# Voltage Park Data Center Capex and Sites
Source: https://savrn.com/data-center-capital-atlas/company/voltage-park
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

6

Site-level commitments the atlas ties to Voltage Park

Disclosed site capital

n.a.

Sum of named sites with a stated dollar figure. Not a capex total; see the spending table

Disclosed capacity

n.a.

Sum of named sites with a stated megawatt figure

Financing transactions

9

Transactions naming Voltage Park or tied to one of its sites

Spending

## Reported and guided spending

Audited, reported and guided figures as the filing or release states them. Reported lines are what was spent; guidance is what management said it expects. They are shown side by side and never combined.

| Period | Kind | Amount | As stated | Sources |
| --- | --- | --- | --- | --- |
| Oct 2023 | raise | ~$500M | Approximately $500 million of Nvidia H100 GPUs purchased by Jed McCaleb's nonprofit; 24,000 H100s per the Navigation Fund's later description |  |
| reported Jan 2026 | raise | $900M | $900 million grant from McCaleb |  |

Named sites

## Where Voltage Park builds

Texas

2 sites

Open the Texas investment tracker →

Washington

2 sites

Open the Washington investment tracker →

Utah

1 site

Open the Utah investment tracker →

Virginia

1 site

Open the Virginia investment tracker →

| Site | State | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Allen facility | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Allen | n.a. | n.a. | operating |  |
| Fort Worth facility | [Texas](https://savrn.com/data-center-capital-atlas/texas) | Fort Worth | n.a. | n.a. | operating |  |
| Puyallup facility | [Washington](https://savrn.com/data-center-capital-atlas/washington) | Puyallup | n.a. | n.a. | operating |  |
| Quincy facility | [Washington](https://savrn.com/data-center-capital-atlas/washington) | Quincy | n.a. | n.a. | operating |  |
| Salt Lake City facilities (two) | [Utah](https://savrn.com/data-center-capital-atlas/utah) | Salt Lake City | n.a. | n.a. | operating |  |
| Sterling facility | [Virginia](https://savrn.com/data-center-capital-atlas/virginia) | Sterling | n.a. | n.a. | operating |  |

Financing

## Financing transactions

Transactions that name Voltage Park as a party or attach to one of its named sites. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| CleanSpark + Anviran, LLC (Meta subsidiary) + Meta Platforms (guarantor)CleanSpark signed a 20-year triple-net lease for 175 MW of critical IT load at Sandersville, Georgia, with deliveries expected to begin in Q4 2027. The tenant also executed a letter of intent and exclusivity arrangement covering CleanSpark's Texas portfolio of 718 acres and up to 885 MW. CleanSpark estimated landlord project costs of $10 million to $12 million per MW On 17 September 2026 CleanSpark disclosed the tenant as Anviran, LLC, a wholly owned subsidiary of Meta, with Meta guaranteeing rent and operating expenses. The investor presentation shows development cost of about $11.9 million per IT MW, rent commencing 30 November 2027 and about $330 million of average annual NOI, and CleanSpark proposed a $2.227 billion senior secured notes offering to fund the remaining Sandersville build. The 17 September 2026 investor presentation states a 3.0% annual rent escalator, rent commencement on 30 November 2027 and one 12-month option in addition to the two five-year extensions | lease | ≥$6.6B | Announced 14 July 2026 | CleanSpark Sandersville data center (GA) |  |
| Voltage Park + Lightning AIMerger creating an entity with more than $500 million of ARR, 60MW, more than 35,000 Nvidia GPUs and six data centers across four states. | merger | ≥$2.5B | January 2026 | n.a. |  |
| CleanSpark, Inc. + CSDC Finance I, LLC (issuer) + CSRE Properties Sandersville, LLC (guarantor)CleanSpark subsidiary CSDC Finance I, LLC priced a Rule 144A / Regulation S private offering of $2.276 billion of 7.875% senior secured notes due 2031 at 98.500% of principal on 18 September 2026, up from the $2.227 billion proposed on 17 September 2026. Net proceeds are to finance the remaining build-out cost of the Sandersville Facility, reimburse CleanSpark for prior equity contributions and fund debt service reserves. The notes are guaranteed by CSRE Properties Sandersville, LLC and secured by first-priority liens on substantially all assets of the issuer and guarantor and on the issuer's equity; CleanSpark provides a customary completion guarantee. Closing is expected on 25 September 2026. The facility is leased for 20 years to an unnamed high investment-grade global technology company (lease announced 14 July 2026). The 17 September 2026 investor presentation filed with the proposed-offering 8-K identifies the tenant as Anviran, LLC, a wholly owned subsidiary of Meta, with Meta guaranteeing rent and operating expenses, and shows a development cost of about $11.9 million per IT MW. As of 24 September 2026 no closing 8-K had been filed; closing remained expected on 25 September 2026. CleanSpark's Form 8-K filed 25 September 2026 reports that CSDC Finance I, LLC completed the offering on 25 September 2026: $2,276.0 million of 7.875% Senior Secured Notes due 2031 issued at 98.500% of principal under an indenture dated 25 September 2026 with U.S. Bank Trust Company, National Association as trustee and collateral agent, guaranteed by CSRE Properties Sandersville, LLC. Net proceeds finance the remaining cost of the Sandersville, Georgia data center facility, reimburse CleanSpark for prior equity contributions and fund debt service reserves. CleanSpark provides a customary completion guarantee for the facility. | project bond | $2.3B | Priced 18 September 2026 (purchase agreement); closed 25 September 2026 (Form 8-K filed 25 September 2026) | CleanSpark Sandersville data center (GA) |  |
| CleanSpark, Inc. + Cantor FitzgeraldCleanSpark completed a Rule 144A offering of $1,150,000,000 of 0.00% Convertible Senior Notes due 2032 on 13 November 2025, issued at par for net proceeds of about $1.13 billion. It used about $460.0 million to repurchase shares from note investors and intends to use the remainder to expand its power and land portfolio, develop data center infrastructure, repay bitcoin-backed credit lines and for general corporate purposes. | convertible | ~$1.1B | Purchase agreement 10 November 2025; completed 13 November 2025 | n.a. |  |
| Voltage Park + Jed McCalebGrant funding cited in the merger reporting. | other | $900M | reported January 2026 | n.a. |  |
| Voltage Park + Navigation Fund + Jed McCalebThe GPU purchase that seeded Voltage Park's fleet. | other | ~$500M | October 2023 | n.a. |  |
| TAR (Transformative American Resources) + Spark CapitalAustin-based TAR raised a $120 million Series A at a $1 billion post-money valuation to build off-grid solar and battery power systems for data centers, with gas backup for emergencies, and is executing a utility-scale deployment with one of the largest neoclouds in West Texas | other | ~$120M | Announced 10 September 2026 | n.a. |  |
| Rune + Spark Capital + Union Square Ventures + Lowercarbon Capital + Activate Capital + Committed Capital + Timeless Partners + Logos FundSan Francisco based Rune announced a $40 million Series A led by Spark Capital, with Union Square Ventures, Lowercarbon Capital, Activate Capital, Committed Capital, Timeless Partners and Logos Fund, bringing total funding to $53.5 million, alongside the launch of RELIC, a modular compute system installed behind the meter inside operating solar farms using clipped and curtailed power without a grid connection. pv magazine reports an active RELIC installation inside a 200 MW operating solar farm in Texas; the site and its compute capacity in MW are not disclosed. Proceeds are to secure more solar host agreements and scale the on-site compute footprint. | equity raise | $40M | Announced 16 September 2026 (Business Wire release); reported by pv magazine USA 24 September 2026 | n.a. |  |
| Voltage Park + TensorDockVoltage Park acquired GPU marketplace TensorDock. | acquisition | n.a. | April 2025 | n.a. |  |

The record

## Sourced facts on Voltage Park

- Voltage Park describes 36,000+ H100/B200/GB300 GPUs post-merger, across six data centers in four states with at least one facility in every US time zone.
- Voltage Park acquired GPU marketplace TensorDock in April 2025.
- Anchor customer contract values are n.a. in the fetched record.

Sources

## Sources for Voltage Park

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- voltagepark.com[Voltage Park](https://www.voltagepark.com/blog/scaling-ai-in-2025-flexibility-speed)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/gpuaas-provider-voltage-park-merges-with-cloud-platform-lightning-ai/)
- investors.cleanspark.com[CleanSpark](https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Secures-Twenty-Year-Lease-with-High-Investment-Grade-Global-Technology-Company-for-Data-Center-in-Sandersville-Georgia/default.aspx)
- sec.gov[SEC Form 8-K Exhibit 99.1 (CleanSpark Sandersville investor presentation)](https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_1.htm)
- sec.gov[SEC Form 8-K Exhibit 99.2 (CleanSpark)](https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_2.htm)
- 247wallst.com[24/7 Wall St.](https://247wallst.com/investing/2026/07/14/cleanspark-jumps-12-on-6-6b-data-center-lease-while-riot-mara-hut-8-edge-higher/)
- forbes.com[Forbes](https://www.forbes.com/sites/iainmartin/2026/01/21/ai-startup-merges-with-a-billionaire-backed-data-center-operator-in-25-billion-deal/)
- voltagepark.com[Voltage Park](https://www.voltagepark.com/blog/lightning-ai-voltage-park-merger-to-create-the-first-cloud-built-for-ai)
- sec.gov[CleanSpark Form 8-K Exhibit 99.2 (SEC)](https://www.sec.gov/Archives/edgar/data/0000827876/000119312526393758/clsk-ex99_2.htm)
- prnewswire.com[CleanSpark press release (PR Newswire)](http://www.prnewswire.com/news-releases/cleanspark-inc-announces-proposed-offering-of-2-227-billion-of-senior-secured-notes-302881360.html)
- sec.gov[CleanSpark Form 8-K Exhibit 99.1, pricing release (SEC)](https://www.sec.gov/Archives/edgar/data/827876/000119312526395727/clsk-ex99_1.htm)
- sec.gov[CleanSpark Form 8-K, 25 September 2026 (SEC)](https://www.sec.gov/Archives/edgar/data/827876/000119312526402944/clsk-20260925.htm)
- sec.gov[CleanSpark Form 8-K, 13 November 2025](https://www.sec.gov/Archives/edgar/data/827876/000119312525280105/clsk-20251113.htm)
- reuters.com[Reuters](https://www.reuters.com/technology/crypto-billionaires-nonprofit-buys-500-million-ai-data-center-chips-2023-10-30/)
- latitudemedia.com[Latitude Media](https://www.latitudemedia.com/news/tar-aims-to-build-off-grid-power-for-data-centers-in-just-six-months/)
- rutlandherald.com[Company press release (TAR, Business Wire via Rutland Herald)](https://www.rutlandherald.com/news/business/tar-raises-120-million-series-a-at-a-1-billion-valuation-led-by-spark-capital/article_c3a5949e-d3b3-509e-93c3-e62536c018ee.html)
- finance.yahoo.com[Rune release via Business Wire on Yahoo Finance](https://finance.yahoo.com/technology/ai/articles/rune-debuts-relic-first-drama-130000257.html)
- pv-magazine-usa.com[pv magazine USA](https://pv-magazine-usa.com/2026/09/24/rune-raises-40-million-series-a-to-build-on-site-off-grid-ai-data-centers-at-solar-facilities/)

### NeoCloud and GPU cloud: one page each

[Applied Digital 5](https://savrn.com/data-center-capital-atlas/company/applied-digital)[Bitdeer Technologies Group 2](https://savrn.com/data-center-capital-atlas/company/bitdeer)[Cerebras Systems 6](https://savrn.com/data-center-capital-atlas/company/cerebras)[Cipher Digital Inc. 0](https://savrn.com/data-center-capital-atlas/company/cipher-digital)[Core Scientific 2](https://savrn.com/data-center-capital-atlas/company/core-scientific)[CoreWeave 4](https://savrn.com/data-center-capital-atlas/company/coreweave)[Corvex, Inc. 0](https://savrn.com/data-center-capital-atlas/company/corvex)[Crusoe Energy 5](https://savrn.com/data-center-capital-atlas/company/crusoe-energy)[Fluidstack 2](https://savrn.com/data-center-capital-atlas/company/fluidstack)[Galaxy Digital Inc. 1](https://savrn.com/data-center-capital-atlas/company/galaxy-digital)[Groq 1](https://savrn.com/data-center-capital-atlas/company/groq)[Hut 8 Corp. 1](https://savrn.com/data-center-capital-atlas/company/hut8)[IREN 1](https://savrn.com/data-center-capital-atlas/company/iren)[Lambda (Lambda Labs) 2](https://savrn.com/data-center-capital-atlas/company/lambda)[Nebius Group 4](https://savrn.com/data-center-capital-atlas/company/nebius-group)[Nscale 2](https://savrn.com/data-center-capital-atlas/company/nscale)[Poolside 1](https://savrn.com/data-center-capital-atlas/company/poolside)[SambaNova Systems 0](https://savrn.com/data-center-capital-atlas/company/sambanova)[Sesterce 3](https://savrn.com/data-center-capital-atlas/company/sesterce)[TeraWulf 1](https://savrn.com/data-center-capital-atlas/company/terawulf)[Together AI 0](https://savrn.com/data-center-capital-atlas/company/together-ai)[Voltage Park 6](https://savrn.com/data-center-capital-atlas/company/voltage-park)[Vultr 1](https://savrn.com/data-center-capital-atlas/company/vultr)[WhiteFiber, Inc. 2](https://savrn.com/data-center-capital-atlas/company/whitefiber)

The figure beside each provider is its count of named sites in the atlas.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Site commitments overlap reported capital expenditure and overlap one another, so this page shows each figure as its source states it and never adds them into a single deployment number. Informational, not investment advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)