# Prime Data Centers Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/prime-data-centers
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

4

Site-level commitments the atlas ties to Prime Data Centers

Disclosed site capital

$3.4B

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

284 MW

Sum of named sites with a stated megawatt figure

Financing transactions

1

Transactions naming Prime Data Centers or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| n.a. | reported | n.a. | n.a. Private developer disclosure is voluntary and incomplete, producing n.a. entries at Prime in particular |  |

Named sites

## Where Prime Data Centers builds

Arizona

1 site · $3.0B disclosed

Open the Arizona investment tracker →

Texas

1 site · $400M disclosed

Open the Texas investment tracker →

California

2 sites

Open the California investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Prime PHX01, Avondaleannounced May 2026 | [Arizona](https://savrn.com/data-center-capital-atlas/arizona) | Avondale | $3.0B | 240 | announced |  |
| Prime Data Centers AUS01 and AUS02 (1395 Bob White Road)with Lockhart Property, LLC (owner of record) | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Lockhart, Caldwell County | ~$400M | n.a. | proposed |  |
| Prime SMF01, Sacramentostatus not explicitly stated in source | [California](https://savrn.com/data-center-capital-atlas/california) | Sacramento | n.a. | 26 | n.a. |  |
| Prime SMF02, Sacramentobroke ground May 2026 | [California](https://savrn.com/data-center-capital-atlas/california) | Sacramento | n.a. | 18 | construction |  |

Financing

## Financing transactions

Transactions that name Prime Data Centers as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| MARA Holdings + Coinbase + Two PrimeMARA added $600 million of bitcoin-backed borrowing from Coinbase and Two Prime. Proceeds are intended to fund part of the cash consideration for the pending Long Ridge acquisition and assumption of existing indebtedness The facilities were initially collateralized by 18,750 bitcoin | debt facility | $600M | Entered 4 August 2026; disclosed 6 August 2026 | n.a. |  |

The record

## Sourced facts on Prime Data Centers

- Prime reports 13 campuses and a 4+ GW pipeline.

Sources

## Sources for Prime Data Centers

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- businesswire.com[Business Wire](https://www.businesswire.com/news/home/20260507097641/en/Prime-Data-Centers-Breaks-Ground-on-Second-Sacramento-Data-Center-Expanding-Regional-Campus-Footprint)
- tdlr.texas.gov[TDLR TABS project TABS2026019473](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026019473)
- datacenterdynamics.com[Data Center Dynamics, 13 May 2026 (walled)](https://www.datacenterdynamics.com/en/news/prime-files-to-build-two-data-centers-outside-austin-texas/)
- ir.mara.com[MARA (Q2 2026 shareholder letter)](https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000020/q226shareholderletter.htm)
- sec.gov[SEC Form 10-Q (MARA Holdings)](https://www.sec.gov/Archives/edgar/data/1507605/000150760526000022/mara-20260630.htm)
- news.bitcoin.com[The Energy Mag via Bitcoin.com News](https://news.bitcoin.com/finance/mara-pledges-18750-btc-for-600-million-new-bitcoin-backed-loans/)
- primedatacenters.com[Prime Data Centers](https://primedatacenters.com/)
- primedatacenters.com[about page](https://primedatacenters.com/about/)

### REIT and developer: one page each

[Aligned Data Centers 1](https://savrn.com/data-center-capital-atlas/company/aligned-data-centers)[Cloverleaf Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/cloverleaf-infrastructure)[Cologix 0](https://savrn.com/data-center-capital-atlas/company/cologix)[Compass Datacenters 3](https://savrn.com/data-center-capital-atlas/company/compass-datacenters)[CRG (Clayco) 1](https://savrn.com/data-center-capital-atlas/company/crg-clayco)[CyrusOne 7](https://savrn.com/data-center-capital-atlas/company/cyrusone)[DataBank 4](https://savrn.com/data-center-capital-atlas/company/databank)[Digital Realty Trust 8](https://savrn.com/data-center-capital-atlas/company/digital-realty)[EdgeConneX 0](https://savrn.com/data-center-capital-atlas/company/edgeconnex)[Equinix 2](https://savrn.com/data-center-capital-atlas/company/equinix)[Fermi Inc. (Fermi America) 1](https://savrn.com/data-center-capital-atlas/company/fermi-inc)[Flexential 0](https://savrn.com/data-center-capital-atlas/company/flexential)[H5 Data Centers 2](https://savrn.com/data-center-capital-atlas/company/h5-data-centers)[Iron Mountain 3](https://savrn.com/data-center-capital-atlas/company/iron-mountain)[Novva Data Centers 1](https://savrn.com/data-center-capital-atlas/company/novva-data-centers)[Prime Data Centers 4](https://savrn.com/data-center-capital-atlas/company/prime-data-centers)[QTS Realty Trust (Blackstone) 7](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)[Rowan Digital Infrastructure 1](https://savrn.com/data-center-capital-atlas/company/rowan-digital-infrastructure)[Sabey Data Centers 3](https://savrn.com/data-center-capital-atlas/company/sabey-data-centers)[SB Energy 4](https://savrn.com/data-center-capital-atlas/company/sb-energy)[STACK Infrastructure 4](https://savrn.com/data-center-capital-atlas/company/stack-infrastructure)[Tract 6](https://savrn.com/data-center-capital-atlas/company/tract)[Vantage Data Centers 7](https://savrn.com/data-center-capital-atlas/company/vantage-data-centers)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)