# Louisiana Data Center Investment Tracker
Source: https://savrn.com/data-center-capital-atlas/louisiana
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

7

Site-level commitments the atlas records in Louisiana

Disclosed capital floor

$102B

Sum of sites with a stated dollar figure. Sites without one are listed, not counted

Disclosed capacity

6,675 MW

Sum of sites with a stated megawatt figure

Blocked, delayed or restricted

3

$12.0B of announced capital in those projects

Who is investing

## Who is investing in data centers in Louisiana?

The largest disclosed commitments in Louisiana are Meta Platforms (Hyperion, Holly Ridge, Richland Parish, ≥$50.0B); IPI Partners / Blue Owl (Meta Hyperion campus (Blue Owl JV), ~$27.0B); Amazon (AWS) (AWS northwest Louisiana campuses (Caddo and Bossier parishes, incl. third campus at Resilient Technologies Park, Shreveport), $18.0B). Together the 7 named sites here carry a disclosed floor of $102B; sites with no dollar figure are listed but not counted.

[Meta Platforms 1 site · $50.0B](https://savrn.com/data-center-capital-atlas/company/meta)[IPI Partners / Blue Owl 1 site · $27.0B](https://savrn.com/data-center-capital-atlas/company/ipi-blue-owl)[Applied Digital 1 site · $3.6B](https://savrn.com/data-center-capital-atlas/company/applied-digital)

Named sites

## Named data center sites in Louisiana

Each row is one site-level commitment with its capital provider, the figure the source states, and the status the source gives it. Capital is shown as one compact figure; the verbatim wording is in the row's sources.

| Site | Capital provider | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Hyperion, Holly Ridge, Richland ParishAnnounced December 2024; Blue Owl JV 21 October 2025; $50B+/5 GW scope reported July 2026 | [Meta Platforms](https://savrn.com/data-center-capital-atlas/company/meta)with Blue Owl Capital, Entergy | Holly Ridge, Richland Parish | ≥$50.0B | 5,000 | construction |  |
| Meta Hyperion campus (Blue Owl JV)JV entered October 21, 2025 | [IPI Partners / Blue Owl](https://savrn.com/data-center-capital-atlas/company/ipi-blue-owl)with Meta | Richland Parish | ~$27.0B | n.a. | announced |  |
| AWS northwest Louisiana campuses (Caddo and Bossier parishes, incl. third campus at Resilient Technologies Park, Shreveport)Announced 18 August 2026 (prior $12 billion commitment announced 23 February 2026) | Amazon (AWS)with Southwestern Electric Power Company (SWEPCO) | Shreveport, Caddo and Bossier parishes | $18.0B | n.a. | announced |  |
| Applied Digital Delta Forge 1Leases signed 20-22 April 2026; state announcement 26 May 2026; PSC expedited review 16 September 2026 | [Applied Digital](https://savrn.com/data-center-capital-atlas/company/applied-digital) | Boyce, Rapides Parish | ≥$3.6B | 430 | announced |  |
| River Bend campusConstruction progress reported 4 August 2026 | Hut 8with Fluidstack, Anthropic | St. Francisville, West Feliciana Parish | $3.2B | 245 | under construction |  |
| Project Barracuda energy park and co-located data center (La. 1)Named in the ONE Nuclear and Hennessy VII closing release 23 September 2026; location and acreage reported by NOLA 28 September 2026 | ONE Nuclear Energywith Landowners under letters of intent | Along La. 1 near the Ascension-Iberville parish line, Iberville Parish | n.a. | 1,000 | proposed |  |
| Project Cayman energy project and co-located data center campusBinding LOI announced 31 August 2026 (company release) | One Nuclear Energywith Unnamed Louisiana landowner group | Ascension Parish | n.a. | n.a. | announced |  |

Capital at risk

## Blocked, delayed or restricted in Louisiana

Every project in Louisiana on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

| Project | Developer | Jurisdiction | Action | Capital | Sources |
| --- | --- | --- | --- | --- | --- |
| Amazon/AWS Caddo Parishmoratorium February 2, 2026 | Amazon/AWS | Caddo Parish | Following Governor Jeff Landry's announcement of Amazon's $12 billion investment in three interconnected data center campuses across Caddo, Louisiana, and Bossier parishes, Commissioner Chris Kracman proposed a one-year | $12.0B |  |
| Amazon west Shreveport data center special-use permit (appeal)under appeal Appeal argued 29 September 2026; no ruling yet | Amazon | Louisiana Second Circuit Court of Appeal / City of Shreveport | On Tuesday 29 September 2026 the Louisiana Second Circuit Court of Appeal heard opponents' challenge to the Shreveport City Council's unanimous approval of a special-use permit for an Amazon data center in west Shreveport, which the Metropolitan Planning Commission had initially denied. Opponents' attorney Clay Garside argued the council approved the permit without a detailed operational plan on noise, light and water impacts or a Louisiana DEQ water withdrawal permit; the city argued the application met requirements. The judges did not rule at the hearing. | n.a. |  |
| Caddo Parish data center moratorium referral (Resolution 53)other Referral rejected 6-4 on 31 August 2026 | Amazon Web Services (area projects) | Caddo Parish Commission | Caddo Parish commissioners voted 6-4, with two members absent, against Resolution 53, which would have asked the parish Planning and Zoning Commission to consider recommending a moratorium on data center construction in commercially and industrially zoned parts of unincorporated Caddo Parish. The measure was introduced by Commissioner John-Paul Young after public concern over data center development in the region. An earlier effort to enact a parishwide moratorium directly had stalled after the parish attorney said it required an ordinance. | n.a. |  |

Financing

## Financing transactions tied to Louisiana sites

Transactions the atlas ties to a named site in Louisiana: joint ventures, project bonds, credit facilities, leases and power agreements. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| Meta + Blue Owl CapitalMeta and funds managed by Blue Owl Capital entered a joint venture to develop and own the Hyperion data center campus, with the parties committing pro rata shares of approximately $27 billion in total development costs. Blue Owl made a cash contribution of approximately $7 billion, Meta received a one-time distribution of approximately $3 billion, leases have a four-year initial term with extension options, and Meta provided a residual value guarantee for the first 16 years of operations. | jv equity | ~$27.0B | Joint venture agreement entered 21 October 2025 | Hyperion, Holly Ridge, Richland Parish |  |
| Blue Owl + MetaJV for the Hyperion campus with a four-year initial lease term and a residual value guarantee covering the first 16 years of operations. | jv equity | ~$27.0B | entered October 21, 2025 | Meta Hyperion campus (Blue Owl JV) |  |
| Applied Digital + undisclosed US hyperscalerApplied Digital subsidiaries APLD AEX-01 LLC and APLD AEX-02 LLC signed leases on 20 and 22 April 2026 with a US hyperscaler for 300 MW of critical IT load at Delta Forge 1, a 430 MW campus near Boyce, Rapides Parish, Louisiana, worth about $7.5 billion over about 15 years, with operations from mid-2027 | lease | ≥$7.5B | April 23, 2026 | Applied Digital Delta Forge 1 |  |
| Entergy + MetaUtility Entergy is planning three new natural gas plants near the Hyperion site at a cost of $3 billion. This record describes the original 2024 plan. For the 5 GW expansion Entergy has proposed seven additional generating units, which are before the Louisiana Public Service Commission; see the Hyperion site record. A second Entergy Louisiana agreement with Meta, filed with the Louisiana PSC on 25 March 2026, adds seven combined-cycle gas units of more than 5,200 MW plus batteries and 500 kV transmission, paid for by Meta (recorded separately as entergy-meta-evest-seven-ccgt-2026). | other | $3.0B | Announced alongside the December 2024 Hyperion announcement | Hyperion, Holly Ridge, Richland Parish |  |
| Entergy Louisiana + Meta (Evest LLC)Under a second agreement supporting Meta's Hyperion campus in Richland Parish, Entergy Louisiana plans, paid for by Meta, seven new natural gas combined-cycle units totaling more than 5,200 MW (about 5,278 MW, roughly 754 MW each; four near the Richland Parish campus and three near Big Cajun in Pointe Coupee Parish), three battery storage projects and about 240 miles of new 500 kV transmission. The customer entity is Evest LLC. The Louisiana PSC holds a three-day evidentiary hearing from 7 October; intervenors include the Alliance for Affordable Energy, Sierra Club, Union of Concerned Scientists, Louisiana Energy Users Group and Walmart. This is in addition to the three gas plants approved in 2025 (meta-entergy-gas-plants). | power supply agreement | n.a. | Agreement announced by Entergy Louisiana in late March 2026; LPSC application filed 25 March 2026 (Docket U-37882); evidentiary hearing set for 7 to 9 October; LPSC decision expected 16 December 2026 | Hyperion, Holly Ridge, Richland Parish |  |

Policy context

## What governs a data center in Louisiana

New Orleanscity

New Orleans passed a one-year moratorium, part of a broader wave of political exposure that also includes Madison, Wisconsin and a complete moratorium passed by the Seminole Nation in March.

Louisiana (PSC vote on Meta Hyperion records)state

Applies to discovery in Entergy Louisiana's applications to build generation for Meta's Hyperion campus in Richland Parish

The Louisiana Public Service Commission voted 3-1 on 12 August 2026, along party lines with one commissioner absent, to overturn an administrative law judge's order that would have required Meta to disclose how it calculated job projections and electricity needs for Hyperion. Advocacy groups sought the records before the commission approves Entergy's additional generating units for the 5 GW expansion. According to an Earthjustice release of 28 September 2026, the Alliance for Affordable Energy and the Union of Concerned Scientists, represented by Earthjustice, have appealed the commission's decision to the Civil District Court for the 19th Judicial District, asking it to reverse the vote and reinstate the subpoena the administrative law judge granted in July, which would require Meta to substantiate Hyperion's job and electricity load projections in the review of Entergy Louisiana's proposed seven additional gas plants (advocacy group release).

Louisiana (PSC large-load fast-track directive)state

Large-load applications that meet the criteria (15-year electric service agreement, demonstrated capacity need, customer paying at least half the cost of new infrastructure, Louisiana Economic Development letter of support) get an eight-month commission timeline and may skip market-based testing for new generation. Adopted 16 December 2025. An acceleration measure, not a moratorium

At its monthly meeting in Natchitoches on Tuesday 16 December 2025 the Louisiana Public Service Commission voted 3-2 to adopt Commissioner Jean-Paul Coussan's directive, aligned with Gov. Jeff Landry's Lightning Speed Initiative executive order of September 2025, letting utilities bypass the market-based mechanism used since the 1980s to show they are pursuing least-cost power when serving qualifying large loads such as data centers. Applications meeting the criteria get commission action within eight months. Commissioner Davante Lewis and consumer advocates objected that it weakens consumer protections; Lewis's separate proposal for a broader review of large-load interconnection and cost allocation was deferred to January 2026 on a 4-1 vote.

The policy layer for Louisiana lives in three companion references: the [Louisiana Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker/louisiana) for every state measure and local moratorium on record, the [Water Tracker](https://savrn.com/data-center-water-tracker) for the water rules that touch a site, and the [Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the large-load rules of the RTO or utility that decides whether it can energize.

Next door

## States next door

Texas

106 sites · $200B disclosed

35 blocked, delayed or restricted

Mississippi

7 sites · $74.8B disclosed

5 blocked, delayed or restricted

Arkansas

2 sites · $10.6B disclosed

8 blocked, delayed or restricted

On the map

## Data centers in Louisiana

The US Data Center Map identifies 22 facilities run by 10 operators in Louisiana, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Louisiana data centers

22 facilities · 10 operators

Map, locations, operators, rules

Louisiana power and local economy

Generation, utilities and county records

Explore the power supply chain and local conditions behind the build-out

US Data Center Map

Every state, one page each

The national map and the operator directory

Sources

## Sources for Louisiana

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- fortune.com[Fortune](https://fortune.com/2026/02/04/meta-hyperion-ai-data-center-louisiana-expansion/)
- opportunitylouisiana.gov[Louisiana Economic Development](https://www.opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state)
- about.fb.com[Meta newsroom](https://about.fb.com/news/2025/10/meta-blue-owl-capital-develop-hyperion-data-center/)
- cnbc.com[CNBC](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html)
- datacenters.atmeta.com[Meta Data Centers](https://datacenters.atmeta.com/richland-parish-data-center/)
- nola.com[The Times-Picayune (PSC vote)](https://www.nola.com/news/meta-won-t-have-to-turn-over-job-electric-information-after-louisiana-regulators-override-judge/article_69105eda-826d-476c-9b01-b911afcdbe64.html)
- nola.com[The Times-Picayune (transmission lines)](https://www.nola.com/news/entergy-meta-data-center-expropriation-eminent-domain/article_23b903c4-ec08-421d-b00f-1ec0b4f7ef95.html)
- finance.yahoo.com[Tom's Hardware via Yahoo Finance](https://finance.yahoo.com/technology/ai/articles/meta-expands-colossal-hyperion-ai-132532615.html)
- neworleanscitybusiness.com[Louisiana Illuminator via New Orleans CityBusiness](https://neworleanscitybusiness.com/blog/2026/08/13/meta-hyperion-data-center-records-secret/)
- aboutamazon.com[About Amazon](https://www.aboutamazon.com/news/company-news/amazon-data-center-louisiana-new-jobs)
- ksla.com[KSLA News 12](https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/)
- reuters.com[Reuters](https://www.reuters.com/business/applied-digital-signs-75-billion-ai-data-center-lease-with-us-hyperscaler-2026-04-23/)
- americanpress.com[American Press](https://americanpress.com/2026/09/17/lpsc-clears-expedited-path-for-cleco-power-plan-tied-to-data-center/)
- opportunitylouisiana.gov[Louisiana Economic Development](https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus)
- sec.gov[Applied Digital Form 10-K (SEC)](https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm)
- sec.gov[Applied Digital Form 8-K Exhibit 99.1 (SEC)](https://www.sec.gov/Archives/edgar/data/1144879/000114487926000036/apld_deltaforgexprxfinal.htm)
- sec.gov[SEC EDGAR (Hut 8 10-Q)](https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm)
- sec.gov[SEC EDGAR (Hut 8 Q2 2026 press release, Ex. 99.1)](https://www.sec.gov/Archives/edgar/data/1964789/000110465926090041/tm2621890d1_ex99-1.htm)
- wafb.com[WAFB](https://www.wafb.com/2026/09/22/west-feliciana-secures-data-center-deal-without-nda-sets-model-other-parishes/)
- finance.yahoo.com[ONE Nuclear and Hennessy Capital VII closing release (via Yahoo Finance), 23 September 2026](https://finance.yahoo.com/energy/articles/one-nuclear-energy-llc-hennessy-200100751.html)
- nola.com[NOLA.com (The Times-Picayune), 28 September 2026](https://www.nola.com/news/business/one-nuclear-louisiana-natural-gas/article_e8871c7c-cad0-44ac-85a4-3a3aeb7489a9.html)
- powermag.com[POWER Magazine](https://www.powermag.com/one-nuclear-signs-deal-for-2-88-gw-gas-fired-plant-large-bess-for-louisiana-data-center-campus/)
- finance.yahoo.com[Yahoo Finance](https://finance.yahoo.com/energy/articles/one-nuclear-announces-second-louisiana-201300434.html)
- sec.gov[ONE Nuclear Energy Inc. Form 8-K, 23 September 2026 (SEC)](https://www.sec.gov/Archives/edgar/data/1846416/000149315226043936/form8-k.htm)
- sec.gov[ONE Nuclear closing release, Exhibit 99.1 (SEC)](https://www.sec.gov/Archives/edgar/data/1846416/000149315226043936/ex99-1.htm)
- lailluminator.com[lailluminator.com](https://lailluminator.com/2026/02/23/amazon-data-center/)
- ktbs.com[ktbs.com](https://www.ktbs.com/community/temporary-caddo-lake-water-restriction-proposal-fails-to-advance/article_e195336c-9f18-400e-b970-473450aa4892.html)
- thecentersquare.com[thecentersquare.com](https://www.thecentersquare.com/louisiana/article_9b293a27-28ee-49c8-b9b6-86cccb79f3b4.html)
- ktbs.com[KTBS 3](https://www.ktbs.com/news/shreveport-city-councils-amazon-data-center-approval-questioned-in-court/article_9ac3f5a4-7cfe-4448-96ec-bf50138c097f.html)
- klax-tv.com[KLAX](https://www.klax-tv.com/news/state/shreveport-city-councils-amazon-data-center-approval-questioned-in-court/article_8aa8b891-626c-5c68-b2e0-2a829b2a5cdf.html)
- ksla.com[KSLA](https://www.ksla.com/2026/09/15/caddo-parish-commission-rejects-pause-data-center-construction/)
- yahoo.com[The Center Square via Yahoo News](https://www.yahoo.com/news/us/articles/caddo-commissioners-reject-data-center-135900154.html)
- reuters.com[Reuters](https://www.reuters.com/technology/meta-forms-joint-venture-with-blue-owl-capital-louisiana-data-center-2025-10-21/)
- entergy.com[Entergy Louisiana release](https://www.entergy.com/news/entergy-louisiana-announces-a-new-agreement-with-meta-that-will-deliver-an-additional-2b-in-customer-savings)
- constructionreviewonline.com[Construction Review](https://constructionreviewonline.com/louisiana-regulators-set-to-review-entergys-12-9b-power-buildout-for-meta-data-center/)
- utilitydive.com[Utility Dive, 30 April 2026](https://www.utilitydive.com/news/new-generation-adds-12b-entergy-capital-plan/818790/)
- techcrunch.com[TechCrunch](https://techcrunch.com/2026/02/25/the-public-opposition-to-ai-infrastructure-is-heating-up/)
- earthjustice.org[Earthjustice (advocacy group release)](https://earthjustice.org/press/2026/advocates-appeal-louisiana-pscs-arbitrary-and-capricious-decision-to-let-meta-off-the-hook-for-its-data-center-project)
- wwno.org[WWNO, 17 December 2025](https://www.wwno.org/coastal-desk/2025-12-17/in-tense-meeting-louisiana-psc-fast-tracks-pathway-for-large-projects-like-data-centers)

### Every state, one page each

[Alabama 9 / 21](https://savrn.com/data-center-capital-atlas/alabama)[Alaska 1 / 1](https://savrn.com/data-center-capital-atlas/alaska)[Arizona 11 / 11](https://savrn.com/data-center-capital-atlas/arizona)[Arkansas 2 / 8](https://savrn.com/data-center-capital-atlas/arkansas)[California 10 / 35](https://savrn.com/data-center-capital-atlas/california)[Colorado 6 / 21](https://savrn.com/data-center-capital-atlas/colorado)[Connecticut 0 / 6](https://savrn.com/data-center-capital-atlas/connecticut)[Delaware 0 / 5](https://savrn.com/data-center-capital-atlas/delaware)[Florida 0 / 46](https://savrn.com/data-center-capital-atlas/florida)[Georgia 23 / 57](https://savrn.com/data-center-capital-atlas/georgia)[Hawaii 0 / 0](https://savrn.com/data-center-capital-atlas/hawaii)[Idaho 2 / 2](https://savrn.com/data-center-capital-atlas/idaho)[Illinois 10 / 35](https://savrn.com/data-center-capital-atlas/illinois)[Indiana 14 / 44](https://savrn.com/data-center-capital-atlas/indiana)[Iowa 3 / 22](https://savrn.com/data-center-capital-atlas/iowa)[Kansas 5 / 19](https://savrn.com/data-center-capital-atlas/kansas)[Kentucky 6 / 26](https://savrn.com/data-center-capital-atlas/kentucky)[Louisiana 7 / 3](https://savrn.com/data-center-capital-atlas/louisiana)[Maine 0 / 20](https://savrn.com/data-center-capital-atlas/maine)[Maryland 1 / 22](https://savrn.com/data-center-capital-atlas/maryland)[Massachusetts 0 / 11](https://savrn.com/data-center-capital-atlas/massachusetts)[Michigan 4 / 55](https://savrn.com/data-center-capital-atlas/michigan)[Minnesota 3 / 31](https://savrn.com/data-center-capital-atlas/minnesota)[Mississippi 7 / 5](https://savrn.com/data-center-capital-atlas/mississippi)[Missouri 10 / 25](https://savrn.com/data-center-capital-atlas/missouri)[Montana 1 / 10](https://savrn.com/data-center-capital-atlas/montana)[Nebraska 3 / 16](https://savrn.com/data-center-capital-atlas/nebraska)[Nevada 8 / 12](https://savrn.com/data-center-capital-atlas/nevada)[New Hampshire 0 / 5](https://savrn.com/data-center-capital-atlas/new-hampshire)[New Jersey 4 / 61](https://savrn.com/data-center-capital-atlas/new-jersey)[New Mexico 3 / 10](https://savrn.com/data-center-capital-atlas/new-mexico)[New York 6 / 21](https://savrn.com/data-center-capital-atlas/new-york)[North Carolina 10 / 45](https://savrn.com/data-center-capital-atlas/north-carolina)[North Dakota 6 / 4](https://savrn.com/data-center-capital-atlas/north-dakota)[Ohio 24 / 80](https://savrn.com/data-center-capital-atlas/ohio)[Oklahoma 11 / 20](https://savrn.com/data-center-capital-atlas/oklahoma)[Oregon 1 / 8](https://savrn.com/data-center-capital-atlas/oregon)[Pennsylvania 16 / 42](https://savrn.com/data-center-capital-atlas/pennsylvania)[Rhode Island 0 / 5](https://savrn.com/data-center-capital-atlas/rhode-island)[South Carolina 6 / 20](https://savrn.com/data-center-capital-atlas/south-carolina)[South Dakota 1 / 6](https://savrn.com/data-center-capital-atlas/south-dakota)[Tennessee 6 / 26](https://savrn.com/data-center-capital-atlas/tennessee)[Texas 106 / 35](https://savrn.com/data-center-capital-atlas/texas)[Utah 11 / 12](https://savrn.com/data-center-capital-atlas/utah)[Vermont 0 / 3](https://savrn.com/data-center-capital-atlas/vermont)[Virginia 33 / 50](https://savrn.com/data-center-capital-atlas/virginia)[Washington 9 / 22](https://savrn.com/data-center-capital-atlas/washington)[Washington, DC 0 / 0](https://savrn.com/data-center-capital-atlas/washington-dc)[West Virginia 4 / 3](https://savrn.com/data-center-capital-atlas/west-virginia)[Wisconsin 4 / 45](https://savrn.com/data-center-capital-atlas/wisconsin)[Wyoming 11 / 5](https://savrn.com/data-center-capital-atlas/wyoming)

Figures beside each state are named sites and blocked, delayed or restricted projects.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Announced commitments overlap one another and overlap reported capital expenditure, so this page shows disclosed floors and never adds them into a single deployment figure. Informational, not investment or legal advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)