# Bitdeer Technologies Group Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/bitdeer
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

2

Site-level commitments the atlas ties to Bitdeer Technologies Group

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

784 MW

Sum of named sites with a stated megawatt figure

Financing transactions

3

Transactions naming Bitdeer Technologies Group or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| 1 September 2026 | reported | ~$100M | Cash purchase price for approximately 200 acres of greenfield land in Milam County, Texas, stated as approximately $100 million |  |

Named sites

## Where Bitdeer Technologies Group builds

Ohio

1 site

Open the Ohio investment tracker →

Texas

1 site

Open the Texas investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Rockdale AI/HPC campus (Milam County)Acquisition announced 1 September 2026 | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Rockdale, Milam County | n.a. | 563 | expansion |  |
| Bitdeer Massillon mining facilityPartially operational as of July 2026; completion expected fall 2026; single-outlet report (The Canton Repository) | [Ohio](https://savrn.com/data-center-capital-atlas/ohio) | Massillon, Stark County | n.a. | 221 | partially operational |  |

Financing

## Financing transactions

Transactions that name Bitdeer Technologies Group as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Bitdeer Technologies Group + Barclays Capital Inc. + Cantor Fitzgerald & Co. + B. Riley Securities, Inc. + BTIG, LLCBitdeer registered an at-the-market program of up to $1.0 billion of Class A ordinary shares through a syndicate of sales agents. The company said net proceeds, if any, would be used for datacenter expansion, HPC and AI cloud business expansion, and ASIC mining rig development and manufacture, as well as working capital. Bitdeer's North American AI/HPC development includes its Rockdale, Texas site | at-the-market equity program | $1.0B | Prospectus supplement filed 10 August 2026 | n.a. |  |
| Bitdeer Technologies Group + U.S. Bank Trust Company, National Association (trustee)Bitdeer priced $325.0 million of 5.00% convertible senior notes due 2032 on 20 February 2026, up from $300.0 million, alongside a registered direct share offering; the initial conversion price is about $9.93 per share. The notes closed on 24 February 2026 and a further $50.0 million was issued on 26 February 2026 when the initial purchasers exercised their option in full. Proceeds paid about $29.2 million of capped calls and about $138.2 million to repurchase $135.0 million of the November 2029 convertible notes, with the remainder for data center expansion, HPC and AI cloud expansion, mining rig development and general corporate purposes. Bitdeer's data center footprint spans the United States and other countries; proceeds are not allocated by site. | convertible | ~$375M | Backfill (not previously recorded). Priced 20 February 2026 (upsized from $300 million); closed 24 February 2026; option notes issued 26 February 2026 | n.a. |  |
| Bitdeer Technologies GroupBitdeer completed the acquisition of approximately 200 acres of greenfield property in Milam County, Texas for total consideration of approximately $100 million paid in cash. The parcel adjoins the existing Rockdale facility and was formerly part of an Alcoa aluminum smelting plant. Bitdeer states that following the transaction it owns or operates approximately 255 acres and 742 MW of existing and pipeline power capacity in Milam County, against approximately 563 MW of interconnected grid capacity today. | acquisition | ~$100M | Announced 1 September 2026 | Rockdale AI/HPC campus (Milam County) (TX) |  |

The record

## Sourced facts on Bitdeer Technologies Group

- The Milam County sites, including the newly acquired parcel, carry approximately 563 MW of interconnected grid capacity with existing plans expected to scale to 742 MW, plus a dedicated water supply.
- The acquired parcel was formerly part of an aluminum smelting plant owned by Alcoa Corporation.

Sources

## Sources for Bitdeer Technologies Group

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- globenewswire.com[Bitdeer press release (GlobeNewswire)](https://www.globenewswire.com/news-release/2026/09/01/3354593/0/en/bitdeer-announces-acquisition-of-200-acres-near-rockdale-facility-in-milam-county-texas-to-support-ai-hpc-infrastructure-development.html)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/bitdeer-buys-200-acres-in-milam-county-texas-to-expand-ai-and-hpc-data-center/)
- aol.com[The Canton Repository via AOL, 15 July 2026](https://www.aol.com/articles/supporters-see-opportunity-critics-see-091202000.html)
- yahoo.com[The Canton Repository via Yahoo, 10 July 2026](https://www.yahoo.com/news/us/articles/dubai-based-damac-digital-plans-153758755.html)
- sec.gov[SEC EDGAR (Bitdeer 424B5)](https://www.sec.gov/Archives/edgar/data/1899123/000121390026087060/ea030073702-424b5_bitdeer.htm)
- sec.gov[SEC Form 6-K (Bitdeer)](https://www.sec.gov/Archives/edgar/data/1899123/000121390026087067/ea0301286-6k_bitdeer.htm)
- fool.com[The Motley Fool](https://www.fool.com/investing/2026/08/14/why-investors-were-cold-on-bitdeer-technologies-st/)
- sec.gov[Bitdeer pricing release, Form 6-K Exhibit 99.2 (SEC)](https://www.sec.gov/Archives/edgar/data/1899123/000121390026018592/ea027781201ex99-2_bitdeer.htm)
- sec.gov[Bitdeer Form 6-K, 26 February 2026 (SEC)](https://www.sec.gov/Archives/edgar/data/1899123/000121390026020827/ea0278306-6k_bitdeer.htm)
- technode.global[TNGlobal](https://technode.global/2026/09/03/singapores-bitdeer-buys-200-acres-in-texas-for-100m-for-ai-data-center-expansion/)

### NeoCloud and GPU cloud: one page each

[Applied Digital 5](https://savrn.com/data-center-capital-atlas/company/applied-digital)[Bitdeer Technologies Group 2](https://savrn.com/data-center-capital-atlas/company/bitdeer)[Cerebras Systems 6](https://savrn.com/data-center-capital-atlas/company/cerebras)[Cipher Digital Inc. 0](https://savrn.com/data-center-capital-atlas/company/cipher-digital)[Core Scientific 2](https://savrn.com/data-center-capital-atlas/company/core-scientific)[CoreWeave 4](https://savrn.com/data-center-capital-atlas/company/coreweave)[Corvex, Inc. 0](https://savrn.com/data-center-capital-atlas/company/corvex)[Crusoe Energy 5](https://savrn.com/data-center-capital-atlas/company/crusoe-energy)[Fluidstack 2](https://savrn.com/data-center-capital-atlas/company/fluidstack)[Galaxy Digital Inc. 1](https://savrn.com/data-center-capital-atlas/company/galaxy-digital)[Groq 1](https://savrn.com/data-center-capital-atlas/company/groq)[Hut 8 Corp. 1](https://savrn.com/data-center-capital-atlas/company/hut8)[IREN 1](https://savrn.com/data-center-capital-atlas/company/iren)[Lambda (Lambda Labs) 2](https://savrn.com/data-center-capital-atlas/company/lambda)[Nebius Group 4](https://savrn.com/data-center-capital-atlas/company/nebius-group)[Nscale 2](https://savrn.com/data-center-capital-atlas/company/nscale)[Poolside 1](https://savrn.com/data-center-capital-atlas/company/poolside)[SambaNova Systems 0](https://savrn.com/data-center-capital-atlas/company/sambanova)[Sesterce 3](https://savrn.com/data-center-capital-atlas/company/sesterce)[TeraWulf 1](https://savrn.com/data-center-capital-atlas/company/terawulf)[Together AI 0](https://savrn.com/data-center-capital-atlas/company/together-ai)[Voltage Park 6](https://savrn.com/data-center-capital-atlas/company/voltage-park)[Vultr 1](https://savrn.com/data-center-capital-atlas/company/vultr)[WhiteFiber, Inc. 2](https://savrn.com/data-center-capital-atlas/company/whitefiber)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
