0

Site-level commitments the atlas records in Connecticut

Disclosed capital floor

n.a.

Sum of sites with a stated dollar figure. Sites without one are listed, not counted

Disclosed capacity

n.a.

Sum of sites with a stated megawatt figure

Blocked, delayed or restricted

6

$231M of announced capital in those projects

Who is investing

## Who is investing in data centers in Connecticut?

No capital provider has a named site commitment on record in Connecticut as of October 8, 2026. The atlas records a site the day it can be tied to a filing, an issuer release, a government announcement or reporting of record, not before. The activity here is on the other side of the ledger: 6 projects blocked, delayed or restricted, listed below.

Named sites

## Named data center sites in Connecticut

No named site commitment is on record in Connecticut as of October 8, 2026.

Capital at risk

## Blocked, delayed or restricted in Connecticut

Every project in Connecticut on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

| Project | Developer | Jurisdiction | Action | Capital | Sources |
| --- | --- | --- | --- | --- | --- |
| NE Edge Waterford / East Lymedenied January 9, 2024 | NE Edge | Waterford / East Lyme | CT Siting Council denied Dominion Energy's petition to modify Millstone Power Station boundaries for NE Edge's 1.5M sq ft hyperscale data center (300MW, ~15% of reactor output). | $231M |  |
| Morris data center moratoriummoratorium Enacted May 2026 | n.a. | Morris | Morris, Connecticut, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated May 2026. 2-year moratorium covering data centers and battery storage, passed unanimously by the PZC. Driven by farmland and rural character concerns. The measure runs to 20 May 2028. | n.a. |  |
| NE Edge data center at Millstone Power Stationdenied Siting Council petition denied January 2024; host fee agreement reported ended April 2026 (opinion piece by project opponent) | NE Edge (with Dominion Energy) | Connecticut Siting Council / Town of Waterford | NE Edge proposed two data center buildings of roughly 1.5 million square feet at Dominion Energy's Millstone nuclear station in Waterford, drawing 300 megawatts directly from the plant. In January 2024 the Connecticut Siting Council denied Dominion's petition arguing that the data centers and switchyard were unrelated to its generating operations and so not subject to council approval. A CT Mirror opinion piece by a member of the residents' group, published 15 April 2026, states that the host fee agreement between NE Edge-Waterford LLC and the Town of Waterford has ended due to a default and expired by its terms. | n.a. |  |
| New Haven 12-month data center moratoriummoratorium Approved unanimously by the Board of Alders 22 September 2026; 12 months | n.a. | New Haven Board of Alders | On Tuesday 22 September 2026 the New Haven Board of Alders unanimously approved a one-year moratorium on new data centers, authored by Majority Leader Richard Furlow. City Plan staff will use the period to review zoning, under which data processing centers are otherwise allowed as of right in light and heavy industrial zones and the transit oriented community zone. The city has not received any AI data center proposals. | n.a. |  |
| Trumbull two-year data center moratoriummoratorium Approved unanimously 11 September 2026; two years, effective immediately | n.a. (town-wide land use action) | Town of Trumbull | The Trumbull Town Council approved a two-year moratorium on new data centers unanimously by voice vote on 11 September 2026, effective immediately. The resolution reaches only newly built data centers and expressly does not apply to work under way at Trumbull Corporate Park on Merritt Boulevard, where 365 Data Centers of Norwalk is carrying out a $200 million modernization of the former Nasdaq facility at 80 Merritt Boulevard under a 15-year tenant commitment. Residents had expected the measure to halt that project, which they regard as an AI-ready pipeline rather than a modernization, and that gap between expectation and effect became the central controversy. The record here is that the moratorium did not stop the capital already committed in the town. | n.a. |  |
| West Haven data center moratoriummoratorium Enacted January 2026 | n.a. | West Haven | West Haven, Connecticut, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. City Council unanimously approved a 12-month moratorium on establishment and development of data centers; proposed by Mayor Dorinda Borer; defines data centers as facilities primarily used for storage, processing, and distribution of digital data; exempts incidental server rooms; city to review zoning and licensing rules. The measure runs to 8 June 2027. | n.a. |  |

Policy context

## What governs a data center in Connecticut

The policy layer for Connecticut lives in three companion references: the [Connecticut Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker/connecticut) for every state measure and local moratorium on record, the [Water Tracker](https://savrn.com/data-center-water-tracker) for the water rules that touch a site, and the [Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the large-load rules of the RTO or utility that decides whether it can energize.

Next door

## States next door

New York

6 sites · $4.2B disclosed

21 blocked, delayed or restricted

Massachusetts

0 sites

11 blocked, delayed or restricted

Rhode Island

0 sites

5 blocked, delayed or restricted

On the map

## Data centers in Connecticut

The US Data Center Map identifies 33 facilities run by 14 operators in Connecticut, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Connecticut data centers

33 facilities · 14 operators

Map, locations, operators, rules

Connecticut power and local economy

Generation, utilities and county records

Explore the power supply chain and local conditions behind the build-out

US Data Center Map

Every state, one page each

The national map and the operator directory

Sources

## Sources for Connecticut

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- theday.com[theday.com](https://www.theday.com/local-news/20240109/siting-council-deals-initial-blow-to-waterford-data-center-project/)
- ctmirror.org[ctmirror.org](https://ctmirror.org/2024/04/19/ct-data-center-nuclear-plant-bill/)
- yahoo.com[yahoo.com](https://www.yahoo.com/news/us/articles/why-one-connecticut-town-approved-100000211.html)
- ctmirror.org[CT Mirror](https://ctmirror.org/2024/01/19/millstone-power-plant-ct-data-center-nuclear/)
- ctmirror.org[CT Mirror (opinion)](https://ctmirror.org/2026/04/15/tale-of-a-defeated-ct-data-center/)
- newhavenindependent.org[New Haven Independent](https://www.newhavenindependent.org/2026/09/23/12-month-pause-approved-for-data-center-development/)
- westfaironline.com[Westfair Communications](https://westfaironline.com/news/trumbull-town-council-oks-moratorium-on-new-data-centers/)
- hartfordbusiness.com[hartfordbusiness.com](https://hartfordbusiness.com/article/new-haven-weighs-12-month-moratorium-on-data-center-development/)

### Every state, one page each

[Alabama 9 / 21](https://savrn.com/data-center-capital-atlas/alabama)[Alaska 1 / 1](https://savrn.com/data-center-capital-atlas/alaska)[Arizona 11 / 11](https://savrn.com/data-center-capital-atlas/arizona)[Arkansas 2 / 8](https://savrn.com/data-center-capital-atlas/arkansas)[California 10 / 35](https://savrn.com/data-center-capital-atlas/california)[Colorado 6 / 21](https://savrn.com/data-center-capital-atlas/colorado)[Connecticut 0 / 6](https://savrn.com/data-center-capital-atlas/connecticut)[Delaware 0 / 5](https://savrn.com/data-center-capital-atlas/delaware)[Florida 0 / 46](https://savrn.com/data-center-capital-atlas/florida)[Georgia 23 / 57](https://savrn.com/data-center-capital-atlas/georgia)[Hawaii 0 / 0](https://savrn.com/data-center-capital-atlas/hawaii)[Idaho 2 / 2](https://savrn.com/data-center-capital-atlas/idaho)[Illinois 10 / 35](https://savrn.com/data-center-capital-atlas/illinois)[Indiana 14 / 44](https://savrn.com/data-center-capital-atlas/indiana)[Iowa 3 / 22](https://savrn.com/data-center-capital-atlas/iowa)[Kansas 5 / 19](https://savrn.com/data-center-capital-atlas/kansas)[Kentucky 6 / 26](https://savrn.com/data-center-capital-atlas/kentucky)[Louisiana 7 / 3](https://savrn.com/data-center-capital-atlas/louisiana)[Maine 0 / 20](https://savrn.com/data-center-capital-atlas/maine)[Maryland 1 / 22](https://savrn.com/data-center-capital-atlas/maryland)[Massachusetts 0 / 11](https://savrn.com/data-center-capital-atlas/massachusetts)[Michigan 4 / 55](https://savrn.com/data-center-capital-atlas/michigan)[Minnesota 3 / 31](https://savrn.com/data-center-capital-atlas/minnesota)[Mississippi 7 / 5](https://savrn.com/data-center-capital-atlas/mississippi)[Missouri 10 / 25](https://savrn.com/data-center-capital-atlas/missouri)[Montana 1 / 10](https://savrn.com/data-center-capital-atlas/montana)[Nebraska 3 / 16](https://savrn.com/data-center-capital-atlas/nebraska)[Nevada 8 / 12](https://savrn.com/data-center-capital-atlas/nevada)[New Hampshire 0 / 5](https://savrn.com/data-center-capital-atlas/new-hampshire)[New Jersey 4 / 61](https://savrn.com/data-center-capital-atlas/new-jersey)[New Mexico 3 / 10](https://savrn.com/data-center-capital-atlas/new-mexico)[New York 6 / 21](https://savrn.com/data-center-capital-atlas/new-york)[North Carolina 10 / 45](https://savrn.com/data-center-capital-atlas/north-carolina)[North Dakota 6 / 4](https://savrn.com/data-center-capital-atlas/north-dakota)[Ohio 24 / 80](https://savrn.com/data-center-capital-atlas/ohio)[Oklahoma 11 / 20](https://savrn.com/data-center-capital-atlas/oklahoma)[Oregon 1 / 8](https://savrn.com/data-center-capital-atlas/oregon)[Pennsylvania 16 / 42](https://savrn.com/data-center-capital-atlas/pennsylvania)[Rhode Island 0 / 5](https://savrn.com/data-center-capital-atlas/rhode-island)[South Carolina 6 / 20](https://savrn.com/data-center-capital-atlas/south-carolina)[South Dakota 1 / 6](https://savrn.com/data-center-capital-atlas/south-dakota)[Tennessee 6 / 26](https://savrn.com/data-center-capital-atlas/tennessee)[Texas 106 / 35](https://savrn.com/data-center-capital-atlas/texas)[Utah 11 / 12](https://savrn.com/data-center-capital-atlas/utah)[Vermont 0 / 3](https://savrn.com/data-center-capital-atlas/vermont)[Virginia 33 / 50](https://savrn.com/data-center-capital-atlas/virginia)[Washington 9 / 22](https://savrn.com/data-center-capital-atlas/washington)[Washington, DC 0 / 0](https://savrn.com/data-center-capital-atlas/washington-dc)[West Virginia 4 / 3](https://savrn.com/data-center-capital-atlas/west-virginia)[Wisconsin 4 / 45](https://savrn.com/data-center-capital-atlas/wisconsin)[Wyoming 11 / 5](https://savrn.com/data-center-capital-atlas/wyoming)

Figures beside each state are named sites and blocked, delayed or restricted projects.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Announced commitments overlap one another and overlap reported capital expenditure, so this page shows disclosed floors and never adds them into a single deployment figure. Informational, not investment or legal advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)