# Oregon Data Center Investment Tracker
Source: https://savrn.com/data-center-capital-atlas/oregon
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Named sites

1

Site-level commitments the atlas records in Oregon

Disclosed capital floor

n.a.

Sum of sites with a stated dollar figure. Sites without one are listed, not counted

Disclosed capacity

4 MW

Sum of sites with a stated megawatt figure

Blocked, delayed or restricted

8

$1.6B of announced capital in those projects

Who is investing

## Who is investing in data centers in Oregon?

The named commitments in Oregon carry no disclosed dollar figure yet. The record is QTS Realty Trust (Blackstone).

[QTS Realty Trust (Blackstone) 1 site](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust)

Named sites

## Named data center sites in Oregon

Each row is one site-level commitment with its capital provider, the figure the source states, and the status the source gives it. Capital is shown as one compact figure; the verbatim wording is in the row's sources.

| Site | Capital provider | Place | Capital | MW | Status | Sources |
| --- | --- | --- | --- | --- | --- | --- |
| QTS Hillsboro campusannounced 2018; city moratorium adopted July 27, 2026 | [QTS Realty Trust (Blackstone)](https://savrn.com/data-center-capital-atlas/company/qts-realty-trust) | Hillsboro | n.a. | 4 | operating |  |

Capital at risk

## Blocked, delayed or restricted in Oregon

Every project in Oregon on the atlas's capital-at-risk record: the action taken, who took it, and the announced capital affected. Restarts and reversals are recorded with the same weight as blocks.

| Project | Developer | Jurisdiction | Action | Capital | Sources |
| --- | --- | --- | --- | --- | --- |
| La Pine Industrial Park data centerrejected Rejected 27 May 2026; single outlet | Boxminer.io | City of La Pine | The La Pine City Council voted unanimously on 27 May 2026 against pursuing a land sale in the La Pine Industrial Park to the developer of a 20-megawatt data center, after hours of resident testimony against it. Opponents cited groundwater, air quality and the capacity of the rural grid. | $800M |  |
| Intel / Stack Infrastructure Hillsboro (SB 1586)moratorium February 17, 2026 | Intel / Stack Infrastructure | Hillsboro (SB 1586) | SB 1586, which would have brought 373 acres of rural land into Hillsboro's UGB for tech industries, was shelved. | $700M |  |
| Cascade Locksblocked 2024-25 | Roundhouse | Cascade Locks | Blocked | $100M |  |
| Former Hynix site data centerdenied Decision letter 8 September 2026; appealable to the Oregon Land Use Board of Appeals | n.a. (prospective buyer, not publicly named) | City of Eugene | The City of Eugene planning department determined in a letter dated 8 September 2026 that the data center described by the prospective buyer of the former Hynix plant is prohibited in the site's E-1 Campus Employment zone, reasoning that data centers are almost self-operating with little human presence at the site. The buyer's attorney had argued the use qualified under information technology services permitted in E-1. A city planner stated the decision can be appealed to the Oregon Land Use Board of Appeals, which could uphold it, seek more information or overturn it. | n.a. |  |
| Hillsboro pipeline (incl. QTS 250 MW campus)moratorium Jul 2026 | multiple | Hillsboro | First Oregon city moratorium: 120 days adopted Jul 27 2026, expires Nov 24 2026, extendable 6 months; plus 180-day SIP pause approved Jul 21 2026 | n.a. |  |
| Oregon state-owned land pause for data centersmoratorium Announced 8 September 2026; in effect through 1 July 2027 | n.a. (statewide administrative action) | State of Oregon | Governor Tina Kotek directed state agencies to immediately pause all unapproved land transactions and permits for new data center projects on state-owned property. The pause covers requests for easements, leases, rentals, land-use permits, and sales or transfers of state-owned property for data centers, and runs through 1 July 2027 or until further direction from the Governor's Office or the legislature. The stated purpose is to allow a statewide evaluation of long-term impacts including infrastructure capacity, environmental sustainability, water usage, job creation and effects on surrounding communities, and to ensure that data center growth does not shift utility and infrastructure costs onto Oregon ratepayers. Reporting notes that Oregon does not currently have authority to impose a statewide moratorium on data center development on private land, and that this action reaches only the state's own property. On the same day, at an anti-data-center rally outside the Capitol in Salem, Kotek said she now supports a statewide moratorium on new data centers and that the legislature should pass a temporary ban when it convenes next year, a shift from her previous position. Republican gubernatorial candidate Christine Drazan also called for a moratorium. No statewide moratorium has been enacted; what is in force is the state-land pause recorded here. | n.a. |  |
| Verrus data centermoratorium Initial vote 3 August 2026; moratorium adopted 21 September 2026, in effect through 19 January 2027 | Verrus | Salem | Salem City Council voted unanimously on 3 August 2026 to move toward a temporary moratorium on AI data centers and to begin updating zoning and land use rules. On 21 September 2026 the council voted unanimously to adopt the moratorium, effective immediately through 19 January 2027, with state law allowing extensions of up to 300 days with additional findings. It covers all data centers as a primary use and accessory data centers above 2 MW. The city attorney said the Verrus application filed in late July must be reviewed under the rules in place when filed, but construction can be prohibited while the moratorium is in effect; the city cited water supply risk from the deep drawdown of Detroit Reservoir. | n.a. |  |
| Woodburn 120-day data center moratoriummoratorium Adopted 14 September 2026 (Resolution 2267); runs 120 days | n.a. | City of Woodburn | Woodburn City Council adopted Resolution 2267 on 14 September 2026 declaring a 120-day moratorium on the acceptance, review and approval of city permits and development proposals for new data centers. Other industrial development is not affected. During the pause the city will review zoning and siting criteria and study water, energy, noise and environmental impacts. The vote count was not published in the sources reviewed. | n.a. |  |

Policy context

## What governs a data center in Oregon

Oregon (statewide summary)state

C.4 floors: 10 MW (Cascade Locks) + Hillsboro DC/BESS pipeline; $100M identified; 3 named; 2-4 tracked actions. Hillsboro adopted the first Oregon city moratorium: 120 days from July 27, 2026, expiring November 24, 2026, extendable 6 months, plus a 180-day SIP pause approved July 21, 2026.

Hillsboro's moratorium covers a pipeline that includes a QTS 250 MW campus, Salem halted new applications for 120 days on August 3, 2026, and Wasco County carries restrictive zoning from June 2025.

Oregon (PUC approval of PGE data center rate increase under the POWER Act)state

POWER Act rate class applies to loads above 20 MW in Portland General Electric territory

The Oregon Public Utility Commission unanimously approved on 7 July 2026 a 29.7% rate increase for data centers, cryptocurrency operations and other large industrial users in PGE territory, the first significant increase under the 2025 POWER Act, effective 8 July 2026. Residential customers received a 1.3% decrease. The Data Center Coalition appealed the PGE allocation to the commission, which rejected the appeal; the Citizens' Utility Board expects the coalition to take the case to the Oregon Court of Appeals (reported 23 September 2026).

Oregon (Pacific Power data center cost-assignment settlement under the POWER Act)state

Pacific Power data center rate class under the 2025 POWER Act; applies to future data centers, and existing data center customers are to be addressed next spring

Last week Pacific Power reached a settlement with Oregon Public Utility Commission staff, the Citizens' Utility Board and advocacy groups that assigns the cost of new generation, storage, wires, market power and a share of shared lines needed for new data centers to the data center operators. The Citizens' Utility Board called it the strongest deal yet from a for-profit utility under the POWER Act. The three-member commission is expected to act on 13 November 2026, and the Data Center Coalition is expected to try to appeal. The coalition's appeal of PGE's July 2026 cost allocation was rejected by the commission, and the Citizens' Utility Board expects it to go to the Oregon Court of Appeals.

The policy layer for Oregon lives in three companion references: the [Oregon Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker/oregon) for every state measure and local moratorium on record, the [Water Tracker](https://savrn.com/data-center-water-tracker) for the water rules that touch a site, and the [Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the large-load rules of the RTO or utility that decides whether it can energize.

Next door

## States next door

California

10 sites

35 blocked, delayed or restricted

Washington

9 sites

22 blocked, delayed or restricted

Nevada

8 sites · $7.2B disclosed

12 blocked, delayed or restricted

Idaho

2 sites · $1.2B disclosed

2 blocked, delayed or restricted

On the map

## Data centers in Oregon

The US Data Center Map identifies 121 facilities run by 44 operators in Oregon, each one placed from primary sources and listed by city and by operator, with this atlas record beside it.

Oregon data centers

121 facilities · 44 operators

Map, locations, operators, rules

Oregon power and local economy

Generation, utilities and county records

Explore the power supply chain and local conditions behind the build-out

US Data Center Map

Every state, one page each

The national map and the operator directory

Sources

## Sources for Oregon

Every source cited on this page, once each. The full atlas source register is at [Capital Atlas sources](https://savrn.com/data-center-capital-atlas/sources).

- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/qts-opens-phase-1-its-250mw-hillsboro-oregon-data-center-campus/)
- hillsboro-oregon.gov[City of Hillsboro](https://www.hillsboro-oregon.gov/community/data-centers)
- opb.org[OPB](https://www.opb.org/article/2026/07/27/hillsboro-approves-data-center-moratorium/)
- opb.org[OPB](https://www.opb.org/article/2026/05/28/la-pine-rejects-data-center-central-oregon/)
- opb.org[opb.org](https://www.opb.org/article/2026/03/03/hillsboro-will-not-get-more-industrial-land-for-high-tech-data-centers/)
- capitalpress.com[capitalpress.com](https://capitalpress.com/2026/03/06/lawmaker-shelves-bill-slating-hillsboro-farmland-for-industrial-development/)
- opb.org[opb.org](https://www.opb.org/article/2026/02/17/oregon-senators-tech-development-hillsboro-farm-group/)
- oregoncapitalchronicle.com[oregoncapitalchronicle.com](https://oregoncapitalchronicle.com/2026/03/02/oregon-would-temporarily-bar-expanded-tax-benefits-for-data-centers-under-changes-to-governors-bill/)
- katu.com[katu.com](https://katu.com/news/local/hillsboro-petition-seeks-pause-data-centers-amid-energy-and-farmland-concerns-washington-county-oregon-city-councilor-kipperlyn-sinclair-jacob-roloff-tammy-carpenter-illsboro-herald-editor-dirk-knudsen-tualatin-riverkeepers-pge)
- hillsboroherald.com[hillsboroherald.com](https://hillsboroherald.com/signatures-sought-on-hillsboro-data-center-moratorium-petition-brought-by-kipperlyn-sinclair/)
- datacenterwatch.org[Data Center Watch](https://www.datacenterwatch.org/report)
- kval.com[KVAL](https://kval.com/news/local/eugene-rejects-data-center-at-former-hynix-site-ai-artificial-intelligence-cloud-services-websites-apps-machine-processing)
- hillsboro-oregon.gov[Hillsboro next steps](https://www.hillsboro-oregon.gov/Home/Components/News/News/17569/)
- oregoncapitalchronicle.com[Oregon Capital Chronicle](https://oregoncapitalchronicle.com/2026/09/08/gov-kotek-pauses-data-centers-on-state-land-capitol-demonstrators-want-her-to-go-further/)
- koin.com[KOIN](https://www.koin.com/news/oregon/oregon-gov-kotek-pauses-state-land-requests-for-data-centers/)
- datacenterdynamics.com[DCD](https://www.datacenterdynamics.com/en/news/oregon-pauses-land-sales-of-state-owned-property-for-data-center-projects-through-july-1-2027/)
- klcc.org[KLCC](https://www.klcc.org/politics-government/2026-09-08/gov-tina-kotek-says-she-now-supports-a-data-center-moratorium)
- apps.oregon.gov[Oregon Governor's Office](https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-supports-moratoriums-on-data-center-development)
- ktvz.com[KTVZ](https://ktvz.com/news/2026/09/08/gov-kotek-pauses-data-center-projects-on-state-land-until-2027/)
- ijpr.org[Jefferson Public Radio](https://www.ijpr.org/politics-government/2026-09-09/gov-kotek-pauses-data-centers-on-state-land-capitol-demonstrators-want-her-to-go-further)
- interconnectedcapital.com[Interconnected Capital](https://www.interconnectedcapital.com/research/data-center-moratoriums)
- statesmanjournal.com[Salem Statesman Journal](https://www.statesmanjournal.com/story/news/local/2026/09/21/salem-unanimously-passes-moratorium-on-data-centers/91875871007/)
- woodburn-or.gov[City of Woodburn](https://www.woodburn-or.gov/1133/Data-Center-Moratorium)
- nbc16.com[NBC 16](https://nbc16.com/news/local/woodburn-approves-120-day-moratorium-on-new-data-center-development)
- dimetrics.ai[Dimetrics Oregon](https://www.dimetrics.ai/datacenter-risk/oregon)
- opb.org[OPB](https://www.opb.org/article/2026/07/07/oregon-data-center-general-electric-rate-hikes/)
- oregoncapitalchronicle.com[Oregon Capital Chronicle](https://oregoncapitalchronicle.com/2026/09/23/pacific-power-to-charge-new-oregon-data-centers-for-all-costs-associated-with-growing-energy-need/)
- eurasiareview.com[Eurasia Review (Oregon Capital Chronicle republication)](https://www.eurasiareview.com/24092026-pacific-power-to-charge-new-oregon-data-centers-for-all-costs-associated-with-growing-energy-need/)

### Every state, one page each

[Alabama 9 / 21](https://savrn.com/data-center-capital-atlas/alabama)[Alaska 1 / 1](https://savrn.com/data-center-capital-atlas/alaska)[Arizona 11 / 11](https://savrn.com/data-center-capital-atlas/arizona)[Arkansas 2 / 8](https://savrn.com/data-center-capital-atlas/arkansas)[California 10 / 35](https://savrn.com/data-center-capital-atlas/california)[Colorado 6 / 21](https://savrn.com/data-center-capital-atlas/colorado)[Connecticut 0 / 6](https://savrn.com/data-center-capital-atlas/connecticut)[Delaware 0 / 5](https://savrn.com/data-center-capital-atlas/delaware)[Florida 0 / 46](https://savrn.com/data-center-capital-atlas/florida)[Georgia 23 / 57](https://savrn.com/data-center-capital-atlas/georgia)[Hawaii 0 / 0](https://savrn.com/data-center-capital-atlas/hawaii)[Idaho 2 / 2](https://savrn.com/data-center-capital-atlas/idaho)[Illinois 10 / 35](https://savrn.com/data-center-capital-atlas/illinois)[Indiana 14 / 44](https://savrn.com/data-center-capital-atlas/indiana)[Iowa 3 / 22](https://savrn.com/data-center-capital-atlas/iowa)[Kansas 5 / 19](https://savrn.com/data-center-capital-atlas/kansas)[Kentucky 6 / 26](https://savrn.com/data-center-capital-atlas/kentucky)[Louisiana 7 / 3](https://savrn.com/data-center-capital-atlas/louisiana)[Maine 0 / 20](https://savrn.com/data-center-capital-atlas/maine)[Maryland 1 / 22](https://savrn.com/data-center-capital-atlas/maryland)[Massachusetts 0 / 11](https://savrn.com/data-center-capital-atlas/massachusetts)[Michigan 4 / 55](https://savrn.com/data-center-capital-atlas/michigan)[Minnesota 3 / 31](https://savrn.com/data-center-capital-atlas/minnesota)[Mississippi 7 / 5](https://savrn.com/data-center-capital-atlas/mississippi)[Missouri 10 / 25](https://savrn.com/data-center-capital-atlas/missouri)[Montana 1 / 10](https://savrn.com/data-center-capital-atlas/montana)[Nebraska 3 / 16](https://savrn.com/data-center-capital-atlas/nebraska)[Nevada 8 / 12](https://savrn.com/data-center-capital-atlas/nevada)[New Hampshire 0 / 5](https://savrn.com/data-center-capital-atlas/new-hampshire)[New Jersey 4 / 61](https://savrn.com/data-center-capital-atlas/new-jersey)[New Mexico 3 / 10](https://savrn.com/data-center-capital-atlas/new-mexico)[New York 6 / 21](https://savrn.com/data-center-capital-atlas/new-york)[North Carolina 10 / 45](https://savrn.com/data-center-capital-atlas/north-carolina)[North Dakota 6 / 4](https://savrn.com/data-center-capital-atlas/north-dakota)[Ohio 24 / 80](https://savrn.com/data-center-capital-atlas/ohio)[Oklahoma 11 / 20](https://savrn.com/data-center-capital-atlas/oklahoma)[Oregon 1 / 8](https://savrn.com/data-center-capital-atlas/oregon)[Pennsylvania 16 / 42](https://savrn.com/data-center-capital-atlas/pennsylvania)[Rhode Island 0 / 5](https://savrn.com/data-center-capital-atlas/rhode-island)[South Carolina 6 / 20](https://savrn.com/data-center-capital-atlas/south-carolina)[South Dakota 1 / 6](https://savrn.com/data-center-capital-atlas/south-dakota)[Tennessee 6 / 26](https://savrn.com/data-center-capital-atlas/tennessee)[Texas 106 / 35](https://savrn.com/data-center-capital-atlas/texas)[Utah 11 / 12](https://savrn.com/data-center-capital-atlas/utah)[Vermont 0 / 3](https://savrn.com/data-center-capital-atlas/vermont)[Virginia 33 / 50](https://savrn.com/data-center-capital-atlas/virginia)[Washington 9 / 22](https://savrn.com/data-center-capital-atlas/washington)[Washington, DC 0 / 0](https://savrn.com/data-center-capital-atlas/washington-dc)[West Virginia 4 / 3](https://savrn.com/data-center-capital-atlas/west-virginia)[Wisconsin 4 / 45](https://savrn.com/data-center-capital-atlas/wisconsin)[Wyoming 11 / 5](https://savrn.com/data-center-capital-atlas/wyoming)

Figures beside each state are named sites and blocked, delayed or restricted projects.

Part of the [North American Data Center Capital Atlas](https://savrn.com/data-center-capital-atlas), refreshed every Tuesday, Thursday and Saturday. Announced commitments overlap one another and overlap reported capital expenditure, so this page shows disclosed floors and never adds them into a single deployment figure. Informational, not investment or legal advice.

The SAVRN reference set

## Seven references, one system

Capital, delay, policy, water, grid, permits and scarcity are one system seen from seven sides. Each reference is primary-sourced, refreshed on a schedule, and links into the others, so a project can be followed from the money committed to the docket that stopped it.

Delay Watchlist

Project-level slippage: named projects, jurisdictional actions, utility and federal dockets, SEC disclosures, and the interconnection queue.

[Open the watchlist →](https://savrn.com/data-center-delay-tracker)

Moratorium Tracker

The policy layer: every state measure and local moratorium mapped and cited, with one page per state.

Open the tracker →

Water Tracker

Every federal, state, local and interstate water measure that touches a data center, plus a fifty-state water ledger.

Open the water tracker →

Grid Operator Watchlist

ERCOT, PJM, MISO, CAISO, SPP, NYISO, ISO-NE and FERC: the large-load rules, filings and queue positions that decide whether a site can energize.

Open the watchlist →

Permits and Power Development

Data center and substation permits, large loads in the interconnection queues, and the power plants planned to serve them, refreshed hourly from public records.

Open the permits tracker →

SAVRN Scarcity Tracker

Eleven primary-sourced indicators of AI infrastructure scarcity, one composite index, read against the token index, SAVRN's own cost basis and the frontier ceiling.

Open the scarcity tracker →

Have a specific address? Site Intelligence reads all seven references against one location, county, utility and grid operator included, and cites every finding.

[Check an address →](https://savrn.com/site-intelligence)