# Mountain Creek: a 300 MW AI factory site south of Dallas
Source: https://savrn.com/available-sites/mountain-creek
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Available site · South of Dallas, Texas

# Mountain Creek: 100 acres south of Dallas, scalable to 300 MW

Ready for development · joint venture with the landowner

Mountain Creek is a 100-acre site in the Dallas metro, developed as a joint venture between SAVRN and the landowner. Natural gas is at or near the site, fiber is in reach, and transmission and existing generation sit close by. SAVRN builds it out in SAVRN Atom blocks, up to 300 MW gross.

[Request the Mountain Creek site package](https://savrn.com/engage) [See the SAVRN Atom](https://savrn.com/atom)

Site area

100 acres

Gross capacity at full build

300 MW

SAVRN Atom blocks

~23

Power market

ERCOT

Ready now

## What is already in hand

- Land100 acres under a joint venture with the landowner.
- FuelNatural gas at or near the site.
- NetworkFiber access and Dallas interconnection 7 miles away.
- Grid in reach345 kV in the area, substation within half a mile.
- ScaleUp to 300 MW gross, built in 13.2 MW Atom blocks.

Power

## The power plan

Mountain Creek is planned for onsite generation, sized block by block with the campus. Two paths are open and can be combined.

- Gas turbinesBehind-the-meter turbine plant on natural gas at or near the site, built out with the campus.
- Fuel cellsModular, low-emission baseload that grows one module at a time. A strong fit for the Dallas-Fort Worth air basin, which is in ozone nonattainment.
- GridHigh-voltage transmission up to 345 kV in the area and a substation within half a mile, for backup or export under ERCOT large-load rules.
- Existing generation nearbyUtility-scale gas-fired generation operates close to the site.

Scale

## Built block by block

1

23 blocks · up to 300 MW gross About 23 SAVRN Atom blocks at 13.2 MW gross each reach 300 MW gross. The first block energizes first; the rest follow demand. First blockLater blocks · 13.2 MW gross each

Connectivity

## Fiber and access

- Fiber accessFiber in reach of the site; the carrier entrance is confirmed in the site package.
- Dallas interconnectionA Dallas interconnection facility with multiple networks about 7 miles away, under a millisecond round trip.
- Rail and highwayRail within about 1.3 miles; a state highway within about 0.6 miles.

Site conditions

## Screened with SAVRN Site Intelligence

Each condition comes from public federal and state records at the saved site, screened by [SAVRN Site Intelligence](https://savrn.com/intelligence/sites).

| Flood | FEMA Zone X, minimal flood hazard |
| --- | --- |
| Seismic | Very low (PGA 0.04 g) |
| Land | Developed, gentle grade (about 3%) |
| Wetlands | None mapped on the site |
| Climate | Design wet-bulb 80°F: closed-loop, dry or hybrid cooling |
| Workforce | Dallas County, population 2.6 million |
| Incentives | Texas sales and use tax exemption for qualifying large data centers |

Next step

## Get the site package

The exact location, power and fuel documents, fiber, zoning and the full Site Intelligence screen are shared with qualified tenants and capital partners under NDA.

[Request the Mountain Creek site package](https://savrn.com/engage)[All available sites](https://savrn.com/available-sites)

Have a site of your own?Tell us where it is and what power it has. We look at every site for a joint venture.

Screening and planning figures are subject to confirmation in diligence. Gross MW includes cooling and facility load. Market: ERCOT.