# Maine Data Center Investment Tracker
Source: https://savrn.com/data-center-capital-atlas/maine
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

0

Site-level commitments the atlas records in Maine

Disclosed capital floor

n.a.

Sum of sites with a stated dollar figure. Sites without one are listed, not counted

Disclosed capacity

n.a.

Sum of sites with a stated megawatt figure

Blocked, delayed or restricted

20

$850M of announced capital in those projects

Who is investing

## Who is investing in data centers in Maine?

No capital provider has a named site commitment on record in Maine as of October 8, 2026. The atlas records a site the day it can be tied to a filing, an issuer release, a government announcement or reporting of record, not before. The activity here is on the other side of the ledger: 20 projects blocked, delayed or restricted, listed below.

Named sites

## Named data center sites in Maine

No named site commitment is on record in Maine as of October 8, 2026.

Capital at risk

## Blocked, delayed or restricted in Maine

Every project in Maine on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

| Project | Developer | Jurisdiction | Action | Capital | Sources |
| --- | --- | --- | --- | --- | --- |
| Androscoggin Mill data center (Jay)withdrawn Reported 11 June 2026; project on hold after developer exit | Sentinel Data Centers with mill owner JGT2 Redevelopment | Town of Jay | Jay's town manager said on 11 June 2026 that Sentinel Data Centers had advised it does not intend to move forward with the planned $550 million data center at the former Androscoggin Mill. The information came from mill owner JGT2 Redevelopment, which had planned to partner with Sentinel and said it was pursuing talks with other parties while the project is on hold. Gov. Janet Mills had vetoed a statewide data center moratorium in April because it did not exempt the Jay project. | $550M |  |
| Bates Mill No. 3 data centerrejected Rejected 16 December 2025 | Bill Johnson | City of Lewiston | A developer proposed a $300 million data center in Bates Mill No. 3 in Lewiston, with the public notified six days before the council vote. The Lewiston City Council unanimously rejected it on 16 December 2025. Councilors cited limited notice and engagement, environmental concerns near the riverfront, about 30 jobs, and a requested 90 percent tax break for 10 years. | $300M |  |
| Bangor data center moratoriummoratorium Adopted April 2026 for 180 days; extended 28 September 2026 by 180 days | n.a. | Bangor City Council | The Bangor City Council first approved a 180-day data center moratorium in April 2026, fast-tracked after a developer with San Francisco-based Kratos AI approached the city in March about building a data center. On Monday 28 September 2026 the council voted 8-0 to extend the moratorium by another 180 days so staff and consultants can draft zoning rules on infrastructure, environmental and neighbor impacts. | n.a. |  |
| Brunswick 180-day data center moratoriummoratorium Passed 1 June 2026; 180 days | n.a. | Town of Brunswick | The Brunswick Town Council unanimously passed a 180-day data center moratorium in early June 2026, running until December. Existing smaller facilities in town include Enable IT and FirstLight. The Portland Press Herald reported the council approved the pause on Monday 1 June 2026; the town will not process applications for new or expanded data centers of 1 MW or more during the 180 days. | n.a. |  |
| Dixfield 180-day data center moratoriummoratorium Approved 14 September 2026; 180 days | n.a. | Town of Dixfield | Dixfield residents voted 35-3 by secret ballot at a town meeting to enact a 180-day moratorium on data centers, effective immediately. The Select Board said no one had requested permits for a data center despite local rumors. The planning board will research data centers and draft an ordinance during the moratorium. | n.a. |  |
| Dover-Foxcroft 180-day data center moratoriummoratorium Resolution passed Monday 28 September 2026; 180 days | n.a. | Town of Dover-Foxcroft | The Dover-Foxcroft Select Board passed a resolution on Monday 28 September 2026 temporarily banning data center applications and projects for 180 days while officials review whether existing ordinances are sufficient. Select Chair Steve Grammont said no data center proposal is pending. The resolution defines data centers broadly, including server farms, cryptocurrency mining operations and AI training or processing facilities. | n.a. |  |
| Eastport data center moratorium (DeepGreen Western Passage)moratorium Moratorium adopted 12 August 2026; ordinance prohibiting large-scale data centers enacted 9 September 2026; city motion to intervene filed at FERC 29 September 2026 | DeepGreen Western Passage | City of Eastport | City councilors unanimously adopted a 180-day moratorium on 12 August 2026 barring approval of any permit, license or application for industrial data centers or computing facilities and associated infrastructure, on land or underwater. On 27 August 2026 the Planning Board unanimously recommended that the city adopt a permanent ban. The measures respond to DeepGreen Western Passage's February 2026 application to the Federal Energy Regulatory Commission for a preliminary permit to study a tidal-powered subsea data center in Passamaquoddy Bay; federal regulators accepted that application in the week after the moratorium took effect. A separate citizen petition from the Eastport Coalition for Healthy Oceans seeks an ordinance prohibiting data centers larger than 25,000 sq ft in the city and its coastal waters. The city held a public hearing on citizen-initiated ordinances in September 2026 while residents sought intervenor status in the FERC preliminary permit proceeding for the DeepGreen project. On Tuesday 29 September 2026 the City of Eastport filed a formal motion to intervene at the Federal Energy Regulatory Commission in DeepGreen Western Passage's application for a 48-month preliminary permit, and in a letter posted 30 September asked FERC to deny it. The letter states that on 9 September 2026 the City Council unanimously enacted ordinance provisions prohibiting large-scale data centers, including underwater data centers, in the areas those provisions cover. The 60-day FERC intervention window that opened with the August acceptance of the application closes in October 2026. | n.a. |  |
| Ellsworth 180-day data center moratoriummoratorium Adopted 17 August 2026; 180 days | n.a. | Ellsworth City Council | The Ellsworth City Council voted 4-1 on 17 August 2026 to adopt a 180-day moratorium on data center development with an immediate effective date, with two members absent. The pause gives the city time to study impacts and decide whether to amend ordinances, which currently contain no specific data center standards. Councilor Steve O'Halloran voted against it. | n.a. |  |
| Gorham 180-day data center moratoriummoratorium Adopted June 2026 (reported 4 June 2026); permanent ban referred to planning board September 2026 | n.a. | Town of Gorham | The Gorham Town Council voted 7-0 to adopt a 180-day moratorium on large-scale data center proposals, with an option to extend another 180 days. In September 2026 the council voted unanimously to send a proposed permanent ban to the planning board for a public hearing. | n.a. |  |
| Gray 180-day data center moratoriummoratorium Approved 4 August 2026; retroactive to 14 July 2026; 180 days | n.a. | Town of Gray | The Gray Town Council unanimously approved a 180-day data center moratorium on 4 August 2026, retroactive to 14 July 2026. The action followed Governor Janet Mills' veto of LD 307, a statewide measure. | n.a. |  |
| LD 307 Moratorium Amendmentdenied April 24, 2026 | LiquidCool (seeking exemption for Loring data center) | Maine (statewide) | Governor Janet Mills VETOED LD 307 on April 24, 2026, "An Act to Establish the Maine Data Center Coordination Council and Place a Temporary Limitation on Certain Data Centers." | n.a. |  |
| North Berwick data center ban referendum (November ballot)other Ballot question approved on a Tuesday (reported 19 August 2026); vote pending in November 2026 | n.a. | North Berwick Select Board | The North Berwick Select Board approved on a Tuesday, reported 19 August 2026, a November ballot question asking voters whether to enact a zoning amendment that defines and permanently prohibits data centers. The ban would apply to facilities with 25,000 square feet or more of aggregate data center area. Town officials had decided in June to skip a temporary moratorium and let voters decide. The outcome is pending the November vote. | n.a. |  |
| Old Town six-month data center ban (industrial zones)moratorium Passed unanimously 5 October 2026; six months, retroactive to 8 September 2026; single outlet | n.a. | Old Town City Council | The Old Town City Council unanimously passed a six-month ban on data center development in the city's industrial zones on Monday 5 October 2026, retroactive to 8 September 2026, when the council first discussed it. Data centers are already not allowed in the city's other zones. The ban is set to expire in March 2027 with a possible extension to June 2027; councilors have said a long-term zoning ban would go to a public referendum. | n.a. |  |
| Saco temporary data center moratoriummoratorium Enacted August 2026 for 61 days; extended 28 September 2026 to 28 November 2026; single outlet | n.a. | Saco City Council | Saco enacted a 61-day data center moratorium in August 2026 to give staff time to write data center rules into the city code. On Monday 28 September 2026 the City Council voted to extend it by 60 days, to 28 November 2026. The city administrator said the city will likely keep extending it until the Maine Data Center Advisory Task Force reports in December. | n.a. |  |
| Sanford Woods data center (Sanford emergency moratorium extension)moratorium Extended on a Tuesday (reported 5 August 2026); expires 31 January 2027 | Sanford Woods Industrial and Technical Campus (primary developer Randy Gibbs) | Sanford City Council | The Sanford City Council voted unanimously on a Tuesday, reported 5 August 2026, to extend an emergency data center moratorium for 180 days, to expire 31 January 2027. The extension replaces an initial 91-day emergency moratorium, born of a citizen initiative, that would have ended 18 August. The moratoriums halted a data center proposed as part of the Sanford Woods Industrial and Technical Campus while a city task force drafts development standards. | n.a. |  |
| Scarborough Technology Parkmoratorium Enacted 3 June 2026; retroactive to 1 April 2026; 180 days | Daniel Dickinson | Town of Scarborough | The Scarborough Town Council unanimously enacted a 180-day data center moratorium on 3 June 2026, retroactive to applications submitted on or after 1 April 2026. The proposed Scarborough Technology Park by developer Daniel Dickinson on 52 acres was the project cited in coverage. | n.a. |  |
| Unnamed Maine projectwithdrawn 2026; dollar value n.a. | n.a. | Maine | Developer backed out after LD 307 was vetoed Apr 24 2026 | n.a. |  |
| Warren 180-day data center moratoriummoratorium Approved 8 July 2026; 180 days | n.a. | Town of Warren special town meeting | About 60 residents at a special town meeting on 8 July 2026 nearly unanimously approved a 180-day moratorium on data centers, with one resident voting against. The Select Board can extend the moratorium in 180-day increments after public hearings if progress is made on ordinances. Town officials said no data center applications had been received. | n.a. |  |
| Westbrook data center moratoriummoratorium Enacted June 2026 | n.a. | Westbrook | Westbrook, Maine, enacted a local data center moratorium or ban, recorded in SAVRN's moratorium tracker as dated June 2026. 180-day moratorium on siting, permitting, construction and operation of data centers regardless of MW; unanimous vote. The measure runs to 28 November 2026. | n.a. |  |
| Wiscasset data center proposal (Old Ferry Road town-owned property)paused Pause voted 4 November 2025; still in place February 2026 | n.a. | Wiscasset Select Board | The Wiscasset Select Board voted 5-0 on 4 November 2025 to pause review of any proposals involving tax-acquired town properties until an evaluation process is in place, which covers a party's interest in the town's Old Ferry Road property for a possible data center. Residents had formed the group Protect Wiscasset after the idea became public on 16 September 2025. The town manager told the Daily Yonder in February 2026 that the pause was ongoing with no timeline. | n.a. |  |

Policy context

## What governs a data center in Maine

Maine (statewide)state

LD 307, a statewide moratorium, was vetoed April 24, 2026.

Maine's governor vetoed the statewide moratorium bill LD 307, after which a developer backed out of an unnamed Maine project.

The policy layer for Maine lives in three companion references: the [Maine Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker/maine) for every state measure and local moratorium on record, the [Water Tracker](https://savrn.com/data-center-water-tracker) for the water rules that touch a site, and the [Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the large-load rules of the RTO or utility that decides whether it can energize.

Next door

## States next door

New Hampshire

0 sites

5 blocked, delayed or restricted

On the map

## Data centers in Maine

The US Data Center Map identifies 12 facilities run by 5 operators in Maine, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Maine data centers

12 facilities · 5 operators

Map, locations, operators, rules

Maine power and local economy

Generation, utilities and county records

Explore the power supply chain and local conditions behind the build-out

US Data Center Map

Every state, one page each

The national map and the operator directory

Sources

## Sources for Maine

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- sunjournal.com[Sun Journal: Plan for $550M data center in Jay on hold, official says](https://www.sunjournal.com/2026/06/11/plan-for-data-center-in-jay-suffers-setback-2/)
- mainepublic.org[Maine Public](https://www.mainepublic.org/climate/2026-06-12/developer-halts-plans-for-data-center-at-former-jay-paper-mill)
- themainemonitor.org[The Maine Monitor](https://themainemonitor.org/secretive-plan-lewiston-data-center/)
- wabi.tv[WABI](https://www.wabi.tv/2026/09/29/bangor-city-council-votes-extend-data-center-moratorium/)
- bangordailynews.com[Bangor Daily News](https://www.bangordailynews.com/2026/09/29/bangor/bangor-government/bangor-maine-data-center-ban-extension/)
- spectrumlocalnews.com[Spectrum News Maine](https://spectrumlocalnews.com/me/maine/news/2026/06/08/brunswick--scarborough-enact-data-center-moratoriums)
- pressherald.com[Portland Press Herald](https://www.pressherald.com/2026/06/01/brunswick-passes-data-center-moratorium/)
- sunjournal.com[Sun Journal](https://www.sunjournal.com/2026/09/15/dixfield-oks-180-day-moratorium-on-data-centers/)
- observer-me.com[Piscataquis Observer](https://observer-me.com/2026/09/30/featured/dover-foxcroft-temporarily-pauses-data-centers/)
- bangordailynews.com[Bangor Daily News](https://www.bangordailynews.com/2026/09/29/piscataquis/piscataquis-government/dover-foxcroft-temporarily-bans-data-centers/)
- mainepublic.org[Maine Public](https://www.mainepublic.org/climate/2026-08-14/eastport-enacts-pause-on-data-center-development)
- themainemonitor.org[The Maine Monitor](https://themainemonitor.org/eastport-adopts-moratorium-underwater-data-center-proposal/)
- bangordailynews.com[Bangor Daily News](https://www.bangordailynews.com/2026/08/14/down-east/downeast-government/eastport-maine-underwater-ai-data-center-temporary-ban/)
- writing.strisker.com[Strisker daily notes](https://writing.strisker.com/data-centers-daily-notes-september-08-2026/)
- themainemonitor.org[The Maine Monitor, 2 October 2026](https://themainemonitor.org/eastport-motion-data-center-ferc/)
- ellsworthamerican.com[The Ellsworth American: Ellsworth City Council approves data center moratorium](https://www.ellsworthamerican.com/news/ellsworth-city-council-approves-data-center-moratorium/article_9ab5df1b-3fa9-41a0-be16-9fca1ad83919.html)
- pressherald.com[Portland Press Herald](https://www.pressherald.com/2026/06/03/gorham-approves-data-center-moratorium/)
- wgme.com[WGME](https://wgme.com/news/local/gorham-officials-consider-permanent-ban-on-data-centers-maine-economy)
- pressherald.com[Portland Press Herald](https://www.pressherald.com/2026/08/06/gray-joins-growing-list-of-towns-with-data-center-moratoriums/)
- maine.gov[maine.gov](https://www.maine.gov/governor/mills/news/governor-mills-announces-decision-ld-307-2026-04-24)
- maine.gov[maine.gov](https://www.maine.gov/governor/mills/official_documents/veto_messages/2026-04-ld-307-act-establish-maine-data-center-coordination)
- bangordailynews.com[bangordailynews.com](https://www.bangordailynews.com/2026/04/24/politics/janet-mills-vetoes-maine-data-center-ban/)
- mainemorningstar.com[mainemorningstar.com](https://mainemorningstar.com/2026/04/24/gov-mills-vetoes-landmark-data-center-ban/)
- techcrunch.com[techcrunch.com](https://techcrunch.com/2026/04/25/maines-governor-vetoes-data-center-moratorium/)
- mainemorningstar.com[mainemorningstar.com](https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/)
- bostonglobe.com[bostonglobe.com](https://www.bostonglobe.com/2026/02/23/metro/maine-data-center-legislation-ld307/)
- themainemonitor.org[themainemonitor.org](https://themainemonitor.org/maine-considers-data-centers-moratorium/)
- legislature.maine.gov[legislature.maine.gov](https://legislature.maine.gov/backend/app/services/getDocument.aspx?documentId=122054)
- nrcm.org[nrcm.org](https://www.nrcm.org/blog/four-ways-maine-can-address-energy-impact-data-centers/)
- pressherald.com[Portland Press Herald: North Berwick to ask voters about data center ban, comprehensive plan change](https://www.pressherald.com/2026/08/19/north-berwick-to-ask-voters-about-data-center-ban-comprehensive-plan-change/)
- wgme.com[WGME](https://wgme.com/news/local/north-berwick-could-vote-to-ban-data-centers-in-november)
- bangordailynews.com[Bangor Daily News](https://www.bangordailynews.com/2026/10/05/bangor/bangor-government/old-town-passes-data-center-ban/)
- pressherald.com[Portland Press Herald](https://www.pressherald.com/2026/09/29/saco-extends-temporary-data-center-ban-by-another-2-months/)
- pressherald.com[Portland Press Herald: Sanford extends data center moratorium for 180 days](https://www.pressherald.com/2026/08/05/sanford-extends-data-center-moratorium-for-180-days/)
- yahoo.com[WMTW via Yahoo](https://www.yahoo.com/news/videos/sanford-city-council-extends-data-195412917.html)
- pressherald.com[Portland Press Herald](https://www.pressherald.com/2026/06/03/scarborough-town-council-imposes-data-center-moratorium/)
- floridadatacenters.org[Florida Data Centers](https://floridadatacenters.org/news)
- midcoastvillager.com[Midcoast Villager: Warren Residents Nearly Unanimously OK Data Center Moratorium](https://www.midcoastvillager.com/news/warren-residents-nearly-unanimously-ok-data-center-moratorium/article_617b81b5-89a1-451e-b9a9-c75da72bf549.html)
- pressherald.com[pressherald.com](https://www.pressherald.com/2026/06/01/westbrook-city-council-approves-180-day-data-center-moratorium/)
- wiscassetnewspaper.com[Wiscasset Newspaper](https://www.wiscassetnewspaper.com/article/board-nods-properties-proposal-pause-5-0/264309)
- dailyyonder.com[The Daily Yonder](https://dailyyonder.com/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/2026/02/23/)
- techcrunch.com[TechCrunch](https://techcrunch.com/2026/02/25/the-public-opposition-to-ai-infrastructure-is-heating-up/)

### Every state, one page each

[Alabama 9 / 21](https://savrn.com/data-center-capital-atlas/alabama)[Alaska 1 / 1](https://savrn.com/data-center-capital-atlas/alaska)[Arizona 11 / 11](https://savrn.com/data-center-capital-atlas/arizona)[Arkansas 2 / 8](https://savrn.com/data-center-capital-atlas/arkansas)[California 10 / 35](https://savrn.com/data-center-capital-atlas/california)[Colorado 6 / 21](https://savrn.com/data-center-capital-atlas/colorado)[Connecticut 0 / 6](https://savrn.com/data-center-capital-atlas/connecticut)[Delaware 0 / 5](https://savrn.com/data-center-capital-atlas/delaware)[Florida 0 / 46](https://savrn.com/data-center-capital-atlas/florida)[Georgia 23 / 57](https://savrn.com/data-center-capital-atlas/georgia)[Hawaii 0 / 0](https://savrn.com/data-center-capital-atlas/hawaii)[Idaho 2 / 2](https://savrn.com/data-center-capital-atlas/idaho)[Illinois 10 / 35](https://savrn.com/data-center-capital-atlas/illinois)[Indiana 14 / 44](https://savrn.com/data-center-capital-atlas/indiana)[Iowa 3 / 22](https://savrn.com/data-center-capital-atlas/iowa)[Kansas 5 / 19](https://savrn.com/data-center-capital-atlas/kansas)[Kentucky 6 / 26](https://savrn.com/data-center-capital-atlas/kentucky)[Louisiana 7 / 3](https://savrn.com/data-center-capital-atlas/louisiana)[Maine 0 / 20](https://savrn.com/data-center-capital-atlas/maine)[Maryland 1 / 22](https://savrn.com/data-center-capital-atlas/maryland)[Massachusetts 0 / 11](https://savrn.com/data-center-capital-atlas/massachusetts)[Michigan 4 / 55](https://savrn.com/data-center-capital-atlas/michigan)[Minnesota 3 / 31](https://savrn.com/data-center-capital-atlas/minnesota)[Mississippi 7 / 5](https://savrn.com/data-center-capital-atlas/mississippi)[Missouri 10 / 25](https://savrn.com/data-center-capital-atlas/missouri)[Montana 1 / 10](https://savrn.com/data-center-capital-atlas/montana)[Nebraska 3 / 16](https://savrn.com/data-center-capital-atlas/nebraska)[Nevada 8 / 12](https://savrn.com/data-center-capital-atlas/nevada)[New Hampshire 0 / 5](https://savrn.com/data-center-capital-atlas/new-hampshire)[New Jersey 4 / 61](https://savrn.com/data-center-capital-atlas/new-jersey)[New Mexico 3 / 10](https://savrn.com/data-center-capital-atlas/new-mexico)[New York 6 / 21](https://savrn.com/data-center-capital-atlas/new-york)[North Carolina 10 / 45](https://savrn.com/data-center-capital-atlas/north-carolina)[North Dakota 6 / 4](https://savrn.com/data-center-capital-atlas/north-dakota)[Ohio 24 / 80](https://savrn.com/data-center-capital-atlas/ohio)[Oklahoma 11 / 20](https://savrn.com/data-center-capital-atlas/oklahoma)[Oregon 1 / 8](https://savrn.com/data-center-capital-atlas/oregon)[Pennsylvania 16 / 42](https://savrn.com/data-center-capital-atlas/pennsylvania)[Rhode Island 0 / 5](https://savrn.com/data-center-capital-atlas/rhode-island)[South Carolina 6 / 20](https://savrn.com/data-center-capital-atlas/south-carolina)[South Dakota 1 / 6](https://savrn.com/data-center-capital-atlas/south-dakota)[Tennessee 6 / 26](https://savrn.com/data-center-capital-atlas/tennessee)[Texas 106 / 35](https://savrn.com/data-center-capital-atlas/texas)[Utah 11 / 12](https://savrn.com/data-center-capital-atlas/utah)[Vermont 0 / 3](https://savrn.com/data-center-capital-atlas/vermont)[Virginia 33 / 50](https://savrn.com/data-center-capital-atlas/virginia)[Washington 9 / 22](https://savrn.com/data-center-capital-atlas/washington)[Washington, DC 0 / 0](https://savrn.com/data-center-capital-atlas/washington-dc)[West Virginia 4 / 3](https://savrn.com/data-center-capital-atlas/west-virginia)[Wisconsin 4 / 45](https://savrn.com/data-center-capital-atlas/wisconsin)[Wyoming 11 / 5](https://savrn.com/data-center-capital-atlas/wyoming)

Figures beside each state are named sites and blocked, delayed or restricted projects.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Announced commitments overlap one another and overlap reported capital expenditure, so this page shows disclosed floors and never adds them into a single deployment figure. Informational, not investment or legal advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.