# Temasek Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/temasek
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

0

Site-level commitments the atlas ties to Temasek

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

1

Transactions naming Temasek or tied to one of its sites

Spending

## Reported and guided spending

Temasek has no reported or guided spending line in the atlas. Its position is recorded through its named sites, its transactions and its sourced facts below.

Named sites

## Where Temasek builds

Temasek has no named site commitment on record in the atlas as of October 8, 2026. That is normal for a pension and sovereign wealth position: the capital shows up in the transactions below rather than on a site of its own.

Financing

## Financing transactions

Transactions that name Temasek as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| MGX + BlackRock + Kuwait Investment Authority + Temasek + Nvidia + xAI + Microsoft + AI Infrastructure Partnership + GIPMGX is a founding partner of the AI Infrastructure Partnership (AIP), seeking $30 billion of equity scaling to up to $100 billion including debt financing. Kuwait Investment Authority joined in June 2025 and Temasek made an anchor investment at the October 2025 initial closing. | platform | $30.0B | n.a. in source; KIA joined June 2025, Temasek anchored October 2025 initial closing | n.a. |  |

The record

## Sourced facts on Temasek

- Temasek made an anchor investment in AIP at its October 2025 initial closing.

Sources

## Sources for Temasek

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- blackrock.com[BlackRock](https://www.blackrock.com/corporate/newsroom/media/press-releases/ai-infrastructure-partnership)
- reuters.com[Reuters](https://www.reuters.com/technology/artificial-intelligence/nvidia-xai-join-microsoft-blackrock-develop-ai-infrastructure-2025-03-19/)
- ropesgray.com[Ropes & Gray](https://www.ropesgray.com/en/news-and-events/news/2026/01/ropes-gray-advises-temasek-on-joining-ai-infrastructure-partnership)
- reuters.com[Reuters](https://www.reuters.com/world/asia-pacific/temasek-joins-microsoft-blackrock-mgx-develop-ai-infrastructure-2025-06-12/)

### Pension and sovereign wealth: one page each

[ADIA (Abu Dhabi Investment Authority) 0](https://savrn.com/data-center-capital-atlas/company/adia)[CalPERS 0](https://savrn.com/data-center-capital-atlas/company/calpers)[CDPQ / La Caisse 2](https://savrn.com/data-center-capital-atlas/company/cdpq-la-caisse)[CPP Investments (CPPIB) 1](https://savrn.com/data-center-capital-atlas/company/cpp-investments)[GIC 0](https://savrn.com/data-center-capital-atlas/company/gic)[Kuwait Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/kuwait-investment-authority)[MGX 0](https://savrn.com/data-center-capital-atlas/company/mgx)[Mubadala 0](https://savrn.com/data-center-capital-atlas/company/mubadala)[Ontario Teachers' Pension Plan (OTPP) 1](https://savrn.com/data-center-capital-atlas/company/otpp)[PSP Investments 0](https://savrn.com/data-center-capital-atlas/company/psp-investments)[Qatar Investment Authority 0](https://savrn.com/data-center-capital-atlas/company/qatar-investment-authority)[Temasek 0](https://savrn.com/data-center-capital-atlas/company/temasek)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)
