# CDPQ / La Caisse Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/cdpq-la-caisse
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

2

Site-level commitments the atlas ties to CDPQ / La Caisse

Disclosed site capital

$75M

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

107 MW

Sum of named sites with a stated megawatt figure

Financing transactions

10

Transactions naming CDPQ / La Caisse or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| as of December 31, 2025 | aum | n.a. | net assets of CAD 517 billion (Canadian dollars, no USD figure given) |  |
| at Yondr acquisition release | aum | n.a. | net assets CAD 473 billion at that release (Canadian dollars, no USD figure given) |  |

Named sites

## Where CDPQ / La Caisse builds

Quebec

2 sites · $75M disclosed

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Vantage QC2 campuswith Vantage Data Centers | Quebec | Québec City | $75M | 86 | expansion |  |
| Cologix MTL8with Cologix, Stonepeak | Quebec | Montreal | n.a. | 21 | announced |  |

Financing

## Financing transactions

Transactions that name CDPQ / La Caisse as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| CoreWeave + Blackstone + Magnetar + Coatue + Carlyle + CDPQ + BlackRock + DigitalBridgeBlackstone-led delayed-draw term loan with Magnetar, Coatue, Carlyle, CDPQ, BlackRock and DigitalBridge participating. | debt facility | $7.5B | May 17, 2024 | n.a. |  |
| CDPQ + Vantage Data CentersCDPQ committed USD 75 million (CAD 103 million) of a USD 130 million facility for Vantage's QC2 campus in Québec City, adding 16MW for a total of 86MW. | debt facility | $75M | n.a. in source | Vantage QC2 campus (Quebec) |  |
| DigitalBridge + La Caisse + Yondr GroupDigitalBridge and La Caisse completed the acquisition of Yondr Group. | acquisition | n.a. | completed | n.a. |  |
| Ares + CDPQ + Schroders Capital + Vantage EMEAAres participated with CDPQ and Schroders Capital in a financing for Vantage EMEA. | debt facility | n.a. | n.a. | n.a. |  |
| La Caisse + CologixLa Caisse invested CAD 240 million to advance Cologix's AI-ready MTL8 data center. | equity raise | n.a. | n.a. | Cologix MTL8 (Quebec) |  |
| CDPQ + CoreWeaveCDPQ participated in the CoreWeave $7.5 billion facility. | debt facility | n.a. | n.a. in source | n.a. |  |
| CDPQ + Fengate + eStruxtureCDPQ and Fengate committed new capital to eStruxture, which operates data centers in Montréal, Vancouver and Calgary. | jv equity | n.a. | n.a. in source | n.a. |  |
| La Caisse + CologixLa Caisse provided CAD 240 million of senior financing for Cologix's MTL8, a 21MW data centre at Technoparc Montréal. | debt facility | n.a. | disclosed with net assets of CAD 517 billion as of December 31, 2025 | Cologix MTL8 (Quebec) |  |
| La Caisse + DigitalBridge + Yondr GroupLa Caisse co-acquired Yondr Group with DigitalBridge. Yondr has 420MW committed and more than 1GW potential. | acquisition | n.a. | completed; disclosed with net assets CAD 473 billion at that release | n.a. |  |
| Ares Management + CDPQ + Schroders Capital + Vantage Data CentersLa Caisse joined the EUR 750 million Vantage EMEA financing with Ares and Schroders. | debt facility | n.a. | n.a. in source | n.a. |  |

The record

## Sourced facts on CDPQ / La Caisse

- CDPQ committed USD 75 million (CAD 103 million) of a USD 130 million facility for Vantage's QC2 campus in Québec City, adding 16MW for a total of 86MW across 925,000 sq ft.
- CDPQ participated in the CoreWeave $7.5 billion facility.
- CDPQ and Fengate committed new capital to eStruxture, which operates data centers in Montréal, Vancouver and Calgary.
- La Caisse provided CAD 240 million of senior financing for Cologix's MTL8 (21MW, Technoparc Montréal).
- La Caisse co-acquired Yondr Group with DigitalBridge, with 420MW committed and more than 1GW potential.
- La Caisse joined the EUR 750 million Vantage EMEA financing with Ares and Schroders.

Sources

## Sources for CDPQ / La Caisse

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/cdpq-supports-expansion-vantage-data-centers-quebec-city-campus)
- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/caisse-invests-cad-240-million-advance-cologixs-ai-ready-mtl8-data-centre)
- investors.coreweave.com[CoreWeave IR](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx)
- blackstone.com[Blackstone](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/)
- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/digitalbridge-caisse-complete-acquisition-yondr-group)
- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/ares-management-cdpq-schroders-capital-announce-eur-750-million-financing)
- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/new-capital-commitment-cdpq-fengate-estruxture-data-centers)

### Pension and sovereign wealth: one page each

[ADIA (Abu Dhabi Investment Authority) 0](https://savrn.com/data-center-capital-atlas/company/adia)[CalPERS 0](https://savrn.com/data-center-capital-atlas/company/calpers)[CDPQ / La Caisse 2](https://savrn.com/data-center-capital-atlas/company/cdpq-la-caisse)[CPP Investments (CPPIB) 1](https://savrn.com/data-center-capital-atlas/company/cpp-investments)[GIC 0](https://savrn.com/data-center-capital-atlas/company/gic)[Kuwait Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/kuwait-investment-authority)[MGX 0](https://savrn.com/data-center-capital-atlas/company/mgx)[Mubadala 0](https://savrn.com/data-center-capital-atlas/company/mubadala)[Ontario Teachers' Pension Plan (OTPP) 1](https://savrn.com/data-center-capital-atlas/company/otpp)[PSP Investments 0](https://savrn.com/data-center-capital-atlas/company/psp-investments)[Qatar Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/qatar-investment-authority)[Temasek 0](https://savrn.com/data-center-capital-atlas/company/temasek)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)