# Cloverleaf Infrastructure Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

1

Site-level commitments the atlas ties to Cloverleaf Infrastructure

Disclosed site capital

$1.5B

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

1,500 MW

Sum of named sites with a stated megawatt figure

Financing transactions

1

Transactions naming Cloverleaf Infrastructure or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| 2026 | raise | n.a. | NVIDIA took an undisclosed minority investment in Cloverleaf on 21 August 2026. Neither company disclosed the amount. The Wall Street Journal reported, via TechCrunch, that the investment would likely total several hundred million dollars; that is a reported estimate, not a company disclosure, and no dollar value is recorded here. |  |

Named sites

## Where Cloverleaf Infrastructure builds

Alabama

1 site · $1.5B disclosed

Open the Alabama investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Project Red Clay data centerCommission meeting Monday 24 August 2026; reported 24 to 25 August 2026 | [Alabama](https://savrn.com/data-center-capital-atlas/alabama) | Near Hayneville, Lowndes County | ≥$1.5B | 1,500 | proposed |  |

Financing

## Financing transactions

Transactions that name Cloverleaf Infrastructure as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| NVIDIA + Cloverleaf InfrastructureNVIDIA took a minority investment in Cloverleaf Infrastructure, a Houston developer of powered data center sites founded in 2024 and backed by Sandbrook Capital and NGP Energy Capital. Cloverleaf will adopt the NVIDIA DSX platform to bring site, power, cooling, computing and facility decisions together earlier in project design, targeting shovel-ready sites under power, water and grid constraints. | equity raise | n.a. | Announced 21 August 2026 | n.a. |  |

The record

## Sourced facts on Cloverleaf Infrastructure

- Founded in 2024; initial founding investors Sandbrook Capital and NGP Energy Capital.
- Neither Cloverleaf nor NVIDIA disclosed the size or terms of NVIDIA's minority investment announced 21 August 2026.
- Cloverleaf did not disclose a total development pipeline figure in the NVIDIA announcement, describing only multiple GW-scale projects delivered across North America (specific gigawatt figure n.a.).

Sources

## Sources for Cloverleaf Infrastructure

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- yahoo.com[Alabama Reflector via Yahoo](https://www.yahoo.com/news/us/articles/lowndes-county-residents-demand-transparency-100110159.html)
- msn.com[WSFA via MSN](https://www.msn.com/en-us/news/other/lowndes-county-residents-intensify-fight-against-project-red-clay-data-center/ar-AA2aRbMJ)
- yellowhammernews.com[Yellowhammer News, 1 October 2026](https://yellowhammernews.com/our-history-has-always-been-priced-cheap-lowndes-county-commission-nears-2-billion-incentive-for-nvidia-backed-data-center-developer-on-selma-march-route/)
- yellowhammernews.com[Yellowhammer News](https://yellowhammernews.com/our-history-has-always-been-priced-cheap-lowndes)
- cloverleafinfra.com[Cloverleaf Infrastructure newsroom](https://www.cloverleafinfra.com/newsroom/cloverleaf-infrastructure-forms-strategic-partnership-with-nvidia-to-accelerate-data-center-infrastructure-development)
- prnewswire.com[PR Newswire](https://www.prnewswire.com/news-releases/cloverleaf-infrastructure-forms-strategic-partnership-with-nvidia-to-accelerate-data-center-infrastructure-development-302857329.html)
- techcrunch.com[TechCrunch](https://techcrunch.com/2026/08/21/nvidia-partners-with-data-center-developer-cloverleaf/)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)