Named sites

1

Site-level commitments the atlas ties to Novva Data Centers

Disclosed site capital

$2.0B

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

175 MW

Sum of named sites with a stated megawatt figure

Financing transactions

2

Transactions naming Novva Data Centers or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | raise | $2.0B | $2B of financing led by JPMorgan with Starwood participation, for a 175 MW West Jordan, Utah campus |  |
| earlier | raise | $355M | earlier $355M CIM Group equity round |  |

Named sites

## Where Novva Data Centers builds

Utah

1 site · $2.0B disclosed

Open the Utah investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Novva West Jordan campus | [Utah](https://savrn.com/data-center-capital-atlas/utah) | West Jordan | $2.0B | 175 | construction |  |

Financing

## Financing transactions

Transactions that name Novva Data Centers as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Novva Data Centers + JPMorgan + StarwoodNovva secured $2B of financing led by JPMorgan with Starwood participation for a 175 MW West Jordan, Utah campus. | debt facility | $2.0B | not dated in source | Novva West Jordan campus (UT) |  |
| Novva Data Centers + CIM GroupAn earlier $355M CIM Group equity round backed Novva's national expansion. | equity raise | $355M | earlier than the $2B financing | n.a. |  |

Sources

## Sources for Novva Data Centers

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- novva.com[Novva](https://www.novva.com/media-center/cim-group-novva-data-centers-secure-2b-to-expand-sustainable-data-centers-in-the-western-u-s/)
- enr.com[ENR](https://www.enr.com/articles/60451-novva-secures-2b-to-complete-utah-data-center-campus-construction)
- datacenterfrontier.com[Data Center Frontier](https://www.datacenterfrontier.com/site-selection/article/11427344/novva-data-centers-plans-national-expansion-backed-by-355m-funding)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)