Named sites

5

Site-level commitments the atlas ties to DigitalBridge

Disclosed site capital

$43.0B

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

1,880 MW

Sum of named sites with a stated megawatt figure

Financing transactions

10

Transactions naming DigitalBridge or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| Jan 2025 | aum | ≥$88.0B | over $88 billion of infrastructure assets managed on behalf of LPs and shareholders; approximately $100 billion cited in the La Caisse/Yondr release; the frequently cited $80 billion figure appears in the Vantage equity release |  |
| by end-2026 | guidance | ≥$43.0B | $43bn of expected portfolio capex by end-2026 (just under $30bn DigitalBridge's share), and $50-plus billion to be put to work over the next few years; roughly $10bn is required to build one gigawatt, about half of it equity |  |
| 2024 | raise | ≥$13.0B | Vantage secured over $13 billion of incremental funding in 2024, including a $3 billion Wells Fargo-led green loan covering at least eight North American sites (cumulative for the year) |  |

Named sites

## Where DigitalBridge builds

Texas

1 site · $25.0B disclosed

Open the Texas investment tracker →

Wisconsin

1 site · $15.0B disclosed

Open the Wisconsin investment tracker →

Nevada

1 site · $3.0B disclosed

Open the Nevada investment tracker →

Ohio

1 site

Open the Ohio investment tracker →

Virginia

1 site

Open the Virginia investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Vantage Frontier mega-campuswith Silver Lake | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Shackelford County | ≥$25.0B | 1,400 | announced |  |
| Vantage Lighthouse campusConstruction ramped up January 2026; 20 to 25 percent complete September 2026; staged deliveries to Oracle and OpenAI from end of 2027; TID lawsuit dismissed (oral ruling, reported 22 September 2026) | [Wisconsin](https://savrn.com/data-center-capital-atlas/wisconsin) | Port Washington | ~$15.0B | n.a. | under construction |  |
| Switch Nevada AI campuswith IFM Investors | [Nevada](https://savrn.com/data-center-capital-atlas/nevada) | n.a. | $3.0B | n.a. | announced |  |
| Vantage third Northern Virginia campus2024 | [Virginia](https://savrn.com/data-center-capital-atlas/virginia) | n.a. | n.a. | 288 | announced |  |
| Vantage Ohio campus2024 | [Ohio](https://savrn.com/data-center-capital-atlas/ohio) | n.a. | n.a. | 192 | announced |  |

Financing

## Financing transactions

Transactions that name DigitalBridge as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| DigitalBridge + IFM Investors + SwitchDigitalBridge and IFM Investors completed the take-private of Switch. | acquisition | ~$11.0B | completed December 6, 2022 | n.a. |  |
| DigitalBridge + Silver Lake + Vantage Data CentersDigitalBridge and Silver Lake co-led the completed equity investment in Vantage Data Centers. | equity raise | ≥$9.2B | completed June 13, 2024 | n.a. |  |
| CoreWeave + Blackstone + Magnetar + Coatue + Carlyle + CDPQ + BlackRock + DigitalBridgeBlackstone-led delayed-draw term loan with Magnetar, Coatue, Carlyle, CDPQ, BlackRock and DigitalBridge participating. | debt facility | $7.5B | May 17, 2024 | n.a. |  |
| SoftBank + DigitalBridgeSoftBank agreed to acquire DigitalBridge. The merger closed on 30 September 2026: a SoftBank Group subsidiary merged into DigitalBridge, which became an indirect subsidiary of Duncan Holdco LLC, wholly owned by SoftBank Group Overseas GK. Holders received $16.00 per Class A share in cash, the common stock was suspended from NYSE trading before the open on 30 September 2026, and Marc Ganzi remains a director. The aggregate consideration was funded through a SoftBank Group Overseas GK equity commitment and cash of DigitalBridge and its subsidiaries. | acquisition | ~$4.0B | Announced 29 December 2025; approved by stockholders 23 April 2026; completed 30 September 2026 (DigitalBridge Form 8-K, Item 2.01) | n.a. |  |
| DataBank + DigitalBridge + TJCDataBank equity round across a platform of more than 65+ data centers, 20 interconnection hubs and 27+ markets; DigitalBridge received $59 million of gross cash proceeds with its remaining stake implied at $486 million. | equity raise | $2.0B | announced October 2024 | n.a. |  |
| DigitalBridge + ArcLight + TakanockDigitalBridge and ArcLight invested $500 million into Takanock. | equity raise | $500M | n.a. | n.a. |  |
| DigitalBridge + La Caisse + Yondr GroupDigitalBridge and La Caisse completed the acquisition of Yondr Group. | acquisition | n.a. | completed | n.a. |  |
| La Caisse + DigitalBridge + Yondr GroupLa Caisse co-acquired Yondr Group with DigitalBridge. Yondr has 420MW committed and more than 1GW potential. | acquisition | n.a. | completed; disclosed with net assets CAD 473 billion at that release | n.a. |  |
| Switch + Andreessen Horowitz + DigitalBridge + Goldman Sachs + JPMorgan ChaseSwitch launched a private funding round led by Andreessen Horowitz. The report puts equity value at about $19 billion before the new money and a valuation approaching $50 billion including debt Switch hired JPMorgan Chase and Goldman Sachs to run the fundraise, per the Bloomberg report as relayed by Benzinga | equity raise | n.a. | Reported by Bloomberg 2 July 2026 | n.a. |  |
| Oracle + We Energies (WEC Energy Group) + NextEra Energy (Point Beach owner)On Friday 2 October 2026 Oracle and We Energies announced an agreement under which Oracle would subscribe to between 10% and 20% of the generation We Energies buys from NextEra's Point Beach Nuclear Plant in Manitowoc County, to help supply the Port Washington campus (Project Lighthouse) that Oracle is developing with OpenAI. The Journal Sentinel reports the subscription at 125 to 250 MW, roughly 10% to 20% of the 1.3 GW campus's consumption. We Energies and Oracle say the arrangement would spare other customers about $300 million of fuel costs over five years; that is a ratepayer savings estimate, not a contract value. The agreement requires approval by the Public Service Commission of Wisconsin, and Oracle expects the proposal to be filed by the end of 2026. | power supply agreement | n.a. | Announced Friday 2 October 2026 (Oracle and We Energies); subject to Public Service Commission of Wisconsin approval | Vantage Lighthouse campus (WI) |  |

The record

## Sourced facts on DigitalBridge

- Portfolio capacity is 5.4GW lit or under construction, up 50 percent year over year, representing over $50 billion of total investment and more than $25 billion of equity.
- Reuters reported Vantage exploring an IPO at about $100 billion valuation, potentially raising $10 billion, having raised roughly $11 billion since late 2023; a Switch IPO could raise $10 billion at roughly $80 billion valuation.
- Pause exposure: n.a. at platform level in fetched sources.

Sources

## Sources for DigitalBridge

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- vantage-dc.com[Vantage](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)
- techinformed.com[TechInformed](https://techinformed.com/softbank-to-buy-digitalbridge-adding-a-data-center-deal-machine-to-its-stargate-push/)
- finance.yahoo.com[Yahoo Finance (citing Financial Times)](https://finance.yahoo.com/technology/ai/articles/oracle-faces-potential-7-billion-104844370.html)
- wisconsinwatch.org[Wisconsin Watch](https://wisconsinwatch.org/2026/08/oracle-drops-lawsuit-challenging-wisconsin-data-center-credit-rules/)
- msn.com[Milwaukee Journal Sentinel via MSN](https://www.msn.com/en-us/news/other/power-lines-proposal-resubmitted-for-port-washington-data-center/ar-AA2clgPL)
- constructionreviewonline.com[Construction Review Online, 24 September 2026](https://constructionreviewonline.com/15bn-vantage-data-centers-lighthouse-campus-nears-25-completion-in-wisconsin/)
- wpr.org[WPR, 22 September 2026](https://www.wpr.org/news/judge-dismisses-lawsuit-challenging-port-washington-data-center-tid)
- biztimes.com[BizTimes Milwaukee, 30 September 2026](https://biztimes.com/analysis-of-port-washington-data-center-project-says-completion-likely-to-be-delayed-until-at-least-mid-2028/)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/digitalbridge-has-54gw-of-data-center-capacity-in-operation-or-under-construction/)
- vantage-dc.com[Vantage](https://vantage-dc.com/news/vantage-data-centers-growth-continued-in-2024-driven-by-ai-and-cloud-adoption-secured-a-record-13-billion-in-incremental-funding/)
- digitalbridge.com[DigitalBridge](https://www.digitalbridge.com/news/2022-12-06-digitalbridge-and-ifm-investors-complete-11-billion-take-private-of-switch)
- vantage-dc.com[Vantage](https://vantage-dc.com/news/vantage-data-centers-completes-9-2-billion-equity-investment-led-by-digitalbridge-and-silver-lake/)
- lw.com[Latham & Watkins](https://www.lw.com/en/news/2024/06/latham-watkins-advises-silver-lake-in-completed-equity-investment-in-vantage-data-centers)
- investors.coreweave.com[CoreWeave IR](https://investors.coreweave.com/news/news-details/2024/CoreWeave-Secures-7-5-Billion-Debt-Financing-Facility-led-by-Blackstone-and-Magnetar/default.aspx)
- blackstone.com[Blackstone](https://www.blackstone.com/news/press/coreweave-secures-7-5-billion-debt-financing-facility-led-by-blackstone-and-magnetar/)
- digitalbridge.com[DigitalBridge](https://www.digitalbridge.com/news)
- sec.gov[DigitalBridge Form 8-K, 30 September 2026 (SEC)](https://www.sec.gov/Archives/edgar/data/1679688/000110465926112148/tm2626145d9_8k.htm)
- digitalbridge.com[DigitalBridge](https://www.digitalbridge.com/news/2025-01-30-digitalbridge-announces-participation-in-databank-financing)
- databank.com[DataBank](https://www.databank.com/resources/press-releases/databank-announces-250m-equity-investment-from-tjc-and-a-600m-secondary-share-sale/)
- lacaisse.com[La Caisse](https://www.lacaisse.com/en/news/pressreleases/digitalbridge-caisse-complete-acquisition-yondr-group)
- news.bloomberglaw.com[Bloomberg Law](https://news.bloomberglaw.com/capital-markets/data-center-firm-switch-said-to-seek-2-billion-in-funding-round)
- msn.com[Benzinga (via MSN)](https://www.msn.com/en-us/money/technology/venture-capital-giant-andreessen-horowitz-leads-data-center-switch-s-2-billion-funding-round/ar-AA275AOH)
- wisconsinwatch.org[Wisconsin Watch](https://wisconsinwatch.org/2026/10/wisconsin-we-energies-deal-oracle-data-center-nuclear-energy-power-point-beach-plant/)
- biztimes.com[BizTimes Milwaukee](https://biztimes.com/user-of-port-washington-data-center-commits-to-absorb-300-million-in-rising-costs-for-point-beach-nuclear-plant/)
- msn.com[Milwaukee Journal Sentinel (via MSN)](https://www.msn.com/en-us/news/other/oracle-data-center-deal-could-lower-we-energies-electric-bills/ar-AA2dnzeQ)
- finance.yahoo.com[Oracle release via PR Newswire (Yahoo Finance), 2 October 2026](https://finance.yahoo.com/energy/articles/oracle-announces-commitment-absorb-300-130000568.html)
- civicmedia.us[Wisconsin Watch via Civic Media, 2 October 2026](https://civicmedia.us/news/2026/10/02/we-energies-strikes-deal-to-power-oracle-data-center-with-nuclear-energy)
- reuters.com[Reuters](https://www.reuters.com/legal/transactional/vantage-data-centers-explores-ipo-100-billion-valuation-or-sale-sources-say-2026-08-13/)

### Private equity and infrastructure: one page each

[Antin Infrastructure Partners 0](https://savrn.com/data-center-capital-atlas/company/antin)[Apollo Global Management 0](https://savrn.com/data-center-capital-atlas/company/apollo)[Ares Management 2](https://savrn.com/data-center-capital-atlas/company/ares)[BlackRock / GIP / AI Infrastructure Partnership 0](https://savrn.com/data-center-capital-atlas/company/blackrock-gip-aip)[Blackstone 5](https://savrn.com/data-center-capital-atlas/company/blackstone)[Brookfield (BAM / Brookfield Infrastructure Partners) 2](https://savrn.com/data-center-capital-atlas/company/brookfield)[Copenhagen Infrastructure Partners 1](https://savrn.com/data-center-capital-atlas/company/cip)[DigitalBridge 5](https://savrn.com/data-center-capital-atlas/company/digitalbridge)[EQT 1](https://savrn.com/data-center-capital-atlas/company/eqt)[Global Infrastructure Partners (as a distinct platform) 0](https://savrn.com/data-center-capital-atlas/company/gip)[I Squared Capital 0](https://savrn.com/data-center-capital-atlas/company/i-squared)[IPI Partners / Blue Owl 1](https://savrn.com/data-center-capital-atlas/company/ipi-blue-owl)[KKR 3](https://savrn.com/data-center-capital-atlas/company/kkr)[Macquarie Asset Management 1](https://savrn.com/data-center-capital-atlas/company/macquarie-am)[Oaktree Capital Management 1](https://savrn.com/data-center-capital-atlas/company/oaktree)[Pensions & Sovereign Wealth Funds (CalPERS, CPPIB, CDPQ/La Caisse, OTPP, PSP, ADIA, GIC, Mubadala, MGX) 0](https://savrn.com/data-center-capital-atlas/company/pensions-swfs)[Silver Lake 0](https://savrn.com/data-center-capital-atlas/company/silver-lake)[Stonepeak 2](https://savrn.com/data-center-capital-atlas/company/stonepeak)[The Carlyle Group 2](https://savrn.com/data-center-capital-atlas/company/carlyle)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.