# DataBank Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/databank
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

4

Site-level commitments the atlas ties to DataBank

Disclosed site capital

$2.4B

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

992 MW

Sum of named sites with a stated megawatt figure

Financing transactions

7

Transactions naming DataBank or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | raise | $2.0B | $2B of funding to support 850 MW, allocated Dallas 480 MW, Culpeper, VA 192 MW, and Atlanta 120 MW |  |

Named sites

## Where DataBank builds

Georgia

2 sites · $2.4B disclosed

Open the Georgia investment tracker →

Texas

1 site

Open the Texas investment tracker →

Virginia

1 site

Open the Virginia investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Project Indo (218 Industrial Park Road)DRI initial form submitted 19 June 2026; regional commission finding 15 July 2026 (Georgia DCA DRI 4761) | [Georgia](https://savrn.com/data-center-capital-atlas/georgia) | Cartersville, Bartow County | ~$2.4B | 200 | proposed |  |
| DataBank Dallas allocation | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Dallas | n.a. | 480 | announced |  |
| DataBank Culpeper development | [Virginia](https://savrn.com/data-center-capital-atlas/virginia) | Culpeper, Culpeper | n.a. | 192 | construction |  |
| DataBank Atlanta allocation | [Georgia](https://savrn.com/data-center-capital-atlas/georgia) | Atlanta | n.a. | 120 | announced |  |

Financing

## Financing transactions

Transactions that name DataBank as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| DataBank + DigitalBridge + TJCDataBank equity round across a platform of more than 65+ data centers, 20 interconnection hubs and 27+ markets; DigitalBridge received $59 million of gross cash proceeds with its remaining stake implied at $486 million. | equity raise | $2.0B | announced October 2024 | n.a. |  |
| DataBankDataBank raised $2B of funding to support 850 MW, allocated Dallas 480 MW, Culpeper, VA 192 MW, and Atlanta 120 MW. | other | $2.0B | not dated in source | n.a. |  |
| DataBankDataBank issued $1.1 billion of secured notes into a new master trust, its first for hyperscale facilities and fifth securitization since 2021, bringing its securitized portfolio to $3.23 billion. Proceeds refinance construction loans on its ATL4, IAD3 and LGA3 facilities, which are leased almost entirely to hyperscale and emerging hyperscale providers, and fund further US development. | abs | $1.1B | Announced 24 September 2025 (DataBank release via PR Newswire) | n.a. |  |
| DataBankSecondary sale accompanying the DataBank $2 billion equity round. | other | ~$600M | alongside the October 2024 round | n.a. |  |
| DataBankDataBank completed a $456 million green bond securitization in February 2024, its fourth securitization after issues of $658 million (March 2021), $330 million (October 2021) and $715 million (March 2023). | abs | $456M | Issued February 2024 (as stated in DataBank's release of 24 September 2025) | n.a. |  |
| DataBank Properties + Mapletree Industrial TrustDataBank, the sole tenant, exercised its option under a 2014 lease to buy the single-storey data center at 3255 Neil Armstrong Boulevard, Eagan, Minnesota (about 87,402 sq ft on about 343,253 sq ft of freehold land, completed 1998). Mapletree bought the building in July 2021 as part of a 29-property US data center portfolio and says net proceeds may repay debt. DataBank announced on 1 October 2026 that it has acquired the building, which houses its MSP2 data center and was previously leased; the release gives no price. | acquisition | ~$10M | Announced by Mapletree Industrial Trust's manager 29 September 2026; acquisition announced as completed by DataBank 1 October 2026 | n.a. |  |
| DataBank + EdgeCore Digital Infrastructure + Netrality Data Centers + EdgedNetrality, DataBank, Edged and EdgeCore have engaged bankers to solicit offers for majority stakes in their operating platforms, according to The Wall Street Journal. The processes target private equity buyers for whole platforms, including development pipelines | other | n.a. | Reported by The Wall Street Journal, via CRE Daily 15 July 2026 | n.a. |  |

The record

## Sourced facts on DataBank

- Culpeper County is one of the 23 Virginia jurisdictions with tracked siting actions, with a September 2025 action recorded.

Sources

## Sources for DataBank

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- apps.dca.ga.gov[Georgia DCA DRI application summary (DRI 4761)](https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4761)
- apps.dca.ga.gov[Georgia DCA DRI initial form (DRI 4761)](https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4761)
- apps.dca.ga.gov[Georgia DCA DRI additional form (DRI 4761)](https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4761)
- constructiondive.com[Construction Dive](https://www.constructiondive.com/news/databank-data-centers-dallas-virginia-atlanta/730800/)
- msn.com[Dallas Morning News via MSN](https://www.msn.com/en-us/news/other/12-billion-in-d-fw-data-center-projects-filed-in-recent-weeks/ar-AA2cnhQU)
- tdlr.texas.gov[TDLR TABS project TABS2027000733](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2027000733)
- tdlr.texas.gov[TDLR TABS project TABS2026027681](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026027681)
- databank.com[DataBank](https://www.databank.com/resources/news/databank-breaks-ground-on-new-hyperscale-ready-data-centers-in-culpeper/)
- dimetrics.ai[Dimetrics Virginia](https://www.dimetrics.ai/datacenter-risk/virginia)
- digitalbridge.com[DigitalBridge](https://www.digitalbridge.com/news/2025-01-30-digitalbridge-announces-participation-in-databank-financing)
- databank.com[DataBank](https://www.databank.com/resources/press-releases/databank-announces-250m-equity-investment-from-tjc-and-a-600m-secondary-share-sale/)
- finance.yahoo.com[DataBank release (PR Newswire via Yahoo Finance)](https://finance.yahoo.com/news/databank-raises-1-1-billion-130000498.html)
- msn.com[The Business Times via MSN](https://www.msn.com/en-sg/money/top-stocks/mapletree-industrial-trust-to-sell-minnesota-data-centre-property-for-us-9-8-million/ar-AA2d9FxD)
- datacenterdynamics.com[Data Center Dynamics (walled)](https://www.datacenterdynamics.com/en/news/msp2/)
- prnewswire.com[DataBank release via PR Newswire, 1 October 2026](https://www.prnewswire.com/news-releases/databank-acquires-building-housing-msp2-data-center-in-minneapolis-302895408.html)
- finance.yahoo.com[Yahoo Finance (CRE Daily)](https://finance.yahoo.com/technology/articles/ai-surge-fuels-major-data-035107899.html)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)