# Aligned Data Centers Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/aligned-data-centers
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

1

Site-level commitments the atlas ties to Aligned Data Centers

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

60 MW

Sum of named sites with a stated megawatt figure

Financing transactions

6

Transactions naming Aligned Data Centers or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| 2025 | raise | ≥$12.0B | $12B+ raise: approximately $5B of equity led by Macquarie Asset Management plus ~$7B of debt, supporting 5+ GW across the Americas; the brief's $12B build plan is more precisely a $12B capital raise |  |

Named sites

## Where Aligned Data Centers builds

Virginia

1 site

Open the Virginia investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Aligned Ashburn facilitybuilt 2019 | [Virginia](https://savrn.com/data-center-capital-atlas/virginia) | Ashburn | n.a. | 60 | operating |  |

Financing

## Financing transactions

Transactions that name Aligned Data Centers as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| AIP + MGX + BlackRock GIP + Macquarie Asset Management (seller) + Macquarie Asset Management + Aligned Data CentersThe largest North American data center transaction of the period, covering a platform of 6.4GW across 51 locations. Macquarie Asset Management led the sale as exiting sponsor. | acquisition | ≥$40.0B | announced October 16, 2025; closed July 21, 2026 | n.a. |  |
| Aligned Data Centers + Macquarie Asset Management + Patrizia + CenterSquareAligned completed a $12B+ capital raise supporting 5+ GW across the Americas; Patrizia and CenterSquare are additional investors. | other | ≥$12.0B | completed; Reuters dated January 15, 2025 | n.a. |  |
| Aligned Data Centers + AI Infrastructure Partnership + MGX + Global Infrastructure PartnersAfter closing the $40 billion acquisition of Aligned from Macquarie Asset Management, the AIP, MGX and GIP consortium plans to invest $5 billion in the company, primarily to expand capacity. Aligned has more than 6.4 GW of operational and planned capacity across the Americas, according to the report | equity raise | ~$5.0B | Reported by Bloomberg 21 July 2026, via The Real Deal | n.a. |  |
| Aligned Data CentersClosed to fund continued US expansion. | debt facility | $2.6B | closed March 26, 2026 | n.a. |  |
| Aligned Data CentersAligned completed a $1.183 billion securitization, its first issuance since 2023, one week after the AIP, MGX and GIP acquisition closed. Collateral is four Aligned campuses with 14 customers, and more than 90% of annualized adjusted base rent comes from investment-grade counterparties. Proceeds fund the development pipeline, refinance upcoming maturities and fund reserve accounts | abs | ~$1.2B | Announced 28 July 2026 | n.a. |  |
| Mubadala + Aligned Data CentersMubadala invested in Aligned Data Centers on August 2, 2023, amount not disclosed, when Aligned planned more than 2.5GW across 40 plus data centers at full build-out. | jv equity | n.a. | August 2, 2023 | n.a. |  |

The record

## Sourced facts on Aligned Data Centers

- Patrizia and CenterSquare are additional investors in Aligned Data Centers.
- Salt Lake City, Phoenix, Dallas and Utah site-specific delay disclosures were n.a. in the fetched record.

Sources

## Sources for Aligned Data Centers

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- datacentermap.com[DataCenterMap listing, via fetched extract](https://www.datacentermap.com/usa/virginia/ashburn/intergate-ashburn/)
- esgdive.com[ESG Dive](https://www.esgdive.com/news/blackrocks-gip-microsoft-backed-ai-group-buy-aligned-data-centers-for-40/825920/)
- infrastructureinvestor.com[Infrastructure Investor](https://www.infrastructureinvestor.com/macquarie-exits-aligned-data-centers-in-40bn-sale-to-consortium-including-gip/)
- aligneddc.com[Aligned](https://aligneddc.com/press-release/aip-mgx-and-blackrocks-gip-close-acquisition-of-aligned-data-centers/)
- macquarie.com[Macquarie](https://www.macquarie.com/au/en/about/news/2026/macquarie-asset-management-announces-successful-close-of-aligned-data-centers-transaction.html)
- macquarie.com[Macquarie](https://www.macquarie.com/au/en/about/company/macquarie-asset-management/insights/macquarie-asset-management-invests-in-applied-digital-and-aligned-data-centers.html)
- aligneddc.com[Aligned press release](https://aligneddc.com/press-release/aligned-data-centers-completes-12-billion-capital-raise/)
- reuters.com[Reuters](https://www.reuters.com/technology/aligned-data-centers-completes-capital-raise-over-12-billion-2025-01-15/)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/patrizia-and-centersquare-invest-in-aligned-data-centers/)
- therealdeal.com[The Real Deal](https://therealdeal.com/texas/2026/07/21/blackrock-mgx-dumping-5b-into-aligned-data-centers/)
- dmagazine.com[D Magazine](https://www.dmagazine.com/business-economy/2026/07/blackrock-led-consortium-closes-40-billion-acquisition-of-aligned-data-centers/)
- aligneddc.com[Aligned](https://aligneddc.com/press-release/aligned-data-centers-closes-on-2-58-billion-credit-facility-to-fuel-continued-u-s-expansion/)
- globenewswire.com[GlobeNewswire](https://www.globenewswire.com/news-release/2026/07/28/3334210/0/en/aligned-data-centers-completes-1-18-billion-securitization-financing.html)
- aligneddc.com[Company press release (Aligned Data Centers)](https://aligneddc.com/press-release/aligned-data-centers-completes-1-18-billion-securitization-financing/)
- mubadala.com[Mubadala](https://www.mubadala.com/en/news/mubadala-invests-in-aligned-data-centers-a-pan-american-data-center-company)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)