{"groups":{"policy:site-control":{"id":"policy:site-control","label":"Evidence of site control","tracker":"policy"},"policy:security":{"id":"policy:security","label":"Financial security","tracker":"policy"},"policy:curtailment":{"id":"policy:curtailment","label":"Emergency response","tracker":"policy"},"policy:emissions":{"id":"policy:emissions","label":"Emissions safeguards","tracker":"policy"},"policy:cost-allocation":{"id":"policy:cost-allocation","label":"Attributable-cost allocation","tracker":"policy"},"policy:departure":{"id":"policy:departure","label":"Departure / reduced-load protection","tracker":"policy"},"policy:supply-review":{"id":"policy:supply-review","label":"Water-supply review","tracker":"policy"},"policy:clean-energy":{"id":"policy:clean-energy","label":"Clean-energy service terms","tracker":"policy"},"policy:water-reporting":{"id":"policy:water-reporting","label":"Water-use reporting","tracker":"policy"},"policy:local-authority":{"id":"policy:local-authority","label":"Preserved local authority","tracker":"policy"},"policy:minimum-payment":{"id":"policy:minimum-payment","label":"Minimum payment commitments","tracker":"policy"},"policy:regulator-reporting":{"id":"policy:regulator-reporting","label":"Regulatory reporting","tracker":"policy"},"policy:environmental-review":{"id":"policy:environmental-review","label":"Environmental assessment","tracker":"policy"},"policy:permit-hold":{"id":"policy:permit-hold","label":"Interim permit restraint","tracker":"policy"},"restriction:local:enacted":{"id":"restriction:local:enacted","label":"Local restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:local:failed":{"id":"restriction:local:failed","label":"Local restriction records: failed (as recorded)","tracker":"moratorium"},"restriction:local:proposed":{"id":"restriction:local:proposed","label":"Local restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:local:pause":{"id":"restriction:local:pause","label":"Local restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:enacted":{"id":"restriction:states:enacted","label":"State restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:states:pause":{"id":"restriction:states:pause","label":"State restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:proposed":{"id":"restriction:states:proposed","label":"State restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:states:failed":{"id":"restriction:states:failed","label":"State restriction records: failed (as recorded)","tracker":"moratorium"},"water:reclaimed:enacted":{"id":"water:reclaimed:enacted","label":"Water reclaimed measures: enacted (as recorded)","tracker":"water"},"water:disclosure:enacted":{"id":"water:disclosure:enacted","label":"Water disclosure measures: enacted (as recorded)","tracker":"water"},"water:siting:vetoed":{"id":"water:siting:vetoed","label":"Water siting measures: vetoed (as recorded)","tracker":"water"},"water:reclaimed:failed":{"id":"water:reclaimed:failed","label":"Water reclaimed measures: failed (as recorded)","tracker":"water"},"water:incentive:proposed":{"id":"water:incentive:proposed","label":"Water incentive measures: proposed (as recorded)","tracker":"water"},"water:disclosure:proposed":{"id":"water:disclosure:proposed","label":"Water disclosure measures: proposed (as recorded)","tracker":"water"},"water:disclosure:vetoed":{"id":"water:disclosure:vetoed","label":"Water disclosure measures: vetoed (as recorded)","tracker":"water"},"water:closed-loop:proposed":{"id":"water:closed-loop:proposed","label":"Water closed-loop measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:failed":{"id":"water:closed-loop:failed","label":"Water closed-loop measures: failed (as recorded)","tracker":"water"},"water:disclosure:failed":{"id":"water:disclosure:failed","label":"Water disclosure measures: failed (as recorded)","tracker":"water"},"water:rate:failed":{"id":"water:rate:failed","label":"Water rate measures: failed (as recorded)","tracker":"water"},"water:siting:enacted":{"id":"water:siting:enacted","label":"Water siting measures: enacted (as recorded)","tracker":"water"},"water:study:proposed":{"id":"water:study:proposed","label":"Water study measures: proposed (as recorded)","tracker":"water"},"water:siting:proposed":{"id":"water:siting:proposed","label":"Water siting measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:enacted":{"id":"water:closed-loop:enacted","label":"Water closed-loop measures: enacted (as recorded)","tracker":"water"},"water:moratorium:enacted":{"id":"water:moratorium:enacted","label":"Water moratorium measures: enacted (as recorded)","tracker":"water"},"water:reclaimed:proposed":{"id":"water:reclaimed:proposed","label":"Water reclaimed measures: proposed (as recorded)","tracker":"water"},"water:moratorium:vetoed":{"id":"water:moratorium:vetoed","label":"Water moratorium measures: vetoed (as recorded)","tracker":"water"},"water:study:enacted":{"id":"water:study:enacted","label":"Water study measures: enacted (as recorded)","tracker":"water"},"water:moratorium:failed":{"id":"water:moratorium:failed","label":"Water moratorium measures: failed (as recorded)","tracker":"water"},"water:moratorium:proposed":{"id":"water:moratorium:proposed","label":"Water moratorium measures: proposed (as recorded)","tracker":"water"},"water:shield:enacted":{"id":"water:shield:enacted","label":"Water shield measures: enacted (as recorded)","tracker":"water"},"water:shield:failed":{"id":"water:shield:failed","label":"Water shield measures: failed (as recorded)","tracker":"water"},"water:siting:failed":{"id":"water:siting:failed","label":"Water siting measures: failed (as recorded)","tracker":"water"},"water:study:failed":{"id":"water:study:failed","label":"Water study measures: failed (as recorded)","tracker":"water"},"water:rate:enacted":{"id":"water:rate:enacted","label":"Water rate measures: enacted (as recorded)","tracker":"water"},"water:incentive:enacted":{"id":"water:incentive:enacted","label":"Water incentive measures: enacted (as recorded)","tracker":"water"},"delay:state_moratorium:withdrawn":{"id":"delay:state_moratorium:withdrawn","label":"Delay cause: state moratorium / withdrawn","tracker":"delay"},"delay:transformer_supply:delayed":{"id":"delay:transformer_supply:delayed","label":"Delay cause: transformer supply / delayed","tracker":"delay"},"delay:gas_pipeline_delay:delayed":{"id":"delay:gas_pipeline_delay:delayed","label":"Delay cause: gas pipeline delay / delayed","tracker":"delay"},"delay:corporate_realignment:withdrawn":{"id":"delay:corporate_realignment:withdrawn","label":"Delay cause: corporate realignment / withdrawn","tracker":"delay"},"delay:financing:withdrawn":{"id":"delay:financing:withdrawn","label":"Delay cause: financing / withdrawn","tracker":"delay"},"delay:environmental_review:litigation_active":{"id":"delay:environmental_review:litigation_active","label":"Delay cause: environmental review / litigation_active","tracker":"delay"},"delay:litigation:litigation_active":{"id":"delay:litigation:litigation_active","label":"Delay cause: litigation / litigation_active","tracker":"delay"},"delay:community_opposition:litigation_active":{"id":"delay:community_opposition:litigation_active","label":"Delay cause: community opposition / litigation_active","tracker":"delay"},"delay:zoning_denial:cancelled":{"id":"delay:zoning_denial:cancelled","label":"Delay cause: zoning denial / cancelled","tracker":"delay"},"delay:community_opposition:cancelled":{"id":"delay:community_opposition:cancelled","label":"Delay cause: community opposition / cancelled","tracker":"delay"},"delay:water_dispute:cancelled":{"id":"delay:water_dispute:cancelled","label":"Delay cause: water dispute / cancelled","tracker":"delay"},"delay:zoning_denial:litigation_active":{"id":"delay:zoning_denial:litigation_active","label":"Delay cause: zoning denial / litigation_active","tracker":"delay"},"delay:local_moratorium:litigation_active":{"id":"delay:local_moratorium:litigation_active","label":"Delay cause: local moratorium / litigation_active","tracker":"delay"},"delay:permit_denial:litigation_active":{"id":"delay:permit_denial:litigation_active","label":"Delay cause: permit denial / litigation_active","tracker":"delay"},"delay:community_opposition:withdrawn":{"id":"delay:community_opposition:withdrawn","label":"Delay cause: community opposition / withdrawn","tracker":"delay"},"delay:zoning_denial:withdrawn":{"id":"delay:zoning_denial:withdrawn","label":"Delay cause: zoning denial / withdrawn","tracker":"delay"},"delay:environmental_review:delayed":{"id":"delay:environmental_review:delayed","label":"Delay cause: environmental review / delayed","tracker":"delay"},"delay:community_opposition:delayed":{"id":"delay:community_opposition:delayed","label":"Delay cause: community opposition / delayed","tracker":"delay"},"delay:water_dispute:under_appeal":{"id":"delay:water_dispute:under_appeal","label":"Delay cause: water dispute / under_appeal","tracker":"delay"},"delay:community_opposition:under_appeal":{"id":"delay:community_opposition:under_appeal","label":"Delay cause: community opposition / under_appeal","tracker":"delay"},"delay:water_dispute:delayed":{"id":"delay:water_dispute:delayed","label":"Delay cause: water dispute / delayed","tracker":"delay"},"delay:local_moratorium:delayed":{"id":"delay:local_moratorium:delayed","label":"Delay cause: local moratorium / delayed","tracker":"delay"},"delay:litigation:cancelled":{"id":"delay:litigation:cancelled","label":"Delay cause: litigation / cancelled","tracker":"delay"},"delay:zoning_denial:delayed":{"id":"delay:zoning_denial:delayed","label":"Delay cause: zoning denial / delayed","tracker":"delay"},"delay:zoning_denial:under_appeal":{"id":"delay:zoning_denial:under_appeal","label":"Delay cause: zoning denial / under_appeal","tracker":"delay"},"delay:water_dispute:litigation_active":{"id":"delay:water_dispute:litigation_active","label":"Delay cause: water dispute / litigation_active","tracker":"delay"},"delay:environmental_review:cancelled":{"id":"delay:environmental_review:cancelled","label":"Delay cause: environmental review / cancelled","tracker":"delay"},"delay:litigation:under_appeal":{"id":"delay:litigation:under_appeal","label":"Delay cause: litigation / under_appeal","tracker":"delay"},"delay:community_opposition:approved_but_citywide_moratorium_pending":{"id":"delay:community_opposition:approved_but_citywide_moratorium_pending","label":"Delay cause: community opposition / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":{"id":"delay:proposed_moratorium:approved_but_citywide_moratorium_pending","label":"Delay cause: proposed moratorium / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:rezoning_denial_or_withdrawal:withdrawn":{"id":"delay:rezoning_denial_or_withdrawal:withdrawn","label":"Delay cause: rezoning denial or withdrawal / withdrawn","tracker":"delay"},"delay:rezoning_denial:rezoning_denied":{"id":"delay:rezoning_denial:rezoning_denied","label":"Delay cause: rezoning denial / rezoning_denied","tracker":"delay"},"delay:community_opposition:rezoning_denied":{"id":"delay:community_opposition:rezoning_denied","label":"Delay cause: community opposition / rezoning_denied","tracker":"delay"},"delay:litigation:active_litigation":{"id":"delay:litigation:active_litigation","label":"Delay cause: litigation / active_litigation","tracker":"delay"},"delay:permit_challenge:active_litigation":{"id":"delay:permit_challenge:active_litigation","label":"Delay cause: permit challenge / active_litigation","tracker":"delay"},"delay:community_opposition:approved_amid_opposition":{"id":"delay:community_opposition:approved_amid_opposition","label":"Delay cause: community opposition / approved_amid_opposition","tracker":"delay"},"delay:missed_milestones:development_agreement_expired":{"id":"delay:missed_milestones:development_agreement_expired","label":"Delay cause: missed milestones / development_agreement_expired","tracker":"delay"},"delay:financing_delay:development_agreement_expired":{"id":"delay:financing_delay:development_agreement_expired","label":"Delay cause: financing delay / development_agreement_expired","tracker":"delay"},"delay:unresolved_commitments:rezoning_denied":{"id":"delay:unresolved_commitments:rezoning_denied","label":"Delay cause: unresolved commitments / rezoning_denied","tracker":"delay"},"delay:county_moratorium:moratorium_in_force":{"id":"delay:county_moratorium:moratorium_in_force","label":"Delay cause: county moratorium / moratorium_in_force","tracker":"delay"},"delay:county_moratorium:moratorium_extended":{"id":"delay:county_moratorium:moratorium_extended","label":"Delay cause: county moratorium / moratorium_extended","tracker":"delay"},"delay:regulatory_review:regulatory_approval_pending":{"id":"delay:regulatory_review:regulatory_approval_pending","label":"Delay cause: regulatory review / regulatory_approval_pending","tracker":"delay"},"delay:power_allocation_dispute:regulatory_approval_pending":{"id":"delay:power_allocation_dispute:regulatory_approval_pending","label":"Delay cause: power allocation dispute / regulatory_approval_pending","tracker":"delay"},"delay:corporate_reassessment:construction_paused":{"id":"delay:corporate_reassessment:construction_paused","label":"Delay cause: corporate reassessment / construction_paused","tracker":"delay"},"delay:openai_relationship_change:construction_paused":{"id":"delay:openai_relationship_change:construction_paused","label":"Delay cause: openai relationship change / construction_paused","tracker":"delay"},"delay:tariff_costs:construction_paused":{"id":"delay:tariff_costs:construction_paused","label":"Delay cause: tariff costs / construction_paused","tracker":"delay"},"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: local moratorium / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: ballot initiative threat / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:signature_gathering":{"id":"delay:ballot_initiative_threat:signature_gathering","label":"Delay cause: ballot initiative threat / signature_gathering","tracker":"delay"},"delay:statewide_moratorium_push:signature_gathering":{"id":"delay:statewide_moratorium_push:signature_gathering","label":"Delay cause: statewide moratorium push / signature_gathering","tracker":"delay"},"delay:environmental_review_challenge:active_litigation":{"id":"delay:environmental_review_challenge:active_litigation","label":"Delay cause: environmental review challenge / active_litigation","tracker":"delay"},"delay:regulatory_collateral_dispute:active_litigation":{"id":"delay:regulatory_collateral_dispute:active_litigation","label":"Delay cause: regulatory collateral dispute / active_litigation","tracker":"delay"},"delay:corporate_reassessment:construction_partially_paused":{"id":"delay:corporate_reassessment:construction_partially_paused","label":"Delay cause: corporate reassessment / construction_partially_paused","tracker":"delay"},"delay:design_changes:construction_partially_paused":{"id":"delay:design_changes:construction_partially_paused","label":"Delay cause: design changes / construction_partially_paused","tracker":"delay"},"delay:community_opposition:under_council_consideration":{"id":"delay:community_opposition:under_council_consideration","label":"Delay cause: community opposition / under_council_consideration","tracker":"delay"},"delay:withdrawal:cancelled":{"id":"delay:withdrawal:cancelled","label":"Delay cause: withdrawal / cancelled","tracker":"delay"},"delay:village_infeasibility_finding:cancelled":{"id":"delay:village_infeasibility_finding:cancelled","label":"Delay cause: village infeasibility finding / cancelled","tracker":"delay"},"delay:litigation:construction_halted_by_court":{"id":"delay:litigation:construction_halted_by_court","label":"Delay cause: litigation / construction_halted_by_court","tracker":"delay"},"delay:environmental_review_inadequate:construction_halted_by_court":{"id":"delay:environmental_review_inadequate:construction_halted_by_court","label":"Delay cause: environmental review inadequate / construction_halted_by_court","tracker":"delay"},"delay:city_moratorium:active_litigation":{"id":"delay:city_moratorium:active_litigation","label":"Delay cause: city moratorium / active_litigation","tracker":"delay"},"delay:environmental_review_pending:final_decision_paused":{"id":"delay:environmental_review_pending:final_decision_paused","label":"Delay cause: environmental review pending / final_decision_paused","tracker":"delay"},"delay:city_moratorium:moratorium_in_force":{"id":"delay:city_moratorium:moratorium_in_force","label":"Delay cause: city moratorium / moratorium_in_force","tracker":"delay"},"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":{"id":"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial","label":"Delay cause: planning commission denial recommendation / planning_commission_recommended_denial","tracker":"delay"},"delay:community_opposition:opposed_planned":{"id":"delay:community_opposition:opposed_planned","label":"Delay cause: community opposition / opposed_planned","tracker":"delay"},"delay:city_council_resolution_against:opposed_planned":{"id":"delay:city_council_resolution_against:opposed_planned","label":"Delay cause: city council resolution against / opposed_planned","tracker":"delay"},"delay:rezoning_denial:rezoning_denied_then_litigation_settled":{"id":"delay:rezoning_denial:rezoning_denied_then_litigation_settled","label":"Delay cause: rezoning denial / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:litigation:rezoning_denied_then_litigation_settled":{"id":"delay:litigation:rezoning_denied_then_litigation_settled","label":"Delay cause: litigation / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:city_moratorium:moratorium_delay":{"id":"delay:city_moratorium:moratorium_delay","label":"Delay cause: city moratorium / moratorium_delay","tracker":"delay"},"delay:community_opposition:moratorium_delay":{"id":"delay:community_opposition:moratorium_delay","label":"Delay cause: community opposition / moratorium_delay","tracker":"delay"},"delay:community_opposition:rezoning_paused":{"id":"delay:community_opposition:rezoning_paused","label":"Delay cause: community opposition / rezoning_paused","tracker":"delay"},"delay:planning_commission_postponement:rezoning_paused":{"id":"delay:planning_commission_postponement:rezoning_paused","label":"Delay cause: planning commission postponement / rezoning_paused","tracker":"delay"},"delay:community_opposition:opposed_proposed":{"id":"delay:community_opposition:opposed_proposed","label":"Delay cause: community opposition / opposed_proposed","tracker":"delay"},"delay:transparency_concerns:opposed_proposed":{"id":"delay:transparency_concerns:opposed_proposed","label":"Delay cause: transparency concerns / opposed_proposed","tracker":"delay"},"delay:litigation:abandoned":{"id":"delay:litigation:abandoned","label":"Delay cause: litigation / abandoned","tracker":"delay"},"delay:community_opposition:abandoned":{"id":"delay:community_opposition:abandoned","label":"Delay cause: community opposition / abandoned","tracker":"delay"},"delay:china_ties_backlash:abandoned":{"id":"delay:china_ties_backlash:abandoned","label":"Delay cause: china ties backlash / abandoned","tracker":"delay"},"delay:wetlands_permit_suspended:active_litigation":{"id":"delay:wetlands_permit_suspended:active_litigation","label":"Delay cause: wetlands permit suspended / active_litigation","tracker":"delay"},"delay:community_opposition:opposed_pending_council_vote":{"id":"delay:community_opposition:opposed_pending_council_vote","label":"Delay cause: community opposition / opposed_pending_council_vote","tracker":"delay"},"delay:community_opposition:opposed_effectively_stalled":{"id":"delay:community_opposition:opposed_effectively_stalled","label":"Delay cause: community opposition / opposed_effectively_stalled","tracker":"delay"},"delay:petition_campaign:opposed_effectively_stalled":{"id":"delay:petition_campaign:opposed_effectively_stalled","label":"Delay cause: petition campaign / opposed_effectively_stalled","tracker":"delay"},"delay:public_notice_violation_alleged:active_litigation":{"id":"delay:public_notice_violation_alleged:active_litigation","label":"Delay cause: public notice violation alleged / active_litigation","tracker":"delay"},"delay:rezoning_denial:withdrawn":{"id":"delay:rezoning_denial:withdrawn","label":"Delay cause: rezoning denial / withdrawn","tracker":"delay"},"delay:no_secured_tenant:withdrawn":{"id":"delay:no_secured_tenant:withdrawn","label":"Delay cause: no secured tenant / withdrawn","tracker":"delay"},"delay:council_opposition:withdrawn":{"id":"delay:council_opposition:withdrawn","label":"Delay cause: council opposition / withdrawn","tracker":"delay"},"delay:eminent_domain_threat:active_litigation":{"id":"delay:eminent_domain_threat:active_litigation","label":"Delay cause: eminent domain threat / active_litigation","tracker":"delay"},"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":{"id":"delay:rezoning_denial:rezoning_rejected_moratorium_recommended","label":"Delay cause: rezoning denial / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":{"id":"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended","label":"Delay cause: county moratorium recommended / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:environmental_review_order:active_litigation":{"id":"delay:environmental_review_order:active_litigation","label":"Delay cause: environmental review order / active_litigation","tracker":"delay"},"delay:unpermitted_power_plant:active_litigation":{"id":"delay:unpermitted_power_plant:active_litigation","label":"Delay cause: unpermitted power plant / active_litigation","tracker":"delay"},"delay:community_opposition:under_construction_amid_scrutiny":{"id":"delay:community_opposition:under_construction_amid_scrutiny","label":"Delay cause: community opposition / under_construction_amid_scrutiny","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_scrutiny":{"id":"delay:transparency_concerns:under_construction_amid_scrutiny","label":"Delay cause: transparency concerns / under_construction_amid_scrutiny","tracker":"delay"},"delay:permit_denial:permit_denied":{"id":"delay:permit_denial:permit_denied","label":"Delay cause: permit denial / permit_denied","tracker":"delay"},"delay:community_opposition:permit_denied":{"id":"delay:community_opposition:permit_denied","label":"Delay cause: community opposition / permit_denied","tracker":"delay"},"delay:county_moratorium:permit_denied":{"id":"delay:county_moratorium:permit_denied","label":"Delay cause: county moratorium / permit_denied","tracker":"delay"},"delay:county_moratorium:approved_active_litigation":{"id":"delay:county_moratorium:approved_active_litigation","label":"Delay cause: county moratorium / approved_active_litigation","tracker":"delay"},"delay:litigation:approved_active_litigation":{"id":"delay:litigation:approved_active_litigation","label":"Delay cause: litigation / approved_active_litigation","tracker":"delay"},"delay:community_opposition:approved_active_litigation":{"id":"delay:community_opposition:approved_active_litigation","label":"Delay cause: community opposition / approved_active_litigation","tracker":"delay"},"delay:county_moratorium:delayed_amid_moratorium":{"id":"delay:county_moratorium:delayed_amid_moratorium","label":"Delay cause: county moratorium / delayed_amid_moratorium","tracker":"delay"},"delay:community_opposition:delayed_amid_moratorium":{"id":"delay:community_opposition:delayed_amid_moratorium","label":"Delay cause: community opposition / delayed_amid_moratorium","tracker":"delay"},"delay:public_outcry:tax_incentive_withdrawn":{"id":"delay:public_outcry:tax_incentive_withdrawn","label":"Delay cause: public outcry / tax_incentive_withdrawn","tracker":"delay"},"delay:tax_break_withdrawal:tax_incentive_withdrawn":{"id":"delay:tax_break_withdrawal:tax_incentive_withdrawn","label":"Delay cause: tax break withdrawal / tax_incentive_withdrawn","tracker":"delay"},"delay:permit_denial:denied_without_prejudice":{"id":"delay:permit_denial:denied_without_prejudice","label":"Delay cause: permit denial / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:denied_without_prejudice":{"id":"delay:community_opposition:denied_without_prejudice","label":"Delay cause: community opposition / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:under_construction_amid_opposition":{"id":"delay:community_opposition:under_construction_amid_opposition","label":"Delay cause: community opposition / under_construction_amid_opposition","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_opposition":{"id":"delay:transparency_concerns:under_construction_amid_opposition","label":"Delay cause: transparency concerns / under_construction_amid_opposition","tracker":"delay"},"delay:community_opposition:rumored_no_application_filed":{"id":"delay:community_opposition:rumored_no_application_filed","label":"Delay cause: community opposition / rumored_no_application_filed","tracker":"delay"},"delay:meeting_postponed:rumored_no_application_filed":{"id":"delay:meeting_postponed:rumored_no_application_filed","label":"Delay cause: meeting postponed / rumored_no_application_filed","tracker":"delay"},"delay:community_opposition:moratorium_in_force":{"id":"delay:community_opposition:moratorium_in_force","label":"Delay cause: community opposition / moratorium_in_force","tracker":"delay"},"delay:community_opposition:under_review_no_zoning_process":{"id":"delay:community_opposition:under_review_no_zoning_process","label":"Delay cause: community opposition / under_review_no_zoning_process","tracker":"delay"},"delay:no_local_zoning_framework:under_review_no_zoning_process":{"id":"delay:no_local_zoning_framework:under_review_no_zoning_process","label":"Delay cause: no local zoning framework / under_review_no_zoning_process","tracker":"delay"},"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":{"id":"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute","label":"Delay cause: regulatory transparency dispute / regulatory_disclosure_dispute","tracker":"delay"},"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":{"id":"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute","label":"Delay cause: ratepayer cost concerns / regulatory_disclosure_dispute","tracker":"delay"},"delay:noise_nuisance:active_litigation":{"id":"delay:noise_nuisance:active_litigation","label":"Delay cause: noise nuisance / active_litigation","tracker":"delay"},"delay:historic_preservation_conflict:permit_denied":{"id":"delay:historic_preservation_conflict:permit_denied","label":"Delay cause: historic preservation conflict / permit_denied","tracker":"delay"},"delay:community_opposition:under_construction_amid_water_concerns":{"id":"delay:community_opposition:under_construction_amid_water_concerns","label":"Delay cause: community opposition / under_construction_amid_water_concerns","tracker":"delay"},"delay:water_capacity_constraints:under_construction_amid_water_concerns":{"id":"delay:water_capacity_constraints:under_construction_amid_water_concerns","label":"Delay cause: water capacity constraints / under_construction_amid_water_concerns","tracker":"delay"},"delay:city_moratorium_partial_exemption:phase_vote_delayed":{"id":"delay:city_moratorium_partial_exemption:phase_vote_delayed","label":"Delay cause: city moratorium partial exemption / phase_vote_delayed","tracker":"delay"},"delay:planning_commission_delay:phase_vote_delayed":{"id":"delay:planning_commission_delay:phase_vote_delayed","label":"Delay cause: planning commission delay / phase_vote_delayed","tracker":"delay"},"delay:community_opposition:approved_expanded_amid_opposition":{"id":"delay:community_opposition:approved_expanded_amid_opposition","label":"Delay cause: community opposition / approved_expanded_amid_opposition","tracker":"delay"},"delay:noise_regulation_review:approved_expanded_amid_opposition":{"id":"delay:noise_regulation_review:approved_expanded_amid_opposition","label":"Delay cause: noise regulation review / approved_expanded_amid_opposition","tracker":"delay"},"delay:multi_year_construction_delay:delayed_extension_requested":{"id":"delay:multi_year_construction_delay:delayed_extension_requested","label":"Delay cause: multi year construction delay / delayed_extension_requested","tracker":"delay"},"delay:design_changes:delayed_extension_requested":{"id":"delay:design_changes:delayed_extension_requested","label":"Delay cause: design changes / delayed_extension_requested","tracker":"delay"},"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":{"id":"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums","label":"Delay cause: county moratorium neighboring / early_stage_amid_county_moratoriums","tracker":"delay"},"delay:regulatory_review:permitting_challenged":{"id":"delay:regulatory_review:permitting_challenged","label":"Delay cause: regulatory review / permitting_challenged","tracker":"delay"},"delay:environmental_petition:permitting_challenged":{"id":"delay:environmental_petition:permitting_challenged","label":"Delay cause: environmental petition / permitting_challenged","tracker":"delay"},"delay:utility_interconnection_timing:abandoned":{"id":"delay:utility_interconnection_timing:abandoned","label":"Delay cause: utility interconnection timing / abandoned","tracker":"delay"},"delay:withdrawal:abandoned":{"id":"delay:withdrawal:abandoned","label":"Delay cause: withdrawal / abandoned","tracker":"delay"},"delay:zoning_approval_challenge:active_litigation":{"id":"delay:zoning_approval_challenge:active_litigation","label":"Delay cause: zoning approval challenge / active_litigation","tracker":"delay"},"delay:litigation:zoning_request_paused_active_litigation":{"id":"delay:litigation:zoning_request_paused_active_litigation","label":"Delay cause: litigation / zoning_request_paused_active_litigation","tracker":"delay"},"delay:council_agenda_removal:zoning_request_paused_active_litigation":{"id":"delay:council_agenda_removal:zoning_request_paused_active_litigation","label":"Delay cause: council agenda removal / zoning_request_paused_active_litigation","tracker":"delay"},"delay:environmental_concerns:zoning_request_paused_active_litigation":{"id":"delay:environmental_concerns:zoning_request_paused_active_litigation","label":"Delay cause: environmental concerns / zoning_request_paused_active_litigation","tracker":"delay"},"delay:litigation:active_litigation_temporary_block":{"id":"delay:litigation:active_litigation_temporary_block","label":"Delay cause: litigation / active_litigation_temporary_block","tracker":"delay"},"delay:state_law_ownership_ban:active_litigation_temporary_block":{"id":"delay:state_law_ownership_ban:active_litigation_temporary_block","label":"Delay cause: state law ownership ban / active_litigation_temporary_block","tracker":"delay"},"delay:quorum_court_rejection:moratorium_exemption_rejected":{"id":"delay:quorum_court_rejection:moratorium_exemption_rejected","label":"Delay cause: quorum court rejection / moratorium_exemption_rejected","tracker":"delay"},"delay:county_moratorium_dispute:moratorium_exemption_rejected":{"id":"delay:county_moratorium_dispute:moratorium_exemption_rejected","label":"Delay cause: county moratorium dispute / moratorium_exemption_rejected","tracker":"delay"},"delay:litigation:active_litigation_records_dispute":{"id":"delay:litigation:active_litigation_records_dispute","label":"Delay cause: litigation / active_litigation_records_dispute","tracker":"delay"},"delay:public_records_dispute:active_litigation_records_dispute":{"id":"delay:public_records_dispute:active_litigation_records_dispute","label":"Delay cause: public records dispute / active_litigation_records_dispute","tracker":"delay"},"delay:litigation:delayed":{"id":"delay:litigation:delayed","label":"Delay cause: litigation / delayed","tracker":"delay"},"delay:permit_denial:delayed":{"id":"delay:permit_denial:delayed","label":"Delay cause: permit denial / delayed","tracker":"delay"},"delay:local_moratorium:cancelled":{"id":"delay:local_moratorium:cancelled","label":"Delay cause: local moratorium / cancelled","tracker":"delay"},"delay:tax_incentive_change:under_appeal":{"id":"delay:tax_incentive_change:under_appeal","label":"Delay cause: tax incentive change / under_appeal","tracker":"delay"},"delay:litigation:halted":{"id":"delay:litigation:halted","label":"Delay cause: litigation / halted","tracker":"delay"},"delay:environmental_review:halted":{"id":"delay:environmental_review:halted","label":"Delay cause: environmental review / halted","tracker":"delay"},"delay:local_moratorium:halted":{"id":"delay:local_moratorium:halted","label":"Delay cause: local moratorium / halted","tracker":"delay"},"delay:water_dispute:halted":{"id":"delay:water_dispute:halted","label":"Delay cause: water dispute / halted","tracker":"delay"},"delay:tax_incentive_change:halted":{"id":"delay:tax_incentive_change:halted","label":"Delay cause: tax incentive change / halted","tracker":"delay"},"delay:community_opposition:halted":{"id":"delay:community_opposition:halted","label":"Delay cause: community opposition / halted","tracker":"delay"},"delay:tax_incentive_change:litigation_active":{"id":"delay:tax_incentive_change:litigation_active","label":"Delay cause: tax incentive change / litigation_active","tracker":"delay"},"delay:corporate_realignment:delayed":{"id":"delay:corporate_realignment:delayed","label":"Delay cause: corporate realignment / delayed","tracker":"delay"},"delay:tax_incentive_change:cancelled":{"id":"delay:tax_incentive_change:cancelled","label":"Delay cause: tax incentive change / cancelled","tracker":"delay"},"delay:financing:litigation_active":{"id":"delay:financing:litigation_active","label":"Delay cause: financing / litigation_active","tracker":"delay"},"delay:state_moratorium:halted":{"id":"delay:state_moratorium:halted","label":"Delay cause: state moratorium / halted","tracker":"delay"},"delay:state_moratorium:litigation_active":{"id":"delay:state_moratorium:litigation_active","label":"Delay cause: state moratorium / litigation_active","tracker":"delay"},"delay:state_moratorium:cancelled":{"id":"delay:state_moratorium:cancelled","label":"Delay cause: state moratorium / cancelled","tracker":"delay"},"delay:water_dispute:withdrawn":{"id":"delay:water_dispute:withdrawn","label":"Delay cause: water dispute / withdrawn","tracker":"delay"},"delay:interconnection_queue:halted":{"id":"delay:interconnection_queue:halted","label":"Delay cause: interconnection queue / halted","tracker":"delay"},"delay:interconnection:cancelled":{"id":"delay:interconnection:cancelled","label":"Delay cause: interconnection / cancelled","tracker":"delay"},"delay:financing:cancelled":{"id":"delay:financing:cancelled","label":"Delay cause: financing / cancelled","tracker":"delay"},"delay:interconnection:denied":{"id":"delay:interconnection:denied","label":"Delay cause: interconnection / denied","tracker":"delay"},"delay:water:cancelled":{"id":"delay:water:cancelled","label":"Delay cause: water / cancelled","tracker":"delay"},"delay:water:denied":{"id":"delay:water:denied","label":"Delay cause: water / denied","tracker":"delay"},"delay:zoning_denial:halted":{"id":"delay:zoning_denial:halted","label":"Delay cause: zoning denial / halted","tracker":"delay"},"delay:permit_denial:halted":{"id":"delay:permit_denial:halted","label":"Delay cause: permit denial / halted","tracker":"delay"},"delay:council_vote_delay:final_vote_delayed":{"id":"delay:council_vote_delay:final_vote_delayed","label":"Delay cause: council vote delay / final_vote_delayed","tracker":"delay"},"delay:community_opposition:final_vote_delayed":{"id":"delay:community_opposition:final_vote_delayed","label":"Delay cause: community opposition / final_vote_delayed","tracker":"delay"},"utility:tariff:pending":{"id":"utility:tariff:pending","label":"Utility action: tariff / pending","tracker":"delay"},"utility:statement:pending":{"id":"utility:statement:pending","label":"Utility action: statement / pending","tracker":"delay"},"utility:tariff:contested":{"id":"utility:tariff:contested","label":"Utility action: tariff / contested","tracker":"delay"},"utility:other:pending":{"id":"utility:other:pending","label":"Utility action: other / pending","tracker":"delay"},"utility:tariff:approved":{"id":"utility:tariff:approved","label":"Utility action: tariff / approved","tracker":"delay"},"utility:rate case:approved":{"id":"utility:rate case:approved","label":"Utility action: rate case / approved","tracker":"delay"},"utility:special contract:approved":{"id":"utility:special contract:approved","label":"Utility action: special contract / approved","tracker":"delay"},"utility:rate case:pending":{"id":"utility:rate case:pending","label":"Utility action: rate case / pending","tracker":"delay"},"utility:special contract:denied":{"id":"utility:special contract:denied","label":"Utility action: special contract / denied","tracker":"delay"},"utility:statement:contested":{"id":"utility:statement:contested","label":"Utility action: statement / contested","tracker":"delay"},"utility:IRP:contested":{"id":"utility:IRP:contested","label":"Utility action: IRP / contested","tracker":"delay"},"utility:complaint:contested":{"id":"utility:complaint:contested","label":"Utility action: complaint / contested","tracker":"delay"},"utility:statement:approved":{"id":"utility:statement:approved","label":"Utility action: statement / approved","tracker":"delay"},"utility:IRP:pending":{"id":"utility:IRP:pending","label":"Utility action: IRP / pending","tracker":"delay"},"utility:special contract:pending":{"id":"utility:special contract:pending","label":"Utility action: special contract / pending","tracker":"delay"},"utility:other:approved":{"id":"utility:other:approved","label":"Utility action: other / approved","tracker":"delay"},"utility:other:contested":{"id":"utility:other:contested","label":"Utility action: other / contested","tracker":"delay"},"utility:IRP:approved":{"id":"utility:IRP:approved","label":"Utility action: IRP / approved","tracker":"delay"},"utility:tariff:denied":{"id":"utility:tariff:denied","label":"Utility action: tariff / denied","tracker":"delay"},"utility:certificate:approved":{"id":"utility:certificate:approved","label":"Utility action: certificate / approved","tracker":"delay"},"utility:policy:approved":{"id":"utility:policy:approved","label":"Utility action: policy / approved","tracker":"delay"},"utility:policy:effective":{"id":"utility:policy:effective","label":"Utility action: policy / effective","tracker":"delay"},"utility:tariff:effective":{"id":"utility:tariff:effective","label":"Utility action: tariff / effective","tracker":"delay"},"utility:policy:rejected":{"id":"utility:policy:rejected","label":"Utility action: policy / rejected","tracker":"delay"},"utility:policy:pending":{"id":"utility:policy:pending","label":"Utility action: policy / pending","tracker":"delay"},"utility:rate_case:pending":{"id":"utility:rate_case:pending","label":"Utility action: rate_case / pending","tracker":"delay"},"utility:other:denied":{"id":"utility:other:denied","label":"Utility action: other / denied","tracker":"delay"},"utility:other:effective":{"id":"utility:other:effective","label":"Utility action: other / effective","tracker":"delay"}},"warnings":[],"credits":["6abc Philadelphia","AEP Ohio Transmission Company (filed with Ohio Power Siting Board)","AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)","Alabama Reflector","Alaska Beacon","American Transmission Company LLC (filed with PSC of Wisconsin)","Americus Times-Recorder","Arizona Mirror","Arkansas Advocate","Axios Pro Energy","Bisnow","Bisnow National","Bradenton Herald","CNBC Technology","Cardinal News VA","Central Florida Public Media","Chesterfield County public permit records","Chicago Construction News","City of Atlanta public permit records","City of Austin issued construction permits open data","City of Buckeye public permit records","City of Chandler public permit records","City of Charlotte public permit records","City of Chicago building permits open data","City of Fort Worth public permit records","City of Goodyear public permit records","City of Hillsboro public permit records","City of Mesa building permits open data","City of Mesa public permit records","City of Minneapolis construction permits (CCS) open data","City of Papillion public permit records","City of Phoenix public permit records","City of Red Oak public permit records","City of Reno public permit records","City of San Antonio public permit records","City of Statesboro, Georgia","City of Temple, Texas","Clearfield City Council (Utah Public Notice Website)","Colorado Newsline","Colorado Public Radio","Congress.gov (Library of Congress, public domain)","ConstructConnect News","Construction Dive","CourtListener DataCenter Dockets","CourtListener Opinions","Data Center Dynamics","Data Center Dynamics news","DataCenterTracker.org, CC BY 4.0","Dominion Energy Virginia","EIN News","East Bay Insiders Newsletter","Energy Central","FOX19 | Cincinnati","FOX5 Vegas","FOX6 News Milwaukee","Facilities Dive","Fairfax County public permit records","Florida Phoenix","Georgia Department of Community Affairs","Georgia EPD air permit records","Georgia Recorder","GovTech","Greensboro News and Record","Grist","Idaho Capital Sun","Illinois EPA air permit records","Indiana Capital Chronicle","Indiana Department of Environmental Management","Indiana IDEM air permit records","InkFreeNews.com","Iowa Capital Dispatch","Iowa DNR air permit records","KERA News","KEYC News Now","KGW","KRON4","Kansas City MO city issued permits open data","Kansas Reflector","Kentucky Lantern","Law360","Law360 Energy","LegiScan (legiscan.com) and the state legislature","Lehigh Valley Planning Commission","Local News Matters","Loudoun County public permit records","Loudoun Times-Mirror","Louisiana DEQ air permit records","Louisiana Illuminator","Maine Morning Star","Maricopa County Air Quality Department air permit records","Maricopa County public permit records","Maryland Matters","Mecklenburg County public permit records","Michigan Advance","Mid Bay News","Missouri Independent","Montana Free Press","NBC Bay Area","NBC4 Washington","NC Newsline","Native News Online","Nebraska Examiner","Nevada Current","Nevada NDEP air permit records","New Hampshire Bulletin","New Mexico Environment Department","North Carolina DEQ Division of Air Quality air permit records","North Dakota Department of Environmental Quality","North Dakota Monitor","Ohio Capital Journal","Ohio EPA air permit records","Oklahoma DEQ air permit records","Oklahoma Voice","OpenStates v3 (openstates.org), CC BY 4.0","Oregon Capital Chronicle","Orlando Sentinel","Pennsylvania Capital-Star","Pennsylvania Department of Environmental Protection","Pennsylvania Office of Consumer Advocate (filed with PA PUC)","Pioneer Press","Prince William County public permit records","Public Service Commission of Wisconsin","Public record (Legistar Web API, Granicus)","Rhode Island Current","Route Fifty","SEC EDGAR company submissions, public domain","SEC EDGAR full-text search, public domain","Searchlight New Mexico","Smithfield Township, Monroe County, PA","Source New Mexico","South Carolina Department of Environmental Services","South Dakota Searchlight","Springfield Daily Citizen","Stafford County public permit records","Statesman Journal","Strisker data center notes","Tennessee Lookout","Texas Commission on Environmental Quality","Texas TCEQ air permit records","The Baltimore Banner","The Current (GA)","The Detroit News","The Hill Energy","The North State Journal","The Pantagraph","The Real Deal","The Register","The Texas Tribune","The Verge","Times-Standard","Town of Culpeper public permit records","Tuscaloosa Thread","U.S. EPA ECHO","Union-Bulletin","Uprise RI","Utah Division of Air Quality","Utah Division of Air Quality air permit records","Utah News Dispatch","Utah Public Radio","Utility Dive","Virginia Business","Virginia DEQ air permit records","Virginia Electric and Power Company (filed with Virginia SCC)","Virginia Mercury","Visalia Times-Delta","WBUR","WCPO 9 Cincinnati","WGLT","WHEC.com","WJON","WKYT","WLOS","WLUK","WPBF","WQCS","WRAL (NC)","WUNC News","WVPE","Washington County public permit records","Washington Ecology air permit records","Washington State SEPA Register public permit records","Washington State Standard","Washoe County public permit records","Wausau Pilot & Review","West Virginia Watch","Winston-Salem Journal","Wisconsin Department of Natural Resources","Wisconsin Examiner","Yale Daily News","citybiz","contracosta.news","ictnews.org","indianapublicradio.org","inkfreenews.com","lex18.com","mountaintimesoregon.com","newmedia-wi.com","newscentermaine.com","thegazette.com","tuscaloosathread.com","wcpo.com","www.cities929.com"],"omitted":{"unverified_or_pending":1013,"no_explicit_state":136},"revision":"8bbc0d7f56a15216","trackers":{"policy":{"label":"Policy provisions","url":"#policy-governance"},"moratorium":{"label":"Restrictions & moratoriums","url":"/data-center-moratorium-tracker"},"delay":{"label":"Delays & utility actions","url":"/data-center-delay-tracker"},"water":{"label":"Water measures","url":"/data-center-water-tracker"},"atlas":{"label":"Projects & capital","url":"/data-center-capital-atlas"},"permits":{"label":"Permits & facilities","url":"/data-center-permits-tracker"},"grid":{"label":"Grid operator rules","url":"/data-center-grid-operator-watchlist"}},"selected":{"id":"SD","name":"South Dakota","records":[{"id":"b87c8e5ab20d7865","state":"SD","tracker":"policy","section":"provisions","title":"Address departure and reduced load","summary":"Cost responsibility includes costs incurred if the customer departs or materially reduces load. The law states cost responsibility; it does not supply a universal exit-fee formula.","scope":"Statutorily defined data centers; electricity providers, water providers, and local governments.","status":"Documented in cited instrument","date":null,"sources":[{"url":"https://mylrc.sdlegislature.gov/api/Documents/SessionLaw/306613.pdf?Year=2026","label":"South Dakota SB 135, Chapter 190"}],"parties":[],"groups":["policy:departure"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5f04413f1e1d314b","state":"SD","tracker":"policy","section":"provisions","title":"Obtain local supply determinations","summary":"Water providers assess compatibility, with board review and allocation limits protecting priority uses. Local supply determinations are distinct from the Minnesota consumptive-use permit review.","scope":"Statutorily defined data centers; electricity providers, water providers, and local governments.","status":"Documented in cited instrument","date":null,"sources":[{"url":"https://mylrc.sdlegislature.gov/api/Documents/SessionLaw/306613.pdf?Year=2026","label":"South Dakota SB 135, Chapter 190"}],"parties":[],"groups":["policy:supply-review"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d5abe6128808804e","state":"SD","tracker":"policy","section":"provisions","title":"Preserve local regulation","summary":"The state may not limit local authority to regulate data-center development or operation. Preservation of local authority is not evidence that a local ban exists.","scope":"Statutorily defined data centers; electricity providers, water providers, and local governments.","status":"Documented in cited instrument","date":null,"sources":[{"url":"https://mylrc.sdlegislature.gov/api/Documents/SessionLaw/306613.pdf?Year=2026","label":"South Dakota SB 135, Chapter 190"}],"parties":[],"groups":["policy:local-authority"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3d0987d18045023f","state":"SD","tracker":"policy","section":"provisions","title":"Publish water-use data","summary":"Operators report usage to the board, which makes usage data available to the public. Operator reporting differs from Virginia supplier category reporting.","scope":"Statutorily defined data centers; electricity providers, water providers, and local governments.","status":"Documented in cited instrument","date":null,"sources":[{"url":"https://mylrc.sdlegislature.gov/api/Documents/SessionLaw/306613.pdf?Year=2026","label":"South Dakota SB 135, Chapter 190"}],"parties":[],"groups":["policy:water-reporting"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e1de11c16d8239a6","state":"SD","tracker":"policy","section":"provisions","title":"Recover attributable electricity costs","summary":"Separate service terms must recover costs fairly attributable to the data center. Applies through provider terms rather than a published statewide minimum billing percentage.","scope":"Statutorily defined data centers; electricity providers, water providers, and local governments.","status":"Documented in cited instrument","date":null,"sources":[{"url":"https://mylrc.sdlegislature.gov/api/Documents/SessionLaw/306613.pdf?Year=2026","label":"South Dakota SB 135, Chapter 190"}],"parties":[],"groups":["policy:cost-allocation"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"901f9cb980b11fc3","state":"SD","tracker":"atlas","section":"at_risk","title":"Applied Digital Toronto data center campus","summary":"Applied Digital told KELOLAND News on 13 March 2026 that its proposed data center near Toronto, South Dakota, is unlikely to go forward, after the 2026 Legislature declined to pass a sales and use tax exemption for data center equipment (House Bill 1005 failed in committee). CEO Wes Cummins said later in March that he does not expect any projects in the state for now.","scope":"Record-specific: Deuel County / State of South Dakota","status":"paused","date":"Company statement 13 March 2026 that the project is unlikely to go forward","sources":[{"url":"https://www.keloland.com/news/local-news/deuel-county-data-center-unlikely-to-go-forward/amp/","label":"KELOLAND (13 March 2026)"},{"url":"https://www.keloland.com/keloland-com-original/applied-digital-says-sd-data-center-future-unclear/amp","label":"KELOLAND (23 March 2026)"}],"parties":[{"role":"Developer","name":"Applied Digital"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ce0ea15e87929109","state":"SD","tracker":"atlas","section":"sites","title":"Leola Data Center","summary":"The South Dakota Public Utilities Commission unanimously approved a settlement letting Montana-Dakota Utilities serve the proposed Leola Data Center, near an MDU substation. The PUC chairman stressed the vote was not a permit to construct; McPherson County recently deferred action on the conditional use permit Montana-Dakota Utilities in place of incumbent FEM Electric under a PUC-approved settlement; minimum 2,000 kW billing demand Investment not disclosed; project website cites $159,000 a year in property taxes, $2 million to EMS at the outset then $200,000 a year, and $1 million to schools About 50 MW on about nine acres","scope":"Record-specific: Leola","status":"utility service approved; county permit pending","date":"PUC approval reported 8 to 9 September 2026; county conditional use permit deferred","sources":[{"url":"https://www.sdpb.org/politics/2026-09-09/leola-data-center-electricity-to-be-served-by-mdu-next-faces-county-permitting","label":"SDPB"}],"parties":[{"role":"Entity","name":"Leola Data Center"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"00e2790cf7af9050","state":"SD","tracker":"atlas","section":"at_risk","title":"Lincoln County data center moratorium amendment (failed; Gemini Sioux Falls data center)","summary":"At a joint meeting with the Sioux Falls City Council on Tuesday 25 August 2026, the Lincoln County Commission voted 3-2 against Commissioner Joel Arends' amendment to schedule a hearing on a data center moratorium, attached to adoption of the Sioux Falls 2050 comprehensive plan. A companion amendment barring non-disclosure agreements on zoning proposals also failed. The commission instead approved a public hearing on data center regulation for 27 October 2026. The Sioux Falls City Council had approved the controversial Gemini data center.","scope":"Record-specific: Lincoln County Commission","status":"other","date":"Moratorium amendment failed 3-2 on 25 August 2026; regulation hearing set for 27 October 2026","sources":[{"url":"https://www.yahoo.com/news/us/articles/data-center-moratorium-shot-down-162241974.html","label":"Argus Leader via Yahoo News"},{"url":"https://www.lennoxnews.com/single-post/lincoln-county-sioux-falls-approve-2050-plan-data-center-moratorium-rejected","label":"Lennox News"}],"parties":[{"role":"Developer","name":"Gemini (Sioux Falls data center)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8032dfb59fe8d8f8","state":"SD","tracker":"atlas","section":"at_risk","title":"Yankton County six-month data center and bitcoin mining moratorium","summary":"Yankton County commissioners voted unanimously on Tuesday 21 July 2026 to pass a six-month moratorium on data center and bitcoin mining facility permits, shorter than the 12 months on the agenda. The commission may extend it another six months if no ordinance is drafted. The pause gives the county time to study economic and environmental effects and write regulations. The vote followed nearly an hour of public comment.","scope":"Record-specific: Yankton County Commission","status":"moratorium","date":"Approved unanimously 21 July 2026; six months, extendable six months","sources":[{"url":"https://www.ktiv.com/2026/07/22/data-center-moratorium-passes-yankton-county-south-dakota/","label":"KTIV"},{"url":"https://www.yankton.net/community/article_77f0cd48-dbbc-4f5d-9f5b-56b709da8a36.html","label":"Yankton Press & Dakotan"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"827a8ad7f81cb560","state":"SD","tracker":"delay","section":"county_restrictions","title":"Brookings","summary":"Brookings, South Dakota, City Council voted unanimously to reject a $644K sales-tax rebate for Sequitor Edge's proposed $41 million co-location data center. The denial came alongside state-level defeats: the House State Affairs Committee voted 9-3 against a 50-year data center sales tax break, and the Senate killed two data center incentive bills in a chaotic session when a key senator went missin","scope":"city: Brookings","status":"expired","date":"2026-02-26","sources":[{"url":"https://www.brookingsregister.com/2026/02/26/brookings-city-council-denies-data-center-tax-incentive/","label":"www.brookingsregister.com"},{"url":"https://www.mykxlg.com/news/state/brookings-rejects-tax-rebate-for-proposed-data-center/article_333bb788-4bf6-4d95-969e-4ac71b8d99e0.html","label":"www.mykxlg.com"},{"url":"https://southdakotasearchlight.com/2026/02/24/a-missing-senator-a-failed-search-and-two-dead-data-center-bills-the-south-dakota-senates-chaotic-day/","label":"southdakotasearchlight.com"},{"url":"https://southdakotasearchlight.com/2026/02/04/data-center-tax-break-proposal-fails-in-south-dakota-legislative-committee/","label":"southdakotasearchlight.com"}],"parties":[{"role":"Authority","name":"City Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"8b2fb7f9df02011d","state":"SD","tracker":"delay","section":"county_restrictions","title":"Lincoln County","summary":"Lincoln County Commissioner Joel Arends proposed a one-year moratorium on hyperscale data centers requiring 100+ MW, calling it an opportunity to 'press pause and further research' the impacts of projects like Gemini Data Center SD LLC's proposed $1.9 billion, 500MW facility on 164 acres. However, no commissioner seconded the motion, killing the measure. Commissioner Jim Schmidt argued projects of","scope":"county: Lincoln County","status":"expired","date":"2026-02-24","sources":[{"url":"https://www.mitchellrepublic.com/news/south-dakota/lincoln-county-backs-down-on-hyperscale-data-center-moratorium","label":"www.mitchellrepublic.com"},{"url":"https://www.dakotanewsnetwork.com/2026/02/27/lincoln-county-commissioners-discuss-moratorium-on-building-data-centers","label":"www.dakotanewsnetwork.com"},{"url":"https://kelo.com/2026/02/26/889056/","label":"kelo.com"},{"url":"https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/","label":"siouxfalls.business"},{"url":"https://www.sdpb.org/business-economics/2025-08-15/la-based-company-looking-to-build-data-center-in-sioux-falls","label":"www.sdpb.org"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ad241f560bc35128","state":"SD","tracker":"delay","section":"county_restrictions","title":"Sioux Falls","summary":"Gemini Capital proposed a $1.9B, 500 MW hyperscale data center on 164 acres in eastern Sioux Falls. The City Council voted 7-0 on Jan. 6, 2026 to rezone the farmland for light industrial use, despite 200+ people attending in opposition with over 5 hours of mostly negative testimony. Opponents Samantha Scarlata and Amanda Kendall formed 'Let Sioux Falls Vote' and circulated referendum petitions, bu","scope":"city: Sioux Falls","status":"in_force","date":"2025-12-01","sources":[{"url":"https://www.siouxfallslive.com/news/sioux-falls/planned-data-center-sparks-outrage-in-downtown-sioux-falls","label":"www.siouxfallslive.com"},{"url":"https://dakotafreepress.com/2026/01/17/sioux-falls-loses-11-of-voters-in-one-year-anti-data-center-petitioners-need-1000-fewer-signatures-than-expected/","label":"dakotafreepress.com"},{"url":"https://dakotafreepress.com/2026/01/31/sioux-falls-data-center-referendum-petition-fails-january-chills-signature-collection/","label":"dakotafreepress.com"},{"url":"https://siouxfalls.business/hyperscale-data-center-gains-rezoning-vote-after-hours-of-opposing-testimony/","label":"siouxfalls.business"}],"parties":[{"role":"Authority","name":"City Council"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d8c094983431ab9c","state":"SD","tracker":"delay","section":"county_restrictions","title":"Yankton County","summary":"On June 16, 2026 the Yankton County (SD) Commission held a first reading of a resolution for a temporary moratorium of up to 12 months on data centers and Bitcoin-mining facilities exceeding a power-capacity threshold, prompted by reports of a possible data center; a capacity crowd attended. A1 Development Solutions said it is analyzing eastern SD locations with no current Yankton commitment. [Upd Update 2026-07-21: Yankton County commissioners unanimously passed a six-month moratorium on July 21, 2026, after declining to pass one earlier in the month. The agenda item had proposed 12 months. The moratorium halts permits for data centers and bitcoin mining facilities, and commissioners may extend it by another six months. The commission directed the planning and zoning commission to begin drafting a data center ordinance immediately. (Previously recorded as pending, dated 2026-06-16.)","scope":"county: Yankton County","status":"in_force","date":"2026-07-21","sources":[{"url":"https://www.kynt1450.com/2026/06/16/285378/","label":"www.kynt1450.com"},{"url":"https://www.yankton.net/community/article_ba8fb3d6-f80e-4123-8a79-3f6bbe395390.html","label":"www.yankton.net"},{"url":"https://www.dakotanewsnow.com/2026/07/22/data-center-moratorium-passes-yankton-county-south-dakota/","label":"www.dakotanewsnow.com"}],"parties":[{"role":"Authority","name":"Board of Supervisors/County Commission"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e69882d4dd9dec56","state":"SD","tracker":"moratorium","section":"states","title":"Data Center Bill of Rights for Citizens","summary":"Signed by Gov. Rhoden on March 30, 2026 and effective July 1, 2026. Requires data centers with peak electrical demand of 10 MW or greater to pay for any rate increases they cause, adds water use regulation, and prohibits the state from limiting local governments' authority to regulate or ban data centers. Lawmakers passed it after rejecting the SB 232 statewide moratorium, moving that decision to localities instead.","scope":"State: South Dakota","status":"enacted","date":"2026-03","sources":[{"url":"https://www.sdpb.org/politics/2026-03-25/rhoden-signs-data-center-bill-of-rights-bill","label":"www.sdpb.org"}],"parties":[],"groups":["restriction:states:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d2cb3118b636a794","state":"SD","tracker":"moratorium","section":"states","title":"Limit costs and risks associated with electricity use by data centers and impose a moratorium.","summary":"South Dakota HB1301 (2026 Regular Session): Limit costs and risks associated with electricity use by data centers and impose a moratorium.. Last action 2026-02-18: State Affairs Deferred to the 41st legislative day, Passed, YEAS 10, NAYS 2..","scope":"State: South Dakota","status":"proposed","date":"2026-02","sources":[{"url":"https://sdlegislature.gov/#/Session/Bill/27287","label":"sdlegislature.gov"}],"parties":[],"groups":["restriction:states:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"0c5ecfaba5561367","state":"SD","tracker":"moratorium","section":"local","title":"Lincoln County data center moratorium (failed)","summary":"Lincoln County Commissioner Joel Arends proposed a one-year moratorium on hyperscale data centers requiring 100+ MW, calling it an opportunity to 'press pause and further research' the impacts of projects like Gemini Data Center SD LLC's proposed $1.9 billion, 500MW facility on 164 acres. However, no commissioner seconded the motion, killing the measure. Commissioner Jim Schmidt argued projects of that scale already take at least a year to go through the permitting process with multiple public hearings. The commission voted 3-2 to refer regulations to Planning and Zoning instead, to the dismay of 15 constituents in the audience who supported the moratorium.","scope":"Local: Lincoln County","status":"failed","date":"2026-02","sources":[{"url":"https://www.mitchellrepublic.com/news/south-dakota/lincoln-county-backs-down-on-hyperscale-data-center-moratorium","label":"www.mitchellrepublic.com"}],"parties":[{"role":"Jurisdiction","name":"Lincoln County"}],"groups":["restriction:local:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3ddf71976e354659","state":"SD","tracker":"moratorium","section":"states","title":"One-year hyperscale data center moratorium","summary":"Would impose a one-year moratorium on new or expanded hyperscale data centers; stalled in committee. SD instead enacted SB 135 protecting local governments' authority to regulate or ban data centers.","scope":"State: South Dakota","status":"failed","date":"2026-02","sources":[{"url":"https://legiscan.com/SD/bill/SB232/2026","label":"legiscan.com"}],"parties":[],"groups":["restriction:states:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5a5f4731708d3508","state":"SD","tracker":"moratorium","section":"local","title":"Proposed county moratorium on data centers","summary":"Planning Commission reviewed draft data center ordinance that would outright prohibit hyperscale facilities (500,000+ sq ft); smaller data centers allowed only in commercial/industrial zones with half-mile dwelling setback. Draft sent back for revision; final approval likely months away. The measure has no documented term.","scope":"Local: Minnehaha County","status":"proposed","date":"2026-08","sources":[{"url":"https://www.siouxfallslive.com/news/sioux-falls/minnehaha-county-begins-work-on-potential-data-center-regulations","label":"www.siouxfallslive.com"}],"parties":[{"role":"Jurisdiction","name":"Minnehaha County"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"127e547bdcf06887","state":"SD","tracker":"moratorium","section":"local","title":"Six-month data center and crypto moratorium","summary":"County commissioners voted in July 2026 for a six-month moratorium on large data center and cryptocurrency projects to study impacts and draft an ordinance, with an option to extend.","scope":"Local: Yankton County","status":"enacted","date":"2026-07","sources":[{"url":"https://www.ktiv.com/2026/07/22/data-center-moratorium-passes-yankton-county-south-dakota/","label":"www.ktiv.com"}],"parties":[{"role":"Jurisdiction","name":"Yankton County"}],"groups":["restriction:local:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e0c13222b8896f55","state":"SD","tracker":"moratorium","section":"states","title":"South Dakota: In South Dakota, multiple data center bills saw different outcomes: HB 1005 (50-year sales tax exemption for data centers) was rejected 9-3","summary":"In South Dakota, multiple data center bills saw different outcomes: HB 1005 (50-year sales tax exemption for data centers) was rejected 9-3 in House State Affairs Committee. SB 232 (one-year moratorium) passed committee but was killed in full Senate vote. SB 135 ('Data Center Bill of Rights for Citizens' from Sen. Karr) passed committee 5-4 - it would set protections for utility ratepayers and resources while banning tax exemptions for data centers. Bills addressing noise levels, minimum distances from residences, and water/electricity regulation were also halted.","scope":"State: South Dakota","status":"enacted","date":"2026-02","sources":[{"url":"https://kelo.com/2026/02/24/887979/","label":"kelo.com"}],"parties":[],"groups":["restriction:states:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ffe8dd3d14d778df","state":"SD","tracker":"permits","section":"air_permits","title":"USGS - EROS DATA CENTER","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Sioux Falls","status":"No Operating Status In ICIS","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_fn=DATA%20CENTER&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110001149793","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"95158506706fb5b4","state":"SD","tracker":"water","section":"measures","title":"Data Center Bill of Rights for Citizens","summary":"Requires full transparency of data center water usage, requires operators to work with water service providers so that their use is compatible with local supply, and gives counties and municipalities authority to decide whether a data center is welcome. Signed by Governor Rhoden. The legislature set limits on data centers while rejecting a moratorium. Also requires data centers to cover their own electricity costs.","scope":"state: South Dakota","status":"enacted","date":"2026-03-30","sources":[{"url":"https://legiscan.com/SD/bill/SB135/2026","label":"legiscan.com"}],"parties":[{"role":"Jurisdiction","name":"South Dakota"}],"groups":["water:disclosure:enacted"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."}],"groups":{"policy:cost-allocation":["e1de11c16d8239a6"],"policy:departure":["b87c8e5ab20d7865"],"policy:supply-review":["5f04413f1e1d314b"],"policy:water-reporting":["3d0987d18045023f"],"policy:local-authority":["d5abe6128808804e"],"restriction:local:failed":["0c5ecfaba5561367"],"restriction:local:proposed":["5a5f4731708d3508"],"restriction:local:enacted":["127e547bdcf06887"],"restriction:states:enacted":["e69882d4dd9dec56","e0c13222b8896f55"],"restriction:states:proposed":["d2cb3118b636a794"],"restriction:states:failed":["3ddf71976e354659"],"water:disclosure:enacted":["95158506706fb5b4"]},"grid":[{"name":"MISO","key":"MISO","rules":[{"title":"FERC Order to Show Cause on large-load integration (MISO)","summary":"FPA Section 206 order preliminarily finding the MISO tariff unjust and unreasonable because it lacks a consistent, transparent framework for large-load application, study, cost-transparency, co-location, and operational requirements. Defines 'Large Load' as a new commercial or industrial customer at a single site with peak load of 50 MW or greater, interconnecting above 69 kV, not part of a co-location arrangement. Required a generation-adequacy informational report by July 20, 2026 and a show-cause response by…","status":"Pending ,  held in abeyance (see abeyance entry)","date":"2026-06-18","sources":[{"url":"https://www.akingump.com/en/insights/blogs/speaking-energy/ferc-issues-show-cause-order-to-midcontinent-independent-system-operator-inc","label":"www.akingump.com"}]},{"title":"MISO generation-adequacy informational report (EL26-70)","summary":"Report required by the June 18 order on how MISO will ensure adequate generation for existing and new large loads. It acknowledged that concentrated, fast-moving large-load demand requires new tools and previewed two filings: a Zero-Injection GIA (then targeted on or about July 31, 2026) and a Large Load Parallel Study Process (targeted on or about end of September 2026). It stated the region is currently resource adequate.","status":"Filed","date":"2026-07-20","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"MISO abeyance motion and FERC grant ,  show-cause response deadline moved to November 16, 2026","summary":"MISO (like every RTO/ISO) moved on August 3, 2026 to hold the show-cause proceeding in abeyance for up to 90 days to develop Section 205 filings; American Municipal Power opposed. Per a docket tracker updated August 23, 2026, FERC granted full abeyance on August 14, 2026, resetting MISO's response to November 16, 2026 with answers due December 16, 2026. Consequence: MISO did NOT file a substantive show-cause response on August 17, 2026.","status":"Granted ,  proceeding in full abeyance; response due November 16, 2026, answers due December 16, 2026","date":"2026-08-03","sources":[{"url":"https://www.pranavaraparla.com/FERC-Orders-June-2026/","label":"www.pranavaraparla.com"}]},{"title":"Zero-Injection Generator Interconnection Agreement (ZGIA) tariff filing","summary":"Section 205(d) filing creating a fast-track interconnection path for generation co-located with large loads behind the same point of interconnection that will not inject power onto the transmission system (injection prevented beyond transient tolerance windows; POIs on the same voltage side of the same substation treated as electrically equivalent). Per the June 29, 2026 LLWG: ZGIA generators must register as market resources; associated loads are classified as firm NITS loads paying transmission on a gross…","status":"Filed ,  pending at FERC","date":"2026-08-18","sources":[{"url":"https://www.govinfo.gov/content/pkg/FR-2026-08-24/html/2026-17246.htm","label":"www.govinfo.gov"}]},{"title":"Large Load Parallel Study Process (planned tariff filing)","summary":"A new, expedited study process for large loads conducted outside MISO's regular interconnection queue, allowing concurrent rather than sequential study of new large loads and their associated ('devoted') generation. MISO also said it intends to develop a non-firm transmission service option for large loads. Developed through the Large Load Working Group, with meetings scheduled through November 2026.","status":"Proposed ,  pre-filing; announced in MISO's July 20, 2026 informational report","date":"2026-09","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Large Load Interconnection Reliability Requirements (LLWG-2026-3) tariff package","summary":"MISO-wide reliability requirements for large loads: hourly 168-hour forecasts updated hourly plus 5-minute forecasts covering 6 hours; real-time SCADA/ICCP telemetry (MW, MVAR, voltage, breaker status); PMUs at each point of withdrawal streaming IEEE C37.118 data; ramp-rate limits, voltage/frequency ride-through, and remote-disconnect capability; new tariff definitions for computational load, large load customer, and points of withdrawal. Generation over 20 MVA behind the same POI needs individual, un-netted…","status":"Tariff language drafted; filing not independently confirmed","date":"2026-06-29","sources":[{"url":"https://cdn.misoenergy.org/20260716%20LLWG%20Item%2001c%20Minutes%2020260629769037.pdf","label":"cdn.misoenergy.org"}]},{"title":"Expedited Resource Addition Study (ERAS) ,  generation fast lane","summary":"Expedited interconnection track for shovel-ready generation addressing resource adequacy, including generation serving large-load growth; MISO began its first ERAS review with 6.1 GW of projects, about 70% gas. A third-party tracker lists ERAS as sunsetting August 31, 2027 or at a 68-project cap. MISO's large-load page pairs ERAS with Expedited Project Review (EPR) for accelerating transmission solutions.","status":"Approved/operating; first cycle reviewing 6.1 GW (~70% gas)","date":"2025-06","sources":[{"url":"https://www.utilitydive.com/news/miso-eras-fast-track-interconnection-study-gas/806747/","label":"www.utilitydive.com"}]},{"title":"Attachment GGG (Merchant HVDC Connection Procedures) and Improvements (PAC-2024-6)","summary":"Attachment GGG is MISO's connection-only procedure for merchant HVDC ties: it establishes safe physical interconnection while separating physical connection from injection rights and transmission service. MISO targeted a tariff/BPM filing in Q2-Q3 2026 with FERC action and implementation expected Q4 2026. The connection-only construct has been referenced in MISO's large-load interconnection policy discussions (January 21, 2026 PAC), making it a template of interest for load-only connections.","status":"Active ,  'FERC' phase on MISO dashboard (last modified August 12, 2026)","date":"2026-05-12","sources":[{"url":"https://www.misoenergy.org/engage/MISO-Dashboard/attachment-ggg-improvements/","label":"www.misoenergy.org"}]},{"title":"2026/27 Planning Resource Auction results","summary":"Annualized capacity prices fell ~42% to $116-126/MW-day across MISO's zones (from $212-217/MW-day for 2025/26). Summer-season prices cleared at $424.30/MW-day in North/Central, $384.10 in Arkansas/Mississippi, $412.10 in Louisiana/Texas (down from $666.50 footprint-wide). Driven by a 4% increase in offered capacity including 12.2 GW of accredited solar (up 59%).","status":"Final ,  all zones cleared, no shortfalls","date":"2026-04-28","sources":[{"url":"https://www.misoenergy.org/meet-miso/media-center/2026---news-releases/misos-planning-resource-auction-shows-sufficient-capacity-for-coming-year","label":"www.misoenergy.org"}]},{"title":"2026 OMS-MISO Resource Adequacy Survey","summary":"Members plan record additions averaging ~15 GW/year of new accredited summer capacity over five years (~100 GW of new supply by 2032; ~60% wind/solar/storage, ~40% gas), against 5.1%/year load growth. Projected surpluses above the planning reserve margin: summer 2028 +11.5 GW, summer 2031 up to +39 GW (November-forecast basis); the April-forecast basis shows materially lower margins. Record 99.5% survey participation.","status":"Published","date":"2026-06-03","sources":[{"url":"https://www.utilitydive.com/news/oms-miso-survey-resource-outlook-generation/821973/","label":"www.utilitydive.com"}]},{"title":"State commissions' complaint against LRTP Tranche 2.1 benefits/cost allocation","summary":"Utility commissions from Arkansas, Louisiana, Mississippi, Montana and North Dakota asked FERC to undo the Tranche 2.1 Multi-Value Project designation, alleging MISO's modeling overstated benefits. MISO, six other state commissions, multiple utilities, the Data Center Coalition, and the governor of Iowa opposed the complaint and sought dismissal. Outcome directly affects cost allocation for the 765 kV backbone that would serve large-load growth.","status":"Pending ,  no FERC merits ruling found as of 2026-08-24","date":"2025-07-30","sources":[{"url":"https://www.utilitydive.com/news/ferc-complaint-mvp-multi-value-project-transmission/756411/","label":"www.utilitydive.com"}]},{"title":"FERC rulemaking: Interconnection of Large Loads to the Interstate Transmission System","summary":"The Secretary of Energy initiated a rulemaking in October 2025 to facilitate timely large-load interconnection ('speed to power'). FERC's June 18, 2026 response was six tailored show cause orders (including EL26-70 for MISO) rather than a single national rule, while keeping the RM26-4 docket open. Binds all six RTO/ISO regions' reform schedules.","status":"Open rulemaking docket; FERC chose targeted Section 206 show-cause orders over an immediate generic rule","date":"2026-06-18","sources":[{"url":"https://www.ferc.gov/rm26-4","label":"www.ferc.gov"}]}]},{"name":"SPP","key":"SPP","rules":[{"title":"High Impact Large Load (HILL) study process, HILLGA, and Load Limited Resource Interconnection Service (LLRIS)","summary":"Creates a HILL load category ,  new or increased commercial/industrial load of 10 MW+ at ≤69 kV or 50 MW+ at >69 kV at a single site (electric storage excluded) ,  with a 90-day study-and-approval path to interconnection agreements for loads paired with new or existing generation. HILLs must provide real-time telemetry, give the transmission operator remote-disconnect capability, hold ramp rates to no more than 20 MW/minute unless otherwise directed, install a PMU at customer expense, and meet ride-through…","status":"approved / effective (unanimous; Commissioner Rosner concurrence; compliance filing due within 30 days)","date":"2025-10-24","sources":[{"url":"https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf","label":"spp.org"}]},{"title":"Conditional High Impact Large Load Service (CHILLS) ,  non-firm bridge transmission service","summary":"Adds a new as-available, non-firm transmission service letting customers serving HILLs take energy transfers to designated delivery points, subject to curtailment and interruption when the system is constrained or during emergency conditions, until designated resources and/or network upgrades supporting long-term firm service are in place. Maximum term is seven years, intended to push customers to complete firm-service arrangements through existing tariff processes. FERC found CHILLS just and reasonable given…","status":"approved / effective","date":"2026-02-10","sources":[{"url":"https://spp.org/documents/76880/20260605_order%20-%20revisions%20to%20add%20the%20conditional%20high%20impact%20large%20load%20service_er26-1323.pdf","label":"spp.org"}]},{"title":"Expedited Resource Adequacy Study (ERAS) ,  one-time fast-track generation interconnection process","summary":"One-time expedited interconnection framework for generation needed for member resource adequacy, adopted in response to queue backlogs and projected capacity deficits. As of SPP's July 2026 informational reports, 36 active requests totaling ~13.3 GW are in the process, with Generator Interconnection Agreement negotiation/execution expected in September 2026. Thermal resources lead the ERAS mix, followed by hybrid projects.","status":"approved / in execution (36 requests ~13.3 GW; GIAs anticipated September 2026)","date":"2025-07-21","sources":[{"url":"https://www.spp.org/documents/74369/20250721_order%20accepting%20tariff%20revisions%20subject%20to%20condition%20-%20expediated%20resource%20adequacy%20study_er25-2296-000.pdf","label":"www.spp.org"}]},{"title":"FERC Section 206 show cause order on large and co-located loads (one of six issued to all RTOs/ISOs)","summary":"FERC preliminarily found SPP's OATT appears unjust, unreasonable, or unduly discriminatory and directed SPP and 22 named transmission owners to either show cause or propose remedies on four gaps: (a) no requirement to evaluate alternative transmission technologies (GETs) or memorialize ongoing operational requirements in a transmission service agreement; (b) transparency on network upgrade costs, a pro forma cost recovery agreement, and a crediting mechanism to prevent cost shifting; (c) rates/terms for…","status":"pending (SPP filed its 30-day informational report July 20, 2026; the 60-day show-cause response deadline passed Aug 17, 2026 ,  contents not yet…","date":"2026-06-18","sources":[{"url":"https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf","label":"spp.org"}]},{"title":"SPP informational report on resource adequacy for large loads (EL26-68 compliance)","summary":"SPP argued its existing framework ,  ERAS, Provisional Load Process (Attachment AX), HILL/HILLGA, CHILLS, Peak Demand Assessment, and the Consolidated Planning Process ,  collectively addresses resource adequacy for new large loads and that no immediate tariff overhaul is required. Reported all 65 Load Responsible Entities met summer 2026 resource adequacy requirements, with the East Balancing Authority Area holding a 17.1% reserve margin (~5,752 MW excess capacity).","status":"Filed","date":"2026-07-20","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Price Adaptive Load / Price Adaptive Load Service (PAL/PALS) market participation model","summary":"A new market participation model and non-firm transmission service for flexible, price-responsive large loads willing to curtail, developed partly in response to the EL26-68 show cause order's directive on flexible-load services. A draft Schedule 16 would assign PALS the lowest non-firm curtailment priority ,  curtailed before other non-firm customers and well before firm service. Target FERC filing on or before November 16, 2026.","status":"proposed / in stakeholder development","date":"2026","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Seasonal planning reserve margins ,  36% winter / 16% summer","summary":"Load Responsible Entities must hold capacity of at least 36% above winter peak (first separately defined winter PRM) and 16% above summer peak, up from the prior 15% requirement in effect since 2023. The summer PRM is scheduled to rise to 17% in 2029. These requirements bind the capacity that must back any new large load served by an LRE.","status":"approved / effective","date":"2026","sources":[{"url":"https://www.spp.org/news-list/spp-board-approves-new-planning-reserve-margins-to-protect-against-high-winter-summer-use/","label":"www.spp.org"}]},{"title":"Consolidated Planning Process (CPP) ,  merged transmission/interconnection/load planning","summary":"Consolidates SPP's transmission planning, generator interconnection, and (large) load processes into a single planning framework, adopted in response to historic load growth, queue backlogs, escalating network-upgrade costs, and project withdrawals. First Interconnection Cluster Study queue window opened 30 days after the effective date; initial GRID-C rate publication expected by end of 2026.","status":"approved / effective; first CPP planning cycle concludes 2028","date":"2026-03-13","sources":[{"url":"https://www.hklaw.com/en/insights/publications/2026/03/ferc-approves-spps-consolidated-planning-process","label":"www.hklaw.com"}]},{"title":"CHILLS refinement revision requests RR767 / RR768","summary":"RR767 clarifies how CHILL-related curtailment commitments must be defined, sequenced, and made operationally feasible; RR768 accommodates planned outages of generators supporting a CHILL while preserving SPP's ability to curtail for reliability. SPP is also developing refinements on resource commitment sequencing and minimum curtailment ramp rates.","status":"Proposed","date":"2026","sources":[{"url":"https://epeconsulting.com/epe-intelligence/news/accelerating-project-opportunity-new-chills-tariff-revisions-in-spp-provide-critical-flexibility","label":"epeconsulting.com"}]}]}],"grid_note":"Black Hills (Rapid City), NorthWestern SD, and Basin/East River co-op territory SPP; Xcel (Sioux Falls) and Otter Tail areas MISO. Split is close ,  no public state load-share figure located; SPP dominance inferred from…","grid_operators":["SPP","MISO"],"counts":{"policy":5,"moratorium":7,"water":1,"delay":4,"atlas":4,"permits":1},"record_count":22},"states":[{"id":"AL","name":"Alabama","groups":{"restriction:local:enacted":["b754e99ab4330e15","decd6891258f47ef","f0af2bd58075bd01","acf788f0940c151f","5d2b5e02877a6db1","86b6b59a0f9f25d6","c4e0ec1c77b375f6","f54b7627480545ea","e01160ee3d027689","a5568f503c16796e","672a4451f57ed71f","130f0e56bf60745e","4985760687f3ce84","03643fb450f0e606","e03f681545f8685d","7e09fb347db9cc56","3eaa5dec8cc4f32e"],"restriction:local:failed":["c8b4ae70216bc13d"],"restriction:states:proposed":["e7f13067c265e602"],"water:moratorium:enacted":["fe369e5b2f828936"],"delay:litigation:active_litigation":["588eb0c7ad945e8c"],"delay:zoning_approval_challenge:active_litigation":["588eb0c7ad945e8c"],"delay:litigation:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:council_agenda_removal:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:environmental_concerns:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"utility:statement:pending":["11c4e5e5098ce897"],"utility:special contract:pending":["6d50a85ed575ad70","ea51d9bfa3f2aef7"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":19,"water":1,"delay":17,"atlas":28,"permits":3},"record_count":68},{"id":"AK","name":"Alaska","groups":{"restriction:local:enacted":["a3bdbc7a2f903071"],"restriction:local:proposed":["1b1fd599ecf09004"],"restriction:local:failed":["14fcd2107dd36027"],"restriction:states:failed":["70bf8b65e5240449"],"delay:interconnection:cancelled":["cbda12242cdda058"],"delay:community_opposition:cancelled":["cbda12242cdda058"],"delay:financing:cancelled":["cbda12242cdda058"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":4,"delay":2,"atlas":1},"record_count":7},{"id":"AZ","name":"Arizona","groups":{"restriction:local:enacted":["efe1b1646b346c07","a90bced96e18e77a","a6281e2e804f5a60","1d398d0ae1a21d5b","641d11706e6d4289"],"restriction:local:proposed":["543df422425e5d64"],"restriction:states:enacted":["341f659a40d6be88","8c611b34dae73c14","1e866041a2d45903"],"restriction:states:proposed":["add216a01080fe60","226daa2040f1d307"],"restriction:states:failed":["1b22a852fb3cd3d6","6300ce595ef5d0af","fe22b44843f73aaa"],"water:closed-loop:enacted":["869ef8ac67db8830"],"water:siting:enacted":["e4c543ec417de650","bf9111175cdcc2be"],"water:study:enacted":["c002da5fb08b6601"],"water:moratorium:enacted":["5706e495e387c218"],"delay:zoning_denial:cancelled":["3a372b9b02a89621","717671bd9cdc167f"],"delay:water_dispute:cancelled":["3a372b9b02a89621"],"delay:community_opposition:cancelled":["3a372b9b02a89621"],"delay:community_opposition:litigation_active":["b1a04c91d82be6c4"],"delay:water_dispute:delayed":["f0fd3f3d4688462e"],"delay:community_opposition:delayed":["f0fd3f3d4688462e"],"delay:zoning_denial:under_appeal":["cb82a5cd61fb9cec"],"delay:tax_incentive_change:under_appeal":["cb82a5cd61fb9cec"],"delay:zoning_denial:withdrawn":["5567ed106330c2df"],"delay:community_opposition:withdrawn":["5567ed106330c2df"],"utility:other:pending":["5d17a79f01d2eb63"],"utility:tariff:pending":["1da26df1fe5c13a0"],"utility:rate case:pending":["5b45806c6fb887c7","d2b222dc47567225"],"utility:special contract:approved":["d3d18ed766abfecd","44611b67548fe3db"],"utility:tariff:approved":["f2a114901b242afc"],"utility:special contract:pending":["aa4d78d10d987248"],"utility:statement:pending":["0dcfef71df5fb811"],"utility:other:approved":["03326890e794e215"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":14,"water":5,"delay":29,"atlas":21,"permits":63},"record_count":132},{"id":"AR","name":"Arkansas","groups":{"restriction:local:enacted":["ccd17d0cc78e8f6b","24be15d78831b997","2976edbd642bc5ee","165be2cac366e40a","c321161246656575","11b2b2b4357c9b9a","f1fcd0a91c9b364f","cc8edc44497c00b0"],"restriction:local:failed":["7a3c89981993bc87","f0d3a1dde3ddedd3"],"restriction:states:proposed":["24cb87919949138b"],"restriction:states:failed":["669f43bd9db94313","4cd8f4567d93ecf7"],"water:disclosure:failed":["b599e881f9e16713","460013ff73ea7911"],"water:siting:enacted":["d25f62e8d2b28025"],"water:disclosure:vetoed":["34510ed612779eb7"],"delay:litigation:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:state_law_ownership_ban:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:quorum_court_rejection:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:county_moratorium_dispute:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:litigation:active_litigation_records_dispute":["a103b1f5c7cb3114"],"delay:public_records_dispute:active_litigation_records_dispute":["a103b1f5c7cb3114"],"utility:statement:approved":["36a2338551fca4bf"],"utility:tariff:approved":["f43b05ef42c2b01e"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":13,"water":4,"delay":17,"atlas":10,"permits":2},"record_count":46},{"id":"CA","name":"California","groups":{"restriction:local:enacted":["a25de67269df0ed1","5709c4b5b56bdcb7","2a076a8efdfced43","09ce6bf92df9e75f","846b44fb44875a68","c8bffaf8e914e126","d3f536e572c853c0","e6f878bf8f23af8a","0bc1904215c57133","91ff35645c472dbe","188c7c4f44c8536f","2e31d9e1a9cca3fe","c6bb03e1b77debf9","1df245d5ecbbe1dd","106240b9c12fa638","71e0bfc997caca17","e8632d627b1772a4","7c6238e16f306088","055c2fca846ffbb0","4db95272d4d0b3b9","c0ec3d7f70d99734","9749538c1593f5cd","396ad9209089e80b","8aa7be7faae30500","dbd84a0fba7823d9","4297fa613aade787","1ed97d6ba694c7ec"],"restriction:local:proposed":["ea295658dff6c100","4d8d1ffdf12217a7","0552f5d218785acb","566895b8839e5229","558caf6ac46fd86a","aafdf3f00fd02036","1447a768a8032ada","8f8c47d0520b6675","07dc420f28cea720","cc095341ed505538","96c02fe3f2b69d63"],"restriction:local:failed":["4c7a6aab7028e4cf","6c0f45a31c38dd96","60a1fd085fb7faa2"],"restriction:local:pause":["9441b074827051cd"],"restriction:states:enacted":["b138c8f25c6a1df9","6cd48a1a9e3b6e42","e04ce361015d10b8","997e47cb2efa0fb1","a99eee6a8346d803","f8de3ea100d5a73c","36821d2782e3a288","b175ffb656ec4e09"],"restriction:states:failed":["9a181689208d061f"],"water:disclosure:proposed":["6018757e291cf1cf"],"water:disclosure:enacted":["f1363de6a8051f4c","0542c8536ced8e81","d192c59c767e1959"],"water:moratorium:enacted":["1cc46a341cdc3ef8","455741d01ef09906","490cb87c459dd8d3","b85c5b51cdf4ca84","2d55ff4b663fe464"],"water:moratorium:proposed":["7dd1832dd7f10e5b","d430cf80aec173de"],"water:incentive:enacted":["4a4855c312ff4655"],"water:siting:enacted":["0f9ba6aedeacc0f2"],"delay:litigation:litigation_active":["df264e03425ec97a"],"delay:permit_denial:litigation_active":["df264e03425ec97a"],"delay:local_moratorium:delayed":["81e21ec7e868a8a0"],"delay:water_dispute:delayed":["81e21ec7e868a8a0"],"delay:community_opposition:delayed":["81e21ec7e868a8a0","14833b21d81cfae2"],"delay:litigation:delayed":["8f4ba499ed265bb0"],"delay:permit_denial:delayed":["8f4ba499ed265bb0"],"delay:local_moratorium:cancelled":["e6ef57967971f34b"],"delay:community_opposition:cancelled":["e6ef57967971f34b","60ad802b8bf4ce26"],"delay:community_opposition:withdrawn":["dabaa0d9ca40c829"],"utility:other:pending":["2331af1293597280","65708bfad2e82891"],"utility:tariff:pending":["9365b7af7942c436","345f48017f0b0304"],"utility:statement:pending":["686efa78facdadc1","c9e2f082eb03806e"],"utility:tariff:contested":["d8dc8b595b9287b9"],"utility:IRP:pending":["2c217c66f5f9e73f"],"utility:special contract:approved":["e9224e475fe0078d"],"utility:special contract:pending":["a93460236987d2aa"],"utility:tariff:approved":["77fc87a9cbbc5266"]},"grid_operators":["CAISO","NON-RTO"],"counts":{"moratorium":51,"water":13,"delay":52,"atlas":42,"permits":18},"record_count":176},{"id":"CO","name":"Colorado","groups":{"restriction:local:enacted":["d20e86908dbdc520","7e23b2c472790666","b680584b86f47325","27892c65296bbedd","4057677a34555f38","611f35a83bc2affd","079b59e4fdf63d21","a78ac9d55cc5b6e7","72aaf79dce28835b","8c94de22f0407e5e","fafd70f2e092776b","b7f34202c64479ce","68d895f0c2ab0e74","9ef574abef591c91","73177d5333c4eddd","025c6d645640e09f","2c25069cf664aaf3"],"restriction:local:proposed":["180c78e281f128cd","e516a7d3e6cb6124"],"restriction:local:failed":["1224f46eadf9763d"],"restriction:states:failed":["804810ef9bbbcba8","8bb8b6f98d15d82f"],"water:siting:enacted":["1a50144d2155e77c","b03afdefabd7d0fe"],"water:moratorium:enacted":["da5550e87bcd99b9"],"delay:local_moratorium:halted":["9cef3b22115f1c92"],"delay:community_opposition:delayed":["a38043d281f78904"],"delay:litigation:delayed":["a38043d281f78904"],"delay:tax_incentive_change:litigation_active":["75f9d2abb9fb3326"],"delay:local_moratorium:delayed":["346f7ed881ecaa83"],"utility:tariff:pending":["959a6c65c1b74f30","59050cc9ea65018e","7d2e982178725742"],"utility:IRP:approved":["c4287797ac10652c"],"utility:tariff:denied":["c0672975e176ca01"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":22,"water":3,"delay":27,"atlas":26,"permits":35},"record_count":113},{"id":"CT","name":"Connecticut","groups":{"restriction:local:enacted":["6e1a2316302287f7","576ae2d483109634","f7bc5e6a64694fc6","afa7c0bb25faeb00","0642f9a9d449638b"],"restriction:states:failed":["717698e42ef6e901","e135ad979d2fc395"],"water:disclosure:proposed":["7a7d2e991305affc"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":7,"water":1,"delay":4,"atlas":5,"permits":1},"record_count":18},{"id":"DE","name":"Delaware","groups":{"restriction:local:proposed":["d3ed82824472253c"],"restriction:local:enacted":["20667d2af7bb1915","349d8f4e1160a386","e6b800970826b7ff"],"restriction:states:enacted":["f79088b84dfb570b","f797bd58db306835","00d385fc78b43d3c"],"restriction:states:failed":["8e1aedf35862eb28"],"delay:zoning_denial:halted":["5fef84a0dc8a6ea7"],"delay:community_opposition:halted":["5fef84a0dc8a6ea7"],"utility:tariff:pending":["5c2aae85d73c5722","7d3ea4d67fa68520","db8fb22803e36edc","5b6e0fabe7643de5","a3ef5c98705ce81a"],"utility:tariff:contested":["17240088860f9cd6"],"utility:policy:effective":["c3275bc79925ea23"]},"grid_operators":["PJM"],"counts":{"moratorium":8,"delay":14,"atlas":4,"permits":3},"record_count":29},{"id":"FL","name":"Florida","groups":{"restriction:local:proposed":["3c6d8b831356d465","e8b089b79a0f9026","7425d7591ce9c05a","e1b9861a123c1037","eff63eaba9c47d23","5b481baefebc87d9","a5e933035ad808b1","fac9127296bbb451","81e7440dc92c2b86","92a8872884499683"],"restriction:local:enacted":["a5503fc35c328f46","23c7119619365d48","8b07f1ffc26fabaf","3d8300137881558a","73505e05af5a93eb","f81b18c1e2c17955","930a54e75fe30dbf","a6dde620b7e76c37","55f91fe7e81d73f9","256ea0475a8abfbc","3d3d3059a4680f72","d7dcf42909108795","81d807032f719371","e068dd6b5ef9a080","2309ccbc3d286709","6056ac6cc19512a9","7143529782427cf5","089c1610e25cae54","6519ee70858d723f","10e7ec4ad55643e8","9d86ef4ad5bda00b","664c54df9091c973","05af516c4516ea5a","f5948f47a6af75c6","983f2c993373327d","06dc3cba02451c3d","c1218a13301328fe","b404521e586a3d39"],"restriction:local:failed":["3cabceedb3599796","cea30c117def2cca","3eec78ad6ec41fba","b3455f9b6eb27513"],"restriction:states:enacted":["bd1baf5ebba563ea","0481f85a9e1d5f2a"],"restriction:states:failed":["8cb4a715971a72e5","3ba747e753788cc7","04d2addc80c5d977"],"water:reclaimed:enacted":["41fb56a04133f262"],"water:moratorium:proposed":["edf34b85cb944f74","1cd10774835a9376","ad733fa464deef93"],"water:moratorium:enacted":["2940ba1eefc2e616","9b3a0316ced968a7","209a4247fb52b5dd"],"delay:community_opposition:cancelled":["8e40e6f05855c417"],"delay:water_dispute:cancelled":["8e40e6f05855c417"],"delay:zoning_denial:cancelled":["8e40e6f05855c417"],"delay:permit_denial:denied_without_prejudice":["a96919e42e70568c"],"delay:community_opposition:denied_without_prejudice":["a96919e42e70568c"],"delay:county_moratorium:moratorium_in_force":["a80ab26a0223aab0"],"delay:community_opposition:under_construction_amid_opposition":["30167fbd092c1632"],"delay:transparency_concerns:under_construction_amid_opposition":["30167fbd092c1632"],"delay:community_opposition:rumored_no_application_filed":["f2412c254c9be527"],"delay:meeting_postponed:rumored_no_application_filed":["f2412c254c9be527"],"utility:tariff:pending":["8decf641f8a25d7d","a3c4a2035b1bbdae"],"utility:tariff:approved":["e302a349f266e980","6e774dbc7dc0ad70"],"utility:other:pending":["49d867567171c0f6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":47,"water":7,"delay":35,"atlas":45,"permits":3},"record_count":137},{"id":"GA","name":"Georgia","groups":{"policy:cost-allocation":["8dcc4b156d460b66"],"policy:minimum-payment":["90114ff524521a31"],"restriction:local:enacted":["83b7e8e76b5ee0bc","c702f3e21493eb78","f01b7f9bb899e3d6","f7d299ad7a92bf12","3bbce17db7406e29","d82372162bbd6160","85de3463c47701a1","7086dae6422907ad","754cf92f96c529a3","c7572839bf1e65ec","0f457e9b1f07b13c","cde0de75b390a38c","190ca6042402e496","b7df742790192976","18d1622ef7bf1615","91cb94f80ea44672","8b31abcd9fbd53f1","25670f673645fec9","a263b272f78d0c97","c968b3ce64dc6e50","94471cc36a302f4d","d8321a4a32d96fe5","d6fd85ec434dbb95","e92bfd601e97e81a","b442425bf5306c01","0a299b6f3e4f8a71","97f3ce24746ab390","75bf8ea8521c54fa","0a88eeaf1510a872","b85fe594520520c1","90a000efae4eb640","c5f545916c737149","7718b91252a0926a","dea0bc58f5667b0f","31c097aea2e6b922","e07ddb442cda946c","8e0052e65c172653","8c1646131950febb","05cc6246e1b41c7f","f7dbcf4c51bf6858","a0256947e3545780","8a2dd9e2691ff06f","9f541b9254ba4673"],"restriction:local:failed":["0abc00ddccf55a33","2bc57eb4e3e90e1f","701836b773fb0b9f","69a87b66a5ff3dc2","c86da04ebcb107b1","496e8e5d89e48f9e","e1f3ad4472027620","6e2cdff1c98b89c0"],"restriction:local:proposed":["c2f04f5b50afc543","0fb52176825fcefa","cb9ce96499427440"],"restriction:states:proposed":["8f9aa89848bde366"],"restriction:states:failed":["e9f083814e55fed7","9c1953c2716db6dd","40cfc9d1ff50d003","6a4a691d7908a952","1f42995802ab1e14","1b3fd31a366bf4bd","a9baa8b690070329","30d8a643dc1032e6","35836125f8f5c6e9"],"water:disclosure:proposed":["763ca1cd9c5aab65"],"water:siting:enacted":["dfcc4d38d0110edd","e2e353fc1545946a"],"water:siting:proposed":["1054015276abc18b"],"water:closed-loop:enacted":["de00fb52546e6f23"],"water:disclosure:enacted":["2ad2d7c1dd2cabd0"],"delay:permit_denial:permit_denied":["1f36ddedf54f3fd4"],"delay:community_opposition:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:approved_active_litigation":["d0f8256ac51fab90"],"delay:litigation:approved_active_litigation":["d0f8256ac51fab90"],"delay:community_opposition:approved_active_litigation":["d0f8256ac51fab90"],"delay:county_moratorium:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:community_opposition:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:county_moratorium:moratorium_in_force":["dc2902692d6491a1"],"delay:public_outcry:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:tax_break_withdrawal:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:community_opposition:cancelled":["2a4ab4968e918d44"],"delay:interconnection:cancelled":["1de43b4a847f9aa8"],"delay:financing:cancelled":["1de43b4a847f9aa8"],"delay:interconnection:denied":["2661c3858a5d582c"],"delay:zoning_denial:halted":["07d5ce26e3298956"],"delay:community_opposition:halted":["07d5ce26e3298956"],"utility:tariff:approved":["51165aeea3b5c521"],"utility:rate case:approved":["858fc088c06ae5c6"],"utility:other:pending":["7eacf8103d2cde93","725643f3b4745c90"],"utility:statement:pending":["83d8f442e8f028cc","613ee18634340b67"]},"grid_operators":["NON-RTO"],"counts":{"policy":2,"moratorium":64,"water":6,"delay":70,"atlas":70,"permits":91},"record_count":303},{"id":"HI","name":"Hawaii","groups":{"restriction:local:proposed":["28597eb2f2e2356b"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":1},"record_count":1},{"id":"ID","name":"Idaho","groups":{"restriction:local:enacted":["95089721b56ee774","fe1a183a87096ad9","cfe65746b5a0f7e3"],"restriction:local:failed":["93f06396ad555ba2"],"restriction:states:enacted":["276f9be7f349fc75"],"restriction:states:proposed":["cefda14587a887e9","f7f09ea72ca4e50b"],"restriction:states:failed":["9c8a456a09d32f23","89b3c3ec88bdbc77","46828f9c28d595d2"],"water:siting:enacted":["d9479381dd39426b"],"delay:litigation:under_appeal":["6c2c455020d0272b"],"delay:corporate_realignment:delayed":["7e9cb32e4e8d817f"],"utility:other:pending":["7cf4e8e8f3a38458"],"utility:tariff:approved":["e898000ea6ecc3d6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":10,"water":1,"delay":9,"atlas":3,"permits":1},"record_count":24},{"id":"IL","name":"Illinois","groups":{"restriction:local:failed":["1688237928438d39"],"restriction:local:enacted":["ca8eaa4fae2c852a","6f07a6763fa734a0","09ae1486502886e8","5bd418f017328c7c","06b72d07cd1c49ac","0c47dab15c0d2f8b","0af9b2178b92e9d5","a63897e78f332f95","9c11e0fbe25fcdd9","dff4c418b6ff66a4","4dbd1742ac88cba6","98cdcd339817f68e","95fb3d3156498f12","15e7d96176c192b0","4ada4d4ff9e7b794","9f441a6e33f21096","91816e044ae91d73","606804a7751c5741"],"restriction:local:proposed":["c658effcd8a8404b","e742ed625e62ce6f","a952290a81b198a4","5b9ee8080b2a9ab7"],"restriction:states:pause":["d15586bf00803a21"],"restriction:states:proposed":["2de67be693a93ad7"],"restriction:states:failed":["6456aa7bb0b23688"],"water:disclosure:proposed":["8a7dc5bdfec701e7"],"water:moratorium:enacted":["080dab59c19bd690","2a07c1558296be02","e635d05e2074a570"],"water:disclosure:enacted":["dc2475a676fa62ca"],"delay:litigation:litigation_active":["fea0362f66d7ce4d"],"delay:community_opposition:litigation_active":["fea0362f66d7ce4d"],"delay:zoning_denial:litigation_active":["fea0362f66d7ce4d"],"delay:litigation:active_litigation":["9e23d3ec3c2afc8f","73e7e2b4984b632d","180053263745dfcc"],"delay:wetlands_permit_suspended:active_litigation":["9e23d3ec3c2afc8f"],"delay:community_opposition:opposed_pending_council_vote":["e132605bfcfb961d"],"delay:community_opposition:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:petition_campaign:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:city_moratorium:moratorium_in_force":["58cf33c3ebe468f0"],"delay:public_notice_violation_alleged:active_litigation":["73e7e2b4984b632d","180053263745dfcc"],"delay:rezoning_denial:withdrawn":["035003b98053fc06"],"delay:no_secured_tenant:withdrawn":["035003b98053fc06"],"delay:council_opposition:withdrawn":["035003b98053fc06"],"delay:water:cancelled":["46efd12bf3ea6dcb"],"delay:financing:cancelled":["46efd12bf3ea6dcb"],"utility:rate case:approved":["37ab93fd8b57c77e"],"utility:tariff:approved":["1543e61fc24998f6"]},"grid_operators":["PJM","MISO"],"counts":{"moratorium":26,"water":5,"delay":42,"atlas":40,"permits":60},"record_count":173},{"id":"IN","name":"Indiana","groups":{"policy:minimum-payment":["bf784d50ec22157b"],"policy:departure":["03586139e9d09948"],"policy:security":["19c77af74e853a13"],"policy:regulator-reporting":["dde07ed35b93f0c9"],"restriction:local:enacted":["963b8c0256246b3b","8eac5106889da9ac","183f5e5fde8b2c9e","a7e5ebb04d58be95","f4c86ae66329b23b","a3e5e35d93d700fd","a444b64740435e08","3a39e47da83f24be","c7133c46e29c6d69","5e41da92046a9bcb","ff803a94b802fe31","7db5ead22195b986","998bd34f448ab467","9e2594c01650c7f4","837d5ad2452c9a6c","42d0a19e60e69b3f","7a052f9efca8b303","5be45e17d6ec7513","c1be058ee36c4738","a86775303cb769f2","bba265c36e34c00f","ee5f8620c8465f3d","736410e487973794","faaee5c934ec1ecb","ee6a98915d4cd96d","678dfff8b193d0a3","0e6064d1c5503319"],"restriction:local:proposed":["e66e435a43f67c04","7467dd109abc68e3","fed5ec0ec8852137","c73095088bd90160","b24ea3f72d09cb82"],"restriction:local:failed":["845faec2de5f43fc"],"restriction:local:pause":["4d96d9bb18ac4024"],"restriction:states:enacted":["227139621030dba6"],"restriction:states:failed":["eea922145c00d1a8"],"water:moratorium:enacted":["2e6ca318ecd03dd0"],"water:siting:failed":["b35eb608d2415382"],"delay:community_opposition:cancelled":["bb2ed0971e6302ac"],"delay:zoning_denial:cancelled":["bb2ed0971e6302ac"],"delay:litigation:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:community_opposition:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial_or_withdrawal:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial:rezoning_denied":["d11979032cadd398","569435ce3fe609dd"],"delay:community_opposition:rezoning_denied":["d11979032cadd398"],"delay:litigation:active_litigation":["c5e676669917e797"],"delay:permit_challenge:active_litigation":["c5e676669917e797"],"delay:community_opposition:approved_amid_opposition":["6d8bec92336deeb0"],"delay:missed_milestones:development_agreement_expired":["27c39d9347a1192e"],"delay:financing_delay:development_agreement_expired":["27c39d9347a1192e"],"delay:unresolved_commitments:rezoning_denied":["569435ce3fe609dd"],"delay:county_moratorium:moratorium_in_force":["33af90259cf95dde"],"delay:county_moratorium:moratorium_extended":["6e309bb5ef6dcc2b"],"utility:tariff:approved":["4b48c2fabeec119f","fa98544ba5e059ad","6b0503ca135ba204"],"utility:special contract:pending":["113a466c8203c668"]},"grid_operators":["MISO","PJM"],"counts":{"policy":4,"moratorium":36,"water":2,"delay":51,"atlas":50,"permits":12},"record_count":155},{"id":"IA","name":"Iowa","groups":{"restriction:local:enacted":["6ec7f0571c9f0b36","b997268fd2bd8a07","a3d89d9d748c79e5","ece6aca21720a05a","b53022fa847d859d","2265266858f1808d","d2821404eb9b773b","e429297830c5c85e","2c27ac27b47a53de","8ce23138e1f0ecbd","0e74326bb2038903","245488a7b0f0baed","4ec7c3f119f63571","5d574b2e962d112d","57926d8a3b16421b","6873275732caceab","6572038f8fb6515a","09dabb3487e83177","fc20843db6b3c777","ab4c1a0e46a2c211","f73ca7c24ea9ea51","48355f233539620f","e170f696214b321f","8f8fd51101db1cc6","c5304dad0e04e811","75a122be02ae0d9d"],"restriction:local:failed":["0fa0b840766c8a19","c263db1bebb5e27f","a131c04ede50c5f6"],"restriction:states:enacted":["9e83b550b15760aa"],"restriction:states:proposed":["639d23fdd3311f98","262084f7a02f3ad2","e2e155d413c48eda"],"water:disclosure:failed":["304d0cab55c6bd68","e3e82ac6f5792d65"],"water:rate:failed":["42f37d1bced6be18"],"water:closed-loop:failed":["b47e084956bfc26a"],"water:closed-loop:proposed":["24ce35cf4b42f743"],"delay:multi_year_construction_delay:delayed_extension_requested":["4ce223b15edc681a"],"delay:design_changes:delayed_extension_requested":["4ce223b15edc681a"],"delay:county_moratorium:moratorium_in_force":["679ae4b13385d757"],"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":["12e1cb598a859683"],"delay:zoning_denial:delayed":["8e0bc83eff50a9de"],"delay:community_opposition:delayed":["8e0bc83eff50a9de"],"utility:tariff:approved":["a9a9512892558d03"],"utility:other:approved":["3046845ad149fe7d"],"utility:special contract:approved":["e59432224488c63a"],"utility:special contract:pending":["48182dc47986bf11"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":33,"water":5,"delay":37,"atlas":22,"permits":21},"record_count":118},{"id":"KS","name":"Kansas","groups":{"restriction:local:enacted":["092e69a7498ed6f4","c5d6b2d241f5cc17","5d6e924e754d82a1","d65aa07eb73bb390","2b56b5bc78d3d2c2","779bf14e695b30f3","46ebfe654cb98769","6b3d06b7e6d5546b","3e6f9643e146e802","a03f8a97d54da728","88a8f8a97b3eb631","5c9d3499ff80e6d7","61d91d35faaab6ce","49d229995410fd72","4654c90eb016ce15"],"restriction:local:proposed":["3989c573db251ea1","c49b85a22488877d"],"restriction:local:failed":["50ea4020ea582738"],"restriction:states:enacted":["2ee674af511b50f4"],"restriction:states:failed":["f13da72ca930c823","b3815616ed614981","c1154548fbef7c6e","8db95808ba8ac8e5","69b27b03dc718361"],"water:closed-loop:failed":["4eb2bfa0c2e15d57"],"delay:community_opposition:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:noise_regulation_review:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:water:cancelled":["70833cef331617f1"],"delay:community_opposition:cancelled":["7d838f4833d1b349"],"delay:financing:cancelled":["7d838f4833d1b349"],"utility:tariff:approved":["f77ece2de2ac70fa","3ba852096f736178","1dface436cf210c2"],"utility:tariff:pending":["3e89a8aa0948bcc5"],"utility:other:pending":["aead86c34e456420","7fee508d92451cef"],"utility:other:contested":["fe3448ceb67c13bb"]},"grid_operators":["SPP"],"counts":{"moratorium":24,"water":1,"delay":23,"atlas":20,"permits":3},"record_count":71},{"id":"KY","name":"Kentucky","groups":{"restriction:local:enacted":["a26d4b9555d02fc3","4a7e0503c84a18fb","068617b3ee7c1e34","27a0ce76b943a447","65fd1df9f999e56d","9b96e5de0e107e49","7206025d4f188dc5","a3f8e60045a8e496","3be8e5e1324a2209","ef0ceaa96e4124a9","b8c035523c2353d3","59ddefe2d22f34aa","bcf7474f970300a6","3b2a3d6c317e1650","a1acef1340d31231","a5a9aea1171b918a","baf08a5fdb9be408","626ca6058bcfe492","bcc91f5729167578","ad6f059e45735cb0","c9ad189fcf915368","78d859810fda2f18","971b3f19c633ffe9","0d7d376001869f9f","7cfc5e2b338d1914","0d5a0d6559c93531","341751834d403210","0cd0db1bab37a48b","a1b25cbc5a439391","6dbd46ac8566eabd","f6c91c535f7eae69"],"restriction:local:proposed":["f68fb746468a09f9","e795d08b5d2d9c0b","c509add78042616b"],"restriction:states:enacted":["77733d81d9d3baed"],"restriction:states:failed":["9900fddb93bcc64d"],"delay:rezoning_denial:rezoning_denied":["e55329fac133bb24"],"delay:community_opposition:rezoning_denied":["e55329fac133bb24"],"delay:city_moratorium:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"delay:no_local_zoning_framework:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"utility:special contract:denied":["253d0f130a165e15"],"utility:tariff:contested":["ae68fdeac34bbc8d"],"utility:other:contested":["42fead8f4bce2aaa"],"utility:tariff:approved":["801dfc830fd07245","4f7f2aea34be5c96","d0cda138d452d757"]},"grid_operators":["NON-RTO","PJM","MISO"],"counts":{"moratorium":36,"delay":39,"atlas":28,"permits":2},"record_count":105},{"id":"LA","name":"Louisiana","groups":{"restriction:local:failed":["082df063713becdd","337eff2a8faaedc2"],"restriction:local:enacted":["450b6661aa0aa3ae"],"restriction:states:enacted":["9ba2486256f256c2","144e7d01d58cef74"],"water:disclosure:enacted":["03f274e9a5dce14c"],"water:disclosure:failed":["f7cd1c9b5f782122"],"water:study:failed":["28f58e0cdd0b7e0e"],"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"utility:tariff:approved":["eff42b274f0be9ef","a83e236f50a73f18"],"utility:rate case:pending":["c65e9e2d95997fa6"],"utility:tariff:pending":["69e0ffd4849ee579","88fc6caa48aac8b2"],"utility:statement:pending":["457342b4fea42a74"],"utility:other:pending":["4a0bb7e423217973"],"utility:other:approved":["61067a61b636c781"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":5,"water":3,"delay":15,"atlas":9,"permits":1},"record_count":33},{"id":"ME","name":"Maine","groups":{"restriction:local:enacted":["ecd5966d9b342311","c36961854ebd6ca7","a4804efbc073f070","d766badde34909ee","3d017e2610e8d02c","b9330f5763dfe845","b2a8fec20ddd4e17","f5a714682b29daa5","8d49ab7b7f89d04b","27b044f270dad65f","be26656565cc2456"],"restriction:local:proposed":["6aff9b58bac5e8f3","ebf579b381f356dd","0afc065fdda3c091","b0ec262465eb00f1","8149b851eb2d0584","e3f47f6089a0ee71","3acc511d9da72bf5","fe1e50be7095ea83"],"restriction:states:enacted":["fe74bf6eed39dbcb","7d62f3ffa4427f55"],"restriction:states:failed":["4e5deea3e7dff0be","0ab980856a66fe1d","a3a43b954eba3113"],"water:moratorium:vetoed":["297d93ad9da5f26a"],"delay:state_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:local_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:water:denied":["922b3fd62f9c070b"]},"grid_operators":["ISO-NE","NON-RTO"],"counts":{"moratorium":24,"water":1,"delay":17,"atlas":19},"record_count":61},{"id":"MD","name":"Maryland","groups":{"restriction:local:enacted":["348298ff6f51a691","08097815a98470c5","4deb89713fe98326","8f74fbbd8993b148","3afe4fa64e87f546","8730de2c9ff67503","c73fe44c03df38ae","8dda8813a9c298d6","764a5ea5baee0c4d","6617f7b48c44c942","a8f91eecf6abf3b5","0afbbaf26cf8f904","83ff2804204a626d","9c034ea2bef0ece8","3373477ac1ec4f02","62bac4f016f1945b","11d1a89900718a96","eb36aed04afe9d8a","499348363c3b81ea","6f9687423e2dc4e7","dc1acf38d039ac19"],"restriction:local:proposed":["265e093c1f9eb417","755b1c07e83184e1","08ca97e19dc7abb4","3e8bbaa7cd3afe15"],"restriction:states:enacted":["17348e6b8d304518","b044300e1a2b5236"],"restriction:states:proposed":["5e23b6297efd7527"],"restriction:states:failed":["3c99947280200b8d","1fcccf76e9b86359","cf6793fd2c12b7d5","f1a32ee4fda04c94"],"water:study:enacted":["558d1f7246d3e647"],"water:moratorium:proposed":["e3bd79694db1db39"],"delay:litigation:litigation_active":["27582584bea51673"],"delay:local_moratorium:litigation_active":["27582584bea51673"],"delay:community_opposition:litigation_active":["27582584bea51673"],"delay:zoning_denial:withdrawn":["5aa3c5c167a2712e"],"delay:community_opposition:withdrawn":["5aa3c5c167a2712e"],"utility:statement:pending":["96ed3e4e28dc5f46"],"utility:tariff:pending":["b5a5ebb9845972c4"],"utility:tariff:contested":["151f94517d5bd763"],"utility:other:pending":["eecc4c5501407ced","de3593715e5e8754","b1f2cd97d9cd0cd1","246625aeebba0d27","e8088afeef1bad4c"],"utility:complaint:contested":["1f79c8153170b0cd"],"utility:policy:approved":["d89063b61a861688"]},"grid_operators":["PJM"],"counts":{"moratorium":32,"water":2,"delay":31,"atlas":22,"permits":12},"record_count":99},{"id":"MA","name":"Massachusetts","groups":{"restriction:local:enacted":["9dfd357ee1d1d79e","6fc10604ec34d46e","f0730563712dc086","e2b170911a980baf","443c78d2d2548652","51aa3706f59d3551","9a147c3e16821a2a","37641c80d5d22ef5","3bcf5029dee4b702"],"restriction:local:proposed":["6df99955fb5274ef","e88057500b5af5a2","251bed6de274003a","4e469b93e2617726","f9879ca8a354d99f","cbe95c8b12548c20","d3546c56fc54089d"],"restriction:states:enacted":["dbbfb14cd16be3f9"],"restriction:states:pause":["187e9da595e7eb96"],"restriction:states:failed":["8472091318232e86"],"water:siting:enacted":["c4f434d0074d8012"],"water:siting:proposed":["12f4ef4de2542657"],"delay:litigation:litigation_active":["655e83c186a87988","2493de70fabc445c"],"delay:environmental_review:litigation_active":["655e83c186a87988"],"delay:community_opposition:litigation_active":["2493de70fabc445c"],"delay:community_opposition:delayed":["27d4f05a55fdde9e"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":19,"water":2,"delay":10,"atlas":9,"permits":3},"record_count":43},{"id":"MI","name":"Michigan","groups":{"restriction:local:proposed":["c78ca68312691303","728e3efd8cbaccb2","f81a68f97adf08c0"],"restriction:local:enacted":["e6998880993aa177","b2511715ae4b990f","e1921072a7125833","98f07a32bbf38bd8","6f83b57549342f0e","2212cea497a5e376","6b17b974dff83ac6","0b835486e1c6675b","248845e3115d1b28","0e4058dda626a25d","576d5da42d138d11","bcdc28bfc405e76e","8408b058fbc315db","5d171a2ab62f7804","dc13381e1263b1fd","09e923cf2b67c07f","987c61998db8747a","1b63965c95a1e946","29918b3b1beffe19","99eeb7d2511ceb55","7bb3ee3000662f52","a0e759d085ba7e52","0d0e24de27bbc37a","2b9943a276289d6a","ee9073c9ad75a86f","9a62b17a98e57199","be5f41b4ec785373","ac7d9bd4ffd00f9e","9cecaa0a00ab43e5","1cb30633bb851922","f1c6da2f0000273a","ca9c48eee9e1d1a5","b70d22d7ae290b7d","c2d9415cc3e16da6","3828b0e2eec67db3","7e420db8d37c15f5","98cdd231fea86e2f","e8f1f476cf2c431f","c35e7a7d7cee74a5","e55663914c7c7dcb","33d2ea51a8acf987","51c80939f7496063","aaefdc75bd8c4aeb","911a6b9444bd1607","a7b6b76bf5329d54"],"restriction:local:failed":["516ad57aeb1648fc","b3ad7b9e668b591e","33b46a0d012daefc","3d03aba3f1700469","82599d14f4fba0f6"],"restriction:states:proposed":["a7533c1f529edc2d","6b7ffd32f765b5a4","456ce7c5d8d8f323","91c4adfd115bdb5d","c8d7e8822cffe0b7","98d30a9bf813c747","e816819481689635"],"water:disclosure:proposed":["c32c25eaa98e91c6","8bcea3f333be2510","905756b51034ebc2"],"water:siting:enacted":["d5816002c74cef1d","a2249bcfc2597539"],"water:closed-loop:proposed":["f8e09c679ee0460a"],"water:disclosure:enacted":["225876463f5c6047"],"delay:water_dispute:delayed":["1a7a2592e25c74aa"],"delay:local_moratorium:delayed":["1a7a2592e25c74aa"],"delay:community_opposition:opposed_planned":["90620f2ccd2b9bdd"],"delay:city_council_resolution_against:opposed_planned":["90620f2ccd2b9bdd"],"delay:rezoning_denial:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:litigation:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:city_moratorium:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:rezoning_paused":["cc32421f495a41b9"],"delay:planning_commission_postponement:rezoning_paused":["cc32421f495a41b9"],"delay:community_opposition:opposed_proposed":["8155ffe35c87d600"],"delay:transparency_concerns:opposed_proposed":["8155ffe35c87d600"],"delay:litigation:abandoned":["b9b9b57ad82d9568"],"delay:community_opposition:abandoned":["b9b9b57ad82d9568"],"delay:china_ties_backlash:abandoned":["b9b9b57ad82d9568"],"utility:tariff:approved":["630e6b38a0b9bb35"],"utility:special contract:approved":["cd42a1000e119f0e","50f9ae193de9e4a3"],"utility:tariff:denied":["a850b2486651c1d3"],"utility:tariff:pending":["5bc36f6821c8abbf"],"utility:policy:approved":["54c782b0ead7889e"]},"grid_operators":["MISO","PJM"],"counts":{"moratorium":60,"water":7,"delay":91,"atlas":55,"permits":1},"record_count":214},{"id":"MN","name":"Minnesota","groups":{"policy:cost-allocation":["0e9cef0d480c11c6"],"policy:departure":["96d76c523368de3c"],"policy:supply-review":["fa129260c9a1191c"],"policy:clean-energy":["5b0759b74511376b"],"restriction:local:enacted":["b739365ff698ee0a","d80387aab9ef2c1b","c3cc4eb6dd8578c2","0dc094cdf13edec8","5aa9e70c1a21d1c7","3fba111c587a7167","199bf867a340507d","d26a44d5312532d6","8e5e33fb9390f491","5ab133e795e83aed","385a484f3217fe24","793265102ee5e04c","35608fd55ce01e87","4fcdd676bd44f6aa","d1abcacd61245c1f","45935f6103775172","db3bb10a74b42708","ba8faf4607030280","8e02e3b0e7618f3a","3f4d995fd6fa4cfb"],"restriction:states:enacted":["2ab863890b12fdcb"],"restriction:states:proposed":["86e0d1d3835c9be9","c61b092c34b879a0","22e3f68246b5a4cc","797e76275710b3d8","7143edd8de397ba4","89d199639f253ee5"],"restriction:states:failed":["d0a94e01d35c42d4","3e22495abb3596c7","e2236d557902ae56","a3cf11f7c0f5a8bf","dfab67689c609a1b","23cc1180dbd6e5d9","eaed289a984419ff"],"water:moratorium:enacted":["e18e98913f2987dd","e11834d93a5792ed"],"water:shield:failed":["edb4285bd2e6d496","48bbbf542eb24d6c"],"water:siting:failed":["9c0626855c13a619"],"water:closed-loop:proposed":["bec7c68e6812d46b"],"water:siting:enacted":["f02889f2df50210d"],"delay:environmental_review:litigation_active":["51ba402b96b22669"],"delay:litigation:litigation_active":["51ba402b96b22669","2eb3d7b7efd8d959"],"delay:local_moratorium:litigation_active":["2eb3d7b7efd8d959"],"delay:litigation:construction_halted_by_court":["3e814c29543f4a91"],"delay:environmental_review_inadequate:construction_halted_by_court":["3e814c29543f4a91"],"delay:litigation:active_litigation":["6afa0ca47b947af4","f52d37a4709f02d3"],"delay:city_moratorium:active_litigation":["6afa0ca47b947af4"],"delay:environmental_review_challenge:active_litigation":["f52d37a4709f02d3"],"delay:environmental_review_pending:final_decision_paused":["452d128b99f4b891"],"delay:city_moratorium:moratorium_in_force":["7af8f1a65d714f3c"],"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":["796fdc6d59ce947f"],"delay:community_opposition:withdrawn":["7565837e009abac3"],"delay:council_vote_delay:final_vote_delayed":["800f8019c1868fa1"],"delay:community_opposition:final_vote_delayed":["800f8019c1868fa1"],"utility:tariff:approved":["0669b1659a0e805f"],"utility:tariff:pending":["bdec46fd73a2cf42","8fe5290a1832e86c"],"utility:tariff:contested":["2b6636adee0c7012"],"utility:other:pending":["049d9ec6a4db5efc"]},"grid_operators":["MISO","SPP"],"counts":{"policy":4,"moratorium":34,"water":7,"delay":31,"atlas":30,"permits":7},"record_count":113},{"id":"MS","name":"Mississippi","groups":{"restriction:local:enacted":["ecef92d17dfc1c52"],"restriction:states:failed":["ebb062a18af2c39e","4ed51c6c792fa708","e4e4ee9189096b02"],"water:siting:enacted":["5a06d81d34bea26d"],"delay:litigation:active_litigation":["4063038ccfbba534"],"delay:unpermitted_power_plant:active_litigation":["4063038ccfbba534"],"delay:noise_nuisance:active_litigation":["4063038ccfbba534"]},"grid_operators":["MISO","NON-RTO"],"counts":{"moratorium":4,"water":1,"delay":4,"atlas":12,"permits":1},"record_count":22},{"id":"MO","name":"Missouri","groups":{"restriction:local:enacted":["d90eaac4fe51359a","176fecd092621295","204232d5f8ca8df3","79b2a4ad0fec8c24","7017a935b3b7ecbc","85d940e773175229","f803c38f884f6aa0","de0764506bff684b","08196d135c493f63","8d67875968fb64f7","bed91c8df00c2c5a","21f8768f48599598","14bf3311c27da66b","9d5e52899f706d27","f5c0d2e49453bac0","8e6ecd071b72033d","c6cf03998a9e63c8","a9eede6ea17f0f0b"],"restriction:local:failed":["96f484a5795f8aff"],"restriction:states:proposed":["2195fea337e09dc1"],"restriction:states:failed":["79f07d9601a68a2d"],"water:siting:proposed":["fecf28fd776e3f17"],"water:closed-loop:enacted":["f922a9cc8df7f6f1"],"water:closed-loop:proposed":["c842f3220a560928"],"delay:permit_denial:permit_denied":["b6e024ff51469e78"],"delay:historic_preservation_conflict:permit_denied":["b6e024ff51469e78"],"delay:community_opposition:permit_denied":["b6e024ff51469e78"],"delay:county_moratorium:moratorium_in_force":["d74c3761e71266b9"],"delay:community_opposition:moratorium_in_force":["d74c3761e71266b9"],"delay:interconnection:cancelled":["8cb756be5b7ae3a9"],"delay:water:cancelled":["8cb756be5b7ae3a9"],"utility:tariff:contested":["8de24874c642dcbd","f91605a21f63d072","d9c3570921a04363"],"utility:rate case:pending":["082924cd33e117e5"],"utility:tariff:pending":["7394fb772ac183e9","faf8561206d5bf0f"]},"grid_operators":["MISO","SPP","NON-RTO"],"counts":{"moratorium":21,"water":3,"delay":32,"atlas":33,"permits":25},"record_count":114},{"id":"MT","name":"Montana","groups":{"restriction:local:proposed":["9243773c369f1ecf"],"restriction:local:enacted":["8d6ef72e11d1fccd","3ecba2b53f87c88c"],"utility:tariff:pending":["6dcfac3c7c1172f6"],"utility:tariff:contested":["d367203d6f870b27"]},"grid_operators":["NON-RTO","SPP","MISO"],"counts":{"moratorium":3,"delay":6,"atlas":9},"record_count":18},{"id":"NE","name":"Nebraska","groups":{"restriction:local:enacted":["d3d7827f878ed2cf","c57a91902ce91633","4674af901736f5cc","e196b29819de5c9a","135d7b8ca90eebf7","d568851b5061cdaf","81440ae3fafa3d75","e8af315b45a1acfc","08fcf1d2b6f49514","160252554036f1ad","32303ecaa9e0a2ad"],"restriction:local:proposed":["affd265938fabf3b","8c97d016dfddfc1b"],"restriction:local:failed":["1d8ae470cf5d925b"],"restriction:states:enacted":["230cce9838d45d24","e688676c3ac0f747"],"restriction:states:failed":["67b1ace6369704fd","50fd44805485a090","ff2913405faf7657","8d77947d7b8a528f"],"water:study:enacted":["fe6d9f80cee7122e"],"utility:other:approved":["32c8b9ae8d888b6c"],"utility:statement:pending":["4af3c2798acdbf21"],"utility:rate case:pending":["1e47741959ff4b29"],"utility:tariff:approved":["823eb52c6feaee82"],"utility:policy:effective":["c01aa91e1a04b36d"]},"grid_operators":["SPP"],"counts":{"moratorium":20,"water":1,"delay":32,"atlas":13,"permits":22},"record_count":88},{"id":"NV","name":"Nevada","groups":{"restriction:local:enacted":["333dd9b87e58bcbb","b9a69bbde96b5385","55b16953865e48f5","37f2d1d5eb3e2cea","5b58a9e336830633","6773b1cfaaba1346","935d2182c6d74d12"],"restriction:local:failed":["402c12e2dbad57ba"],"restriction:states:enacted":["619839655d751fb6"],"water:moratorium:proposed":["e61948237d868f0e"],"water:moratorium:enacted":["279be78d9d551bf8"],"water:incentive:enacted":["efec6184955a1086"],"delay:water_dispute:under_appeal":["d29280cf2b0521a1"],"delay:community_opposition:under_appeal":["d29280cf2b0521a1"],"delay:litigation:halted":["a81117457f2cb354"],"delay:environmental_review:halted":["a81117457f2cb354"],"delay:litigation:litigation_active":["114d5609ed0f4f35"],"delay:local_moratorium:halted":["5c9d9715723ce0bb"],"utility:tariff:approved":["a7207409cc3dfd45"],"utility:other:approved":["fb307da5f358f615"]},"grid_operators":["NON-RTO","CAISO"],"counts":{"moratorium":9,"water":3,"delay":22,"atlas":20,"permits":18},"record_count":72},{"id":"NH","name":"New Hampshire","groups":{"restriction:local:proposed":["e63e233025fc94fe","b44152b5d37d167b"],"restriction:local:enacted":["d80de2562936a0f7","92290f0a7d985a7f","36c9c8099e12dd15"],"restriction:states:proposed":["5a9909b17dfc57b4","02f0a87d99437f9b"],"restriction:states:failed":["ea8860685576e23e"],"delay:community_opposition:withdrawn":["c1a6706de3454167"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":4,"atlas":5,"permits":3},"record_count":20},{"id":"NJ","name":"New Jersey","groups":{"restriction:local:enacted":["73ec87cfb0aa92d2","9c00fd42521991f9","a384a032bef8e970","124a77e04ac821ec","f23cd51e2cc7cb7f","238c6e78c54a4877","3af6dd3170f1aa82","714725f2229b99d0","08f19d7681319c4d","8cf681d798655aaf","20d0aeda361ce61b","a2b1b417fb0a76fc","face92012462a2a7","968c4f50d3bde674","ceb24ddecb59d86b","3a5c452ca6841c71","742e4aac2483f4af","80f6f1b93985f9f7","c95d899c60e09eb6","7c69fc6032dd27e8","60c1835a0012ce53","054f376e8df396e6","64e87a1ece4414b3","1b9d7255dcc00d88","e3e0f29d691690ec","01b12fb419074edd","c74b23df8b93a3f0","db82850c96b7a694","9844557ef3af937a","559fbafe318ed5ac","0c592d7ddda2c6ac","a784c9eec1d5c3f7","5fb4b28c2b68eccd","ea304a4830a80fb4","fe372a70ddf19936","48334bde9c2fa0b9","d177f8f0171343b7","62a91ee8ab340642","ebd8ee2e6043e34f","39ed97a814dde3a9","3a432a805dccac1c","50b87b303123480f","9a18c03c18a10dd4","b3ca39b6b1630160"],"restriction:local:pause":["1a9db0d9060caea1"],"restriction:local:proposed":["ae409fafdf46bd29","f884ab9b88fff31b","927a7a3ac1c78482","d95561001f914447","7be184c2d2a57e2b","0e8c72bfcc16a39e","8820df8f26c39fea","78d39318109dd5e8","fd2b054d547ea766","df9befec2a94c308"],"restriction:states:enacted":["4df967540ce38c86","30be08e4be6ac9ca","68de33fe969f9287","0438d1ace3661698"],"restriction:states:proposed":["f19c1038b15c7609","d12af38fe29d843e"],"restriction:states:failed":["f915c938338285f1"],"water:disclosure:vetoed":["800fd0cd4f6bebba"],"water:siting:proposed":["45f1ccb950a71b8a","a375aa38a4210e7c"],"water:disclosure:proposed":["0cf376028b422204","36230e1c7c9edac6","c77115dfc059c958","de400f891c588542","6998a87b3e02ca11"],"water:study:proposed":["a7495217b70ef1e5","9cef65942ed49967","bced9687293104ba"],"water:disclosure:failed":["59ae5b971166ac3c","791cdd88090bef4e","1908cf4216d925bc","073e65e826df6c51","378fb181ac8f016c","60262597b91c5af0"],"water:study:failed":["f640ec3294e3f1f2"],"delay:zoning_denial:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4"],"delay:litigation:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:local_moratorium:litigation_active":["b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:community_opposition:litigation_active":["b617e293b82d2ac4"],"utility:tariff:pending":["f28161bfc2c29f8c","3620e96459726891","1a6ae3c2ad122164"],"utility:statement:pending":["2e9ea8571e10d078","7a11205dc76a67a6"],"utility:tariff:approved":["296ea913839e1b58"],"utility:other:contested":["5c1b494458632232"],"utility:policy:effective":["3af8bf166bd3c54d"]},"grid_operators":["PJM"],"counts":{"moratorium":62,"water":18,"delay":72,"atlas":65,"permits":18},"record_count":235},{"id":"NM","name":"New Mexico","groups":{"restriction:local:failed":["818109db81472817","f9afe907073e0002"],"restriction:local:enacted":["297204240678eb0e","9ff51438652ddf60","59bea7e940d70194","ada7aa80e60c9320","5eb7f0ff789e43fa"],"restriction:local:proposed":["8ddb604cc82e2c35","b6fb3ebcb7f6c50f"],"restriction:states:proposed":["a99720a3bb94fcaf","78568f32702491ba","b4b3d5817b49728f"],"delay:litigation:litigation_active":["f3a0c010a8f35a41"],"delay:zoning_denial:litigation_active":["f3a0c010a8f35a41"],"delay:community_opposition:litigation_active":["f3a0c010a8f35a41"],"delay:financing:litigation_active":["f3a0c010a8f35a41"],"utility:other:contested":["8ef259cb295588bc"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":12,"delay":12,"atlas":10,"permits":7},"record_count":41},{"id":"NY","name":"New York","groups":{"policy:environmental-review":["71f511e90d956ca8"],"policy:permit-hold":["4c560e212a74545e"],"policy:supply-review":["ab3c1a20557c8b23"],"restriction:local:enacted":["77679a7c3332c853","a787c81c1d3730a4","cdc22ba5f2f05b59","b14b8ef8ed1860cc","8cca37bd22e9d7b5","4975cfd97e76b52d","bd582af96f35230a","5ffdbe85acc1bde0","a1694e06d983606d","8981b39c54144dc6","d0967cbc5048c7de","210debbc0355f8ce","f47af1d0c2261335","b9f412d2266126c0","723df3b34c814ee8","cebe672bdd456765","edbfc6143edc2bdf","8a9e37cabb7d8067","59d414cbb6a42f77","17aedba2bb3f2d87","2e58841b837a406b","0e1022291bffc7b7","12dd3a35361949ae","3511a027b56d7d7d"],"restriction:local:proposed":["dcd7ff846525f0e1","08c437cc51d4c950","789641906952093a","28bc949979bb83db","111d81838fa01dde","3e58cfc1f209b083","7ae98bc62927c82c","9137cf580ba6858a"],"restriction:local:failed":["cb6d8c82049c8acb"],"restriction:states:enacted":["869f08a4a1fa556c"],"restriction:states:pause":["841d22380b00ad01"],"restriction:states:proposed":["b7ba31aec1fafd00","47c9cf15c60d51b3","daaf6dec95bd6ec2","07d737c4acf173d7"],"water:moratorium:enacted":["8fc3c7d9b9ff9ba8"],"water:reclaimed:proposed":["4ee636f9337e1806"],"delay:environmental_review:delayed":["51347b4b64fa9e01"],"delay:community_opposition:delayed":["51347b4b64fa9e01"],"delay:state_moratorium:halted":["293beafa3fa06f20"],"delay:local_moratorium:halted":["293beafa3fa06f20","77e9bf4bd7aac210","ee2c0366ee0ef429"],"delay:litigation:litigation_active":["e81eb7c91736a32a"],"delay:state_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:local_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:zoning_denial:litigation_active":["e81eb7c91736a32a"],"utility:other:pending":["57638a6f961a13ac","1552fe1a118cce4c","e654e6cbee2e4334","6cf999b790c4a9a6","5b7294bb9bbf171f","a15e9c634f236eaf"],"utility:tariff:pending":["acb3338b2c56b00c","637843fba8961a3b","f4e2166ff0723f1e"],"utility:tariff:approved":["d8fdd2247363f439"],"utility:other:approved":["4b76df05fa507106"],"utility:statement:pending":["85d4d00b457a99fb"]},"grid_operators":["NYISO"],"counts":{"policy":3,"moratorium":39,"water":2,"delay":41,"atlas":26,"permits":4},"record_count":115},{"id":"NC","name":"North Carolina","groups":{"restriction:local:enacted":["0878148bce531a65","26626f41150f13d7","5d4e94286383e811","45843231657d4577","b767f9b8778c3e9c","0425c77f21429fc9","160ecb6859daba38","f700899151bd3d13","afaf001e2ddc7c0f","9125956ad212eba6","1e5e7d19256112cb","de170f5d806a8488","7e05882bb14eba58","d5446d1a27d68afb","66d7df4ef7713b17","a96570a4d8c02995","03d509191d6a1bb8","d3b97dbcfb4cc458","11b4b426a5a3adeb","9730db9306df2eda","f7b5b5059f3d9a76","a7863b1a8d95a6f9","e6debd81c60b3074","72b422fc810eeab3","6bfcfb56a94aa399","0fe95e27742d2793","7f7b78e8dd0072a4","3ab16e9b6bda0047","58f61d5e2dcac367","901f12fcfb423655","77ad5d31685db4d2","13de2569fd40eab9","2c3f7f7d7474e8df","047fa125450d5c53","d7d45ef0e253b55d","2aa6e2ef54433db5","076a69b4395ac51c","aeb0772ca82eb874","49ad917ecc3002cf","c355e8d58e082040","1eeb09c2f8b5063f","37a1cf7995845834","2bd64ffed6dec4b3","17d8cc51d6a5711f"],"restriction:local:proposed":["84efe8243d6504bc","181bd4b518b2cfed","b83f8907c29714e9","8294c67374182bdf","8b259a9fdb940566"],"restriction:local:failed":["928488ab5100d192","aafc220952d6a48c","e3fad9e4ae5cae83","b68811b610a11964"],"restriction:states:proposed":["f10a82ce8ce07853","2bf52937fb8640a7","d91aa188fd06f5e0"],"restriction:states:failed":["35ebc5f44dd67c98","ccde728219226db1","857477e095526aaf"],"water:moratorium:enacted":["b9f652a9b7c4b011"],"water:moratorium:proposed":["38d2bf42e833778a"],"water:closed-loop:proposed":["ad8e73dba358f034"],"delay:community_opposition:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:zoning_denial:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:litigation:litigation_active":["26de238e0f400d29"],"delay:local_moratorium:litigation_active":["26de238e0f400d29"],"delay:community_opposition:delayed":["886117a42038f872"],"utility:tariff:approved":["3733629beaf1ada1"],"utility:statement:contested":["8f109ead8aab43d0"],"utility:statement:pending":["5338dfae87b7a6f7"],"utility:tariff:pending":["535ff2bea70f7e1e"],"utility:other:pending":["36e711f6271a98a9","b8438dca9b49aebd"],"utility:tariff:contested":["1a0900299d02d68d","f4c8c4668d869233"],"utility:rate_case:pending":["45ffc3ccaa151b55"],"utility:other:denied":["7d51d5e504430b5e"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":59,"water":3,"delay":67,"atlas":44,"permits":34},"record_count":207},{"id":"ND","name":"North Dakota","groups":{"restriction:local:enacted":["918ec9976a6ebc76","5fe4251ab4cdcb1d"],"restriction:local:failed":["da10b7684b67acdc","b94dc16d48f67fd9"],"restriction:local:proposed":["0867cb4ffce5c18b"],"restriction:states:enacted":["10810ad90dae3c22"],"restriction:states:failed":["06b00e83aed9df20","37e09c9be2329183","45f55a5bdae7aa9c","bc1c99050827355d"],"utility:tariff:pending":["bd130d6595b26f7c"]},"grid_operators":["SPP","MISO"],"counts":{"moratorium":10,"delay":6,"atlas":9,"permits":2},"record_count":27},{"id":"OH","name":"Ohio","groups":{"policy:cost-allocation":["55634d9b0e3dbe0d"],"restriction:local:enacted":["461dc19405784392","691815701a1e7b84","407f6a32f3a3a0ae","1d451c4d01991061","c05d611c3e7dd8d5","303593cae196f587","7a83cf56d52a963c","7fc064d20dc788bd","a7e5c5aec188366b","7ce6031118cad4fd","8f219dc030624cd2","950d5e0e199dfb22","c2b95d5838587ff4","9ba6b9b9692b4708","d72f4489e825fef2","940b6159ab502612","f0c97f968bab3081","405f1ab18b45cec2","8542695ddd9b5b30","7026f0fd2b5bc6f0","ca89ad24dc656f79","978214f7dd1d9d8f","c1bda0acec337164","730091555169da66","3b3d27d4919f1e77","a96013d0b5b1c9a2","d8f63ab9b450228a","cc6ca7b31398d910","306d3fab23b96651","f394a0eb7801b57b","0ac4ec70dc0bb4ba","6cbf93fd3792d38e","c0aba8a27555a0c0","d533d9f7cdfc603d","ea2a114d10a3194e","61fe898c9107f2ba","4b26ee4f418c3dd5","cccc5aef83beacac","f1d5c9a4b6023b27","4fbd89f670532629","421b341a093f14c9","53701fd2f75ff500","23811974e54dcac2","b90f5b1569114026","ca5208c669ad2550","ecf81cf135cd7c41","fe4bc2e21abc7fd0","c636f6e8fe61d8bc","70667db94a767cf0","d3ccdcc868a68902","0fc759bfa86292c3","12369281bb53a55f","5f2de78e4e2f9413","2321a1c503022d33","bc140f9d0778a158","88cd458bc7993ab1","e281827c22b8aaa6","904259f746e7f001","668044e9a5218b84","e526f703d4ba3d40","406582468189cd53","e560f4fc1b2d48cf","15eda7648a7da254","1ea75a7e46cea951","8c428e28c6fa59b7","94595b6204b14f34","a795c2b6fa5fb605","a91e87e8e532a81a","0f566e9f055d874d","a3338ba4c589f2a1","024a636c91c52568"],"restriction:local:failed":["941a2b27ff9dd2f9","f0125c1f3d577939","1984235e10d07864","47e7f50ceb79bde2"],"restriction:local:proposed":["329efb5b9ab278b2","fe3263d096bb1d42","f0c8462ea6d10a36","5d2dc1ac11a37fd0"],"restriction:states:enacted":["a33e963e7ed0f3f9"],"restriction:states:pause":["aac6bd4ca937a3a1","790d7df967d13e33"],"restriction:states:proposed":["9791d6ee8a159714","5bb7dbbf3f54e1f6","076c38b44f191708","35dfe120e8f90c81","a4f886faea465453","f67274b3d1ca79e3","b0b20187a84ac61b"],"water:siting:enacted":["1fc784371ef77c63"],"water:closed-loop:proposed":["d9a55d5bd1815a7a"],"water:disclosure:proposed":["07d5958ebc0e2919"],"water:siting:proposed":["af9b7989afe0d6ff"],"water:moratorium:enacted":["b03281ae45156609"],"water:rate:enacted":["f38675b9d14c3301"],"water:shield:failed":["31cb3e61422ae705"],"delay:community_opposition:delayed":["6041ee70dd8ec4f2","33619bda345609b8"],"delay:regulatory_review:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:power_allocation_dispute:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:corporate_reassessment:construction_paused":["ec84904200576a9f"],"delay:openai_relationship_change:construction_paused":["ec84904200576a9f"],"delay:tariff_costs:construction_paused":["ec84904200576a9f"],"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:signature_gathering":["738d37cb16e4b52b"],"delay:statewide_moratorium_push:signature_gathering":["738d37cb16e4b52b"],"delay:local_moratorium:halted":["8924323156a513a6"],"delay:community_opposition:halted":["8924323156a513a6"],"utility:tariff:approved":["b119f3dad60e8067","b0b7b5e3ba42091a","feb6e8ebba7bc21b","d471fb8c04d4d42b","e688652c63a8603c","3b0d6703179b004f"],"utility:tariff:pending":["4e7c1eaf6aefd563","8d64014cf73ea8c5","33358a52bdbff1e9"],"utility:tariff:denied":["d77af2ba4e087bb7"],"utility:rate case:pending":["1f4f51f2805cd230","4e52d117f119a0ab"],"utility:other:pending":["8867995dfeac8af8"]},"grid_operators":["PJM"],"counts":{"policy":1,"moratorium":89,"water":7,"delay":156,"atlas":100,"permits":15},"record_count":368},{"id":"OK","name":"Oklahoma","groups":{"restriction:local:enacted":["50b51ab105de1694","4d5225243a046a38","42183c5f0e187ec9","2da276ac2eced4b7","409936f3ff16ca77","fd3e3e400e15bcb3","311f0b103dd1c20a","e11236c60dcb019b","af39a5a9b91cf374","80850e3b3240130d","6d6d4b47a1f08094","fd7e05f695b792fb","57bfec0310076c02","ac38ecc9080693a4"],"restriction:states:enacted":["5ce11b610f2019f8"],"restriction:states:failed":["c5ac0e3ebaec0fff","df4a0cf535656562"],"water:closed-loop:enacted":["f01e9c7f92ad912f"],"water:disclosure:failed":["4cffe4be712b7fee"],"delay:community_opposition:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:water_capacity_constraints:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:city_moratorium_partial_exemption:phase_vote_delayed":["d2464a0059b2da36"],"delay:planning_commission_delay:phase_vote_delayed":["d2464a0059b2da36"],"delay:community_opposition:opposed_proposed":["d6d03051edf8cadd"],"delay:transparency_concerns:opposed_proposed":["d6d03051edf8cadd"],"delay:water:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:community_opposition:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:financing:cancelled":["b81165f74fca6c9b"],"utility:complaint:contested":["6a0e62dd608338b3"],"utility:tariff:pending":["0244a5050bd89f54","d23c9de2ed780784","369b25b59f1044b0","8caf179819a91899","b44407ade651e171"],"utility:tariff:approved":["7c0393e3288507ab"],"utility:policy:effective":["533edea4d22fcfc3"]},"grid_operators":["SPP"],"counts":{"moratorium":17,"water":2,"delay":29,"atlas":25,"permits":34},"record_count":107},{"id":"OR","name":"Oregon","groups":{"policy:cost-allocation":["ec3aab8c8e487810"],"policy:minimum-payment":["09b69a3ac7ed320c"],"policy:clean-energy":["573b7be7282c24e9"],"policy:regulator-reporting":["82e5b2896507c105"],"restriction:local:enacted":["c46ac99932456879","bfb08271f1889aa3","406a4fe8c580044d"],"restriction:local:proposed":["9fecbaadfc504d91","55072e55f3993603","c167670c15d2c9ec"],"restriction:local:failed":["2217c7fce49a6fcb"],"restriction:states:enacted":["4266a70286a34bc9","fd7d68ca06671d0b"],"restriction:states:pause":["b05de37e3bed5008","0bb7ee781820adb4"],"restriction:states:proposed":["1d87e7ca35d788e4","97e59a9c63be62e9"],"water:moratorium:enacted":["f436cd79501cb106"],"delay:litigation:litigation_active":["189ec25f09c73d30"],"delay:local_moratorium:halted":["fc7ac8c5e0c9a3e0"],"delay:water_dispute:halted":["fc7ac8c5e0c9a3e0"],"delay:tax_incentive_change:halted":["fc7ac8c5e0c9a3e0"],"delay:community_opposition:cancelled":["508cd09772361d44"],"utility:tariff:approved":["8f26d54b8098d83a","933a75515edac858","919ed293cccce0b5"],"utility:other:approved":["fd904a85f9f038d0"],"utility:tariff:pending":["90bff93d506e12d8"],"utility:other:pending":["500c12c6d84c5535"]},"grid_operators":["NON-RTO"],"counts":{"policy":4,"moratorium":13,"water":1,"delay":16,"atlas":8,"permits":28},"record_count":70},{"id":"PA","name":"Pennsylvania","groups":{"restriction:local:enacted":["38de5bf25db60ea6","a07e0f5e3b200bbb","e0e19b054c78ba90","d57a038848981525","08cc6d470b3f20a4","786ec40f80121492","9d46b0435161c347","7f0801a61ac6bdc8","e91f573252606528","30d8d8996a24365c","7a05632963af26b7","0525ead7d8196b60","c49102319b7d9c26","828f9f1b7a9fc4d8","7e498adfb9cf36be","30e2226befeb9e41","d01de37fe2c38608","3ef85431f6a82760","50a74ef750ecebc2","86690394ec34fe0d","f4098716a0ee721b","2f1f35aee33b8d1b","0b7ff980380eafa0","a80d24e122853bfe","83bf5bc987c8973d","b4f499936ec56461","b3ea3d581da9a606","71a38b1ed5950ad1","e191001ca64a606d","f9511193a66cd3bc"],"restriction:local:failed":["491849e21df0aa97"],"restriction:local:proposed":["04f7d83298b30de7","f979d0fdee3f9fa3"],"restriction:local:pause":["533afd77cfc5eebb"],"restriction:states:enacted":["7f4af8a87d95c544","7471943bfacd9b79"],"restriction:states:proposed":["6aa38b3ad7bc8095","30479ff8f518235c","2f437f53e7c38048","535c2efca50b83dc","1b368eec31f98fde","5442b108786851c0","f486ff97ce82e49d","7739eeecd45bc5b3","a5f21a3c4a91636e","a4c98945f6116fb9","122b2ca8ea2dce4c"],"restriction:states:failed":["291e4c7a5a21088d","9a687477c380a153","9ab4c50b87f3e567","c916da28feddac2f","a879ae6745a42d11","ce6deddc6f7620a6","d3752761d30cd8b6"],"water:disclosure:enacted":["71b44216bc39b316","19977f7326ae5f36"],"water:disclosure:proposed":["ce335eca213a335f","268f6575720b3e76"],"water:siting:proposed":["e6cd4c87af287f2e","ec0986faeb616e79","02edb086bcb4ec16"],"water:study:enacted":["7e7071bf9f2d7636"],"water:siting:enacted":["f4b911f9a8638b44"],"water:closed-loop:proposed":["ecec2267314e711d"],"delay:zoning_denial:under_appeal":["221a7177ef54c146"],"delay:community_opposition:under_appeal":["221a7177ef54c146"],"delay:litigation:under_appeal":["221a7177ef54c146"],"delay:litigation:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:cancelled":["72fbfc95e6717af4"],"delay:zoning_denial:cancelled":["72fbfc95e6717af4"],"delay:community_opposition:delayed":["91270d77ce33c433","b79613921282641a"],"utility:tariff:approved":["4c72868c8e004412","c89690d0346c7890","ac3f1efb2976fc5b"],"utility:rate case:approved":["e934571677cf1704"],"utility:other:pending":["fbc1615a2aea7504","84096c1cd33d1c29"],"utility:tariff:pending":["6ccd7eecfb420cbd","03f4e94591ffe708"],"utility:tariff:effective":["d4a74e67bb8dc281"],"utility:policy:pending":["04bd0eb54a15c158"]},"grid_operators":["PJM"],"counts":{"moratorium":54,"water":10,"delay":84,"atlas":53,"permits":21},"record_count":222},{"id":"RI","name":"Rhode Island","groups":{"restriction:local:enacted":["ed259525eb90ab6d","dab8ece38c5fb9d5","09f9a1112ca9bb16","8758bf36db37de62"],"restriction:local:proposed":["9c9aa6a6cab87eae"],"restriction:states:proposed":["39109139e4499da1"],"restriction:states:failed":["87b18404613879e9","1ca1db6d54c60804"],"delay:zoning_denial:litigation_active":["09f90dd4b212e592"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":6,"atlas":5},"record_count":19},{"id":"SC","name":"South Carolina","groups":{"restriction:local:enacted":["58631f91fad85e5b","b8911b8723010e16","f7b981d36cb76fc6","ead5aac6d1de0198","28116638b206c684","e712a9602d7fc092","17168f8283569007","3fbf04d4d1abbc30","b5c702b7d9d268b1","31c3c407ecaa9b02","08d501a7dce90945","bfe556ca5819bf38","65163505f47f6e65"],"restriction:local:proposed":["d522fdfd4fa7adac","9e6a95af9b1a6338","5e3217c2394c85d9"],"restriction:local:failed":["ead4c3dd6bcf23b7"],"restriction:states:proposed":["70456b2f17fa016f","1bd520760aca35e7","dfe1a31d8cfe99e5"],"restriction:states:failed":["d7cf8717beef89cd"],"water:closed-loop:proposed":["836cb4c1add36778"],"water:siting:proposed":["d5588d305d72ed31"],"water:moratorium:proposed":["feaa74b8ade8d152","e0c20f860681a471"],"water:disclosure:failed":["2a360b96adeac4a5"],"water:closed-loop:enacted":["c4c6394d78cf14cf"],"water:moratorium:enacted":["83129110381c2b8d"],"delay:regulatory_review:permitting_challenged":["ebbc3548ee675c57"],"delay:environmental_petition:permitting_challenged":["ebbc3548ee675c57"],"delay:utility_interconnection_timing:abandoned":["59d31c90f99a8e27"],"delay:withdrawal:abandoned":["59d31c90f99a8e27"],"delay:county_moratorium:moratorium_in_force":["4fd68a1a4d95ecf1"],"delay:permit_denial:halted":["2a19530b645b4515"],"delay:local_moratorium:halted":["2a19530b645b4515"],"delay:community_opposition:halted":["2a19530b645b4515"],"utility:tariff:approved":["a6a9b54dc2f7e887","4acfdfc6ae530074"],"utility:rate case:approved":["836e8495e0094213"],"utility:other:effective":["4650a698f603d88c"],"utility:other:contested":["5976280cf4e599c1"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":21,"water":7,"delay":30,"atlas":22,"permits":3},"record_count":83},{"id":"SD","name":"South Dakota","groups":{"policy:cost-allocation":["e1de11c16d8239a6"],"policy:departure":["b87c8e5ab20d7865"],"policy:supply-review":["5f04413f1e1d314b"],"policy:water-reporting":["3d0987d18045023f"],"policy:local-authority":["d5abe6128808804e"],"restriction:local:failed":["0c5ecfaba5561367"],"restriction:local:proposed":["5a5f4731708d3508"],"restriction:local:enacted":["127e547bdcf06887"],"restriction:states:enacted":["e69882d4dd9dec56","e0c13222b8896f55"],"restriction:states:proposed":["d2cb3118b636a794"],"restriction:states:failed":["3ddf71976e354659"],"water:disclosure:enacted":["95158506706fb5b4"]},"grid_operators":["SPP","MISO"],"counts":{"policy":5,"moratorium":7,"water":1,"delay":4,"atlas":4,"permits":1},"record_count":22},{"id":"TN","name":"Tennessee","groups":{"restriction:local:enacted":["15608211c6ca3581","307b38ee1b228384","23049879ff0a5d1c","7cebe8d5c67147c3","747d1db6063c1a74","51b2b9b3a961b6ab","de659fa3e365eec8","33552bf4e80b18ee","730a5f5d55050cb7","087bbbb5a483b776","0137c4ed47954709","8272522f979f7008","9d632430d6a03021","78dbb699f219d0d0","1f546cb2797f996d","c43fd1c858232412","b97b3954b1b0949c","d68b3a39798f9791","f0bb509eaf3c5b2f","a431da7d7f705e27","048501d4a5383269","8cb4602a6ee8dcbd","af28772857e3903f","3e19367856e206f1","241a6f9524fa5b55","54976e44fee3018e","ebeae99d6b6421df","0d02b8ce1211373d","492d17cc76c60e58"],"restriction:local:proposed":["c72ff700a8b5e0fe","a5263d6dfaed1a21","05ec77d83a2fb722"],"restriction:states:enacted":["3c219120a612265b"],"restriction:states:proposed":["963831dc8907e951"],"restriction:states:failed":["640e5053d7ed492c","2f485290fc876c3d"],"water:reclaimed:proposed":["34047d55aaad8568"],"water:disclosure:failed":["3024f2dbcb00785c","7932fbffdf71a9e7"],"water:siting:proposed":["95d5d77e861f2e1a"],"water:moratorium:proposed":["51b30007138592e5"],"water:closed-loop:proposed":["bdc557047de3e52b","3b9e61fb1da5de65"],"delay:local_moratorium:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:active_litigation":["f23f3210c5447afd","9783ae8705aab3e7"],"delay:city_moratorium:active_litigation":["f23f3210c5447afd"],"delay:eminent_domain_threat:active_litigation":["f23f3210c5447afd"],"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:environmental_review_order:active_litigation":["9783ae8705aab3e7"],"delay:unpermitted_power_plant:active_litigation":["9783ae8705aab3e7"],"delay:community_opposition:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"delay:transparency_concerns:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"utility:tariff:pending":["b63a0876c6c743c3","af3b47ccdb7cb94a"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":36,"water":7,"delay":38,"atlas":29,"permits":5},"record_count":115},{"id":"TX","name":"Texas","groups":{"policy:site-control":["170b3631ad48f5a9"],"policy:security":["1deb6f4ebbbba3d4"],"policy:curtailment":["56b017e8edee0f3b"],"policy:emissions":["e17cedb3112fd488"],"restriction:local:enacted":["cb4fae95f6ec62e9","226d9579a44729dd","8725a51570228ad5","9cd0e5a2740b6579","49d98f654070e13e","5a6631afcf14f245","1526c144af9c4197","bfaeb2b05925f9bf"],"restriction:local:proposed":["aa120245d3cde2b5","4bbd796802e5b2a9","29dbbc44e88a23f5","d4ddebe26453aec0","fd40bfb18bd582d1","e3d9ca006093dd8c","347c664b42d6867c","f141990e3f9ddb5c"],"restriction:local:failed":["4cf9e86df26cb47f","036f9e40cb83532e","8fbbd5e4d1430368","0148c0779dde3d94","c154399207131e2f"],"restriction:states:enacted":["35fcd20bf3d4a4e3","07b7360c48f3c46e","98ec338e6e03cba0"],"restriction:states:pause":["707703d5f96368d1","41c39b9ee7a58df2","9607cd1000488b0d"],"restriction:states:proposed":["8d85cc66b1113104"],"water:study:proposed":["97674740d6ace3d0"],"water:siting:proposed":["ce0a82530ed2e6c2","617e27c4c491786f"],"water:closed-loop:enacted":["a3bc163e4fc8a78f","b41ba038f3b958e1"],"water:closed-loop:proposed":["0711b71f0ca0c23e","0026ba717d68569a"],"water:shield:enacted":["f512098faa3bf9c4"],"water:siting:enacted":["0d07fe0b0e4fa3bb"],"water:disclosure:enacted":["f4c280b4acf60e61","4fe0a4491af0e56e","ab5ef43c0bd56795","18fff3b222f896e1"],"water:moratorium:enacted":["23aaebd91e78f209"],"delay:state_moratorium:withdrawn":["a8fe02f84bc4a666"],"delay:transformer_supply:delayed":["a60e9b00093891d5"],"delay:gas_pipeline_delay:delayed":["87485593349454ff"],"delay:corporate_realignment:withdrawn":["15ca382a6f880e9f"],"delay:financing:withdrawn":["15ca382a6f880e9f"],"delay:zoning_denial:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:cancelled":["9832792554ff4c9d"],"delay:community_opposition:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:withdrawn":["0581ab61da4d6697"],"delay:community_opposition:withdrawn":["0581ab61da4d6697","adfb727c5dd4e1cc"],"delay:litigation:litigation_active":["792ce5aec9329c29","109278a363838f96","f27cb758664748d7"],"delay:community_opposition:litigation_active":["792ce5aec9329c29","109278a363838f96"],"delay:corporate_realignment:delayed":["0120772c7188f042"],"delay:community_opposition:delayed":["168b4298a9ab289d","f7513e35f7c721c0","2e380fe2f7f014dc"],"delay:litigation:under_appeal":["f08287b22f91f244"],"delay:local_moratorium:litigation_active":["f27cb758664748d7"],"delay:zoning_denial:delayed":["2e380fe2f7f014dc"],"delay:interconnection_queue:halted":["d5e9430ff55efa0d"],"delay:zoning_denial:withdrawn":["adfb727c5dd4e1cc"],"utility:tariff:approved":["75dc99c20658fe92","aed4fabd0e2dc51c","9a879f558b598ed3"],"utility:rate case:pending":["3af74a147ed90618"],"utility:other:pending":["234c8b4fd863479c","b540667ef8b17e0f","0b11ccddef1877eb","99a349313213c782","87c2bcaca8770a64","ca36e7d667fd52d5","624c21796e30622a","6218dc8d9c2c19aa","a068f88c8918edb0"],"utility:special contract:pending":["85e644b149d44cc3"],"utility:tariff:pending":["179ce9c6749195ff","ecc5b89ff5cb7890"],"utility:statement:pending":["d04486225e3fbb69"],"utility:other:approved":["0b929d848501d87d"],"utility:certificate:approved":["f70bcf2339f86b49"],"utility:policy:rejected":["c7c2a7a3b4cd9ee5"],"utility:policy:effective":["ad4e34e0dfe00af1"]},"grid_operators":["ERCOT","SPP","MISO","NON-RTO"],"counts":{"policy":4,"moratorium":28,"water":14,"delay":83,"atlas":135,"permits":127},"record_count":391},{"id":"UT","name":"Utah","groups":{"restriction:local:enacted":["fe8d104f8d67e17c","093e457d95e139ba","a73c33aad89fd8c4","d39140513b342349","0c19d0bfb2b41666","be172ab12b60089d","7272dd8d9cbcbd97","2c4637d21201bc5a"],"restriction:local:pause":["6689ae5de85fb884"],"restriction:states:enacted":["161bb7df391f5393","29634d18789600f9"],"water:disclosure:enacted":["aa23c2f90b922d2f"],"water:siting:enacted":["92181bfbd0f092dc"],"delay:local_moratorium:litigation_active":["43fe8f06c251d00a"],"delay:zoning_denial:litigation_active":["43fe8f06c251d00a"],"delay:community_opposition:litigation_active":["43fe8f06c251d00a"],"delay:tax_incentive_change:cancelled":["9a747679a42936ff"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":11,"water":2,"delay":16,"atlas":23,"permits":16},"record_count":68},{"id":"VT","name":"Vermont","groups":{"restriction:local:enacted":["fd5d7c35a8a164d5","ffd4551238ee66c3","24609fa0cc03fd6d"],"restriction:states:failed":["a22c89dd88f7805b"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":4,"delay":1,"atlas":3},"record_count":8},{"id":"VA","name":"Virginia","groups":{"policy:water-reporting":["d2e1f34ebb87db96"],"policy:regulator-reporting":["a2d7165da9c4273d"],"restriction:local:enacted":["5d1933a50e2fffa9","d9c9702f7193a5d0","00ea8549bf7d9107","5e8fa08848e7ea49","b612281109895776","a8439ee49b85f3b9","cb1ee56619c41591","fc8930e333e47393","33da24b96e9450aa","3c8c47c48655c7c2"],"restriction:local:failed":["c0313d873e52c337"],"restriction:local:proposed":["1fb124f1d0600aad"],"restriction:states:enacted":["07bca14c6c769cd9","822881c141b55b58","1bc4820da2e184d8","260f9d0fdac1fb1d"],"restriction:states:proposed":["115a01cddaaebb83","81387474427b857f","de3a5a259065cee6","d9698a681bcb77d1","1ccb96de87be8c20","6f2fd99dffb3ee19","5fbcc9b83d0cea89","5286a63674ab303e"],"restriction:states:failed":["96a928bdb916449a","82304cb623ce2fd1","1c2b5c27f2a20646"],"water:disclosure:enacted":["236efd0b5ce918b3","ea2fc9f0f2561dd5","1bb0eef74b265bbc"],"water:siting:vetoed":["fc6a89d84ea3761e"],"water:reclaimed:failed":["7c9863297abb29b6"],"water:incentive:proposed":["30149d37cde17dd5"],"water:study:enacted":["4d9a8e7a99e3e39b"],"water:disclosure:failed":["133af645ccadb7ec"],"water:siting:enacted":["13c66e32329bf4c9"],"water:disclosure:proposed":["739c2b83e1630596"],"delay:zoning_denial:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","ae2116cf001391ca","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b"],"delay:community_opposition:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b","b0af2cf0f00c0c33","0093933737713687"],"delay:water_dispute:cancelled":["b654fcba5611c495","c24066658a7c87b0"],"delay:litigation:cancelled":["b2f708f236602e8d","3059b79f61908e3d"],"delay:community_opposition:delayed":["2a92789be1587ada","dc394d8881dcfd7f","d7fec75934b138bd","4ef289628ac834d5"],"delay:litigation:litigation_active":["01bbee83623720b2","e5c30ca57b2dbc24","dcf5dbffe665442a","85cd3631575a5bdf","1832912b622cc7ca","e7ee0387e9522f52"],"delay:community_opposition:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:zoning_denial:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:community_opposition:litigation_active":["dcf5dbffe665442a"],"delay:zoning_denial:delayed":["ba73fb104a300b67","dc394d8881dcfd7f","d7fec75934b138bd"],"delay:zoning_denial:under_appeal":["f8a6c494d6a909f4"],"delay:community_opposition:under_appeal":["f8a6c494d6a909f4"],"delay:water_dispute:litigation_active":["85cd3631575a5bdf"],"delay:zoning_denial:litigation_active":["e7ee0387e9522f52"],"delay:environmental_review:cancelled":["3059b79f61908e3d"],"utility:tariff:approved":["c2935488c1650819","39c6440688564d5b","87a87dde118e582a"],"utility:IRP:contested":["1d207f181f290a4a","9ba1e9a7df265951","7f6e112a0c84fe66"],"utility:tariff:contested":["d5ac5227a2747fcf","b3484cb6d3aad2da"],"utility:rate case:pending":["7a09881b3efc53a9"],"utility:other:pending":["cb40a9cac60f8cec","925eb6e874d3a48f","53aeac44973adb8a"],"utility:statement:pending":["95c8534650ed9b12"],"utility:tariff:pending":["17c7d5340af6b949"],"utility:other:contested":["e0efcc5e95491272"],"utility:rate case:approved":["2d9b62ed5a5a8c85"]},"grid_operators":["PJM","NON-RTO"],"counts":{"policy":2,"moratorium":27,"water":10,"delay":88,"atlas":73,"permits":642},"record_count":842},{"id":"WA","name":"Washington","groups":{"restriction:local:enacted":["9f5f2923e39b9be8","d4e7ad9cf08df51e","a0fc2d121a678362","0b3a9ecd7c2478dc","de683906483b8fe5","d6189396d865dfc1","a4d0a0075eb42622","844f1f18ded0ca1c","50cb86e7f24d5c8a","5f99587cd1f4762d","e207b014a5280c8e","abcdda3f927a1476","31a8daed20fe189e","af832be8ade36360","510f60e365739621","7eb7d0c92f5f8dd9","5565880179e00904","c8eaae4e91fc4247","4f498d7e9f152136","29f8e05bf47f65e4"],"restriction:states:enacted":["13d139ecdc65b4b1","b6f7e9b035c67d69"],"restriction:states:proposed":["73392c07183451a2","d65bf66b10bb27dc","d97ae6ca24475af1"],"restriction:states:failed":["b0d11e81f4e16dea","fc47b1de08dff922","383388e3142065cd"],"water:moratorium:enacted":["6455f69859c340a2"],"delay:community_opposition:halted":["8ced64a3cbb11f6c"],"delay:local_moratorium:halted":["0d03a9c2805d05b6","2fc49a0ff709020e"],"delay:community_opposition:delayed":["887cc460e5eb83f6"],"utility:tariff:pending":["c168cf070187ea92"],"utility:other:pending":["611e6f5599ef718f","8c8130676232d1c6"],"utility:statement:pending":["4ed38cff9678ccf0","4b866a2091ab3ecc"],"utility:tariff:approved":["325a6b7ee8b34e77"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":28,"water":1,"delay":22,"atlas":30,"permits":13},"record_count":94},{"id":"WV","name":"West Virginia","groups":{"water:disclosure:failed":["8cf5514f4b5ff375"],"delay:community_opposition:delayed":["4124cb9080c91f7c"],"utility:IRP:pending":["a67a61284873a2b2","8da91197a3806bcc"],"utility:special contract:pending":["39679c94f0d7f830"],"utility:other:contested":["c12d842abe5446ff","040b3c446bff4aee","5e6fb296651a928a","6f948a872911044f","0ae82e92301e638b"]},"grid_operators":["PJM"],"counts":{"water":1,"delay":12,"atlas":7},"record_count":20},{"id":"WI","name":"Wisconsin","groups":{"restriction:local:enacted":["197cdb77aa511062","c32fbb4074e34eba","9fa928579bf6e19b","1ef57a5ad557563c","d383195f7d8cd078","07b5a8ef15cadf6b","0a3550a0b812064e","2f12caa1fa8a1620","4efd296b41cadd58","502234e3282fa94d","98de8d31bfd06c50","9baf377f17b48199","2b2ac1debfbe57ca","aee74a04d13b1375","02ac37032bda8131","375f029130348bd2","6e56afd4aed59791","893a3aae04278c40","7650d4a5b8a48f92","e18b7a4b7fbc1df5","b56152d653914388","b916df50f4c51b94","5a64d5c33607de67","643f527e927e4058","7b1745a42047131e","e09c79ad3db16d88","734fd94028341ac3","69f22ea5aa3e34d3","1a270a98a4fa2e6d","d41ed6223bfeed81","112e1e1079c890e9","844ad5858c872078","47a591fadc2e8900","f7cf8bb4ab48824a"],"restriction:local:failed":["0c67dadae5dac0e9"],"restriction:local:proposed":["e66086d4c7d49f01","c8953b5f4533a4b5","68e48cc43363c3ba","f04d2abd046f97a9","1eae3d6650182a35"],"restriction:states:enacted":["5db6a8a411191d98"],"restriction:states:proposed":["d9aeb06afb1cc48b"],"restriction:states:failed":["a7f7ac4ffcf569cf","e87712374a5a9bb6","1fa055042bc56cba","bf5f897298b22196"],"water:moratorium:failed":["dabd0296a8769724"],"water:disclosure:proposed":["52d3503b7b7a29d2"],"water:disclosure:failed":["3d11e7d09b3698e1"],"water:moratorium:proposed":["0d06b92b967fdc00"],"water:siting:proposed":["4157cf76b6d65b0a"],"delay:environmental_review:litigation_active":["debb467bcb4d5430"],"delay:litigation:litigation_active":["debb467bcb4d5430"],"delay:community_opposition:litigation_active":["debb467bcb4d5430"],"delay:litigation:active_litigation":["e199a6213982873d"],"delay:environmental_review_challenge:active_litigation":["e199a6213982873d"],"delay:regulatory_collateral_dispute:active_litigation":["e199a6213982873d"],"delay:corporate_reassessment:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:design_changes:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:community_opposition:under_council_consideration":["28e37770792b4c08"],"delay:withdrawal:cancelled":["ea733b19fc76a19b"],"delay:village_infeasibility_finding:cancelled":["ea733b19fc76a19b"],"delay:interconnection:denied":["fd3e6fff23dec30a"],"delay:water:cancelled":["6b688ff399652711"],"delay:community_opposition:cancelled":["6b688ff399652711"],"delay:financing:cancelled":["6b688ff399652711"],"utility:special contract:approved":["c0e0e62ba225486e"],"utility:tariff:approved":["477299baafe80b07","8b74b857f211fa23","9d22a2aeb195e4fc","124399acbd7a554c"],"utility:tariff:pending":["dde2390c69924c91","4b8f10b414687805","7d0c020f1825cea4"],"utility:rate case:pending":["fbf33f025d17bc1f"],"utility:other:pending":["8f81691272c2cefc"]},"grid_operators":["MISO"],"counts":{"moratorium":46,"water":5,"delay":59,"atlas":44,"permits":6},"record_count":160},{"id":"WY","name":"Wyoming","groups":{"restriction:local:failed":["d0485054fd79e820"],"restriction:local:proposed":["3ed10f6e2d7fa4f4"],"restriction:states:failed":["be934bcf6dde21e3"],"utility:tariff:pending":["b1729fb79f6ff5af"],"utility:tariff:approved":["48ce507193eae507","2e0818019f3d14fe","103e672184e6c568"],"utility:other:pending":["b06ef4aba51b6d71"],"utility:special contract:pending":["31c5bf9bd2103358"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":3,"delay":10,"atlas":13,"permits":4},"record_count":30}]}