# Cologix Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/cologix
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

0

Site-level commitments the atlas ties to Cologix

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

7

Transactions naming Cologix or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| July 2026 | raise | ≥$1.5B | $1.5B: a $1B multi-asset development debt facility plus $500M of equity from new and existing investors, across a 40+ data center platform |  |

Named sites

## Where Cologix builds

Cologix has no named site commitment on record in the atlas as of October 8, 2026. It is recorded through its transactions and sourced facts.

Financing

## Financing transactions

Transactions that name Cologix as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Cologix + StonepeakCologix was recapitalized by Stonepeak at a $3.0B equity value via a single-asset continuation vehicle. | equity raise | $3.0B | WSJ coverage dated 2022 | n.a. |  |
| Cologix + new and existing investorsCologix raised $1.5B in July 2026, a $1B multi-asset development debt facility plus $500M of equity, across a 40+ data center platform. | other | $1.5B | July 2026 | n.a. |  |
| Mubadala + Cologix + StonepeakMubadala invested $500 million into Cologix alongside Stonepeak for data center expansion. | equity raise | $500M | n.a. | n.a. |  |
| Stonepeak + CologixStonepeak's initial 2017 investment in Cologix was $500M, when the platform had 24 data centers in nine markets including Montreal, Toronto and Vancouver. | equity raise | $500M | 2017 | n.a. |  |
| La Caisse + CologixLa Caisse invested CAD 240 million to advance Cologix's AI-ready MTL8 data center. | equity raise | n.a. | n.a. | Cologix MTL8 (Quebec) |  |
| La Caisse + CologixLa Caisse provided CAD 240 million of senior financing for Cologix's MTL8, a 21MW data centre at Technoparc Montréal. | debt facility | n.a. | disclosed with net assets of CAD 517 billion as of December 31, 2025 | Cologix MTL8 (Quebec) |  |
| Cologix + Cologix Canadian Issuer Limited Partnership + KBRAKBRA published preliminary ratings on Cologix Canadian Issuer Limited Partnership Series 2026-1/2, the issuer's third Canadian data center ABS. The notes are secured by 21 operating data centers in Montreal, Toronto and Vancouver generating about $234.2 million of annualized revenue and $150.2 million of annualized adjusted NOI as of 31 March 2026 | abs | n.a. | KBRA preliminary ratings published 11 August 2026 | n.a. |  |

The record

## Sourced facts on Cologix

- Stonepeak's initial 2017 investment was $500M across a platform then at 24 data centers in nine markets including Montreal, Toronto and Vancouver.

Sources

## Sources for Cologix

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- cologix.com[Cologix](https://cologix.com/news/stonepeak-recapitalizes-cologix-in-3-billion-transaction/)
- cologix.com[Cologix](https://cologix.com/news/cologix-recapitalizes-with-stonepeak-in-deal-valued-at-3b/)
- cologix.com[Cologix/Stonepeak](https://cologix.com/news/stonepeak-successfully-completes-3-0-billion-equity-recapitalization-portfolio-company-cologix/)
- wsj.com[WSJ](https://www.wsj.com/articles/stonepeak-raises-3-billion-to-extend-its-ownership-of-cologix-11649070000)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/cologix-raises-15bn-to-fund-hyperscale-growth-plans/)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/cologix-gets-500m-investment-data-center-expansion/)
- datacenterfrontier.com[Data Center Frontier](https://www.datacenterfrontier.com/site-selection/article/11430919/cologix-acquired-by-private-equity-firm-stonepeak)
- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/caisse-invests-cad-240-million-advance-cologixs-ai-ready-mtl8-data-centre)
- finance.yahoo.com[Yahoo Finance (Business Wire)](https://finance.yahoo.com/markets/stocks/articles/kbra-publishes-preliminary-ratings-cologix-222200984.html)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)