# ADIA Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/adia
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

0

Site-level commitments the atlas ties to ADIA (Abu Dhabi Investment Authority)

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

3

Transactions naming ADIA (Abu Dhabi Investment Authority) or tied to one of its sites

Spending

## Reported and guided spending

ADIA (Abu Dhabi Investment Authority) has no reported or guided spending line in the atlas. Its position is recorded through its named sites, its transactions and its sourced facts below.

Named sites

## Where ADIA (Abu Dhabi Investment Authority) builds

ADIA (Abu Dhabi Investment Authority) has no named site commitment on record in the atlas as of October 8, 2026. That is normal for a pension and sovereign wealth position: the capital shows up in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name ADIA (Abu Dhabi Investment Authority) as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| ADIA + GIC + Vantage Data CentersADIA and GIC agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025. | jv equity | $1.6B | agreed September 2025; closing expected Q4 2025 | n.a. |  |
| Zelestra + Meta (PPA offtaker) + Canadian Imperial Bank of Commerce + BBVA + Societe GeneraleIndependent power producer Zelestra closed a US$350 million green credit facility from CIBC, BBVA and Societe Generale for the 203 MW Reclamation Solar project on former coal mining land in Gibson County, Indiana, which will fulfil a power purchase agreement with Meta. The project is under construction with commercial operation expected at the end of 2027. Zelestra said the financing brings its 2026 US project financing to US$1.14 billion; it has seven US PPAs with Meta. | debt facility | $350M | Financial close announced 7 October 2026 | n.a. |  |
| Cologix + Cologix Canadian Issuer Limited Partnership + KBRAKBRA published preliminary ratings on Cologix Canadian Issuer Limited Partnership Series 2026-1/2, the issuer's third Canadian data center ABS. The notes are secured by 21 operating data centers in Montreal, Toronto and Vancouver generating about $234.2 million of annualized revenue and $150.2 million of annualized adjusted NOI as of 31 March 2026 | abs | n.a. | KBRA preliminary ratings published 11 August 2026 | n.a. |  |

The record

## Sourced facts on ADIA (Abu Dhabi Investment Authority)

- ADIA and GIC agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025.

Sources

## Sources for ADIA (Abu Dhabi Investment Authority)

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- agbi.com[AGBI](https://www.agbi.com/tech/2025/09/adia-partners-in-1-6bn-deal-backing-us-data-centre-operator/)
- pv-tech.org[PV Tech](https://www.pv-tech.org/zelestra-closes-us350-million-financing-at-203mw-pv-plant-in-indiana-backed-by-meta/)
- pv-magazine-usa.com[pv magazine USA](https://pv-magazine-usa.com/2026/10/07/meta-backed-solar-project-on-reclaimed-indiana-coal-mine-secures-350-million/)
- finance.yahoo.com[Yahoo Finance (Business Wire)](https://finance.yahoo.com/markets/stocks/articles/kbra-publishes-preliminary-ratings-cologix-222200984.html)

### Pension and sovereign wealth: one page each

[ADIA (Abu Dhabi Investment Authority) 0](https://savrn.com/data-center-capital-atlas/company/adia)[CalPERS 0](https://savrn.com/data-center-capital-atlas/company/calpers)[CDPQ / La Caisse 2](https://savrn.com/data-center-capital-atlas/company/cdpq-la-caisse)[CPP Investments (CPPIB) 1](https://savrn.com/data-center-capital-atlas/company/cpp-investments)[GIC 0](https://savrn.com/data-center-capital-atlas/company/gic)[Kuwait Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/kuwait-investment-authority)[MGX 0](https://savrn.com/data-center-capital-atlas/company/mgx)[Mubadala 0](https://savrn.com/data-center-capital-atlas/company/mubadala)[Ontario Teachers' Pension Plan (OTPP) 1](https://savrn.com/data-center-capital-atlas/company/otpp)[PSP Investments 0](https://savrn.com/data-center-capital-atlas/company/psp-investments)[Qatar Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/qatar-investment-authority)[Temasek 0](https://savrn.com/data-center-capital-atlas/company/temasek)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)