# H5 Data Centers Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/h5-data-centers
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

2

Site-level commitments the atlas ties to H5 Data Centers

Disclosed site capital

$49M

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

2

Transactions naming H5 Data Centers or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| 2025 | raise | n.a. | n.a. 2025 platform-level financing: n.a. |  |

Named sites

## Where H5 Data Centers builds

New York

1 site · $49M disclosed

Open the New York investment tracker →

New Mexico

1 site

Open the New Mexico investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| H5 Lockport facility (former Yahoo)with Yahoo | [New York](https://savrn.com/data-center-capital-atlas/new-york) | Lockport | ~$49M | n.a. | operating |  |
| H5 505 Marquette, Albuquerqueacquired June 23, 2022 | [New Mexico](https://savrn.com/data-center-capital-atlas/new-mexico) | Albuquerque | n.a. | n.a. | operating |  |

Financing

## Financing transactions

Transactions that name H5 Data Centers as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| H5 Data Centers + YahooH5 acquired Yahoo's Lockport, New York facility in a sale-leaseback estimated at $49M, with Yahoo signing a five-year lease. | acquisition | ~$49M | closing December 30 | H5 Lockport facility (former Yahoo) (NY) |  |
| H5 Data CentersH5 acquired the 225,000 sq ft, 18-floor 505 Marquette Hotel in Albuquerque, New Mexico. | acquisition | n.a. | June 23, 2022 | H5 505 Marquette, Albuquerque (NM) |  |

The record

## Sourced facts on H5 Data Centers

- H5 acquired the 225,000 sq ft, 18-floor 505 Marquette Hotel in Albuquerque, New Mexico on June 23, 2022.

Sources

## Sources for H5 Data Centers

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- finance.yahoo.com[Yahoo Finance](https://finance.yahoo.com/news/yahoo-staying-lockport-data-center-045900704.html)
- pitchbook.com[PitchBook](https://pitchbook.com/profiles/company/742495-60)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
