{"groups":{"policy:site-control":{"id":"policy:site-control","label":"Evidence of site control","tracker":"policy"},"policy:security":{"id":"policy:security","label":"Financial security","tracker":"policy"},"policy:curtailment":{"id":"policy:curtailment","label":"Emergency response","tracker":"policy"},"policy:emissions":{"id":"policy:emissions","label":"Emissions safeguards","tracker":"policy"},"policy:cost-allocation":{"id":"policy:cost-allocation","label":"Attributable-cost allocation","tracker":"policy"},"policy:departure":{"id":"policy:departure","label":"Departure / reduced-load protection","tracker":"policy"},"policy:supply-review":{"id":"policy:supply-review","label":"Water-supply review","tracker":"policy"},"policy:clean-energy":{"id":"policy:clean-energy","label":"Clean-energy service terms","tracker":"policy"},"policy:water-reporting":{"id":"policy:water-reporting","label":"Water-use reporting","tracker":"policy"},"policy:local-authority":{"id":"policy:local-authority","label":"Preserved local authority","tracker":"policy"},"policy:minimum-payment":{"id":"policy:minimum-payment","label":"Minimum payment commitments","tracker":"policy"},"policy:regulator-reporting":{"id":"policy:regulator-reporting","label":"Regulatory reporting","tracker":"policy"},"policy:environmental-review":{"id":"policy:environmental-review","label":"Environmental assessment","tracker":"policy"},"policy:permit-hold":{"id":"policy:permit-hold","label":"Interim permit restraint","tracker":"policy"},"restriction:local:enacted":{"id":"restriction:local:enacted","label":"Local restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:local:failed":{"id":"restriction:local:failed","label":"Local restriction records: failed (as recorded)","tracker":"moratorium"},"restriction:local:proposed":{"id":"restriction:local:proposed","label":"Local restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:local:pause":{"id":"restriction:local:pause","label":"Local restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:enacted":{"id":"restriction:states:enacted","label":"State restriction records: enacted (as recorded)","tracker":"moratorium"},"restriction:states:pause":{"id":"restriction:states:pause","label":"State restriction records: pause (as recorded)","tracker":"moratorium"},"restriction:states:proposed":{"id":"restriction:states:proposed","label":"State restriction records: proposed (as recorded)","tracker":"moratorium"},"restriction:states:failed":{"id":"restriction:states:failed","label":"State restriction records: failed (as recorded)","tracker":"moratorium"},"water:reclaimed:enacted":{"id":"water:reclaimed:enacted","label":"Water reclaimed measures: enacted (as recorded)","tracker":"water"},"water:disclosure:enacted":{"id":"water:disclosure:enacted","label":"Water disclosure measures: enacted (as recorded)","tracker":"water"},"water:siting:vetoed":{"id":"water:siting:vetoed","label":"Water siting measures: vetoed (as recorded)","tracker":"water"},"water:reclaimed:failed":{"id":"water:reclaimed:failed","label":"Water reclaimed measures: failed (as recorded)","tracker":"water"},"water:incentive:proposed":{"id":"water:incentive:proposed","label":"Water incentive measures: proposed (as recorded)","tracker":"water"},"water:disclosure:proposed":{"id":"water:disclosure:proposed","label":"Water disclosure measures: proposed (as recorded)","tracker":"water"},"water:disclosure:vetoed":{"id":"water:disclosure:vetoed","label":"Water disclosure measures: vetoed (as recorded)","tracker":"water"},"water:closed-loop:proposed":{"id":"water:closed-loop:proposed","label":"Water closed-loop measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:failed":{"id":"water:closed-loop:failed","label":"Water closed-loop measures: failed (as recorded)","tracker":"water"},"water:disclosure:failed":{"id":"water:disclosure:failed","label":"Water disclosure measures: failed (as recorded)","tracker":"water"},"water:rate:failed":{"id":"water:rate:failed","label":"Water rate measures: failed (as recorded)","tracker":"water"},"water:siting:enacted":{"id":"water:siting:enacted","label":"Water siting measures: enacted (as recorded)","tracker":"water"},"water:study:proposed":{"id":"water:study:proposed","label":"Water study measures: proposed (as recorded)","tracker":"water"},"water:siting:proposed":{"id":"water:siting:proposed","label":"Water siting measures: proposed (as recorded)","tracker":"water"},"water:closed-loop:enacted":{"id":"water:closed-loop:enacted","label":"Water closed-loop measures: enacted (as recorded)","tracker":"water"},"water:moratorium:enacted":{"id":"water:moratorium:enacted","label":"Water moratorium measures: enacted (as recorded)","tracker":"water"},"water:reclaimed:proposed":{"id":"water:reclaimed:proposed","label":"Water reclaimed measures: proposed (as recorded)","tracker":"water"},"water:moratorium:vetoed":{"id":"water:moratorium:vetoed","label":"Water moratorium measures: vetoed (as recorded)","tracker":"water"},"water:study:enacted":{"id":"water:study:enacted","label":"Water study measures: enacted (as recorded)","tracker":"water"},"water:moratorium:failed":{"id":"water:moratorium:failed","label":"Water moratorium measures: failed (as recorded)","tracker":"water"},"water:moratorium:proposed":{"id":"water:moratorium:proposed","label":"Water moratorium measures: proposed (as recorded)","tracker":"water"},"water:shield:enacted":{"id":"water:shield:enacted","label":"Water shield measures: enacted (as recorded)","tracker":"water"},"water:shield:failed":{"id":"water:shield:failed","label":"Water shield measures: failed (as recorded)","tracker":"water"},"water:siting:failed":{"id":"water:siting:failed","label":"Water siting measures: failed (as recorded)","tracker":"water"},"water:study:failed":{"id":"water:study:failed","label":"Water study measures: failed (as recorded)","tracker":"water"},"water:rate:enacted":{"id":"water:rate:enacted","label":"Water rate measures: enacted (as recorded)","tracker":"water"},"water:incentive:enacted":{"id":"water:incentive:enacted","label":"Water incentive measures: enacted (as recorded)","tracker":"water"},"delay:state_moratorium:withdrawn":{"id":"delay:state_moratorium:withdrawn","label":"Delay cause: state moratorium / withdrawn","tracker":"delay"},"delay:transformer_supply:delayed":{"id":"delay:transformer_supply:delayed","label":"Delay cause: transformer supply / delayed","tracker":"delay"},"delay:gas_pipeline_delay:delayed":{"id":"delay:gas_pipeline_delay:delayed","label":"Delay cause: gas pipeline delay / delayed","tracker":"delay"},"delay:corporate_realignment:withdrawn":{"id":"delay:corporate_realignment:withdrawn","label":"Delay cause: corporate realignment / withdrawn","tracker":"delay"},"delay:financing:withdrawn":{"id":"delay:financing:withdrawn","label":"Delay cause: financing / withdrawn","tracker":"delay"},"delay:environmental_review:litigation_active":{"id":"delay:environmental_review:litigation_active","label":"Delay cause: environmental review / litigation_active","tracker":"delay"},"delay:litigation:litigation_active":{"id":"delay:litigation:litigation_active","label":"Delay cause: litigation / litigation_active","tracker":"delay"},"delay:community_opposition:litigation_active":{"id":"delay:community_opposition:litigation_active","label":"Delay cause: community opposition / litigation_active","tracker":"delay"},"delay:zoning_denial:cancelled":{"id":"delay:zoning_denial:cancelled","label":"Delay cause: zoning denial / cancelled","tracker":"delay"},"delay:community_opposition:cancelled":{"id":"delay:community_opposition:cancelled","label":"Delay cause: community opposition / cancelled","tracker":"delay"},"delay:water_dispute:cancelled":{"id":"delay:water_dispute:cancelled","label":"Delay cause: water dispute / cancelled","tracker":"delay"},"delay:zoning_denial:litigation_active":{"id":"delay:zoning_denial:litigation_active","label":"Delay cause: zoning denial / litigation_active","tracker":"delay"},"delay:local_moratorium:litigation_active":{"id":"delay:local_moratorium:litigation_active","label":"Delay cause: local moratorium / litigation_active","tracker":"delay"},"delay:permit_denial:litigation_active":{"id":"delay:permit_denial:litigation_active","label":"Delay cause: permit denial / litigation_active","tracker":"delay"},"delay:community_opposition:withdrawn":{"id":"delay:community_opposition:withdrawn","label":"Delay cause: community opposition / withdrawn","tracker":"delay"},"delay:zoning_denial:withdrawn":{"id":"delay:zoning_denial:withdrawn","label":"Delay cause: zoning denial / withdrawn","tracker":"delay"},"delay:environmental_review:delayed":{"id":"delay:environmental_review:delayed","label":"Delay cause: environmental review / delayed","tracker":"delay"},"delay:community_opposition:delayed":{"id":"delay:community_opposition:delayed","label":"Delay cause: community opposition / delayed","tracker":"delay"},"delay:water_dispute:under_appeal":{"id":"delay:water_dispute:under_appeal","label":"Delay cause: water dispute / under_appeal","tracker":"delay"},"delay:community_opposition:under_appeal":{"id":"delay:community_opposition:under_appeal","label":"Delay cause: community opposition / under_appeal","tracker":"delay"},"delay:water_dispute:delayed":{"id":"delay:water_dispute:delayed","label":"Delay cause: water dispute / delayed","tracker":"delay"},"delay:local_moratorium:delayed":{"id":"delay:local_moratorium:delayed","label":"Delay cause: local moratorium / delayed","tracker":"delay"},"delay:litigation:cancelled":{"id":"delay:litigation:cancelled","label":"Delay cause: litigation / cancelled","tracker":"delay"},"delay:zoning_denial:delayed":{"id":"delay:zoning_denial:delayed","label":"Delay cause: zoning denial / delayed","tracker":"delay"},"delay:zoning_denial:under_appeal":{"id":"delay:zoning_denial:under_appeal","label":"Delay cause: zoning denial / under_appeal","tracker":"delay"},"delay:water_dispute:litigation_active":{"id":"delay:water_dispute:litigation_active","label":"Delay cause: water dispute / litigation_active","tracker":"delay"},"delay:environmental_review:cancelled":{"id":"delay:environmental_review:cancelled","label":"Delay cause: environmental review / cancelled","tracker":"delay"},"delay:litigation:under_appeal":{"id":"delay:litigation:under_appeal","label":"Delay cause: litigation / under_appeal","tracker":"delay"},"delay:community_opposition:approved_but_citywide_moratorium_pending":{"id":"delay:community_opposition:approved_but_citywide_moratorium_pending","label":"Delay cause: community opposition / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":{"id":"delay:proposed_moratorium:approved_but_citywide_moratorium_pending","label":"Delay cause: proposed moratorium / approved_but_citywide_moratorium_pending","tracker":"delay"},"delay:rezoning_denial_or_withdrawal:withdrawn":{"id":"delay:rezoning_denial_or_withdrawal:withdrawn","label":"Delay cause: rezoning denial or withdrawal / withdrawn","tracker":"delay"},"delay:rezoning_denial:rezoning_denied":{"id":"delay:rezoning_denial:rezoning_denied","label":"Delay cause: rezoning denial / rezoning_denied","tracker":"delay"},"delay:community_opposition:rezoning_denied":{"id":"delay:community_opposition:rezoning_denied","label":"Delay cause: community opposition / rezoning_denied","tracker":"delay"},"delay:litigation:active_litigation":{"id":"delay:litigation:active_litigation","label":"Delay cause: litigation / active_litigation","tracker":"delay"},"delay:permit_challenge:active_litigation":{"id":"delay:permit_challenge:active_litigation","label":"Delay cause: permit challenge / active_litigation","tracker":"delay"},"delay:community_opposition:approved_amid_opposition":{"id":"delay:community_opposition:approved_amid_opposition","label":"Delay cause: community opposition / approved_amid_opposition","tracker":"delay"},"delay:missed_milestones:development_agreement_expired":{"id":"delay:missed_milestones:development_agreement_expired","label":"Delay cause: missed milestones / development_agreement_expired","tracker":"delay"},"delay:financing_delay:development_agreement_expired":{"id":"delay:financing_delay:development_agreement_expired","label":"Delay cause: financing delay / development_agreement_expired","tracker":"delay"},"delay:unresolved_commitments:rezoning_denied":{"id":"delay:unresolved_commitments:rezoning_denied","label":"Delay cause: unresolved commitments / rezoning_denied","tracker":"delay"},"delay:county_moratorium:moratorium_in_force":{"id":"delay:county_moratorium:moratorium_in_force","label":"Delay cause: county moratorium / moratorium_in_force","tracker":"delay"},"delay:county_moratorium:moratorium_extended":{"id":"delay:county_moratorium:moratorium_extended","label":"Delay cause: county moratorium / moratorium_extended","tracker":"delay"},"delay:regulatory_review:regulatory_approval_pending":{"id":"delay:regulatory_review:regulatory_approval_pending","label":"Delay cause: regulatory review / regulatory_approval_pending","tracker":"delay"},"delay:power_allocation_dispute:regulatory_approval_pending":{"id":"delay:power_allocation_dispute:regulatory_approval_pending","label":"Delay cause: power allocation dispute / regulatory_approval_pending","tracker":"delay"},"delay:corporate_reassessment:construction_paused":{"id":"delay:corporate_reassessment:construction_paused","label":"Delay cause: corporate reassessment / construction_paused","tracker":"delay"},"delay:openai_relationship_change:construction_paused":{"id":"delay:openai_relationship_change:construction_paused","label":"Delay cause: openai relationship change / construction_paused","tracker":"delay"},"delay:tariff_costs:construction_paused":{"id":"delay:tariff_costs:construction_paused","label":"Delay cause: tariff costs / construction_paused","tracker":"delay"},"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: local moratorium / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":{"id":"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight","label":"Delay cause: ballot initiative threat / proposed_amid_local_moratorium_and_ballot_fight","tracker":"delay"},"delay:ballot_initiative_threat:signature_gathering":{"id":"delay:ballot_initiative_threat:signature_gathering","label":"Delay cause: ballot initiative threat / signature_gathering","tracker":"delay"},"delay:statewide_moratorium_push:signature_gathering":{"id":"delay:statewide_moratorium_push:signature_gathering","label":"Delay cause: statewide moratorium push / signature_gathering","tracker":"delay"},"delay:environmental_review_challenge:active_litigation":{"id":"delay:environmental_review_challenge:active_litigation","label":"Delay cause: environmental review challenge / active_litigation","tracker":"delay"},"delay:regulatory_collateral_dispute:active_litigation":{"id":"delay:regulatory_collateral_dispute:active_litigation","label":"Delay cause: regulatory collateral dispute / active_litigation","tracker":"delay"},"delay:corporate_reassessment:construction_partially_paused":{"id":"delay:corporate_reassessment:construction_partially_paused","label":"Delay cause: corporate reassessment / construction_partially_paused","tracker":"delay"},"delay:design_changes:construction_partially_paused":{"id":"delay:design_changes:construction_partially_paused","label":"Delay cause: design changes / construction_partially_paused","tracker":"delay"},"delay:community_opposition:under_council_consideration":{"id":"delay:community_opposition:under_council_consideration","label":"Delay cause: community opposition / under_council_consideration","tracker":"delay"},"delay:withdrawal:cancelled":{"id":"delay:withdrawal:cancelled","label":"Delay cause: withdrawal / cancelled","tracker":"delay"},"delay:village_infeasibility_finding:cancelled":{"id":"delay:village_infeasibility_finding:cancelled","label":"Delay cause: village infeasibility finding / cancelled","tracker":"delay"},"delay:litigation:construction_halted_by_court":{"id":"delay:litigation:construction_halted_by_court","label":"Delay cause: litigation / construction_halted_by_court","tracker":"delay"},"delay:environmental_review_inadequate:construction_halted_by_court":{"id":"delay:environmental_review_inadequate:construction_halted_by_court","label":"Delay cause: environmental review inadequate / construction_halted_by_court","tracker":"delay"},"delay:city_moratorium:active_litigation":{"id":"delay:city_moratorium:active_litigation","label":"Delay cause: city moratorium / active_litigation","tracker":"delay"},"delay:environmental_review_pending:final_decision_paused":{"id":"delay:environmental_review_pending:final_decision_paused","label":"Delay cause: environmental review pending / final_decision_paused","tracker":"delay"},"delay:city_moratorium:moratorium_in_force":{"id":"delay:city_moratorium:moratorium_in_force","label":"Delay cause: city moratorium / moratorium_in_force","tracker":"delay"},"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":{"id":"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial","label":"Delay cause: planning commission denial recommendation / planning_commission_recommended_denial","tracker":"delay"},"delay:community_opposition:opposed_planned":{"id":"delay:community_opposition:opposed_planned","label":"Delay cause: community opposition / opposed_planned","tracker":"delay"},"delay:city_council_resolution_against:opposed_planned":{"id":"delay:city_council_resolution_against:opposed_planned","label":"Delay cause: city council resolution against / opposed_planned","tracker":"delay"},"delay:rezoning_denial:rezoning_denied_then_litigation_settled":{"id":"delay:rezoning_denial:rezoning_denied_then_litigation_settled","label":"Delay cause: rezoning denial / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:litigation:rezoning_denied_then_litigation_settled":{"id":"delay:litigation:rezoning_denied_then_litigation_settled","label":"Delay cause: litigation / rezoning_denied_then_litigation_settled","tracker":"delay"},"delay:city_moratorium:moratorium_delay":{"id":"delay:city_moratorium:moratorium_delay","label":"Delay cause: city moratorium / moratorium_delay","tracker":"delay"},"delay:community_opposition:moratorium_delay":{"id":"delay:community_opposition:moratorium_delay","label":"Delay cause: community opposition / moratorium_delay","tracker":"delay"},"delay:community_opposition:rezoning_paused":{"id":"delay:community_opposition:rezoning_paused","label":"Delay cause: community opposition / rezoning_paused","tracker":"delay"},"delay:planning_commission_postponement:rezoning_paused":{"id":"delay:planning_commission_postponement:rezoning_paused","label":"Delay cause: planning commission postponement / rezoning_paused","tracker":"delay"},"delay:community_opposition:opposed_proposed":{"id":"delay:community_opposition:opposed_proposed","label":"Delay cause: community opposition / opposed_proposed","tracker":"delay"},"delay:transparency_concerns:opposed_proposed":{"id":"delay:transparency_concerns:opposed_proposed","label":"Delay cause: transparency concerns / opposed_proposed","tracker":"delay"},"delay:litigation:abandoned":{"id":"delay:litigation:abandoned","label":"Delay cause: litigation / abandoned","tracker":"delay"},"delay:community_opposition:abandoned":{"id":"delay:community_opposition:abandoned","label":"Delay cause: community opposition / abandoned","tracker":"delay"},"delay:china_ties_backlash:abandoned":{"id":"delay:china_ties_backlash:abandoned","label":"Delay cause: china ties backlash / abandoned","tracker":"delay"},"delay:wetlands_permit_suspended:active_litigation":{"id":"delay:wetlands_permit_suspended:active_litigation","label":"Delay cause: wetlands permit suspended / active_litigation","tracker":"delay"},"delay:community_opposition:opposed_pending_council_vote":{"id":"delay:community_opposition:opposed_pending_council_vote","label":"Delay cause: community opposition / opposed_pending_council_vote","tracker":"delay"},"delay:community_opposition:opposed_effectively_stalled":{"id":"delay:community_opposition:opposed_effectively_stalled","label":"Delay cause: community opposition / opposed_effectively_stalled","tracker":"delay"},"delay:petition_campaign:opposed_effectively_stalled":{"id":"delay:petition_campaign:opposed_effectively_stalled","label":"Delay cause: petition campaign / opposed_effectively_stalled","tracker":"delay"},"delay:public_notice_violation_alleged:active_litigation":{"id":"delay:public_notice_violation_alleged:active_litigation","label":"Delay cause: public notice violation alleged / active_litigation","tracker":"delay"},"delay:rezoning_denial:withdrawn":{"id":"delay:rezoning_denial:withdrawn","label":"Delay cause: rezoning denial / withdrawn","tracker":"delay"},"delay:no_secured_tenant:withdrawn":{"id":"delay:no_secured_tenant:withdrawn","label":"Delay cause: no secured tenant / withdrawn","tracker":"delay"},"delay:council_opposition:withdrawn":{"id":"delay:council_opposition:withdrawn","label":"Delay cause: council opposition / withdrawn","tracker":"delay"},"delay:eminent_domain_threat:active_litigation":{"id":"delay:eminent_domain_threat:active_litigation","label":"Delay cause: eminent domain threat / active_litigation","tracker":"delay"},"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":{"id":"delay:rezoning_denial:rezoning_rejected_moratorium_recommended","label":"Delay cause: rezoning denial / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":{"id":"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended","label":"Delay cause: county moratorium recommended / rezoning_rejected_moratorium_recommended","tracker":"delay"},"delay:environmental_review_order:active_litigation":{"id":"delay:environmental_review_order:active_litigation","label":"Delay cause: environmental review order / active_litigation","tracker":"delay"},"delay:unpermitted_power_plant:active_litigation":{"id":"delay:unpermitted_power_plant:active_litigation","label":"Delay cause: unpermitted power plant / active_litigation","tracker":"delay"},"delay:community_opposition:under_construction_amid_scrutiny":{"id":"delay:community_opposition:under_construction_amid_scrutiny","label":"Delay cause: community opposition / under_construction_amid_scrutiny","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_scrutiny":{"id":"delay:transparency_concerns:under_construction_amid_scrutiny","label":"Delay cause: transparency concerns / under_construction_amid_scrutiny","tracker":"delay"},"delay:permit_denial:permit_denied":{"id":"delay:permit_denial:permit_denied","label":"Delay cause: permit denial / permit_denied","tracker":"delay"},"delay:community_opposition:permit_denied":{"id":"delay:community_opposition:permit_denied","label":"Delay cause: community opposition / permit_denied","tracker":"delay"},"delay:county_moratorium:permit_denied":{"id":"delay:county_moratorium:permit_denied","label":"Delay cause: county moratorium / permit_denied","tracker":"delay"},"delay:county_moratorium:approved_active_litigation":{"id":"delay:county_moratorium:approved_active_litigation","label":"Delay cause: county moratorium / approved_active_litigation","tracker":"delay"},"delay:litigation:approved_active_litigation":{"id":"delay:litigation:approved_active_litigation","label":"Delay cause: litigation / approved_active_litigation","tracker":"delay"},"delay:community_opposition:approved_active_litigation":{"id":"delay:community_opposition:approved_active_litigation","label":"Delay cause: community opposition / approved_active_litigation","tracker":"delay"},"delay:county_moratorium:delayed_amid_moratorium":{"id":"delay:county_moratorium:delayed_amid_moratorium","label":"Delay cause: county moratorium / delayed_amid_moratorium","tracker":"delay"},"delay:community_opposition:delayed_amid_moratorium":{"id":"delay:community_opposition:delayed_amid_moratorium","label":"Delay cause: community opposition / delayed_amid_moratorium","tracker":"delay"},"delay:public_outcry:tax_incentive_withdrawn":{"id":"delay:public_outcry:tax_incentive_withdrawn","label":"Delay cause: public outcry / tax_incentive_withdrawn","tracker":"delay"},"delay:tax_break_withdrawal:tax_incentive_withdrawn":{"id":"delay:tax_break_withdrawal:tax_incentive_withdrawn","label":"Delay cause: tax break withdrawal / tax_incentive_withdrawn","tracker":"delay"},"delay:permit_denial:denied_without_prejudice":{"id":"delay:permit_denial:denied_without_prejudice","label":"Delay cause: permit denial / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:denied_without_prejudice":{"id":"delay:community_opposition:denied_without_prejudice","label":"Delay cause: community opposition / denied_without_prejudice","tracker":"delay"},"delay:community_opposition:under_construction_amid_opposition":{"id":"delay:community_opposition:under_construction_amid_opposition","label":"Delay cause: community opposition / under_construction_amid_opposition","tracker":"delay"},"delay:transparency_concerns:under_construction_amid_opposition":{"id":"delay:transparency_concerns:under_construction_amid_opposition","label":"Delay cause: transparency concerns / under_construction_amid_opposition","tracker":"delay"},"delay:community_opposition:rumored_no_application_filed":{"id":"delay:community_opposition:rumored_no_application_filed","label":"Delay cause: community opposition / rumored_no_application_filed","tracker":"delay"},"delay:meeting_postponed:rumored_no_application_filed":{"id":"delay:meeting_postponed:rumored_no_application_filed","label":"Delay cause: meeting postponed / rumored_no_application_filed","tracker":"delay"},"delay:community_opposition:moratorium_in_force":{"id":"delay:community_opposition:moratorium_in_force","label":"Delay cause: community opposition / moratorium_in_force","tracker":"delay"},"delay:community_opposition:under_review_no_zoning_process":{"id":"delay:community_opposition:under_review_no_zoning_process","label":"Delay cause: community opposition / under_review_no_zoning_process","tracker":"delay"},"delay:no_local_zoning_framework:under_review_no_zoning_process":{"id":"delay:no_local_zoning_framework:under_review_no_zoning_process","label":"Delay cause: no local zoning framework / under_review_no_zoning_process","tracker":"delay"},"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":{"id":"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute","label":"Delay cause: regulatory transparency dispute / regulatory_disclosure_dispute","tracker":"delay"},"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":{"id":"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute","label":"Delay cause: ratepayer cost concerns / regulatory_disclosure_dispute","tracker":"delay"},"delay:noise_nuisance:active_litigation":{"id":"delay:noise_nuisance:active_litigation","label":"Delay cause: noise nuisance / active_litigation","tracker":"delay"},"delay:historic_preservation_conflict:permit_denied":{"id":"delay:historic_preservation_conflict:permit_denied","label":"Delay cause: historic preservation conflict / permit_denied","tracker":"delay"},"delay:community_opposition:under_construction_amid_water_concerns":{"id":"delay:community_opposition:under_construction_amid_water_concerns","label":"Delay cause: community opposition / under_construction_amid_water_concerns","tracker":"delay"},"delay:water_capacity_constraints:under_construction_amid_water_concerns":{"id":"delay:water_capacity_constraints:under_construction_amid_water_concerns","label":"Delay cause: water capacity constraints / under_construction_amid_water_concerns","tracker":"delay"},"delay:city_moratorium_partial_exemption:phase_vote_delayed":{"id":"delay:city_moratorium_partial_exemption:phase_vote_delayed","label":"Delay cause: city moratorium partial exemption / phase_vote_delayed","tracker":"delay"},"delay:planning_commission_delay:phase_vote_delayed":{"id":"delay:planning_commission_delay:phase_vote_delayed","label":"Delay cause: planning commission delay / phase_vote_delayed","tracker":"delay"},"delay:community_opposition:approved_expanded_amid_opposition":{"id":"delay:community_opposition:approved_expanded_amid_opposition","label":"Delay cause: community opposition / approved_expanded_amid_opposition","tracker":"delay"},"delay:noise_regulation_review:approved_expanded_amid_opposition":{"id":"delay:noise_regulation_review:approved_expanded_amid_opposition","label":"Delay cause: noise regulation review / approved_expanded_amid_opposition","tracker":"delay"},"delay:multi_year_construction_delay:delayed_extension_requested":{"id":"delay:multi_year_construction_delay:delayed_extension_requested","label":"Delay cause: multi year construction delay / delayed_extension_requested","tracker":"delay"},"delay:design_changes:delayed_extension_requested":{"id":"delay:design_changes:delayed_extension_requested","label":"Delay cause: design changes / delayed_extension_requested","tracker":"delay"},"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":{"id":"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums","label":"Delay cause: county moratorium neighboring / early_stage_amid_county_moratoriums","tracker":"delay"},"delay:regulatory_review:permitting_challenged":{"id":"delay:regulatory_review:permitting_challenged","label":"Delay cause: regulatory review / permitting_challenged","tracker":"delay"},"delay:environmental_petition:permitting_challenged":{"id":"delay:environmental_petition:permitting_challenged","label":"Delay cause: environmental petition / permitting_challenged","tracker":"delay"},"delay:utility_interconnection_timing:abandoned":{"id":"delay:utility_interconnection_timing:abandoned","label":"Delay cause: utility interconnection timing / abandoned","tracker":"delay"},"delay:withdrawal:abandoned":{"id":"delay:withdrawal:abandoned","label":"Delay cause: withdrawal / abandoned","tracker":"delay"},"delay:zoning_approval_challenge:active_litigation":{"id":"delay:zoning_approval_challenge:active_litigation","label":"Delay cause: zoning approval challenge / active_litigation","tracker":"delay"},"delay:litigation:zoning_request_paused_active_litigation":{"id":"delay:litigation:zoning_request_paused_active_litigation","label":"Delay cause: litigation / zoning_request_paused_active_litigation","tracker":"delay"},"delay:council_agenda_removal:zoning_request_paused_active_litigation":{"id":"delay:council_agenda_removal:zoning_request_paused_active_litigation","label":"Delay cause: council agenda removal / zoning_request_paused_active_litigation","tracker":"delay"},"delay:environmental_concerns:zoning_request_paused_active_litigation":{"id":"delay:environmental_concerns:zoning_request_paused_active_litigation","label":"Delay cause: environmental concerns / zoning_request_paused_active_litigation","tracker":"delay"},"delay:litigation:active_litigation_temporary_block":{"id":"delay:litigation:active_litigation_temporary_block","label":"Delay cause: litigation / active_litigation_temporary_block","tracker":"delay"},"delay:state_law_ownership_ban:active_litigation_temporary_block":{"id":"delay:state_law_ownership_ban:active_litigation_temporary_block","label":"Delay cause: state law ownership ban / active_litigation_temporary_block","tracker":"delay"},"delay:quorum_court_rejection:moratorium_exemption_rejected":{"id":"delay:quorum_court_rejection:moratorium_exemption_rejected","label":"Delay cause: quorum court rejection / moratorium_exemption_rejected","tracker":"delay"},"delay:county_moratorium_dispute:moratorium_exemption_rejected":{"id":"delay:county_moratorium_dispute:moratorium_exemption_rejected","label":"Delay cause: county moratorium dispute / moratorium_exemption_rejected","tracker":"delay"},"delay:litigation:active_litigation_records_dispute":{"id":"delay:litigation:active_litigation_records_dispute","label":"Delay cause: litigation / active_litigation_records_dispute","tracker":"delay"},"delay:public_records_dispute:active_litigation_records_dispute":{"id":"delay:public_records_dispute:active_litigation_records_dispute","label":"Delay cause: public records dispute / active_litigation_records_dispute","tracker":"delay"},"delay:litigation:delayed":{"id":"delay:litigation:delayed","label":"Delay cause: litigation / delayed","tracker":"delay"},"delay:permit_denial:delayed":{"id":"delay:permit_denial:delayed","label":"Delay cause: permit denial / delayed","tracker":"delay"},"delay:local_moratorium:cancelled":{"id":"delay:local_moratorium:cancelled","label":"Delay cause: local moratorium / cancelled","tracker":"delay"},"delay:tax_incentive_change:under_appeal":{"id":"delay:tax_incentive_change:under_appeal","label":"Delay cause: tax incentive change / under_appeal","tracker":"delay"},"delay:litigation:halted":{"id":"delay:litigation:halted","label":"Delay cause: litigation / halted","tracker":"delay"},"delay:environmental_review:halted":{"id":"delay:environmental_review:halted","label":"Delay cause: environmental review / halted","tracker":"delay"},"delay:local_moratorium:halted":{"id":"delay:local_moratorium:halted","label":"Delay cause: local moratorium / halted","tracker":"delay"},"delay:water_dispute:halted":{"id":"delay:water_dispute:halted","label":"Delay cause: water dispute / halted","tracker":"delay"},"delay:tax_incentive_change:halted":{"id":"delay:tax_incentive_change:halted","label":"Delay cause: tax incentive change / halted","tracker":"delay"},"delay:community_opposition:halted":{"id":"delay:community_opposition:halted","label":"Delay cause: community opposition / halted","tracker":"delay"},"delay:tax_incentive_change:litigation_active":{"id":"delay:tax_incentive_change:litigation_active","label":"Delay cause: tax incentive change / litigation_active","tracker":"delay"},"delay:corporate_realignment:delayed":{"id":"delay:corporate_realignment:delayed","label":"Delay cause: corporate realignment / delayed","tracker":"delay"},"delay:tax_incentive_change:cancelled":{"id":"delay:tax_incentive_change:cancelled","label":"Delay cause: tax incentive change / cancelled","tracker":"delay"},"delay:financing:litigation_active":{"id":"delay:financing:litigation_active","label":"Delay cause: financing / litigation_active","tracker":"delay"},"delay:state_moratorium:halted":{"id":"delay:state_moratorium:halted","label":"Delay cause: state moratorium / halted","tracker":"delay"},"delay:state_moratorium:litigation_active":{"id":"delay:state_moratorium:litigation_active","label":"Delay cause: state moratorium / litigation_active","tracker":"delay"},"delay:state_moratorium:cancelled":{"id":"delay:state_moratorium:cancelled","label":"Delay cause: state moratorium / cancelled","tracker":"delay"},"delay:water_dispute:withdrawn":{"id":"delay:water_dispute:withdrawn","label":"Delay cause: water dispute / withdrawn","tracker":"delay"},"delay:interconnection_queue:halted":{"id":"delay:interconnection_queue:halted","label":"Delay cause: interconnection queue / halted","tracker":"delay"},"delay:interconnection:cancelled":{"id":"delay:interconnection:cancelled","label":"Delay cause: interconnection / cancelled","tracker":"delay"},"delay:financing:cancelled":{"id":"delay:financing:cancelled","label":"Delay cause: financing / cancelled","tracker":"delay"},"delay:interconnection:denied":{"id":"delay:interconnection:denied","label":"Delay cause: interconnection / denied","tracker":"delay"},"delay:water:cancelled":{"id":"delay:water:cancelled","label":"Delay cause: water / cancelled","tracker":"delay"},"delay:water:denied":{"id":"delay:water:denied","label":"Delay cause: water / denied","tracker":"delay"},"delay:zoning_denial:halted":{"id":"delay:zoning_denial:halted","label":"Delay cause: zoning denial / halted","tracker":"delay"},"delay:permit_denial:halted":{"id":"delay:permit_denial:halted","label":"Delay cause: permit denial / halted","tracker":"delay"},"delay:council_vote_delay:final_vote_delayed":{"id":"delay:council_vote_delay:final_vote_delayed","label":"Delay cause: council vote delay / final_vote_delayed","tracker":"delay"},"delay:community_opposition:final_vote_delayed":{"id":"delay:community_opposition:final_vote_delayed","label":"Delay cause: community opposition / final_vote_delayed","tracker":"delay"},"utility:tariff:pending":{"id":"utility:tariff:pending","label":"Utility action: tariff / pending","tracker":"delay"},"utility:statement:pending":{"id":"utility:statement:pending","label":"Utility action: statement / pending","tracker":"delay"},"utility:tariff:contested":{"id":"utility:tariff:contested","label":"Utility action: tariff / contested","tracker":"delay"},"utility:other:pending":{"id":"utility:other:pending","label":"Utility action: other / pending","tracker":"delay"},"utility:tariff:approved":{"id":"utility:tariff:approved","label":"Utility action: tariff / approved","tracker":"delay"},"utility:rate case:approved":{"id":"utility:rate case:approved","label":"Utility action: rate case / approved","tracker":"delay"},"utility:special contract:approved":{"id":"utility:special contract:approved","label":"Utility action: special contract / approved","tracker":"delay"},"utility:rate case:pending":{"id":"utility:rate case:pending","label":"Utility action: rate case / pending","tracker":"delay"},"utility:special contract:denied":{"id":"utility:special contract:denied","label":"Utility action: special contract / denied","tracker":"delay"},"utility:statement:contested":{"id":"utility:statement:contested","label":"Utility action: statement / contested","tracker":"delay"},"utility:IRP:contested":{"id":"utility:IRP:contested","label":"Utility action: IRP / contested","tracker":"delay"},"utility:complaint:contested":{"id":"utility:complaint:contested","label":"Utility action: complaint / contested","tracker":"delay"},"utility:statement:approved":{"id":"utility:statement:approved","label":"Utility action: statement / approved","tracker":"delay"},"utility:IRP:pending":{"id":"utility:IRP:pending","label":"Utility action: IRP / pending","tracker":"delay"},"utility:special contract:pending":{"id":"utility:special contract:pending","label":"Utility action: special contract / pending","tracker":"delay"},"utility:other:approved":{"id":"utility:other:approved","label":"Utility action: other / approved","tracker":"delay"},"utility:other:contested":{"id":"utility:other:contested","label":"Utility action: other / contested","tracker":"delay"},"utility:IRP:approved":{"id":"utility:IRP:approved","label":"Utility action: IRP / approved","tracker":"delay"},"utility:tariff:denied":{"id":"utility:tariff:denied","label":"Utility action: tariff / denied","tracker":"delay"},"utility:certificate:approved":{"id":"utility:certificate:approved","label":"Utility action: certificate / approved","tracker":"delay"},"utility:policy:approved":{"id":"utility:policy:approved","label":"Utility action: policy / approved","tracker":"delay"},"utility:policy:effective":{"id":"utility:policy:effective","label":"Utility action: policy / effective","tracker":"delay"},"utility:tariff:effective":{"id":"utility:tariff:effective","label":"Utility action: tariff / effective","tracker":"delay"},"utility:policy:rejected":{"id":"utility:policy:rejected","label":"Utility action: policy / rejected","tracker":"delay"},"utility:policy:pending":{"id":"utility:policy:pending","label":"Utility action: policy / pending","tracker":"delay"},"utility:rate_case:pending":{"id":"utility:rate_case:pending","label":"Utility action: rate_case / pending","tracker":"delay"},"utility:other:denied":{"id":"utility:other:denied","label":"Utility action: other / denied","tracker":"delay"},"utility:other:effective":{"id":"utility:other:effective","label":"Utility action: other / effective","tracker":"delay"}},"warnings":[],"credits":["6abc Philadelphia","AEP Ohio Transmission Company (filed with Ohio Power Siting Board)","AI GridWatch moratorium tracker, CC BY 4.0 (aigridwatch.com)","Alabama Reflector","Alaska Beacon","American Transmission Company LLC (filed with PSC of Wisconsin)","Americus Times-Recorder","Arizona Mirror","Arkansas Advocate","Axios Pro Energy","Bisnow","Bisnow National","Bradenton Herald","CNBC Technology","Cardinal News VA","Central Florida Public Media","Chesterfield County public permit records","Chicago Construction News","City of Atlanta public permit records","City of Austin issued construction permits open data","City of Buckeye public permit records","City of Chandler public permit records","City of Charlotte public permit records","City of Chicago building permits open data","City of Fort Worth public permit records","City of Goodyear public permit records","City of Hillsboro public permit records","City of Mesa building permits open data","City of Mesa public permit records","City of Minneapolis construction permits (CCS) open data","City of Papillion public permit records","City of Phoenix public permit records","City of Red Oak public permit records","City of Reno public permit records","City of San Antonio public permit records","City of Statesboro, Georgia","City of Temple, Texas","Clearfield City Council (Utah Public Notice Website)","Colorado Newsline","Colorado Public Radio","Congress.gov (Library of Congress, public domain)","ConstructConnect News","Construction Dive","CourtListener DataCenter Dockets","CourtListener Opinions","Data Center Dynamics","Data Center Dynamics news","DataCenterTracker.org, CC BY 4.0","Dominion Energy Virginia","EIN News","East Bay Insiders Newsletter","Energy Central","FOX19 | Cincinnati","FOX5 Vegas","FOX6 News Milwaukee","Facilities Dive","Fairfax County public permit records","Florida Phoenix","Georgia Department of Community Affairs","Georgia EPD air permit records","Georgia Recorder","GovTech","Greensboro News and Record","Grist","Idaho Capital Sun","Illinois EPA air permit records","Indiana Capital Chronicle","Indiana Department of Environmental Management","Indiana IDEM air permit records","InkFreeNews.com","Iowa Capital Dispatch","Iowa DNR air permit records","KERA News","KEYC News Now","KGW","KRON4","Kansas City MO city issued permits open data","Kansas Reflector","Kentucky Lantern","Law360","Law360 Energy","LegiScan (legiscan.com) and the state legislature","Lehigh Valley Planning Commission","Local News Matters","Loudoun County public permit records","Loudoun Times-Mirror","Louisiana DEQ air permit records","Louisiana Illuminator","Maine Morning Star","Maricopa County Air Quality Department air permit records","Maricopa County public permit records","Maryland Matters","Mecklenburg County public permit records","Michigan Advance","Mid Bay News","Missouri Independent","Montana Free Press","NBC Bay Area","NBC4 Washington","NC Newsline","Native News Online","Nebraska Examiner","Nevada Current","Nevada NDEP air permit records","New Hampshire Bulletin","New Mexico Environment Department","North Carolina DEQ Division of Air Quality air permit records","North Dakota Department of Environmental Quality","North Dakota Monitor","Ohio Capital Journal","Ohio EPA air permit records","Oklahoma DEQ air permit records","Oklahoma Voice","OpenStates v3 (openstates.org), CC BY 4.0","Oregon Capital Chronicle","Orlando Sentinel","Pennsylvania Capital-Star","Pennsylvania Department of Environmental Protection","Pennsylvania Office of Consumer Advocate (filed with PA PUC)","Pioneer Press","Prince William County public permit records","Public Service Commission of Wisconsin","Public record (Legistar Web API, Granicus)","Rhode Island Current","Route Fifty","SEC EDGAR company submissions, public domain","SEC EDGAR full-text search, public domain","Searchlight New Mexico","Smithfield Township, Monroe County, PA","Source New Mexico","South Carolina Department of Environmental Services","South Dakota Searchlight","Springfield Daily Citizen","Stafford County public permit records","Statesman Journal","Strisker data center notes","Tennessee Lookout","Texas Commission on Environmental Quality","Texas TCEQ air permit records","The Baltimore Banner","The Current (GA)","The Detroit News","The Hill Energy","The North State Journal","The Pantagraph","The Real Deal","The Register","The Texas Tribune","The Verge","Times-Standard","Town of Culpeper public permit records","Tuscaloosa Thread","U.S. EPA ECHO","Union-Bulletin","Uprise RI","Utah Division of Air Quality","Utah Division of Air Quality air permit records","Utah News Dispatch","Utah Public Radio","Utility Dive","Virginia Business","Virginia DEQ air permit records","Virginia Electric and Power Company (filed with Virginia SCC)","Virginia Mercury","Visalia Times-Delta","WBUR","WCPO 9 Cincinnati","WGLT","WHEC.com","WJON","WKYT","WLOS","WLUK","WPBF","WQCS","WRAL (NC)","WUNC News","WVPE","Washington County public permit records","Washington Ecology air permit records","Washington State SEPA Register public permit records","Washington State Standard","Washoe County public permit records","Wausau Pilot & Review","West Virginia Watch","Winston-Salem Journal","Wisconsin Department of Natural Resources","Wisconsin Examiner","Yale Daily News","citybiz","contracosta.news","ictnews.org","indianapublicradio.org","inkfreenews.com","lex18.com","mountaintimesoregon.com","newmedia-wi.com","newscentermaine.com","thegazette.com","tuscaloosathread.com","wcpo.com","www.cities929.com"],"omitted":{"unverified_or_pending":1013,"no_explicit_state":136},"revision":"8bbc0d7f56a15216","trackers":{"policy":{"label":"Policy provisions","url":"#policy-governance"},"moratorium":{"label":"Restrictions & moratoriums","url":"/data-center-moratorium-tracker"},"delay":{"label":"Delays & utility actions","url":"/data-center-delay-tracker"},"water":{"label":"Water measures","url":"/data-center-water-tracker"},"atlas":{"label":"Projects & capital","url":"/data-center-capital-atlas"},"permits":{"label":"Permits & facilities","url":"/data-center-permits-tracker"},"grid":{"label":"Grid operator rules","url":"/data-center-grid-operator-watchlist"}},"selected":{"id":"WY","name":"Wyoming","records":[{"id":"3759c61384969584","state":"WY","tracker":"atlas","section":"sites","title":"Cheyenne data center","summary":"Cheyenne, Wyoming, will be home to Meta's newest data center, its 21st in the U.S. The 715,000-square-foot campus will represent an investment of more than $800 million and support approximately 100 jobs.  an investment of more than $800 million","scope":"Record-specific: Cheyenne","status":"announced","date":"Announced July 2024","sources":[{"url":"https://datacenters.atmeta.com/2024/07/hello-cheyenne/","label":"Meta Data Centers"}],"parties":[{"role":"Entity","name":"meta"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"98fa34254dd90d0c","state":"WY","tracker":"atlas","section":"at_risk","title":"Cox Ranch data center annexation and rezoning (Skybox Datacenters and ViaWest Group)","summary":"The Cox Ranch annexation for a data center campus was introduced in April 2026, drew public backlash and was unanimously postponed by the Cheyenne City Council until September. On Monday 28 September 2026 the council approved the annexation 8-2 on third and final reading and approved the accompanying zoning, allowing Skybox Datacenters and ViaWest Group to proceed. Residents criticized the city's handling of data center expansion at the meeting.","scope":"Record-specific: Cheyenne City Council","status":"approved_after_delay","date":"Postponed April 2026; approved 8-2 on Monday 28 September 2026","sources":[{"url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/","label":"Cowboy State Daily"},{"url":"https://www.wyomingnews.com/news/local_news/cox-ranch-annexation-rezoning-for-data-center-passes-five-months-after-introduction/article_079fc6d3-db2d-44a5-a1dd-e31a75a09b7e.html","label":"Wyoming Tribune Eagle"},{"url":"https://capcity.news/news/2026/09/28/cheyenne-approves-1260-acre-cox-ranch-addition-after-final-vote/","label":"Cap City News"},{"url":"https://www.wyomingnews.com/laramieboomerang/news/cox-ranch-data-center-developers-outline-project-commitments-at-cheyenne-city-council-work-session/article_d3952c20-60ab-4b4c-9b65-fe69dec3e13b.html","label":"Wyoming Tribune Eagle"}],"parties":[{"role":"Developer","name":"Skybox Datacenters and ViaWest Group"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2667bf9e155b262b","state":"WY","tracker":"atlas","section":"sites","title":"Cox Ranch data center campus","summary":"The Cheyenne City Council voted 8-2 on third and final reading on Monday 28 September 2026 to annex Cox Ranch, an agricultural site west of Roundtop Road and adjacent to Happy Jack Road, and approved the zoning that lets Skybox Datacenters and ViaWest Group proceed with a planned data center campus. The annexation was introduced in April 2026, met public backlash and was postponed until September. The end user has not been named. Council members Lawrence Wolfe and Mark Moody voted no.  Not disclosed Not disclosed; about 1,260 acres annexed (Wyoming Tribune Eagle gives about 1,198 acres for the owner-requested annexation, with a city-owned parcel zoned public)","scope":"Record-specific: Cheyenne","status":"approved","date":"Annexation and rezoning approved 8-2 on Monday 28 September 2026; first introduced April 2026 and postponed to September","sources":[{"url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/","label":"Cowboy State Daily"},{"url":"https://www.wyomingnews.com/news/local_news/cox-ranch-annexation-rezoning-for-data-center-passes-five-months-after-introduction/article_079fc6d3-db2d-44a5-a1dd-e31a75a09b7e.html","label":"Wyoming Tribune Eagle"}],"parties":[{"role":"Entity","name":"Skybox Datacenters"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"39b0a5972673cce2","state":"WY","tracker":"atlas","section":"at_risk","title":"Crux AI (Google-Blackstone venture) Cheyenne site","summary":"Bloomberg reported on 8 September 2026 that the Google and Blackstone cloud venture has hit delays at major data center locations intended to run Google's chips, among them a data center being developed in Cheyenne, Wyoming. Executives involved with the venture, reported internally as Project Braid, are described as having accepted that data center projects now carry roughly a 50% chance of meeting delivery dates, against about 90% three years ago, with organized opposition, switchgear supply shortages and skilled labor constraints cited as causes. The venture, publicly named Crux AI, was launched with an initial $5 billion equity commitment from Blackstone and targets a first 500 MW in 2027. This record captures a reported schedule delay, not a cancellation, and the parties have not confirmed a revised delivery date.","scope":"Record-specific: Cheyenne","status":"delayed","date":"Reported 8 September 2026","sources":[{"url":"https://www.bloomberg.com/news/articles/2026-09-08/google-blackstone-venture-faces-delays-at-data-center-sites","label":"Bloomberg"},{"url":"https://www.datacenterdynamics.com/en/news/google-and-blackstone-jv-experiences-delays-in-data-center-projects-report/","label":"DCD"},{"url":"https://finance.yahoo.com/technology/ai/articles/google-blackstone-venture-faces-delays-202510079.html","label":"Yahoo Finance"}],"parties":[{"role":"Developer","name":"Crux AI (Blackstone and Google joint venture)"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5baaceea772d9b84","state":"WY","tracker":"atlas","section":"at_risk","title":"Microsoft Highlands data center campus annexation (about 3,460 acres, south Cheyenne)","summary":"Laramie County homeowner Heather Madrid Donis filed two petitions in Laramie County District Court in September 2026 challenging the city's approval of the roughly 3,460-acre annexation for Microsoft's proposed 2.7 GW Highlands campus. One, filed 3 September, asks the court to void the 13 July annexation because the ordinance names U.S. Sen. Cynthia Lummis as landowner although Microsoft said it closed on the property 26 June; the other alleges the council violated the Open Meetings Act on 10 August when, after an executive session, it voted 8-1 to seek a court ruling on whether the annexation is subject to a referendum instead of acting on a petition with more than 3,000 signatures. The city declined to comment on ongoing litigation.","scope":"Record-specific: Laramie County District Court / City of Cheyenne","status":"litigation","date":"Annexation approved 13 July 2026; petitions filed September 2026 (one on 3 September); reported 25 September 2026","sources":[{"url":"https://cowboystatedaily.com/2026/09/25/cheyenne-woman-asks-court-to-overturn-3-500-acre-microsoft-data-center-annexation/","label":"Cowboy State Daily"}],"parties":[{"role":"Developer","name":"Microsoft"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b7c2d87bc3fb0193","state":"WY","tracker":"atlas","section":"sites","title":"Microsoft southeast Cheyenne data center expansion annexation (3,460 acres)","summary":"Cheyenne City Council approved Microsoft's request to annex about 3,460 acres east of South Greeley Highway and south of the Sweetgrass subdivision to expand its Cheyenne data center operations, with Councilmen Mark Moody, Larry Wolfe and Pete Laybourn voting against after a motion to delay six months failed. Microsoft officials have said the buildout will take 10 to 20 years. Public debate centered on water use, environmental impact, infrastructure demands and transparency  Not disclosed in the fetched coverage Not disclosed in the fetched coverage","scope":"Record-specific: Cheyenne","status":"approved","date":"Approved in the early hours of Tuesday 14 July 2026; reported 16 to 17 July 2026; single-outlet report (Wyoming Tribune Eagle via Yahoo News)","sources":[{"url":"https://www.yahoo.com/news/us/articles/cheyenne-city-council-approves-microsofts-035900167.html","label":"Wyoming Tribune Eagle via Yahoo News"}],"parties":[{"role":"Entity","name":"Microsoft"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"0a09c6f6636219a7","state":"WY","tracker":"atlas","section":"at_risk","title":"Orchard Hills data center rezoning (Trammell Crow)","summary":"The Planning Commission recommended denial of the land-use map and rezoning amendments on 8 September 2026; the council held first reading and a public hearing without a vote on 14 September 2026, and the first annexation vote is set for 28 September 2026. On Monday 21 September 2026 the council's Public Services Committee recommended approval of the annexation and initial agricultural zoning on second reading, voted to amend the zoning map and to overrule the Planning Commission's denial of the future land-use map amendment, and postponed the land-use map item to align with the annexation process. The 162-acre site adjoins Meta's Cheyenne campus. The council did not take final action on 28 September 2026; Cowboy State Daily reported on 29 September 2026 that final votes on the 162-acre Orchard Hills annexation are scheduled for 12 October 2026. At the same 28 September meeting the council approved, 8-2 on third reading, the separate 1,260-acre Cox Ranch annexation and business park rezoning for a Skybox Data Centers and ViaWest Group data center. The Wyoming Tribune Eagle reported on 1 October 2026 that at the Monday 28 September 2026 meeting the council approved on second reading the annexation of the 162-acre site, its initial agricultural zoning and the change to light industrial zoning, and voted to overrule the Planning Commission's unanimous denial of the related future land-use map; the resolution changing the land-use designation was postponed to 12 October 2026 to align with the annexation.","scope":"Record-specific: City of Cheyenne","status":"other","date":"Denial recommended by Planning Commission 8 September 2026; council approved annexation and zoning on second reading and overruled the commission 28 September 2026; final votes scheduled 12 October 2026","sources":[{"url":"https://www.yahoo.com/news/us/articles/orchard-hills-data-center-enters-171600526.html","label":"Wyoming Tribune Eagle via Yahoo News"},{"url":"https://www.buffalobulletin.com/news/cheyenne-city-council-committee-backs-orchard-hills-data-center-recommends-overruling-planning-commission/article_b57189b6-9e75-45b0-8b8c-04374269704b.html","label":"Wyoming Tribune Eagle via Buffalo Bulletin"},{"url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/","label":"Cowboy State Daily"},{"url":"https://www.wyomingnews.com/news/local_news/city-council-advances-orchard-hills-data-center-items-ahead-of-oct-12-final-vote/article_68bddf3a-2f83-4275-a559-d4db3378851e.html","label":"Wyoming Tribune Eagle"}],"parties":[{"role":"Developer","name":"Trammell Crow"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"6906364bd8040c11","state":"WY","tracker":"atlas","section":"at_risk","title":"Project Jade (Crusoe and Tallgrass Cheyenne campus)","summary":"On Tuesday 9 June 2026 Crusoe said that, at the request of its customer, it had paused development activities on Project Jade, the 1.8 GW campus it was developing with Tallgrass; Tallgrass confirmed Crusoe had demobilized and left the site months earlier and said its power work continued. Bloomberg, as relayed by TechRadar, reported that customers including Google had raised concerns over cost and construction time. The campus has since moved forward as Google's Project Tembo with Tallgrass, with four data center buildings instead of five (see site google-project-tembo-laramie-wy).","scope":"Record-specific: Laramie County","status":"restarted","date":"Crusoe pause statement 9 June 2026; campus presented by Google as Project Tembo 9 September 2026","sources":[{"url":"https://www.yahoo.com/news/us/articles/crusoe-pulls-project-jade-data-035900867.html","label":"Wyoming Tribune Eagle (via Yahoo), 9 June 2026"},{"url":"https://www.msn.com/en-us/money/real-estate/crusoe-paused-wyoming-data-center-plan-after-failing-to-win-customers-including-google/ar-AA25uYz9","label":"TechRadar Pro (via MSN), 12 June 2026"},{"url":"https://www.msn.com/en-us/money/general/be-stock-recovers-after-10-selloff-morgan-stanley-says-crusoe-project-pause-does-not-break-ai-power-thesis/ar-AA25lF1V","label":"Stocktwits (via MSN), 11 June 2026"},{"url":"https://www.wyomingnews.com/laramieboomerang/news/google-outlines-17b-project-tembo-data-center-campus-planned-for-laramie-county/article_1c1c3912-f785-480c-9ed6-aa005fb3418a.html","label":"Wyoming Tribune Eagle, 12 September 2026"}],"parties":[{"role":"Developer","name":"Crusoe (data center) and Tallgrass (power); now Google as Project Tembo"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"6488ac0f407b75a3","state":"WY","tracker":"atlas","section":"sites","title":"Project Latigo campus","summary":"The Laramie County Board of County Commissioners approved a zone change from Land Use to Planned Unit Development on 1 September 2026 for 1,835 acres about 12 miles south of Cheyenne, near Terry Ranch Road between Interstate 25 and U.S. Highway 85. Vantage Data Centers described an investment of up to $20 billion at completion and up to 2,000 jobs, across four data center buildings with staging areas, access routes and modular worker housing. Vantage must submit a site plan to the county for approval before construction. First-phase construction is slated to begin as early as 2027, with phase one completion targeted in 2030. On-site natural gas generation using Wyoming gas; closed-loop cooling, with the permit application stating that for every 100 gallons of water used 110 will be restored up to $20 billion when completed, as stated by the developer to the county Reported as a 480 MW project; permitting is stated to begin in late 2026 and continue into 2027","scope":"Record-specific: Cheyenne","status":"announced","date":"Zone change approved 1 September 2026; permitting late 2026 into 2027; construction from 2027; phase one completion targeted 2030","sources":[{"url":"https://capcity.news/community/county-community/2026/09/01/vantage-data-center-gets-zone-change-ok-from-laramie-county-tuesday/","label":"Cap City News"},{"url":"http://www.wyomingnews.com/news/local_news/commissioners-approve-zone-change-for-vantage-data-center-south-of-cheyenne/article_ee336047-ce8e-4c25-8300-3af52862357c.html","label":"Wyoming Tribune Eagle"}],"parties":[{"role":"Entity","name":"vantage-data-centers"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"7115e111afba0a38","state":"WY","tracker":"atlas","section":"sites","title":"Project Tembo (formerly Project Jade), Switchgrass Industrial Park","summary":"A site-plan amendment filed 30 June 2026 with Laramie County Planning and Development identified Google, through Jupiter Star Holdings LLC, as the owner of the 716-acre campus previously known as Project Jade. The plan covers four data center halls, an office hub, logistics and network buildings, new access roads off U.S. 85 and on-site wastewater lagoons. The original Project Jade received a conditional-use permit in January 2026, and a public hearing on the amendment was scheduled for 13 August 2026. The outcome of that hearing was not confirmed in the fetched sources At a community meeting in Cheyenne on 9 September 2026 Google said Project Tembo represents a $17 billion investment. The resubmitted, scaled-back site plan has four data center buildings instead of five with about 1 million fewer square feet and was handled administratively by the county; Google added a two-story office building that requires a conditional use permit. Related Digital is lead developer managing construction, Tallgrass will develop adjacent power generation keeping the campus off the local Cheyenne grid, and Google said it did not pursue local incentives. Site development may begin by the end of 2026, with some data halls operating in the second half of 2028 and full build-out near the end of 2031, and the project is expected to employ up to 2,500 construction workers and about 250 operations staff Tallgrass Energy to combine energy resources from Black Hills Energy, fuel cells and its power plant to serve the campus Google stated a $17 billion investment at a Laramie County community meeting on 9 September 2026 2.7 GW initially, scalable to 10 GW, per the site-plan amendment coverage; planned completion by 2031","scope":"Record-specific: Cheyenne (8 miles south)","status":"approved","date":"Google ownership reported 8 July 2026 from the 30 June 2026 county filing","sources":[{"url":"https://cowboystatedaily.com/2026/07/08/google-revealed-as-owner-of-wyomings-largest-data-center-now-project-tembo/","label":"Cowboy State Daily"},{"url":"https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-august-2026","label":"Data Center Knowledge (August 2026 roundup)"},{"url":"https://oilcity.news/business-feature-2/2026/09/11/google-stepping-in-for-crusoe-pitches-700-acre-data-center-campus-to-laramie-county-on-wednesday/","label":"Oil City News (Cap City News)"}],"parties":[{"role":"Entity","name":"alphabet"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"09ca59ae29927f32","state":"WY","tracker":"atlas","section":"sites","title":"Site Layer 4 Goshen Hole data center and energy campus","summary":"Platte County commissioners unanimously rezoned 5,344 acres of ranchland in Goshen Hole, northeast of Wheatland, to industrial for a utility-scale energy generation, storage and data center campus proposed by Site Layer 4, LLC. Conditions include reversion to prior zoning if construction does not begin within five years and a special-use permit for any use. At a 2 September 2026 public hearing, Platte County commissioners approved rezoning 5,344 acres of Lazy V6 Ranch land along the Goshen Hole rim from RAM to Industrial for the Site Layer 4 energy and data center campus, with conditions: a five-year sunset reverting the zoning if construction does not begin, county review of any subdivision, and a required Special Use Permit with full engineering, environmental, water and traffic studies before construction. The developer said it expects to use about 15 acre-feet of water a year with closed-loop cooling from a private commercial supplier Co-located utility-scale generation and energy storage planned; project would generate its own power Local reporting in July 2026 described a $26 billion project; no developer filing or release confirming the figure was fetched, so capital is left null No MW disclosed","scope":"Record-specific: near Wheatland","status":"rezoning approved","date":"Rezoning approved early September 2026 (reported 3 September 2026); project first reported 13 July 2026","sources":[{"url":"https://cowboystatedaily.com/2026/09/02/platte-county-commissioners-push-back-then-ok-industrial-zoning-for-data-center/","label":"Cowboy State Daily (rezoning vote)"},{"url":"https://cowboystatedaily.com/2026/07/13/ranchlands-near-wheatland-eyed-for-26-billion-transformational-data-center/","label":"Cowboy State Daily (project proposal)"},{"url":"https://www.wyomingnews.com/news/local_news/conditional-approval-granted-for-ram-to-industrial-rezone-opposition-fears-irrevocable-infrastructure-strain-lifestyle-disruption/article_2d709335-c105-4833-9a10-b5e3a2f0c530.html","label":"Wyoming Tribune Eagle (Platte County Record-Times)"}],"parties":[{"role":"Entity","name":"Site Layer 4, LLC"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"9ac758c19d8b714a","state":"WY","tracker":"atlas","section":"sites","title":"Vantage Data Centers Project Latigo (Terry Ranch Road)","summary":"The Laramie County Board of County Commissioners approved rezoning the site 12 miles south of Cheyenne from Land Use to Planned Unit Development for Project Latigo, framing a campus with cooling plants, onsite generation and temporary workforce housing. Vantage said the project could bring up to 2,000 jobs and hopes to begin construction in 2027 with work continuing into 2030. Vantage described the rezoning as one of its first entitlement steps Onsite power generation planned using Wyoming natural gas; closed-loop cooling with onsite wells Up to $20 billion at completion per Vantage government affairs manager Matt Clark 480 MW on an 1,835-acre site","scope":"Record-specific: South of Cheyenne","status":"rezoning approved","date":"Rezoning approved Tuesday 1 September 2026; reported 3 September 2026; single-outlet report (Wyoming Tribune Eagle)","sources":[{"url":"https://www.wyomingnews.com/news/local_news/commissioners-approve-zone-change-for-vantage-data-center-south-of-cheyenne/article_ee336047-ce8e-4c25-8300-3af52862357c.html","label":"Wyoming Tribune Eagle"}],"parties":[{"role":"Entity","name":"Vantage Data Centers"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"61e51c2041e827ee","state":"WY","tracker":"atlas","section":"sites","title":"Wyoming pipeline capacity","summary":"The Series E first-close disclosure cited 1.8GW in Wyoming alongside 1.2GW at Abilene within a 45GW pipeline. No city or further detail is given. County 17 reported on 11 September 2026 that the 700-acre Laramie County project switched from Crusoe to Google earlier in summer 2026 and is now Google's Project Tembo, which Google representatives described as a $17 billion investment with four data center buildings  n.a. 1.8GW in Wyoming, cited in the Series E disclosure within a 45GW pipeline","scope":"Record-specific:","status":"announced","date":"cited October 24, 2025","sources":[{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-announces-series-e-funding","label":"Crusoe"},{"url":"https://county17.com/2026/09/11/google-stepping-in-for-crusoe-pitches-700-acre-data-center-campus-to-laramie-county-on-wednesday/","label":"County 17"}],"parties":[{"role":"Entity","name":"crusoe-energy"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"2e0818019f3d14fe","state":"WY","tracker":"delay","section":"utility_actions","title":"Black Hills Corporation","summary":"Black Hills Corporation serves data center and blockchain customers in the Cheyenne, Wyoming area under approved tariffs using a market energy procurement model. Earnings from these customers are separated from retail customers for rate-making purposes, providing utility-like returns without utility capital investment.","scope":"Record-specific: WY","status":"approved","date":null,"sources":[{"url":"https://www.investing.com/news/stock-market-news/earnings-call-black-hills-corporation-reports-q1-growth-eyes-renewables-93CH-3433007","label":"www.investing.com"}],"parties":[{"role":"Named utility / authority","name":"Black Hills Corporation"}],"groups":["utility:tariff:approved"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"48ce507193eae507","state":"WY","tracker":"delay","section":"utility_actions","title":"Black Hills Energy","summary":"The Wyoming Public Service Commission approved Black Hills Energy’s Large Power Contract Service Tariff. The tariff allows qualifying Wyoming retail customers with loads over 13 MW to use customer-owned, behind-the-meter dispatchable generation during periods of high demand while Black Hills Energy purchases market power, including renewable energy, at a firm price.","scope":"Record-specific: WY","status":"approved","date":"2020-05","sources":[{"url":"https://datacenters.blackhillsenergy.com/resources/energy-solutions-data-centers","label":"datacenters.blackhillsenergy.com"}],"parties":[{"role":"Named utility / authority","name":"Black Hills Energy"}],"groups":["utility:tariff:approved"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b06ef4aba51b6d71","state":"WY","tracker":"delay","section":"utility_actions","title":"Black Hills Energy (Cheyenne Light, Fuel & Power)","summary":"Black Hills stated that the proposed 1.8-gigawatt data center project in Cheyenne continues to move forward. Its Wyoming electric utility subsidiary filed a Certificate of Public Convenience and Necessity for a supporting substation in January, executed a substation agreement with the large-load customer, and expects service under its Large Power Contract Service Tariff.","scope":"Record-specific: WY","status":"pending","date":null,"sources":[{"url":"https://www.investing.com/news/company-news/black-hills-continues-18gigawatt-wyoming-data-center-project-93CH-4735293","label":"www.investing.com"}],"parties":[{"role":"Named utility / authority","name":"Black Hills Energy (Cheyenne Light, Fuel & Power)"}],"groups":["utility:other:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"103e672184e6c568","state":"WY","tracker":"delay","section":"utility_actions","title":"Cheyenne Light, Fuel & Power Company, doing business as Black Hills Energy","summary":"Black Hills Energy serves qualifying Wyoming data center customers through its Large Power Contract Service tariff, which has been in place since 2016. The tariff was developed with an early data center customer to support growing industrial and data center load while protecting other customers from risks associated with large-scale capacity additions and rate impacts.","scope":"Record-specific: WY","status":"approved","date":null,"sources":[{"url":"https://ir.blackhillscorp.com/news-releases/news-release-details/black-hills-corp-power-metas-new-data-center-wyoming-innovative/","label":"ir.blackhillscorp.com"}],"parties":[{"role":"Named utility / authority","name":"Cheyenne Light, Fuel & Power Company, doing business as Black Hills Energy"}],"groups":["utility:tariff:approved"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"31c5bf9bd2103358","state":"WY","tracker":"delay","section":"utility_actions","title":"Cheyenne Light, Fuel and Power Company, doing business as Wyoming Electric and Black Hills Energy","summary":"Wyoming Electric entered into a generation reservation agreement with a prospective customer seeking to construct a 1.8 GW data center under its Large Power Contract Service tariff. The agreement received refundable advances and was amended in July 2026 to increase those advances to $377 million and extend the maturity date to August 31, 2026.","scope":"Record-specific: WY","status":"pending","date":"2026-04-22","sources":[{"url":"https://www.stocktitan.net/sec-filings/BKH/10-q-black-hills-corp-sd-quarterly-earnings-report-cbf4dc8a162e.html","label":"www.stocktitan.net"}],"parties":[{"role":"Named utility / authority","name":"Cheyenne Light, Fuel and Power Company, doing business as Wyoming Electric and Black Hills Energy"}],"groups":["utility:special contract:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e17e09b2526a4e84","state":"WY","tracker":"delay","section":"projects","title":"Cox Ranch addition","summary":"The Cheyenne City Council voted 8-2 on September 28, 2026 on final reading to annex and zone the 1,259.91-acre Cox Ranch property for data center development by SkyBox Data Centers and ViaWest Group. The land received a Business Park designation. Councilors Lawrence Wolfe and Mark Moody voted no, and residents of the neighboring Rolling Hills area raised noise, light and traffic concerns. The developers still need site plan and permit approvals.","scope":"Record-specific: Cheyenne","status":"approved_amid_opposition","date":"2026-09-28","sources":[{"url":"https://capcity.news/news/2026/09/28/cheyenne-approves-1260-acre-cox-ranch-addition-after-final-vote/","label":"capcity.news"}],"parties":[{"role":"Operator","name":"SkyBox Data Centers and ViaWest Group"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"92f671556b157534","state":"WY","tracker":"delay","section":"lawsuits","title":"LAWSUIT-Donis-v-City-of-Cheyenne-Microsoft-Highlands-2026-09","summary":"In July 2026 the Cheyenne City Council approved the annexation of roughly 3,460 acres for Microsoft's proposed 2.7-gigawatt Highlands data center campus. On August 10, 2026 the council allegedly took an unannounced vote on a citizen referendum petition seeking to overturn the approval. In September 2026 resident Heather Madrid Donis filed two petitions in Laramie County District Court asking a judge to overturn the annexation. One petition alleges the wrong landowner is listed on the annexation paperwork and the other alleges the August 10 vote violated the Open Meetings Act. The city declined to comment on ongoing litigation, and no hearing date or case number is reported.","scope":"Record-specific: WY","status":"litigation_active","date":null,"sources":[{"url":"https://cowboystatedaily.com/2026/09/25/cheyenne-woman-asks-court-to-overturn-3-500-acre-microsoft-data-center-annexation/","label":"cowboystatedaily.com"}],"parties":[],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e49bdf2a9b9141ad","state":"WY","tracker":"delay","section":"projects","title":"Prometheus Hyperscale data center","summary":"At their September 15, 2026 meeting at the Mountain View Town Hall, the Uinta County commissioners approved a conditional use permit for independent power production for data center developer Prometheus Hyperscale, and granted a map amendment rezoning a 644-acre subdivision from agricultural resource development to business industrial. The planning and zoning commission had approved the permit on August 26. The permit carries 13 conditions. The data center itself received its conditional use permit in June.","scope":"Record-specific: Uinta County","status":"approved_amid_opposition","date":"2026-09-15","sources":[{"url":"https://www.wyomingnews.com/news/local_news/uinta-county-approves-permit-for-incoming-data-center-s-power-grid/article_0e238d3c-5b6e-4be4-98d8-cc9e034e5bc8.html","label":"www.wyomingnews.com"}],"parties":[{"role":"Operator","name":"Prometheus Hyperscale"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"485e938db7389166","state":"WY","tracker":"delay","section":"projects","title":"Site Layer 4 energy and data center campus","summary":"Platte County commissioners unanimously approved a request by Site Layer 4, LLC to rezone 5,344 acres of private ranchland in Goshen Hole to industrial use for a data center and energy campus, after nearly four hours of questions. Four conditions were attached: the land reverts to its prior zoning if construction has not begun within five years, an industrial park subdivision plan must come before the commissioners, any use of the property requires a special use permit, and the owner must sign acceptance of the conditions. Capacity was not disclosed.","scope":"Record-specific: Platte County","status":"approved_amid_opposition","date":"2026-09-02","sources":[{"url":"https://cowboystatedaily.com/2026/09/02/platte-county-commissioners-push-back-then-ok-industrial-zoning-for-data-center/","label":"cowboystatedaily.com"}],"parties":[{"role":"Operator","name":"Site Layer 4, LLC"}],"groups":[],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"b1729fb79f6ff5af","state":"WY","tracker":"delay","section":"utility_actions","title":"Tri-State G&T","summary":"Tri-State refiled its High Impact Load Tariff with FERC on March 26, 2026, after an initial rejection in October 2025 without prejudice. The tariff establishes a process for evaluating and integrating loads greater than 45 MW, or loads expected to exceed 45 MW within four years, and includes a Bring Your Own Resource option.","scope":"Record-specific: WY","status":"pending","date":"2026-03-26","sources":[{"url":"https://wyoleg.gov/InterimCommittee/2026/07-202605216-01WY_Cooperative_Large_Load_SolutionsRev5.pdf","label":"wyoleg.gov"}],"parties":[{"role":"Named utility / authority","name":"Tri-State G&T"}],"groups":["utility:tariff:pending"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"be934bcf6dde21e3","state":"WY","tracker":"moratorium","section":"states","title":"Data center tax exemption-repeal.","summary":"Wyoming HB 88 (2021): Data center tax exemption-repeal.. Last action 2021-04-08: H:Died in Committee Returned Bill Pursuant to HR 5-4.","scope":"State: Wyoming","status":"failed","date":"2021-04","sources":[{"url":"http://lso.wyoleg.gov/Legislation/2021/HB0088","label":"lso.wyoleg.gov"}],"parties":[],"groups":["restriction:states:failed"],"attribution":"OpenStates v3 (openstates.org), CC BY 4.0","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"3ed10f6e2d7fa4f4","state":"WY","tracker":"moratorium","section":"local","title":"Proposed zoning prohibition on data centers in most zones","summary":"At a July 2026 work session, Park County commissioners agreed on a development standards update that would prohibit data centers in most zoning districts, including residential and commercial zones, and allow them only by special-use permit in General Rural 20- and 35-acre zones and industrial zones. Commissioners directed the planning director to prepare an adoption draft for public review; no final vote had been reported.","scope":"Local: Park County","status":"proposed","date":"2026-07","sources":[{"url":"https://wyofile.com/park-county-proposes-prohibiting-data-centers-in-most-areas/","label":"wyofile.com"}],"parties":[{"role":"Jurisdiction","name":"Park County"}],"groups":["restriction:local:proposed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"d0485054fd79e820","state":"WY","tracker":"moratorium","section":"local","title":"Rejected local moratorium on data centers","summary":"12-month proposal voted down 8, 1 after 3.5 hours of public comment. The measure has no documented term.","scope":"Local: Cheyenne","status":"failed","date":"2026-05","sources":[{"url":"https://wyofile.com/cheyenne-rejects-moratorium-on-data-centers/","label":"wyofile.com"}],"parties":[{"role":"Jurisdiction","name":"Cheyenne"}],"groups":["restriction:local:failed"],"attribution":null,"provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ef8f99da95dda569","state":"WY","tracker":"permits","section":"air_permits","title":"1547 GREEN HOUSE DATA CENTER","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Cheyenne","status":"Not recorded","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_fn=DATA%20CENTER&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071034456","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"ec2f0e29feaf4ea1","state":"WY","tracker":"permits","section":"air_permits","title":"MICROSOFT CHEYENNE DATA CENTER","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Laramie","status":"Operating","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_fn=DATA%20CENTER&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070255951","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"e7f628ead0c10865","state":"WY","tracker":"permits","section":"air_permits","title":"MICROSOFT CHEYENNE DATA CENTER CYS13 & CYS14 (MICROSOFT CORP)","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Laramie County","status":"Operating","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_fn=DATA%20CENTER&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071537962","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."},{"id":"5ee57dc1c8ecb148","state":"WY","tracker":"permits","section":"air_permits","title":"MICROSOFT CHEYENNE DATA CENTER CYS17 - CYS22 (MICROSOFT CORP)","summary":"Facility listing; a permit or issuance date may not be recorded.","scope":"Facility: Laramie County","status":"Operating","date":null,"sources":[{"url":"https://echodata.epa.gov/echo/echo_rest_services.get_facility_info?output=JSON&p_fn=DATA%20CENTER&responseset=1000","label":"echodata.epa.gov"},{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071544649","label":"echo.epa.gov"}],"parties":[],"groups":[],"attribution":"U.S. EPA ECHO","provenance":"Published SAVRN record; source status retained, not newly reverified here."}],"groups":{"restriction:local:failed":["d0485054fd79e820"],"restriction:local:proposed":["3ed10f6e2d7fa4f4"],"restriction:states:failed":["be934bcf6dde21e3"],"utility:tariff:pending":["b1729fb79f6ff5af"],"utility:tariff:approved":["48ce507193eae507","2e0818019f3d14fe","103e672184e6c568"],"utility:other:pending":["b06ef4aba51b6d71"],"utility:special contract:pending":["31c5bf9bd2103358"]},"grid":[{"name":"SPP","key":"SPP","rules":[{"title":"High Impact Large Load (HILL) study process, HILLGA, and Load Limited Resource Interconnection Service (LLRIS)","summary":"Creates a HILL load category ,  new or increased commercial/industrial load of 10 MW+ at ≤69 kV or 50 MW+ at >69 kV at a single site (electric storage excluded) ,  with a 90-day study-and-approval path to interconnection agreements for loads paired with new or existing generation. HILLs must provide real-time telemetry, give the transmission operator remote-disconnect capability, hold ramp rates to no more than 20 MW/minute unless otherwise directed, install a PMU at customer expense, and meet ride-through…","status":"approved / effective (unanimous; Commissioner Rosner concurrence; compliance filing due within 30 days)","date":"2025-10-24","sources":[{"url":"https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf","label":"spp.org"}]},{"title":"Conditional High Impact Large Load Service (CHILLS) ,  non-firm bridge transmission service","summary":"Adds a new as-available, non-firm transmission service letting customers serving HILLs take energy transfers to designated delivery points, subject to curtailment and interruption when the system is constrained or during emergency conditions, until designated resources and/or network upgrades supporting long-term firm service are in place. Maximum term is seven years, intended to push customers to complete firm-service arrangements through existing tariff processes. FERC found CHILLS just and reasonable given…","status":"approved / effective","date":"2026-02-10","sources":[{"url":"https://spp.org/documents/76880/20260605_order%20-%20revisions%20to%20add%20the%20conditional%20high%20impact%20large%20load%20service_er26-1323.pdf","label":"spp.org"}]},{"title":"Expedited Resource Adequacy Study (ERAS) ,  one-time fast-track generation interconnection process","summary":"One-time expedited interconnection framework for generation needed for member resource adequacy, adopted in response to queue backlogs and projected capacity deficits. As of SPP's July 2026 informational reports, 36 active requests totaling ~13.3 GW are in the process, with Generator Interconnection Agreement negotiation/execution expected in September 2026. Thermal resources lead the ERAS mix, followed by hybrid projects.","status":"approved / in execution (36 requests ~13.3 GW; GIAs anticipated September 2026)","date":"2025-07-21","sources":[{"url":"https://www.spp.org/documents/74369/20250721_order%20accepting%20tariff%20revisions%20subject%20to%20condition%20-%20expediated%20resource%20adequacy%20study_er25-2296-000.pdf","label":"www.spp.org"}]},{"title":"FERC Section 206 show cause order on large and co-located loads (one of six issued to all RTOs/ISOs)","summary":"FERC preliminarily found SPP's OATT appears unjust, unreasonable, or unduly discriminatory and directed SPP and 22 named transmission owners to either show cause or propose remedies on four gaps: (a) no requirement to evaluate alternative transmission technologies (GETs) or memorialize ongoing operational requirements in a transmission service agreement; (b) transparency on network upgrade costs, a pro forma cost recovery agreement, and a crediting mechanism to prevent cost shifting; (c) rates/terms for…","status":"pending (SPP filed its 30-day informational report July 20, 2026; the 60-day show-cause response deadline passed Aug 17, 2026 ,  contents not yet…","date":"2026-06-18","sources":[{"url":"https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf","label":"spp.org"}]},{"title":"SPP informational report on resource adequacy for large loads (EL26-68 compliance)","summary":"SPP argued its existing framework ,  ERAS, Provisional Load Process (Attachment AX), HILL/HILLGA, CHILLS, Peak Demand Assessment, and the Consolidated Planning Process ,  collectively addresses resource adequacy for new large loads and that no immediate tariff overhaul is required. Reported all 65 Load Responsible Entities met summer 2026 resource adequacy requirements, with the East Balancing Authority Area holding a 17.1% reserve margin (~5,752 MW excess capacity).","status":"Filed","date":"2026-07-20","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Price Adaptive Load / Price Adaptive Load Service (PAL/PALS) market participation model","summary":"A new market participation model and non-firm transmission service for flexible, price-responsive large loads willing to curtail, developed partly in response to the EL26-68 show cause order's directive on flexible-load services. A draft Schedule 16 would assign PALS the lowest non-firm curtailment priority ,  curtailed before other non-firm customers and well before firm service. Target FERC filing on or before November 16, 2026.","status":"proposed / in stakeholder development","date":"2026","sources":[{"url":"https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/","label":"www.climatesolutionslaw.com"}]},{"title":"Seasonal planning reserve margins ,  36% winter / 16% summer","summary":"Load Responsible Entities must hold capacity of at least 36% above winter peak (first separately defined winter PRM) and 16% above summer peak, up from the prior 15% requirement in effect since 2023. The summer PRM is scheduled to rise to 17% in 2029. These requirements bind the capacity that must back any new large load served by an LRE.","status":"approved / effective","date":"2026","sources":[{"url":"https://www.spp.org/news-list/spp-board-approves-new-planning-reserve-margins-to-protect-against-high-winter-summer-use/","label":"www.spp.org"}]},{"title":"Consolidated Planning Process (CPP) ,  merged transmission/interconnection/load planning","summary":"Consolidates SPP's transmission planning, generator interconnection, and (large) load processes into a single planning framework, adopted in response to historic load growth, queue backlogs, escalating network-upgrade costs, and project withdrawals. First Interconnection Cluster Study queue window opened 30 days after the effective date; initial GRID-C rate publication expected by end of 2026.","status":"approved / effective; first CPP planning cycle concludes 2028","date":"2026-03-13","sources":[{"url":"https://www.hklaw.com/en/insights/publications/2026/03/ferc-approves-spps-consolidated-planning-process","label":"www.hklaw.com"}]},{"title":"CHILLS refinement revision requests RR767 / RR768","summary":"RR767 clarifies how CHILL-related curtailment commitments must be defined, sequenced, and made operationally feasible; RR768 accommodates planned outages of generators supporting a CHILL while preserving SPP's ability to curtail for reliability. SPP is also developing refinements on resource commitment sequencing and minimum curtailment ramp rates.","status":"Proposed","date":"2026","sources":[{"url":"https://epeconsulting.com/epe-intelligence/news/accelerating-project-opportunity-new-chills-tariff-revisions-in-spp-provide-critical-flexibility","label":"epeconsulting.com"}]}]}],"grid_note":"PacifiCorp/Rocky Mountain Power (west, WECC) non-RTO; eastern WY (Basin Electric, Tri-State, WAPA) in SPP RTO ,  WAPA-UGP since 2015, expanded via RTO West 4/1/2026.","grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":3,"delay":10,"atlas":13,"permits":4},"record_count":30},"states":[{"id":"AL","name":"Alabama","groups":{"restriction:local:enacted":["b754e99ab4330e15","decd6891258f47ef","f0af2bd58075bd01","acf788f0940c151f","5d2b5e02877a6db1","86b6b59a0f9f25d6","c4e0ec1c77b375f6","f54b7627480545ea","e01160ee3d027689","a5568f503c16796e","672a4451f57ed71f","130f0e56bf60745e","4985760687f3ce84","03643fb450f0e606","e03f681545f8685d","7e09fb347db9cc56","3eaa5dec8cc4f32e"],"restriction:local:failed":["c8b4ae70216bc13d"],"restriction:states:proposed":["e7f13067c265e602"],"water:moratorium:enacted":["fe369e5b2f828936"],"delay:litigation:active_litigation":["588eb0c7ad945e8c"],"delay:zoning_approval_challenge:active_litigation":["588eb0c7ad945e8c"],"delay:litigation:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:council_agenda_removal:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"delay:environmental_concerns:zoning_request_paused_active_litigation":["1b2abff9a622f18f"],"utility:statement:pending":["11c4e5e5098ce897"],"utility:special contract:pending":["6d50a85ed575ad70","ea51d9bfa3f2aef7"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":19,"water":1,"delay":17,"atlas":28,"permits":3},"record_count":68},{"id":"AK","name":"Alaska","groups":{"restriction:local:enacted":["a3bdbc7a2f903071"],"restriction:local:proposed":["1b1fd599ecf09004"],"restriction:local:failed":["14fcd2107dd36027"],"restriction:states:failed":["70bf8b65e5240449"],"delay:interconnection:cancelled":["cbda12242cdda058"],"delay:community_opposition:cancelled":["cbda12242cdda058"],"delay:financing:cancelled":["cbda12242cdda058"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":4,"delay":2,"atlas":1},"record_count":7},{"id":"AZ","name":"Arizona","groups":{"restriction:local:enacted":["efe1b1646b346c07","a90bced96e18e77a","a6281e2e804f5a60","1d398d0ae1a21d5b","641d11706e6d4289"],"restriction:local:proposed":["543df422425e5d64"],"restriction:states:enacted":["341f659a40d6be88","8c611b34dae73c14","1e866041a2d45903"],"restriction:states:proposed":["add216a01080fe60","226daa2040f1d307"],"restriction:states:failed":["1b22a852fb3cd3d6","6300ce595ef5d0af","fe22b44843f73aaa"],"water:closed-loop:enacted":["869ef8ac67db8830"],"water:siting:enacted":["e4c543ec417de650","bf9111175cdcc2be"],"water:study:enacted":["c002da5fb08b6601"],"water:moratorium:enacted":["5706e495e387c218"],"delay:zoning_denial:cancelled":["3a372b9b02a89621","717671bd9cdc167f"],"delay:water_dispute:cancelled":["3a372b9b02a89621"],"delay:community_opposition:cancelled":["3a372b9b02a89621"],"delay:community_opposition:litigation_active":["b1a04c91d82be6c4"],"delay:water_dispute:delayed":["f0fd3f3d4688462e"],"delay:community_opposition:delayed":["f0fd3f3d4688462e"],"delay:zoning_denial:under_appeal":["cb82a5cd61fb9cec"],"delay:tax_incentive_change:under_appeal":["cb82a5cd61fb9cec"],"delay:zoning_denial:withdrawn":["5567ed106330c2df"],"delay:community_opposition:withdrawn":["5567ed106330c2df"],"utility:other:pending":["5d17a79f01d2eb63"],"utility:tariff:pending":["1da26df1fe5c13a0"],"utility:rate case:pending":["5b45806c6fb887c7","d2b222dc47567225"],"utility:special contract:approved":["d3d18ed766abfecd","44611b67548fe3db"],"utility:tariff:approved":["f2a114901b242afc"],"utility:special contract:pending":["aa4d78d10d987248"],"utility:statement:pending":["0dcfef71df5fb811"],"utility:other:approved":["03326890e794e215"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":14,"water":5,"delay":29,"atlas":21,"permits":63},"record_count":132},{"id":"AR","name":"Arkansas","groups":{"restriction:local:enacted":["ccd17d0cc78e8f6b","24be15d78831b997","2976edbd642bc5ee","165be2cac366e40a","c321161246656575","11b2b2b4357c9b9a","f1fcd0a91c9b364f","cc8edc44497c00b0"],"restriction:local:failed":["7a3c89981993bc87","f0d3a1dde3ddedd3"],"restriction:states:proposed":["24cb87919949138b"],"restriction:states:failed":["669f43bd9db94313","4cd8f4567d93ecf7"],"water:disclosure:failed":["b599e881f9e16713","460013ff73ea7911"],"water:siting:enacted":["d25f62e8d2b28025"],"water:disclosure:vetoed":["34510ed612779eb7"],"delay:litigation:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:state_law_ownership_ban:active_litigation_temporary_block":["038ee7f241ea0405"],"delay:quorum_court_rejection:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:county_moratorium_dispute:moratorium_exemption_rejected":["31e41baa9c0feb7f"],"delay:litigation:active_litigation_records_dispute":["a103b1f5c7cb3114"],"delay:public_records_dispute:active_litigation_records_dispute":["a103b1f5c7cb3114"],"utility:statement:approved":["36a2338551fca4bf"],"utility:tariff:approved":["f43b05ef42c2b01e"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":13,"water":4,"delay":17,"atlas":10,"permits":2},"record_count":46},{"id":"CA","name":"California","groups":{"restriction:local:enacted":["a25de67269df0ed1","5709c4b5b56bdcb7","2a076a8efdfced43","09ce6bf92df9e75f","846b44fb44875a68","c8bffaf8e914e126","d3f536e572c853c0","e6f878bf8f23af8a","0bc1904215c57133","91ff35645c472dbe","188c7c4f44c8536f","2e31d9e1a9cca3fe","c6bb03e1b77debf9","1df245d5ecbbe1dd","106240b9c12fa638","71e0bfc997caca17","e8632d627b1772a4","7c6238e16f306088","055c2fca846ffbb0","4db95272d4d0b3b9","c0ec3d7f70d99734","9749538c1593f5cd","396ad9209089e80b","8aa7be7faae30500","dbd84a0fba7823d9","4297fa613aade787","1ed97d6ba694c7ec"],"restriction:local:proposed":["ea295658dff6c100","4d8d1ffdf12217a7","0552f5d218785acb","566895b8839e5229","558caf6ac46fd86a","aafdf3f00fd02036","1447a768a8032ada","8f8c47d0520b6675","07dc420f28cea720","cc095341ed505538","96c02fe3f2b69d63"],"restriction:local:failed":["4c7a6aab7028e4cf","6c0f45a31c38dd96","60a1fd085fb7faa2"],"restriction:local:pause":["9441b074827051cd"],"restriction:states:enacted":["b138c8f25c6a1df9","6cd48a1a9e3b6e42","e04ce361015d10b8","997e47cb2efa0fb1","a99eee6a8346d803","f8de3ea100d5a73c","36821d2782e3a288","b175ffb656ec4e09"],"restriction:states:failed":["9a181689208d061f"],"water:disclosure:proposed":["6018757e291cf1cf"],"water:disclosure:enacted":["f1363de6a8051f4c","0542c8536ced8e81","d192c59c767e1959"],"water:moratorium:enacted":["1cc46a341cdc3ef8","455741d01ef09906","490cb87c459dd8d3","b85c5b51cdf4ca84","2d55ff4b663fe464"],"water:moratorium:proposed":["7dd1832dd7f10e5b","d430cf80aec173de"],"water:incentive:enacted":["4a4855c312ff4655"],"water:siting:enacted":["0f9ba6aedeacc0f2"],"delay:litigation:litigation_active":["df264e03425ec97a"],"delay:permit_denial:litigation_active":["df264e03425ec97a"],"delay:local_moratorium:delayed":["81e21ec7e868a8a0"],"delay:water_dispute:delayed":["81e21ec7e868a8a0"],"delay:community_opposition:delayed":["81e21ec7e868a8a0","14833b21d81cfae2"],"delay:litigation:delayed":["8f4ba499ed265bb0"],"delay:permit_denial:delayed":["8f4ba499ed265bb0"],"delay:local_moratorium:cancelled":["e6ef57967971f34b"],"delay:community_opposition:cancelled":["e6ef57967971f34b","60ad802b8bf4ce26"],"delay:community_opposition:withdrawn":["dabaa0d9ca40c829"],"utility:other:pending":["2331af1293597280","65708bfad2e82891"],"utility:tariff:pending":["9365b7af7942c436","345f48017f0b0304"],"utility:statement:pending":["686efa78facdadc1","c9e2f082eb03806e"],"utility:tariff:contested":["d8dc8b595b9287b9"],"utility:IRP:pending":["2c217c66f5f9e73f"],"utility:special contract:approved":["e9224e475fe0078d"],"utility:special contract:pending":["a93460236987d2aa"],"utility:tariff:approved":["77fc87a9cbbc5266"]},"grid_operators":["CAISO","NON-RTO"],"counts":{"moratorium":51,"water":13,"delay":52,"atlas":42,"permits":18},"record_count":176},{"id":"CO","name":"Colorado","groups":{"restriction:local:enacted":["d20e86908dbdc520","7e23b2c472790666","b680584b86f47325","27892c65296bbedd","4057677a34555f38","611f35a83bc2affd","079b59e4fdf63d21","a78ac9d55cc5b6e7","72aaf79dce28835b","8c94de22f0407e5e","fafd70f2e092776b","b7f34202c64479ce","68d895f0c2ab0e74","9ef574abef591c91","73177d5333c4eddd","025c6d645640e09f","2c25069cf664aaf3"],"restriction:local:proposed":["180c78e281f128cd","e516a7d3e6cb6124"],"restriction:local:failed":["1224f46eadf9763d"],"restriction:states:failed":["804810ef9bbbcba8","8bb8b6f98d15d82f"],"water:siting:enacted":["1a50144d2155e77c","b03afdefabd7d0fe"],"water:moratorium:enacted":["da5550e87bcd99b9"],"delay:local_moratorium:halted":["9cef3b22115f1c92"],"delay:community_opposition:delayed":["a38043d281f78904"],"delay:litigation:delayed":["a38043d281f78904"],"delay:tax_incentive_change:litigation_active":["75f9d2abb9fb3326"],"delay:local_moratorium:delayed":["346f7ed881ecaa83"],"utility:tariff:pending":["959a6c65c1b74f30","59050cc9ea65018e","7d2e982178725742"],"utility:IRP:approved":["c4287797ac10652c"],"utility:tariff:denied":["c0672975e176ca01"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":22,"water":3,"delay":27,"atlas":26,"permits":35},"record_count":113},{"id":"CT","name":"Connecticut","groups":{"restriction:local:enacted":["6e1a2316302287f7","576ae2d483109634","f7bc5e6a64694fc6","afa7c0bb25faeb00","0642f9a9d449638b"],"restriction:states:failed":["717698e42ef6e901","e135ad979d2fc395"],"water:disclosure:proposed":["7a7d2e991305affc"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":7,"water":1,"delay":4,"atlas":5,"permits":1},"record_count":18},{"id":"DE","name":"Delaware","groups":{"restriction:local:proposed":["d3ed82824472253c"],"restriction:local:enacted":["20667d2af7bb1915","349d8f4e1160a386","e6b800970826b7ff"],"restriction:states:enacted":["f79088b84dfb570b","f797bd58db306835","00d385fc78b43d3c"],"restriction:states:failed":["8e1aedf35862eb28"],"delay:zoning_denial:halted":["5fef84a0dc8a6ea7"],"delay:community_opposition:halted":["5fef84a0dc8a6ea7"],"utility:tariff:pending":["5c2aae85d73c5722","7d3ea4d67fa68520","db8fb22803e36edc","5b6e0fabe7643de5","a3ef5c98705ce81a"],"utility:tariff:contested":["17240088860f9cd6"],"utility:policy:effective":["c3275bc79925ea23"]},"grid_operators":["PJM"],"counts":{"moratorium":8,"delay":14,"atlas":4,"permits":3},"record_count":29},{"id":"FL","name":"Florida","groups":{"restriction:local:proposed":["3c6d8b831356d465","e8b089b79a0f9026","7425d7591ce9c05a","e1b9861a123c1037","eff63eaba9c47d23","5b481baefebc87d9","a5e933035ad808b1","fac9127296bbb451","81e7440dc92c2b86","92a8872884499683"],"restriction:local:enacted":["a5503fc35c328f46","23c7119619365d48","8b07f1ffc26fabaf","3d8300137881558a","73505e05af5a93eb","f81b18c1e2c17955","930a54e75fe30dbf","a6dde620b7e76c37","55f91fe7e81d73f9","256ea0475a8abfbc","3d3d3059a4680f72","d7dcf42909108795","81d807032f719371","e068dd6b5ef9a080","2309ccbc3d286709","6056ac6cc19512a9","7143529782427cf5","089c1610e25cae54","6519ee70858d723f","10e7ec4ad55643e8","9d86ef4ad5bda00b","664c54df9091c973","05af516c4516ea5a","f5948f47a6af75c6","983f2c993373327d","06dc3cba02451c3d","c1218a13301328fe","b404521e586a3d39"],"restriction:local:failed":["3cabceedb3599796","cea30c117def2cca","3eec78ad6ec41fba","b3455f9b6eb27513"],"restriction:states:enacted":["bd1baf5ebba563ea","0481f85a9e1d5f2a"],"restriction:states:failed":["8cb4a715971a72e5","3ba747e753788cc7","04d2addc80c5d977"],"water:reclaimed:enacted":["41fb56a04133f262"],"water:moratorium:proposed":["edf34b85cb944f74","1cd10774835a9376","ad733fa464deef93"],"water:moratorium:enacted":["2940ba1eefc2e616","9b3a0316ced968a7","209a4247fb52b5dd"],"delay:community_opposition:cancelled":["8e40e6f05855c417"],"delay:water_dispute:cancelled":["8e40e6f05855c417"],"delay:zoning_denial:cancelled":["8e40e6f05855c417"],"delay:permit_denial:denied_without_prejudice":["a96919e42e70568c"],"delay:community_opposition:denied_without_prejudice":["a96919e42e70568c"],"delay:county_moratorium:moratorium_in_force":["a80ab26a0223aab0"],"delay:community_opposition:under_construction_amid_opposition":["30167fbd092c1632"],"delay:transparency_concerns:under_construction_amid_opposition":["30167fbd092c1632"],"delay:community_opposition:rumored_no_application_filed":["f2412c254c9be527"],"delay:meeting_postponed:rumored_no_application_filed":["f2412c254c9be527"],"utility:tariff:pending":["8decf641f8a25d7d","a3c4a2035b1bbdae"],"utility:tariff:approved":["e302a349f266e980","6e774dbc7dc0ad70"],"utility:other:pending":["49d867567171c0f6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":47,"water":7,"delay":35,"atlas":45,"permits":3},"record_count":137},{"id":"GA","name":"Georgia","groups":{"policy:cost-allocation":["8dcc4b156d460b66"],"policy:minimum-payment":["90114ff524521a31"],"restriction:local:enacted":["83b7e8e76b5ee0bc","c702f3e21493eb78","f01b7f9bb899e3d6","f7d299ad7a92bf12","3bbce17db7406e29","d82372162bbd6160","85de3463c47701a1","7086dae6422907ad","754cf92f96c529a3","c7572839bf1e65ec","0f457e9b1f07b13c","cde0de75b390a38c","190ca6042402e496","b7df742790192976","18d1622ef7bf1615","91cb94f80ea44672","8b31abcd9fbd53f1","25670f673645fec9","a263b272f78d0c97","c968b3ce64dc6e50","94471cc36a302f4d","d8321a4a32d96fe5","d6fd85ec434dbb95","e92bfd601e97e81a","b442425bf5306c01","0a299b6f3e4f8a71","97f3ce24746ab390","75bf8ea8521c54fa","0a88eeaf1510a872","b85fe594520520c1","90a000efae4eb640","c5f545916c737149","7718b91252a0926a","dea0bc58f5667b0f","31c097aea2e6b922","e07ddb442cda946c","8e0052e65c172653","8c1646131950febb","05cc6246e1b41c7f","f7dbcf4c51bf6858","a0256947e3545780","8a2dd9e2691ff06f","9f541b9254ba4673"],"restriction:local:failed":["0abc00ddccf55a33","2bc57eb4e3e90e1f","701836b773fb0b9f","69a87b66a5ff3dc2","c86da04ebcb107b1","496e8e5d89e48f9e","e1f3ad4472027620","6e2cdff1c98b89c0"],"restriction:local:proposed":["c2f04f5b50afc543","0fb52176825fcefa","cb9ce96499427440"],"restriction:states:proposed":["8f9aa89848bde366"],"restriction:states:failed":["e9f083814e55fed7","9c1953c2716db6dd","40cfc9d1ff50d003","6a4a691d7908a952","1f42995802ab1e14","1b3fd31a366bf4bd","a9baa8b690070329","30d8a643dc1032e6","35836125f8f5c6e9"],"water:disclosure:proposed":["763ca1cd9c5aab65"],"water:siting:enacted":["dfcc4d38d0110edd","e2e353fc1545946a"],"water:siting:proposed":["1054015276abc18b"],"water:closed-loop:enacted":["de00fb52546e6f23"],"water:disclosure:enacted":["2ad2d7c1dd2cabd0"],"delay:permit_denial:permit_denied":["1f36ddedf54f3fd4"],"delay:community_opposition:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:permit_denied":["1f36ddedf54f3fd4"],"delay:county_moratorium:approved_active_litigation":["d0f8256ac51fab90"],"delay:litigation:approved_active_litigation":["d0f8256ac51fab90"],"delay:community_opposition:approved_active_litigation":["d0f8256ac51fab90"],"delay:county_moratorium:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:community_opposition:delayed_amid_moratorium":["4b90e184c8781b68"],"delay:county_moratorium:moratorium_in_force":["dc2902692d6491a1"],"delay:public_outcry:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:tax_break_withdrawal:tax_incentive_withdrawn":["79abe857d504f0de"],"delay:community_opposition:cancelled":["2a4ab4968e918d44"],"delay:interconnection:cancelled":["1de43b4a847f9aa8"],"delay:financing:cancelled":["1de43b4a847f9aa8"],"delay:interconnection:denied":["2661c3858a5d582c"],"delay:zoning_denial:halted":["07d5ce26e3298956"],"delay:community_opposition:halted":["07d5ce26e3298956"],"utility:tariff:approved":["51165aeea3b5c521"],"utility:rate case:approved":["858fc088c06ae5c6"],"utility:other:pending":["7eacf8103d2cde93","725643f3b4745c90"],"utility:statement:pending":["83d8f442e8f028cc","613ee18634340b67"]},"grid_operators":["NON-RTO"],"counts":{"policy":2,"moratorium":64,"water":6,"delay":70,"atlas":70,"permits":91},"record_count":303},{"id":"HI","name":"Hawaii","groups":{"restriction:local:proposed":["28597eb2f2e2356b"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":1},"record_count":1},{"id":"ID","name":"Idaho","groups":{"restriction:local:enacted":["95089721b56ee774","fe1a183a87096ad9","cfe65746b5a0f7e3"],"restriction:local:failed":["93f06396ad555ba2"],"restriction:states:enacted":["276f9be7f349fc75"],"restriction:states:proposed":["cefda14587a887e9","f7f09ea72ca4e50b"],"restriction:states:failed":["9c8a456a09d32f23","89b3c3ec88bdbc77","46828f9c28d595d2"],"water:siting:enacted":["d9479381dd39426b"],"delay:litigation:under_appeal":["6c2c455020d0272b"],"delay:corporate_realignment:delayed":["7e9cb32e4e8d817f"],"utility:other:pending":["7cf4e8e8f3a38458"],"utility:tariff:approved":["e898000ea6ecc3d6"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":10,"water":1,"delay":9,"atlas":3,"permits":1},"record_count":24},{"id":"IL","name":"Illinois","groups":{"restriction:local:failed":["1688237928438d39"],"restriction:local:enacted":["ca8eaa4fae2c852a","6f07a6763fa734a0","09ae1486502886e8","5bd418f017328c7c","06b72d07cd1c49ac","0c47dab15c0d2f8b","0af9b2178b92e9d5","a63897e78f332f95","9c11e0fbe25fcdd9","dff4c418b6ff66a4","4dbd1742ac88cba6","98cdcd339817f68e","95fb3d3156498f12","15e7d96176c192b0","4ada4d4ff9e7b794","9f441a6e33f21096","91816e044ae91d73","606804a7751c5741"],"restriction:local:proposed":["c658effcd8a8404b","e742ed625e62ce6f","a952290a81b198a4","5b9ee8080b2a9ab7"],"restriction:states:pause":["d15586bf00803a21"],"restriction:states:proposed":["2de67be693a93ad7"],"restriction:states:failed":["6456aa7bb0b23688"],"water:disclosure:proposed":["8a7dc5bdfec701e7"],"water:moratorium:enacted":["080dab59c19bd690","2a07c1558296be02","e635d05e2074a570"],"water:disclosure:enacted":["dc2475a676fa62ca"],"delay:litigation:litigation_active":["fea0362f66d7ce4d"],"delay:community_opposition:litigation_active":["fea0362f66d7ce4d"],"delay:zoning_denial:litigation_active":["fea0362f66d7ce4d"],"delay:litigation:active_litigation":["9e23d3ec3c2afc8f","73e7e2b4984b632d","180053263745dfcc"],"delay:wetlands_permit_suspended:active_litigation":["9e23d3ec3c2afc8f"],"delay:community_opposition:opposed_pending_council_vote":["e132605bfcfb961d"],"delay:community_opposition:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:petition_campaign:opposed_effectively_stalled":["0cd52f874d37722a"],"delay:city_moratorium:moratorium_in_force":["58cf33c3ebe468f0"],"delay:public_notice_violation_alleged:active_litigation":["73e7e2b4984b632d","180053263745dfcc"],"delay:rezoning_denial:withdrawn":["035003b98053fc06"],"delay:no_secured_tenant:withdrawn":["035003b98053fc06"],"delay:council_opposition:withdrawn":["035003b98053fc06"],"delay:water:cancelled":["46efd12bf3ea6dcb"],"delay:financing:cancelled":["46efd12bf3ea6dcb"],"utility:rate case:approved":["37ab93fd8b57c77e"],"utility:tariff:approved":["1543e61fc24998f6"]},"grid_operators":["PJM","MISO"],"counts":{"moratorium":26,"water":5,"delay":42,"atlas":40,"permits":60},"record_count":173},{"id":"IN","name":"Indiana","groups":{"policy:minimum-payment":["bf784d50ec22157b"],"policy:departure":["03586139e9d09948"],"policy:security":["19c77af74e853a13"],"policy:regulator-reporting":["dde07ed35b93f0c9"],"restriction:local:enacted":["963b8c0256246b3b","8eac5106889da9ac","183f5e5fde8b2c9e","a7e5ebb04d58be95","f4c86ae66329b23b","a3e5e35d93d700fd","a444b64740435e08","3a39e47da83f24be","c7133c46e29c6d69","5e41da92046a9bcb","ff803a94b802fe31","7db5ead22195b986","998bd34f448ab467","9e2594c01650c7f4","837d5ad2452c9a6c","42d0a19e60e69b3f","7a052f9efca8b303","5be45e17d6ec7513","c1be058ee36c4738","a86775303cb769f2","bba265c36e34c00f","ee5f8620c8465f3d","736410e487973794","faaee5c934ec1ecb","ee6a98915d4cd96d","678dfff8b193d0a3","0e6064d1c5503319"],"restriction:local:proposed":["e66e435a43f67c04","7467dd109abc68e3","fed5ec0ec8852137","c73095088bd90160","b24ea3f72d09cb82"],"restriction:local:failed":["845faec2de5f43fc"],"restriction:local:pause":["4d96d9bb18ac4024"],"restriction:states:enacted":["227139621030dba6"],"restriction:states:failed":["eea922145c00d1a8"],"water:moratorium:enacted":["2e6ca318ecd03dd0"],"water:siting:failed":["b35eb608d2415382"],"delay:community_opposition:cancelled":["bb2ed0971e6302ac"],"delay:zoning_denial:cancelled":["bb2ed0971e6302ac"],"delay:litigation:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:litigation_active":["6f356448fc4e65f9"],"delay:community_opposition:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:proposed_moratorium:approved_but_citywide_moratorium_pending":["e034c083058251a3","72ffc530ecd5fd9a","3e312e13c51a83a6"],"delay:community_opposition:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial_or_withdrawal:withdrawn":["1729a8c1f14a58a4"],"delay:rezoning_denial:rezoning_denied":["d11979032cadd398","569435ce3fe609dd"],"delay:community_opposition:rezoning_denied":["d11979032cadd398"],"delay:litigation:active_litigation":["c5e676669917e797"],"delay:permit_challenge:active_litigation":["c5e676669917e797"],"delay:community_opposition:approved_amid_opposition":["6d8bec92336deeb0"],"delay:missed_milestones:development_agreement_expired":["27c39d9347a1192e"],"delay:financing_delay:development_agreement_expired":["27c39d9347a1192e"],"delay:unresolved_commitments:rezoning_denied":["569435ce3fe609dd"],"delay:county_moratorium:moratorium_in_force":["33af90259cf95dde"],"delay:county_moratorium:moratorium_extended":["6e309bb5ef6dcc2b"],"utility:tariff:approved":["4b48c2fabeec119f","fa98544ba5e059ad","6b0503ca135ba204"],"utility:special contract:pending":["113a466c8203c668"]},"grid_operators":["MISO","PJM"],"counts":{"policy":4,"moratorium":36,"water":2,"delay":51,"atlas":50,"permits":12},"record_count":155},{"id":"IA","name":"Iowa","groups":{"restriction:local:enacted":["6ec7f0571c9f0b36","b997268fd2bd8a07","a3d89d9d748c79e5","ece6aca21720a05a","b53022fa847d859d","2265266858f1808d","d2821404eb9b773b","e429297830c5c85e","2c27ac27b47a53de","8ce23138e1f0ecbd","0e74326bb2038903","245488a7b0f0baed","4ec7c3f119f63571","5d574b2e962d112d","57926d8a3b16421b","6873275732caceab","6572038f8fb6515a","09dabb3487e83177","fc20843db6b3c777","ab4c1a0e46a2c211","f73ca7c24ea9ea51","48355f233539620f","e170f696214b321f","8f8fd51101db1cc6","c5304dad0e04e811","75a122be02ae0d9d"],"restriction:local:failed":["0fa0b840766c8a19","c263db1bebb5e27f","a131c04ede50c5f6"],"restriction:states:enacted":["9e83b550b15760aa"],"restriction:states:proposed":["639d23fdd3311f98","262084f7a02f3ad2","e2e155d413c48eda"],"water:disclosure:failed":["304d0cab55c6bd68","e3e82ac6f5792d65"],"water:rate:failed":["42f37d1bced6be18"],"water:closed-loop:failed":["b47e084956bfc26a"],"water:closed-loop:proposed":["24ce35cf4b42f743"],"delay:multi_year_construction_delay:delayed_extension_requested":["4ce223b15edc681a"],"delay:design_changes:delayed_extension_requested":["4ce223b15edc681a"],"delay:county_moratorium:moratorium_in_force":["679ae4b13385d757"],"delay:county_moratorium_neighboring:early_stage_amid_county_moratoriums":["12e1cb598a859683"],"delay:zoning_denial:delayed":["8e0bc83eff50a9de"],"delay:community_opposition:delayed":["8e0bc83eff50a9de"],"utility:tariff:approved":["a9a9512892558d03"],"utility:other:approved":["3046845ad149fe7d"],"utility:special contract:approved":["e59432224488c63a"],"utility:special contract:pending":["48182dc47986bf11"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":33,"water":5,"delay":37,"atlas":22,"permits":21},"record_count":118},{"id":"KS","name":"Kansas","groups":{"restriction:local:enacted":["092e69a7498ed6f4","c5d6b2d241f5cc17","5d6e924e754d82a1","d65aa07eb73bb390","2b56b5bc78d3d2c2","779bf14e695b30f3","46ebfe654cb98769","6b3d06b7e6d5546b","3e6f9643e146e802","a03f8a97d54da728","88a8f8a97b3eb631","5c9d3499ff80e6d7","61d91d35faaab6ce","49d229995410fd72","4654c90eb016ce15"],"restriction:local:proposed":["3989c573db251ea1","c49b85a22488877d"],"restriction:local:failed":["50ea4020ea582738"],"restriction:states:enacted":["2ee674af511b50f4"],"restriction:states:failed":["f13da72ca930c823","b3815616ed614981","c1154548fbef7c6e","8db95808ba8ac8e5","69b27b03dc718361"],"water:closed-loop:failed":["4eb2bfa0c2e15d57"],"delay:community_opposition:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:noise_regulation_review:approved_expanded_amid_opposition":["947909f4a6543759"],"delay:water:cancelled":["70833cef331617f1"],"delay:community_opposition:cancelled":["7d838f4833d1b349"],"delay:financing:cancelled":["7d838f4833d1b349"],"utility:tariff:approved":["f77ece2de2ac70fa","3ba852096f736178","1dface436cf210c2"],"utility:tariff:pending":["3e89a8aa0948bcc5"],"utility:other:pending":["aead86c34e456420","7fee508d92451cef"],"utility:other:contested":["fe3448ceb67c13bb"]},"grid_operators":["SPP"],"counts":{"moratorium":24,"water":1,"delay":23,"atlas":20,"permits":3},"record_count":71},{"id":"KY","name":"Kentucky","groups":{"restriction:local:enacted":["a26d4b9555d02fc3","4a7e0503c84a18fb","068617b3ee7c1e34","27a0ce76b943a447","65fd1df9f999e56d","9b96e5de0e107e49","7206025d4f188dc5","a3f8e60045a8e496","3be8e5e1324a2209","ef0ceaa96e4124a9","b8c035523c2353d3","59ddefe2d22f34aa","bcf7474f970300a6","3b2a3d6c317e1650","a1acef1340d31231","a5a9aea1171b918a","baf08a5fdb9be408","626ca6058bcfe492","bcc91f5729167578","ad6f059e45735cb0","c9ad189fcf915368","78d859810fda2f18","971b3f19c633ffe9","0d7d376001869f9f","7cfc5e2b338d1914","0d5a0d6559c93531","341751834d403210","0cd0db1bab37a48b","a1b25cbc5a439391","6dbd46ac8566eabd","f6c91c535f7eae69"],"restriction:local:proposed":["f68fb746468a09f9","e795d08b5d2d9c0b","c509add78042616b"],"restriction:states:enacted":["77733d81d9d3baed"],"restriction:states:failed":["9900fddb93bcc64d"],"delay:rezoning_denial:rezoning_denied":["e55329fac133bb24"],"delay:community_opposition:rezoning_denied":["e55329fac133bb24"],"delay:city_moratorium:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:moratorium_in_force":["6e62257e2bdac106"],"delay:community_opposition:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"delay:no_local_zoning_framework:under_review_no_zoning_process":["880dfcdecb0dbbcf"],"utility:special contract:denied":["253d0f130a165e15"],"utility:tariff:contested":["ae68fdeac34bbc8d"],"utility:other:contested":["42fead8f4bce2aaa"],"utility:tariff:approved":["801dfc830fd07245","4f7f2aea34be5c96","d0cda138d452d757"]},"grid_operators":["NON-RTO","PJM","MISO"],"counts":{"moratorium":36,"delay":39,"atlas":28,"permits":2},"record_count":105},{"id":"LA","name":"Louisiana","groups":{"restriction:local:failed":["082df063713becdd","337eff2a8faaedc2"],"restriction:local:enacted":["450b6661aa0aa3ae"],"restriction:states:enacted":["9ba2486256f256c2","144e7d01d58cef74"],"water:disclosure:enacted":["03f274e9a5dce14c"],"water:disclosure:failed":["f7cd1c9b5f782122"],"water:study:failed":["28f58e0cdd0b7e0e"],"delay:regulatory_transparency_dispute:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"delay:ratepayer_cost_concerns:regulatory_disclosure_dispute":["03dbeebbd06cbb4e"],"utility:tariff:approved":["eff42b274f0be9ef","a83e236f50a73f18"],"utility:rate case:pending":["c65e9e2d95997fa6"],"utility:tariff:pending":["69e0ffd4849ee579","88fc6caa48aac8b2"],"utility:statement:pending":["457342b4fea42a74"],"utility:other:pending":["4a0bb7e423217973"],"utility:other:approved":["61067a61b636c781"]},"grid_operators":["MISO","SPP"],"counts":{"moratorium":5,"water":3,"delay":15,"atlas":9,"permits":1},"record_count":33},{"id":"ME","name":"Maine","groups":{"restriction:local:enacted":["ecd5966d9b342311","c36961854ebd6ca7","a4804efbc073f070","d766badde34909ee","3d017e2610e8d02c","b9330f5763dfe845","b2a8fec20ddd4e17","f5a714682b29daa5","8d49ab7b7f89d04b","27b044f270dad65f","be26656565cc2456"],"restriction:local:proposed":["6aff9b58bac5e8f3","ebf579b381f356dd","0afc065fdda3c091","b0ec262465eb00f1","8149b851eb2d0584","e3f47f6089a0ee71","3acc511d9da72bf5","fe1e50be7095ea83"],"restriction:states:enacted":["fe74bf6eed39dbcb","7d62f3ffa4427f55"],"restriction:states:failed":["4e5deea3e7dff0be","0ab980856a66fe1d","a3a43b954eba3113"],"water:moratorium:vetoed":["297d93ad9da5f26a"],"delay:state_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:local_moratorium:cancelled":["2156a0ef2be22eb0"],"delay:water:denied":["922b3fd62f9c070b"]},"grid_operators":["ISO-NE","NON-RTO"],"counts":{"moratorium":24,"water":1,"delay":17,"atlas":19},"record_count":61},{"id":"MD","name":"Maryland","groups":{"restriction:local:enacted":["348298ff6f51a691","08097815a98470c5","4deb89713fe98326","8f74fbbd8993b148","3afe4fa64e87f546","8730de2c9ff67503","c73fe44c03df38ae","8dda8813a9c298d6","764a5ea5baee0c4d","6617f7b48c44c942","a8f91eecf6abf3b5","0afbbaf26cf8f904","83ff2804204a626d","9c034ea2bef0ece8","3373477ac1ec4f02","62bac4f016f1945b","11d1a89900718a96","eb36aed04afe9d8a","499348363c3b81ea","6f9687423e2dc4e7","dc1acf38d039ac19"],"restriction:local:proposed":["265e093c1f9eb417","755b1c07e83184e1","08ca97e19dc7abb4","3e8bbaa7cd3afe15"],"restriction:states:enacted":["17348e6b8d304518","b044300e1a2b5236"],"restriction:states:proposed":["5e23b6297efd7527"],"restriction:states:failed":["3c99947280200b8d","1fcccf76e9b86359","cf6793fd2c12b7d5","f1a32ee4fda04c94"],"water:study:enacted":["558d1f7246d3e647"],"water:moratorium:proposed":["e3bd79694db1db39"],"delay:litigation:litigation_active":["27582584bea51673"],"delay:local_moratorium:litigation_active":["27582584bea51673"],"delay:community_opposition:litigation_active":["27582584bea51673"],"delay:zoning_denial:withdrawn":["5aa3c5c167a2712e"],"delay:community_opposition:withdrawn":["5aa3c5c167a2712e"],"utility:statement:pending":["96ed3e4e28dc5f46"],"utility:tariff:pending":["b5a5ebb9845972c4"],"utility:tariff:contested":["151f94517d5bd763"],"utility:other:pending":["eecc4c5501407ced","de3593715e5e8754","b1f2cd97d9cd0cd1","246625aeebba0d27","e8088afeef1bad4c"],"utility:complaint:contested":["1f79c8153170b0cd"],"utility:policy:approved":["d89063b61a861688"]},"grid_operators":["PJM"],"counts":{"moratorium":32,"water":2,"delay":31,"atlas":22,"permits":12},"record_count":99},{"id":"MA","name":"Massachusetts","groups":{"restriction:local:enacted":["9dfd357ee1d1d79e","6fc10604ec34d46e","f0730563712dc086","e2b170911a980baf","443c78d2d2548652","51aa3706f59d3551","9a147c3e16821a2a","37641c80d5d22ef5","3bcf5029dee4b702"],"restriction:local:proposed":["6df99955fb5274ef","e88057500b5af5a2","251bed6de274003a","4e469b93e2617726","f9879ca8a354d99f","cbe95c8b12548c20","d3546c56fc54089d"],"restriction:states:enacted":["dbbfb14cd16be3f9"],"restriction:states:pause":["187e9da595e7eb96"],"restriction:states:failed":["8472091318232e86"],"water:siting:enacted":["c4f434d0074d8012"],"water:siting:proposed":["12f4ef4de2542657"],"delay:litigation:litigation_active":["655e83c186a87988","2493de70fabc445c"],"delay:environmental_review:litigation_active":["655e83c186a87988"],"delay:community_opposition:litigation_active":["2493de70fabc445c"],"delay:community_opposition:delayed":["27d4f05a55fdde9e"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":19,"water":2,"delay":10,"atlas":9,"permits":3},"record_count":43},{"id":"MI","name":"Michigan","groups":{"restriction:local:proposed":["c78ca68312691303","728e3efd8cbaccb2","f81a68f97adf08c0"],"restriction:local:enacted":["e6998880993aa177","b2511715ae4b990f","e1921072a7125833","98f07a32bbf38bd8","6f83b57549342f0e","2212cea497a5e376","6b17b974dff83ac6","0b835486e1c6675b","248845e3115d1b28","0e4058dda626a25d","576d5da42d138d11","bcdc28bfc405e76e","8408b058fbc315db","5d171a2ab62f7804","dc13381e1263b1fd","09e923cf2b67c07f","987c61998db8747a","1b63965c95a1e946","29918b3b1beffe19","99eeb7d2511ceb55","7bb3ee3000662f52","a0e759d085ba7e52","0d0e24de27bbc37a","2b9943a276289d6a","ee9073c9ad75a86f","9a62b17a98e57199","be5f41b4ec785373","ac7d9bd4ffd00f9e","9cecaa0a00ab43e5","1cb30633bb851922","f1c6da2f0000273a","ca9c48eee9e1d1a5","b70d22d7ae290b7d","c2d9415cc3e16da6","3828b0e2eec67db3","7e420db8d37c15f5","98cdd231fea86e2f","e8f1f476cf2c431f","c35e7a7d7cee74a5","e55663914c7c7dcb","33d2ea51a8acf987","51c80939f7496063","aaefdc75bd8c4aeb","911a6b9444bd1607","a7b6b76bf5329d54"],"restriction:local:failed":["516ad57aeb1648fc","b3ad7b9e668b591e","33b46a0d012daefc","3d03aba3f1700469","82599d14f4fba0f6"],"restriction:states:proposed":["a7533c1f529edc2d","6b7ffd32f765b5a4","456ce7c5d8d8f323","91c4adfd115bdb5d","c8d7e8822cffe0b7","98d30a9bf813c747","e816819481689635"],"water:disclosure:proposed":["c32c25eaa98e91c6","8bcea3f333be2510","905756b51034ebc2"],"water:siting:enacted":["d5816002c74cef1d","a2249bcfc2597539"],"water:closed-loop:proposed":["f8e09c679ee0460a"],"water:disclosure:enacted":["225876463f5c6047"],"delay:water_dispute:delayed":["1a7a2592e25c74aa"],"delay:local_moratorium:delayed":["1a7a2592e25c74aa"],"delay:community_opposition:opposed_planned":["90620f2ccd2b9bdd"],"delay:city_council_resolution_against:opposed_planned":["90620f2ccd2b9bdd"],"delay:rezoning_denial:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:litigation:rezoning_denied_then_litigation_settled":["f83e49f859e07603"],"delay:city_moratorium:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:moratorium_delay":["042472b06a41f987"],"delay:community_opposition:rezoning_paused":["cc32421f495a41b9"],"delay:planning_commission_postponement:rezoning_paused":["cc32421f495a41b9"],"delay:community_opposition:opposed_proposed":["8155ffe35c87d600"],"delay:transparency_concerns:opposed_proposed":["8155ffe35c87d600"],"delay:litigation:abandoned":["b9b9b57ad82d9568"],"delay:community_opposition:abandoned":["b9b9b57ad82d9568"],"delay:china_ties_backlash:abandoned":["b9b9b57ad82d9568"],"utility:tariff:approved":["630e6b38a0b9bb35"],"utility:special contract:approved":["cd42a1000e119f0e","50f9ae193de9e4a3"],"utility:tariff:denied":["a850b2486651c1d3"],"utility:tariff:pending":["5bc36f6821c8abbf"],"utility:policy:approved":["54c782b0ead7889e"]},"grid_operators":["MISO","PJM"],"counts":{"moratorium":60,"water":7,"delay":91,"atlas":55,"permits":1},"record_count":214},{"id":"MN","name":"Minnesota","groups":{"policy:cost-allocation":["0e9cef0d480c11c6"],"policy:departure":["96d76c523368de3c"],"policy:supply-review":["fa129260c9a1191c"],"policy:clean-energy":["5b0759b74511376b"],"restriction:local:enacted":["b739365ff698ee0a","d80387aab9ef2c1b","c3cc4eb6dd8578c2","0dc094cdf13edec8","5aa9e70c1a21d1c7","3fba111c587a7167","199bf867a340507d","d26a44d5312532d6","8e5e33fb9390f491","5ab133e795e83aed","385a484f3217fe24","793265102ee5e04c","35608fd55ce01e87","4fcdd676bd44f6aa","d1abcacd61245c1f","45935f6103775172","db3bb10a74b42708","ba8faf4607030280","8e02e3b0e7618f3a","3f4d995fd6fa4cfb"],"restriction:states:enacted":["2ab863890b12fdcb"],"restriction:states:proposed":["86e0d1d3835c9be9","c61b092c34b879a0","22e3f68246b5a4cc","797e76275710b3d8","7143edd8de397ba4","89d199639f253ee5"],"restriction:states:failed":["d0a94e01d35c42d4","3e22495abb3596c7","e2236d557902ae56","a3cf11f7c0f5a8bf","dfab67689c609a1b","23cc1180dbd6e5d9","eaed289a984419ff"],"water:moratorium:enacted":["e18e98913f2987dd","e11834d93a5792ed"],"water:shield:failed":["edb4285bd2e6d496","48bbbf542eb24d6c"],"water:siting:failed":["9c0626855c13a619"],"water:closed-loop:proposed":["bec7c68e6812d46b"],"water:siting:enacted":["f02889f2df50210d"],"delay:environmental_review:litigation_active":["51ba402b96b22669"],"delay:litigation:litigation_active":["51ba402b96b22669","2eb3d7b7efd8d959"],"delay:local_moratorium:litigation_active":["2eb3d7b7efd8d959"],"delay:litigation:construction_halted_by_court":["3e814c29543f4a91"],"delay:environmental_review_inadequate:construction_halted_by_court":["3e814c29543f4a91"],"delay:litigation:active_litigation":["6afa0ca47b947af4","f52d37a4709f02d3"],"delay:city_moratorium:active_litigation":["6afa0ca47b947af4"],"delay:environmental_review_challenge:active_litigation":["f52d37a4709f02d3"],"delay:environmental_review_pending:final_decision_paused":["452d128b99f4b891"],"delay:city_moratorium:moratorium_in_force":["7af8f1a65d714f3c"],"delay:planning_commission_denial_recommendation:planning_commission_recommended_denial":["796fdc6d59ce947f"],"delay:community_opposition:withdrawn":["7565837e009abac3"],"delay:council_vote_delay:final_vote_delayed":["800f8019c1868fa1"],"delay:community_opposition:final_vote_delayed":["800f8019c1868fa1"],"utility:tariff:approved":["0669b1659a0e805f"],"utility:tariff:pending":["bdec46fd73a2cf42","8fe5290a1832e86c"],"utility:tariff:contested":["2b6636adee0c7012"],"utility:other:pending":["049d9ec6a4db5efc"]},"grid_operators":["MISO","SPP"],"counts":{"policy":4,"moratorium":34,"water":7,"delay":31,"atlas":30,"permits":7},"record_count":113},{"id":"MS","name":"Mississippi","groups":{"restriction:local:enacted":["ecef92d17dfc1c52"],"restriction:states:failed":["ebb062a18af2c39e","4ed51c6c792fa708","e4e4ee9189096b02"],"water:siting:enacted":["5a06d81d34bea26d"],"delay:litigation:active_litigation":["4063038ccfbba534"],"delay:unpermitted_power_plant:active_litigation":["4063038ccfbba534"],"delay:noise_nuisance:active_litigation":["4063038ccfbba534"]},"grid_operators":["MISO","NON-RTO"],"counts":{"moratorium":4,"water":1,"delay":4,"atlas":12,"permits":1},"record_count":22},{"id":"MO","name":"Missouri","groups":{"restriction:local:enacted":["d90eaac4fe51359a","176fecd092621295","204232d5f8ca8df3","79b2a4ad0fec8c24","7017a935b3b7ecbc","85d940e773175229","f803c38f884f6aa0","de0764506bff684b","08196d135c493f63","8d67875968fb64f7","bed91c8df00c2c5a","21f8768f48599598","14bf3311c27da66b","9d5e52899f706d27","f5c0d2e49453bac0","8e6ecd071b72033d","c6cf03998a9e63c8","a9eede6ea17f0f0b"],"restriction:local:failed":["96f484a5795f8aff"],"restriction:states:proposed":["2195fea337e09dc1"],"restriction:states:failed":["79f07d9601a68a2d"],"water:siting:proposed":["fecf28fd776e3f17"],"water:closed-loop:enacted":["f922a9cc8df7f6f1"],"water:closed-loop:proposed":["c842f3220a560928"],"delay:permit_denial:permit_denied":["b6e024ff51469e78"],"delay:historic_preservation_conflict:permit_denied":["b6e024ff51469e78"],"delay:community_opposition:permit_denied":["b6e024ff51469e78"],"delay:county_moratorium:moratorium_in_force":["d74c3761e71266b9"],"delay:community_opposition:moratorium_in_force":["d74c3761e71266b9"],"delay:interconnection:cancelled":["8cb756be5b7ae3a9"],"delay:water:cancelled":["8cb756be5b7ae3a9"],"utility:tariff:contested":["8de24874c642dcbd","f91605a21f63d072","d9c3570921a04363"],"utility:rate case:pending":["082924cd33e117e5"],"utility:tariff:pending":["7394fb772ac183e9","faf8561206d5bf0f"]},"grid_operators":["MISO","SPP","NON-RTO"],"counts":{"moratorium":21,"water":3,"delay":32,"atlas":33,"permits":25},"record_count":114},{"id":"MT","name":"Montana","groups":{"restriction:local:proposed":["9243773c369f1ecf"],"restriction:local:enacted":["8d6ef72e11d1fccd","3ecba2b53f87c88c"],"utility:tariff:pending":["6dcfac3c7c1172f6"],"utility:tariff:contested":["d367203d6f870b27"]},"grid_operators":["NON-RTO","SPP","MISO"],"counts":{"moratorium":3,"delay":6,"atlas":9},"record_count":18},{"id":"NE","name":"Nebraska","groups":{"restriction:local:enacted":["d3d7827f878ed2cf","c57a91902ce91633","4674af901736f5cc","e196b29819de5c9a","135d7b8ca90eebf7","d568851b5061cdaf","81440ae3fafa3d75","e8af315b45a1acfc","08fcf1d2b6f49514","160252554036f1ad","32303ecaa9e0a2ad"],"restriction:local:proposed":["affd265938fabf3b","8c97d016dfddfc1b"],"restriction:local:failed":["1d8ae470cf5d925b"],"restriction:states:enacted":["230cce9838d45d24","e688676c3ac0f747"],"restriction:states:failed":["67b1ace6369704fd","50fd44805485a090","ff2913405faf7657","8d77947d7b8a528f"],"water:study:enacted":["fe6d9f80cee7122e"],"utility:other:approved":["32c8b9ae8d888b6c"],"utility:statement:pending":["4af3c2798acdbf21"],"utility:rate case:pending":["1e47741959ff4b29"],"utility:tariff:approved":["823eb52c6feaee82"],"utility:policy:effective":["c01aa91e1a04b36d"]},"grid_operators":["SPP"],"counts":{"moratorium":20,"water":1,"delay":32,"atlas":13,"permits":22},"record_count":88},{"id":"NV","name":"Nevada","groups":{"restriction:local:enacted":["333dd9b87e58bcbb","b9a69bbde96b5385","55b16953865e48f5","37f2d1d5eb3e2cea","5b58a9e336830633","6773b1cfaaba1346","935d2182c6d74d12"],"restriction:local:failed":["402c12e2dbad57ba"],"restriction:states:enacted":["619839655d751fb6"],"water:moratorium:proposed":["e61948237d868f0e"],"water:moratorium:enacted":["279be78d9d551bf8"],"water:incentive:enacted":["efec6184955a1086"],"delay:water_dispute:under_appeal":["d29280cf2b0521a1"],"delay:community_opposition:under_appeal":["d29280cf2b0521a1"],"delay:litigation:halted":["a81117457f2cb354"],"delay:environmental_review:halted":["a81117457f2cb354"],"delay:litigation:litigation_active":["114d5609ed0f4f35"],"delay:local_moratorium:halted":["5c9d9715723ce0bb"],"utility:tariff:approved":["a7207409cc3dfd45"],"utility:other:approved":["fb307da5f358f615"]},"grid_operators":["NON-RTO","CAISO"],"counts":{"moratorium":9,"water":3,"delay":22,"atlas":20,"permits":18},"record_count":72},{"id":"NH","name":"New Hampshire","groups":{"restriction:local:proposed":["e63e233025fc94fe","b44152b5d37d167b"],"restriction:local:enacted":["d80de2562936a0f7","92290f0a7d985a7f","36c9c8099e12dd15"],"restriction:states:proposed":["5a9909b17dfc57b4","02f0a87d99437f9b"],"restriction:states:failed":["ea8860685576e23e"],"delay:community_opposition:withdrawn":["c1a6706de3454167"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":4,"atlas":5,"permits":3},"record_count":20},{"id":"NJ","name":"New Jersey","groups":{"restriction:local:enacted":["73ec87cfb0aa92d2","9c00fd42521991f9","a384a032bef8e970","124a77e04ac821ec","f23cd51e2cc7cb7f","238c6e78c54a4877","3af6dd3170f1aa82","714725f2229b99d0","08f19d7681319c4d","8cf681d798655aaf","20d0aeda361ce61b","a2b1b417fb0a76fc","face92012462a2a7","968c4f50d3bde674","ceb24ddecb59d86b","3a5c452ca6841c71","742e4aac2483f4af","80f6f1b93985f9f7","c95d899c60e09eb6","7c69fc6032dd27e8","60c1835a0012ce53","054f376e8df396e6","64e87a1ece4414b3","1b9d7255dcc00d88","e3e0f29d691690ec","01b12fb419074edd","c74b23df8b93a3f0","db82850c96b7a694","9844557ef3af937a","559fbafe318ed5ac","0c592d7ddda2c6ac","a784c9eec1d5c3f7","5fb4b28c2b68eccd","ea304a4830a80fb4","fe372a70ddf19936","48334bde9c2fa0b9","d177f8f0171343b7","62a91ee8ab340642","ebd8ee2e6043e34f","39ed97a814dde3a9","3a432a805dccac1c","50b87b303123480f","9a18c03c18a10dd4","b3ca39b6b1630160"],"restriction:local:pause":["1a9db0d9060caea1"],"restriction:local:proposed":["ae409fafdf46bd29","f884ab9b88fff31b","927a7a3ac1c78482","d95561001f914447","7be184c2d2a57e2b","0e8c72bfcc16a39e","8820df8f26c39fea","78d39318109dd5e8","fd2b054d547ea766","df9befec2a94c308"],"restriction:states:enacted":["4df967540ce38c86","30be08e4be6ac9ca","68de33fe969f9287","0438d1ace3661698"],"restriction:states:proposed":["f19c1038b15c7609","d12af38fe29d843e"],"restriction:states:failed":["f915c938338285f1"],"water:disclosure:vetoed":["800fd0cd4f6bebba"],"water:siting:proposed":["45f1ccb950a71b8a","a375aa38a4210e7c"],"water:disclosure:proposed":["0cf376028b422204","36230e1c7c9edac6","c77115dfc059c958","de400f891c588542","6998a87b3e02ca11"],"water:study:proposed":["a7495217b70ef1e5","9cef65942ed49967","bced9687293104ba"],"water:disclosure:failed":["59ae5b971166ac3c","791cdd88090bef4e","1908cf4216d925bc","073e65e826df6c51","378fb181ac8f016c","60262597b91c5af0"],"water:study:failed":["f640ec3294e3f1f2"],"delay:zoning_denial:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4"],"delay:litigation:litigation_active":["54dc7c86bddf4103","b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:local_moratorium:litigation_active":["b617e293b82d2ac4","3b478d5d6f56d1ab"],"delay:community_opposition:litigation_active":["b617e293b82d2ac4"],"utility:tariff:pending":["f28161bfc2c29f8c","3620e96459726891","1a6ae3c2ad122164"],"utility:statement:pending":["2e9ea8571e10d078","7a11205dc76a67a6"],"utility:tariff:approved":["296ea913839e1b58"],"utility:other:contested":["5c1b494458632232"],"utility:policy:effective":["3af8bf166bd3c54d"]},"grid_operators":["PJM"],"counts":{"moratorium":62,"water":18,"delay":72,"atlas":65,"permits":18},"record_count":235},{"id":"NM","name":"New Mexico","groups":{"restriction:local:failed":["818109db81472817","f9afe907073e0002"],"restriction:local:enacted":["297204240678eb0e","9ff51438652ddf60","59bea7e940d70194","ada7aa80e60c9320","5eb7f0ff789e43fa"],"restriction:local:proposed":["8ddb604cc82e2c35","b6fb3ebcb7f6c50f"],"restriction:states:proposed":["a99720a3bb94fcaf","78568f32702491ba","b4b3d5817b49728f"],"delay:litigation:litigation_active":["f3a0c010a8f35a41"],"delay:zoning_denial:litigation_active":["f3a0c010a8f35a41"],"delay:community_opposition:litigation_active":["f3a0c010a8f35a41"],"delay:financing:litigation_active":["f3a0c010a8f35a41"],"utility:other:contested":["8ef259cb295588bc"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":12,"delay":12,"atlas":10,"permits":7},"record_count":41},{"id":"NY","name":"New York","groups":{"policy:environmental-review":["71f511e90d956ca8"],"policy:permit-hold":["4c560e212a74545e"],"policy:supply-review":["ab3c1a20557c8b23"],"restriction:local:enacted":["77679a7c3332c853","a787c81c1d3730a4","cdc22ba5f2f05b59","b14b8ef8ed1860cc","8cca37bd22e9d7b5","4975cfd97e76b52d","bd582af96f35230a","5ffdbe85acc1bde0","a1694e06d983606d","8981b39c54144dc6","d0967cbc5048c7de","210debbc0355f8ce","f47af1d0c2261335","b9f412d2266126c0","723df3b34c814ee8","cebe672bdd456765","edbfc6143edc2bdf","8a9e37cabb7d8067","59d414cbb6a42f77","17aedba2bb3f2d87","2e58841b837a406b","0e1022291bffc7b7","12dd3a35361949ae","3511a027b56d7d7d"],"restriction:local:proposed":["dcd7ff846525f0e1","08c437cc51d4c950","789641906952093a","28bc949979bb83db","111d81838fa01dde","3e58cfc1f209b083","7ae98bc62927c82c","9137cf580ba6858a"],"restriction:local:failed":["cb6d8c82049c8acb"],"restriction:states:enacted":["869f08a4a1fa556c"],"restriction:states:pause":["841d22380b00ad01"],"restriction:states:proposed":["b7ba31aec1fafd00","47c9cf15c60d51b3","daaf6dec95bd6ec2","07d737c4acf173d7"],"water:moratorium:enacted":["8fc3c7d9b9ff9ba8"],"water:reclaimed:proposed":["4ee636f9337e1806"],"delay:environmental_review:delayed":["51347b4b64fa9e01"],"delay:community_opposition:delayed":["51347b4b64fa9e01"],"delay:state_moratorium:halted":["293beafa3fa06f20"],"delay:local_moratorium:halted":["293beafa3fa06f20","77e9bf4bd7aac210","ee2c0366ee0ef429"],"delay:litigation:litigation_active":["e81eb7c91736a32a"],"delay:state_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:local_moratorium:litigation_active":["e81eb7c91736a32a"],"delay:zoning_denial:litigation_active":["e81eb7c91736a32a"],"utility:other:pending":["57638a6f961a13ac","1552fe1a118cce4c","e654e6cbee2e4334","6cf999b790c4a9a6","5b7294bb9bbf171f","a15e9c634f236eaf"],"utility:tariff:pending":["acb3338b2c56b00c","637843fba8961a3b","f4e2166ff0723f1e"],"utility:tariff:approved":["d8fdd2247363f439"],"utility:other:approved":["4b76df05fa507106"],"utility:statement:pending":["85d4d00b457a99fb"]},"grid_operators":["NYISO"],"counts":{"policy":3,"moratorium":39,"water":2,"delay":41,"atlas":26,"permits":4},"record_count":115},{"id":"NC","name":"North Carolina","groups":{"restriction:local:enacted":["0878148bce531a65","26626f41150f13d7","5d4e94286383e811","45843231657d4577","b767f9b8778c3e9c","0425c77f21429fc9","160ecb6859daba38","f700899151bd3d13","afaf001e2ddc7c0f","9125956ad212eba6","1e5e7d19256112cb","de170f5d806a8488","7e05882bb14eba58","d5446d1a27d68afb","66d7df4ef7713b17","a96570a4d8c02995","03d509191d6a1bb8","d3b97dbcfb4cc458","11b4b426a5a3adeb","9730db9306df2eda","f7b5b5059f3d9a76","a7863b1a8d95a6f9","e6debd81c60b3074","72b422fc810eeab3","6bfcfb56a94aa399","0fe95e27742d2793","7f7b78e8dd0072a4","3ab16e9b6bda0047","58f61d5e2dcac367","901f12fcfb423655","77ad5d31685db4d2","13de2569fd40eab9","2c3f7f7d7474e8df","047fa125450d5c53","d7d45ef0e253b55d","2aa6e2ef54433db5","076a69b4395ac51c","aeb0772ca82eb874","49ad917ecc3002cf","c355e8d58e082040","1eeb09c2f8b5063f","37a1cf7995845834","2bd64ffed6dec4b3","17d8cc51d6a5711f"],"restriction:local:proposed":["84efe8243d6504bc","181bd4b518b2cfed","b83f8907c29714e9","8294c67374182bdf","8b259a9fdb940566"],"restriction:local:failed":["928488ab5100d192","aafc220952d6a48c","e3fad9e4ae5cae83","b68811b610a11964"],"restriction:states:proposed":["f10a82ce8ce07853","2bf52937fb8640a7","d91aa188fd06f5e0"],"restriction:states:failed":["35ebc5f44dd67c98","ccde728219226db1","857477e095526aaf"],"water:moratorium:enacted":["b9f652a9b7c4b011"],"water:moratorium:proposed":["38d2bf42e833778a"],"water:closed-loop:proposed":["ad8e73dba358f034"],"delay:community_opposition:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:zoning_denial:withdrawn":["c8b91c53c8d76443","2364b319549649b0"],"delay:litigation:litigation_active":["26de238e0f400d29"],"delay:local_moratorium:litigation_active":["26de238e0f400d29"],"delay:community_opposition:delayed":["886117a42038f872"],"utility:tariff:approved":["3733629beaf1ada1"],"utility:statement:contested":["8f109ead8aab43d0"],"utility:statement:pending":["5338dfae87b7a6f7"],"utility:tariff:pending":["535ff2bea70f7e1e"],"utility:other:pending":["36e711f6271a98a9","b8438dca9b49aebd"],"utility:tariff:contested":["1a0900299d02d68d","f4c8c4668d869233"],"utility:rate_case:pending":["45ffc3ccaa151b55"],"utility:other:denied":["7d51d5e504430b5e"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":59,"water":3,"delay":67,"atlas":44,"permits":34},"record_count":207},{"id":"ND","name":"North Dakota","groups":{"restriction:local:enacted":["918ec9976a6ebc76","5fe4251ab4cdcb1d"],"restriction:local:failed":["da10b7684b67acdc","b94dc16d48f67fd9"],"restriction:local:proposed":["0867cb4ffce5c18b"],"restriction:states:enacted":["10810ad90dae3c22"],"restriction:states:failed":["06b00e83aed9df20","37e09c9be2329183","45f55a5bdae7aa9c","bc1c99050827355d"],"utility:tariff:pending":["bd130d6595b26f7c"]},"grid_operators":["SPP","MISO"],"counts":{"moratorium":10,"delay":6,"atlas":9,"permits":2},"record_count":27},{"id":"OH","name":"Ohio","groups":{"policy:cost-allocation":["55634d9b0e3dbe0d"],"restriction:local:enacted":["461dc19405784392","691815701a1e7b84","407f6a32f3a3a0ae","1d451c4d01991061","c05d611c3e7dd8d5","303593cae196f587","7a83cf56d52a963c","7fc064d20dc788bd","a7e5c5aec188366b","7ce6031118cad4fd","8f219dc030624cd2","950d5e0e199dfb22","c2b95d5838587ff4","9ba6b9b9692b4708","d72f4489e825fef2","940b6159ab502612","f0c97f968bab3081","405f1ab18b45cec2","8542695ddd9b5b30","7026f0fd2b5bc6f0","ca89ad24dc656f79","978214f7dd1d9d8f","c1bda0acec337164","730091555169da66","3b3d27d4919f1e77","a96013d0b5b1c9a2","d8f63ab9b450228a","cc6ca7b31398d910","306d3fab23b96651","f394a0eb7801b57b","0ac4ec70dc0bb4ba","6cbf93fd3792d38e","c0aba8a27555a0c0","d533d9f7cdfc603d","ea2a114d10a3194e","61fe898c9107f2ba","4b26ee4f418c3dd5","cccc5aef83beacac","f1d5c9a4b6023b27","4fbd89f670532629","421b341a093f14c9","53701fd2f75ff500","23811974e54dcac2","b90f5b1569114026","ca5208c669ad2550","ecf81cf135cd7c41","fe4bc2e21abc7fd0","c636f6e8fe61d8bc","70667db94a767cf0","d3ccdcc868a68902","0fc759bfa86292c3","12369281bb53a55f","5f2de78e4e2f9413","2321a1c503022d33","bc140f9d0778a158","88cd458bc7993ab1","e281827c22b8aaa6","904259f746e7f001","668044e9a5218b84","e526f703d4ba3d40","406582468189cd53","e560f4fc1b2d48cf","15eda7648a7da254","1ea75a7e46cea951","8c428e28c6fa59b7","94595b6204b14f34","a795c2b6fa5fb605","a91e87e8e532a81a","0f566e9f055d874d","a3338ba4c589f2a1","024a636c91c52568"],"restriction:local:failed":["941a2b27ff9dd2f9","f0125c1f3d577939","1984235e10d07864","47e7f50ceb79bde2"],"restriction:local:proposed":["329efb5b9ab278b2","fe3263d096bb1d42","f0c8462ea6d10a36","5d2dc1ac11a37fd0"],"restriction:states:enacted":["a33e963e7ed0f3f9"],"restriction:states:pause":["aac6bd4ca937a3a1","790d7df967d13e33"],"restriction:states:proposed":["9791d6ee8a159714","5bb7dbbf3f54e1f6","076c38b44f191708","35dfe120e8f90c81","a4f886faea465453","f67274b3d1ca79e3","b0b20187a84ac61b"],"water:siting:enacted":["1fc784371ef77c63"],"water:closed-loop:proposed":["d9a55d5bd1815a7a"],"water:disclosure:proposed":["07d5958ebc0e2919"],"water:siting:proposed":["af9b7989afe0d6ff"],"water:moratorium:enacted":["b03281ae45156609"],"water:rate:enacted":["f38675b9d14c3301"],"water:shield:failed":["31cb3e61422ae705"],"delay:community_opposition:delayed":["6041ee70dd8ec4f2","33619bda345609b8"],"delay:regulatory_review:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:power_allocation_dispute:regulatory_approval_pending":["67f7d406d0b7de7c"],"delay:corporate_reassessment:construction_paused":["ec84904200576a9f"],"delay:openai_relationship_change:construction_paused":["ec84904200576a9f"],"delay:tariff_costs:construction_paused":["ec84904200576a9f"],"delay:local_moratorium:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:proposed_amid_local_moratorium_and_ballot_fight":["ceca7cca8784dd96"],"delay:ballot_initiative_threat:signature_gathering":["738d37cb16e4b52b"],"delay:statewide_moratorium_push:signature_gathering":["738d37cb16e4b52b"],"delay:local_moratorium:halted":["8924323156a513a6"],"delay:community_opposition:halted":["8924323156a513a6"],"utility:tariff:approved":["b119f3dad60e8067","b0b7b5e3ba42091a","feb6e8ebba7bc21b","d471fb8c04d4d42b","e688652c63a8603c","3b0d6703179b004f"],"utility:tariff:pending":["4e7c1eaf6aefd563","8d64014cf73ea8c5","33358a52bdbff1e9"],"utility:tariff:denied":["d77af2ba4e087bb7"],"utility:rate case:pending":["1f4f51f2805cd230","4e52d117f119a0ab"],"utility:other:pending":["8867995dfeac8af8"]},"grid_operators":["PJM"],"counts":{"policy":1,"moratorium":89,"water":7,"delay":156,"atlas":100,"permits":15},"record_count":368},{"id":"OK","name":"Oklahoma","groups":{"restriction:local:enacted":["50b51ab105de1694","4d5225243a046a38","42183c5f0e187ec9","2da276ac2eced4b7","409936f3ff16ca77","fd3e3e400e15bcb3","311f0b103dd1c20a","e11236c60dcb019b","af39a5a9b91cf374","80850e3b3240130d","6d6d4b47a1f08094","fd7e05f695b792fb","57bfec0310076c02","ac38ecc9080693a4"],"restriction:states:enacted":["5ce11b610f2019f8"],"restriction:states:failed":["c5ac0e3ebaec0fff","df4a0cf535656562"],"water:closed-loop:enacted":["f01e9c7f92ad912f"],"water:disclosure:failed":["4cffe4be712b7fee"],"delay:community_opposition:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:water_capacity_constraints:under_construction_amid_water_concerns":["b02a88e32f069571"],"delay:city_moratorium_partial_exemption:phase_vote_delayed":["d2464a0059b2da36"],"delay:planning_commission_delay:phase_vote_delayed":["d2464a0059b2da36"],"delay:community_opposition:opposed_proposed":["d6d03051edf8cadd"],"delay:transparency_concerns:opposed_proposed":["d6d03051edf8cadd"],"delay:water:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:community_opposition:cancelled":["b81165f74fca6c9b","194ddf5960f0882a"],"delay:financing:cancelled":["b81165f74fca6c9b"],"utility:complaint:contested":["6a0e62dd608338b3"],"utility:tariff:pending":["0244a5050bd89f54","d23c9de2ed780784","369b25b59f1044b0","8caf179819a91899","b44407ade651e171"],"utility:tariff:approved":["7c0393e3288507ab"],"utility:policy:effective":["533edea4d22fcfc3"]},"grid_operators":["SPP"],"counts":{"moratorium":17,"water":2,"delay":29,"atlas":25,"permits":34},"record_count":107},{"id":"OR","name":"Oregon","groups":{"policy:cost-allocation":["ec3aab8c8e487810"],"policy:minimum-payment":["09b69a3ac7ed320c"],"policy:clean-energy":["573b7be7282c24e9"],"policy:regulator-reporting":["82e5b2896507c105"],"restriction:local:enacted":["c46ac99932456879","bfb08271f1889aa3","406a4fe8c580044d"],"restriction:local:proposed":["9fecbaadfc504d91","55072e55f3993603","c167670c15d2c9ec"],"restriction:local:failed":["2217c7fce49a6fcb"],"restriction:states:enacted":["4266a70286a34bc9","fd7d68ca06671d0b"],"restriction:states:pause":["b05de37e3bed5008","0bb7ee781820adb4"],"restriction:states:proposed":["1d87e7ca35d788e4","97e59a9c63be62e9"],"water:moratorium:enacted":["f436cd79501cb106"],"delay:litigation:litigation_active":["189ec25f09c73d30"],"delay:local_moratorium:halted":["fc7ac8c5e0c9a3e0"],"delay:water_dispute:halted":["fc7ac8c5e0c9a3e0"],"delay:tax_incentive_change:halted":["fc7ac8c5e0c9a3e0"],"delay:community_opposition:cancelled":["508cd09772361d44"],"utility:tariff:approved":["8f26d54b8098d83a","933a75515edac858","919ed293cccce0b5"],"utility:other:approved":["fd904a85f9f038d0"],"utility:tariff:pending":["90bff93d506e12d8"],"utility:other:pending":["500c12c6d84c5535"]},"grid_operators":["NON-RTO"],"counts":{"policy":4,"moratorium":13,"water":1,"delay":16,"atlas":8,"permits":28},"record_count":70},{"id":"PA","name":"Pennsylvania","groups":{"restriction:local:enacted":["38de5bf25db60ea6","a07e0f5e3b200bbb","e0e19b054c78ba90","d57a038848981525","08cc6d470b3f20a4","786ec40f80121492","9d46b0435161c347","7f0801a61ac6bdc8","e91f573252606528","30d8d8996a24365c","7a05632963af26b7","0525ead7d8196b60","c49102319b7d9c26","828f9f1b7a9fc4d8","7e498adfb9cf36be","30e2226befeb9e41","d01de37fe2c38608","3ef85431f6a82760","50a74ef750ecebc2","86690394ec34fe0d","f4098716a0ee721b","2f1f35aee33b8d1b","0b7ff980380eafa0","a80d24e122853bfe","83bf5bc987c8973d","b4f499936ec56461","b3ea3d581da9a606","71a38b1ed5950ad1","e191001ca64a606d","f9511193a66cd3bc"],"restriction:local:failed":["491849e21df0aa97"],"restriction:local:proposed":["04f7d83298b30de7","f979d0fdee3f9fa3"],"restriction:local:pause":["533afd77cfc5eebb"],"restriction:states:enacted":["7f4af8a87d95c544","7471943bfacd9b79"],"restriction:states:proposed":["6aa38b3ad7bc8095","30479ff8f518235c","2f437f53e7c38048","535c2efca50b83dc","1b368eec31f98fde","5442b108786851c0","f486ff97ce82e49d","7739eeecd45bc5b3","a5f21a3c4a91636e","a4c98945f6116fb9","122b2ca8ea2dce4c"],"restriction:states:failed":["291e4c7a5a21088d","9a687477c380a153","9ab4c50b87f3e567","c916da28feddac2f","a879ae6745a42d11","ce6deddc6f7620a6","d3752761d30cd8b6"],"water:disclosure:enacted":["71b44216bc39b316","19977f7326ae5f36"],"water:disclosure:proposed":["ce335eca213a335f","268f6575720b3e76"],"water:siting:proposed":["e6cd4c87af287f2e","ec0986faeb616e79","02edb086bcb4ec16"],"water:study:enacted":["7e7071bf9f2d7636"],"water:siting:enacted":["f4b911f9a8638b44"],"water:closed-loop:proposed":["ecec2267314e711d"],"delay:zoning_denial:under_appeal":["221a7177ef54c146"],"delay:community_opposition:under_appeal":["221a7177ef54c146"],"delay:litigation:under_appeal":["221a7177ef54c146"],"delay:litigation:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:litigation_active":["acb6c23674d3443b","457d01e6aa50ccb9"],"delay:community_opposition:cancelled":["72fbfc95e6717af4"],"delay:zoning_denial:cancelled":["72fbfc95e6717af4"],"delay:community_opposition:delayed":["91270d77ce33c433","b79613921282641a"],"utility:tariff:approved":["4c72868c8e004412","c89690d0346c7890","ac3f1efb2976fc5b"],"utility:rate case:approved":["e934571677cf1704"],"utility:other:pending":["fbc1615a2aea7504","84096c1cd33d1c29"],"utility:tariff:pending":["6ccd7eecfb420cbd","03f4e94591ffe708"],"utility:tariff:effective":["d4a74e67bb8dc281"],"utility:policy:pending":["04bd0eb54a15c158"]},"grid_operators":["PJM"],"counts":{"moratorium":54,"water":10,"delay":84,"atlas":53,"permits":21},"record_count":222},{"id":"RI","name":"Rhode Island","groups":{"restriction:local:enacted":["ed259525eb90ab6d","dab8ece38c5fb9d5","09f9a1112ca9bb16","8758bf36db37de62"],"restriction:local:proposed":["9c9aa6a6cab87eae"],"restriction:states:proposed":["39109139e4499da1"],"restriction:states:failed":["87b18404613879e9","1ca1db6d54c60804"],"delay:zoning_denial:litigation_active":["09f90dd4b212e592"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":8,"delay":6,"atlas":5},"record_count":19},{"id":"SC","name":"South Carolina","groups":{"restriction:local:enacted":["58631f91fad85e5b","b8911b8723010e16","f7b981d36cb76fc6","ead5aac6d1de0198","28116638b206c684","e712a9602d7fc092","17168f8283569007","3fbf04d4d1abbc30","b5c702b7d9d268b1","31c3c407ecaa9b02","08d501a7dce90945","bfe556ca5819bf38","65163505f47f6e65"],"restriction:local:proposed":["d522fdfd4fa7adac","9e6a95af9b1a6338","5e3217c2394c85d9"],"restriction:local:failed":["ead4c3dd6bcf23b7"],"restriction:states:proposed":["70456b2f17fa016f","1bd520760aca35e7","dfe1a31d8cfe99e5"],"restriction:states:failed":["d7cf8717beef89cd"],"water:closed-loop:proposed":["836cb4c1add36778"],"water:siting:proposed":["d5588d305d72ed31"],"water:moratorium:proposed":["feaa74b8ade8d152","e0c20f860681a471"],"water:disclosure:failed":["2a360b96adeac4a5"],"water:closed-loop:enacted":["c4c6394d78cf14cf"],"water:moratorium:enacted":["83129110381c2b8d"],"delay:regulatory_review:permitting_challenged":["ebbc3548ee675c57"],"delay:environmental_petition:permitting_challenged":["ebbc3548ee675c57"],"delay:utility_interconnection_timing:abandoned":["59d31c90f99a8e27"],"delay:withdrawal:abandoned":["59d31c90f99a8e27"],"delay:county_moratorium:moratorium_in_force":["4fd68a1a4d95ecf1"],"delay:permit_denial:halted":["2a19530b645b4515"],"delay:local_moratorium:halted":["2a19530b645b4515"],"delay:community_opposition:halted":["2a19530b645b4515"],"utility:tariff:approved":["a6a9b54dc2f7e887","4acfdfc6ae530074"],"utility:rate case:approved":["836e8495e0094213"],"utility:other:effective":["4650a698f603d88c"],"utility:other:contested":["5976280cf4e599c1"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":21,"water":7,"delay":30,"atlas":22,"permits":3},"record_count":83},{"id":"SD","name":"South Dakota","groups":{"policy:cost-allocation":["e1de11c16d8239a6"],"policy:departure":["b87c8e5ab20d7865"],"policy:supply-review":["5f04413f1e1d314b"],"policy:water-reporting":["3d0987d18045023f"],"policy:local-authority":["d5abe6128808804e"],"restriction:local:failed":["0c5ecfaba5561367"],"restriction:local:proposed":["5a5f4731708d3508"],"restriction:local:enacted":["127e547bdcf06887"],"restriction:states:enacted":["e69882d4dd9dec56","e0c13222b8896f55"],"restriction:states:proposed":["d2cb3118b636a794"],"restriction:states:failed":["3ddf71976e354659"],"water:disclosure:enacted":["95158506706fb5b4"]},"grid_operators":["SPP","MISO"],"counts":{"policy":5,"moratorium":7,"water":1,"delay":4,"atlas":4,"permits":1},"record_count":22},{"id":"TN","name":"Tennessee","groups":{"restriction:local:enacted":["15608211c6ca3581","307b38ee1b228384","23049879ff0a5d1c","7cebe8d5c67147c3","747d1db6063c1a74","51b2b9b3a961b6ab","de659fa3e365eec8","33552bf4e80b18ee","730a5f5d55050cb7","087bbbb5a483b776","0137c4ed47954709","8272522f979f7008","9d632430d6a03021","78dbb699f219d0d0","1f546cb2797f996d","c43fd1c858232412","b97b3954b1b0949c","d68b3a39798f9791","f0bb509eaf3c5b2f","a431da7d7f705e27","048501d4a5383269","8cb4602a6ee8dcbd","af28772857e3903f","3e19367856e206f1","241a6f9524fa5b55","54976e44fee3018e","ebeae99d6b6421df","0d02b8ce1211373d","492d17cc76c60e58"],"restriction:local:proposed":["c72ff700a8b5e0fe","a5263d6dfaed1a21","05ec77d83a2fb722"],"restriction:states:enacted":["3c219120a612265b"],"restriction:states:proposed":["963831dc8907e951"],"restriction:states:failed":["640e5053d7ed492c","2f485290fc876c3d"],"water:reclaimed:proposed":["34047d55aaad8568"],"water:disclosure:failed":["3024f2dbcb00785c","7932fbffdf71a9e7"],"water:siting:proposed":["95d5d77e861f2e1a"],"water:moratorium:proposed":["51b30007138592e5"],"water:closed-loop:proposed":["bdc557047de3e52b","3b9e61fb1da5de65"],"delay:local_moratorium:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:litigation_active":["b63b7988b1a6e4a0"],"delay:litigation:active_litigation":["f23f3210c5447afd","9783ae8705aab3e7"],"delay:city_moratorium:active_litigation":["f23f3210c5447afd"],"delay:eminent_domain_threat:active_litigation":["f23f3210c5447afd"],"delay:rezoning_denial:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:county_moratorium_recommended:rezoning_rejected_moratorium_recommended":["d1de5e4992b534d6"],"delay:environmental_review_order:active_litigation":["9783ae8705aab3e7"],"delay:unpermitted_power_plant:active_litigation":["9783ae8705aab3e7"],"delay:community_opposition:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"delay:transparency_concerns:under_construction_amid_scrutiny":["18dc39f31efad1cf"],"utility:tariff:pending":["b63a0876c6c743c3","af3b47ccdb7cb94a"]},"grid_operators":["NON-RTO","PJM"],"counts":{"moratorium":36,"water":7,"delay":38,"atlas":29,"permits":5},"record_count":115},{"id":"TX","name":"Texas","groups":{"policy:site-control":["170b3631ad48f5a9"],"policy:security":["1deb6f4ebbbba3d4"],"policy:curtailment":["56b017e8edee0f3b"],"policy:emissions":["e17cedb3112fd488"],"restriction:local:enacted":["cb4fae95f6ec62e9","226d9579a44729dd","8725a51570228ad5","9cd0e5a2740b6579","49d98f654070e13e","5a6631afcf14f245","1526c144af9c4197","bfaeb2b05925f9bf"],"restriction:local:proposed":["aa120245d3cde2b5","4bbd796802e5b2a9","29dbbc44e88a23f5","d4ddebe26453aec0","fd40bfb18bd582d1","e3d9ca006093dd8c","347c664b42d6867c","f141990e3f9ddb5c"],"restriction:local:failed":["4cf9e86df26cb47f","036f9e40cb83532e","8fbbd5e4d1430368","0148c0779dde3d94","c154399207131e2f"],"restriction:states:enacted":["35fcd20bf3d4a4e3","07b7360c48f3c46e","98ec338e6e03cba0"],"restriction:states:pause":["707703d5f96368d1","41c39b9ee7a58df2","9607cd1000488b0d"],"restriction:states:proposed":["8d85cc66b1113104"],"water:study:proposed":["97674740d6ace3d0"],"water:siting:proposed":["ce0a82530ed2e6c2","617e27c4c491786f"],"water:closed-loop:enacted":["a3bc163e4fc8a78f","b41ba038f3b958e1"],"water:closed-loop:proposed":["0711b71f0ca0c23e","0026ba717d68569a"],"water:shield:enacted":["f512098faa3bf9c4"],"water:siting:enacted":["0d07fe0b0e4fa3bb"],"water:disclosure:enacted":["f4c280b4acf60e61","4fe0a4491af0e56e","ab5ef43c0bd56795","18fff3b222f896e1"],"water:moratorium:enacted":["23aaebd91e78f209"],"delay:state_moratorium:withdrawn":["a8fe02f84bc4a666"],"delay:transformer_supply:delayed":["a60e9b00093891d5"],"delay:gas_pipeline_delay:delayed":["87485593349454ff"],"delay:corporate_realignment:withdrawn":["15ca382a6f880e9f"],"delay:financing:withdrawn":["15ca382a6f880e9f"],"delay:zoning_denial:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:cancelled":["9832792554ff4c9d"],"delay:community_opposition:cancelled":["9832792554ff4c9d","0b4408147f79994e","a1bb576b290d6353"],"delay:water_dispute:withdrawn":["0581ab61da4d6697"],"delay:community_opposition:withdrawn":["0581ab61da4d6697","adfb727c5dd4e1cc"],"delay:litigation:litigation_active":["792ce5aec9329c29","109278a363838f96","f27cb758664748d7"],"delay:community_opposition:litigation_active":["792ce5aec9329c29","109278a363838f96"],"delay:corporate_realignment:delayed":["0120772c7188f042"],"delay:community_opposition:delayed":["168b4298a9ab289d","f7513e35f7c721c0","2e380fe2f7f014dc"],"delay:litigation:under_appeal":["f08287b22f91f244"],"delay:local_moratorium:litigation_active":["f27cb758664748d7"],"delay:zoning_denial:delayed":["2e380fe2f7f014dc"],"delay:interconnection_queue:halted":["d5e9430ff55efa0d"],"delay:zoning_denial:withdrawn":["adfb727c5dd4e1cc"],"utility:tariff:approved":["75dc99c20658fe92","aed4fabd0e2dc51c","9a879f558b598ed3"],"utility:rate case:pending":["3af74a147ed90618"],"utility:other:pending":["234c8b4fd863479c","b540667ef8b17e0f","0b11ccddef1877eb","99a349313213c782","87c2bcaca8770a64","ca36e7d667fd52d5","624c21796e30622a","6218dc8d9c2c19aa","a068f88c8918edb0"],"utility:special contract:pending":["85e644b149d44cc3"],"utility:tariff:pending":["179ce9c6749195ff","ecc5b89ff5cb7890"],"utility:statement:pending":["d04486225e3fbb69"],"utility:other:approved":["0b929d848501d87d"],"utility:certificate:approved":["f70bcf2339f86b49"],"utility:policy:rejected":["c7c2a7a3b4cd9ee5"],"utility:policy:effective":["ad4e34e0dfe00af1"]},"grid_operators":["ERCOT","SPP","MISO","NON-RTO"],"counts":{"policy":4,"moratorium":28,"water":14,"delay":83,"atlas":135,"permits":127},"record_count":391},{"id":"UT","name":"Utah","groups":{"restriction:local:enacted":["fe8d104f8d67e17c","093e457d95e139ba","a73c33aad89fd8c4","d39140513b342349","0c19d0bfb2b41666","be172ab12b60089d","7272dd8d9cbcbd97","2c4637d21201bc5a"],"restriction:local:pause":["6689ae5de85fb884"],"restriction:states:enacted":["161bb7df391f5393","29634d18789600f9"],"water:disclosure:enacted":["aa23c2f90b922d2f"],"water:siting:enacted":["92181bfbd0f092dc"],"delay:local_moratorium:litigation_active":["43fe8f06c251d00a"],"delay:zoning_denial:litigation_active":["43fe8f06c251d00a"],"delay:community_opposition:litigation_active":["43fe8f06c251d00a"],"delay:tax_incentive_change:cancelled":["9a747679a42936ff"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":11,"water":2,"delay":16,"atlas":23,"permits":16},"record_count":68},{"id":"VT","name":"Vermont","groups":{"restriction:local:enacted":["fd5d7c35a8a164d5","ffd4551238ee66c3","24609fa0cc03fd6d"],"restriction:states:failed":["a22c89dd88f7805b"]},"grid_operators":["ISO-NE"],"counts":{"moratorium":4,"delay":1,"atlas":3},"record_count":8},{"id":"VA","name":"Virginia","groups":{"policy:water-reporting":["d2e1f34ebb87db96"],"policy:regulator-reporting":["a2d7165da9c4273d"],"restriction:local:enacted":["5d1933a50e2fffa9","d9c9702f7193a5d0","00ea8549bf7d9107","5e8fa08848e7ea49","b612281109895776","a8439ee49b85f3b9","cb1ee56619c41591","fc8930e333e47393","33da24b96e9450aa","3c8c47c48655c7c2"],"restriction:local:failed":["c0313d873e52c337"],"restriction:local:proposed":["1fb124f1d0600aad"],"restriction:states:enacted":["07bca14c6c769cd9","822881c141b55b58","1bc4820da2e184d8","260f9d0fdac1fb1d"],"restriction:states:proposed":["115a01cddaaebb83","81387474427b857f","de3a5a259065cee6","d9698a681bcb77d1","1ccb96de87be8c20","6f2fd99dffb3ee19","5fbcc9b83d0cea89","5286a63674ab303e"],"restriction:states:failed":["96a928bdb916449a","82304cb623ce2fd1","1c2b5c27f2a20646"],"water:disclosure:enacted":["236efd0b5ce918b3","ea2fc9f0f2561dd5","1bb0eef74b265bbc"],"water:siting:vetoed":["fc6a89d84ea3761e"],"water:reclaimed:failed":["7c9863297abb29b6"],"water:incentive:proposed":["30149d37cde17dd5"],"water:study:enacted":["4d9a8e7a99e3e39b"],"water:disclosure:failed":["133af645ccadb7ec"],"water:siting:enacted":["13c66e32329bf4c9"],"water:disclosure:proposed":["739c2b83e1630596"],"delay:zoning_denial:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","ae2116cf001391ca","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b"],"delay:community_opposition:cancelled":["b654fcba5611c495","3de6fb41fb4c6757","c24066658a7c87b0","c05ff50d0eaddb83","b2f708f236602e8d","1df2fd29204a101c","0d43e4ef0a99dcc3","15020a3ca9ed5c0c","4ef0ce9c1aab379b","b0af2cf0f00c0c33","0093933737713687"],"delay:water_dispute:cancelled":["b654fcba5611c495","c24066658a7c87b0"],"delay:litigation:cancelled":["b2f708f236602e8d","3059b79f61908e3d"],"delay:community_opposition:delayed":["2a92789be1587ada","dc394d8881dcfd7f","d7fec75934b138bd","4ef289628ac834d5"],"delay:litigation:litigation_active":["01bbee83623720b2","e5c30ca57b2dbc24","dcf5dbffe665442a","85cd3631575a5bdf","1832912b622cc7ca","e7ee0387e9522f52"],"delay:community_opposition:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:zoning_denial:withdrawn":["4e9752c1f7793fed","dd7e54e17e5d9610","c0eb9b29986c263e","5bd7758d176ed830","c66e2ba9c7927837"],"delay:community_opposition:litigation_active":["dcf5dbffe665442a"],"delay:zoning_denial:delayed":["ba73fb104a300b67","dc394d8881dcfd7f","d7fec75934b138bd"],"delay:zoning_denial:under_appeal":["f8a6c494d6a909f4"],"delay:community_opposition:under_appeal":["f8a6c494d6a909f4"],"delay:water_dispute:litigation_active":["85cd3631575a5bdf"],"delay:zoning_denial:litigation_active":["e7ee0387e9522f52"],"delay:environmental_review:cancelled":["3059b79f61908e3d"],"utility:tariff:approved":["c2935488c1650819","39c6440688564d5b","87a87dde118e582a"],"utility:IRP:contested":["1d207f181f290a4a","9ba1e9a7df265951","7f6e112a0c84fe66"],"utility:tariff:contested":["d5ac5227a2747fcf","b3484cb6d3aad2da"],"utility:rate case:pending":["7a09881b3efc53a9"],"utility:other:pending":["cb40a9cac60f8cec","925eb6e874d3a48f","53aeac44973adb8a"],"utility:statement:pending":["95c8534650ed9b12"],"utility:tariff:pending":["17c7d5340af6b949"],"utility:other:contested":["e0efcc5e95491272"],"utility:rate case:approved":["2d9b62ed5a5a8c85"]},"grid_operators":["PJM","NON-RTO"],"counts":{"policy":2,"moratorium":27,"water":10,"delay":88,"atlas":73,"permits":642},"record_count":842},{"id":"WA","name":"Washington","groups":{"restriction:local:enacted":["9f5f2923e39b9be8","d4e7ad9cf08df51e","a0fc2d121a678362","0b3a9ecd7c2478dc","de683906483b8fe5","d6189396d865dfc1","a4d0a0075eb42622","844f1f18ded0ca1c","50cb86e7f24d5c8a","5f99587cd1f4762d","e207b014a5280c8e","abcdda3f927a1476","31a8daed20fe189e","af832be8ade36360","510f60e365739621","7eb7d0c92f5f8dd9","5565880179e00904","c8eaae4e91fc4247","4f498d7e9f152136","29f8e05bf47f65e4"],"restriction:states:enacted":["13d139ecdc65b4b1","b6f7e9b035c67d69"],"restriction:states:proposed":["73392c07183451a2","d65bf66b10bb27dc","d97ae6ca24475af1"],"restriction:states:failed":["b0d11e81f4e16dea","fc47b1de08dff922","383388e3142065cd"],"water:moratorium:enacted":["6455f69859c340a2"],"delay:community_opposition:halted":["8ced64a3cbb11f6c"],"delay:local_moratorium:halted":["0d03a9c2805d05b6","2fc49a0ff709020e"],"delay:community_opposition:delayed":["887cc460e5eb83f6"],"utility:tariff:pending":["c168cf070187ea92"],"utility:other:pending":["611e6f5599ef718f","8c8130676232d1c6"],"utility:statement:pending":["4ed38cff9678ccf0","4b866a2091ab3ecc"],"utility:tariff:approved":["325a6b7ee8b34e77"]},"grid_operators":["NON-RTO"],"counts":{"moratorium":28,"water":1,"delay":22,"atlas":30,"permits":13},"record_count":94},{"id":"WV","name":"West Virginia","groups":{"water:disclosure:failed":["8cf5514f4b5ff375"],"delay:community_opposition:delayed":["4124cb9080c91f7c"],"utility:IRP:pending":["a67a61284873a2b2","8da91197a3806bcc"],"utility:special contract:pending":["39679c94f0d7f830"],"utility:other:contested":["c12d842abe5446ff","040b3c446bff4aee","5e6fb296651a928a","6f948a872911044f","0ae82e92301e638b"]},"grid_operators":["PJM"],"counts":{"water":1,"delay":12,"atlas":7},"record_count":20},{"id":"WI","name":"Wisconsin","groups":{"restriction:local:enacted":["197cdb77aa511062","c32fbb4074e34eba","9fa928579bf6e19b","1ef57a5ad557563c","d383195f7d8cd078","07b5a8ef15cadf6b","0a3550a0b812064e","2f12caa1fa8a1620","4efd296b41cadd58","502234e3282fa94d","98de8d31bfd06c50","9baf377f17b48199","2b2ac1debfbe57ca","aee74a04d13b1375","02ac37032bda8131","375f029130348bd2","6e56afd4aed59791","893a3aae04278c40","7650d4a5b8a48f92","e18b7a4b7fbc1df5","b56152d653914388","b916df50f4c51b94","5a64d5c33607de67","643f527e927e4058","7b1745a42047131e","e09c79ad3db16d88","734fd94028341ac3","69f22ea5aa3e34d3","1a270a98a4fa2e6d","d41ed6223bfeed81","112e1e1079c890e9","844ad5858c872078","47a591fadc2e8900","f7cf8bb4ab48824a"],"restriction:local:failed":["0c67dadae5dac0e9"],"restriction:local:proposed":["e66086d4c7d49f01","c8953b5f4533a4b5","68e48cc43363c3ba","f04d2abd046f97a9","1eae3d6650182a35"],"restriction:states:enacted":["5db6a8a411191d98"],"restriction:states:proposed":["d9aeb06afb1cc48b"],"restriction:states:failed":["a7f7ac4ffcf569cf","e87712374a5a9bb6","1fa055042bc56cba","bf5f897298b22196"],"water:moratorium:failed":["dabd0296a8769724"],"water:disclosure:proposed":["52d3503b7b7a29d2"],"water:disclosure:failed":["3d11e7d09b3698e1"],"water:moratorium:proposed":["0d06b92b967fdc00"],"water:siting:proposed":["4157cf76b6d65b0a"],"delay:environmental_review:litigation_active":["debb467bcb4d5430"],"delay:litigation:litigation_active":["debb467bcb4d5430"],"delay:community_opposition:litigation_active":["debb467bcb4d5430"],"delay:litigation:active_litigation":["e199a6213982873d"],"delay:environmental_review_challenge:active_litigation":["e199a6213982873d"],"delay:regulatory_collateral_dispute:active_litigation":["e199a6213982873d"],"delay:corporate_reassessment:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:design_changes:construction_partially_paused":["18d12b7d0ac7dea8"],"delay:community_opposition:under_council_consideration":["28e37770792b4c08"],"delay:withdrawal:cancelled":["ea733b19fc76a19b"],"delay:village_infeasibility_finding:cancelled":["ea733b19fc76a19b"],"delay:interconnection:denied":["fd3e6fff23dec30a"],"delay:water:cancelled":["6b688ff399652711"],"delay:community_opposition:cancelled":["6b688ff399652711"],"delay:financing:cancelled":["6b688ff399652711"],"utility:special contract:approved":["c0e0e62ba225486e"],"utility:tariff:approved":["477299baafe80b07","8b74b857f211fa23","9d22a2aeb195e4fc","124399acbd7a554c"],"utility:tariff:pending":["dde2390c69924c91","4b8f10b414687805","7d0c020f1825cea4"],"utility:rate case:pending":["fbf33f025d17bc1f"],"utility:other:pending":["8f81691272c2cefc"]},"grid_operators":["MISO"],"counts":{"moratorium":46,"water":5,"delay":59,"atlas":44,"permits":6},"record_count":160},{"id":"WY","name":"Wyoming","groups":{"restriction:local:failed":["d0485054fd79e820"],"restriction:local:proposed":["3ed10f6e2d7fa4f4"],"restriction:states:failed":["be934bcf6dde21e3"],"utility:tariff:pending":["b1729fb79f6ff5af"],"utility:tariff:approved":["48ce507193eae507","2e0818019f3d14fe","103e672184e6c568"],"utility:other:pending":["b06ef4aba51b6d71"],"utility:special contract:pending":["31c5bf9bd2103358"]},"grid_operators":["NON-RTO","SPP"],"counts":{"moratorium":3,"delay":10,"atlas":13,"permits":4},"record_count":30}]}