# Talino: a 500 MW national AI factory campus in the Philippines
Source: https://savrn.com/available-sites/talino
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Available site · Laguna, Philippines

# Talino: 50 MW per phase, 500 MW at full build-out

Concept stage · national, institutional and enterprise partners invited

Talino is a proposed AI factory campus in Laguna, Philippines: industrial-scale compute powered on site, with data that stays in the country, and a training institute that prepares the local team to run it. It grows one identical 50 MW phase at a time, ten phases to 500 MW. SAVRN builds, powers, operates and takes it to market.

[Engage Talino](https://savrnplatform.com/p/talino#engage) [See the Talino concept](https://savrnplatform.com/p/talino) [See the SAVRN Atom](https://savrn.com/atom)

Per phase

50 MW

Phases over time

10

At full build-out

500 MW

Institute departments

8

The plan

## What is planned

- ConceptA master plan laid out for all ten phases.
- DesignOne repeatable block design, no redesign between phases.
- WorkforceAn eight-department institute planned on campus.
- DeliverySAVRN responsible for build, power, operations and go-to-market.
- Scale50 MW per phase, 500 MW at full build-out.

Power

## The power plan

Talino is planned as a self-powered campus: generation is built and firmed on site with each phase, so the campus does not compete with the community for grid capacity or water.

- Onsite generationBehind-the-meter power generated and firmed on the campus, added phase by phase.
- Islanded designEach phase stands on its own power rather than leaning on the local grid.
- Sized for the full buildPower, cooling and roads are laid out from day one for all ten phases.

Scale

## Built block by block

1

Ten phases · 50 MW each · 500 MW at full build-out The campus grows one identical 50 MW phase at a time. Each phase is the same proven design, so every expansion repeats the last. Phase oneLater phases · 50 MW per phase

Site conditions

## The campus

Talino is a concept for discussion. Renderings and figures are illustrative and subject to power, structural and feasibility study.

| Location | Laguna province, Luzon, Philippines |
| --- | --- |
| Compute | Factory-built, liquid-cooled modular blocks, identical in every phase |
| Data residency | Compute and data stay in the Philippines, ready for regulated and national workloads |
| Institute | An eight-department training institute that prepares local residents to run the campus |
| Delivery | Built, powered, operated and taken to market by SAVRN |
| Status | Concept stage, subject to feasibility study |

Next step

## Engage Talino

For national, institutional and enterprise partners: talk to SAVRN about phase one.

[Engage Talino](https://savrnplatform.com/p/talino#engage)[All available sites](https://savrn.com/available-sites)

Have a site of your own?Tell us where it is and what power it has. We look at every site for a joint venture.

Screening and planning figures are subject to confirmation in diligence. Gross MW includes cooling and facility load. Market: Philippines.

More sites

## Other available sites

South of Dallas, Texas

A 100-acre site south of Dallas with natural gas at or near the site and fiber access, built out to 300 MW gross with onsite turbines or fuel cells.

View the Mountain Creek profile →

Imperial Valley, California

An Imperial Valley site with biomass power already on site, 100 MW of solar and 100 MW of storage, 300 MW gross in phase one and 1.8 GW at full build.

View the IVDC profile →
