delay:environmental_review_pending:final_decision_paused":{"id":"delay:environmental_review_pending:final_decision_paused","label":"Delay cause: environmental review pending / final_decision_paused","tracker":"delay"},"delay:city_moratorium:moratorium_in_force":{"id":"delay:city_moratorium:moratorium_in_force","label":"Delay cause: city moratorium / moratorium_in_force","tracker":"delay"},"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":{"id":"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial","label":"Delay cause: planning commission denial recommendation / planning_commission_recommended_denial","tracker":"delay"},"delay:community_opposition:opposed_planned":{"id":"delay:community_opposition:opposed_planned","label":"Delay cause: community opposition / opposed_planned","tracker":"delay"},"delay:city_council_resolution_against:opposed_planned":{"id":"delay:city_council_resolution_against:opposed_planned","label":"Delay cause: city council resolution against / opposed_planned","tracker":"delay"},"delay:rezoning_denial:rezoning_denied_then_litigation_settled":{"id":"delay:rezoning_denial:rezoning_denied_then_litigation_settled","label":"Delay cause: rezoning denial / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:litigation:rezoning_denied_then_litigation_settled":{"id":"delay:litigation:rezoning_denied_then_litigation_settled","label":"Delay cause: litigation / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:city_moratorium:moratorium_delay":{"id":"delay:city_moratorium:moratorium_delay","label":"Delay cause: city moratorium / moratorium_delay","tracker":"delay"},"delay:community_opposition:moratorium_delay":{"id":"delay:community_opposition:moratorium_delay","label":"Delay cause: community opposition / moratorium_delay","tracker":"delay"},"delay:community_opposition:rezoning_paused":{"id":"delay:community_opposition:rezoning_paused","label":"Delay cause: community opposition / rezoning_paused","tracker":"delay"},"delay:planning_commission_postponement:rezoning_paused":{"id":"delay:planning_commission_postponement:rezoning_paused","label":"Delay cause: planning commission postponement / rezoning_paused","tracker":"delay"},"delay:community_opposition:opposed_proposed":{"id":"delay:community_opposition:opposed_proposed","label":"Delay cause: community opposition / opposed_proposed","tracker":"delay"},"delay:transparency_concerns:opposed_proposed":{"id":"delay:transparency_concerns:opposed_proposed","label":"Delay cause: transparency concerns / opposed_proposed","tracker":"delay"},"delay:litigation:abandoned":{"id":"delay:litigation:abandoned","label":"Delay cause: litigation / abandoned","tracker":"delay"},"delay:community_opposition:abandoned":{"id":"delay:community_opposition:abandoned","label":"Delay cause: community opposition / abandoned","tracker":"delay"},"delay:china_ties_backlash:abandoned":{"id":"delay:china_ties_backlash:abandoned","label":"Delay cause: china ties backlash / abandoned","tracker":"delay"},"delay:wetlands_permit_suspended:active_litigation":{"id":"delay:wetlands_permit_suspended:active_litigation","label":"Delay cause: wetlands permit suspended / active_litigation","tracker":"delay"},"delay:community_opposition:opposed_pending_council_vote":{"id":"delay:community_opposition:opposed_pending_council_vote","label":"Delay cause: community opposition / opposed_pending_council_vote","tracker":"delay"},"delay:community_opposition:opposed_effectively_stalled":{"id":"delay:community_opposition:opposed_effectively_stalled","label":"Delay cause: community opposition / opposed_effectively_stalled","tracker":"delay"},"delay:petition_campaign:opposed_effectively_stalled":{"id":"delay:petition_campaign:opposed_effectively_stalled","label":"Delay cause: petition campaign / opposed_effectively_stalled","tracker":"delay"},"delay:public_notice_violation_alleged:active_litigation":{"id":"delay:public_notice_violation_alleged:active_litigation","label":"Delay cause: public notice violation alleged / active_litigation","tracker":"delay"},"delay:rezoning_denial:withdrawn":{"id":"delay:rezoning_denial:withdrawn","label":"Delay cause: rezoning denial / withdrawn","tracker":"delay"},"delay:no_secured_tenant:withdrawn":{"id":"delay:no_secured_tenant:withdrawn","label":"Delay cause: no secured tenant / withdrawn","tracker":"delay"},"delay:council_opposition:withdrawn":{"id":"delay:council_opposition:withdrawn","label":"Delay cause: council opposition / withdrawn","tracker":"delay"},"delay:eminent_domain_threat:active_litigation":{"id":"delay:eminent_domain_threat:active_litigation","label":"Delay cause: eminent domain threat / active_litigation","tracker":"delay"},"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":{"id":"delay:rezoning_denial:rezoning_rejected_moratorium_recommended","label":"Delay cause: rezoning denial / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":{"id":"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended","label":"Delay cause: county moratorium recommended / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:environmental_review_order:active_litigation":{"id":"delay:environmental_review_order:active_litigation","label":"Delay cause: environmental review order / active_litigation","tracker":"delay"},"delay:unpermitted_power_plant:active_litigation":{"id":"delay:unpermitted_power_plant:active_litigation","label":"Delay cause: unpermitted power plant / active_litigation","tracker":"delay"},"delay:community_opposition:under_construction_amid_scrutiny":{"id":"delay:community_opposition:under_construction_amid_scrutiny","label":"Delay cause: community opposition / under_construction_amid_scrutiny","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_scrutiny":{"id":"delay:transparency_concerns:under_construction_amid_scrutiny","label":"Delay cause: transparency concerns / under_construction_amid_scrutiny","tracker":"delay"},"delay:permit_denial:permit_denied":{"id":"delay:permit_denial:permit_denied","label":"Delay cause: permit denial / permit_denied","tracker":"delay"},"delay:community_opposition:permit_denied":{"id":"delay:community_opposition:permit_denied","label":"Delay cause: community opposition / permit_denied","tracker":"delay"},"delay:county_moratorium:permit_denied":{"id":"delay:county_moratorium:permit_denied","label":"Delay cause: county moratorium / permit_denied","tracker":"delay"},"delay:county_moratorium:approved_active_litigation":{"id":"delay:county_moratorium:approved_active_litigation","label":"Delay cause: county moratorium / approved_active_litigation","tracker":"delay"},"delay:litigation:approved_active_litigation":{"id":"delay:litigation:approved_active_litigation","label":"Delay cause: litigation / approved_active_litigation","tracker":"delay"},"delay:community_opposition:approved_active_litigation":{"id":"delay:community_opposition:approved_active_litigation","label":"Delay cause: community opposition / approved_active_litigation","tracker":"delay"},"delay:county_moratorium:delayed_amid_moratorium":{"id":"delay:county_moratorium:delayed_amid_moratorium","label":"Delay cause: county moratorium / delayed_amid_moratorium","tracker":"delay"},"delay:community_opposition:delayed_amid_moratorium":{"id":"delay:community_opposition:delayed_amid_moratorium","label":"Delay cause: community opposition / delayed_amid_moratorium","tracker":"delay"},"delay:public_outcry:tax_incentive_withdrawn":{"id":"delay:public_outcry:tax_incentive_withdrawn","label":"Delay cause: public outcry / tax_incentive_withdrawn","tracker":"delay"},"delay:tax_break_withdrawal:tax_incentive_withdrawn":{"id":"delay:tax_break_withdrawal:tax_incentive_withdrawn","label":"Delay cause: tax break withdrawal / tax_incentive_withdrawn","tracker":"delay"},"delay:permit_denial:denied_without_prejudice":{"id":"delay:permit_denial:denied_without_prejudice","label":"Delay cause: permit denial / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:denied_without_prejudice":{"id":"delay:community_opposition:denied_without_prejudice","label":"Delay cause: community opposition / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:under_construction_amid_opposition":{"id":"delay:community_opposition:under_construction_amid_opposition","label":"Delay cause: community opposition / under_construction_amid_opposition","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_opposition":{"id":"delay:transparency_concerns:under_construction_amid_opposition","label":"Delay cause: transparency concerns / under_construction_amid_opposition","tracker":"delay"},"delay:community_opposition:rumored_no_application_filed":{"id":"delay:community_opposition:rumored_no_application_filed","label":"Delay cause: community opposition / rumored_no_application_filed","tracker":"delay"},"delay:meeting_postponed:rumored_no_application_filed":{"id":"delay:meeting_postponed:rumored_no_application_filed","label":"Delay cause: meeting postponed / rumored_no_application_filed","tracker":"delay"},"delay:community_opposition:moratorium_in_force":{"id":"delay:community_opposition:moratorium_in_force","label":"Delay cause: community opposition / moratorium_in_force","tracker":"delay"},"delay:community_opposition:under_review_no_zoning_process":{"id":"delay:community_opposition:under_review_no_zoning_process","label":"Delay cause: community opposition / under_review_no_zoning_process","tracker":"delay"},"delay:no_local_zoning_framework:under_review_no_zoning_process":{"id":"delay:no_local_zoning_framework:under_review_no_zoning_process","label":"Delay cause: no local zoning framework / under_review_no_zoning_process","tracker":"delay"},"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":{"id":"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute","label":"Delay cause: regulatory transparency dispute / regulatory_disclosure_dispute","tracker":"delay"},"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":{"id":"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute","label":"Delay cause: ratepayer cost concerns / regulatory_disclosure_dispute","tracker":"delay"},"delay:noise_nuisance:active_litigation":{"id":"delay:noise_nuisance:active_litigation","label":"Delay cause: noise nuisance / active_litigation","tracker":"delay"},"delay:historic_preservation_conflict:permit_denied":{"id":"delay:historic_preservation_conflict:permit_denied","label":"Delay cause: historic preservation conflict / permit_denied","tracker":"delay"},"delay:community_opposition:under_construction_amid_water_concerns":{"id":"delay:community_opposition:under_construction_amid_water_concerns","label":"Delay cause: community opposition / under_construction_amid_water_concerns","tracker":"delay"},"delay:water_capacity_constraints:under_construction_amid_water_concerns":{"id":"delay:water_capacity_constraints:under_construction_amid_water_concerns","label":"Delay cause: water capacity constraints / under_construction_amid_water_concerns","tracker":"delay"},"delay:city_moratorium_partial_exemption:phase_vote_delayed":{"id":"delay:city_moratorium_partial_exemption:phase_vote_delayed","label":"Delay cause: city moratorium partial exemption / phase_vote_delayed","tracker":"delay"},"delay:planning_commission_delay:phase_vote_delayed":{"id":"delay:planning_commission_delay:phase_vote_delayed","label":"Delay cause: planning commission delay / phase_vote_delayed","tracker":"delay"},"delay:community_opposition:approved_expanded_amid_opposition":{"id":"delay:community_opposition:approved_expanded_amid_opposition","label":"Delay cause: community opposition / approved_expanded_amid_opposition","tracker":"delay"},"delay:noise_regulation_review:approved_expanded_amid_opposition":{"id":"delay:noise_regulation_review:approved_expanded_amid_opposition","label":"Delay cause: noise regulation review / approved_expanded_amid_opposition","tracker":"delay"},"delay:multi_year_construction_delay:delayed_extension_requested":{"id":"delay:multi_year_construction_delay:delayed_extension_requested","label":"Delay cause: multi year construction delay / delayed_extension_requested","tracker":"delay"},"delay:design_changes:delayed_extension_requested":{"id":"delay:design_changes:delayed_extension_requested","label":"Delay cause: design changes / delayed_extension_requested","tracker":"delay"},"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":{"id":"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums","label":"Delay cause: county moratorium neighboring / early_stage_amid_county_moratoriums","tracker":"delay"},"delay:regulatory_review:permitting_challenged":{"id":"delay:regulatory_review:permitting_challenged","label":"Delay cause: regulatory review / permitting_challenged","tracker":"delay"},"delay:environmental_petition:permitting_challenged":{"id":"delay:environmental_petition:permitting_challenged","label":"Delay cause: environmental petition / permitting_challenged","tracker":"delay"},"delay:utility_interconnection_timing:abandoned":{"id":"delay:utility_interconnection_timing:abandoned","label":"Delay cause: utility interconnection timing / abandoned","tracker":"delay"},"delay:withdrawal:abandoned":{"id":"delay:withdrawal:abandoned","label":"Delay cause: withdrawal / abandoned","tracker":"delay"},"delay:zoning_approval_challenge:active_litigation":{"id":"delay:zoning_approval_challenge:active_litigation","label":"Delay cause: zoning approval challenge / active_litigation","tracker":"delay"},"delay:litigation:zoning_request_paused_active_litigation":{"id":"delay:litigation:zoning_request_paused_active_litigation","label":"Delay cause: litigation / zoning_request_paused_active_litigation","tracker":"delay"},"delay:council_agenda_removal:zoning_request_paused_active_litigation":{"id":"delay:council_agenda_removal:zoning_request_paused_active_litigation","label":"Delay cause: council agenda removal / zoning_request_paused_active_litigation","tracker":"delay"},"delay:environmental_concerns:zoning_request_paused_active_litigation":{"id":"delay:environmental_concerns:zoning_request_paused_active_litigation","label":"Delay cause: environmental concerns / zoning_request_paused_active_litigation","tracker":"delay"},"delay:litigation:active_litigation_temporary_block":{"id":"delay:litigation:active_litigation_temporary_block","label":"Delay cause: litigation / active_litigation_temporary_block","tracker":"delay"},"delay:state_law_ownership_ban:active_litigation_temporary_block":{"id":"delay:state_law_ownership_ban:active_litigation_temporary_block","label":"Delay cause: state law ownership ban / active_litigation_temporary_block","tracker":"delay"},"delay:quorum_court_rejection:moratorium_exemption_rejected":{"id":"delay:quorum_court_rejection:moratorium_exemption_rejected","label":"Delay cause: quorum court rejection / moratorium_exemption_rejected","tracker":"delay"},"delay:county_moratorium_dispute:moratorium_exemption_rejected":{"id":"delay:county_moratorium_dispute:moratorium_exemption_rejected","label":"Delay cause: county moratorium dispute / moratorium_exemption_rejected","tracker":"delay"},"delay:litigation:active_litigation_records_dispute":{"id":"delay:litigation:active_litigation_records_dispute","label":"Delay cause: litigation / active_litigation_records_dispute","tracker":"delay"},"delay:public_records_dispute:active_litigation_records_dispute":{"id":"delay:public_records_dispute:active_litigation_records_dispute","label":"Delay cause: public records dispute / active_litigation_records_dispute","tracker":"delay"},"delay:litigation:delayed":{"id":"delay:litigation:delayed","label":"Delay cause: litigation / delayed","tracker":"delay"},"delay:permit_denial:delayed":{"id":"delay:permit_denial:delayed","label":"Delay cause: permit denial / delayed","tracker":"delay"},"delay:local_moratorium:cancelled":{"id":"delay:local_moratorium:cancelled","label":"Delay cause: local moratorium / cancelled","tracker":"delay"},"delay:tax_incentive_change:under_appeal":{"id":"delay:tax_incentive_change:under_appeal","label":"Delay cause: tax incentive change / under_appeal","tracker":"delay"},"delay:litigation:halted":{"id":"delay:litigation:halted","label":"Delay cause: litigation / halted","tracker":"delay"},"delay:environmental_review:halted":{"id":"delay:environmental_review:halted","label":"Delay cause: environmental review / halted","tracker":"delay"},"delay:local_moratorium:halted":{"id":"delay:local_moratorium:halted","label":"Delay cause: local moratorium / halted","tracker":"delay"},"delay:water_dispute:halted":{"id":"delay:water_dispute:halted","label":"Delay cause: water dispute / halted","tracker":"delay"},"delay:tax_incentive_change:halted":{"id":"delay:tax_incentive_change:halted","label":"Delay cause: tax incentive change / halted","tracker":"delay"},"delay:community_opposition:halted":{"id":"delay:community_opposition:halted","label":"Delay cause: community opposition / halted","tracker":"delay"},"delay:tax_incentive_change:litigation_active":{"id":"delay:tax_incentive_change:litigation_active","label":"Delay cause: tax incentive change / litigation_active","tracker":"delay"},"delay:corporate_realignment:delayed":{"id":"delay:corporate_realignment:delayed","label":"Delay cause: corporate realignment / delayed","tracker":"delay"},"delay:tax_incentive_change:cancelled":{"id":"delay:tax_incentive_change:cancelled","label":"Delay cause: tax incentive change / cancelled","tracker":"delay"},"delay:financing:litigation_active":{"id":"delay:financing:litigation_active","label":"Delay cause: financing / litigation_active","tracker":"delay"},"delay:state_moratorium:halted":{"id":"delay:state_moratorium:halted","label":"Delay cause: state moratorium / halted","tracker":"delay"},"delay:state_moratorium:litigation_active":{"id":"delay:state_moratorium:litigation_active","label":"Delay cause: state moratorium / litigation_active","tracker":"delay"},"delay:state_moratorium:cancelled":{"id":"delay:state_moratorium:cancelled","label":"Delay cause: state moratorium / cancelled","tracker":"delay"},"delay:water_dispute:withdrawn":{"id":"delay:water_dispute:withdrawn","label":"Delay cause: water dispute / withdrawn","tracker":"delay"},"delay:interconnection_queue:halted":{"id":"delay:interconnection_queue:halted","label":"Delay cause: interconnection queue / halted","tracker":"delay"},"delay:interconnection:cancelled":{"id":"delay:interconnection:cancelled","label":"Delay cause: interconnection / cancelled","tracker":"delay"},"delay:financing:cancelled":{"id":"delay:financing:cancelled","label":"Delay cause: financing / cancelled","tracker":"delay"},"delay:interconnection:denied":{"id":"delay:interconnection:denied","label":"Delay cause: interconnection / denied","tracker":"delay"},"delay:water:cancelled":{"id":"delay:water:cancelled","label":"Delay cause: water / cancelled","tracker":"delay"},"delay:water:denied":{"id":"delay:water:denied","label":"Delay cause: water / denied","tracker":"delay"},"delay:zoning_denial:halted":{"id":"delay:zoning_denial:halted","label":"Delay cause: zoning denial / halted","tracker":"delay"},"delay:permit_denial:halted":{"id":"delay:permit_denial:halted","label":"Delay cause: permit denial / halted","tracker":"delay"},"delay:council_vote_delay:final_vote_delayed":{"id":"delay:council_vote_delay:final_vote_delayed","label":"Delay cause: council vote delay / final_vote_delayed","tracker":"delay"},"delay:community_opposition:final_vote_delayed":{"id":"delay:community_opposition:final_vote_delayed","label":"Delay cause: community opposition / final_vote_delayed","tracker":"delay"},"utility:tariff:pending":{"id":"utility:tariff:pending","label":"Utility action: tariff / pending","tracker":"delay"},"utility:statement:pending":{"id":"utility:statement:pending","label":"Utility action: statement / pending","tracker":"delay"},"utility:tariff:contested":{"id":"utility:tariff:contested","label":"Utility action: tariff / contested","tracker":"delay"},"utility:other:pending":{"id":"utility:other:pending","label":"Utility action: other / pending","tracker":"delay"},"utility:tariff:approved":{"id":"utility:tariff:approved","label":"Utility action: tariff / approved","tracker":"delay"},"utility:rate case:approved":{"id":"utility:rate case:approved","label":"Utility action: rate case / approved","tracker":"delay"},"utility:special contract:approved":{"id":"utility:special contract:approved","label":"Utility action: special contract / approved","tracker":"delay"},"utility:rate case:pending":{"id":"utility:rate case:pending","label":"Utility action: rate case / pending","tracker":"delay"},"utility:special contract:denied":{"id":"utility:special contract:denied","label":"Utility action: special contract / denied","tracker":"delay"},"utility:statement:contested":{"id":"utility:statement:contested","label":"Utility action: statement / contested","tracker":"delay"},"utility:IRP:contested":{"id":"utility:IRP:contested","label":"Utility action: IRP / contested","tracker":"delay"},"utility:complaint:contested":{"id":"utility:complaint:contested","label":"Utility action: complaint / contested","tracker":"delay"},"utility:statement:approved":{"id":"utility:statement:approved","label":"Utility action: statement / approved","tracker":"delay"},"utility:IRP:pending":{"id":"utility:IRP:pending","label":"Utility action: IRP / pending","tracker":"delay"},"utility:special contract:pending":{"id":"utility:special contract:pending","label":"Utility action: special contract / pending","tracker":"delay"},"utility:other:approved":{"id":"utility:other:approved","label":"Utility action: other / approved","tracker":"delay"},"utility:other:contested":{"id":"utility:other:contested","label":"Utility action: other / contested","tracker":"delay"},"utility:IRP:approved":{"id":"utility:IRP:approved","label":"Utility action: IRP / approved","tracker":"delay"},"utility:tariff:denied":{"id":"utility:tariff:denied","label":"Utility action: tariff / denied","tracker":"delay"},"utility:certificate:approved":{"id":"utility:certificate:approved","label":"Utility action: certificate / approved","tracker":"delay"},"utility:policy:approved":{"id":"utility:policy:approved","label":"Utility action: policy / approved","tracker":"delay"},"utility:policy:effective":{"id":"utility:policy:effective","label":"Utility action: policy / effective","tracker":"delay"},"utility:tariff:effective":{"id":"utility:tariff:effective","label":"Utility action: tariff / effective","tracker":"delay"},"utility:policy:rejected":{"id":"utility:policy:rejected","label":"Utility action: policy / rejected","tracker":"delay"},"utility:policy:pending":{"id":"utility:policy:pending","label":"Utility action: policy / pending","tracker":"delay"},"utility:rate_case:pending":{"id":"utility:rate_case:pending","label":"Utility action: rate_case / pending","tracker":"delay"},"utility:other:denied":{"id":"utility:other:denied","label":"Utility action: other / denied","tracker":"delay"},"utility:other:effective":{"id":"utility:other:effective","label":"Utility action: other / effective","tracker":"delay"}},"warnings":[],"credits":["6abc Philadelphia","AEP Ohio Transmission Company (filed with Ohio Power Siting Board)","AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)","Alabama Reflector","Alaska Beacon","American Transmission Company LLC (filed with PSC of Wisconsin)","Americus Times-Recorder","Arizona Mirror","Arkansas Advocate","Axios Pro Energy","Bisnow","Bisnow National","Bradenton Herald","CNBC Technology","Cardinal News VA","Central Florida Public Media","Chesterfield County public permit records","Chicago Construction News","City of Atlanta public permit records","City of Austin issued construction permits open data","City of Buckeye public permit records","City of Chandler public permit records","City of Charlotte public permit records","City of Chicago building permits open data","City of Fort Worth public permit records","City of Goodyear public permit records","City of Hillsboro public permit records","City of Mesa building permits open data","City of Mesa public permit records","City of Minneapolis construction permits (CCS) open data","City of Papillion public permit records","City of Phoenix public permit records","City of Red Oak public permit records","City of Reno public permit records","City of San Antonio public permit records","City of Statesboro, Georgia","City of Temple, Texas","Clearfield City Council (Utah Public Notice Website)","Colorado Newsline","Colorado Public Radio","Congress.gov (Library of Congress, public domain)","ConstructConnect News","Construction Dive","CourtListener DataCenter Dockets","CourtListener Opinions","Data Center Dynamics","Data Center Dynamics news","DataCenterTracker.org, CC BY 4.0","Dominion Energy Virginia","EIN News","East Bay Insiders Newsletter","Energy Central","FOX19 | Cincinnati","FOX5 Vegas","FOX6 News Milwaukee","Facilities Dive","Fairfax County public permit records","Florida Phoenix","Georgia Department of Community Affairs","Georgia EPD air permit records","Georgia Recorder","GovTech","Greensboro News and Record","Grist","Idaho Capital Sun","Illinois EPA air permit records","Indiana Capital Chronicle","Indiana Department of Environmental Management","Indiana IDEM air permit records","InkFreeNews.com","Iowa Capital Dispatch","Iowa DNR air permit records","KERA News","KEYC News Now","KGW","KRON4","Kansas City MO city issued permits open data","Kansas Reflector","Kentucky Lantern","Law360","Law360 Energy","LegiScan (legiscan.com) and the state legislature","Lehigh Valley Planning Commission","Local News Matters","Loudoun County public permit records","Loudoun Times-Mirror","Louisiana DEQ air permit records","Louisiana Illuminator","Maine Morning Star","Maricopa County Air Quality Department air permit records","Maricopa County public permit records","Maryland Matters","Mecklenburg County public permit records","Michigan Advance","Mid Bay News","Missouri Independent","Montana Free Press","NBC Bay Area","NBC4 Washington","NC Newsline","Native News Online","Nebraska Examiner","Nevada Current","Nevada NDEP air permit records","New Hampshire Bulletin","New Mexico Environment Department","North Carolina DEQ Division of Air Quality air permit records","North Dakota Department of Environmental Quality","North Dakota Monitor","Ohio Capital Journal","Ohio EPA air permit records","Oklahoma DEQ air permit records","Oklahoma Voice","OpenStates v3 (openstates.org), CC BY 4.0","Oregon Capital Chronicle","Orlando Sentinel","Pennsylvania Capital-Star","Pennsylvania Department of Environmental Protection","Pennsylvania Office of Consumer Advocate (filed with PA PUC)","Pioneer Press","Prince William County public permit records","Public Service Commission of Wisconsin","Public record (Legistar Web API, Granicus)","Rhode Island Current","Route Fifty","SEC EDGAR company submissions, public domain","SEC EDGAR full-text search, public domain","Searchlight New Mexico","Smithfield Township, Monroe County, PA","Source New Mexico","South Carolina Department of Environmental Services","South Dakota Searchlight","Springfield Daily Citizen","Stafford County public permit records","Statesman Journal","Strisker data center notes","Tennessee Lookout","Texas Commission on Environmental Quality","Texas TCEQ air permit records","The Baltimore Banner","The Current (GA)","The Detroit News","The Hill Energy","The North State Journal","The Pantagraph","The Real Deal","The Register","The Texas Tribune","The Verge","Times-Standard","Town of Culpeper public permit records","Tuscaloosa Thread","U.S. EPA ECHO","Union-Bulletin","Uprise RI","Utah Division of Air Quality","Utah Division of Air Quality air permit records","Utah News Dispatch","Utah Public Radio","Utility Dive","Virginia Business","Virginia DEQ air permit records","Virginia Electric and Power Company (filed with Virginia SCC)","Virginia Mercury","Visalia Times-Delta","WBUR","WCPO 9 Cincinnati","WGLT","WHEC.com","WJON","WKYT","WLOS","WLUK","WPBF","WQCS","WRAL (NC)","WUNC News","WVPE","Washington County public permit records","Washington Ecology air permit records","Washington State SEPA Register public permit records","Washington State Standard","Washoe County public permit records","Wausau Pilot & Review","West Virginia Watch","Winston-Salem Journal","Wisconsin Department of Natural Resources","Wisconsin Examiner","Yale Daily News","citybiz","contracosta.news","ictnews.org","indianapublicradio.org","inkfreenews.com","lex18.com","mountaintimesoregon.com","newmedia-wi.com","newscentermaine.com","thegazette.com","tuscaloosathread.com","wcpo.com","www.cities929.com"],"omitted":{"unverified_or_pending":1013,"no_explicit_state":136},"revision":"8bbc0d7f56a15216","trackers":{"policy":{"label":"Policy provisions","url":"#policy-governance"},"moratorium":{"label":"Restrictions & moratoriums","url":"/data-center-moratorium-tracker"},"delay":{"label":"Delays & utility actions","url":"/data-center-delay-tracker"},"water":{"label":"Water measures","url":"/data-center-water-tracker"},"atlas":{"label":"Projects & capital","url":"/data-center-capital-atlas"},"permits":{"label":"Permits & facilities","url":"/data-center-permits-tracker"},"grid":{"label":"Grid operator rules","url":"/data-center-grid-operator-watchlist"}},"selected":{"id":"SC","name":"South Carolina","records":[{"id":"de34b95a84b277eb","state":"SC","tracker":"atlas","section":"at_risk","title":"ACE Basin proposal","summary":"Six-month moratorium proposed; zoning reconsidered. The Charleston City Paper identifies the proposal as a $6 billion, 850-acre project by Eagle Rock Partners and Thomas and Hutton on the headwaters of the Ashepoo River, which the Southern Environmental Law Center has challenged in court. After the county moratorium delayed it, Eagle Rock shifted to a new 1,200-acre site in the western part of the county, and on 14 September 2026 the Colleton County Council lifted its moratorium in the portion of the county west of I-95 (see the Rhodes Technology Park site record). Residents Miles Crosby and Jennifer Singleton, represented by the Southern Environmental Law Center, sued Colleton County in state court over the zoning ordinance that allows data centers in rural areas by special exception, in a complaint reported 9 January 2026. The complaint says Eagle Rock Partners applied under the new rule for an 859-acre, 1,000-megawatt data center complex in the ACE Basin, and asks the court to overturn the ordinance and block approvals under it.","scope":"Record-specific: Colleton County, SC","status":"moratorium","date":"Moratorium 5 May 2026; landowner lawsuit reported 9 January 2026; moratorium lifted west of I-95 on 14 September 2026","sources":[{"url":"https://www.interconnectedcapital.com/research/data-center-moratoriums","label":"Interconnected Capital"},{"url":"https://charlestoncitypaper.com/2026/10/02/ai-data-center-fights-spread-from-counties-to-campaign-trail/","label":"Charleston City Paper"},{"url":"https://www.live5news.com/2026/01/09/landowners-sue-colleton-county-over-data-center-ordinance/","label":"WCSC Live 5 News"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"f98fed3b139e3bca","state":"SC","tracker":"atlas","section":"sites","title":"AIB Data Centers CLT-01 Campus","summary":"AIB, through its subsidiary One Blockchain, is repurposing its existing 40 MW bitcoin hosting facility in Spartanburg County into an AI and HPC campus of about 65 MW, and signed Nebius for 50 MW of critical IT capacity in two data halls. AIB's Q3 2026 investor presentation (furnished 30 September 2026) sizes the CLT-01 build at about $800 million and schedules electric service to begin 1 October 2026. Existing grid-interconnected site; 15-year electric service agreement for 65 MW, which AIB says needs no significant additional electrical upgrades About $800 million build per AIB's illustrative financing example (construction debt $560 million, preferred equity $140 million, equity $100 million funded with prepayments); project-level debt and preferred equity not yet arranged About 65 MW of contracted utility capacity (65,000 kVA contract demand under a 15-year electric service agreement); 50 MW of critical IT contracted to Nebius","scope":"Record-specific: Not disclosed","status":"proposed","date":"Nebius agreement announced 30 September 2026; campus described in the Form 10-Q filed 13 August 2026","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/2070542/000121390026089151/ea0301093-10q_aibdata.htm","label":"AIB Data Centers Form 10-Q (SEC)"},{"url":"https://finance.yahoo.com/technology/ai/articles/aib-data-centers-signs-contract-121700973.html","label":"AIB release (GlobeNewswire via Yahoo Finance)"},{"url":"https://www.sec.gov/Archives/edgar/data/2070542/000121390026105249/ea030723301ex99-1.htm","label":"AIB Data Centers Form 8-K Exhibit 99.1 (SEC)"}],"parties":[{"role":"Entity","name":"AIB Data Centers Inc. (AIB CLT1 LLC)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"710bf8cc8a657777","state":"SC","tracker":"atlas","section":"at_risk","title":"Anderson County six-month data center moratorium","summary":"County Council passed the third and final reading of a six-month data center moratorium on Aug. 20, 2026.","scope":"Record-specific: Anderson County","status":"moratorium","date":"Adopted August 2026","sources":[{"url":"https://www.foxcarolina.com/2026/08/20/anderson-county-council-approves-final-reading-six-month-data-center-moratorium/","label":"Source"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"055ff1c19bbf0b0a","state":"SC","tracker":"atlas","section":"at_risk","title":"Chester County six-month data center moratorium","summary":"Chester County Council unanimously approved a six-month, countywide pause on accepting, processing and approving data center applications, directing staff to prepare development standards and invoking the pending ordinance doctrine. Workshops with experts were scheduled for 13 August and 28 September 2026.","scope":"Record-specific: Chester County Council","status":"moratorium","date":"Approved Monday 20 July 2026; six months","sources":[{"url":"https://www.wbtv.com/2026/07/21/chester-county-council-approves-6-month-data-center-moratorium/","label":"WBTV"},{"url":"https://www.wsoctv.com/news/local/chester-county-approves-6-month-data-center-moratorium/AAKGJV6MMZCAZELAWDMJLWIZR4/","label":"WSOC TV"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"083a3c1c72136110","state":"SC","tracker":"atlas","section":"at_risk","title":"Chesterfield County data center moratorium","summary":"Chesterfield County, South Carolina, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated June 2026. Ordinance 25-26-23 imposing moratorium on data centers, data processing, and crypto mining in unincorporated areas until 1 January 2028. The measure runs to 1 January 2028.","scope":"Record-specific: Chesterfield County","status":"moratorium","date":"Enacted June 2026","sources":[{"url":"https://scdailygazette.com/2026/06/26/sc-counties-enacting-data-center-moratoriums/","label":"scdailygazette.com"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8ee077a0892ea949","state":"SC","tracker":"atlas","section":"at_risk","title":"Clarendon County data center moratorium (Project 59)","summary":"Clarendon County Council passed the third and final reading of a moratorium pausing future data center development unanimously, with no one opposed, at its meeting on 14 September 2026. Council said the measure closes existing loopholes before a new project can proceed and that research on data centers will continue during the pause. Council members said an outright ban would be discriminatory and is not planned. Public concern centered on Project 59 and a Santee Electric Co-op proposal, along with tourism, environmental and water-use impacts. The duration was not stated in the reporting.","scope":"Record-specific: Clarendon County","status":"moratorium","date":"Third and final reading passed unanimously on 14 September 2026; duration not published","sources":[{"url":"https://www.wistv.com/2026/09/15/clarendon-county-council-advances-third-final-reading-data-center-moratorium/","label":"WIS News 10"},{"url":"https://www.wistv.com/video/2026/09/14/final-vote-data-center-moratorium-tonight/","label":"WIS News 10 (vote-night video)"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2478a324f9d69d30","state":"SC","tracker":"atlas","section":"at_risk","title":"Fairfield County 12-month data center moratorium","summary":"Fairfield County Council approved a 12-month moratorium on data centers at its 10 August 2026 meeting, becoming the second Midlands county to halt new construction, and plans to research data centers through town halls, expert work sessions and site visits. The State later described the August vote as initial approval, so final adoption status should be confirmed. Fairfield County Council gave the moratorium final approval as Ordinance 856 on 14 September 2026; during the 12 months the county will not negotiate with data center developers.","scope":"Record-specific: Fairfield County Council","status":"moratorium","date":"Initial approval 10 August 2026; Ordinance 856 approved 14 September 2026; 12 months","sources":[{"url":"https://www.yahoo.com/news/us/articles/data-center-moratorium-12-months-093000872.html","label":"The State via Yahoo News"},{"url":"https://www.wltx.com/article/news/community/fairfield-county-places-12-month-moratorium-on-data-centers/101-60d1aef5-e827-4c8a-867d-e79ecc9019b8","label":"WLTX"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"66f480358b15ec8c","state":"SC","tracker":"atlas","section":"at_risk","title":"Greenwood County data center moratorium","summary":"Greenwood County Council approved a one-year moratorium on new data center approvals 4-3 on third and final reading on 21 July 2026. At second reading on July 7 the council also rejected a separate ordinance that would have permitted data centers in designated areas. Council members said three companies had approached the county, though no deals were under negotiation.","scope":"Record-specific: Greenwood County","status":"moratorium","date":"Final reading 21 July 2026, one year","sources":[{"url":"https://www.foxcarolina.com/2026/07/21/greenwood-co-council-approves-final-reading-one-year-moratorium-data-centers/","label":"FOX Carolina"},{"url":"https://www.foxcarolina.com/2026/07/08/greenwood-county-council-advances-one-year-moratorium-data-centers-4-3-vote/","label":"FOX Carolina"}],"parties":[{"role":"Developer","name":"n.a. (county-wide action)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"44ef0d1ee4636d89","state":"SC","tracker":"atlas","section":"at_risk","title":"Jasper County one-year data center moratorium","summary":"Jasper County Council approved first reading of a one-year moratorium on 8 September 2026, covering applications for rezoning, site plans, building permits and economic incentives for data centers, data processing facilities and cryptocurrency mining in unincorporated areas. After a public hearing on Monday 21 September 2026, the council voted unanimously to approve the moratorium; Bluffton Today reported that meeting as the second reading, with a third reading to be scheduled at a future meeting. Staff said current zoning allows data centers by right in several commercial and industrial districts, and the Planning Commission recommended approval on 11 August 2026 invoking the pending ordinance doctrine.","scope":"Record-specific: Jasper County Council","status":"other","date":"First reading 8 September 2026; approved unanimously after public hearing 21 September 2026 (second reading); third reading pending","sources":[{"url":"https://www.wtoc.com/2026/09/22/jasper-county-council-approves-1-year-moratorium-data-centers/","label":"WTOC"},{"url":"https://www.yahoo.com/news/articles/first-reading-approved-data-center-090214071.html","label":"Bluffton Today via Yahoo News"}],"parties":[{"role":"Developer","name":"n.a."}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3e0168da05fb3f4d","state":"SC","tracker":"atlas","section":"at_risk","title":"Laurens County one-year data center moratorium","summary":"Laurens County Council voted 6-0 on third and final reading to approve a one-year moratorium on new data center development in unincorporated areas, after unanimous votes on the first two readings. Vice Chairman Matthew Brownlee sponsored the measure to allow time to evaluate public health effects and draft siting rules.","scope":"Record-specific: Laurens County Council","status":"moratorium","date":"Final reading approved 14 September 2026; one year","sources":[{"url":"https://www.wyff4.com/article/laurens-county-blocks-data-center-development/73732782","label":"WYFF 4"},{"url":"https://www.golaurens.com/news/what-does-the-new-data-center-moratorium-mean-for-laurens-county/article_85d68547-710c-425c-b67e-7c2884da874f.html","label":"The Laurens County Advertiser (GoLaurens)"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b138bcf973bc3f90","state":"SC","tracker":"atlas","section":"at_risk","title":"Lightstone Group data center, 300 Jones Road","summary":"The Spartanburg County Board of Zoning Appeals voted unanimously to uphold county planning staff's denial of the Lightstone Group's proposed data center at 300 Jones Road. Lightstone applied on 28 April 2026, and staff denied the plan in late June 2026 for noncompliance with the county's unified land management ordinance, then required a new application after Lightstone submitted revisions. Staff said new applications after 22 June 2026 would not be approved because a county moratorium was pending, while Lightstone argued the county had earlier confirmed a data center was allowed on the site. WSPA reported the county denied the application on 26 June 2026 and the Board of Zoning Appeals rejected the appeal unanimously on Tuesday 25 August 2026; WSPA identified the applicant representative as Lighthouse Data Centers, while The Post and Courier names the Lightstone Group.","scope":"Record-specific: Spartanburg County Board of Zoning Appeals","status":"denied","date":"Staff denial 26 June 2026; appeal denied unanimously 25 August 2026","sources":[{"url":"https://www.postandcourier.com/spartanburg/news/spartanburg-zoning-appeal-lighstone-data-center-jones-road/article_80014d48-4d5f-4aa9-83c3-92f3a6aea648.html","label":"The Post and Courier"},{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/","label":"WSPA"}],"parties":[{"role":"Developer","name":"The Lightstone Group"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b651e3f3c557d333","state":"SC","tracker":"atlas","section":"at_risk","title":"Newberry County data center moratorium","summary":"Newberry County, South Carolina, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated July 2026. 12-month moratorium on accepting new data-center permits, confirmed unanimously after the council unanimously denied the 'Project Altair' land-sale ordinance in June. Staff directed to research appropriate locations for future data-center development. The measure runs to 16 July 2027.","scope":"Record-specific: Newberry County","status":"moratorium","date":"Enacted July 2026","sources":[{"url":"https://www.foxcarolina.com/2026/07/16/newberry-county-council-unanimously-confirms-year-long-moratorium-data-centers/","label":"foxcarolina.com"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ca66aec3afe17290","state":"SC","tracker":"atlas","section":"at_risk","title":"NorthMark / Valara computing center","summary":"$2.8B conversion of a former Kohler kitchen/bath plant (also a longtime bitcoin-mining site) into a computing center. State regulators initially approved ~50MW; company sought to expand to 450MW (five 17MW plus six 54MW natural gas turbines, atop 24 existing 2MW generators). On 27 August 2026 the South Carolina Public Service Commission ruled unanimously, with Commissioner David Britt recused, that the Utility Facility Siting and Environmental Protection Act does not apply to NorthMark's 457 MW on-site power station on Pine Street in Spartanburg because it generates power for internal use rather than export to the grid, and that only the Office of Regulatory Staff can enforce the Act. The Southern Environmental Law Center opposed the ruling and may seek reconsideration or appeal. Concerned Citizens of Spartanburg County filed a further suit in the Seventh Judicial Circuit Court asking the court to require the county to apply its land development ordinance and to make Valara obtain a major land development permit before the full planning commission; a hearing was held Thursday 17 September 2026. The South Carolina Department of Environmental Services granted NorthMark and Valara an air permit on 18 September 2026 to build 11 natural gas turbines at the Pine Street data center in Spartanburg, adding 408 MW to the 48 MW already permitted, for 457 MW in total. The permit sets rolling 12-month limits of 250 tons for volatile organic compounds, 250 tons for nitrogen oxides and 25 tons for hazardous air pollutants, with no single hazardous pollutant above 10 tons, and requires quarterly reporting in the first year of operation. The Southern Environmental Law Center criticized the permit. The separate lawsuit over the county land development permit remains pending. SELC, for Concerned Citizens of Spartanburg County and the Southern Alliance for Clean Energy, has asked the Public Service Commission to reconsider its August decision not to review the power plant under the Siting Act; SELC says the commission has 30 days to decide (Herald-Journal, 24 September 2026).","scope":"Record-specific: Spartanburg County","status":"litigation","date":"PSC ruling 27 August 2026; circuit court hearing 17 September 2026; SC DES air permit 18 September 2026; SELC reconsideration request reported 24 September 2026","sources":[{"url":"https://scdailygazette.com/2026/06/26/sc-counties-enacting-data-center-moratoriums/","label":"Scdailygazette"},{"url":"https://www.yahoo.com/news/us/articles/public-commission-sides-spartanburg-data-194500894.html","label":"Spartanburg Herald-Journal via Yahoo News"},{"url":"https://www.foxcarolina.com/2026/08/27/sc-public-service-commission-dismisses-challenge-spartanburg-county-data-center-project/","label":"FOX Carolina"},{"url":"https://www.yahoo.com/news/us/articles/hearing-scheduled-lawsuit-against-data-123210144.html","label":"WSPA via Yahoo News"},{"url":"https://www.postandcourier.com/spartanburg/news/spartanburg-valara-data-center-permitted-457-megawatt/article_0e421eae-f5a3-4967-811e-3b1565520935.html","label":"The Post and Courier (21 September 2026)"},{"url":"https://www.msn.com/en-us/general/general/spartanburg-data-center-gets-ok-to-generate-457-megawatts-from-sc-regulators/ar-AA2cHl9t","label":"The Post and Courier via MSN"},{"url":"https://www.yahoo.com/news/us/articles/selc-asks-public-agency-review-220414565.html","label":"Herald-Journal (GoUpstate) via Yahoo News"}],"parties":[{"role":"Developer","name":"NorthMark Strategies (Valara Holdings)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"81ac7742e1f34970","state":"SC","tracker":"atlas","section":"at_risk","title":"Orangeburg County one-year data center moratorium","summary":"Orangeburg County Council voted unanimously to impose a moratorium barring development or construction of data centers in the county for at least a year. Councilwoman Latisha Walker, who sponsored the measure, said it gives the county time to establish protections for residents' homes, health and quality of life.","scope":"Record-specific: Orangeburg County Council","status":"moratorium","date":"Approved unanimously 8 September 2026; at least one year","sources":[{"url":"https://thetandd.com/news/local/government-politics/article_74d808ca-a037-45dd-9b9b-eb20cf94b17c.html","label":"The Times and Democrat"},{"url":"https://www.yahoo.com/news/videos/orangeburg-county-just-hit-pause-000040099.html","label":"WLTX via Yahoo"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8a48df6ca686dc55","state":"SC","tracker":"atlas","section":"sites","title":"Pollard Land Company McCormick County data center","summary":"McCormick County Council voted to rezone land for Pollard Land Company's proposed data center and rejected a proposed pause on data center development at a contentious meeting. The developer had held a public meeting in August 2026 on the roughly 1,000-acre request. The council chairman said the county retains control over environmental issues and could stop the project if misled Natural gas line extension of $250 million to $280 million proposed Not disclosed; WRDW reported plans for a $250 million to $280 million gas line tied to the project Not disclosed; about 1,000 acres requested for rezoning","scope":"Record-specific:","status":"approved","date":"Rezoning approved at the council meeting reported 10 September 2026","sources":[{"url":"https://www.wrdw.com/2026/09/16/mccormick-county-chairman-discusses-approved-data-center-site/","label":"WRDW"},{"url":"https://www.yahoo.com/news/us/articles/tensions-rise-over-proposed-mccormick-221618621.html","label":"WRDW via Yahoo News"}],"parties":[{"role":"Entity","name":"Pollard Land Company"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"6bf8d8d3ab21382f","state":"SC","tracker":"atlas","section":"at_risk","title":"Pollard data center rezoning (Whitetown Road)","summary":"The McCormick County Planning Commission recommended denial of the Pollard Land Company rezoning and a nine-month data center pause on 30 July 2026 after a packed hearing. On 10 September 2026 the county council voted 3-2 to reject the nine-month pause on first reading, 5-0 to approve first reading of data center regulations, and 3-2 to approve the rezoning of roughly 1,000 acres. Deputies intervened when audience members approached the dais after the vote.","scope":"Record-specific: McCormick County Council","status":"approved_after_delay","date":"Planning Commission denial recommendation 30 July 2026; council approved rezoning 3-2 on 10 September 2026","sources":[{"url":"https://www.wrdw.com/2026/07/31/no-rezoning-no-data-center-mccormick-county-planners-side-with-residents-opposing-development/","label":"WRDW (30 July 2026)"},{"url":"https://www.wrdw.com/2026/09/11/mccormick-county-council-approves-data-center-rezoning-while-tempers-flare/","label":"WRDW (10 September 2026)"}],"parties":[{"role":"Developer","name":"Pollard Land Company"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8b269606be6cb908","state":"SC","tracker":"atlas","section":"at_risk","title":"Project Liberty","summary":"Marion County Council approved Project Liberty in January 2026 after council members signed non-disclosure agreements, drawing criticism over secrecy. Stream Data Centers announced in June 2026 it would not proceed, citing utility timing constraints. The cooperative MPD Electric said power could not be secured in a timely, cost-effective way.","scope":"Record-specific: Marion County","status":"cancelled","date":"Approved January 2026; cancelled June 2026","sources":[{"url":"https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/","label":"WMBF"},{"url":"https://www.aol.com/articles/texas-company-won-t-build-110000000.html","label":"The State via AOL"}],"parties":[{"role":"Developer","name":"Stream Data Centers"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"21f8c17d1b39f6ad","state":"SC","tracker":"atlas","section":"sites","title":"Rhodes Technology Park","summary":"At a Colleton County Economic Alliance information session reported 23 September 2026, Ken Loeber of Eagle Rock Partners described Rhodes Technology Park, a $6 billion, 1,000 MW single-user hyperscale campus of 10 data centers and two substations on more than 1,200 acres west of I-95 off Mount Carmel Road, inside the Digital Infrastructure Overlay District the county council adopted unanimously on 14 September 2026 (65-decibel noise cap, 200-foot buffers, closed-loop cooling). The developers project 500 permanent jobs and more than 1,000 construction jobs over five to seven years, with construction expected around 2028 or 2029. The county alliance projected tax revenue passing $100 million a year by year four. It may be the same project as the gigawatt ACE Basin proposal in at-risk row 83, but the fetched coverage does not say so. The Charleston City Paper reports that this 1,200-acre site is a new location Eagle Rock turned to after its earlier $6 billion, 850-acre proposal near the ACE Basin (at-risk row 83) was delayed by the county moratorium, and that the council lifted the moratorium west of I-95 on 14 September 2026; the campus would have 10 buildings. Santee Cooper energy and transmission study under way; developer says it pays all off-site transmission infrastructure and is not tied to the Canadys gas plant project $6 billion, as described by the developer and county economic alliance at a public information session 1,000 MW; 10 data centers and two substations on more than 1,200 acres; single-user hyperscale campus, user not named","scope":"Record-specific: Colleton County (off Mount Carmel Road, west of I-95)","status":"proposed","date":"Overlay district adopted 14 September 2026; information session reported 23 September 2026; single-outlet report (Live 5 News)","sources":[{"url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/","label":"Live 5 News (WCSC), 23 September 2026"},{"url":"https://www.live5news.com/2026/09/15/colleton-county-approves-controversial-data-center-rules-despite-pushback/","label":"Live 5 News (WCSC), 15 September 2026"},{"url":"https://charlestoncitypaper.com/2026/10/02/ai-data-center-fights-spread-from-counties-to-campaign-trail/","label":"Charleston City Paper"}],"parties":[{"role":"Entity","name":"Eagle Rock Partners"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"49477cfc05bef0aa","state":"SC","tracker":"atlas","section":"sites","title":"Savannah River Site AI data center and energy generation project","summary":"DOE's National Nuclear Security Administration selected Amentum to negotiate a phased lease for a 1 GW AI data center at the Savannah River Site, one of four DOE sites chosen for private AI and energy projects. DC BLOX is the digital infrastructure partner in the consortium, and NNSA said the end user has not been determined. About 2 GW of dedicated on-site generation, initially natural gas bridging to advanced nuclear No capital figure disclosed; NNSA says the selected developer pays for the project 1 GW data center with about 2 GW of on-site generation","scope":"Record-specific:","status":"Developer selected to negotiate a phased lease; no final lease","date":"Selection announced 20 July 2026","sources":[{"url":"https://www.morningstar.com/news/business-wire/20260720865380/amentum-selected-for-the-department-of-energy-ai-data-center-and-energy-generation-project","label":"Amentum (Business Wire via Morningstar)"},{"url":"https://www.world-nuclear-news.org/articles/amentum-selected-for-savannah-river-ai-project","label":"World Nuclear News"},{"url":"https://www.yahoo.com/news/us/articles/savannah-river-host-1-gigawatt-090000948.html","label":"Yahoo News (The State summary)"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"7799709f5c8a8b78","state":"SC","tracker":"atlas","section":"sites","title":"South Carolina: Berkeley County campus and two Dorchester County sites","summary":"Google announced a new $9 billion investment in South Carolina through 2027, which will expand its Berkeley County data center campus and support the continued construction of two new sites in Dorchester County. DCD's roundup corroborates the $9bn figure.  a new $9 billion investment through 2027","scope":"Record-specific:","status":"expansion","date":"Through 2027","sources":[{"url":"https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/","label":"Google"},{"url":"https://www.datacenterdynamics.com/en/news/google-commits-40bn-to-expand-cloud-and-ai-infrastructure-in-texas-through-2027/","label":"DCD"}],"parties":[{"role":"Entity","name":"alphabet"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"afdc47c04817053a","state":"SC","tracker":"atlas","section":"at_risk","title":"Spartanburg County one-year data center moratorium","summary":"Spartanburg County Council voted 5-1 on Monday 21 September 2026 on third and final reading to adopt a one-year moratorium on new data centers, with Councilwoman Jessica Coker voting no. Council adopted four amendments before the vote. Applications for new data centers received after first reading are held in abeyance. Data centers of 65 MW or less may still be built if they are in an established industrial park or on a former industrial site, do not generate their own electricity except for emergency backup, have storing, managing and processing data as their primary function, and are not on the same parcel as, in the same industrial park as, or within one mile of another data center. The moratorium does not apply to data centers that received a development permit within the 12 months before adoption, so the Valara data center under construction on South Pine Street is not affected. Ancillary business server rooms and cryptocurrency mining, which is regulated separately, are also exempt. After adjourning on 21 September 2026, council reconvened without public notice and voted to reconsider third reading; the county then posted a slightly more restrictive summary, attributed the difference to a scrivener's error, and said council will formally re-adopt the online version at its October meeting. South Carolina Press Association attorney Jay Bender said the reconvening was an illegal meeting, so the version passed on third reading remains in effect.","scope":"Record-specific: Spartanburg County Council","status":"moratorium","date":"Adopted 5-1 on third reading 21 September 2026; reconsideration vote the same night disputed; re-adoption planned for October 2026","sources":[{"url":"https://www.msn.com/en-us/news/other/spartanburg-county-council-passes-data-center-moratorium/ar-AA2cHKkI","label":"WSPA via MSN"},{"url":"https://www.foxcarolina.com/2026/09/22/spartanburg-county-council-passes-data-center-moratorium-with-several-amendments/","label":"FOX Carolina"},{"url":"https://www.yahoo.com/news/politics/articles/spartanburg-county-council-hastily-met-213000259.html","label":"The Post and Courier via Yahoo News"}],"parties":[{"role":"Developer","name":"n.a."}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"91aec08a396c75e6","state":"SC","tracker":"atlas","section":"sites","title":"Valara data center (former Kohler plant, Pine Street)","summary":"NorthMark Strategies announced a $2.8 billion operation in Spartanburg County on 21 April 2025 at the former Kohler plant on Pine Street. The South Carolina Department of Environmental Services granted an air permit on 18 September 2026 for 11 natural gas turbines adding 408 MW to the 48 MW already permitted, for 457 MW, with 12-month limits of 250 tons each for VOCs and nitrogen oxides and 25 tons for hazardous air pollutants. On 21 September 2026 NorthMark revised its projected water use to an average of 1.2 million gallons a day with peaks up to 1.6 million, more than double the 459,000 gallons previously reported, saying the earlier figure was a Phase I projection. Litigation is tracked in at-risk row 107. On-site natural gas turbines and generators; SC DES air permit granted 18 September 2026 for 11 turbines adding 408 MW to 48 MW already permitted $2.8 billion operation announced 21 April 2025, per WSPA IT load not disclosed; on-site gas generation permitted at 457 MW (48 MW previously permitted plus 408 MW from 11 turbines)","scope":"Record-specific: Spartanburg","status":"under construction","date":"Announced 21 April 2025; SC DES air permit 18 September 2026; water projection revised 21 September 2026","sources":[{"url":"https://www.msn.com/en-us/news/other/spartanburg-data-center-gets-ok-from-sc-regulators-to-generate-457-megawatts/ar-AA2cHl9t","label":"The Post and Courier via MSN, 21 September 2026"},{"url":"https://www.yahoo.com/news/us/articles/spartanburg-data-center-more-doubles-180300962.html","label":"Spartanburg Herald-Journal via Yahoo, 21 September 2026"},{"url":"https://www.wspa.com/news/local-news/investment-firm-announces-2-8-billion-operation-in-spartanburg-county/","label":"WSPA, 21 April 2025"}],"parties":[{"role":"Entity","name":"NorthMark Strategies (Valara)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"dfa32eed4d37752d","state":"SC","tracker":"delay","section":"county_restrictions","title":"Beaufort County","summary":"The Beaufort County Council Natural Resources Committee voted 7-0 on Tuesday, September 8, 2026 to direct staff to prepare a nine-month data center moratorium and an ordinance that would let the council later either heavily regulate data centers or ban them. No data center proposal is before the county. The moratorium and future regulations still require approval by the full County Council.","scope":"county: Beaufort County","status":"proposed","date":"2026-09-08","sources":[{"url":"https://www.islandpacket.com/news/local/community/beaufort-news/article317167591.html","label":"www.islandpacket.com"}],"parties":[{"role":"Authority","name":"Beaufort County Council Natural Resources Committee"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"6c15c429f704d223","state":"SC","tracker":"delay","section":"county_restrictions","title":"Cherokee County","summary":"Cielo Digital Infrastructure's $2.1B data center was approved by Cherokee County Council. The development at Ford Road in Gaffney will include four 400,000 sq ft facilities with an associated electrical substation, totaling up to 300 MW at full build-out. The project is expected to create only 30 jobs. Initial operations are projected to come online by year-end 2028. Tax incentives were offered to","scope":"county: Cherokee County","status":"in_force","date":"2025-06-01","sources":[{"url":"https://www.wspa.com/news/if-they-come-they-need-their-own-power-cherokee-co-sets-limits-on-data-centers/","label":"www.wspa.com"},{"url":"https://www.change.org/p/stop-data-centers-coming-to-upstate-sc","label":"www.change.org"},{"url":"https://www.datacenterdynamics.com/en/news/cielo-digital-infrastructure-plans-300mw-data-center-campus-in-south-carolina/","label":"www.datacenterdynamics.com"},{"url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development","label":"governor.sc.gov"},{"url":"https://www.sccommerce.com/news/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development-project","label":"www.sccommerce.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"399217fc19e0924e","state":"SC","tracker":"delay","section":"county_restrictions","title":"Chester County","summary":"On June 15, 2026 the Chester County (SC) Council approved FIRST READING of a six-month pause on accepting new data center applications, to study power-grid demand, local utility capacity, environmental, economic, and community impacts. It applies to future applications only (none currently pending, though officials reported developer interest). Council Chair Pete Wilson framed it as a chance to 'l Update 2026-07-20: Chester County Council unanimously approved a six-month data center moratorium on Monday, July 20, 2026, at third and final reading. The ordinance pauses acceptance, processing and approval of applications for data centers while the county prepares development standards. The county scheduled expert workshops for August 13 and September 28. Council Chair Pete Wilson said no data centers are currently proposed or approved in the county. Next date: 2027-01-20. (Previously recorded as pending, dated 2026-06-15.)","scope":"county: Chester County","status":"in_force","date":"2026-07-20","sources":[{"url":"https://www.southcarolinapublicradio.org/sc-news/2026-06-18/chester-county-council-considers-temporary-pause-on-data-center-applications","label":"www.southcarolinapublicradio.org"},{"url":"https://www.wfae.org/charlotte-area/2026-06-18/chester-county-approves-temporary-moratorium-for-data-center-projects","label":"www.wfae.org"},{"url":"https://www.wbtv.com/2026/06/19/york-county-discusses-project-palmetto-rock-chester-county-data-center-moratorium-rock-hill-juneteenth-celebration/","label":"www.wbtv.com"},{"url":"https://www.wbtv.com/2026/07/21/chester-county-council-approves-6-month-data-center-moratorium/","label":"www.wbtv.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"90bafd9048a97852","state":"SC","tracker":"delay","section":"county_restrictions","title":"Clarendon County","summary":"Clarendon County Council unanimously passed third and final reading of a moratorium pausing future data center development in the county (WIS report of the evening of September 14, 2026; report date). A mandatory public hearing preceded the vote. Much of the public concern centers on Project 59; council members said the moratorium has no direct bearing on the county industrial park and that the project operator is unconfirmed. The report does not give the moratorium's length.","scope":"county: Clarendon County","status":"in_force","date":"2026-09-14","sources":[{"url":"https://www.wistv.com/2026/09/15/clarendon-county-council-advances-third-final-reading-data-center-moratorium/","label":"www.wistv.com"}],"parties":[{"role":"Authority","name":"Clarendon County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"c9fcfd9b687591e9","state":"SC","tracker":"delay","section":"county_restrictions","title":"Colleton County","summary":"At a special meeting on the night of September 14, 2026, Colleton County Council approved ordinances overhauling how the county approves and zones data centers. The changes create a digital infrastructure overlay district, amend the comprehensive plan and apply the overlay to a property near the unincorporated community of Smoaks, clearing the way for a data center there. The overlay allows data centers and battery energy storage systems, with lot size and buffer rules and a closed-loop cooling requirement. The move replaces permitting rules adopted in late 2025. The vote count was not stated in the text opened.","scope":"county: Colleton County","status":"enacted","date":"2026-09-14","sources":[{"url":"https://www.postandcourier.com/rising-waters/data-center-colleton-county-overlay-district/article_74d76b64-1253-4ca1-a18f-08a4f3629399.html","label":"www.postandcourier.com"},{"url":"https://www.live5news.com/2026/09/15/colleton-county-approves-controversial-data-center-rules-despite-pushback/","label":"www.live5news.com"}],"parties":[{"role":"Authority","name":"Colleton County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2bba0a1054989cc0","state":"SC","tracker":"delay","section":"county_restrictions","title":"Colleton County Council","summary":"Colleton County Council finalized a 6-month data center moratorium; the Southern Environmental Law Center agreed to pause its related lawsuit against the county for the moratorium's duration. Target project: Eagle Rock Partners' proposed 1,000 MW/859-acre facility near Walterboro. Hyperscaler unconfirmed. A July 20, 2026 Live 5 News report corroborates the finalized moratorium and continued commun","scope":"county: Colleton County Council","status":"in_force","date":"2026-07-07","sources":[{"url":"https://www.live5news.com/2026/07/08/6-month-pause-data-center-developments-colleton-county-lawsuit-paused/","label":"www.live5news.com"},{"url":"https://www.postandcourier.com/rising-waters/colleton-county-data-center-moratorium-council/article_69012926-1f61-4283-b0ec-786c5673158f.html","label":"www.postandcourier.com"},{"url":"https://www.live5news.com/2026/07/20/sc-80m-investment-in-data-centers-draw-scrutiny-over-power-jobs/","label":"www.live5news.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"836e8495e0094213","state":"SC","tracker":"delay","section":"utility_actions","title":"Dominion Energy South Carolina","summary":"PSC Order No. 2026-374 approved a large-load stipulation in Dominion Energy South Carolina’s general rate case. Dominion agreed to join and participate in generic Docket 2026-138-E, deferring issues involving new loads of 50 MW or more to that proceeding.","scope":"Record-specific: SC","status":"approved","date":"2026-07-02","sources":[{"url":"https://servercountry.org/power/south-carolina/","label":"servercountry.org"}],"parties":[{"role":"Named utility / authority","name":"Dominion Energy South Carolina"}],"groups":["utility:rate case:approved"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"bec85265b7e87202","state":"SC","tracker":"delay","section":"county_restrictions","title":"Dorchester County (Google FOIA)","summary":"Frank Heindel filed a FOIA lawsuit in April 2024 against Dorchester County, South Carolina, after the county redacted Google's projected water and sewer usage from public records, claiming trade secret protections. Google plans two data center campuses in Dorchester County (Pine Hill Business Campus in Ridgeville and Winding Woods Commerce Park in St. George), part of a $9 billion investment announced in October 2025. The lawsuit forced Dorchester County to release water usage data revealing one campus alone could use 978.2 million gallons annually. Google's existing Berkeley County facility already withdraws 853.8 million gallons per year. The case became a touchstone for data center transparency advocacy statewide.","scope":"county: Dorchester County (Google FOIA)","status":"in_force","date":"2024-04-01","sources":[{"url":"https://www.postandcourier.com/business/dorchester-google-data-center-foia-lawsuit-water-charleston/article_13536bb8-fe45-11ee-8e2c-ab63a46ae251.html","label":"www.postandcourier.com"},{"url":"https://abcnews4.com/news/local/new-google-data-centers-promise-jobs-but-raise-questions-about-water-usage-impact-dorchester-county-berkeley-county-weather-impacts-ai","label":"abcnews4.com"},{"url":"https://www.dorchestercountysc.gov/business/data-center-fact-sheet","label":"www.dorchestercountysc.gov"}],"parties":[{"role":"Authority","name":"Dorchester County (Google FOIA)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"365852e71c3924d4","state":"SC","tracker":"delay","section":"county_restrictions","title":"Fairfield County","summary":"Fairfield County Council voted on Monday, September 14, 2026 to approve Ordinance 856, a 12-month moratorium on data centers. Under the ordinance the county will not negotiate with data center developers during the period. The county has published a timeline with town halls on October 22 in Jenkinsville, January 7 in Ridgeway and January 21 in Winnsboro, a Planning Commission hearing on March 25, 2027, and council votes on revised zoning rules expected to conclude by June. The vote count was not reported. Next date: 2026-10-22.","scope":"county: Fairfield County","status":"in_force","date":"2026-09-14","sources":[{"url":"https://www.wltx.com/article/news/community/fairfield-county-places-12-month-moratorium-on-data-centers/101-60d1aef5-e827-4c8a-867d-e79ecc9019b8","label":"www.wltx.com"},{"url":"https://www.wistv.com/2026/09/29/fairfield-county-maps-out-1-year-data-center-pause-schedules-community-town-halls/","label":"www.wistv.com"}],"parties":[{"role":"Authority","name":"Fairfield County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a888030faba646a8","state":"SC","tracker":"delay","section":"county_restrictions","title":"Greenwood County","summary":"In the June 16-17, 2026 window the Greenwood County (SC) Council took up a proposed one-year data center moratorium, saying it wants preemptive regulations though no projects are currently proposed; residents questioned officials' motives. It sits alongside Spartanburg and York County actions in a June SC local-moratorium wave. Procedural detail/refinement: at the June 16, 2026","scope":"county: Greenwood County","status":"in_force","date":"2026-07-07","sources":[{"url":"https://www.wspa.com/news/local-news/greenwood-co-considers-data-center-regulations-residents-question-motives/","label":"www.wspa.com"},{"url":"https://www.indexjournal.com/news/greenwood-county-council-moves-data-center-moratorium-forward/article_5a49005a-9961-4db1-b78b-6bb5bad87d21.html","label":"www.indexjournal.com"},{"url":"https://www.foxcarolina.com/2026/07/07/greenwood-county-faces-dueling-votes-data-centers-tuesday-night-meeting/","label":"www.foxcarolina.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"4fd68a1a4d95ecf1","state":"SC","tracker":"delay","section":"projects","title":"Greenwood County Data Center Moratorium","summary":"Greenwood County Council advanced a one-year moratorium on data centers in a 4-3 vote.","scope":"Record-specific: Greenwood County","status":"moratorium_in_force","date":"2026-07-08","sources":[{"url":"https://www.foxcarolina.com/2026/07/08/greenwood-county-council-advances-one-year-moratorium-data-centers-4-3-vote/","label":"www.foxcarolina.com"}],"parties":[],"groups":["delay:county_moratorium:moratorium_in_force"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8cdf027bab6e45e4","state":"SC","tracker":"delay","section":"county_restrictions","title":"Jasper County","summary":"Jasper County Council unanimously approved second reading of a temporary moratorium on data centers, data processing facilities and cryptocurrency mining operations at its September 21, 2026 meeting, after a public hearing. The moratorium has a one-year term and can be extended in six-month periods. A third and final reading is expected at the next council meeting. Council Chair Joey Rowell said first reading on September 8 invoked the pending ordinance doctrine, so the moratorium is effectively already being enforced.","scope":"county: Jasper County","status":"pending","date":"2026-09-21","sources":[{"url":"https://www.postandcourier.com/beaufort-county/news/jasper-county-data-center-moratorium/article_baf75c02-420a-40c2-8930-fc64e93ef867.html","label":"www.postandcourier.com"},{"url":"https://www.wtoc.com/2026/09/22/jasper-county-council-approves-1-year-moratorium-data-centers/","label":"www.wtoc.com"},{"url":"https://www.wjcl.com/article/jasper-county-takes-first-step-toward-temporary-moratorium-on-new-data-centers/73647232","label":"www.wjcl.com"}],"parties":[{"role":"Authority","name":"Jasper County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"22cb59914931fb82","state":"SC","tracker":"delay","section":"county_restrictions","title":"Kershaw County","summary":"Kershaw County Council unanimously passed third and final reading of an ordinance establishing a temporary moratorium on data centers, cryptocurrency mining operations and data processing facilities (WIS report dated September 22, 2026; report date). The moratorium gives county officials one year to study the industry and develop regulations. A public hearing held earlier in the same meeting drew one speaker. First and second readings passed on August 25 and September 8.","scope":"county: Kershaw County","status":"in_force","date":"2026-09-22","sources":[{"url":"https://www.wistv.com/2026/09/23/kershaw-county-council-passes-temporary-moratorium-data-centers/","label":"www.wistv.com"}],"parties":[{"role":"Authority","name":"Kershaw County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"1af91a40a7a3404d","state":"SC","tracker":"delay","section":"county_restrictions","title":"Laurens County","summary":"Adopted Monday, September 14, 2026. The ordinance requires the county to evaluate potential regulations by March 14, 2027, covering zoning districts, setbacks, buffering, noise, water and wastewater, electrical infrastructure, emergency services, environmental impacts, traffic and decommissioning. The cities of Laurens and Clinton keep control inside their limits.","scope":"county: Laurens County","status":"in_force","date":"2026-09-14","sources":[{"url":"https://www.foxcarolina.com/2026/09/14/laurens-county-council-votes-approve-one-year-data-center-pause/","label":"www.foxcarolina.com"},{"url":"https://www.wspa.com/news/laurens-county-data-center-moratorium-approved/","label":"www.wspa.com"}],"parties":[{"role":"Authority","name":"County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2a19530b645b4515","state":"SC","tracker":"delay","section":"projects","title":"LightHouse Data Centers campus at 300 Jones Road (former paper mill site)","summary":"County planning staff rejected the development application on June 26, 2026 for five items not in compliance with the Unified Land Management ordinance. On August 25, 2026 the Spartanburg County Board of Zoning Appeals unanimously upheld the rejection. Planned as a 200,000 square foot, 60 MW campus. The county said it would keep denying new data center applications while its proposed one-year moratorium is pending; the moratorium's third reading was deferred on August 17 to September. Update 2026-08-24: Spartanburg County planners upheld an earlier denial of the proposed Lighthouse data center project on Monday of the week of August 24, 2026, according to South Carolina Public Radio (published August 28). In the same week the South Carolina Public Service Commission said it would not regulate the under-construction Valara data center after a legal challenge about the nature of the facility did not hold up. Vote counts were not given in the opened page.","scope":"Record-specific: Spartanburg County","status":"halted","date":"2026-06-26","sources":[{"url":"https://www.postandcourier.com/spartanburg/news/spartanburg-data-center-300-jones-road-appeal-moratorium/article_63dc64e8-55ad-426d-9f17-79a2a0a8b136.html","label":"www.postandcourier.com"},{"url":"https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/","label":"www.wspa.com"},{"url":"https://www.audacy.com/989word/news/local/plug-pulled-on-proposed-data-center-in-spartanburg-county","label":"www.audacy.com"},{"url":"https://www.southcarolinapublicradio.org/sc-news/2026-08-28/a-win-a-loss-and-a-conversation-on-data-centers-in-spartanburg","label":"www.southcarolinapublicradio.org"}],"parties":[{"role":"Operator","name":"LightHouse Data Centers (property acquired by a Lightstone Group affiliate)"}],"groups":["delay:permit_denial:halted","delay:local_moratorium:halted","delay:community_opposition:halted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5bf124973ae086e9","state":"SC","tracker":"delay","section":"county_restrictions","title":"McCormick County","summary":"At its Thursday, September 10, 2026 meeting, McCormick County Council voted 3-2 to strike down Ordinance 26-07, a proposed nine-month moratorium on data center applications. Because it was denied on first reading, the pause ended without further votes. The council then voted 5-0 on first reading of Ordinance 26-06, which adds restrictions on where and how data centers can be developed. Chairman Bernie Hamby later said he voted against the moratorium because the lumber company facilitating the data center deal said it had to be done by September. A packed crowd opposed the outcome and deputies stepped in as the meeting ended.","scope":"county: McCormick County","status":"denied","date":"2026-09-10","sources":[{"url":"https://www.wrdw.com/2026/09/11/mccormick-county-council-approves-data-center-rezoning-while-tempers-flare/","label":"www.wrdw.com"},{"url":"https://www.wjbf.com/news/update-on-mccormick-countys-council-meeting-on-data-centers/","label":"www.wjbf.com"}],"parties":[{"role":"Authority","name":"McCormick County Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2cc0326f98481981","state":"SC","tracker":"delay","section":"county_restrictions","title":"Newberry County","summary":"On June 4, 2026, the Newberry County Council voted unanimously to deny an ordinance that would have let a developer purchase county land for a potential data center, and enacted a one-year ban on new data center projects. The crowd cheered the decision. Newberry County Council unanimously confirmed the 12-month moratorium on new data-center permits in a follow-up vote.","scope":"county: Newberry County","status":"in_force","date":"2026-06-04","sources":[{"url":"https://www.wrdw.com/2026/06/05/newberry-county-passes-1-year-data-center-moratorium/","label":"www.wrdw.com"},{"url":"https://www.foxcarolina.com/2026/07/16/newberry-county-council-unanimously-confirms-year-long-moratorium-data-centers/","label":"www.foxcarolina.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ebbc3548ee675c57","state":"SC","tracker":"delay","section":"projects","title":"NorthMark Strategies / Valara Holdings Computing Center (former Kohler plant)","summary":"$2.8B conversion of a former Kohler kitchen/bath plant (also a longtime bitcoin-mining site) into a computing center. State regulators initially approved ~50MW; company sought to expand to 450MW (five 17MW plus six 54MW natural gas turbines, atop 24 existing 2MW generators). Southern Environmental Law Center petitioned for independent review and asked the PSC to halt construction pending a ruling, citing air pollution and noise.","scope":"Record-specific: Spartanburg County","status":"permitting_challenged","date":"2026-03-01","sources":[{"url":"https://scdailygazette.com/2026/06/26/sc-counties-enacting-data-center-moratoriums/","label":"scdailygazette.com"}],"parties":[{"role":"Operator","name":"NorthMark Strategies (Valara Holdings)"}],"groups":["delay:regulatory_review:permitting_challenged","delay:environmental_petition:permitting_challenged"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"adb68b8c076564b6","state":"SC","tracker":"delay","section":"county_restrictions","title":"Orangeburg County","summary":"Orangeburg County Council unanimously passed first reading of a data center construction and development moratorium after learning a company was scouting a Brentwood Drive site for a potential project. The moratorium requires a second reading to take final effect. Update 2026-09-08: Orangeburg County Council approved a moratorium on new data center development at third reading on Tuesday night, September 8, 2026, after a public hearing. Under the moratorium the county will not accept or act on new applications for data centers or other data processing facilities. Developer Blake Simpson asked the council to reject the measure or create a pathway for his proposed 25 to 50 megawatt facility. The WLTX report does not state the moratorium's length or the vote count. (Previously recorded as pending, dated 2026-07-23.)","scope":"county: Orangeburg County","status":"in_force","date":"2026-09-08","sources":[{"url":"https://www.postandcourier.com/columbia/news/orangeburg-data-center-moratorium-sc/article_947fef3f-b818-49b1-b9d9-e4cf1afa0e66.html","label":"www.postandcourier.com"},{"url":"https://www.wistv.com/2026/07/23/orangeburg-county-considers-one-year-pause-data-center-developments/","label":"www.wistv.com"},{"url":"https://www.wltx.com/article/news/politics/orangeburg-county-enacts-moratorium-on-new-data-centers/101-2d0e1609-646e-4113-b110-4ac94697102f","label":"www.wltx.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"897faa1e2413d81e","state":"SC","tracker":"delay","section":"projects","title":"Pollard data center project","summary":"McCormick County Council gave third and final reading on Thursday, September 10, 2026 to Ordinance 25-11, rezoning five properties from forest agriculture to service industrial for the Pollard data center project. WRDW reports the vote was 3-2 and that the rezoning covers roughly 1,000 acres, with an accompanying gas pipeline planned minutes from downtown McCormick. Ordinance 26-08, rezoning three more properties to service industrial, passed first reading the same night. All but one public speaker opposed the rezoning.","scope":"Record-specific: McCormick County","status":"approved_amid_opposition","date":"2026-09-10","sources":[{"url":"https://www.wrdw.com/2026/09/11/mccormick-county-council-approves-data-center-rezoning-while-tempers-flare/","label":"www.wrdw.com"},{"url":"https://www.wrdw.com/2026/09/16/mccormick-county-chairman-discusses-approved-data-center-site/","label":"www.wrdw.com"}],"parties":[{"role":"Operator","name":"Pollard Lumber Company (land)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"a6a9b54dc2f7e887","state":"SC","tracker":"delay","section":"utility_actions","title":"Santee Cooper","summary":"Santee Cooper enacted a new experimental electricity rate for large-load customers requiring 50 MW or more, including data centers. The rate is effective immediately, requires 15-year contracts, permits higher charges during periods of high demand, and requires customers to ramp up to full contracted usage within three years.","scope":"Record-specific: SC","status":"approved","date":null,"sources":[{"url":"https://www.datacenterdynamics.com/en/news/south-carolina-utility-santee-cooper-enacts-new-electricity-rates-for-data-centers-and-other-large-loads/","label":"www.datacenterdynamics.com"}],"parties":[{"role":"Named utility / authority","name":"Santee Cooper"}],"groups":["utility:tariff:approved"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"4acfdfc6ae530074","state":"SC","tracker":"delay","section":"utility_actions","title":"Santee Cooper","summary":"Santee Cooper’s board unanimously approved a special, higher electricity rate for new customers requiring 50 megawatts or more, including data centers and new manufacturing facilities. The rate is intended to ensure these energy-intensive customers cover the cost of the generation they require and will be reviewed after four years.","scope":"Record-specific: SC","status":"approved","date":"2025-04","sources":[{"url":"https://www.rcrwireless.com/20250429/ai-infrastructure/ai-boom-energy-showdown","label":"www.rcrwireless.com"}],"parties":[{"role":"Named utility / authority","name":"Santee Cooper"}],"groups":["utility:tariff:approved"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b5decdafecf33470","state":"SC","tracker":"delay","section":"county_restrictions","title":"Spartanburg County","summary":"TigerDC formally withdrew its $3 billion 'Project Spero' AI data center from Tyger River Industrial Park after Spartanburg County Council unanimously voted down two Fee-In-Lieu-Of-Tax (FILOT) agreements (400 MW, 868 acres). Weeks of strong public opposition, a 'No Data Centers in Spartanburg' Facebook group with nearly 3,000 members, and a petition with 4,000+ signatures sealed the project's fate.","scope":"county: Spartanburg County","status":"expired","date":"2026-02-27","sources":[{"url":"https://palmettostatewatchfoundation.com/2026/01/06/petitions-protests-and-power-bills-spartanburg-faces-data-center-debacle/","label":"palmettostatewatchfoundation.com"},{"url":"https://stopprojectspero.com/","label":"stopprojectspero.com"},{"url":"https://www.change.org/p/stop-data-centers-coming-to-upstate-sc","label":"www.change.org"},{"url":"https://www.datacenterdynamics.com/en/news/proposal-for-3bn-data-center-faces-opposition-in-spartanburg-county-south-carolina/","label":"www.datacenterdynamics.com"},{"url":"https://www.datacenterdynamics.com/en/news/tigerdc-pulls-planned-data-center-project-from-south-carolina-county-after-officials-deny-tax-deal/","label":"www.datacenterdynamics.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3a28fd221875a835","state":"SC","tracker":"delay","section":"county_restrictions","title":"Spartanburg County","summary":"On June 15, 2026 the Spartanburg County (SC) Council unanimously directed the county manager and attorney to draft a data center moratorium/ban ordinance while awaiting state legislation. The existing NorthMark data center (Pine Street, 450 MW) is unaffected; the trigger is 'Project Lighthouse' (300 Jones Road, ~60 MW, a Bitcoin-mining site purchased by LightHouse/Lightstone). Update 2026-09-21: Spartanburg County Council voted 5-1 on Monday, September 21, 2026 to approve a one-year freeze on new data centers. The council adopted four amendments defining which facilities can still move forward. The freeze applies only to facilities larger than 65 megawatts and does not affect data centers that already received county approval, including the Valara facility. (Previously recorded as pending, dated 2026-06-22.)","scope":"county: Spartanburg County","status":"in_force","date":"2026-09-21","sources":[{"url":"https://www.postandcourier.com/spartanburg/news/spartanburg-county-council-data-center-moratorium-northmark/article_ac402d07-de2f-4e55-9d28-b4dbcdb570e0.html","label":"www.postandcourier.com"},{"url":"https://www.wspa.com/news/local-news/spartanburg-county-council-to-explore-data-center-moratorium/","label":"www.wspa.com"},{"url":"https://www.postandcourier.com/spartanburg/news/spartanburg-county-data-center-moratorium-vote/article_e0eba019-fc7a-45ef-bc5d-46cb02e56a3f.html","label":"www.postandcourier.com"},{"url":"https://www.wspa.com/news/local-news/spartanburg-county-council-gives-first-approval-of-data-center-moratorium/","label":"www.wspa.com"},{"url":"https://www.live5news.com/2026/09/22/spartanburg-county-council-passes-data-center-moratorium-with-several-amendments/","label":"www.live5news.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d9bedce048b16e98","state":"SC","tracker":"delay","section":"county_restrictions","title":"Spartanburg County Council","summary":"Spartanburg County Council passed the first reading of a 12-month data center moratorium unanimously; it does not affect the already-under-construction NorthMark project. County Council passed the second reading of the one-year moratorium ordinance on July 20, 2026; a third and final reading is still required. The ordinance's third and final reading remain","scope":"county: Spartanburg County Council","status":"pending","date":"2026-07-20","sources":[{"url":"https://www.foxcarolina.com/2026/06/22/spartanburg-county-votes-pause-data-center-applications-one-year/","label":"www.foxcarolina.com"},{"url":"https://www.foxcarolina.com/2026/07/21/spartanburg-co-council-advances-data-center-moratorium-discusses-flock-cameras/","label":"www.foxcarolina.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"59d31c90f99a8e27","state":"SC","tracker":"delay","section":"projects","title":"Stream Data Centers Marion County (abandoned)","summary":"Dallas-based Stream Data Centers dropped a planned 400MW, 400-acre, ~600,000-sq-ft campus in an industrial park near Marion, SC, citing 'utility timing constraints' ,  MPD Electric said it could not secure the needed power in a timely, cost-effective way. Deal had been negotiated under NDAs, drawing transparency criticism; residents had also raised groundwater and rate concerns.","scope":"Record-specific: Marion County","status":"abandoned","date":"2026-05-11","sources":[{"url":"https://www.thestate.com/news/local/environment/article316090463.html","label":"www.thestate.com"}],"parties":[{"role":"Operator","name":"Stream Data Centers"}],"groups":["delay:utility_interconnection_timing:abandoned","delay:withdrawal:abandoned"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"6572fb87b3ac6891","state":"SC","tracker":"delay","section":"county_restrictions","title":"Town of Mount Pleasant (Charleston County)","summary":"The Mount Pleasant Planning Committee planned to take another look at data center zoning and land use at its Monday, October 5, 2026 meeting as the town works toward a 120-day pause on new data center projects. Council approval of the moratorium is still required. Leaders first discussed the pause in early September.","scope":"town: Town of Mount Pleasant (Charleston County)","status":"proposed","date":"2026-10-05","sources":[{"url":"https://abcnews4.com/news/local/mount-pleasant-committee-revisits-data-center-issues-as-moratorium-advances-zoning-public-review-land-use-planning-committee","label":"abcnews4.com"}],"parties":[{"role":"Authority","name":"Mount Pleasant Planning Committee / Town Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5976280cf4e599c1","state":"SC","tracker":"delay","section":"utility_actions","title":"Valara / NorthMark data center (Spartanburg County)","summary":"The Southern Environmental Law Center asked the South Carolina Public Service Commission to reconsider its August decision that it lacks jurisdiction to review the power plant NorthMark Cloud and Compute and its subsidiary Valara Holdings are building for their Spartanburg data center (Herald-Journal report of September 24, 2026; report date, filing date not stated). SELC filed on behalf of Concerned Citizens of Spartanburg County and the Southern Alliance for Clean Energy. The plant would produce more than 450 megawatts; the Siting Act requires commission approval for plants over 75 megawatts, and commissioners found it did not apply because the power is for private use. No docket number was given.","scope":"Record-specific: SC","status":"contested","date":"2026-09-24","sources":[{"url":"https://www.goupstate.com/story/news/environment/2026/09/24/environmental-group-asks-psc-to-revisit-northmark-power-plant-decision/91926573007/","label":"www.goupstate.com"}],"parties":[{"role":"Named utility / authority","name":"Valara / NorthMark data center (Spartanburg County)"},{"role":"Authority","name":"South Carolina Public Service Commission"}],"groups":["utility:other:contested"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"4650a698f603d88c","state":"SC","tracker":"delay","section":"utility_actions","title":"Valara data center (Spartanburg County)","summary":"On Thursday of the week of August 24, 2026 (August 27), the South Carolina Public Service Commission determined that a legal challenge questioning the nature of the under-construction Valara data center in Spartanburg did not hold up, meaning the commission will not regulate the facility. South Carolina Public Radio later reported the facility plans to generate significantly more power than initially disclosed. Docket number and vote were not stated in the opened page.","scope":"Record-specific: SC","status":"effective","date":"2026-08-27","sources":[{"url":"https://www.southcarolinapublicradio.org/sc-news/2026-08-28/a-win-a-loss-and-a-conversation-on-data-centers-in-spartanburg","label":"www.southcarolinapublicradio.org"}],"parties":[{"role":"Named utility / authority","name":"Valara data center (Spartanburg County)"},{"role":"Authority","name":"South Carolina Public Service Commission"}],"groups":["utility:other:effective"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"c534aa1171fe13b3","state":"SC","tracker":"delay","section":"county_restrictions","title":"York County","summary":"QTS is building a nine-building $1 billion campus near Lake Wylie, threatening the 95-acre Penland Christmas Tree Farm next door. Residents are concerned about noise, blinding security lights, and the sale of 400+ acres under the secretive code name 'Project COBRA' without community knowledge. Nearly 800 people signed a petition to stop the project. The tree farm owner worries increased heat could","scope":"county: York County","status":"in_force","date":"2026-07-13","sources":[{"url":"https://www.change.org/p/stop-the-qts-data-center-in-york-county-sc","label":"www.change.org"},{"url":"https://www.postandcourier.com/york-county/news/resident-concerns-york-county-qts-data-center/article_475e41a6-a73b-4288-a23d-2cdefd0bedec.html","label":"www.postandcourier.com"},{"url":"https://www.datacenterdynamics.com/en/news/qts-to-build-data-center-in-york-county-south-carolina/","label":"www.datacenterdynamics.com"},{"url":"https://qtsdatacenters.com/data-centers/york/","label":"qtsdatacenters.com"},{"url":"https://www.wral.com/news/local/qts-data-center-lake-wylie-york-county-sc-feb-2026/","label":"www.wral.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ead5aac6d1de0198","state":"SC","tracker":"moratorium","section":"local","title":"Clarendon County Council adopts data center moratorium","summary":"Clarendon County Council unanimously approved a data center moratorium on third and final reading on September 14, 2026. The moratorium pauses future data center development applications while council studies impacts. It does not directly affect Project 59 at the county industrial park or Santee Electric Cooperative's existing land holdings. The reported coverage did not state the moratorium's length.","scope":"Local: Clarendon County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.wistv.com/2026/09/15/clarendon-county-council-advances-third-final-reading-data-center-moratorium/","label":"www.wistv.com"}],"parties":[{"role":"Jurisdiction","name":"Clarendon County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"f7b981d36cb76fc6","state":"SC","tracker":"moratorium","section":"local","title":"County moratorium on data centers through January 1, 2028","summary":"Ordinance 25-26-23 imposing moratorium on data centers, data processing, and crypto mining in unincorporated areas until Jan 1, 2028. The measure runs to January 1, 2028.","scope":"Local: Chesterfield County","status":"enacted","date":"2026-06","sources":[{"url":"https://scdailygazette.com/2026/06/26/sc-counties-enacting-data-center-moratoriums/","label":"scdailygazette.com"}],"parties":[{"role":"Jurisdiction","name":"Chesterfield County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"17168f8283569007","state":"SC","tracker":"moratorium","section":"local","title":"County moratorium on data centers through July 21, 2027","summary":"1-year moratorium blocking new data center approvals. Voted 4-3. Followed denial of text amendment allowing data centers as conditional use. The measure runs to July 21, 2027.","scope":"Local: Greenwood County","status":"enacted","date":"2026-01","sources":[{"url":"https://www.foxcarolina.com/2026/07/21/greenwood-co-council-approves-final-reading-one-year-moratorium-data-centers/","label":"www.foxcarolina.com"}],"parties":[{"role":"Jurisdiction","name":"Greenwood County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"1bd520760aca35e7","state":"SC","tracker":"moratorium","section":"states","title":"Data Center Development Act","summary":"Would create a Data Center Development Office within the Department of Environmental Services and require a state-issued siting permit before any new data center could begin operations. The Senate Agriculture and Natural Resources Committee gave it a favorable report on April 28, 2026, sending it to the full Senate.","scope":"State: South Carolina","status":"proposed","date":"2026-04","sources":[{"url":"https://www.scstatehouse.gov/sess126_2025-2026/bills/867.htm","label":"www.scstatehouse.gov"}],"parties":[],"groups":["restriction:states:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d7cf8717beef89cd","state":"SC","tracker":"moratorium","section":"states","title":"Data Center Moratorium","summary":"Would bar state and local approval of permits, rezoning, and incentives for new data centers until Jan 1 2028; referred to Ways and Means, but SC closed the session without enacting data-center bills.","scope":"State: South Carolina","status":"failed","date":"2026-02","sources":[{"url":"https://www.scstatehouse.gov/sess126_2025-2026/bills/5286.htm","label":"www.scstatehouse.gov"}],"parties":[],"groups":["restriction:states:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"70456b2f17fa016f","state":"SC","tracker":"moratorium","section":"states","title":"Data Center Moratorium (joint resolution)","summary":"Would prohibit governmental entities from acting on data center permits and applications until the General Assembly establishes an oversight and approval process; introduced Apr 14, did not advance.","scope":"State: South Carolina","status":"proposed","date":"2026-04","sources":[{"url":"https://www.scstatehouse.gov/sess126_2025-2026/bills/5526.htm","label":"www.scstatehouse.gov"}],"parties":[],"groups":["restriction:states:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"dfe1a31d8cfe99e5","state":"SC","tracker":"moratorium","section":"states","title":"Data center siting permits through the PSC","summary":"A companion approach to S 867 that would task the Public Service Commission with overseeing data center permitting statewide. It carries weaker ratepayer provisions than S 867 and omits the brownfield site provisions.","scope":"State: South Carolina","status":"proposed","date":"2026","sources":[{"url":"https://www.scstatehouse.gov/sess126_2025-2026/bills/902.htm","label":"www.scstatehouse.gov"}],"parties":[],"groups":["restriction:states:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"31c3c407ecaa9b02","state":"SC","tracker":"moratorium","section":"local","title":"Local moratorium on data centers through July 16, 2027","summary":"12-month moratorium on accepting new data-center permits, confirmed unanimously after the council unanimously denied the 'Project Altair' land-sale ordinance in June. Staff directed to research appropriate locations for future data-center development. The measure runs to July 16, 2027.","scope":"Local: Newberry County","status":"enacted","date":"2026-07","sources":[{"url":"https://www.foxcarolina.com/2026/07/16/newberry-county-council-unanimously-confirms-year-long-moratorium-data-centers/","label":"www.foxcarolina.com"}],"parties":[{"role":"Jurisdiction","name":"Newberry County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"65163505f47f6e65","state":"SC","tracker":"moratorium","section":"local","title":"Nine-month data center moratorium","summary":"County Council gave final approval July 13, 2026 to a nine-month moratorium in unincorporated York County on new data-center special exceptions and site plans; nine already-vested QTS buildings are exempt.","scope":"Local: York County","status":"enacted","date":"2026-07","sources":[{"url":"https://www.wsoctv.com/news/local/how-nine-month-data-center-moratorium-sc-impacts-projects-under-construction/D2SFMVJEKRC5FONJKN7SELJD6Y/","label":"www.wsoctv.com"}],"parties":[{"role":"Jurisdiction","name":"York County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"08d501a7dce90945","state":"SC","tracker":"moratorium","section":"local","title":"Orangeburg County data center moratorium (proposed)","summary":"Orangeburg County Council adopted a 12-month temporary moratorium on new data center development on third reading on September 8, 2026, by voice vote, after a public hearing that lasted more than an hour. First reading had passed at a July 23 special-called meeting. The county will not accept or act on new applications for data centers or other data processing facilities during the pause.","scope":"Local: Orangeburg County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.wltx.com/article/news/politics/orangeburg-county-enacts-moratorium-on-new-data-centers/101-2d0e1609-646e-4113-b110-4ac94697102f","label":"www.wltx.com"}],"parties":[{"role":"Jurisdiction","name":"Orangeburg County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"bfe556ca5819bf38","state":"SC","tracker":"moratorium","section":"local","title":"Proposed 12-month data center moratorium","summary":"On September 21, 2026, Spartanburg County Council voted 5-1 on third reading to approve a one-year moratorium on new data centers larger than 65 megawatts, with amendments; previously approved projects such as the Valara data center are not affected.","scope":"Local: Spartanburg County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.foxcarolina.com/2026/09/22/spartanburg-county-council-passes-data-center-moratorium-with-several-amendments/","label":"www.foxcarolina.com"}],"parties":[{"role":"Jurisdiction","name":"Spartanburg County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d522fdfd4fa7adac","state":"SC","tracker":"moratorium","section":"local","title":"Proposed county moratorium on data centers","summary":"On September 21, 2026, Jasper County Council unanimously approved second reading of a one-year moratorium, extendable in six-month periods, on data centers, data processing facilities and cryptocurrency mining in unincorporated areas; third reading is set for the next council meeting.","scope":"Local: Jasper County","status":"proposed","date":"2026-09","sources":[{"url":"https://www.yahoo.com/news/us/articles/council-approves-second-reading-one-090403016.html","label":"www.yahoo.com"}],"parties":[{"role":"Jurisdiction","name":"Jasper County"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3fbf04d4d1abbc30","state":"SC","tracker":"moratorium","section":"local","title":"Proposed county moratorium on data centers","summary":"On September 22, 2026, Kershaw County Council unanimously passed on third and final reading a one-year moratorium on data centers, cryptocurrency mining operations and data processing facilities.","scope":"Local: Kershaw County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.wistv.com/2026/09/23/kershaw-county-council-passes-temporary-moratorium-data-centers/","label":"www.wistv.com"}],"parties":[{"role":"Jurisdiction","name":"Kershaw County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b5c702b7d9d268b1","state":"SC","tracker":"moratorium","section":"local","title":"Proposed county moratorium on data centers","summary":"Laurens County Council approved the third and final reading of a one-year data center moratorium 6 to 0 on September 14, 2026. It stops the acceptance, review, approval and issuance of permits for data center development. The moratorium applies only to unincorporated Laurens County, not the cities of Laurens and Clinton.","scope":"Local: Laurens County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.foxcarolina.com/2026/09/14/laurens-county-council-votes-approve-one-year-data-center-pause/","label":"www.foxcarolina.com"}],"parties":[{"role":"Jurisdiction","name":"Laurens County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e712a9602d7fc092","state":"SC","tracker":"moratorium","section":"local","title":"Proposed county moratorium on data centers for a stated term","summary":"County Council approved Ordinance 856 on Sep 14, 2026, establishing a 12-month moratorium on data centers. During the moratorium the county will not negotiate with data center developers while it studies economic, environmental, infrastructure, utility, land-use and community impacts and drafts a regulatory ordinance.","scope":"Local: Fairfield County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.wltx.com/article/news/community/fairfield-county-places-12-month-moratorium-on-data-centers/101-60d1aef5-e827-4c8a-867d-e79ecc9019b8","label":"www.wltx.com"}],"parties":[{"role":"Jurisdiction","name":"Fairfield County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"9e6a95af9b1a6338","state":"SC","tracker":"moratorium","section":"local","title":"Proposed local moratorium on data centers","summary":"After the town's planning committee recommended a 120-day, extendable moratorium on data center requests, Mount Pleasant Town Council took up first reading of the ordinance on September 8, 2026.","scope":"Local: Mount Pleasant","status":"proposed","date":"2026-09","sources":[{"url":"https://charlestoncitypaper.com/2026/09/08/mount-pleasant-leaders-to-talk-data-center-moratorium/","label":"charlestoncitypaper.com"}],"parties":[{"role":"Jurisdiction","name":"Mount Pleasant"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5e3217c2394c85d9","state":"SC","tracker":"moratorium","section":"local","title":"Proposed nine-month moratorium or ban on data centers","summary":"Beaufort County Council's Natural Resources Committee voted unanimously on Sept. 8, 2026 to have staff draft three ordinance options: a nine-month moratorium, a complete ban, and heavily regulated data center rules. Each option must go to the full County Council for a vote before taking effect.","scope":"Local: Beaufort County","status":"proposed","date":"2026-09","sources":[{"url":"https://www.postandcourier.com/beaufort-county/news/beaufort-county-taking-steps-regulate-data-centers-ban-moratorium/article_8a47b7b3-bc8f-4e61-8800-09124467b643.html","label":"www.postandcourier.com"}],"parties":[{"role":"Jurisdiction","name":"Beaufort County"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ead4c3dd6bcf23b7","state":"SC","tracker":"moratorium","section":"local","title":"Rejected nine-month data center moratorium","summary":"McCormick County Council voted 3-2 on Sept. 10, 2026 against a proposed nine-month pause on data center development; because it was denied on first reading, the measure did not advance. At the same meeting the council voted 3-2 to approve rezoning for the Pollard data center project and 5-0 for first reading of a data center regulation ordinance.","scope":"Local: McCormick County","status":"failed","date":"2026-09","sources":[{"url":"https://www.wrdw.com/2026/09/11/mccormick-county-council-approves-data-center-rezoning-while-tempers-flare/","label":"www.wrdw.com"}],"parties":[{"role":"Jurisdiction","name":"McCormick County"}],"groups":["restriction:local:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"58631f91fad85e5b","state":"SC","tracker":"moratorium","section":"local","title":"Six-month data center moratorium","summary":"County Council passed the third and final reading of a six-month data center moratorium on Aug. 20, 2026.","scope":"Local: Anderson County","status":"enacted","date":"2026-08","sources":[{"url":"https://www.foxcarolina.com/2026/08/20/anderson-county-council-approves-final-reading-six-month-data-center-moratorium/","label":"www.foxcarolina.com"}],"parties":[{"role":"Jurisdiction","name":"Anderson County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b8911b8723010e16","state":"SC","tracker":"moratorium","section":"local","title":"Six-month data center moratorium","summary":"County Council unanimously approved a six-month countywide pause on data center applications on July 20, 2026, invoking the pending-ordinance doctrine; a related Valara Holdings project is contested in litigation.","scope":"Local: Chester County","status":"enacted","date":"2026-07","sources":[{"url":"https://www.wbtv.com/2026/07/21/chester-county-council-approves-6-month-data-center-moratorium/","label":"www.wbtv.com"}],"parties":[{"role":"Jurisdiction","name":"Chester County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"28116638b206c684","state":"SC","tracker":"moratorium","section":"local","title":"Six-month data center moratorium, partially repealed Sept. 14, 2026","summary":"Colleton County Council adopted a six-month data center moratorium (Ordinance 26-O-04) in July 2026. On Sept. 14, 2026 the council unanimously approved a Digital Infrastructure Overlay District and partially repealed the moratorium for areas west of Interstate 95 and for land zoned Light Industrial, Industrial or Heavy Industrial; the moratorium remains in place elsewhere. The overlay sets a 65-decibel noise cap, 200-foot buffers, closed-loop or air-cooled systems and a 300-acre minimum.","scope":"Local: Colleton County","status":"enacted","date":"2026-09","sources":[{"url":"https://www.live5news.com/2026/09/14/colleton-county-creates-new-rules-data-centers/","label":"www.live5news.com"}],"parties":[{"role":"Jurisdiction","name":"Colleton County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"779cdfd950ae168d","state":"SC","tracker":"permits","section":"air_permits","title":"AIKEN 5 MW DATA CENTER","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Aiken","status":"Not recorded","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_fn=DATA%20CENTER&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071929476","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"7ea1ee85ee97aa5a","state":"SC","tracker":"permits","section":"air_permits","title":"Valara Holdings High Performance Compute Center, 4000 S Pine Street","summary":"SC DES issued construction permit CP-50000316 on 17 Sep 2025 for 24 natural gas fired generators at the Valara Spartanburg data center, with synthetic minor limits to avoid PSD and Title V.","scope":"Facility: Spartanburg","status":"Issued","date":"2025-09-17","sources":[{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/StatementofBasis.pdf","label":"des.sc.gov"}],"parties":[],"groups":[],"attribution":"South Carolina Department of Environmental Services","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"4c407a5057924ad4","state":"SC","tracker":"permits","section":"air_permits","title":"Valara Holdings High Performance Compute Center, 4000 S Pine Street","summary":"SC DES issued synthetic minor construction permit CP-50000422 v1.0 on 18 Sep 2026 for five 17 MW Baker Hughes and six 54 MW GE simple cycle gas turbines with SCR and oxidation catalysts at the NorthMark/Valara data center; the Statement of Basis says the facility becomes a Title V major source with this project.","scope":"Facility: Spartanburg","status":"Issued","date":"2026-09-18","sources":[{"url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/ConstructionPermit.pdf","label":"des.sc.gov"}],"parties":[],"groups":[],"attribution":"South Carolina Department of Environmental Services","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"83129110381c2b8d","state":"SC","tracker":"water","section":"measures","title":"A one-year pause to assess power, water and road capacity","summary":"Pauses new data center development for 12 months while the county assesses effects on power, water and road infrastructure and updates its Land Management Ordinance. County Council approved the moratorium on Sep 14, 2026 and later published a schedule of town halls through January. It sets no water standard.","scope":"local: Fairfield County, South Carolina","status":"enacted","date":"2026-09-14","sources":[{"url":"https://www.wistv.com/2026/09/29/fairfield-county-maps-out-1-year-data-center-pause-schedules-community-town-halls/","label":"www.wistv.com"}],"parties":[{"role":"Jurisdiction","name":"Fairfield County, South Carolina"}],"groups":["water:moratorium:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e0c20f860681a471","state":"SC","tracker":"water","section":"measures","title":"A pause covering incentives as well as permits","summary":"A temporary pause on accepting, reviewing and approving applications for data centers, data processing facilities and cryptocurrency mining operations, extending to rezoning requests, building permits, site plans and economic incentives tied to those projects. County Council unanimously approved second reading of the 12-month moratorium on Sep 21, 2026, covering unincorporated Jasper County and cryptocurrency mining; third and final reading is expected next month.","scope":"local: Jasper County, South Carolina","status":"proposed","date":"2026-09-21","sources":[{"url":"https://www.wtoc.com/2026/09/22/jasper-county-council-approves-1-year-moratorium-data-centers/","label":"www.wtoc.com"}],"parties":[{"role":"Jurisdiction","name":"Jasper County, South Carolina"}],"groups":["water:moratorium:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"feaa74b8ade8d152","state":"SC","tracker":"water","section":"measures","title":"A pause in a service area that may not qualify for a groundwater permit","summary":"A 120-day moratorium on requests related to data centers, giving town leaders and staff time to gather information on environmental impacts and decide what restrictions to adopt, while leaving smaller business-related data facilities unaffected. The Planning Committee recommended the moratorium and the town council took up first reading on September 8, 2026, so it is not yet adopted. The proposal cites heavy demands on water and electricity. Mount Pleasant Waterworks general manager Allan Clum has said any customer drawing more than 3 million gallons a month needs a groundwater permit and that he does not believe the Mount Pleasant service area would meet the requirements for one, which makes the supply question here a permitting question rather than a pricing one.","scope":"local: Mount Pleasant, South Carolina","status":"proposed","date":"2026-09-08","sources":[{"url":"https://charlestoncitypaper.com/2026/09/08/mount-pleasant-leaders-to-talk-data-center-moratorium/","label":"charlestoncitypaper.com"}],"parties":[{"role":"Jurisdiction","name":"Mount Pleasant, South Carolina"}],"groups":["water:moratorium:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"c4c6394d78cf14cf","state":"SC","tracker":"water","section":"measures","title":"Closed-loop or air cooling required in a new data center overlay","summary":"Creates a Digital Infrastructure Overlay district for data centers and requires data centers in it to use closed-loop water or air-cooled cooling systems. County Council approved the ordinances unanimously at a special meeting on Sep 14, 2026. The same action repealed the county's July data center moratorium west of Interstate 95 and in industrial zones. The ordinance sets a cooling architecture and no gallon limit.","scope":"local: Colleton County, South Carolina","status":"enacted","date":"2026-09-14","sources":[{"url":"https://www.postandcourier.com/rising-waters/data-center-colleton-county-overlay-district/article_74d76b64-1253-4ca1-a18f-08a4f3629399.html","label":"www.postandcourier.com"}],"parties":[{"role":"Jurisdiction","name":"Colleton County, South Carolina"}],"groups":["water:closed-loop:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2a360b96adeac4a5","state":"SC","tracker":"water","section":"measures","title":"Commercial Data Center Water Usage Report","summary":"As introduced, requires commercial data centers with peak demand of 100 MW or more that use 3 million gallons or more of water per month to report to the Department of Environmental Services by January 31 each year the prior year's water use by source and the anticipated use for the current year. The department may audit, fine up to $10,000 per day for late reports, and levy a $10,000 penalty for false information. S0724. Last official action Jan 13, 2026: Introduced and read first time; referred to Senate Committee on Judiciary; regular session adjourned sine die May 14, 2026.","scope":"state: South Carolina","status":"failed","date":"2026-01-13","sources":[{"url":"https://www.scstatehouse.gov/billsearch.php?billnumbers=0724&session=126&summary=B","label":"www.scstatehouse.gov"}],"parties":[{"role":"Jurisdiction","name":"South Carolina"}],"groups":["water:disclosure:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d5588d305d72ed31","state":"SC","tracker":"water","section":"measures","title":"First proposed gigawatt campus in the state","summary":"An 860-acre, approximately $6 billion campus proposed for the Lowcountry would be South Carolina's first gigawatt-scale data center. Residents and elected officials packed a county civic center meeting to oppose it. Tracked as a live siting decision. South Carolina is simultaneously considering HB 4583, which would require zero net water withdrawal statewide.","scope":"local: Colleton County, South Carolina","status":"proposed","date":"2026-01-01","sources":[{"url":"https://www.yahoo.com/news/articles/gigawatt-data-center-proposal-draws-212106926.html","label":"www.yahoo.com"}],"parties":[{"role":"Jurisdiction","name":"Colleton County, South Carolina"}],"groups":["water:siting:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"836cb4c1add36778","state":"SC","tracker":"water","section":"measures","title":"Zero net withdrawal closed-loop mandate","summary":"Would require closed-loop systems achieving zero net water withdrawal and net zero wastewater discharge, and prohibit extraction of groundwater and municipal water for cooling. Gaining bipartisan co-sponsors. The strictest state-level architecture mandate introduced so far: it does not set a performance threshold, it removes the water source.","scope":"state: South Carolina","status":"proposed","date":"2026-02-01","sources":[{"url":"https://www.multistate.us/insider/2026/3/3/state-data-center-water-usage-legislation-gains-momentum","label":"www.multistate.us"}],"parties":[{"role":"Jurisdiction","name":"South Carolina"}],"groups":["water:closed-loop:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."}],"groups":{"restriction:local:enacted":["58631f91fad85e5b","b8911b8723010e16","f7b981d36cb76fc6","ead5aac6d1de0198","28116638b206c684","e712a9602d7fc092","17168f8283569007","3fbf04d4d1abbc30","b5c702b7d9d268b1","31c3c407ecaa9b02","08d501a7dce90945","bfe556ca5819bf38","65163505f47f6e65"],"restriction:local:proposed":["d522fdfd4fa7adac","9e6a95af9b1a6338","5e3217c2394c85d9"],"restriction:local:failed":["ead4c3dd6bcf23b7"],"restriction:states:proposed":["70456b2f17fa016f","1bd520760aca35e7","dfe1a31d8cfe99e5"],"restriction:states:failed":["d7cf8717beef89cd"],"water:closed-loop:proposed":["836cb4c1add36778"],"water:siting:proposed":["d5588d305d72ed31"],"water:moratorium:proposed":["feaa74b8ade8d152","e0c20f860681a471"],"water:disclosure:failed":["2a360b96adeac4a5"],"water:closed-loop:enacted":["c4c6394d78cf14cf"],"water:moratorium:enacted":["83129110381c2b8d"],"delay:regulatory_review:permitting_challenged":["ebbc3548ee675c57"],"delay:environmental_petition:permitting_challenged":["ebbc3548ee675c57"],"delay:utility_interconnection_timing:abandoned":["59d31c90f99a8e27"],"delay:withdrawal:abandoned":["59d31c90f99a8e27"],"delay:county_moratorium:moratorium_in_force":["4fd68a1a4d95ecf1"],"delay:permit_denial:halted":["2a19530b645b4515"],"delay:local_moratorium:halted":["2a19530b645b4515"],"delay:community_opposition:halted":["2a19530b645b4515"],"utility:tariff:approved":["a6a9b54dc2f7e887","4acfdfc6ae530074"],"utility:rate case:approved":["836e8495e0094213"],"utility:other:effective":["4650a698f603d88c"],"utility:other:contested":["5976280cf4e599c1"]},"grid":[],"grid_note":"Duke, Dominion Energy South Carolina, Santee Cooper; vertically integrated, no RTO.","grid_operators":["NON-RTO"],"counts":{"moratorium":21,"water":7,"delay":30,"atlas":22,"permits":3},"record_count":83},"states":[{"id":"AL","name":"Alabama","groups":{"restriction:local:enacted":["b754e99ab4330e15","decd6891258f47ef","f0af2bd58075bd01","acf788f0940c151f","5d2b5e02877a6db1","86b6b59a0f9f25d6","c4e0ec1c77b375f6","f54b7627480545ea","e01160ee3d027689","a5568f503c16796e","672a4451f57ed71f","130f0e56bf60745e","4985760687f3ce84","03643fb450f0e606","e03f681545f8685d","7e09fb347db9cc56","3eaa5dec8cc4f32e"],"restriction:local:failed":["c8b4ae70216bc13d"],"restriction:states:proposed":["e7f13067c265e602"],"water:moratorium:enacted":["fe369e5b2f828936"],"delay:litigation:active_litigation":["588eb0c7ad945e8c"],"delay:zoning_approval_challenge:active_litigation":["588eb0c7ad945e8c"],"delay:litigation:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:council_agenda_removal:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:environmental_concerns:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"utility:statement:pending":["11c4e5e5098ce897"],"utility:special contract:pending":["6d50a85ed575ad70","ea51d9bfa3f2aef7"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":19,"water":1,"delay":17,"atlas":28,"permits":3},"record_count":68},{"id":"AK","name":"Alaska","groups":{"restriction:local:enacted":["a3bdbc7a2f903071"],"restriction:local:proposed":["1b1fd599ecf09004"],"restriction:local:failed":["14fcd2107dd36027"],"restriction:states:failed":["70bf8b65e5240449"],"delay:interconnection:cancelled":["cbda12242cdda058"],"delay:community_opposition:cancelled":["cbda12242cdda058"],"delay:financing:cancelled":["cbda12242cdda058"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":4,"delay":2,"atlas":1},"record_count":7},{"id":"AZ","name":"Arizona","groups":{"restriction:local:enacted":["efe1b1646b346c07","a90bced96e18e77a","a6281e2e804f5a60","1d398d0ae1a21d5b","641d11706e6d4289"],"restriction:local:proposed":["543df422425e5d64"],"restriction:states:enacted":["341f659a40d6be88","8c611b34dae73c14","1e866041a2d45903"],"restriction:states:proposed":["add216a01080fe60","226daa2040f1d307"],"restriction:states:failed":["1b22a852fb3cd3d6","6300ce595ef5d0af","fe22b44843f73aaa"],"water:closed-loop:enacted":["869ef8ac67db8830"],"water:siting:enacted":["e4c543ec417de650","bf9111175cdcc2be"],"water:study:enacted":["c002da5fb08b6601"],"water:moratorium:enacted":["5706e495e387c218"],"delay:zoning_denial:cancelled":["3a372b9b02a89621","717671bd9cdc167f"],"delay:water_dispute:cancelled":["3a372b9b02a89621"],"delay:community_opposition:cancelled":["3a372b9b02a89621"],"delay:community_opposition:litigation_active":["b1a04c91d82be6c4"],"delay:water_dispute:delayed":["f0fd3f3d4688462e"],"delay:community_opposition:delayed":["f0fd3f3d4688462e"],"delay:zoning_denial:under_appeal":["cb82a5cd61fb9cec"],"delay:tax_incentive_change:under_appeal":["cb82a5cd61fb9cec"],"delay:zoning_denial:withdrawn":["5567ed106330c2df"],"delay:community_opposition:withdrawn":["5567ed106330c2df"],"utility:other:pending":["5d17a79f01d2eb63"],"utility:tariff:pending":["1da26df1fe5c13a0"],"utility:rate case:pending":["5b45806c6fb887c7","d2b222dc47567225"],"utility:special contract:approved":["d3d18ed766abfecd","44611b67548fe3db"],"utility:tariff:approved":["f2a114901b242afc"],"utility:special contract:pending":["aa4d78d10d987248"],"utility:statement:pending":["0dcfef71df5fb811"],"utility:other:approved":["03326890e794e215"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":14,"water":5,"delay":29,"atlas":21,"permits":63},"record_count":132},{"id":"AR","name":"Arkansas","groups":{"restriction:local:enacted":["ccd17d0cc78e8f6b","24be15d78831b997","2976edbd642bc5ee","165be2cac366e40a","c321161246656575","11b2b2b4357c9b9a","f1fcd0a91c9b364f","cc8edc44497c00b0"],"restriction:local:failed":["7a3c89981993bc87","f0d3a1dde3ddedd3"],"restriction:states:proposed":["24cb87919949138b"],"restriction:states:failed":["669f43bd9db94313","4cd8f4567d93ecf7"],"water:disclosure:failed":["b599e881f9e16713","460013ff73ea7911"],"water:siting:enacted":["d25f62e8d2b28025"],"water:disclosure:vetoed":["34510ed612779eb7"],"delay:litigation:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:state_law_ownership_ban:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:quorum_court_rejection:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:county_moratorium_dispute:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:litigation:active_litigation_records_dispute":["a103b1f5c7cb3114"],"delay:public_records_dispute:active_litigation_records_dispute":["a103b1f5c7cb3114"],"utility:statement:approved":["36a2338551fca4bf"],"utility:tariff:approved":["f43b05ef42c2b01e"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":13,"water":4,"delay":17,"atlas":10,"permits":2},"record_count":46},{"id":"CA","name":"California","groups":{"restriction:local:enacted":["a25de67269df0ed1","5709c4b5b56bdcb7","2a076a8efdfced43","09ce6bf92df9e75f","846b44fb44875a68","c8bffaf8e914e126","d3f536e572c853c0","e6f878bf8f23af8a","0bc1904215c57133","91ff35645c472dbe","188c7c4f44c8536f","2e31d9e1a9cca3fe","c6bb03e1b77debf9","1df245d5ecbbe1dd","106240b9c12fa638","71e0bfc997caca17","e8632d627b1772a4","7c6238e16f306088","055c2fca846ffbb0","4db95272d4d0b3b9","c0ec3d7f70d99734","9749538c1593f5cd","396ad9209089e80b","8aa7be7faae30500","dbd84a0fba7823d9","4297fa613aade787","1ed97d6ba694c7ec"],"restriction:local:proposed":["ea295658dff6c100","4d8d1ffdf12217a7","0552f5d218785acb","566895b8839e5229","558caf6ac46fd86a","aafdf3f00fd02036","1447a768a8032ada","8f8c47d0520b6675","07dc420f28cea720","cc095341ed505538","96c02fe3f2b69d63"],"restriction:local:failed":["4c7a6aab7028e4cf","6c0f45a31c38dd96","60a1fd085fb7faa2"],"restriction:local:pause":["9441b074827051cd"],"restriction:states:enacted":["b138c8f25c6a1df9","6cd48a1a9e3b6e42","e04ce361015d10b8","997e47cb2efa0fb1","a99eee6a8346d803","f8de3ea100d5a73c","36821d2782e3a288","b175ffb656ec4e09"],"restriction:states:failed":["9a181689208d061f"],"water:disclosure:proposed":["6018757e291cf1cf"],"water:disclosure:enacted":["f1363de6a8051f4c","0542c8536ced8e81","d192c59c767e1959"],"water:moratorium:enacted":["1cc46a341cdc3ef8","455741d01ef09906","490cb87c459dd8d3","b85c5b51cdf4ca84","2d55ff4b663fe464"],"water:moratorium:proposed":["7dd1832dd7f10e5b","d430cf80aec173de"],"water:incentive:enacted":["4a4855c312ff4655"],"water:siting:enacted":["0f9ba6aedeacc0f2"],"delay:litigation:litigation_active":["df264e03425ec97a"],"delay:permit_denial:litigation_active":["df264e03425ec97a"],"delay:local_moratorium:delayed":["81e21ec7e868a8a0"],"delay:water_dispute:delayed":["81e21ec7e868a8a0"],"delay:community_opposition:delayed":["81e21ec7e868a8a0","14833b21d81cfae2"],"delay:litigation:delayed":["8f4ba499ed265bb0"],"delay:permit_denial:delayed":["8f4ba499ed265bb0"],"delay:local_moratorium:cancelled":["e6ef57967971f34b"],"delay:community_opposition:cancelled":["e6ef57967971f34b","60ad802b8bf4ce26"],"delay:community_opposition:withdrawn":["dabaa0d9ca40c829"],"utility:other:pending":["2331af1293597280","65708bfad2e82891"],"utility:tariff:pending":["9365b7af7942c436","345f48017f0b0304"],"utility:statement:pending":["686efa78facdadc1","c9e2f082eb03806e"],"utility:tariff:contested":["d8dc8b595b9287b9"],"utility:IRP:pending":["2c217c66f5f9e73f"],"utility:special contract:approved":["e9224e475fe0078d"],"utility:special contract:pending":["a93460236987d2aa"],"utility:tariff:approved":["77fc87a9cbbc5266"]},"grid_operators":["CAISO","NON-RTO"],"counts":{"moratorium":51,"water":13,"delay":52,"atlas":42,"permits":18},"record_count":176},{"id":"CO","name":"Colorado","groups":{"restriction:local:enacted":["d20e86908dbdc520","7e23b2c472790666","b680584b86f47325","27892c65296bbedd","4057677a34555f38","611f35a83bc2affd","079b59e4fdf63d21","a78ac9d55cc5b6e7","72aaf79dce28835b","8c94de22f0407e5e","fafd70f2e092776b","b7f34202c64479ce","68d895f0c2ab0e74","9ef574abef591c91","73177d5333c4eddd","025c6d645640e09f","2c25069cf664aaf3"],"restriction:local:proposed":["180c78e281f128cd","e516a7d3e6cb6124"],"restriction:local:failed":["1224f46eadf9763d"],"restriction:states:failed":["804810ef9bbbcba8","8bb8b6f98d15d82f"],"water:siting:enacted":["1a50144d2155e77c","b03afdefabd7d0fe"],"water:moratorium:enacted":["da5550e87bcd99b9"],"delay:local_moratorium:halted":["9cef3b22115f1c92"],"delay:community_opposition:delayed":["a38043d281f78904"],"delay:litigation:delayed":["a38043d281f78904"],"delay:tax_incentive_change:litigation_active":["75f9d2abb9fb3326"],"delay:local_moratorium:delayed":["346f7ed881ecaa83"],"utility:tariff:pending":["959a6c65c1b74f30","59050cc9ea65018e","7d2e982178725742"],"utility:IRP:approved":["c4287797ac10652c"],"utility:tariff:denied":["c0672975e176ca01"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":22,"water":3,"delay":27,"atlas":26,"permits":35},"record_count":113},{"id":"CT","name":"Connecticut","groups":{"restriction:local:enacted":["6e1a2316302287f7","576ae2d483109634","f7bc5e6a64694fc6","afa7c0bb25faeb00","0642f9a9d449638b"],"restriction:states:failed":["717698e42ef6e901","e135ad979d2fc395"],"water:disclosure:proposed":["7a7d2e991305affc"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":7,"water":1,"delay":4,"atlas":5,"permits":1},"record_count":18},{"id":"DE","name":"Delaware","groups":{"restriction:local:proposed":["d3ed82824472253c"],"restriction:local:enacted":["20667d2af7bb1915","349d8f4e1160a386","e6b800970826b7ff"],"restriction:states:enacted":["f79088b84dfb570b","f797bd58db306835","00d385fc78b43d3c"],"restriction:states:failed":["8e1aedf35862eb28"],"delay:zoning_denial:halted":["5fef84a0dc8a6ea7"],"delay:community_opposition:halted":["5fef84a0dc8a6ea7"],"utility:tariff:pending":["5c2aae85d73c5722","7d3ea4d67fa68520","db8fb22803e36edc","5b6e0fabe7643de5","a3ef5c98705ce81a"],"utility:tariff:contested":["17240088860f9cd6"],"utility:policy:effective":["c3275bc79925ea23"]},"grid_operators":["PJM"],"counts":{"moratorium":8,"delay":14,"atlas":4,"permits":3},"record_count":29},{"id":"FL","name":"Florida","groups":{"restriction:local:proposed":["3c6d8b831356d465","e8b089b79a0f9026","7425d7591ce9c05a","e1b9861a123c1037","eff63eaba9c47d23","5b481baefebc87d9","a5e933035ad808b1","fac9127296bbb451","81e7440dc92c2b86","92a8872884499683"],"restriction:local:enacted":["a5503fc35c328f46","23c7119619365d48","8b07f1ffc26fabaf","3d8300137881558a","73505e05af5a93eb","f81b18c1e2c17955","930a54e75fe30dbf","a6dde620b7e76c37","55f91fe7e81d73f9","256ea0475a8abfbc","3d3d3059a4680f72","d7dcf42909108795","81d807032f719371","e068dd6b5ef9a080","2309ccbc3d286709","6056ac6cc19512a9","7143529782427cf5","089c1610e25cae54","6519ee70858d723f","10e7ec4ad55643e8","9d86ef4ad5bda00b","664c54df9091c973","05af516c4516ea5a","f5948f47a6af75c6","983f2c993373327d","06dc3cba02451c3d","c1218a13301328fe","b404521e586a3d39"],"restriction:local:failed":["3cabceedb3599796","cea30c117def2cca","3eec78ad6ec41fba","b3455f9b6eb27513"],"restriction:states:enacted":["bd1baf5ebba563ea","0481f85a9e1d5f2a"],"restriction:states:failed":["8cb4a715971a72e5","3ba747e753788cc7","04d2addc80c5d977"],"water:reclaimed:enacted":["41fb56a04133f262"],"water:moratorium:proposed":["edf34b85cb944f74","1cd10774835a9376","ad733fa464deef93"],"water:moratorium:enacted":["2940ba1eefc2e616","9b3a0316ced968a7","209a4247fb52b5dd"],"delay:community_opposition:cancelled":["8e40e6f05855c417"],"delay:water_dispute:cancelled":["8e40e6f05855c417"],"delay:zoning_denial:cancelled":["8e40e6f05855c417"],"delay:permit_denial:denied_without_prejudice":["a96919e42e70568c"],"delay:community_opposition:denied_without_prejudice":["a96919e42e70568c"],"delay:county_moratorium:moratorium_in_force":["a80ab26a0223aab0"],"delay:community_opposition:under_construction_amid_opposition":["30167fbd092c1632"],"delay:transparency_concerns:under_construction_amid_opposition":["30167fbd092c1632"],"delay:community_opposition:rumored_no_application_filed":["f2412c254c9be527"],"delay:meeting_postponed:rumored_no_application_filed":["f2412c254c9be527"],"utility:tariff:pending":["8decf641f8a25d7d","a3c4a2035b1bbdae"],"utility:tariff:approved":["e302a349f266e980","6e774dbc7dc0ad70"],"utility:other:pending":["49d867567171c0f6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":47,"water":7,"delay":35,"atlas":45,"permits":3},"record_count":137},{"id":"GA","name":"Georgia","groups":{"policy:cost-allocation":["8dcc4b156d460b66"],"policy:minimum-payment":["90114ff524521a31"],"restriction:local:enacted":["83b7e8e76b5ee0bc","c702f3e21493eb78","f01b7f9bb899e3d6","f7d299ad7a92bf12","3bbce17db7406e29","d82372162bbd6160","85de3463c47701a1","7086dae6422907ad","754cf92f96c529a3","c7572839bf1e65ec","0f457e9b1f07b13c","cde0de75b390a38c","190ca6042402e496","b7df742790192976","18d1622ef7bf1615","91cb94f80ea44672","8b31abcd9fbd53f1","25670f673645fec9","a263b272f78d0c97","c968b3ce64dc6e50","94471cc36a302f4d","d8321a4a32d96fe5","d6fd85ec434dbb95","e92bfd601e97e81a","b442425bf5306c01","0a299b6f3e4f8a71","97f3ce24746ab390","75bf8ea8521c54fa","0a88eeaf1510a872","b85fe594520520c1","90a000efae4eb640","c5f545916c737149","7718b91252a0926a","dea0bc58f5667b0f","31c097aea2e6b922","e07ddb442cda946c","8e0052e65c172653","8c1646131950febb","05cc6246e1b41c7f","f7dbcf4c51bf6858","a0256947e3545780","8a2dd9e2691ff06f","9f541b9254ba4673"],"restriction:local:failed":["0abc00ddccf55a33","2bc57eb4e3e90e1f","701836b773fb0b9f","69a87b66a5ff3dc2","c86da04ebcb107b1","496e8e5d89e48f9e","e1f3ad4472027620","6e2cdff1c98b89c0"],"restriction:local:proposed":["c2f04f5b50afc543","0fb52176825fcefa","cb9ce96499427440"],"restriction:states:proposed":["8f9aa89848bde366"],"restriction:states:failed":["e9f083814e55fed7","9c1953c2716db6dd","40cfc9d1ff50d003","6a4a691d7908a952","1f42995802ab1e14","1b3fd31a366bf4bd","a9baa8b690070329","30d8a643dc1032e6","35836125f8f5c6e9"],"water:disclosure:proposed":["763ca1cd9c5aab65"],"water:siting:enacted":["dfcc4d38d0110edd","e2e353fc1545946a"],"water:siting:proposed":["1054015276abc18b"],"water:closed-loop:enacted":["de00fb52546e6f23"],"water:disclosure:enacted":["2ad2d7c1dd2cabd0"],"delay:permit_denial:permit_denied":["1f36ddedf54f3fd4"],"delay:community_opposition:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:approved_active_litigation":["d0f8256ac51fab90"],"delay:litigation:approved_active_litigation":["d0f8256ac51fab90"],"delay:community_opposition:approved_active_litigation":["d0f8256ac51fab90"],"delay:county_moratorium:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:community_opposition:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:county_moratorium:moratorium_in_force":["dc2902692d6491a1"],"delay:public_outcry:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:tax_break_withdrawal:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:community_opposition:cancelled":["2a4ab4968e918d44"],"delay:interconnection:cancelled":["1de43b4a847f9aa8"],"delay:financing:cancelled":["1de43b4a847f9aa8"],"delay:interconnection:denied":["2661c3858a5d582c"],"delay:zoning_denial:halted":["07d5ce26e3298956"],"delay:community_opposition:halted":["07d5ce26e3298956"],"utility:tariff:approved":["51165aeea3b5c521"],"utility:rate case:approved":["858fc088c06ae5c6"],"utility:other:pending":["7eacf8103d2cde93","725643f3b4745c90"],"utility:statement:pending":["83d8f442e8f028cc","613ee18634340b67"]},"grid_operators":["NON-RTO"],"counts":{"policy":2,"moratorium":64,"water":6,"delay":70,"atlas":70,"permits":91},"record_count":303},{"id":"HI","name":"Hawaii","groups":{"restriction:local:proposed":["28597eb2f2e2356b"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":1},"record_count":1},{"id":"ID","name":"Idaho","groups":{"restriction:local:enacted":["95089721b56ee774","fe1a183a87096ad9","cfe65746b5a0f7e3"],"restriction:local:failed":["93f06396ad555ba2"],"restriction:states:enacted":["276f9be7f349fc75"],"restriction:states:proposed":["cefda14587a887e9","f7f09ea72ca4e50b"],"restriction:states:failed":["9c8a456a09d32f23","89b3c3ec88bdbc77","46828f9c28d595d2"],"water:siting:enacted":["d9479381dd39426b"],"delay:litigation:under_appeal":["6c2c455020d0272b"],"delay:corporate_realignment:delayed":["7e9cb32e4e8d817f"],"utility:other:pending":["7cf4e8e8f3a38458"],"utility:tariff:approved":["e898000ea6ecc3d6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":10,"water":1,"delay":9,"atlas":3,"permits":1},"record_count":24},{"id":"IL","name":"Illinois","groups":{"restriction:local:failed":["1688237928438d39"],"restriction:local:enacted":["ca8eaa4fae2c852a","6f07a6763fa734a0","09ae1486502886e8","5bd418f017328c7c","06b72d07cd1c49ac","0c47dab15c0d2f8b","0af9b2178b92e9d5","a63897e78f332f95","9c11e0fbe25fcdd9","dff4c418b6ff66a4","4dbd1742ac88cba6","98cdcd339817f68e","95fb3d3156498f12","15e7d96176c192b0","4ada4d4ff9e7b794","9f441a6e33f21096","91816e044ae91d73","606804a7751c5741"],"restriction:local:proposed":["c658effcd8a8404b","e742ed625e62ce6f","a952290a81b198a4","5b9ee8080b2a9ab7"],"restriction:states:pause":["d15586bf00803a21"],"restriction:states:proposed":["2de67be693a93ad7"],"restriction:states:failed":["6456aa7bb0b23688"],"water:disclosure:proposed":["8a7dc5bdfec701e7"],"water:moratorium:enacted":["080dab59c19bd690","2a07c1558296be02","e635d05e2074a570"],"water:disclosure:enacted":["dc2475a676fa62ca"],"delay:litigation:litigation_active":["fea0362f66d7ce4d"],"delay:community_opposition:litigation_active":["fea0362f66d7ce4d"],"delay:zoning_denial:litigation_active":["fea0362f66d7ce4d"],"delay:litigation:active_litigation":["9e23d3ec3c2afc8f","73e7e2b4984b632d","180053263745dfcc"],"delay:wetlands_permit_suspended:active_litigation":["9e23d3ec3c2afc8f"],"delay:community_opposition:opposed_pending_council_vote":["e132605bfcfb961d"],"delay:community_opposition:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:petition_campaign:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:city_moratorium:moratorium_in_force":["58cf33c3ebe468f0"],"delay:public_notice_violation_alleged:active_litigation":["73e7e2b4984b632d","180053263745dfcc"],"delay:rezoning_denial:withdrawn":["035003b98053fc06"],"delay:no_secured_tenant:withdrawn":["035003b98053fc06"],"delay:council_opposition:withdrawn":["035003b98053fc06"],"delay:water:cancelled":["46efd12bf3ea6dcb"],"delay:financing:cancelled":["46efd12bf3ea6dcb"],"utility:rate case:approved":["37ab93fd8b57c77e"],"utility:tariff:approved":["1543e61fc24998f6"]},"grid_operators":["PJM","MISO"],"counts":{"moratorium":26,"water":5,"delay":42,"atlas":40,"permits":60},"record_count":173},{"id":"IN","name":"Indiana","groups":{"policy:minimum-payment":["bf784d50ec22157b"],"policy:departure":["03586139e9d09948"],"policy:security":["19c77af74e853a13"],"policy:regulator-reporting":["dde07ed35b93f0c9"],"restriction:local:enacted":["963b8c0256246b3b","8eac5106889da9ac","183f5e5fde8b2c9e","a7e5ebb04d58be95","f4c86ae66329b23b","a3e5e35d93d700fd","a444b64740435e08","3a39e47da83f24be","c7133c46e29c6d69","5e41da92046a9bcb","ff803a94b802fe31","7db5ead22195b986","998bd34f448ab467","9e2594c01650c7f4","837d5ad2452c9a6c","42d0a19e60e69b3f","7a052f9efca8b303","5be45e17d6ec7513","c1be058ee36c4738","a86775303cb769f2","bba265c36e34c00f","ee5f8620c8465f3d","736410e487973794","faaee5c934ec1ecb","ee6a98915d4cd96d","678dfff8b193d0a3","0e6064d1c5503319"],"restriction:local:proposed":["e66e435a43f67c04","7467dd109abc68e3","fed5ec0ec8852137","c73095088bd90160","b24ea3f72d09cb82"],"restriction:local:failed":["845faec2de5f43fc"],"restriction:local:pause":["4d96d9bb18ac4024"],"restriction:states:enacted":["227139621030dba6"],"restriction:states:failed":["eea922145c00d1a8"],"water:moratorium:enacted":["2e6ca318ecd03dd0"],"water:siting:failed":["b35eb608d2415382"],"delay:community_opposition:cancelled":["bb2ed0971e6302ac"],"delay:zoning_denial:cancelled":["bb2ed0971e6302ac"],"delay:litigation:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:community_opposition:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial_or_withdrawal:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial:rezoning_denied":["d11979032cadd398","569435ce3fe609dd"],"delay:community_opposition:rezoning_denied":["d11979032cadd398"],"delay:litigation:active_litigation":["c5e676669917e797"],"delay:permit_challenge:active_litigation":["c5e676669917e797"],"delay:community_opposition:approved_amid_opposition":["6d8bec92336deeb0"],"delay:missed_milestones:development_agreement_expired":["27c39d9347a1192e"],"delay:financing_delay:development_agreement_expired":["27c39d9347a1192e"],"delay:unresolved_commitments:rezoning_denied":["569435ce3fe609dd"],"delay:county_moratorium:moratorium_in_force":["33af90259cf95dde"],"delay:county_moratorium:moratorium_extended":["6e309bb5ef6dcc2b"],"utility:tariff:approved":["4b48c2fabeec119f","fa98544ba5e059ad","6b0503ca135ba204"],"utility:special contract:pending":["113a466c8203c668"]},"grid_operators":["MISO","PJM"],"counts":{"policy":4,"moratorium":36,"water":2,"delay":51,"atlas":50,"permits":12},"record_count":155},{"id":"IA","name":"Iowa","groups":{"restriction:local:enacted":["6ec7f0571c9f0b36","b997268fd2bd8a07","a3d89d9d748c79e5","ece6aca21720a05a","b53022fa847d859d","2265266858f1808d","d2821404eb9b773b","e429297830c5c85e","2c27ac27b47a53de","8ce23138e1f0ecbd","0e74326bb2038903","245488a7b0f0baed","4ec7c3f119f63571","5d574b2e962d112d","57926d8a3b16421b","6873275732caceab","6572038f8fb6515a","09dabb3487e83177","fc20843db6b3c777","ab4c1a0e46a2c211","f73ca7c24ea9ea51","48355f233539620f","e170f696214b321f","8f8fd51101db1cc6","c5304dad0e04e811","75a122be02ae0d9d"],"restriction:local:failed":["0fa0b840766c8a19","c263db1bebb5e27f","a131c04ede50c5f6"],"restriction:states:enacted":["9e83b550b15760aa"],"restriction:states:proposed":["639d23fdd3311f98","262084f7a02f3ad2","e2e155d413c48eda"],"water:disclosure:failed":["304d0cab55c6bd68","e3e82ac6f5792d65"],"water:rate:failed":["42f37d1bced6be18"],"water:closed-loop:failed":["b47e084956bfc26a"],"water:closed-loop:proposed":["24ce35cf4b42f743"],"delay:multi_year_construction_delay:delayed_extension_requested":["4ce223b15edc681a"],"delay:design_changes:delayed_extension_requested":["4ce223b15edc681a"],"delay:county_moratorium:moratorium_in_force":["679ae4b13385d757"],"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":["12e1cb598a859683"],"delay:zoning_denial:delayed":["8e0bc83eff50a9de"],"delay:community_opposition:delayed":["8e0bc83eff50a9de"],"utility:tariff:approved":["a9a9512892558d03"],"utility:other:approved":["3046845ad149fe7d"],"utility:special contract:approved":["e59432224488c63a"],"utility:special contract:pending":["48182dc47986bf11"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":33,"water":5,"delay":37,"atlas":22,"permits":21},"record_count":118},{"id":"KS","name":"Kansas","groups":{"restriction:local:enacted":["092e69a7498ed6f4","c5d6b2d241f5cc17","5d6e924e754d82a1","d65aa07eb73bb390","2b56b5bc78d3d2c2","779bf14e695b30f3","46ebfe654cb98769","6b3d06b7e6d5546b","3e6f9643e146e802","a03f8a97d54da728","88a8f8a97b3eb631","5c9d3499ff80e6d7","61d91d35faaab6ce","49d229995410fd72","4654c90eb016ce15"],"restriction:local:proposed":["3989c573db251ea1","c49b85a22488877d"],"restriction:local:failed":["50ea4020ea582738"],"restriction:states:enacted":["2ee674af511b50f4"],"restriction:states:failed":["f13da72ca930c823","b3815616ed614981","c1154548fbef7c6e","8db95808ba8ac8e5","69b27b03dc718361"],"water:closed-loop:failed":["4eb2bfa0c2e15d57"],"delay:community_opposition:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:noise_regulation_review:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:water:cancelled":["70833cef331617f1"],"delay:community_opposition:cancelled":["7d838f4833d1b349"],"delay:financing:cancelled":["7d838f4833d1b349"],"utility:tariff:approved":["f77ece2de2ac70fa","3ba852096f736178","1dface436cf210c2"],"utility:tariff:pending":["3e89a8aa0948bcc5"],"utility:other:pending":["aead86c34e456420","7fee508d92451cef"],"utility:other:contested":["fe3448ceb67c13bb"]},"grid_operators":["SPP"],"counts":{"moratorium":24,"water":1,"delay":23,"atlas":20,"permits":3},"record_count":71},{"id":"KY","name":"Kentucky","groups":{"restriction:local:enacted":["a26d4b9555d02fc3","4a7e0503c84a18fb","068617b3ee7c1e34","27a0ce76b943a447","65fd1df9f999e56d","9b96e5de0e107e49","7206025d4f188dc5","a3f8e60045a8e496","3be8e5e1324a2209","ef0ceaa96e4124a9","b8c035523c2353d3","59ddefe2d22f34aa","bcf7474f970300a6","3b2a3d6c317e1650","a1acef1340d31231","a5a9aea1171b918a","baf08a5fdb9be408","626ca6058bcfe492","bcc91f5729167578","ad6f059e45735cb0","c9ad189fcf915368","78d859810fda2f18","971b3f19c633ffe9","0d7d376001869f9f","7cfc5e2b338d1914","0d5a0d6559c93531","341751834d403210","0cd0db1bab37a48b","a1b25cbc5a439391","6dbd46ac8566eabd","f6c91c535f7eae69"],"restriction:local:proposed":["f68fb746468a09f9","e795d08b5d2d9c0b","c509add78042616b"],"restriction:states:enacted":["77733d81d9d3baed"],"restriction:states:failed":["9900fddb93bcc64d"],"delay:rezoning_denial:rezoning_denied":["e55329fac133bb24"],"delay:community_opposition:rezoning_denied":["e55329fac133bb24"],"delay:city_moratorium:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"delay:no_local_zoning_framework:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"utility:special contract:denied":["253d0f130a165e15"],"utility:tariff:contested":["ae68fdeac34bbc8d"],"utility:other:contested":["42fead8f4bce2aaa"],"utility:tariff:approved":["801dfc830fd07245","4f7f2aea34be5c96","d0cda138d452d757"]},"grid_operators":["NON-RTO","PJM","MISO"],"counts":{"moratorium":36,"delay":39,"atlas":28,"permits":2},"record_count":105},{"id":"LA","name":"Louisiana","groups":{"restriction:local:failed":["082df063713becdd","337eff2a8faaedc2"],"restriction:local:enacted":["450b6661aa0aa3ae"],"restriction:states:enacted":["9ba2486256f256c2","144e7d01d58cef74"],"water:disclosure:enacted":["03f274e9a5dce14c"],"water:disclosure:failed":["f7cd1c9b5f782122"],"water:study:failed":["28f58e0cdd0b7e0e"],"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"utility:tariff:approved":["eff42b274f0be9ef","a83e236f50a73f18"],"utility:rate case:pending":["c65e9e2d95997fa6"],"utility:tariff:pending":["69e0ffd4849ee579","88fc6caa48aac8b2"],"utility:statement:pending":["457342b4fea42a74"],"utility:other:pending":["4a0bb7e423217973"],"utility:other:approved":["61067a61b636c781"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":5,"water":3,"delay":15,"atlas":9,"permits":1},"record_count":33},{"id":"ME","name":"Maine","groups":{"restriction:local:enacted":["ecd5966d9b342311","c36961854ebd6ca7","a4804efbc073f070","d766badde34909ee","3d017e2610e8d02c","b9330f5763dfe845","b2a8fec20ddd4e17","f5a714682b29daa5","8d49ab7b7f89d04b","27b044f270dad65f","be26656565cc2456"],"restriction:local:proposed":["6aff9b58bac5e8f3","ebf579b381f356dd","0afc065fdda3c091","b0ec262465eb00f1","8149b851eb2d0584","e3f47f6089a0ee71","3acc511d9da72bf5","fe1e50be7095ea83"],"restriction:states:enacted":["fe74bf6eed39dbcb","7d62f3ffa4427f55"],"restriction:states:failed":["4e5deea3e7dff0be","0ab980856a66fe1d","a3a43b954eba3113"],"water:moratorium:vetoed":["297d93ad9da5f26a"],"delay:state_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:local_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:water:denied":["922b3fd62f9c070b"]},"grid_operators":["ISO-NE","NON-RTO"],"counts":{"moratorium":24,"water":1,"delay":17,"atlas":19},"record_count":61},{"id":"MD","name":"Maryland","groups":{"restriction:local:enacted":["348298ff6f51a691","08097815a98470c5","4deb89713fe98326","8f74fbbd8993b148","3afe4fa64e87f546","8730de2c9ff67503","c73fe44c03df38ae","8dda8813a9c298d6","764a5ea5baee0c4d","6617f7b48c44c942","a8f91eecf6abf3b5","0afbbaf26cf8f904","83ff2804204a626d","9c034ea2bef0ece8","3373477ac1ec4f02","62bac4f016f1945b","11d1a89900718a96","eb36aed04afe9d8a","499348363c3b81ea","6f9687423e2dc4e7","dc1acf38d039ac19"],"restriction:local:proposed":["265e093c1f9eb417","755b1c07e83184e1","08ca97e19dc7abb4","3e8bbaa7cd3afe15"],"restriction:states:enacted":["17348e6b8d304518","b044300e1a2b5236"],"restriction:states:proposed":["5e23b6297efd7527"],"restriction:states:failed":["3c99947280200b8d","1fcccf76e9b86359","cf6793fd2c12b7d5","f1a32ee4fda04c94"],"water:study:enacted":["558d1f7246d3e647"],"water:moratorium:proposed":["e3bd79694db1db39"],"delay:litigation:litigation_active":["27582584bea51673"],"delay:local_moratorium:litigation_active":["27582584bea51673"],"delay:community_opposition:litigation_active":["27582584bea51673"],"delay:zoning_denial:withdrawn":["5aa3c5c167a2712e"],"delay:community_opposition:withdrawn":["5aa3c5c167a2712e"],"utility:statement:pending":["96ed3e4e28dc5f46"],"utility:tariff:pending":["b5a5ebb9845972c4"],"utility:tariff:contested":["151f94517d5bd763"],"utility:other:pending":["eecc4c5501407ced","de3593715e5e8754","b1f2cd97d9cd0cd1","246625aeebba0d27","e8088afeef1bad4c"],"utility:complaint:contested":["1f79c8153170b0cd"],"utility:policy:approved":["d89063b61a861688"]},"grid_operators":["PJM"],"counts":{"moratorium":32,"water":2,"delay":31,"atlas":22,"permits":12},"record_count":99},{"id":"MA","name":"Massachusetts","groups":{"restriction:local:enacted":["9dfd357ee1d1d79e","6fc10604ec34d46e","f0730563712dc086","e2b170911a980baf","443c78d2d2548652","51aa3706f59d3551","9a147c3e16821a2a","37641c80d5d22ef5","3bcf5029dee4b702"],"restriction:local:proposed":["6df99955fb5274ef","e88057500b5af5a2","251bed6de274003a","4e469b93e2617726","f9879ca8a354d99f","cbe95c8b12548c20","d3546c56fc54089d"],"restriction:states:enacted":["dbbfb14cd16be3f9"],"restriction:states:pause":["187e9da595e7eb96"],"restriction:states:failed":["8472091318232e86"],"water:siting:enacted":["c4f434d0074d8012"],"water:siting:proposed":["12f4ef4de2542657"],"delay:litigation:litigation_active":["655e83c186a87988","2493de70fabc445c"],"delay:environmental_review:litigation_active":["655e83c186a87988"],"delay:community_opposition:litigation_active":["2493de70fabc445c"],"delay:community_opposition:delayed":["27d4f05a55fdde9e"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":19,"water":2,"delay":10,"atlas":9,"permits":3},"record_count":43},{"id":"MI","name":"Michigan","groups":{"restriction:local:proposed":["c78ca68312691303","728e3efd8cbaccb2","f81a68f97adf08c0"],"restriction:local:enacted":["e6998880993aa177","b2511715ae4b990f","e1921072a7125833","98f07a32bbf38bd8","6f83b57549342f0e","2212cea497a5e376","6b17b974dff83ac6","0b835486e1c6675b","248845e3115d1b28","0e4058dda626a25d","576d5da42d138d11","bcdc28bfc405e76e","8408b058fbc315db","5d171a2ab62f7804","dc13381e1263b1fd","09e923cf2b67c07f","987c61998db8747a","1b63965c95a1e946","29918b3b1beffe19","99eeb7d2511ceb55","7bb3ee3000662f52","a0e759d085ba7e52","0d0e24de27bbc37a","2b9943a276289d6a","ee9073c9ad75a86f","9a62b17a98e57199","be5f41b4ec785373","ac7d9bd4ffd00f9e","9cecaa0a00ab43e5","1cb30633bb851922","f1c6da2f0000273a","ca9c48eee9e1d1a5","b70d22d7ae290b7d","c2d9415cc3e16da6","3828b0e2eec67db3","7e420db8d37c15f5","98cdd231fea86e2f","e8f1f476cf2c431f","c35e7a7d7cee74a5","e55663914c7c7dcb","33d2ea51a8acf987","51c80939f7496063","aaefdc75bd8c4aeb","911a6b9444bd1607","a7b6b76bf5329d54"],"restriction:local:failed":["516ad57aeb1648fc","b3ad7b9e668b591e","33b46a0d012daefc","3d03aba3f1700469","82599d14f4fba0f6"],"restriction:states:proposed":["a7533c1f529edc2d","6b7ffd32f765b5a4","456ce7c5d8d8f323","91c4adfd115bdb5d","c8d7e8822cffe0b7","98d30a9bf813c747","e816819481689635"],"water:disclosure:proposed":["c32c25eaa98e91c6","8bcea3f333be2510","905756b51034ebc2"],"water:siting:enacted":["d5816002c74cef1d","a2249bcfc2597539"],"water:closed-loop:proposed":["f8e09c679ee0460a"],"water:disclosure:enacted":["225876463f5c6047"],"delay:water_dispute:delayed":["1a7a2592e25c74aa"],"delay:local_moratorium:delayed":["1a7a2592e25c74aa"],"delay:community_opposition:opposed_planned":["90620f2ccd2b9bdd"],"delay:city_council_resolution_against:opposed_planned":["90620f2ccd2b9bdd"],"delay:rezoning_denial:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:litigation:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:city_moratorium:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:rezoning_paused":["cc32421f495a41b9"],"delay:planning_commission_postponement:rezoning_paused":["cc32421f495a41b9"],"delay:community_opposition:opposed_proposed":["8155ffe35c87d600"],"delay:transparency_concerns:opposed_proposed":["8155ffe35c87d600"],"delay:litigation:abandoned":["b9b9b57ad82d9568"],"delay:community_opposition:abandoned":["b9b9b57ad82d9568"],"delay:china_ties_backlash:abandoned":["b9b9b57ad82d9568"],"utility:tariff:approved":["630e6b38a0b9bb35"],"utility:special contract:approved":["cd42a1000e119f0e","50f9ae193de9e4a3"],"utility:tariff:denied":["a850b2486651c1d3"],"utility:tariff:pending":["5bc36f6821c8abbf"],"utility:policy:approved":["54c782b0ead7889e"]},"grid_operators":["MISO","PJM"],"counts":{"moratorium":60,"water":7,"delay":91,"atlas":55,"permits":1},"record_count":214},{"id":"MN","name":"Minnesota","groups":{"policy:cost-allocation":["0e9cef0d480c11c6"],"policy:departure":["96d76c523368de3c"],"policy:supply-review":["fa129260c9a1191c"],"policy:clean-energy":["5b0759b74511376b"],"restriction:local:enacted":["b739365ff698ee0a","d80387aab9ef2c1b","c3cc4eb6dd8578c2","0dc094cdf13edec8","5aa9e70c1a21d1c7","3fba111c587a7167","199bf867a340507d","d26a44d5312532d6","8e5e33fb9390f491","5ab133e795e83aed","385a484f3217fe24","793265102ee5e04c","35608fd55ce01e87","4fcdd676bd44f6aa","d1abcacd61245c1f","45935f6103775172","db3bb10a74b42708","ba8faf4607030280","8e02e3b0e7618f3a","3f4d995fd6fa4cfb"],"restriction:states:enacted":["2ab863890b12fdcb"],"restriction:states:proposed":["86e0d1d3835c9be9","c61b092c34b879a0","22e3f68246b5a4cc","797e76275710b3d8","7143edd8de397ba4","89d199639f253ee5"],"restriction:states:failed":["d0a94e01d35c42d4","3e22495abb3596c7","e2236d557902ae56","a3cf11f7c0f5a8bf","dfab67689c609a1b","23cc1180dbd6e5d9","eaed289a984419ff"],"water:moratorium:enacted":["e18e98913f2987dd","e11834d93a5792ed"],"water:shield:failed":["edb4285bd2e6d496","48bbbf542eb24d6c"],"water:siting:failed":["9c0626855c13a619"],"water:closed-loop:proposed":["bec7c68e6812d46b"],"water:siting:enacted":["f02889f2df50210d"],"delay:environmental_review:litigation_active":["51ba402b96b22669"],"delay:litigation:litigation_active":["51ba402b96b22669","2eb3d7b7efd8d959"],"delay:local_moratorium:litigation_active":["2eb3d7b7efd8d959"],"delay:litigation:construction_halted_by_court":["3e814c29543f4a91"],"delay:environmental_review_inadequate:construction_halted_by_court":["3e814c29543f4a91"],"delay:litigation:active_litigation":["6afa0ca47b947af4","f52d37a4709f02d3"],"delay:city_moratorium:active_litigation":["6afa0ca47b947af4"],"delay:environmental_review_challenge:active_litigation":["f52d37a4709f02d3"],"delay:environmental_review_pending:final_decision_paused":["452d128b99f4b891"],"delay:city_moratorium:moratorium_in_force":["7af8f1a65d714f3c"],"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":["796fdc6d59ce947f"],"delay:community_opposition:withdrawn":["7565837e009abac3"],"delay:council_vote_delay:final_vote_delayed":["800f8019c1868fa1"],"delay:community_opposition:final_vote_delayed":["800f8019c1868fa1"],"utility:tariff:approved":["0669b1659a0e805f"],"utility:tariff:pending":["bdec46fd73a2cf42","8fe5290a1832e86c"],"utility:tariff:contested":["2b6636adee0c7012"],"utility:other:pending":["049d9ec6a4db5efc"]},"grid_operators":["MISO","SPP"],"counts":{"policy":4,"moratorium":34,"water":7,"delay":31,"atlas":30,"permits":7},"record_count":113},{"id":"MS","name":"Mississippi","groups":{"restriction:local:enacted":["ecef92d17dfc1c52"],"restriction:states:failed":["ebb062a18af2c39e","4ed51c6c792fa708","e4e4ee9189096b02"],"water:siting:enacted":["5a06d81d34bea26d"],"delay:litigation:active_litigation":["4063038ccfbba534"],"delay:unpermitted_power_plant:active_litigation":["4063038ccfbba534"],"delay:noise_nuisance:active_litigation":["4063038ccfbba534"]},"grid_operators":["MISO","NON-RTO"],"counts":{"moratorium":4,"water":1,"delay":4,"atlas":12,"permits":1},"record_count":22},{"id":"MO","name":"Missouri","groups":{"restriction:local:enacted":["d90eaac4fe51359a","176fecd092621295","204232d5f8ca8df3","79b2a4ad0fec8c24","7017a935b3b7ecbc","85d940e773175229","f803c38f884f6aa0","de0764506bff684b","08196d135c493f63","8d67875968fb64f7","bed91c8df00c2c5a","21f8768f48599598","14bf3311c27da66b","9d5e52899f706d27","f5c0d2e49453bac0","8e6ecd071b72033d","c6cf03998a9e63c8","a9eede6ea17f0f0b"],"restriction:local:failed":["96f484a5795f8aff"],"restriction:states:proposed":["2195fea337e09dc1"],"restriction:states:failed":["79f07d9601a68a2d"],"water:siting:proposed":["fecf28fd776e3f17"],"water:closed-loop:enacted":["f922a9cc8df7f6f1"],"water:closed-loop:proposed":["c842f3220a560928"],"delay:permit_denial:permit_denied":["b6e024ff51469e78"],"delay:historic_preservation_conflict:permit_denied":["b6e024ff51469e78"],"delay:community_opposition:permit_denied":["b6e024ff51469e78"],"delay:county_moratorium:moratorium_in_force":["d74c3761e71266b9"],"delay:community_opposition:moratorium_in_force":["d74c3761e71266b9"],"delay:interconnection:cancelled":["8cb756be5b7ae3a9"],"delay:water:cancelled":["8cb756be5b7ae3a9"],"utility:tariff:contested":["8de24874c642dcbd","f91605a21f63d072","d9c3570921a04363"],"utility:rate case:pending":["082924cd33e117e5"],"utility:tariff:pending":["7394fb772ac183e9","faf8561206d5bf0f"]},"grid_operators":["MISO","SPP","NON-RTO"],"counts":{"moratorium":21,"water":3,"delay":32,"atlas":33,"permits":25},"record_count":114},{"id":"MT","name":"Montana","groups":{"restriction:local:proposed":["9243773c369f1ecf"],"restriction:local:enacted":["8d6ef72e11d1fccd","3ecba2b53f87c88c"],"utility:tariff:pending":["6dcfac3c7c1172f6"],"utility:tariff:contested":["d367203d6f870b27"]},"grid_operators":["NON-RTO","SPP","MISO"],"counts":{"moratorium":3,"delay":6,"atlas":9},"record_count":18},{"id":"NE","name":"Nebraska","groups":{"restriction:local:enacted":["d3d7827f878ed2cf","c57a91902ce91633","4674af901736f5cc","e196b29819de5c9a","135d7b8ca90eebf7","d568851b5061cdaf","81440ae3fafa3d75","e8af315b45a1acfc","08fcf1d2b6f49514","160252554036f1ad","32303ecaa9e0a2ad"],"restriction:local:proposed":["affd265938fabf3b","8c97d016dfddfc1b"],"restriction:local:failed":["1d8ae470cf5d925b"],"restriction:states:enacted":["230cce9838d45d24","e688676c3ac0f747"],"restriction:states:failed":["67b1ace6369704fd","50fd44805485a090","ff2913405faf7657","8d77947d7b8a528f"],"water:study:enacted":["fe6d9f80cee7122e"],"utility:other:approved":["32c8b9ae8d888b6c"],"utility:statement:pending":["4af3c2798acdbf21"],"utility:rate case:pending":["1e47741959ff4b29"],"utility:tariff:approved":["823eb52c6feaee82"],"utility:policy:effective":["c01aa91e1a04b36d"]},"grid_operators":["SPP"],"counts":{"moratorium":20,"water":1,"delay":32,"atlas":13,"permits":22},"record_count":88},{"id":"NV","name":"Nevada","groups":{"restriction:local:enacted":["333dd9b87e58bcbb","b9a69bbde96b5385","55b16953865e48f5","37f2d1d5eb3e2cea","5b58a9e336830633","6773b1cfaaba1346","935d2182c6d74d12"],"restriction:local:failed":["402c12e2dbad57ba"],"restriction:states:enacted":["619839655d751fb6"],"water:moratorium:proposed":["e61948237d868f0e"],"water:moratorium:enacted":["279be78d9d551bf8"],"water:incentive:enacted":["efec6184955a1086"],"delay:water_dispute:under_appeal":["d29280cf2b0521a1"],"delay:community_opposition:under_appeal":["d29280cf2b0521a1"],"delay:litigation:halted":["a81117457f2cb354"],"delay:environmental_review:halted":["a81117457f2cb354"],"delay:litigation:litigation_active":["114d5609ed0f4f35"],"delay:local_moratorium:halted":["5c9d9715723ce0bb"],"utility:tariff:approved":["a7207409cc3dfd45"],"utility:other:approved":["fb307da5f358f615"]},"grid_operators":["NON-RTO","CAISO"],"counts":{"moratorium":9,"water":3,"delay":22,"atlas":20,"permits":18},"record_count":72},{"id":"NH","name":"New Hampshire","groups":{"restriction:local:proposed":["e63e233025fc94fe","b44152b5d37d167b"],"restriction:local:enacted":["d80de2562936a0f7","92290f0a7d985a7f","36c9c8099e12dd15"],"restriction:states:proposed":["5a9909b17dfc57b4","02f0a87d99437f9b"],"restriction:states:failed":["ea8860685576e23e"],"delay:community_opposition:withdrawn":["c1a6706de3454167"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":4,"atlas":5,"permits":3},"record_count":20},{"id":"NJ","name":"New Jersey","groups":{"restriction:local:enacted":["73ec87cfb0aa92d2","9c00fd42521991f9","a384a032bef8e970","124a77e04ac821ec","f23cd51e2cc7cb7f","238c6e78c54a4877","3af6dd3170f1aa82","714725f2229b99d0","08f19d7681319c4d","8cf681d798655aaf","20d0aeda361ce61b","a2b1b417fb0a76fc","face92012462a2a7","968c4f50d3bde674","ceb24ddecb59d86b","3a5c452ca6841c71","742e4aac2483f4af","80f6f1b93985f9f7","c95d899c60e09eb6","7c69fc6032dd27e8","60c1835a0012ce53","054f376e8df396e6","64e87a1ece4414b3","1b9d7255dcc00d88","e3e0f29d691690ec","01b12fb419074edd","c74b23df8b93a3f0","db82850c96b7a694","9844557ef3af937a","559fbafe318ed5ac","0c592d7ddda2c6ac","a784c9eec1d5c3f7","5fb4b28c2b68eccd","ea304a4830a80fb4","fe372a70ddf19936","48334bde9c2fa0b9","d177f8f0171343b7","62a91ee8ab340642","ebd8ee2e6043e34f","39ed97a814dde3a9","3a432a805dccac1c","50b87b303123480f","9a18c03c18a10dd4","b3ca39b6b1630160"],"restriction:local:pause":["1a9db0d9060caea1"],"restriction:local:proposed":["ae409fafdf46bd29","f884ab9b88fff31b","927a7a3ac1c78482","d95561001f914447","7be184c2d2a57e2b","0e8c72bfcc16a39e","8820df8f26c39fea","78d39318109dd5e8","fd2b054d547ea766","df9befec2a94c308"],"restriction:states:enacted":["4df967540ce38c86","30be08e4be6ac9ca","68de33fe969f9287","0438d1ace3661698"],"restriction:states:proposed":["f19c1038b15c7609","d12af38fe29d843e"],"restriction:states:failed":["f915c938338285f1"],"water:disclosure:vetoed":["800fd0cd4f6bebba"],"water:siting:proposed":["45f1ccb950a71b8a","a375aa38a4210e7c"],"water:disclosure:proposed":["0cf376028b422204","36230e1c7c9edac6","c77115dfc059c958","de400f891c588542","6998a87b3e02ca11"],"water:study:proposed":["a7495217b70ef1e5","9cef65942ed49967","bced9687293104ba"],"water:disclosure:failed":["59ae5b971166ac3c","791cdd88090bef4e","1908cf4216d925bc","073e65e826df6c51","378fb181ac8f016c","60262597b91c5af0"],"water:study:failed":["f640ec3294e3f1f2"],"delay:zoning_denial:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4"],"delay:litigation:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:local_moratorium:litigation_active":["b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:community_opposition:litigation_active":["b617e293b82d2ac4"],"utility:tariff:pending":["f28161bfc2c29f8c","3620e96459726891","1a6ae3c2ad122164"],"utility:statement:pending":["2e9ea8571e10d078","7a11205dc76a67a6"],"utility:tariff:approved":["296ea913839e1b58"],"utility:other:contested":["5c1b494458632232"],"utility:policy:effective":["3af8bf166bd3c54d"]},"grid_operators":["PJM"],"counts":{"moratorium":62,"water":18,"delay":72,"atlas":65,"permits":18},"record_count":235},{"id":"NM","name":"New Mexico","groups":{"restriction:local:failed":["818109db81472817","f9afe907073e0002"],"restriction:local:enacted":["297204240678eb0e","9ff51438652ddf60","59bea7e940d70194","ada7aa80e60c9320","5eb7f0ff789e43fa"],"restriction:local:proposed":["8ddb604cc82e2c35","b6fb3ebcb7f6c50f"],"restriction:states:proposed":["a99720a3bb94fcaf","78568f32702491ba","b4b3d5817b49728f"],"delay:litigation:litigation_active":["f3a0c010a8f35a41"],"delay:zoning_denial:litigation_active":["f3a0c010a8f35a41"],"delay:community_opposition:litigation_active":["f3a0c010a8f35a41"],"delay:financing:litigation_active":["f3a0c010a8f35a41"],"utility:other:contested":["8ef259cb295588bc"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":12,"delay":12,"atlas":10,"permits":7},"record_count":41},{"id":"NY","name":"New York","groups":{"policy:environmental-review":["71f511e90d956ca8"],"policy:permit-hold":["4c560e212a74545e"],"policy:supply-review":["ab3c1a20557c8b23"],"restriction:local:enacted":["77679a7c3332c853","a787c81c1d3730a4","cdc22ba5f2f05b59","b14b8ef8ed1860cc","8cca37bd22e9d7b5","4975cfd97e76b52d","bd582af96f35230a","5ffdbe85acc1bde0","a1694e06d983606d","8981b39c54144dc6","d0967cbc5048c7de","210debbc0355f8ce","f47af1d0c2261335","b9f412d2266126c0","723df3b34c814ee8","cebe672bdd456765","edbfc6143edc2bdf","8a9e37cabb7d8067","59d414cbb6a42f77","17aedba2bb3f2d87","2e58841b837a406b","0e1022291bffc7b7","12dd3a35361949ae","3511a027b56d7d7d"],"restriction:local:proposed":["dcd7ff846525f0e1","08c437cc51d4c950","789641906952093a","28bc949979bb83db","111d81838fa01dde","3e58cfc1f209b083","7ae98bc62927c82c","9137cf580ba6858a"],"restriction:local:failed":["cb6d8c82049c8acb"],"restriction:states:enacted":["869f08a4a1fa556c"],"restriction:states:pause":["841d22380b00ad01"],"restriction:states:proposed":["b7ba31aec1fafd00","47c9cf15c60d51b3","daaf6dec95bd6ec2","07d737c4acf173d7"],"water:moratorium:enacted":["8fc3c7d9b9ff9ba8"],"water:reclaimed:proposed":["4ee636f9337e1806"],"delay:environmental_review:delayed":["51347b4b64fa9e01"],"delay:community_opposition:delayed":["51347b4b64fa9e01"],"delay:state_moratorium:halted":["293beafa3fa06f20"],"delay:local_moratorium:halted":["293beafa3fa06f20","77e9bf4bd7aac210","ee2c0366ee0ef429"],"delay:litigation:litigation_active":["e81eb7c91736a32a"],"delay:state_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:local_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:zoning_denial:litigation_active":["e81eb7c91736a32a"],"utility:other:pending":["57638a6f961a13ac","1552fe1a118cce4c","e654e6cbee2e4334","6cf999b790c4a9a6","5b7294bb9bbf171f","a15e9c634f236eaf"],"utility:tariff:pending":["acb3338b2c56b00c","637843fba8961a3b","f4e2166ff0723f1e"],"utility:tariff:approved":["d8fdd2247363f439"],"utility:other:approved":["4b76df05fa507106"],"utility:statement:pending":["85d4d00b457a99fb"]},"grid_operators":["NYISO"],"counts":{"policy":3,"moratorium":39,"water":2,"delay":41,"atlas":26,"permits":4},"record_count":115},{"id":"NC","name":"North Carolina","groups":{"restriction:local:enacted":["0878148bce531a65","26626f41150f13d7","5d4e94286383e811","45843231657d4577","b767f9b8778c3e9c","0425c77f21429fc9","160ecb6859daba38","f700899151bd3d13","afaf001e2ddc7c0f","9125956ad212eba6","1e5e7d19256112cb","de170f5d806a8488","7e05882bb14eba58","d5446d1a27d68afb","66d7df4ef7713b17","a96570a4d8c02995","03d509191d6a1bb8","d3b97dbcfb4cc458","11b4b426a5a3adeb","9730db9306df2eda","f7b5b5059f3d9a76","a7863b1a8d95a6f9","e6debd81c60b3074","72b422fc810eeab3","6bfcfb56a94aa399","0fe95e27742d2793","7f7b78e8dd0072a4","3ab16e9b6bda0047","58f61d5e2dcac367","901f12fcfb423655","77ad5d31685db4d2","13de2569fd40eab9","2c3f7f7d7474e8df","047fa125450d5c53","d7d45ef0e253b55d","2aa6e2ef54433db5","076a69b4395ac51c","aeb0772ca82eb874","49ad917ecc3002cf","c355e8d58e082040","1eeb09c2f8b5063f","37a1cf7995845834","2bd64ffed6dec4b3","17d8cc51d6a5711f"],"restriction:local:proposed":["84efe8243d6504bc","181bd4b518b2cfed","b83f8907c29714e9","8294c67374182bdf","8b259a9fdb940566"],"restriction:local:failed":["928488ab5100d192","aafc220952d6a48c","e3fad9e4ae5cae83","b68811b610a11964"],"restriction:states:proposed":["f10a82ce8ce07853","2bf52937fb8640a7","d91aa188fd06f5e0"],"restriction:states:failed":["35ebc5f44dd67c98","ccde728219226db1","857477e095526aaf"],"water:moratorium:enacted":["b9f652a9b7c4b011"],"water:moratorium:proposed":["38d2bf42e833778a"],"water:closed-loop:proposed":["ad8e73dba358f034"],"delay:community_opposition:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:zoning_denial:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:litigation:litigation_active":["26de238e0f400d29"],"delay:local_moratorium:litigation_active":["26de238e0f400d29"],"delay:community_opposition:delayed":["886117a42038f872"],"utility:tariff:approved":["3733629beaf1ada1"],"utility:statement:contested":["8f109ead8aab43d0"],"utility:statement:pending":["5338dfae87b7a6f7"],"utility:tariff:pending":["535ff2bea70f7e1e"],"utility:other:pending":["36e711f6271a98a9","b8438dca9b49aebd"],"utility:tariff:contested":["1a0900299d02d68d","f4c8c4668d869233"],"utility:rate_case:pending":["45ffc3ccaa151b55"],"utility:other:denied":["7d51d5e504430b5e"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":59,"water":3,"delay":67,"atlas":44,"permits":34},"record_count":207},{"id":"ND","name":"North Dakota","groups":{"restriction:local:enacted":["918ec9976a6ebc76","5fe4251ab4cdcb1d"],"restriction:local:failed":["da10b7684b67acdc","b94dc16d48f67fd9"],"restriction:local:proposed":["0867cb4ffce5c18b"],"restriction:states:enacted":["10810ad90dae3c22"],"restriction:states:failed":["06b00e83aed9df20","37e09c9be2329183","45f55a5bdae7aa9c","bc1c99050827355d"],"utility:tariff:pending":["bd130d6595b26f7c"]},"grid_operators":["SPP","MISO"],"counts":{"moratorium":10,"delay":6,"atlas":9,"permits":2},"record_count":27},{"id":"OH","name":"Ohio","groups":{"policy:cost-allocation":["55634d9b0e3dbe0d"],"restriction:local:enacted":["461dc19405784392","691815701a1e7b84","407f6a32f3a3a0ae","1d451c4d01991061","c05d611c3e7dd8d5","303593cae196f587","7a83cf56d52a963c","7fc064d20dc788bd","a7e5c5aec188366b","7ce6031118cad4fd","8f219dc030624cd2","950d5e0e199dfb22","c2b95d5838587ff4","9ba6b9b9692b4708","d72f4489e825fef2","940b6159ab502612","f0c97f968bab3081","405f1ab18b45cec2","8542695ddd9b5b30","7026f0fd2b5bc6f0","ca89ad24dc656f79","978214f7dd1d9d8f","c1bda0acec337164","730091555169da66","3b3d27d4919f1e77","a96013d0b5b1c9a2","d8f63ab9b450228a","cc6ca7b31398d910","306d3fab23b96651","f394a0eb7801b57b","0ac4ec70dc0bb4ba","6cbf93fd3792d38e","c0aba8a27555a0c0","d533d9f7cdfc603d","ea2a114d10a3194e","61fe898c9107f2ba","4b26ee4f418c3dd5","cccc5aef83beacac","f1d5c9a4b6023b27","4fbd89f670532629","421b341a093f14c9","53701fd2f75ff500","23811974e54dcac2","b90f5b1569114026","ca5208c669ad2550","ecf81cf135cd7c41","fe4bc2e21abc7fd0","c636f6e8fe61d8bc","70667db94a767cf0","d3ccdcc868a68902","0fc759bfa86292c3","12369281bb53a55f","5f2de78e4e2f9413","2321a1c503022d33","bc140f9d0778a158","88cd458bc7993ab1","e281827c22b8aaa6","904259f746e7f001","668044e9a5218b84","e526f703d4ba3d40","406582468189cd53","e560f4fc1b2d48cf","15eda7648a7da254","1ea75a7e46cea951","8c428e28c6fa59b7","94595b6204b14f34","a795c2b6fa5fb605","a91e87e8e532a81a","0f566e9f055d874d","a3338ba4c589f2a1","024a636c91c52568"],"restriction:local:failed":["941a2b27ff9dd2f9","f0125c1f3d577939","1984235e10d07864","47e7f50ceb79bde2"],"restriction:local:proposed":["329efb5b9ab278b2","fe3263d096bb1d42","f0c8462ea6d10a36","5d2dc1ac11a37fd0"],"restriction:states:enacted":["a33e963e7ed0f3f9"],"restriction:states:pause":["aac6bd4ca937a3a1","790d7df967d13e33"],"restriction:states:proposed":["9791d6ee8a159714","5bb7dbbf3f54e1f6","076c38b44f191708","35dfe120e8f90c81","a4f886faea465453","f67274b3d1ca79e3","b0b20187a84ac61b"],"water:siting:enacted":["1fc784371ef77c63"],"water:closed-loop:proposed":["d9a55d5bd1815a7a"],"water:disclosure:proposed":["07d5958ebc0e2919"],"water:siting:proposed":["af9b7989afe0d6ff"],"water:moratorium:enacted":["b03281ae45156609"],"water:rate:enacted":["f38675b9d14c3301"],"water:shield:failed":["31cb3e61422ae705"],"delay:community_opposition:delayed":["6041ee70dd8ec4f2","33619bda345609b8"],"delay:regulatory_review:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:power_allocation_dispute:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:corporate_reassessment:construction_paused":["ec84904200576a9f"],"delay:openai_relationship_change:construction_paused":["ec84904200576a9f"],"delay:tariff_costs:construction_paused":["ec84904200576a9f"],"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:signature_gathering":["738d37cb16e4b52b"],"delay:statewide_moratorium_push:signature_gathering":["738d37cb16e4b52b"],"delay:local_moratorium:halted":["8924323156a513a6"],"delay:community_opposition:halted":["8924323156a513a6"],"utility:tariff:approved":["b119f3dad60e8067","b0b7b5e3ba42091a","feb6e8ebba7bc21b","d471fb8c04d4d42b","e688652c63a8603c","3b0d6703179b004f"],"utility:tariff:pending":["4e7c1eaf6aefd563","8d64014cf73ea8c5","33358a52bdbff1e9"],"utility:tariff:denied":["d77af2ba4e087bb7"],"utility:rate case:pending":["1f4f51f2805cd230","4e52d117f119a0ab"],"utility:other:pending":["8867995dfeac8af8"]},"grid_operators":["PJM"],"counts":{"policy":1,"moratorium":89,"water":7,"delay":156,"atlas":100,"permits":15},"record_count":368},{"id":"OK","name":"Oklahoma","groups":{"restriction:local:enacted":["50b51ab105de1694","4d5225243a046a38","42183c5f0e187ec9","2da276ac2eced4b7","409936f3ff16ca77","fd3e3e400e15bcb3","311f0b103dd1c20a","e11236c60dcb019b","af39a5a9b91cf374","80850e3b3240130d","6d6d4b47a1f08094","fd7e05f695b792fb","57bfec0310076c02","ac38ecc9080693a4"],"restriction:states:enacted":["5ce11b610f2019f8"],"restriction:states:failed":["c5ac0e3ebaec0fff","df4a0cf535656562"],"water:closed-loop:enacted":["f01e9c7f92ad912f"],"water:disclosure:failed":["4cffe4be712b7fee"],"delay:community_opposition:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:water_capacity_constraints:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:city_moratorium_partial_exemption:phase_vote_delayed":["d2464a0059b2da36"],"delay:planning_commission_delay:phase_vote_delayed":["d2464a0059b2da36"],"delay:community_opposition:opposed_proposed":["d6d03051edf8cadd"],"delay:transparency_concerns:opposed_proposed":["d6d03051edf8cadd"],"delay:water:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:community_opposition:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:financing:cancelled":["b81165f74fca6c9b"],"utility:complaint:contested":["6a0e62dd608338b3"],"utility:tariff:pending":["0244a5050bd89f54","d23c9de2ed780784","369b25b59f1044b0","8caf179819a91899","b44407ade651e171"],"utility:tariff:approved":["7c0393e3288507ab"],"utility:policy:effective":["533edea4d22fcfc3"]},"grid_operators":["SPP"],"counts":{"moratorium":17,"water":2,"delay":29,"atlas":25,"permits":34},"record_count":107},{"id":"OR","name":"Oregon","groups":{"policy:cost-allocation":["ec3aab8c8e487810"],"policy:minimum-payment":["09b69a3ac7ed320c"],"policy:clean-energy":["573b7be7282c24e9"],"policy:regulator-reporting":["82e5b2896507c105"],"restriction:local:enacted":["c46ac99932456879","bfb08271f1889aa3","406a4fe8c580044d"],"restriction:local:proposed":["9fecbaadfc504d91","55072e55f3993603","c167670c15d2c9ec"],"restriction:local:failed":["2217c7fce49a6fcb"],"restriction:states:enacted":["4266a70286a34bc9","fd7d68ca06671d0b"],"restriction:states:pause":["b05de37e3bed5008","0bb7ee781820adb4"],"restriction:states:proposed":["1d87e7ca35d788e4","97e59a9c63be62e9"],"water:moratorium:enacted":["f436cd79501cb106"],"delay:litigation:litigation_active":["189ec25f09c73d30"],"delay:local_moratorium:halted":["fc7ac8c5e0c9a3e0"],"delay:water_dispute:halted":["fc7ac8c5e0c9a3e0"],"delay:tax_incentive_change:halted":["fc7ac8c5e0c9a3e0"],"delay:community_opposition:cancelled":["508cd09772361d44"],"utility:tariff:approved":["8f26d54b8098d83a","933a75515edac858","919ed293cccce0b5"],"utility:other:approved":["fd904a85f9f038d0"],"utility:tariff:pending":["90bff93d506e12d8"],"utility:other:pending":["500c12c6d84c5535"]},"grid_operators":["NON-RTO"],"counts":{"policy":4,"moratorium":13,"water":1,"delay":16,"atlas":8,"permits":28},"record_count":70},{"id":"PA","name":"Pennsylvania","groups":{"restriction:local:enacted":["38de5bf25db60ea6","a07e0f5e3b200bbb","e0e19b054c78ba90","d57a038848981525","08cc6d470b3f20a4","786ec40f80121492","9d46b0435161c347","7f0801a61ac6bdc8","e91f573252606528","30d8d8996a24365c","7a05632963af26b7","0525ead7d8196b60","c49102319b7d9c26","828f9f1b7a9fc4d8","7e498adfb9cf36be","30e2226befeb9e41","d01de37fe2c38608","3ef85431f6a82760","50a74ef750ecebc2","86690394ec34fe0d","f4098716a0ee721b","2f1f35aee33b8d1b","0b7ff980380eafa0","a80d24e122853bfe","83bf5bc987c8973d","b4f499936ec56461","b3ea3d581da9a606","71a38b1ed5950ad1","e191001ca64a606d","f9511193a66cd3bc"],"restriction:local:failed":["491849e21df0aa97"],"restriction:local:proposed":["04f7d83298b30de7","f979d0fdee3f9fa3"],"restriction:local:pause":["533afd77cfc5eebb"],"restriction:states:enacted":["7f4af8a87d95c544","7471943bfacd9b79"],"restriction:states:proposed":["6aa38b3ad7bc8095","30479ff8f518235c","2f437f53e7c38048","535c2efca50b83dc","1b368eec31f98fde","5442b108786851c0","f486ff97ce82e49d","7739eeecd45bc5b3","a5f21a3c4a91636e","a4c98945f6116fb9","122b2ca8ea2dce4c"],"restriction:states:failed":["291e4c7a5a21088d","9a687477c380a153","9ab4c50b87f3e567","c916da28feddac2f","a879ae6745a42d11","ce6deddc6f7620a6","d3752761d30cd8b6"],"water:disclosure:enacted":["71b44216bc39b316","19977f7326ae5f36"],"water:disclosure:proposed":["ce335eca213a335f","268f6575720b3e76"],"water:siting:proposed":["e6cd4c87af287f2e","ec0986faeb616e79","02edb086bcb4ec16"],"water:study:enacted":["7e7071bf9f2d7636"],"water:siting:enacted":["f4b911f9a8638b44"],"water:closed-loop:proposed":["ecec2267314e711d"],"delay:zoning_denial:under_appeal":["221a7177ef54c146"],"delay:community_opposition:under_appeal":["221a7177ef54c146"],"delay:litigation:under_appeal":["221a7177ef54c146"],"delay:litigation:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:cancelled":["72fbfc95e6717af4"],"delay:zoning_denial:cancelled":["72fbfc95e6717af4"],"delay:community_opposition:delayed":["91270d77ce33c433","b79613921282641a"],"utility:tariff:approved":["4c72868c8e004412","c89690d0346c7890","ac3f1efb2976fc5b"],"utility:rate case:approved":["e934571677cf1704"],"utility:other:pending":["fbc1615a2aea7504","84096c1cd33d1c29"],"utility:tariff:pending":["6ccd7eecfb420cbd","03f4e94591ffe708"],"utility:tariff:effective":["d4a74e67bb8dc281"],"utility:policy:pending":["04bd0eb54a15c158"]},"grid_operators":["PJM"],"counts":{"moratorium":54,"water":10,"delay":84,"atlas":53,"permits":21},"record_count":222},{"id":"RI","name":"Rhode Island","groups":{"restriction:local:enacted":["ed259525eb90ab6d","dab8ece38c5fb9d5","09f9a1112ca9bb16","8758bf36db37de62"],"restriction:local:proposed":["9c9aa6a6cab87eae"],"restriction:states:proposed":["39109139e4499da1"],"restriction:states:failed":["87b18404613879e9","1ca1db6d54c60804"],"delay:zoning_denial:litigation_active":["09f90dd4b212e592"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":6,"atlas":5},"record_count":19},{"id":"SC","name":"South Carolina","groups":{"restriction:local:enacted":["58631f91fad85e5b","b8911b8723010e16","f7b981d36cb76fc6","ead5aac6d1de0198","28116638b206c684","e712a9602d7fc092","17168f8283569007","3fbf04d4d1abbc30","b5c702b7d9d268b1","31c3c407ecaa9b02","08d501a7dce90945","bfe556ca5819bf38","65163505f47f6e65"],"restriction:local:proposed":["d522fdfd4fa7adac","9e6a95af9b1a6338","5e3217c2394c85d9"],"restriction:local:failed":["ead4c3dd6bcf23b7"],"restriction:states:proposed":["70456b2f17fa016f","1bd520760aca35e7","dfe1a31d8cfe99e5"],"restriction:states:failed":["d7cf8717beef89cd"],"water:closed-loop:proposed":["836cb4c1add36778"],"water:siting:proposed":["d5588d305d72ed31"],"water:moratorium:proposed":["feaa74b8ade8d152","e0c20f860681a471"],"water:disclosure:failed":["2a360b96adeac4a5"],"water:closed-loop:enacted":["c4c6394d78cf14cf"],"water:moratorium:enacted":["83129110381c2b8d"],"delay:regulatory_review:permitting_challenged":["ebbc3548ee675c57"],"delay:environmental_petition:permitting_challenged":["ebbc3548ee675c57"],"delay:utility_interconnection_timing:abandoned":["59d31c90f99a8e27"],"delay:withdrawal:abandoned":["59d31c90f99a8e27"],"delay:county_moratorium:moratorium_in_force":["4fd68a1a4d95ecf1"],"delay:permit_denial:halted":["2a19530b645b4515"],"delay:local_moratorium:halted":["2a19530b645b4515"],"delay:community_opposition:halted":["2a19530b645b4515"],"utility:tariff:approved":["a6a9b54dc2f7e887","4acfdfc6ae530074"],"utility:rate case:approved":["836e8495e0094213"],"utility:other:effective":["4650a698f603d88c"],"utility:other:contested":["5976280cf4e599c1"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":21,"water":7,"delay":30,"atlas":22,"permits":3},"record_count":83},{"id":"SD","name":"South Dakota","groups":{"policy:cost-allocation":["e1de11c16d8239a6"],"policy:departure":["b87c8e5ab20d7865"],"policy:supply-review":["5f04413f1e1d314b"],"policy:water-reporting":["3d0987d18045023f"],"policy:local-authority":["d5abe6128808804e"],"restriction:local:failed":["0c5ecfaba5561367"],"restriction:local:proposed":["5a5f4731708d3508"],"restriction:local:enacted":["127e547bdcf06887"],"restriction:states:enacted":["e69882d4dd9dec56","e0c13222b8896f55"],"restriction:states:proposed":["d2cb3118b636a794"],"restriction:states:failed":["3ddf71976e354659"],"water:disclosure:enacted":["95158506706fb5b4"]},"grid_operators":["SPP","MISO"],"counts":{"policy":5,"moratorium":7,"water":1,"delay":4,"atlas":4,"permits":1},"record_count":22},{"id":"TN","name":"Tennessee","groups":{"restriction:local:enacted":["15608211c6ca3581","307b38ee1b228384","23049879ff0a5d1c","7cebe8d5c67147c3","747d1db6063c1a74","51b2b9b3a961b6ab","de659fa3e365eec8","33552bf4e80b18ee","730a5f5d55050cb7","087bbbb5a483b776","0137c4ed47954709","8272522f979f7008","9d632430d6a03021","78dbb699f219d0d0","1f546cb2797f996d","c43fd1c858232412","b97b3954b1b0949c","d68b3a39798f9791","f0bb509eaf3c5b2f","a431da7d7f705e27","048501d4a5383269","8cb4602a6ee8dcbd","af28772857e3903f","3e19367856e206f1","241a6f9524fa5b55","54976e44fee3018e","ebeae99d6b6421df","0d02b8ce1211373d","492d17cc76c60e58"],"restriction:local:proposed":["c72ff700a8b5e0fe","a5263d6dfaed1a21","05ec77d83a2fb722"],"restriction:states:enacted":["3c219120a612265b"],"restriction:states:proposed":["963831dc8907e951"],"restriction:states:failed":["640e5053d7ed492c","2f485290fc876c3d"],"water:reclaimed:proposed":["34047d55aaad8568"],"water:disclosure:failed":["3024f2dbcb00785c","7932fbffdf71a9e7"],"water:siting:proposed":["95d5d77e861f2e1a"],"water:moratorium:proposed":["51b30007138592e5"],"water:closed-loop:proposed":["bdc557047de3e52b","3b9e61fb1da5de65"],"delay:local_moratorium:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:active_litigation":["f23f3210c5447afd","9783ae8705aab3e7"],"delay:city_moratorium:active_litigation":["f23f3210c5447afd"],"delay:eminent_domain_threat:active_litigation":["f23f3210c5447afd"],"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:environmental_review_order:active_litigation":["9783ae8705aab3e7"],"delay:unpermitted_power_plant:active_litigation":["9783ae8705aab3e7"],"delay:community_opposition:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"delay:transparency_concerns:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"utility:tariff:pending":["b63a0876c6c743c3","af3b47ccdb7cb94a"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":36,"water":7,"delay":38,"atlas":29,"permits":5},"record_count":115},{"id":"TX","name":"Texas","groups":{"policy:site-control":["170b3631ad48f5a9"],"policy:security":["1deb6f4ebbbba3d4"],"policy:curtailment":["56b017e8edee0f3b"],"policy:emissions":["e17cedb3112fd488"],"restriction:local:enacted":["cb4fae95f6ec62e9","226d9579a44729dd","8725a51570228ad5","9cd0e5a2740b6579","49d98f654070e13e","5a6631afcf14f245","1526c144af9c4197","bfaeb2b05925f9bf"],"restriction:local:proposed":["aa120245d3cde2b5","4bbd796802e5b2a9","29dbbc44e88a23f5","d4ddebe26453aec0","fd40bfb18bd582d1","e3d9ca006093dd8c","347c664b42d6867c","f141990e3f9ddb5c"],"restriction:local:failed":["4cf9e86df26cb47f","036f9e40cb83532e","8fbbd5e4d1430368","0148c0779dde3d94","c154399207131e2f"],"restriction:states:enacted":["35fcd20bf3d4a4e3","07b7360c48f3c46e","98ec338e6e03cba0"],"restriction:states:pause":["707703d5f96368d1","41c39b9ee7a58df2","9607cd1000488b0d"],"restriction:states:proposed":["8d85cc66b1113104"],"water:study:proposed":["97674740d6ace3d0"],"water:siting:proposed":["ce0a82530ed2e6c2","617e27c4c491786f"],"water:closed-loop:enacted":["a3bc163e4fc8a78f","b41ba038f3b958e1"],"water:closed-loop:proposed":["0711b71f0ca0c23e","0026ba717d68569a"],"water:shield:enacted":["f512098faa3bf9c4"],"water:siting:enacted":["0d07fe0b0e4fa3bb"],"water:disclosure:enacted":["f4c280b4acf60e61","4fe0a4491af0e56e","ab5ef43c0bd56795","18fff3b222f896e1"],"water:moratorium:enacted":["23aaebd91e78f209"],"delay:state_moratorium:withdrawn":["a8fe02f84bc4a666"],"delay:transformer_supply:delayed":["a60e9b00093891d5"],"delay:gas_pipeline_delay:delayed":["87485593349454ff"],"delay:corporate_realignment:withdrawn":["15ca382a6f880e9f"],"delay:financing:withdrawn":["15ca382a6f880e9f"],"delay:zoning_denial:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:cancelled":["9832792554ff4c9d"],"delay:community_opposition:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:withdrawn":["0581ab61da4d6697"],"delay:community_opposition:withdrawn":["0581ab61da4d6697","adfb727c5dd4e1cc"],"delay:litigation:litigation_active":["792ce5aec9329c29","109278a363838f96","f27cb758664748d7"],"delay:community_opposition:litigation_active":["792ce5aec9329c29","109278a363838f96"],"delay:corporate_realignment:delayed":["0120772c7188f042"],"delay:community_opposition:delayed":["168b4298a9ab289d","f7513e35f7c721c0","2e380fe2f7f014dc"],"delay:litigation:under_appeal":["f08287b22f91f244"],"delay:local_moratorium:litigation_active":["f27cb758664748d7"],"delay:zoning_denial:delayed":["2e380fe2f7f014dc"],"delay:interconnection_queue:halted":["d5e9430ff55efa0d"],"delay:zoning_denial:withdrawn":["adfb727c5dd4e1cc"],"utility:tariff:approved":["75dc99c20658fe92","aed4fabd0e2dc51c","9a879f558b598ed3"],"utility:rate case:pending":["3af74a147ed90618"],"utility:other:pending":["234c8b4fd863479c","b540667ef8b17e0f","0b11ccddef1877eb","99a349313213c782","87c2bcaca8770a64","ca36e7d667fd52d5","624c21796e30622a","6218dc8d9c2c19aa","a068f88c8918edb0"],"utility:special contract:pending":["85e644b149d44cc3"],"utility:tariff:pending":["179ce9c6749195ff","ecc5b89ff5cb7890"],"utility:statement:pending":["d04486225e3fbb69"],"utility:other:approved":["0b929d848501d87d"],"utility:certificate:approved":["f70bcf2339f86b49"],"utility:policy:rejected":["c7c2a7a3b4cd9ee5"],"utility:policy:effective":["ad4e34e0dfe00af1"]},"grid_operators":["ERCOT","SPP","MISO","NON-RTO"],"counts":{"policy":4,"moratorium":28,"water":14,"delay":83,"atlas":135,"permits":127},"record_count":391},{"id":"UT","name":"Utah","groups":{"restriction:local:enacted":["fe8d104f8d67e17c","093e457d95e139ba","a73c33aad89fd8c4","d39140513b342349","0c19d0bfb2b41666","be172ab12b60089d","7272dd8d9cbcbd97","2c4637d21201bc5a"],"restriction:local:pause":["6689ae5de85fb884"],"restriction:states:enacted":["161bb7df391f5393","29634d18789600f9"],"water:disclosure:enacted":["aa23c2f90b922d2f"],"water:siting:enacted":["92181bfbd0f092dc"],"delay:local_moratorium:litigation_active":["43fe8f06c251d00a"],"delay:zoning_denial:litigation_active":["43fe8f06c251d00a"],"delay:community_opposition:litigation_active":["43fe8f06c251d00a"],"delay:tax_incentive_change:cancelled":["9a747679a42936ff"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":11,"water":2,"delay":16,"atlas":23,"permits":16},"record_count":68},{"id":"VT","name":"Vermont","groups":{"restriction:local:enacted":["fd5d7c35a8a164d5","ffd4551238ee66c3","24609fa0cc03fd6d"],"restriction:states:failed":["a22c89dd88f7805b"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":4,"delay":1,"atlas":3},"record_count":8},{"id":"VA","name":"Virginia","groups":{"policy:water-reporting":["d2e1f34ebb87db96"],"policy:regulator-reporting":["a2d7165da9c4273d"],"restriction:local:enacted":["5d1933a50e2fffa9","d9c9702f7193a5d0","00ea8549bf7d9107","5e8fa08848e7ea49","b612281109895776","a8439ee49b85f3b9","cb1ee56619c41591","fc8930e333e47393","33da24b96e9450aa","3c8c47c48655c7c2"],"restriction:local:failed":["c0313d873e52c337"],"restriction:local:proposed":["1fb124f1d0600aad"],"restriction:states:enacted":["07bca14c6c769cd9","822881c141b55b58","1bc4820da2e184d8","260f9d0fdac1fb1d"],"restriction:states:proposed":["115a01cddaaebb83","81387474427b857f","de3a5a259065cee6","d9698a681bcb77d1","1ccb96de87be8c20","6f2fd99dffb3ee19","5fbcc9b83d0cea89","5286a63674ab303e"],"restriction:states:failed":["96a928bdb916449a","82304cb623ce2fd1","1c2b5c27f2a20646"],"water:disclosure:enacted":["236efd0b5ce918b3","ea2fc9f0f2561dd5","1bb0eef74b265bbc"],"water:siting:vetoed":["fc6a89d84ea3761e"],"water:reclaimed:failed":["7c9863297abb29b6"],"water:incentive:proposed":["30149d37cde17dd5"],"water:study:enacted":["4d9a8e7a99e3e39b"],"water:disclosure:failed":["133af645ccadb7ec"],"water:siting:enacted":["13c66e32329bf4c9"],"water:disclosure:proposed":["739c2b83e1630596"],"delay:zoning_denial:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","ae2116cf001391ca","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b"],"delay:community_opposition:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b","b0af2cf0f00c0c33","0093933737713687"],"delay:water_dispute:cancelled":["b654fcba5611c495","c24066658a7c87b0"],"delay:litigation:cancelled":["b2f708f236602e8d","3059b79f61908e3d"],"delay:community_opposition:delayed":["2a92789be1587ada","dc394d8881dcfd7f","d7fec75934b138bd","4ef289628ac834d5"],"delay:litigation:litigation_active":["01bbee83623720b2","e5c30ca57b2dbc24","dcf5dbffe665442a","85cd3631575a5bdf","1832912b622cc7ca","e7ee0387e9522f52"],"delay:community_opposition:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:zoning_denial:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:community_opposition:litigation_active":["dcf5dbffe665442a"],"delay:zoning_denial:delayed":["ba73fb104a300b67","dc394d8881dcfd7f","d7fec75934b138bd"],"delay:zoning_denial:under_appeal":["f8a6c494d6a909f4"],"delay:community_opposition:under_appeal":["f8a6c494d6a909f4"],"delay:water_dispute:litigation_active":["85cd3631575a5bdf"],"delay:zoning_denial:litigation_active":["e7ee0387e9522f52"],"delay:environmental_review:cancelled":["3059b79f61908e3d"],"utility:tariff:approved":["c2935488c1650819","39c6440688564d5b","87a87dde118e582a"],"utility:IRP:contested":["1d207f181f290a4a","9ba1e9a7df265951","7f6e112a0c84fe66"],"utility:tariff:contested":["d5ac5227a2747fcf","b3484cb6d3aad2da"],"utility:rate case:pending":["7a09881b3efc53a9"],"utility:other:pending":["cb40a9cac60f8cec","925eb6e874d3a48f","53aeac44973adb8a"],"utility:statement:pending":["95c8534650ed9b12"],"utility:tariff:pending":["17c7d5340af6b949"],"utility:other:contested":["e0efcc5e95491272"],"utility:rate case:approved":["2d9b62ed5a5a8c85"]},"grid_operators":["PJM","NON-RTO"],"counts":{"policy":2,"moratorium":27,"water":10,"delay":88,"atlas":73,"permits":642},"record_count":842},{"id":"WA","name":"Washington","groups":{"restriction:local:enacted":["9f5f2923e39b9be8","d4e7ad9cf08df51e","a0fc2d121a678362","0b3a9ecd7c2478dc","de683906483b8fe5","d6189396d865dfc1","a4d0a0075eb42622","844f1f18ded0ca1c","50cb86e7f24d5c8a","5f99587cd1f4762d","e207b014a5280c8e","abcdda3f927a1476","31a8daed20fe189e","af832be8ade36360","510f60e365739621","7eb7d0c92f5f8dd9","5565880179e00904","c8eaae4e91fc4247","4f498d7e9f152136","29f8e05bf47f65e4"],"restriction:states:enacted":["13d139ecdc65b4b1","b6f7e9b035c67d69"],"restriction:states:proposed":["73392c07183451a2","d65bf66b10bb27dc","d97ae6ca24475af1"],"restriction:states:failed":["b0d11e81f4e16dea","fc47b1de08dff922","383388e3142065cd"],"water:moratorium:enacted":["6455f69859c340a2"],"delay:community_opposition:halted":["8ced64a3cbb11f6c"],"delay:local_moratorium:halted":["0d03a9c2805d05b6","2fc49a0ff709020e"],"delay:community_opposition:delayed":["887cc460e5eb83f6"],"utility:tariff:pending":["c168cf070187ea92"],"utility:other:pending":["611e6f5599ef718f","8c8130676232d1c6"],"utility:statement:pending":["4ed38cff9678ccf0","4b866a2091ab3ecc"],"utility:tariff:approved":["325a6b7ee8b34e77"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":28,"water":1,"delay":22,"atlas":30,"permits":13},"record_count":94},{"id":"WV","name":"West Virginia","groups":{"water:disclosure:failed":["8cf5514f4b5ff375"],"delay:community_opposition:delayed":["4124cb9080c91f7c"],"utility:IRP:pending":["a67a61284873a2b2","8da91197a3806bcc"],"utility:special contract:pending":["39679c94f0d7f830"],"utility:other:contested":["c12d842abe5446ff","040b3c446bff4aee","5e6fb296651a928a","6f948a872911044f","0ae82e92301e638b"]},"grid_operators":["PJM"],"counts":{"water":1,"delay":12,"atlas":7},"record_count":20},{"id":"WI","name":"Wisconsin","groups":{"restriction:local:enacted":["197cdb77aa511062","c32fbb4074e34eba","9fa928579bf6e19b","1ef57a5ad557563c","d383195f7d8cd078","07b5a8ef15cadf6b","0a3550a0b812064e","2f12caa1fa8a1620","4efd296b41cadd58","502234e3282fa94d","98de8d31bfd06c50","9baf377f17b48199","2b2ac1debfbe57ca","aee74a04d13b1375","02ac37032bda8131","375f029130348bd2","6e56afd4aed59791","893a3aae04278c40","7650d4a5b8a48f92","e18b7a4b7fbc1df5","b56152d653914388","b916df50f4c51b94","5a64d5c33607de67","643f527e927e4058","7b1745a42047131e","e09c79ad3db16d88","734fd94028341ac3","69f22ea5aa3e34d3","1a270a98a4fa2e6d","d41ed6223bfeed81","112e1e1079c890e9","844ad5858c872078","47a591fadc2e8900","f7cf8bb4ab48824a"],"restriction:local:failed":["0c67dadae5dac0e9"],"restriction:local:proposed":["e66086d4c7d49f01","c8953b5f4533a4b5","68e48cc43363c3ba","f04d2abd046f97a9","1eae3d6650182a35"],"restriction:states:enacted":["5db6a8a411191d98"],"restriction:states:proposed":["d9aeb06afb1cc48b"],"restriction:states:failed":["a7f7ac4ffcf569cf","e87712374a5a9bb6","1fa055042bc56cba","bf5f897298b22196"],"water:moratorium:failed":["dabd0296a8769724"],"water:disclosure:proposed":["52d3503b7b7a29d2"],"water:disclosure:failed":["3d11e7d09b3698e1"],"water:moratorium:proposed":["0d06b92b967fdc00"],"water:siting:proposed":["4157cf76b6d65b0a"],"delay:environmental_review:litigation_active":["debb467bcb4d5430"],"delay:litigation:litigation_active":["debb467bcb4d5430"],"delay:community_opposition:litigation_active":["debb467bcb4d5430"],"delay:litigation:active_litigation":["e199a6213982873d"],"delay:environmental_review_challenge:active_litigation":["e199a6213982873d"],"delay:regulatory_collateral_dispute:active_litigation":["e199a6213982873d"],"delay:corporate_reassessment:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:design_changes:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:community_opposition:under_council_consideration":["28e37770792b4c08"],"delay:withdrawal:cancelled":["ea733b19fc76a19b"],"delay:village_infeasibility_finding:cancelled":["ea733b19fc76a19b"],"delay:interconnection:denied":["fd3e6fff23dec30a"],"delay:water:cancelled":["6b688ff399652711"],"delay:community_opposition:cancelled":["6b688ff399652711"],"delay:financing:cancelled":["6b688ff399652711"],"utility:special contract:approved":["c0e0e62ba225486e"],"utility:tariff:approved":["477299baafe80b07","8b74b857f211fa23","9d22a2aeb195e4fc","124399acbd7a554c"],"utility:tariff:pending":["dde2390c69924c91","4b8f10b414687805","7d0c020f1825cea4"],"utility:rate case:pending":["fbf33f025d17bc1f"],"utility:other:pending":["8f81691272c2cefc"]},"grid_operators":["MISO"],"counts":{"moratorium":46,"water":5,"delay":59,"atlas":44,"permits":6},"record_count":160},{"id":"WY","name":"Wyoming","groups":{"restriction:local:failed":["d0485054fd79e820"],"restriction:local:proposed":["3ed10f6e2d7fa4f4"],"restriction:states:failed":["be934bcf6dde21e3"],"utility:tariff:pending":["b1729fb79f6ff5af"],"utility:tariff:approved":["48ce507193eae507","2e0818019f3d14fe","103e672184e6c568"],"utility:other:pending":["b06ef4aba51b6d71"],"utility:special contract:pending":["31c5bf9bd2103358"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":3,"delay":10,"atlas":13,"permits":4},"record_count":30}]}