# Apple Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/apple
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

1

Site-level commitments the atlas ties to Apple

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

0

Transactions naming Apple or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| 2025-2029 US commitment | guidance | ≥$500B | 'Apple will spend more than $500 billion in the U.S. over the next four years', announced 24 February 2025; a total US commitment spanning silicon, components, cover glass, suppliers and R&D, not a data center capex figure, and should never be summed with hyperscaler data center capex |  |
| raised US commitment | guidance | $600B | The commitment was subsequently raised by $100 billion, and Apple now references 'a $600 billion commitment last year'; total US commitment, not data center capex |  |
| data center capex | reported | n.a. | n.a. (no data center capex disclosed); MW n.a.; Apple-owned NA data center dollar figures n.a.; delayed/paused capacity n.a. |  |

Named sites

## Where Apple builds

Texas

1 site

Open the Texas investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Advanced Manufacturing Center, HoustonProduction started late 2025 ahead of schedule; opened 13 August 2026 | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Houston | n.a. | n.a. | operating |  |

Financing

## Financing transactions

No financing transaction in the atlas names Apple or attaches to one of its sites as of October 8, 2026.

The record

## Sourced facts on Apple

- Production at the Houston facility started ahead of schedule in late 2025.
- Houston is a server manufacturing plant, not a data center; the $500B to $600B figure spans silicon, components, cover glass, suppliers and R&D and is not a data center capex figure.

Sources

## Sources for Apple

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- apple.com[Apple Newsroom](https://www.apple.com/newsroom/2026/08/apple-opens-advanced-manufacturing-center-in-houston/)
- foxbusiness.com[Fox Business](https://www.foxbusiness.com/politics/apple-building-american-made-ai-servers-ahead-schedule-new-houston-facility-answering-trump-call)
- 9to5mac.com[9to5Mac](https://9to5mac.com/2025/10/23/apple-coo-touts-accelerated-timeline-for-houston-built-ai-servers/)
- timesofoman.com[Times of Oman](https://timesofoman.com/article/175595-apple-opens-advanced-manufacturing-center-in-houston)
- cnbc.com[CNBC](https://www.cnbc.com/video/2026/08/13/apple-says-60-billion-of-its-us-investment-push-is-going-to-texas.html)
- apple.com[Apple Newsroom](https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/)
- reuters.com[Reuters](https://www.reuters.com/technology/artificial-intelligence/apple-plans-texas-factory-ai-servers-20000-research-jobs-2025-02-24/)
- cnbc.com[CNBC](https://www.cnbc.com/2025/02/24/apple-to-open-texas-ai-server-factory-in-500-billion-us-expansion.html)
- khou.com[KHOU/Houston Business Journal](https://www.khou.com/article/money/business/houston-business-journal/apple-texas-investiment/285-50654c3d-5df0-46b6-88a2-ad7c546236f8)

### Hyperscaler: one page each

[Alphabet / Google 25](https://savrn.com/data-center-capital-atlas/company/alphabet)[Amazon (AWS) 20](https://savrn.com/data-center-capital-atlas/company/amazon)[Apple 1](https://savrn.com/data-center-capital-atlas/company/apple)[Meta Platforms 12](https://savrn.com/data-center-capital-atlas/company/meta)[Microsoft (Azure) 16](https://savrn.com/data-center-capital-atlas/company/microsoft)[Oracle 2](https://savrn.com/data-center-capital-atlas/company/oracle)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
