# Iowa Data Center Investment Tracker
Source: https://savrn.com/data-center-capital-atlas/iowa
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

3

Site-level commitments the atlas records in Iowa

Disclosed capital floor

$7.0B

Sum of sites with a stated dollar figure. Sites without one are listed, not counted

Disclosed capacity

n.a.

Sum of sites with a stated megawatt figure

Blocked, delayed or restricted

22

$350M of announced capital in those projects

Who is investing

## Who is investing in data centers in Iowa?

The largest disclosed commitments in Iowa are Alphabet / Google (Iowa: Council Bluffs expansion and new Cedar Rapids data center, $7.0B). Together the 3 named sites here carry a disclosed floor of $7.0B; sites with no dollar figure are listed but not counted.

[Alphabet / Google 3 sites · $7.0B](https://savrn.com/data-center-capital-atlas/company/alphabet)

Named sites

## Named data center sites in Iowa

Each row is one site-level commitment with its capital provider, the figure the source states, and the status the source gives it. Capital is shown as one compact figure; the verbatim wording is in the row's sources.

| Site | Capital provider | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Iowa: Council Bluffs expansion and new Cedar Rapids data centerWithin the next two years from announcement | [Alphabet / Google](https://savrn.com/data-center-capital-atlas/company/alphabet) | Council Bluffs and Cedar Rapids | $7.0B | n.a. | expansion |  |
| Potential Google data center, Salix (MidAmerican Energy site)Google named 3 August 2026; reimbursement MOU reviewed by council September 2026 | [Alphabet / Google](https://savrn.com/data-center-capital-atlas/company/alphabet)with MidAmerican Energy | Salix, Woodbury County | n.a. | n.a. | exploratory |  |
| Proposed Google data center near Duane Arnold Energy Center (Palo)Palo ordinance passed 20 July 2026 | [Alphabet / Google](https://savrn.com/data-center-capital-atlas/company/alphabet)with NextEra Energy, City of Palo, Linn County | Palo (unincorporated Linn County, possible annexation), Linn County | n.a. | n.a. | proposed |  |

Capital at risk

## Blocked, delayed or restricted in Iowa

Every project in Iowa on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

| Project | Developer | Jurisdiction | Action | Capital | Sources |
| --- | --- | --- | --- | --- | --- |
| Marshalltown data center moratorium (Swarm Systems Edgewood Industrial Park proposal)moratorium Motion approved 5-2 on 13 July 2026; ordinance adopted 24 August 2026; land offer expired 11 September 2026; moratorium runs to 23 November 2026, extendable 60 days | Swarm Systems (proposal) | City of Marshalltown | The Marshalltown City Council approved a four-month data center moratorium motion 5-2 at a 13 July 2026 meeting, after a six-month pause failed 4-3 about three weeks earlier. The moratorium ordinance was adopted on 24 August 2026 and halts acceptance, processing and issuance of data center permits, applications and zoning amendments until 23 November 2026, with a possible 60-day extension. Swarm Systems CEO Amir Atefi presented a plan to buy 21 acres in the Edgewood Industrial Park for a 150,000-square-foot data center, and said he would wait out the moratorium. Records made public after the offer expired show Swarm Systems offered the city $1,113,200 on 21 July 2026 for about 29.33 acres, then about a month later the same amount for 21.77 acres (about $51,135 an acre), with closing by 31 March 2027 and contingencies requiring the moratorium to lapse and zoning acceptable to the buyer. The council deadlocked on acting on the offer after the 24 August 2026 presentation and it expired on 11 September 2026. CEO Amir Atefi said the company is also looking at other sites in Iowa and other states but has not moved on from Marshalltown. | $350M |  |
| Adair County proposalmoratorium Mar 25 2026 | Applied Digital | Adair County, IA | Indefinite moratorium | n.a. |  |
| Boone County data center moratoriummoratorium Adopted 9 September 2026; up to one year | n.a. | Boone County Board of Supervisors | The Boone County Board of Supervisors adopted a moratorium of up to one year on the establishment, construction or permitting of new data centers on Wednesday 9 September 2026. Supervisor Shawn Bryant said the pause allows time to study and adopt data center ordinances. WOI noted other Iowa pauses in Marshalltown, Linn County and Woodbury County. | n.a. |  |
| Buchanan County data center moratoriummoratorium Enacted January 2026 | n.a. | Buchanan County | Buchanan County, Iowa, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. Temporary moratorium on data centers. The measure has a stated duration whose end date is not recorded. | n.a. |  |
| Cascade data center moratorium (Simple Mining industrial park project)moratorium Moratorium in place, reported 2 October 2026; runs to June 2027; adoption date not stated; single outlet | Simple Mining | City of Cascade | The City of Cascade, Iowa, has paused data center development under a moratorium set to end in June 2027 while it writes regulations; neither Cascade nor Peosta had specific data center rules. Cedar Falls-based Simple Mining, which has bought land in the city's industrial park and has an initial agreement with the Cascade Economic Development Corp., cannot move forward until the city adopts regulations. The company's CEO said he welcomes clear restrictions. | n.a. |  |
| Clarke County data center moratoriummoratorium Enacted January 2026 | n.a. | Clarke County | Clarke County, Iowa, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2026. Temporary moratorium while permanent rules are developed. The measure runs until a condition is met rather than to a date. | n.a. |  |
| Clayton County data center moratoriummoratorium Enacted February 2025 | n.a. | Clayton County | Clayton County, Iowa, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated February 2025. Clayton County Board of Supervisors approved a temporary moratorium on rezoning requests and conditional use permits for digital asset mining/data centers in February 2025. The moratorium was originally set to expire 31 December 2025, but supervisors extended it to 31 December 2026 to allow more time for research and policy development. County officials and the Planning and Zoning Board are studying potential concerns including noise, visual impact, water use, and effects on surrounding properties. | n.a. |  |
| Clinton data center moratorium (declined; QTS 1,100-acre site under contract)other Moratorium declined 9 June 2026 (split vote); QTS land contract reported 2 September 2026 | QTS (land under contract) | City of Clinton | The Clinton City Council, in a split vote at its 9 June 2026 meeting, declined to implement a moratorium on data center development, with members saying it could signal the city was closed for business. Residents packed the meeting with concerns about a potential QTS site. The city has no data center zoning rules and is drafting an ordinance on setbacks, water, grid needs and noise. The mayor expects a QTS proposal after the ordinance is in place. | n.a. |  |
| Dickinson County six-month moratorium on data centers, bitcoin mining, solar and battery storagemoratorium Approved 4-1 on 12 May 2026; six months | n.a. | Dickinson County Board of Supervisors | The Dickinson County Board of Supervisors voted 4-1 on Tuesday 12 May 2026, after a public hearing, to approve a six-month moratorium on zoning permits for data centers, bitcoin mining, solar and battery storage installations. Chairman Bill Leupold cast the only no vote. Supervisors said the pause can be extended and gives the county time to write specific ordinances. | n.a. |  |
| Dubuque six-month moratorium on hyperscale data centersmoratorium Approved; reported by KCRG 21 September 2026; six months | n.a. | Dubuque City Council | The Dubuque City Council approved a temporary six-month moratorium on hyperscale data centers, placing an immediate hold on large facility applications and utility requests while the city drafts permanent rules, after delaying action at an earlier meeting to refine the ordinance. The city attorney said the pause preserves the status quo while the city evaluates whether and under what conditions land proposed for hyperscale data centers could be annexed or connected to public utilities. Staff will complete water, energy and infrastructure studies during the six months, and the council can extend it. | n.a. |  |
| EU-3 large-scale DC rezoning (~3,500 acres)moratorium Jul 2026 | n.a. | Linn County, IA | Board of Supervisors voted 2-1 | n.a. |  |
| Henry County moratorium on data centers, battery arrays and data miningmoratorium Effective 14 May 2026; runs to 31 December 2026; single outlet | n.a. | Henry County Board of Supervisors | The Henry County Board of Supervisors adopted a moratorium halting development of data centers, large battery arrays and data mining sites, effective at noon on Thursday 14 May 2026 and running until 31 December 2026. Supervisor Chad White said the county wants zoning policy in place before any project arrives; the county has not received any offers to build. | n.a. |  |
| Ida County data center moratoriummoratorium Enacted June 2026 | n.a. | Ida County | Ida County, Iowa, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated June 2026. Indefinite moratorium, unanimous. Supervisors want more information before allowing development. The measure runs until a condition is met rather than to a date. | n.a. |  |
| Jefferson County data center moratoriummoratorium Enacted August 2026 | n.a. | Jefferson County | Jefferson County, Iowa, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated August 2026. 12-month moratorium adopted unanimously alongside a new data center ordinance; second and third readings waived so it took effect at once. County attorney recommended 1 year over the 24 months residents asked for, as more likely to survive a legal challenge. The measure runs to 11 August 2027. | n.a. |  |
| Johnson County (Iowa) data center moratoriummoratorium Approved 6 November 2025; expires 8 November 2026; extension to 8 August 2027 recommended 5-0 by the Planning and Zoning Commission on 14 September 2026, board vote pending | n.a. | Johnson County Board of Supervisors | The Johnson County Board of Supervisors first approved a moratorium on 6 November 2025 that prevents approval of rezoning, subdivision and site plan applications and issuance of building permits related to data centers in unincorporated areas, while staff draft a data center ordinance. It is scheduled to expire 8 November 2026. The Planning and Zoning Commission voted 5-0 on 14 September 2026 to recommend a nine-month extension to 8 August 2027, which supervisors are weighing. | n.a. |  |
| LightEdge data center on city-owned land near the Ames airportdelayed Decision delayed to 1 May 2027 by a council vote in August 2026 (reported by KCCI 26 August 2026); Boone letter of intent announced 10 September 2026 | LightEdge | City of Ames | Des Moines-based LightEdge proposed a 100,000 sq ft data center on city-owned land near the Ames airport. After weeks of review and significant public opposition, the Ames City Council voted to delay a decision until 1 May 2027 and created a study committee on environmental impacts, with meetings from late September through December 2026. LightEdge then signed a letter of intent, announced 10 September 2026, to buy 10 acres in the Boone Business Park instead. | n.a. |  |
| Maquoketa South Highway 61 Industrial Park data center talks (ended)cancelled Discussions ended 18 August 2026 | n.a. | City of Maquoketa | On 18 August 2026 Maquoketa city leaders and development consultant Gronen ended preliminary discussions on a potential data center in the South Highway 61 Industrial Park. The city said it will review Heavy Industrial District regulations before future proposals, including data centers. | n.a. |  |
| Marshall County six-month data center moratorium (unincorporated areas)moratorium Adopted 23 September 2026; six months, extendable | n.a. | Marshall County Board of Supervisors | The Marshall County Board of Supervisors voted 3-0 on Wednesday 23 September 2026 to adopt a resolution imposing a six-month moratorium on applications for data centers, AI computing facilities, data mining facilities and cryptocurrency mining operations. The final text removed the limit on how long the moratorium can be extended, and the Zoning Commission will hold monthly work sessions to draft an ordinance. | n.a. |  |
| Mitchell County data center moratoriummoratorium Enacted January 2025 | n.a. | Mitchell County | Mitchell County, Iowa, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated January 2025. Resolution #1336-25; moratorium on data centers until 31 December 2026. Voted 4-1 (Frein, Marzen, Hartogh, Wherry yes; Hendrickson nay). The measure runs to 31 December 2026. | n.a. |  |
| Peosta data center moratorium (extended)moratorium Original six-month moratorium adopted earlier in 2026; extension approved the week of 21 September 2026 (reported 25 September 2026); runs to 18 June 2027 | n.a. | Peosta City Council | The Peosta City Council voted unanimously the week of 21 September 2026 to extend the city's six-month data center moratorium by six months, to 18 June 2027. The original moratorium, passed earlier in 2026, was due to end in December; Mayor Russ Pfab said leaders felt that timeframe was not long enough. | n.a. |  |
| Salix Google data center (moratorium rejected)other Moratorium rejected 3-2 on Thursday 20 August 2026 | Google (customer) with MidAmerican Energy | City of Salix | The Salix City Council voted 3-2 on 22 August 2026 to reject a one-year moratorium on data center development, allowing the Google-linked project to proceed. One council member changed her vote after Google's involvement was disclosed. The land still requires rezoning, and Woodbury County is challenging the annexation in court. KCAU reported the council voted 3-2 against the moratorium on Thursday night, 20 August 2026, after voting 3-2 in July to have attorneys draft it; the vote came a week after a meeting was cancelled over threats. In September 2026 the Salix Guardian Alliance petitioned a court for a declaratory judgment that the council had already approved a one-year moratorium in July 2026. | n.a. |  |
| Winneshiek County 12-month data center moratorium (unincorporated areas)moratorium Approved unanimously 28 September 2026 after a public hearing; 12 months (single outlet for the vote, Decorah Leader; hearing confirmed by the county agenda) | n.a. | Winneshiek County Board of Supervisors | On Monday 28 September 2026, after a public hearing on the item, the Winneshiek County Board of Supervisors voted unanimously to approve a 12-month moratorium on data centers. It applies only to rural, unincorporated areas; the county's eight cities may act on their own, and the City of Decorah has approved the first reading of an updated zoning ordinance regulating data centers. | n.a. |  |

Policy context

## What governs a data center in Iowa

The policy layer for Iowa lives in three companion references: the [Iowa Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker/iowa) for every state measure and local moratorium on record, the [Water Tracker](https://savrn.com/data-center-water-tracker) for the water rules that touch a site, and the [Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the large-load rules of the RTO or utility that decides whether it can energize.

Next door

## States next door

Wisconsin

4 sites · $37.0B disclosed

45 blocked, delayed or restricted

Illinois

10 sites · $38.5B disclosed

35 blocked, delayed or restricted

Missouri

10 sites · $27.2B disclosed

25 blocked, delayed or restricted

Minnesota

3 sites

31 blocked, delayed or restricted

Nebraska

3 sites

16 blocked, delayed or restricted

South Dakota

1 site

6 blocked, delayed or restricted

On the map

## Data centers in Iowa

The US Data Center Map identifies 85 facilities run by 31 operators in Iowa, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Iowa data centers

85 facilities · 31 operators

Map, locations, operators, rules

Iowa power and local economy

Generation, utilities and county records

Explore the power supply chain and local conditions behind the build-out

US Data Center Map

Every state, one page each

The national map and the operator directory

Sources

## Sources for Iowa

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- blog.google[Google](https://blog.google/feed/new-7-billion-investment-iowa/)
- ktiv.com[KTIV](https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/)
- siouxcityjournal.com[Sioux City Journal](https://siouxcityjournal.com/news/local/government-politics/article_1b8940ab-6d50-4e56-aa34-e32028c2c328.html)
- yahoo.com[Corridor Business Journal via Yahoo](https://www.yahoo.com/news/us/articles/iowa-council-advances-google-data-085200416.html)
- iowapublicradio.org[Iowa Public Radio](https://www.iowapublicradio.org/ipr-news/2026-07-21/palo-linn-county-google-data-center-duane-arnold-nuclear-plant)
- yahoo.com[WHO 13 via Yahoo News](https://www.yahoo.com/news/us/articles/marshalltown-temporarily-pauses-data-center-031843005.html)
- msn.com[The Cool Down via MSN](https://www.msn.com/en-us/politics/government/after-weeks-of-debate-marshalltown-iowa-puts-data-centers-on-hold-for-4-months/ar-AA28apbs)
- businessrecord.com[Business Record](https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/)
- stormlakeradio.com[Storm Lake Radio](https://stormlakeradio.com/state-news/data-center-developer-is-ready-to-ride-out-marshalltowns-moratorium/)
- timesrepublican.com[Times-Republican, 23 September 2026](https://www.timesrepublican.com/news/todays-news/2026/09/prospective-data-center-developer-offered-over-1-1-million-for-city-owned-land/)
- interconnectedcapital.com[Interconnected Capital](https://www.interconnectedcapital.com/research/data-center-moratoriums)
- msn.com[WOI (We Are Iowa) via MSN](https://www.msn.com/en-us/technology/cloud-computing/boone-county-becomes-latest-community-to-enact-data-center-moratorium/ar-AA2c9qXe)
- nbcnews.com[nbcnews.com](https://www.nbcnews.com/politics/2026-election/trump-data-centers-voters-key-midterm-races-rcna594914)
- telegraphherald.com[Telegraph Herald](https://www.telegraphherald.com/news/tri-state/article_7f2d4bb4-6c17-4b4e-889e-20f4fbdb8580.html)
- telegraphherald.com[Telegraph Herald](https://www.telegraphherald.com/news/tri-state/article_f9496581-afe8-4664-a269-a04b8fd31923.html)
- radioiowa.com[radioiowa.com](https://www.radioiowa.com/2026/07/08/eight-iowa-counties-have-moratoriums-on-data-center-development/)
- claytoncountyia.gov[claytoncountyia.gov](https://www.claytoncountyia.gov/AgendaCenter/ViewFile/Minutes/_02252025-1054)
- wvik.org[WVIK Quad Cities NPR](https://www.wvik.org/wvik-top-stories/2026-06-10/majority-of-clinton-city-council-vote-down-data-center-moratorium)
- clintonherald.com[Clinton Herald](https://www.clintonherald.com/news/local_news/clinton-council-rejects-data-center-moratorium-acknowledges-public-fears/article_ddb35b41-cb2f-435e-843d-5bb758dfbc56.html)
- exploreokoboji.com[Explore Okoboji](https://www.exploreokoboji.com/news/dickinson-county-supervisors-approve-moratorium-for-data-collection-bit-coin-solar-battery-storage-on-4-1-vote/)
- dickinsoncountynews.com[Dickinson County News](https://www.dickinsoncountynews.com/articles/dickinsoncountynews-2/dickinson-county-supervisors-approve-6-month-moratorium-on-data-centers-bitcoin-mining-solar-and-battery-storage/)
- kcrg.com[KCRG](https://www.kcrg.com/2026/09/22/dubuque-city-council-passes-temporary-moratorium-hyperscale-data-centers/)
- dcmap.us[DC Map](https://dcmap.us/insights/policy/)
- southeastiowaunion.com[Southeast Iowa Union](https://www.southeastiowaunion.com/mt-pleasant/news/henry-county-imposes-moratorium-to-draft-policy-on-data-centers/article_f77b58eb-7ee3-498c-a16d-4e220d9da36e.html)
- radioiowa.com[radioiowa.com](https://www.radioiowa.com/2026/07/13/ida-county-joins-list-of-iowa-counties-with-data-center-moratoriums/)
- kilj.com[kilj.com](https://kilj.com/jefferson-county-approves-data-center-ordinance-and-one-year-moratorium/)
- cbs2iowa.com[KGAN CBS2 Iowa](https://cbs2iowa.com/news/local/johnson-county-weighs-extending-data-center-moratorium-through-aug-8-2027)
- kcci.com[KCCI](https://www.kcci.com/article/ames-city-council-approves-study-on-environmental-impacts-of-data-centers/73536048)
- amestrib.com[Ames Tribune](https://www.amestrib.com/story/news/technology/2026/09/11/data-center-project-moves-to-boone-after-ames-delays-decision/91697309007/)
- kwqc.com[KWQC](https://www.kwqc.com/2026/08/19/maquoketa-halts-early-discussions-potential-data-center-development/)
- telegraphherald.com[Telegraph Herald](https://www.telegraphherald.com/news/tri-state/article_daf4c57d-d5ac-4b8d-96a1-b67c5ee02301.html)
- ourquadcities.com[WHBF OurQuadCities](https://www.ourquadcities.com/news/local-news/city-of-maquoketa-consultant-cease-talks-about-data-center-development/)
- timesrepublican.com[Times-Republican](https://www.timesrepublican.com/news/todays-news/2026/09/supervisors-ok-six-month-data-center-moratorium-resolution/)
- mitchellcounty.iowa.gov[mitchellcounty.iowa.gov](https://mitchellcounty.iowa.gov/wp-content/uploads/Board-Proceedings-11-25-25-2.pdf)
- telegraphherald.com[Telegraph Herald](https://www.telegraphherald.com/news/tri-state/article_b59076c2-e925-41e7-b57c-3cd8b21aca72.html)
- kscj.com[KSCJ](http://kscj.com/2026/08/23/despite-protests-salix-leaders-vote-to-proceed-with-data-center-project/)
- aol.com[KCAU via AOL](https://www.aol.com/articles/salix-data-center-moratorium-fails-031727000.html)
- siouxcityjournal.com[Sioux City Journal](https://siouxcityjournal.com/news/local/crime-courts/article_28136ff8-7d61-4699-b34d-e9d67101cb15.html)
- decorahleader.com[Decorah Leader](https://www.decorahleader.com/articles/decorahleader/supervisors-unanimously-approve-one-year-moratorium-on-data-centers/)
- winneshiekcounty.iowa.gov[Winneshiek County Board of Supervisors agenda, 28 September 2026](https://winneshiekcounty.iowa.gov/departments/board-of-supervisors/current-agenda)

### Every state, one page each

[Alabama 9 / 21](https://savrn.com/data-center-capital-atlas/alabama)[Alaska 1 / 1](https://savrn.com/data-center-capital-atlas/alaska)[Arizona 11 / 11](https://savrn.com/data-center-capital-atlas/arizona)[Arkansas 2 / 8](https://savrn.com/data-center-capital-atlas/arkansas)[California 10 / 35](https://savrn.com/data-center-capital-atlas/california)[Colorado 6 / 21](https://savrn.com/data-center-capital-atlas/colorado)[Connecticut 0 / 6](https://savrn.com/data-center-capital-atlas/connecticut)[Delaware 0 / 5](https://savrn.com/data-center-capital-atlas/delaware)[Florida 0 / 46](https://savrn.com/data-center-capital-atlas/florida)[Georgia 23 / 57](https://savrn.com/data-center-capital-atlas/georgia)[Hawaii 0 / 0](https://savrn.com/data-center-capital-atlas/hawaii)[Idaho 2 / 2](https://savrn.com/data-center-capital-atlas/idaho)[Illinois 10 / 35](https://savrn.com/data-center-capital-atlas/illinois)[Indiana 14 / 44](https://savrn.com/data-center-capital-atlas/indiana)[Iowa 3 / 22](https://savrn.com/data-center-capital-atlas/iowa)[Kansas 5 / 19](https://savrn.com/data-center-capital-atlas/kansas)[Kentucky 6 / 26](https://savrn.com/data-center-capital-atlas/kentucky)[Louisiana 7 / 3](https://savrn.com/data-center-capital-atlas/louisiana)[Maine 0 / 20](https://savrn.com/data-center-capital-atlas/maine)[Maryland 1 / 22](https://savrn.com/data-center-capital-atlas/maryland)[Massachusetts 0 / 11](https://savrn.com/data-center-capital-atlas/massachusetts)[Michigan 4 / 55](https://savrn.com/data-center-capital-atlas/michigan)[Minnesota 3 / 31](https://savrn.com/data-center-capital-atlas/minnesota)[Mississippi 7 / 5](https://savrn.com/data-center-capital-atlas/mississippi)[Missouri 10 / 25](https://savrn.com/data-center-capital-atlas/missouri)[Montana 1 / 10](https://savrn.com/data-center-capital-atlas/montana)[Nebraska 3 / 16](https://savrn.com/data-center-capital-atlas/nebraska)[Nevada 8 / 12](https://savrn.com/data-center-capital-atlas/nevada)[New Hampshire 0 / 5](https://savrn.com/data-center-capital-atlas/new-hampshire)[New Jersey 4 / 61](https://savrn.com/data-center-capital-atlas/new-jersey)[New Mexico 3 / 10](https://savrn.com/data-center-capital-atlas/new-mexico)[New York 6 / 21](https://savrn.com/data-center-capital-atlas/new-york)[North Carolina 10 / 45](https://savrn.com/data-center-capital-atlas/north-carolina)[North Dakota 6 / 4](https://savrn.com/data-center-capital-atlas/north-dakota)[Ohio 24 / 80](https://savrn.com/data-center-capital-atlas/ohio)[Oklahoma 11 / 20](https://savrn.com/data-center-capital-atlas/oklahoma)[Oregon 1 / 8](https://savrn.com/data-center-capital-atlas/oregon)[Pennsylvania 16 / 42](https://savrn.com/data-center-capital-atlas/pennsylvania)[Rhode Island 0 / 5](https://savrn.com/data-center-capital-atlas/rhode-island)[South Carolina 6 / 20](https://savrn.com/data-center-capital-atlas/south-carolina)[South Dakota 1 / 6](https://savrn.com/data-center-capital-atlas/south-dakota)[Tennessee 6 / 26](https://savrn.com/data-center-capital-atlas/tennessee)[Texas 106 / 35](https://savrn.com/data-center-capital-atlas/texas)[Utah 11 / 12](https://savrn.com/data-center-capital-atlas/utah)[Vermont 0 / 3](https://savrn.com/data-center-capital-atlas/vermont)[Virginia 33 / 50](https://savrn.com/data-center-capital-atlas/virginia)[Washington 9 / 22](https://savrn.com/data-center-capital-atlas/washington)[Washington, DC 0 / 0](https://savrn.com/data-center-capital-atlas/washington-dc)[West Virginia 4 / 3](https://savrn.com/data-center-capital-atlas/west-virginia)[Wisconsin 4 / 45](https://savrn.com/data-center-capital-atlas/wisconsin)[Wyoming 11 / 5](https://savrn.com/data-center-capital-atlas/wyoming)

Figures beside each state are named sites and blocked, delayed or restricted projects.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Announced commitments overlap one another and overlap reported capital expenditure, so this page shows disclosed floors and never adds them into a single deployment figure. Informational, not investment or legal advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)