# Silver Lake Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/silver-lake
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

0

Site-level commitments the atlas ties to Silver Lake

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

4

Transactions naming Silver Lake or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| at Vantage investment (2024) | aum | ~$103B | Silver Lake managed approximately $103 billion; portfolio revenue of approximately $254 billion cited at the powered-land platform launch |  |

Named sites

## Where Silver Lake builds

Silver Lake has no named site commitment on record in the atlas as of October 8, 2026. That is normal for a private equity and infrastructure position: the capital shows up in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name Silver Lake as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| DigitalBridge + Silver Lake + Vantage Data CentersDigitalBridge and Silver Lake co-led the completed equity investment in Vantage Data Centers. | equity raise | ≥$9.2B | completed June 13, 2024 | n.a. |  |
| Cipher Digital (Cipher Barber Lake LLC) + Fluidstack USA II Inc. + Unnamed leading AI labCipher amended its Barber Lake lease with Fluidstack and entered a binding commitment with an unnamed leading AI lab to lease the facility for 10 more years after the Fluidstack term, on economic terms substantially consistent with the existing lease, extending contracted term to 20 years. The amendment adds tenant change orders, a phased data hall delivery from the fourth quarter of 2026 to the first quarter of 2027 (the September 2025 filing had targeted delivery by September 2026), and a cost framework under which Cipher bears the first $359.3 million of overruns above the initial budget and the tenant reimburses 50% of costs above that amount as additional rent. | lease | ≥$5.2B | Amendment and binding commitment signed 24 September 2026; announced 25 September 2026 (Form 8-K) | Barber Lake data center (TX) |  |
| Silver Lake + Adam Fisher + Peter RumboldSilver Lake launched the platform citing AUM of approximately $103 billion. | platform | ≥$400M | launched after the Vantage investment | n.a. |  |
| QTS + City of Blakely + Early CountyBlakely and Early County, Georgia, signed an economic development agreement with QTS after two years of talks. The fund includes $5 million for wastewater upgrades and more than $12 million for workforce training. Officials said the campus could generate $60 million to $85 million a year for the county at full build-out | incentive | ≥$29M | Signed 13 August 2026; reported 14 August 2026 | QTS Blakely campus (GA) |  |

The record

## Sourced facts on Silver Lake

- QTS / NVIDIA involvement: n.a. No fetched source supports a Silver Lake role in QTS or an NVIDIA-linked QTS transaction; NVIDIA's disclosed financing-platform partners are Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs and KKR, and Silver Lake is not among them.
- The $400 million powered-land platform, led by Adam Fisher and Peter Rumbold, plans more than 6GW.
- Pause exposure: n.a.

Sources

## Sources for Silver Lake

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- vantage-dc.com[Vantage](https://vantage-dc.com/news/vantage-data-centers-completes-9-2-billion-equity-investment-led-by-digitalbridge-and-silver-lake/)
- lw.com[Latham & Watkins](https://www.lw.com/en/news/2024/06/latham-watkins-advises-silver-lake-in-completed-equity-investment-in-vantage-data-centers)
- vantage-dc.com[Vantage 2024 recap](https://vantage-dc.com/news/vantage-data-centers-growth-continued-in-2024-driven-by-ai-and-cloud-adoption-secured-a-record-13-billion-in-incremental-funding/)
- sec.gov[Cipher Digital Form 8-K, 25 September 2026 (SEC)](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/cifr-20260924.htm)
- sec.gov[Cipher Digital press release, Exhibit 99.1 (SEC)](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm)
- silverlake.com[Silver Lake](https://www.silverlake.com/silver-lake-launches-400-million-digital-infrastructure-platform-with-adam-fisher-and-peter-rumbold/)
- wtvy.com[WTVY](https://www.wtvy.com/2026/08/14/qts-data-center-deal-brings-2875m-commitment-blakely/)
- nvidianews.nvidia.com[NVIDIA](https://nvidianews.nvidia.com/news/nvidia-partners-with-apollo-blackrock-blackstone-brookfield-goldman-sachs-and-kkr-to-establish-ai-compute-infrastructure-financing-platforms-to-mobilize-over-500-billion-of-third-party-capital)

### Private equity and infrastructure: one page each

[Antin Infrastructure Partners 0](https://savrn.com/data-center-capital-atlas/company/antin)[Apollo Global Management 0](https://savrn.com/data-center-capital-atlas/company/apollo)[Ares Management 2](https://savrn.com/data-center-capital-atlas/company/ares)[BlackRock / GIP / AI Infrastructure Partnership 0](https://savrn.com/data-center-capital-atlas/company/blackrock-gip-aip)[Blackstone 5](https://savrn.com/data-center-capital-atlas/company/blackstone)[Brookfield (BAM / Brookfield Infrastructure Partners) 2](https://savrn.com/data-center-capital-atlas/company/brookfield)[Copenhagen Infrastructure Partners 1](https://savrn.com/data-center-capital-atlas/company/cip)[DigitalBridge 5](https://savrn.com/data-center-capital-atlas/company/digitalbridge)[EQT 1](https://savrn.com/data-center-capital-atlas/company/eqt)[Global Infrastructure Partners (as a distinct platform) 0](https://savrn.com/data-center-capital-atlas/company/gip)[I Squared Capital 0](https://savrn.com/data-center-capital-atlas/company/i-squared)[IPI Partners / Blue Owl 1](https://savrn.com/data-center-capital-atlas/company/ipi-blue-owl)[KKR 3](https://savrn.com/data-center-capital-atlas/company/kkr)[Macquarie Asset Management 1](https://savrn.com/data-center-capital-atlas/company/macquarie-am)[Oaktree Capital Management 1](https://savrn.com/data-center-capital-atlas/company/oaktree)[Pensions & Sovereign Wealth Funds (CalPERS, CPPIB, CDPQ/La Caisse, OTPP, PSP, ADIA, GIC, Mubadala, MGX) 0](https://savrn.com/data-center-capital-atlas/company/pensions-swfs)[Silver Lake 0](https://savrn.com/data-center-capital-atlas/company/silver-lake)[Stonepeak 2](https://savrn.com/data-center-capital-atlas/company/stonepeak)[The Carlyle Group 2](https://savrn.com/data-center-capital-atlas/company/carlyle)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
