# GIC Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/gic
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

0

Site-level commitments the atlas ties to GIC

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

7

Transactions naming GIC or tied to one of its sites

Spending

## Reported and guided spending

GIC has no reported or guided spending line in the atlas. Its position is recorded through its named sites, its transactions and its sourced facts below.

Named sites

## Where GIC builds

GIC has no named site commitment on record in the atlas as of October 8, 2026. That is normal for a pension and sovereign wealth position: the capital shows up in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name GIC as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Equinix + GIC + CPP InvestmentsEquinix agreed to form a greater-than-$15B xScale joint venture with GIC and CPP Investments targeting more than 1.5 GW in the United States, with 750+ MW committed as of the 2025 Analyst Day. | jv equity | $15.0B | agreement announced; as of 2025 Analyst Day $15B planned, ~$6B invested | n.a. |  |
| Fluidstack + US Department of Defense Office of Strategic CapitalThe Pentagon's Office of Strategic Capital was reported to be in talks to lend about $5 billion to Fluidstack to strengthen US manufacturing capacity and supply chains for data center components. Neither party commented on the report | debt facility | ~$5.0B | Reported by The Wall Street Journal 10 September 2026; talks, not signed | n.a. |  |
| ADIA + GIC + Vantage Data CentersADIA and GIC agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025. | jv equity | $1.6B | agreed September 2025; closing expected Q4 2025 | n.a. |  |
| GI Partners + DigiCo Infrastructure REIT (seller, HMC Capital managed)GI Partners bought the fully leased 189,000 square foot data center at 800 East Devon Avenue in Elk Grove Village, Illinois, from a subsidiary of Australia's HMC Capital for $750 million. GI Partners already holds majority stakes in three Digital Realty data centers in Elk Grove Seller DigiCo Infrastructure REIT, spun off from HMC Capital in late 2024, announced the sale on 6 May 2026 without naming the buyer; Reuters reported the CHI1 facility at 32 MW, leased to a hyperscale customer under a 15-year agreement | acquisition | $750M | Reported 9 September 2026 | n.a. |  |
| Anthropic + Macquarie Asset Management + GICTheseus Infrastructure, a US-focused dedicated data center platform. | platform | n.a. | announced (Business Wire release dated 2026-08-09 in URL) | n.a. |  |
| Anthropic + Macquarie Asset Management + GICGIC joined Anthropic and Macquarie Asset Management in the Theseus Infrastructure US platform, a strategic partnership to develop dedicated data center infrastructure at scale. | platform | n.a. | n.a. in source | n.a. |  |
| Anthropic + Macquarie Asset Management + GICAnthropic, Macquarie Asset Management and GIC announced a strategic partnership to develop dedicated data center infrastructure at scale, with an initial focus on the United States. Funds managed by Macquarie Asset Management will, together with GIC, own the platform and fund the majority of the equity for each project, with Anthropic leasing the facilities as anchor tenant under long-term agreements. Anthropic also committed to cover electricity price increases that consumers otherwise may face from these sites. No dollar or capacity figure was disclosed. | platform | n.a. | Announced 10 August 2026 | n.a. |  |

The record

## Sourced facts on GIC

- ADIA and GIC agreed to invest $1.6 billion into Vantage Data Centers in September 2025, with closing expected in Q4 2025.
- GIC formed the greater than $15 billion Equinix xScale JV with CPP Investments.
- GIC joined Anthropic and Macquarie Asset Management in the Theseus Infrastructure US platform.

Sources

## Sources for GIC

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- investor.equinix.com[Equinix](https://investor.equinix.com/news-events/press-releases/detail/1053/equinix-agrees-to-form-greater-than-15b-jv-to-expand)
- d1io3yog0oux5.cloudfront.net[Equinix Analyst Day 2025](https://d1io3yog0oux5.cloudfront.net/_61ce85944b338f3e09395ba2ce8fd459/equinix/files/Equinix_Analyst_Day_2025_Building_Bolder_and_xScale_Kiosk_-_vF.pdf)
- techstartups.com[Tech Startups](https://techstartups.com/2026/09/11/pentagon-in-talks-to-lend-5-billion-to-ai-cloud-startup-fluidstack-to-shore-up-us-data-center-supply-chain/)
- agbi.com[AGBI](https://www.agbi.com/tech/2025/09/adia-partners-in-1-6bn-deal-backing-us-data-centre-operator/)
- therealdeal.com[The Real Deal](https://therealdeal.com/chicago/2026/09/09/gi-partners-drops-record-750m-on-elk-grove-data-center/)
- finance.yahoo.com[Reuters (via Yahoo Finance)](https://finance.yahoo.com/markets/stocks/articles/australias-digico-infrastructure-reit-sell-214840561.html)
- businesswire.com[Business Wire](https://www.businesswire.com/news/home/20260809882025/en/Anthropic-Macquarie-Asset-Management-and-GIC-Announce-Strategic-Partnership-to-Develop-Dedicated-Data-Center-Infrastructure-at-Scale)
- macquarie.com[Macquarie](https://www.macquarie.com/au/en/about/news/2026/anthropic-mam-gic-data-centre-infrastructure-partnership.html)

### Pension and sovereign wealth: one page each

[ADIA (Abu Dhabi Investment Authority) 0](https://savrn.com/data-center-capital-atlas/company/adia)[CalPERS 0](https://savrn.com/data-center-capital-atlas/company/calpers)[CDPQ / La Caisse 2](https://savrn.com/data-center-capital-atlas/company/cdpq-la-caisse)[CPP Investments (CPPIB) 1](https://savrn.com/data-center-capital-atlas/company/cpp-investments)[GIC 0](https://savrn.com/data-center-capital-atlas/company/gic)[Kuwait Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/kuwait-investment-authority)[MGX 0](https://savrn.com/data-center-capital-atlas/company/mgx)[Mubadala 0](https://savrn.com/data-center-capital-atlas/company/mubadala)[Ontario Teachers' Pension Plan (OTPP) 1](https://savrn.com/data-center-capital-atlas/company/otpp)[PSP Investments 0](https://savrn.com/data-center-capital-atlas/company/psp-investments)[Qatar Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/qatar-investment-authority)[Temasek 0](https://savrn.com/data-center-capital-atlas/company/temasek)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
