Named sites

0

Site-level commitments the atlas ties to EdgeConneX

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

5

Transactions naming EdgeConneX or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | reported | n.a. | n.a. North American delay-specific disclosures: n.a. |  |

Named sites

## Where EdgeConneX builds

EdgeConneX has no named site commitment on record in the atlas as of October 8, 2026. It is recorded through its transactions and sourced facts.

Financing

## Financing transactions

Transactions that name EdgeConneX as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| CPP Investments + EQT + EdgeConneXCPP Investments commitment into the EdgeConneX build-out; Sixth Street took a minority stake in 2024. CPP Investments announced the investment on 3 July 2026 and said the transaction had closed following customary approvals. EdgeConneX plans more than 10 GW of additional data centers | equity raise | $1.8B | Announced and closed 3 July 2026 | n.a. |  |
| EQT Infrastructure IV + EdgeConneX + EQTEQT's entry into data centers via EdgeConneX, which has since grown to 80 data centers across 50+ markets. | acquisition | n.a. | closing expected Q4 2020 | n.a. |  |
| Sixth Street + EQT + EdgeConneXSixth Street took a minority strategic stake in EdgeConneX in September 2024. | equity raise | n.a. | September 2024 | n.a. |  |
| EdgeConneX + EQT + Natixis + BBVAEQT-backed EdgeConneX is in talks with lenders including Natixis and BBVA on a letter of credit facility to guarantee up to $2.5 billion of power costs. The facility would help the company secure power for data center sites | debt facility | n.a. | Reported by Bloomberg 14 August 2026 | n.a. |  |
| CoreWeave + EdgeConneX + Bastrop CountyCoreWeave will lease Building 1 at EdgeConneX's Cedar Creek campus in Bastrop County, Texas, according to county tax abatement records reported by Community Impact. State records list the building as AUS02 with an estimated cost of $440 million | other | n.a. | Reported 27 July 2026 | EdgeConneX Cedar Creek campus (AUS02) (TX) |  |

The record

## Sourced facts on EdgeConneX

- Sixth Street took a minority strategic stake in EdgeConneX in September 2024.

Sources

## Sources for EdgeConneX

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/cpp-investments-to-pump-175-billion-into-eqt-and-edgeconnexs-ai-data-center-build-out/)
- newswire.ca[CPP Investments press release (Canada Newswire)](https://www.newswire.ca/news-releases/cpp-investments-partners-with-eqt-to-support-global-digital-infrastructure-growth-826226428.html)
- investmentexecutive.com[The Canadian Press via Investment Executive](https://www.investmentexecutive.com/news/cpp-investments-spends-2-4b-with-eqt-to-build-ai-infrastructure/)
- edgeconnex.com[EdgeConneX](https://www.edgeconnex.com/news/press-releases/eqt-infrastructure-to-acquire-leading-global-data-center-provider-edgeconnex/)
- crn.com[CRN](https://www.crn.com/news/data-center/edge-data-center-pioneer-edgeconnex-acquired-by-eqt)
- edgeconnex.com[EdgeConneX press release](https://www.edgeconnex.com/news/press-releases/eqt-welcomes-sixth-street-as-strategic-investor-in-edgeconnex/)
- bloomberg.com[Bloomberg](https://www.bloomberg.com/news/articles/2026-08-14/edgeconnex-seeks-2-5-billion-bank-pledge-for-data-center-power)
- datacenterdynamics.com[Data Center Dynamics](https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/)
- communityimpact.com[Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)