# Poolside Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/poolside
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

1

Site-level commitments the atlas ties to Poolside

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

2,000 MW

Sum of named sites with a stated megawatt figure

Financing transactions

5

Transactions naming Poolside or tied to one of its sites

Spending

## Reported and guided spending

Poolside has no reported or guided spending line in the atlas. Its position is recorded through its named sites, its transactions and its sourced facts below.

Named sites

## Where Poolside builds

Texas

1 site

Open the Texas investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Project Horizon (Longfellow Ranch)with CoreWeave | [Texas](https://savrn.com/data-center-capital-atlas/texas) | n.a. | n.a. | 2,000 | cancelled |  |

Financing

## Financing transactions

Transactions that name Poolside as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Nvidia + PoolsideNvidia agreed to pay Poolside $6 billion to license the software Poolside used to build AI models and to offer jobs to 109 of its staff, according to a letter Poolside sent investors. Poolside intends to distribute the $6 billion to investors by the end of 2027 and said the arrangement is not an acquisition. The Next Web described it as the third deal Nvidia has structured this way | technology license and acqui-hire | ~$6.0B | Reported 21 August 2026. Reported by Newcomer, based on a Poolside investor letter, and relayed by The Next Web | n.a. |  |
| PoolsideReported alongside the Project Horizon partnership announcement. | equity raise | ~$2.0B | reported October 2025 | n.a. |  |
| Nvidia + PoolsideNvidia announced an investment of up to $1 billion in AI startup Poolside on October 30, 2025. | equity raise | $1.0B | Announced October 30, 2025 | n.a. |  |
| PoolsidePoolside's 2024 raise, per DCD's Project Horizon reporting. | equity raise | $500M | 2024 | n.a. |  |
| Poolside + CoreWeaveCoreWeave ended the 2GW Project Horizon deal, with power procurement challenges cited at the campus. | lease | n.a. | partnership October 2025; deal later ended | Project Horizon (Longfellow Ranch) (TX) |  |

The record

## Sourced facts on Poolside

- Project Horizon called for more than 40,000 Nvidia GB300 NVL72 GPUs to be supplied from December 2025 on a 568-acre site.
- The account of CoreWeave's exit notes CoreWeave's $8.5 billion loan facility secured by its Meta agreement and cites power procurement challenges at the 2GW campus.

Sources

## Sources for Poolside

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- datacenterdynamics.com[DCD Project Horizon](https://www.datacenterdynamics.com/en/news/ai-startup-poolside-teams-up-with-coreweave-on-2gw-data-center-in-texas/)
- mlq.ai[MLQ](https://mlq.ai/news/coreweave-ends-2-gw-texas-data-center-deal-with-poolside/)
- thenextweb.com[The Next Web](https://thenextweb.com/news/nvidia-poolside-6bn-model-factory-licence)
- bloomberg.com[Bloomberg](https://www.bloomberg.com/news/articles/2025-10-30/nvidia-to-invest-up-to-1-billion-in-ai-startup-poolside)

### NeoCloud and GPU cloud: one page each

[Applied Digital 5](https://savrn.com/data-center-capital-atlas/company/applied-digital)[Bitdeer Technologies Group 2](https://savrn.com/data-center-capital-atlas/company/bitdeer)[Cerebras Systems 6](https://savrn.com/data-center-capital-atlas/company/cerebras)[Cipher Digital Inc. 0](https://savrn.com/data-center-capital-atlas/company/cipher-digital)[Core Scientific 2](https://savrn.com/data-center-capital-atlas/company/core-scientific)[CoreWeave 4](https://savrn.com/data-center-capital-atlas/company/coreweave)[Corvex, Inc. 0](https://savrn.com/data-center-capital-atlas/company/corvex)[Crusoe Energy 5](https://savrn.com/data-center-capital-atlas/company/crusoe-energy)[Fluidstack 2](https://savrn.com/data-center-capital-atlas/company/fluidstack)[Galaxy Digital Inc. 1](https://savrn.com/data-center-capital-atlas/company/galaxy-digital)[Groq 1](https://savrn.com/data-center-capital-atlas/company/groq)[Hut 8 Corp. 1](https://savrn.com/data-center-capital-atlas/company/hut8)[IREN 1](https://savrn.com/data-center-capital-atlas/company/iren)[Lambda (Lambda Labs) 2](https://savrn.com/data-center-capital-atlas/company/lambda)[Nebius Group 4](https://savrn.com/data-center-capital-atlas/company/nebius-group)[Nscale 2](https://savrn.com/data-center-capital-atlas/company/nscale)[Poolside 1](https://savrn.com/data-center-capital-atlas/company/poolside)[SambaNova Systems 0](https://savrn.com/data-center-capital-atlas/company/sambanova)[Sesterce 3](https://savrn.com/data-center-capital-atlas/company/sesterce)[TeraWulf 1](https://savrn.com/data-center-capital-atlas/company/terawulf)[Together AI 0](https://savrn.com/data-center-capital-atlas/company/together-ai)[Voltage Park 6](https://savrn.com/data-center-capital-atlas/company/voltage-park)[Vultr 1](https://savrn.com/data-center-capital-atlas/company/vultr)[WhiteFiber, Inc. 2](https://savrn.com/data-center-capital-atlas/company/whitefiber)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)