# Mississippi Data Center Investment Tracker
Source: https://savrn.com/data-center-capital-atlas/mississippi
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

7

Site-level commitments the atlas records in Mississippi

Disclosed capital floor

$74.8B

Sum of sites with a stated dollar figure. Sites without one are listed, not counted

Disclosed capacity

1,446 MW

Sum of sites with a stated megawatt figure

Blocked, delayed or restricted

5

Projects on the capital-at-risk record here

Who is investing

## Who is investing in data centers in Mississippi?

The largest disclosed commitments in Mississippi are xAI (now operating under SpaceX / "SpaceXAI") (Colossus 2, Southaven, ~$35.8B); Brookfield (BAM / Brookfield Infrastructure Partners) (Compass Datacenters Meridian hyperscale campus, $10.0B); Ontario Teachers' Pension Plan (OTPP) (Compass Datacenters Meridian campus, $10.0B). Together the 7 named sites here carry a disclosed floor of $74.8B; sites with no dollar figure are listed but not counted.

[xAI (now operating under SpaceX / "SpaceXAI") 1 site · $35.8B](https://savrn.com/data-center-capital-atlas/company/xai)[Amazon (AWS) 2 sites · $13.0B](https://savrn.com/data-center-capital-atlas/company/amazon)[Brookfield (BAM / Brookfield Infrastructure Partners) 1 site · $10.0B](https://savrn.com/data-center-capital-atlas/company/brookfield)[Ontario Teachers' Pension Plan (OTPP) 1 site · $10.0B](https://savrn.com/data-center-capital-atlas/company/otpp)

Named sites

## Named data center sites in Mississippi

Each row is one site-level commitment with its capital provider, the figure the source states, and the status the source gives it. Capital is shown as one compact figure; the verbatim wording is in the row's sources.

| Site | Capital provider | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| Colossus 2, SouthavenProjections to Q1 2027 | [xAI (now operating under SpaceX / "SpaceXAI")](https://savrn.com/data-center-capital-atlas/company/xai) | Southaven | ~$35.8B | 946 | construction |  |
| Compass Datacenters Meridian hyperscale campuseight-year construction period | [Brookfield (BAM / Brookfield Infrastructure Partners)](https://savrn.com/data-center-capital-atlas/company/brookfield)with Ontario Teachers' Pension Plan | Meridian, Lauderdale County | $10.0B | 500 | announced |  |
| Compass Datacenters Meridian campus | [Ontario Teachers' Pension Plan (OTPP)](https://savrn.com/data-center-capital-atlas/company/otpp)with Brookfield Infrastructure, Compass Datacenters | Meridian, Lauderdale | $10.0B | n.a. | announced |  |
| Madison County data center complexes | [Amazon (AWS)](https://savrn.com/data-center-capital-atlas/company/amazon) | Madison County | $10.0B | n.a. | announced |  |
| Eagle Rock Partners digital infrastructure campus (Jefferson Davis County)Public hearing held Tuesday 29 September 2026; reported 29 to 30 September 2026 (WDAM; Mississippi Today headline, article walled to fetch) | Eagle Rock Partnerswith Jefferson Davis County Economic Development Association | Near Bassfield (Gum Swamp Road, at the Covington County line), Jefferson Davis County | ~$6.0B | n.a. | proposed |  |
| Vicksburg campusTimeline presented 17 September 2026; operations targeted early 2029 | [Amazon (AWS)](https://savrn.com/data-center-capital-atlas/company/amazon) | Vicksburg | $3.0B | n.a. | announced |  |
| SpaceXAI Tulane Road data center (MZX Tech)Approved 1 September 2026; reported 2 September 2026 | MZX Tech LLC (SpaceXAI affiliate)with City of Southaven | Southaven, DeSoto County | n.a. | n.a. | approved |  |

Capital at risk

## Blocked, delayed or restricted in Mississippi

Every project in Mississippi on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

| Project | Developer | Jurisdiction | Action | Capital | Sources |
| --- | --- | --- | --- | --- | --- |
| DeSoto Innovation District data center component (Church Road and Craft Road)delayed Data center use removed 9 June 2026; aldermen tabled project 4 August 2026 | n.a. | Olive Branch Planning Commission; Board of Mayor and Aldermen | The Olive Branch Planning Commission unanimously voted to deny the DeSoto Innovation District rezoning, and the data center conditional use was removed from the plan at the commission's 9 June meeting, according to the city's planning director. On 4 August the Board of Mayor and Aldermen tabled the 562-acre project after a three-hour hearing where many of the more than 100 residents present opposed it, some citing concern that a data center could return in later phases. A motion to approve only the first-phase landfill expansion and deny the industrial rezoning failed 4-3. | n.a. |  |
| Jackson 183-day data center moratoriummoratorium Imposed July 2026; 183 days | n.a. | City of Jackson | The Jackson City Council approved a 183-day moratorium on data center development by a 5-2 vote, described as Mississippi's first. Council members said the capital city was not ready for a data center. | n.a. |  |
| Olive Branch data center zoning restrictions (conditional use only)other Approved 18 August 2026; effective immediately | n.a. | Olive Branch Board of Mayor and Aldermen | The Olive Branch Board of Mayor and Aldermen unanimously approved an ordinance, effective immediately, that allows data centers in the M-1 and M-2 industrial zones only as a conditional use instead of by right. The rules bar data centers without closed-loop cooling, restrict generator use between 2 and 5 p.m., set nighttime and daytime noise limits for hyperscale sites and require developers to pay full decommissioning costs. The city's planning director said Olive Branch could not adopt a moratorium, citing litigation risk. | n.a. |  |
| Walls industrial rezoning of about 1,200 acres (possible data center use)other Planning Commission denial 22 September 2026; Board of Aldermen vote not scheduled | n.a. | Town of Walls Planning Commission | After a public hearing on 22 September 2026, the Walls Planning Commission voted to deny a request to rezone roughly 1,200 acres from Agricultural Residential to M-1 Light Industrial, which would have opened the land to possible data center construction. Residents cited proximity to Lake Cormorant schools, a historic site and the xAI plant in Southaven. The Board of Aldermen has the final say, and no date had been set. | n.a. |  |
| xAI Southaven data center power plantlitigation NAACP challenge April 2026; resident suit June 2026; Memphis residents' federal class action filed 23 September 2026 | xAI | DeSoto County / Mississippi DEQ | xAI's Southaven site runs gas turbines to power its Memphis-area data centers, and the Mississippi Department of Environmental Quality issued an air permit for 41 permanent turbines. The NAACP filed a challenge in April 2026 alleging significant pollutant emissions and contesting the permit. Three Southaven residents filed suit in June 2026 alleging near-constant noise and vibration harming their health. The plant continues to operate. On 30 July 2026 the Mississippi Commission of Environmental Quality and MZX Tech LLC entered an Agreed Order covering the 69 mobile turbines at the Stanton Road facility, setting a retirement schedule after supply chain delays pushed back some of the 41 permitted stationary turbines. SpaceXAI said all temporary turbines would be removed by July 2027 as its 1.2 GW permanent plant comes online, and announced on 31 August 2026 that 11 of the 69 turbines had been powered down. A class action over turbine noise is pending in the US District Court for the Northern District of Mississippi On 30 July 2026 SpaceX announced an agreement with the Mississippi Department of Environmental Quality setting a timeline to remove all 69 temporary mobile turbines at the Southaven power site, starting as early as August and finishing by July 2027, as the 1.2 GW permanent plant of 41 turbines permitted in March 2026 comes online. On 23 September 2026 Lieff Cabraser Heimann & Bernstein and Greer Injury Lawyers filed a federal class action in Tennessee against X.AI Corp and MZX Tech LLC on behalf of southern Memphis residents, alleging noise ordinance violations, private and public nuisance, negligence, negligence per se and trespass from the data centers and gas-turbine plant on the Tennessee and Mississippi border. It seeks damages, abatement and an injunction to cease operations unless they can run without harming the community. Earlier, on 6 May 2026, the NAACP, represented by the Southern Environmental Law Center and Earthjustice, asked the federal court for a preliminary injunction to stop operation of the unpermitted turbines, saying xAI and MZX Tech had added six turbines after the February 2026 notice, bringing the total to 33. | n.a. |  |

Financing

## Financing transactions tied to Mississippi sites

Transactions the atlas ties to a named site in Mississippi: joint ventures, project bonds, credit facilities, leases and power agreements. Amounts are as stated; overlapping commitments are never summed.

| Parties | Instrument | Amount | Date | Site | Sources |
| --- | --- | --- | --- | --- | --- |
| xAIxAI seeks $12bn in debt to fund the Colossus 2 data center, per DCD. | debt facility | $12.0B | Per summary table; first chips online in a few weeks per DCD headline | Colossus 2, Southaven |  |

Policy context

## What governs a data center in Mississippi

The policy layer for Mississippi lives in three companion references: the [Mississippi Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker/mississippi) for every state measure and local moratorium on record, the [Water Tracker](https://savrn.com/data-center-water-tracker) for the water rules that touch a site, and the [Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the large-load rules of the RTO or utility that decides whether it can energize.

Next door

## States next door

Tennessee

6 sites · $47.7B disclosed

26 blocked, delayed or restricted

Alabama

9 sites · $18.3B disclosed

21 blocked, delayed or restricted

Arkansas

2 sites · $10.6B disclosed

8 blocked, delayed or restricted

Louisiana

7 sites · $102B disclosed

3 blocked, delayed or restricted

On the map

## Data centers in Mississippi

The US Data Center Map identifies 14 facilities run by 6 operators in Mississippi, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Mississippi data centers

14 facilities · 6 operators

Map, locations, operators, rules

Mississippi power and local economy

Generation, utilities and county records

Explore the power supply chain and local conditions behind the build-out

US Data Center Map

Every state, one page each

The national map and the operator directory

Sources

## Sources for Mississippi

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- epoch.ai[Epoch AI](https://epoch.ai/data/ai-data-centers/directory/colossus-2)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/xai-seeks-12bn-in-debt-to-fund-colossus-2-data-center-with-first-chips-online-in-a-few-weeks/)
- en.wikipedia.orgWikipedia: Colossus
- governorreeves.ms.gov[Office of Governor Reeves](https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/)
- aboutamazon.com[Amazon](https://www.aboutamazon.com/news/aws/aws-10-billion-investment-mississippi)
- wdam.com[WDAM-TV, 29 September 2026](https://www.wdam.com/2026/09/30/community-voices-concerns-ahead-new-ai-data-center-jefferson-davis-county/)
- mississippitoday.org[Mississippi Today, 30 September 2026 (returned HTTP 403 to fetch)](https://mississippitoday.org/2026/09/30/6b-data-center-planned-for-jefferson-davis-one-of-the-poorest-counties-in-the-country/)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/amazon-capex-to-hit-200bn-in-2026-will-mostly-fund-aws-data-centers/)
- constructionreviewonline.com[Construction Review Online](https://constructionreviewonline.com/aws-lays-out-timeline-for-historic-3-billion-vicksburg-data-center-campus/)
- desototimes.com[DeSoto Times-Tribune](https://www.desototimes.com/news/southaven-approves-new-xai-data-center/article_093ce052-262d-4d77-a0a4-8b9ffe2e09bc.html)
- yahoo.com[The Commercial Appeal via Yahoo News](https://www.yahoo.com/news/us/articles/southaven-board-aldermen-ok-plans-181603359.html)
- yahoo.com[The Commercial Appeal via Yahoo: Olive Branch aldermen delay DeSoto Innovation District vote; zoning questioned](https://www.yahoo.com/news/politics/articles/olive-branch-aldermen-delay-desoto-110825861.html)
- dailymemphian.com[Daily Memphian](https://dailymemphian.com/article/65371/olive-branch-rezoning-landfill-expansion-desoto-innovation-district)
- clarionledger.com[Clarion Ledger (11 August 2026)](https://www.clarionledger.com/story/news/local/2026/08/11/jackson-mississippi-city-council-to-explore-where-data-centers-could-be-built/91239349007/)
- clarionledger.com[Clarion Ledger (3 September 2026)](https://www.clarionledger.com/story/news/local/2026/09/03/mayor-john-horhn-talks-data-centers-housing-and-major-grant-at-delta-fest-in-jackson-mississippi/91562767007/)
- datacenterbans.com[Data Center Moratoriums (datacenterbans.com)](https://www.datacenterbans.com/state/mississippi)
- usatoday.com[The Commercial Appeal via USA Today: Olive Branch Board of Aldermen approves data center restrictions](https://www.usatoday.com/story/money/business/development/2026/08/19/olive-branch-approves-data-center-restrictions-spacexai/91358091007/)
- desototimes.com[DeSoto Times-Tribune](https://www.desototimes.com/news/walls-planning-commission-rejects-controversial-rezoning-request/article_91f0eac7-e8be-40cc-b994-a904ddbab68f.html)
- cbsnews.com[CBS News](https://www.cbsnews.com/news/mississippi-elon-musk-xai-data-center-power-plant-noise/)
- jdsupra.com[JD Supra (Mitchell Williams)](https://www.jdsupra.com/legalnews/air-enforcement-mississippi-commission-7250728/)
- gizmodo.com[Gizmodo](https://gizmodo.com/spacex-agrees-to-remove-temporary-gas-turbines-at-colossus-data-center-by-2027-2000793559)
- enterprise-journal.com[Enterprise-Journal](https://www.enterprise-journal.com/spacexai-powers-down-11-69-temporary-turbines-southaven-facility-6a973a062fd15)
- techcrunch.com[TechCrunch](https://techcrunch.com/2026/07/31/spacex-wont-remove-all-of-xais-unpermitted-turbines-for-another-year/)
- lieffcabraser.com[Lieff Cabraser (Business Wire release)](https://www.lieffcabraser.com/2026/09/lieff-cabraser-announces-federal-class-action-against-x-ai-noise-nuisance-data-centers/)
- law360.com[Law360](https://www.law360.com/real-estate-authority/articles/2530246/x-ai-sued-over-memphis-area-data-center-noise)
- earthjustice.org[Earthjustice (NAACP counsel release)](https://earthjustice.org/press/2026/naacp-asks-court-for-emergency-action-to-stop-illegal-air-pollution-from-xais-data-center-power-plant)

### Every state, one page each

[Alabama 9 / 21](https://savrn.com/data-center-capital-atlas/alabama)[Alaska 1 / 1](https://savrn.com/data-center-capital-atlas/alaska)[Arizona 11 / 11](https://savrn.com/data-center-capital-atlas/arizona)[Arkansas 2 / 8](https://savrn.com/data-center-capital-atlas/arkansas)[California 10 / 35](https://savrn.com/data-center-capital-atlas/california)[Colorado 6 / 21](https://savrn.com/data-center-capital-atlas/colorado)[Connecticut 0 / 6](https://savrn.com/data-center-capital-atlas/connecticut)[Delaware 0 / 5](https://savrn.com/data-center-capital-atlas/delaware)[Florida 0 / 46](https://savrn.com/data-center-capital-atlas/florida)[Georgia 23 / 57](https://savrn.com/data-center-capital-atlas/georgia)[Hawaii 0 / 0](https://savrn.com/data-center-capital-atlas/hawaii)[Idaho 2 / 2](https://savrn.com/data-center-capital-atlas/idaho)[Illinois 10 / 35](https://savrn.com/data-center-capital-atlas/illinois)[Indiana 14 / 44](https://savrn.com/data-center-capital-atlas/indiana)[Iowa 3 / 22](https://savrn.com/data-center-capital-atlas/iowa)[Kansas 5 / 19](https://savrn.com/data-center-capital-atlas/kansas)[Kentucky 6 / 26](https://savrn.com/data-center-capital-atlas/kentucky)[Louisiana 7 / 3](https://savrn.com/data-center-capital-atlas/louisiana)[Maine 0 / 20](https://savrn.com/data-center-capital-atlas/maine)[Maryland 1 / 22](https://savrn.com/data-center-capital-atlas/maryland)[Massachusetts 0 / 11](https://savrn.com/data-center-capital-atlas/massachusetts)[Michigan 4 / 55](https://savrn.com/data-center-capital-atlas/michigan)[Minnesota 3 / 31](https://savrn.com/data-center-capital-atlas/minnesota)[Mississippi 7 / 5](https://savrn.com/data-center-capital-atlas/mississippi)[Missouri 10 / 25](https://savrn.com/data-center-capital-atlas/missouri)[Montana 1 / 10](https://savrn.com/data-center-capital-atlas/montana)[Nebraska 3 / 16](https://savrn.com/data-center-capital-atlas/nebraska)[Nevada 8 / 12](https://savrn.com/data-center-capital-atlas/nevada)[New Hampshire 0 / 5](https://savrn.com/data-center-capital-atlas/new-hampshire)[New Jersey 4 / 61](https://savrn.com/data-center-capital-atlas/new-jersey)[New Mexico 3 / 10](https://savrn.com/data-center-capital-atlas/new-mexico)[New York 6 / 21](https://savrn.com/data-center-capital-atlas/new-york)[North Carolina 10 / 45](https://savrn.com/data-center-capital-atlas/north-carolina)[North Dakota 6 / 4](https://savrn.com/data-center-capital-atlas/north-dakota)[Ohio 24 / 80](https://savrn.com/data-center-capital-atlas/ohio)[Oklahoma 11 / 20](https://savrn.com/data-center-capital-atlas/oklahoma)[Oregon 1 / 8](https://savrn.com/data-center-capital-atlas/oregon)[Pennsylvania 16 / 42](https://savrn.com/data-center-capital-atlas/pennsylvania)[Rhode Island 0 / 5](https://savrn.com/data-center-capital-atlas/rhode-island)[South Carolina 6 / 20](https://savrn.com/data-center-capital-atlas/south-carolina)[South Dakota 1 / 6](https://savrn.com/data-center-capital-atlas/south-dakota)[Tennessee 6 / 26](https://savrn.com/data-center-capital-atlas/tennessee)[Texas 106 / 35](https://savrn.com/data-center-capital-atlas/texas)[Utah 11 / 12](https://savrn.com/data-center-capital-atlas/utah)[Vermont 0 / 3](https://savrn.com/data-center-capital-atlas/vermont)[Virginia 33 / 50](https://savrn.com/data-center-capital-atlas/virginia)[Washington 9 / 22](https://savrn.com/data-center-capital-atlas/washington)[Washington, DC 0 / 0](https://savrn.com/data-center-capital-atlas/washington-dc)[West Virginia 4 / 3](https://savrn.com/data-center-capital-atlas/west-virginia)[Wisconsin 4 / 45](https://savrn.com/data-center-capital-atlas/wisconsin)[Wyoming 11 / 5](https://savrn.com/data-center-capital-atlas/wyoming)

Figures beside each state are named sites and blocked, delayed or restricted projects.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Announced commitments overlap one another and overlap reported capital expenditure, so this page shows disclosed floors and never adds them into a single deployment figure. Informational, not investment or legal advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)