# Data Center Delay Watchlist, Sources and Citations
Source: https://savrn.com/data-center-delay-tracker/sources
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

SAVRN Research · Citations

# Data Center Delay Watchlist, sources and citations

Every primary and secondary source behind the SAVRN Nationwide Data Center Delay Watchlist, grouped by section. Each link opens its original document. This page is the citation index for the tracker.

4,505 sources Across 10 sections Updated 2026-09-28 [Back to the watchlist →](https://savrn.com/data-center-delay-tracker)

Open data credits: Alabama Reflector; Alaska Beacon; Americus Times-Recorder; Arizona Mirror; Arkansas Advocate; Axios Pro Energy; Bisnow; Bisnow National; Bradenton Herald; CNBC Technology; Cardinal News VA; Central Florida Public Media; Colorado Newsline; ConstructConnect News; Construction Dive; CourtListener DataCenter Dockets; CourtListener Opinions; Data Center Dynamics news; DataCenterTracker.org, CC BY 4.0; East Bay Insiders Newsletter; Energy Central; FOX19 | Cincinnati; FOX5 Vegas; Facilities Dive; Florida Phoenix; Georgia Recorder; GovTech; Greensboro News and Record; Grist; Idaho Capital Sun; Indiana Capital Chronicle; InkFreeNews.com; Iowa Capital Dispatch; KERA News; KEYC News Now; Kansas Reflector; Kentucky Lantern; Law360 Energy; Local News Matters; Louisiana Illuminator; Maine Morning Star; Maryland Matters; Michigan Advance; Mid Bay News; Missouri Independent; Montana Free Press; NBC4 Washington; NC Newsline; Native News Online; Nebraska Examiner; Nevada Current; New Hampshire Bulletin; North Dakota Monitor; Ohio Capital Journal; Oregon Capital Chronicle; Orlando Sentinel; Pennsylvania Capital-Star; Rhode Island Current; Route Fifty; SEC EDGAR company submissions, public domain; SEC EDGAR full-text search, public domain; Source New Mexico; South Dakota Searchlight; Springfield Daily Citizen; Statesman Journal; Strisker data center notes; Tennessee Lookout; The Baltimore Banner; The Current (GA); The Detroit News; The Hill Energy; The North State Journal; The Pantagraph; The Real Deal; The Register; The Texas Tribune; Times-Standard; Tuscaloosa Thread; Union-Bulletin; Uprise RI; Utah News Dispatch; Utah Public Radio; Utility Dive; Virginia Business; Virginia Mercury; Visalia Times-Delta; WBUR; WCPO 9 Cincinnati; WGLT; WHEC.com; WJON; WLOS; WLUK; WPBF; WQCS; WRAL (NC); WUNC News; Washington State Standard; Wausau Pilot & Review; West Virginia Watch; Winston-Salem Journal; Wisconsin Examiner; contracosta.news; ictnews.org; indianapublicradio.org; inkfreenews.com; newmedia-wi.com; thegazette.com; tuscaloosathread.com; wcpo.com; www.cities929.com.

## Projects

897 sources

[12onyourside.com](https://www.12onyourside.com/2025/07/28/amazon-pulls-louisa-county-data-center-proposal-after-strong-resistance/)12onyourside.com

[12onyourside.com](https://www.12onyourside.com/2026/02/05/community-meeting-draws-critics-mountain-road-data-center-plan/)12onyourside.com

[25newsnow.com](https://www.25newsnow.com/2026/03/09/pekins-mayor-announces-data-center-project-will-not-move-forward/)25newsnow.com

[Louisa homeowner's lawsuit over Amazon data center moves forward in federal court](https://www.29news.com/2026/07/23/louisa-homeowners-lawsuit-over-amazon-data-center-moves-forward-federal-court/)29news.com

[Developer sues Upper Merion Twp as court halts action on data center applications](https://6abc.com/post/developer-sues-upper-merion-twp-court-halts-action-data-center-applications/19670969/)6abc.com

[9and10news.com](https://www.9and10news.com/2025/11/20/kalkaska-county-data-center-project-halted-after-public-opposition/)9and10news.com

[Douglas County approves $19M tax rebate for company building data center](https://www.9news.com/article/news/local/colorado-news/douglas-county-commissioners-approve-tax-break-data-center-parker/73-052402a1-7e24-4d2d-8d8c-24104fa031b4)9news.com

[Mesa activists oppose Japanese data center, seek audience with city council](https://www.abc15.com/news/region-southeast-valley/mesa/mesa-activists-oppose-japanese-data-center-seek-audience-with-city-council)abc15.com

[abc15.com](https://www.abc15.com/news/business/14-billion-west-valley-data-center-project-request-withdrawn-after-cities-push-back)abc15.com

[abc15.com](https://www.abc15.com/news/region-west-valley/community-concerned-over-major-new-data-center-project)abc15.com

[Legal challenge filed to halt controversial data center project in Bessemer](https://abc3340.com/news/abc-3340-news-iteam/legal-challenge-filed-to-halt-controversial-data-center-project-in-bessemer-public-hearing-temporary-restraining-order-preliminary-injunction-environmental-concerns-outlined-court-documents-follow-up)abc3340.com

[abc4.com](https://www.abc4.com/news/wasatch-front/provo-ai-data-center-not-approved-zoning-city-council/)abc4.com

[abc4.com](https://www.abc4.com/news/wasatch-front/ai-data-center-coming-provo-east-bay/)abc4.com

[abc7chicago.com](https://abc7chicago.com/post/lisle-data-center-public-hearing-held-proposed-former-lockformer-company-site-ogden-avenue/18444943/)abc7chicago.com

[abc7chicago.com](https://abc7chicago.com/post/lisle-data-center-cloudcenters-llc-drops-application-former-lockformer-company-site-ogden-avenue-village-officials-say/18703440/)abc7chicago.com

[abc7chicago.com](https://abc7chicago.com/post/naperville-illinois-city-council-denies-plan-karis-critical-data-center-vacant-lucent-campus-off-warrenville-road/18442413/)abc7chicago.com

[abqjournal.com](https://www.abqjournal.com/news/lands-commissioner-nixes-project-jupiter-pipeline-for-second-time/3083075)abqjournal.com

[adn.com](https://www.adn.com/alaska-news/anchorage/2026/03/27/anchorage-assembly-preemptively-adopts-data-center-regulations/)adn.com

[adn.com](https://www.adn.com/alaska-news/anchorage/2026/03/04/data-centers-powering-the-ai-boom-demand-local-energy-anchorage-assembly-members-want-to-regulate-them/)adn.com

[adn.com](https://www.adn.com/politics/alaska-legislature/2026/05/21/alaska-legislature-adjourns-with-eye-toward-special-session/)adn.com

[africanelements.org](https://www.africanelements.org/news/why-walnut-cove-is-suing-to-stop-project-delta-ai-centers/)africanelements.org

[Prince George's County Executive Aisha Braveboy Orders Temporary Halt To Data Center Plans At Former Landover Mall](https://afrotech.com/prince-georges-county-pauses-landover-mall-data-center-project)afrotech.com

[Coweta votes to turn this 800-acre forest into $17B data center campus](https://www.ajc.com/business/2026/04/coweta-votes-to-turn-this-800-acre-forest-into-17b-data-center-campus/)ajc.com

[Fulton County takes aim at data center tax breaks](https://www.ajc.com/news/2026/08/fulton-seeks-to-stop-tax-breaks-for-new-data-centers-near-atlanta/)ajc.com

[akcenter.org](https://akcenter.org/continuing-the-data-center-conversation-read-our-whitepaper/)akcenter.org

[Texas Pauses Data Center Interconnections Pending Statewide Audit](https://www.akingump.com/en/insights/alerts/texas-pauses-data-center-interconnections-pending-statewide-audit)akingump.com

[akleg.gov](https://www.akleg.gov/basis/Bill/Text/34?Hsid=HB0259A)akleg.gov

[alabamareflector.com](https://alabamareflector.com/2026/04/08/one-year-moratorium-on-solar-farms-fails-on-alabama-senate-procedural-rule/)alabamareflector.com

[alaskapublic.org](https://alaskapublic.org/news/politics/2026-03-11/mat-su-data-center-plan-in-doubt-after-mayors-veto)alaskapublic.org

[alaskapublic.org](https://alaskapublic.org/news/environment/2026-03-19/assembly-overrides-veto-advances-data-center-related-partnership)alaskapublic.org

[Alexandria City Council asks Fairfax County to deny data center substation at the city's edge](https://www.alexandriabrief.com/alexandria-city-council-asks-fairfax-county-to-deny-data-center-substation-at-the-citys-edge/)alexandriabrief.com

[alreporter.com](https://www.alreporter.com/2026/03/12/bill-to-pause-new-solar-developments-advances-to-alabama-senate-for-vote/)alreporter.com

[Kansas' first hyperscale data center to be twice as big as developers pitched](https://amp.kansascity.com/news/local/community/johnson-county/article316434683.html)amp.kansascity.com

[Locals are challenging a million-square-foot data center that would be the biggest in California](https://apnews.com/article/imperial-data-center-hyperscale-moratorium-conflict-a029128eb2458c3c197010ecbedb0cd8)apnews.com

[arkansasadvocate.com](https://arkansasadvocate.com/2026/05/28/data-center-moratorium-in-arkansas-most-populous-county-didnt-pass-review-finds/)arkansasadvocate.com

[Judge dismisses Democrat-Gazette's records law suit seeking data center contracts](https://www.arkansasonline.com/news/2026/jul/28/judge-dismisses-democrat-gazettes-records-law/)arkansasonline.com

[Pulaski County Quorum Court rejects data center moratorium](https://www.arkansasonline.com/news/2026/jul/28/pulaski-county-quorum-court-rejects-data-center/)arkansasonline.com

[arkansasonline.com](https://www.arkansasonline.com/news/2026/may/26/pulaski-county-quorum-court-passes-ordinance-to-ban-new-data-center-permits-for-a-year/)arkansasonline.com

[Little Rock moratorium try on data centers fails](https://arktimes.com/arkansas-blog/2026/08/04/little-rock-moratorium-try-on-data-centers-fails)arktimes.com

[arktimes.com](https://arktimes.com/arkansas-blog/2026/06/04/county-to-get-second-bite-at-moratorium-on-data-center-project)arktimes.com

[Coweta County Data Center Backlash: Residents File Lawsuit](https://atlantafi.com/coweta-county-data-center-proposal-backlash/)atlantafi.com

[atlantanewsfirst.com](https://www.atlantanewsfirst.com/2026/07/09/marietta-city-council-tables-vote-proposed-data-center/)atlantanewsfirst.com

[Audacy WORD: Plug pulled on Proposed Data Center in Spartanburg County](https://www.audacy.com/989word/news/local/plug-pulled-on-proposed-data-center-in-spartanburg-county)audacy.com

[Data Center and Warehouse Moratorium | City of Aurora, IL](https://www.aurora.il.us/Property-and-Business/Zoning-and-Planning/Data-Center-and-Warehouse-Moratorium)aurora.il.us

[Revolt over data center points to rising resistance in Colorado Springs](https://www.axios.com/local/colorado-springs/2026/04/09/data-center-opposition-colorado-springs)axios.com

[axios.com](https://www.axios.com/local/chicago/2026/02/18/illinois-freezes-data-center-tax-incentives-pritzker-trump-energy)axios.com

[axios.com](https://www.axios.com/local/indianapolis/2025/09/23/google-data-center-project-opposition-withdrawal)axios.com

[axios.com](https://www.axios.com/local/indianapolis/2026/02/04/pike-township-data-center-stalls-indiana-lawmakers-incentivize)axios.com

[axios.com](https://www.axios.com/local/twin-cities/2026/04/09/lawmakers-unite-on-bill-to-ban-ndas-for-data-centers)axios.com

[axios.com](https://www.axios.com/local/des-moines/2026/02/19/iowa-lawmakers-push-data-center-transparency)axios.com

[Why Chandler leaders voted to reject an AI data center](https://www.azcentral.com/story/news/local/chandler/2025/12/13/chandler-council-why-they-voted-no-on-lobbied-ai-data-center/87736360007/)azcentral.com

[Tucson City Council rejects Project Blue data center amid intense community pressure](https://azluminaria.org/2025/08/06/tucson-city-council-rejects-project-blue-amid-intense-community-pressure/)azluminaria.org

[bangordailynews.com](https://www.bangordailynews.com/2026/04/24/politics/janet-mills-vetoes-maine-data-center-ban/)bangordailynews.com

[American Battlefield Trust Vows to Keep Up Fight Against Digital Gateway After Judge Dismisses Lawsuit](https://www.battlefields.org/news/american-battlefield-trust-vows-keep-fight-against-digital-gateway-after-judge-dismisses)battlefields.org

[Victory at Manassas! Prince William Digital Gateway Project Dead After Developer Drops Appeal](https://www.battlefields.org/news/victory-manassas-prince-william-digital-gateway-project-dead-after-developer-drops-appeal)battlefields.org

[baxtel.com](https://baxtel.com/data-center/diode-ventures-peculiar-mo)baxtel.com

[bayjournal.com](https://www.bayjournal.com/pennsylvania-localities-feel-data-center-push-and-some-are-pushing-back/article_09db2a10-f46f-48d9-b03c-fd38fff2062c.html)bayjournal.com

[beankinney.com](https://www.beankinney.com/data-center-infrastructure-under-siege-lessons-from-virginias-digital-gateway-decision/)beankinney.com

[billtrack50.com](https://www.billtrack50.com/billdetail/1940964)billtrack50.com

[Officials End Efforts To Build One Of World's Largest Data Center Clusters](https://www.bisnow.com/news/washington-dc/data-center-development/officials-end-fight-2100-acre-data-center-rezoning-killing-one-of-worlds-largest-planned-projects-134136)bisnow.com

[Loudoun homeowners defer rezoning proposal, which they saw as way to escape rampant data centers](https://www.bizjournals.com/washington/news/2024/10/02/loudoun-aldie-data-centers-hiddenwood.html)bizjournals.com

[Boone County Commissioners Approve Moratorium on Data Centers](https://boonecounty.in.gov/2026/06/15/19190/)boonecounty.in.gov

[Westfield data center backlash grows amid Healey scrutiny](https://www.bostonglobe.com/2026/07/14/business/westfield-data-center-backlash-healey/)bostonglobe.com

[bostonglobe.com](https://www.bostonglobe.com/2026/02/23/metro/maine-data-center-legislation-ld307/)bostonglobe.com

[bostonglobe.com](https://www.bostonglobe.com/2024/11/20/business/data-center-western-mass/)bostonglobe.com

[Surry County considers 24-month data center moratorium](https://www.bpr.org/2026-06-16/surry-county-considers-24-month-data-center-moratorium)bpr.org

[Qualified Data Centers Moratorium to Expire June 30th, 2026 in Prince George's County](https://brandywinemd.com/qualified-data-centers-moratorium-to-expire-june-30th-2026-in-prince-georges-county/)brandywinemd.com

[Judge grants restraining order, delaying work on Google's Pine Island data center](https://bringmethenews.com/minnesota-news/judge-grants-restraining-order-delaying-work-on-googles-pine-island-data-center)bringmethenews.com

[Falls Township Residents Share Concerns and Frustrations Over AI Data Center](https://buckscountybeacon.com/2026/06/falls-township-residents-share-concerns-and-frustrations-over-ai-data-center-at-bucks-county-commissioners-meeting/)buckscountybeacon.com

[Update on STAMP lawsuit](https://www.buffaloornithologicalsociety.org/docs/Stamp-Project-Update-092525.pdf)buffaloornithologicalsociety.org

[Developer withdraws New Hampshire data center plan after local uproar](https://www.businessinsider.com/developer-withdraws-new-hampshire-data-center-plan-after-local-uproar-2026-5)businessinsider.com

[Calexico Chronicle, $10B DC sues Imperial](https://calexicochronicle.com/2026/01/12/developer-of-10b-data-center-sues-city-of-imperial-in-fed-court/)calexicochronicle.com

[capitalpress.com](https://capitalpress.com/2026/03/06/lawmaker-shelves-bill-slating-hillsboro-farmland-for-industrial-development/)capitalpress.com

[capitol-beat.org](https://capitol-beat.org/2026/02/bill-limiting-data-center-costs-from-being-passed-on-to-residents-clears-georgia-house/)capitol-beat.org

[capitollien.com](https://capitollien.com/1-6-billion-on-farmland-menomonies-proposed-data-center-and-the-local-backlash/)capitollien.com

[capitolnewsillinois.com](https://capitolnewsillinois.com/?p=99250)capitolnewsillinois.com

[capitolnewsillinois.com](https://capitolnewsillinois.com/news/developer-withdraws-rezoning-request-for-controversial-data-center-in-hoffman-estates/)capitolnewsillinois.com

[cardinalnews.org](https://cardinalnews.org/2025/04/10/data-centers-can-bring-high-paying-jobs-and-millions-in-tax-revenue-is-that-what-southside-will-get/)cardinalnews.org

[cbsaustin.com](https://cbsaustin.com/news/local/hays-county-officials-push-back-on-proposed-ai-data-centers-over-water-concerns)cbsaustin.com

[cbsaustin.com](https://cbsaustin.com/news/local/san-marcos-city-council-votes-5-2-to-deny-ai-data-center-proposal)cbsaustin.com

[CBS Texas: Developer behind proposed "Project Tomahawk" data center in North Texas town withdraws](https://www.cbsnews.com/texas/news/prosper-tx-project-tomahawk-pulled-9-8-2026/)cbsnews.com

[Lawsuit filed against Eagan asks court to void city's data center moratorium](https://www.cbsnews.com/minnesota/news/lawsuit-filed-eagan-data-center-moratorium/)cbsnews.com

[Minneapolis City Council approves 5-month pause on data centers](https://www.cbsnews.com/minnesota/news/minneapolis-city-council-data-center-pause/)cbsnews.com

[Mississippi homeowners blame a noisy data center plant](https://www.cbsnews.com/news/mississippi-elon-musk-xai-data-center-power-plant-noise/)cbsnews.com

[Yorkville farm, residents sue to stop second massive data center project](https://www.cbsnews.com/chicago/news/yorkville-farm-lawsuit-second-massive-data-center-project/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/texas/news/hood-county-commissioners-reject-data-center-moratorium-again-3-2-vote-residents-call-for-resignations/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/texas/news/hood-county-residents-concerns-proposed-data-center/)cbsnews.com

[centralmoinfo.com](https://www.centralmoinfo.com/lawmakers-target-data-center-impacts/)centralmoinfo.com

[High-speed rail pitches data center deals. Merced, Madera leaders push back](https://centralvalleyai.com/news/high-speed-rail-pitches-data-center-deals-merced-madera-leaders-push-back/)centralvalleyai.com

[Sign the Petition: Preserve Powhatan and Block the Data Center Zoning Proposal](https://www.change.org/p/preserve-powhatan-and-block-the-data-center-zoning-proposal)change.org

[change.org](https://www.change.org/p/urge-illinois-to-protect-citizens-from-unregulated-data-center-construction)change.org

[change.org](https://www.change.org/p/deny-data-centers-in-barrington-hills)change.org

[change.org](https://www.change.org/p/deny-the-proposed-data-centers)change.org

[change.org](https://www.change.org/p/stop-chesterton-data-center-campus)change.org

[change.org](https://www.change.org/p/halt-the-proposed-data-center-land-development-in-franklin-township)change.org

[change.org](https://www.change.org/p/no-data-centers-in-oldham-county-only-sign-share-petition-not-for-donations)change.org

[change.org](https://www.change.org/p/stop-the-ai-data-center-construction-in-ekron-ky)change.org

[change.org](https://www.change.org/p/stop-the-construction-of-michigan-s-largest-data-center-in-howell)change.org

[change.org](https://www.change.org/p/don-t-dump-data-on-peculiar)change.org

[change.org](https://www.change.org/p/no-conshy-or-plymouth-data-centers)change.org

[change.org](https://www.change.org/p/stop-re-zoning-and-protect-plymouth-township-s-environment)change.org

[change.org](https://www.change.org/p/stop-data-center-construction-in-lackawanna-county)change.org

[change.org](https://www.change.org/p/stop-data-centers-coming-to-upstate-sc)change.org

[change.org](https://www.change.org/p/pause-data-center-development-in-hood-county-to-protect-our-water-community)change.org

[change.org](https://www.change.org/p/stop-the-intrusion-of-disruptive-data-centers-in-hood-county)change.org

[change.org](https://www.change.org/p/protect-virginia-communities-regulate-data-center-growth-before-it-s-too-late)change.org

[change.org](https://www.change.org/p/no-data-centers-in-matthews-nc)change.org

[Data center project paused amid county lawsuits](https://chesterfieldreport.com/story/data-center-project-paused-amid-county-lawsuits.html)chesterfieldreport.com

[chestertontribune.com](https://www.chestertontribune.com/articles/burns-harbor-residents-say-no-way-to-data-center/)chestertontribune.com

[chicagobusiness.com](https://www.chicagobusiness.com/politics/data-center-development-could-stall-under-new-illinois-move)chicagobusiness.com

[After a rezoning request is withdrawn, Yorkville mayor says city's 'had enough' data center proposals](https://www.chicagotribune.com/2026/04/16/yorkville-data-center-rezoning-request-withdrawn/)chicagotribune.com

[Aurora temporarily pauses data center and warehouse development approvals](https://www.chicagotribune.com/2025/09/26/aurora-temporarily-pauses-data-center-warehouse-development-approvals/)chicagotribune.com

[Hobart residents sue to block city's data center plan](https://www.chicagotribune.com/2025/12/10/hobart-residents-sue-to-block-citys-data-center-plan/)chicagotribune.com

[Lawsuit filed against planned Grayslake data center](https://www.chicagotribune.com/2026/08/07/grayslake-data-center-lawsuit/)chicagotribune.com

[Rezoning for potential data center rejected by Yorkville commission](https://www.chicagotribune.com/2026/01/29/rezoning-for-potential-data-center-rejected-by-yorkville-commission-city-council-vote-planned-for-february/)chicagotribune.com

[Ruling expected later this month on injunction against Hobart data center](https://www.chicagotribune.com/2026/03/09/ruling-expected-later-this-month-on-injunction-against-hobart-data-center/)chicagotribune.com

[chicagotribune.com](https://www.chicagotribune.com/2024/06/16/different-receptions-for-1-billion-investments-data-center-proposals-welcomed-in-laporte-but-not-in-chesterton/)chicagotribune.com

[chicagotribune.com](https://www.chicagotribune.com/2024/08/06/burns-harbor-residents-blast-data-center-plan-plan-commission-meeting-on-sept-9-for-discussion/)chicagotribune.com

[chicagotribune.com](https://www.chicagotribune.com/2025/02/02/texas-firm-yet-to-make-move-on-burns-harbor-data-center-proposal/)chicagotribune.com

[chicagotribune.com](https://www.chicagotribune.com/2024/08/03/developer-eyes-burns-harbor-for-data-center-project/)chicagotribune.com

[citact.org](https://www.citact.org/about)citact.org

[citizen.org](https://www.citizen.org/news/hood-county-residents-left-vulnerable-as-commissioners-reject-data-center-moratorium/)citizen.org

[Clinton County commissioners deny rezoning of roughly 714.55 acres](https://citizenportal.ai/articles/7345204/indiana/clinton-county/clinton-county-commissioners-deny-rezoning-of-roughly-71455-acres-for-proposed-data-center)citizenportal.ai

[James City supervisors require special-use review for data centers, direct staff to write policy](https://citizenportal.ai/articles/5986134/virginia/james-city-county/Virginia/James-City-supervisors-require-special-use-review-for-data-centers-direct-staff-to-write-policy)citizenportal.ai

[Planning Commission indefinitely continues proposed data-center zoning text amendment](https://citizenportal.ai/articles/7893682/virginia/chesapeake-city-independent-city/planning-commission-indefinitely-continues-proposed-datacenter-zoning-text-amendment)citizenportal.ai

[Residents urge Kenosha council to slow Microsoft data center consideration](https://citizenportal.ai/articles/8309004/wisconsin/kenosha-county/kenosha/residents-urge-kenosha-council-to-slow-microsoft-data-center-consideration-over-water-air-and-grid-concerns)citizenportal.ai

[Smithfield council adopts zoning amendment that defines and bars data centers](https://citizenportal.ai/articles/7901656/rhode-island/providence-county/smithfield/smithfield-council-adopts-zoning-amendment-that-defines-and-bars-data-centers)citizenportal.ai

[Spotsylvania supervisors split on requiring special-use permits for data centers](https://citizenportal.ai/articles/6041989/virginia/spotsylvania-county/Virginia/Spotsylvania-County/Spotsylvania-supervisors-split-on-requiring-special-use-permits-for-data-centers-direct-staff-to-draft-standards)citizenportal.ai

[Stafford adopts stricter data-center rules after marathon public hearing](https://citizenportal.ai/articles/7439006/Virginia/Stafford-County/Stafford-adopts-stricter-datacenter-rules-after-marathon-public-hearing-developers-residents-split)citizenportal.ai

[Surry County extends moratorium on large data centers for two years](https://citizenportal.ai/articles/8588220/surry-county-extends-moratorium-on-large-data-centers-for-two-years)citizenportal.ai

[County presses pause on AI data center incentive](https://citydesk.org/2026/01/28/county-presses-pause-on-ai-data-center-incentive/)citydesk.org

[cleanwisconsin.org](https://www.cleanwisconsin.org/how-caledonia-defeated-a-data-center/)cleanwisconsin.org

[cleveland19.com](https://www.cleveland19.com/2026/07/16/3-month-long-moratorium-put-data-centers-cleveland/)cleveland19.com

[Microsoft revealed as company behind controversial data center proposal in Michigan township](https://www.cnbc.com/2026/01/07/microsoft-behind-controversial-data-center-in-michigan-township.html)cnbc.com

[NAACP sues Elon Musk's xAI over Memphis data center air pollution](https://www.cnbc.com/2026/04/14/elon-musk-xai-memphis-data-centers.html)cnbc.com

[New York governor signs order halting new data center approvals](https://www.cnbc.com/2026/07/14/new-york-ai-data-center-ban.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2025/11/25/microsoft-ai-data-center-rejection-vs-support.html)cnbc.com

[coloradonewsline.com](https://coloradonewsline.com/2026/09/18/colorado-springs-data-center-decision/)coloradonewsline.com

[Broomfield temporarily bans new data centers](https://www.coloradopolitics.com/2026/07/08/broomfield-passes-temporary-ban-on-new-data-center-construction/)coloradopolitics.com

[Planning Commission rejects resident appeals to stop proposed data center](https://www.coloradopolitics.com/2026/07/24/planning-commission-rejects-resident-appeals-to-stop-proposed-data-center/)coloradopolitics.com

[Community Impact: Project Tomahawk developer scraps plans for Prosper data center](https://communityimpact.com/prosper-celina/government/project-tomahawk-developer-scraps-plans-for-prosper-data-center/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/san-marcos-buda-kyle/development/2025/05/21/new-data-center-planned-near-new-braunfels-and-san-marcos-sparks-debate/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/san-marcos-buda-kyle/government/2026/02/18/san-marcos-council-denies-map-change-stops-data-center-development/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/pflugerville-hutto/development/2026/04/09/hutto-residents-air-concerns-over-proposed-data-center/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/pflugerville-hutto/government/2026/04/22/zydeco-development-withdraws-zoning-request-for-data-center-in-hutto/)communityimpact.com

[Construction Owners, Oracle/OpenAI new off-grid DC](https://www.constructionowners.com/news/oracle-and-openai-to-power-new-texas-data-center-off-the-grid)constructionowners.com

[constructionowners.com](https://www.constructionowners.com/news/court-halts-digital-gateway-construction-in-virginia)constructionowners.com

[constructionreviewonline.com](https://constructionreviewonline.com/controversial-321-acre-data-center-campus-proposed-in-pekin-illinois-officially-rejected/)constructionreviewonline.com

[City Council passes emergency data center moratorium and policy framework](https://council.seattle.gov/2026/06/09/city-council-passes-emergency-data-center-moratorium-and-policy-framework/)council.seattle.gov

[Newton County enacts moratoriums on data centers, convenience stores](https://www.covnews.com/news/county/newton-county-enacts-moratoriums-data-centers-convenience-stores/)covnews.com

[cowboystatedaily.com](https://cowboystatedaily.com/2026/04/07/where-a-river-runs-through-it-inside-the-hunt-for-data-center-sites/)cowboystatedaily.com

[Aurora City Council rejects data center moratorium, approves new regulations](https://www.cpr.org/2026/08/11/aurora-city-council-rejects-data-center-moratorium/)cpr.org

[Project Taurus decision postponed until after April's Colorado Springs election (CPR News, Sept. 17, 2026)](https://www.cpr.org/2026/09/17/project-taurus-data-center-postponed-colorado-springs/)cpr.org

[crainscleveland.com](https://www.crainscleveland.com/politics-policy/ccl-shortened-data-center-moratorium-20260715/)crainscleveland.com

[Cryptobriefing, Amazon 7.65 GW plant](https://cryptobriefing.com/amazon-natural-gas-power-plant-ai-data-center-texas/)cryptobriefing.com

[ctmirror.org](https://ctmirror.org/2024/04/19/ct-data-center-nuclear-plant-bill/)ctmirror.org

[Person County Residents Demand Answers from Microsoft](https://cwfnc.org/person/)cwfnc.org

[cwfnc.org](https://cwfnc.org/stokes/)cwfnc.org

[daily-tribune.com](https://www.daily-tribune.com/news/springbank-data-center-application-withdrawn/article_4038268b-78d8-5d26-9e10-2bf514aac3a3.html)daily-tribune.com

[dailycaller.com](https://dailycaller.com/2026/04/13/missouri-voters-give-boot-to-2-city-council-members-who-backed-multi-billion-dollar-ai-data-center-bonanza/)dailycaller.com

[Opponents readying to fight proposed South Elgin data center](https://www.dailyherald.com/20260717/technology/opponents-readying-to-fight-proposed-south-elgin-data-center/)dailyherald.com

[dailyherald.com](https://www.dailyherald.com/20260127/real-estate/2-billion-data-center-proposal-in-barrington-hills-withdrawn/)dailyherald.com

[dailyherald.com](https://www.dailyherald.com/20260701/news/rezoning-request-for-potential-data-center-in-hoffman-estates-withdrawn/)dailyherald.com

[dailymontanan.com](https://dailymontanan.com/2026/02/23/eleven-data-center-developers-in-talks-with-northwestern-group-says/)dailymontanan.com

[Faced with widespread disapproval, New Kent spikes plan for data centers](https://www.dailypress.com/2026/07/21/faced-with-widespread-disapproval-new-kent-spikes-plan-for-data-centers/)dailypress.com

[dailyprogress.com](https://dailyprogress.com/news/state-regional/business/article_01ab4690-f617-4e84-b1d8-3b535771a116.html)dailyprogress.com

[DeForest cancels $12 billion data center plan](https://dailyreporter.com/2026/01/29/deforest-cancels-qts-data-center/)dailyreporter.com

[Microsoft pauses some work at Mount Pleasant data center site](https://dailyreporter.com/2024/12/23/microsoft-pauses-some-work-at-mount-pleasant-data-center-site/)dailyreporter.com

[dakotanewsnetwork.com](https://www.dakotanewsnetwork.com/2026/02/27/lincoln-county-commissioners-discuss-moratorium-on-building-data-centers)dakotanewsnetwork.com

[dakotanewsnow.com](https://www.dakotanewsnow.com/2026/04/09/nobles-county-residents-pushing-back-proposed-data-center/)dakotanewsnow.com

[Amazon takes King George County Supervisors to court over denied data center project](https://www.datacenterdynamics.com/en/news/amazon-takes-king-george-county-supervisors-to-court-over-denied-data-center-project/)datacenterdynamics.com

[County planners recommend denial of Brandy Station data center campus in Culpeper County](https://www.datacenterdynamics.com/en/news/county-planners-recommend-denial-of-brandy-station-data-center-campus-in-culpeper-county/)datacenterdynamics.com

[County planning officials outside Richmond vote against Tract data center park](https://www.datacenterdynamics.com/en/news/county-planning-officials-outside-richmond-vote-against-tract-data-center-park/)datacenterdynamics.com

[DCD, Crusoe secures 4.5 GW gas](https://www.datacenterdynamics.com/en/news/crusoe-secures-45gw-of-natural-gas-for-ai-data-centers-report/)datacenterdynamics.com

[DCD, Fermi taps Hillcore for 2.6GW gas plant](https://www.datacenterdynamics.com/en/news/?oo-step=true&term=the-mission-critical-power-channel)datacenterdynamics.com

[Data center plan for Campbell County, Virginia, rejected](https://www.datacenterdynamics.com/en/news/data-center-plan-for-campbell-county-virginia-rejected/)datacenterdynamics.com

[Local activists file lawsuit to stop Amazon data center in Warrenton, Northern Virginia](https://www.datacenterdynamics.com/en/news/local-activists-file-lawsuit-to-stop-amazon-data-center-in-warrenton-northern-virginia/)datacenterdynamics.com

[Los Lunas locals question Facebook's data center expansion, worry about water use](https://www.datacenterdynamics.com/en/news/los-lunas-locals-question-facebooks-data-center-expansion-worry-about-water-use/)datacenterdynamics.com

[Meta pauses construction of Temple, Texas data center as part of AI rescope](https://www.datacenterdynamics.com/en/news/meta-pauses-construction-of-temple-texas-data-center-as-part-of-ai-rescope/)datacenterdynamics.com

[Meta seeks to use idle AEP Ohio substation slated to power delayed Intel fab](https://www.datacenterdynamics.com/en/news/meta-seeks-to-use-idle-aep-ohio-substation-slated-to-power-delayed-intel-fab-for-new-albany-data-center-report/)datacenterdynamics.com

[Meta's Kuna, Idaho, data center latest to be 'paused' in AI redesign rethink](https://www.datacenterdynamics.com/en/news/metas-kuna-idaho-data-center-latest-to-be-paused-in-ai-redesign-rethink/)datacenterdynamics.com

[Plans for 800MW Gigaland data center campus withdrawn in Fauquier County, Virginia](https://www.datacenterdynamics.com/en/news/plans-for-800mw-gigaland-data-center-campus-withdrawn-in-fauquier-county-virginia/)datacenterdynamics.com

[Proposal for 200-acre data center rejected in southern Texas](https://www.datacenterdynamics.com/en/news/proposal-for-200-acre-data-center-rejected-in-southern-texas/)datacenterdynamics.com

[Real estate firm Atlas Capital Group may develop 1m square foot data center in Connecticut](https://www.datacenterdynamics.com/en/news/real-estate-firm-atlas-capital-group-may-develop-1m-square-foot-data-center-in-connecticut/)datacenterdynamics.com

[Report: Apple's Iowa data center faces delay](https://www.datacenterdynamics.com/en/news/reported-apples-iowa-data-center-faces-delay/)datacenterdynamics.com

[Residents of Granbury, Texas sue the city after authorities rezone 2,100 acres for potential data center project](https://www.datacenterdynamics.com/en/news/residents-of-granbury-texas-sue-the-city-after-authorities-rezone-2100-acres-for-potential-data-center-project/)datacenterdynamics.com

[Residents rally against 250MW data center proposal in Wake County, North Carolina](https://www.datacenterdynamics.com/en/news/residents-rally-against-250mw-data-center-proposal-in-wake-county-north-carolina/)datacenterdynamics.com

[Temporary block on Arkansas law banning data centers with links to China](https://www.datacenterdynamics.com/en/news/temporary-block-on-arkansas-law-banning-data-centers-with-links-to-china/)datacenterdynamics.com

[Tract's 430-acre data center rejected by local officials in Hanover County, Virginia](https://www.datacenterdynamics.com/en/news/tracts-430-acre-data-center-rejected-by-local-officials-in-hanover-county-virginia/)datacenterdynamics.com

[Virginia's Leesburg Town Council denies Oaklawn data center proposal](https://www.datacenterdynamics.com/en/news/virginias-leesburg-town-council-denies-oaklawn-data-center-proposal/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/georgia-considering-bill-that-could-shield-ratepayers-from-data-center-related-increases/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/tract-announces-18gw-data-center-park-in-phoenix-arizona/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/brennan-investment-group-withdraws-plans-for-2bn-data-center-outside-chicago-illinois/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/karis-critical-plans-36mw-data-center-in-naperville-illinois/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-proposal-rejected-in-pekin-illinois/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/application-for-13bn-data-center-in-chesterton-indiana-withdrawn/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/sabey-targets-indianapolis-for-250mw-data-center-campus/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/google-withdraws-rezoning-proposal-for-468-acre-data-center-project-in-franklin-township-indianapolis/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/provident-realty-proposes-seven-building-campus-in-burns-harbor-indiana/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-in-meade-county-kentucky-reject-data-center-rezoning-plan/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-campus-proposed-in-westfield-massachusetts/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/meta-reportedly-the-company-behind-1bn-data-center-in-howell-county-michigan/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/amazon-buys-350-acre-parcel-in-becker-minnesota-for-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/oppidan-proposes-data-center-campus-in-apple-valley-minnesota/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/peculiar-officials-in-missouri-remove-data-centers-from-ordinance-blocking-15bn-diode-project/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/peculiar-data-center-faces-opposition-in-missouri/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/independence-missouri-faces-lawsuit-after-rejecting-petition-against-tax-breaks-for-nebius-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/microsoft-shares-details-on-ohio-data-center-in-perry-township/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/application-for-data-center-in-preble-county-ohio-withdrawn/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/300-acres-of-land-in-preble-county-ohio-could-host-data-center-campus/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/planned-project-atlas-data-center-campus-in-coweta-oklahoma-fails-to-secure-backing-from-planners/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/legal-issues-force-developer-to-withdraw-data-center-proposal-in-plymouth-township-pennsylvania/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/planning-agency-of-plymouth-township-pennsylvania-votes-not-to-recommend-data-center-proposal/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/developers-withdraw-request-for-data-center-in-blakely-pennsylvania/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/junkyard-in-pennsylvania-acquired-developer-files-to-develop-data-center-campus/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/northpoint-proposes-15-building-1280-acre-data-center-campus-in-pennsylvania/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/plan-to-convert-former-psychiatric-hospital-near-philadelphia-into-data-center-set-to-be-blocked/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/proposal-for-3bn-data-center-faces-opposition-in-spartanburg-county-south-carolina/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/tigerdc-pulls-planned-data-center-project-from-south-carolina-county-after-officials-deny-tax-deal/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/applied-digital-says-data-center-near-toronto-south-dakota-unlikely-to-go-forward/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-in-franklin-county-tennessee-deny-zoning-request-for-cryptomine-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/cloudburst-signs-natural-gas-deal-with-energy-transfer-to-power-texas-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/936-acre-data-center-could-come-to-lubbock-texas/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/aws-withdraws-plans-for-third-data-center-campus-in-louisa-county-virginia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/950-acre-data-center-campus-proposed-in-pittsylvania-county-virginia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/900mw-data-center-campus-plan-withdrawn-in-hanover-county-virginia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-development-in-menomonie-wisconsin-delayed/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/microsoft-cancels-plans-for-data-center-caledonia-wisconsin/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/milwaukee/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/american-tower-pauses-plans-for-edge-data-center-in-indianapolis-indiana/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/prologis-data-center-proposal-in-kosciusko-county-indiana-denied/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-campus-recommended-for-disapproval-by-fredericksburg-planning-commission/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/city-council-of-provo-utah-votes-against-data-center-rezoning-proposal/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/project-accelerate-data-center-could-come-to-matthews-north-carolina/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/opposition-leads-developer-to-withdraw-data-center-proposal-in-kalkaska-county-michigan/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/oracleopenai-drop-plans-to-expand-flagship-abilene-stargate-site-meta-in-talks-to-pick-up-crusoe-capacity-with-nvidias-help/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/county-officials-deny-data-center-zoning-request-in-georgia/)datacenterdynamics.com

[Data Center Knowledge, Amazon explores grid connection](https://www.datacenterknowledge.com/energy-power-supply/amazon-explores-grid-connection-for-8-000-acre-ai-campus)datacenterknowledge.com

[datacentermap.com](https://www.datacentermap.com/usa/south-carolina/spartanburg/tigerdc-sc1-campus/)datacentermap.com

[Data Center Watch: $64 billion of data center projects have been blocked or delayed](https://www.datacenterwatch.org/report)datacenterwatch.org

[datacenterwatch.substack.com](https://datacenterwatch.substack.com/p/briefing-10172025)datacenterwatch.substack.com

[DCMap.us, Policy tracker](https://dcmap.us/insights/policy/)dcmap.us

[deceleration.news](https://deceleration.news/san-marcos-data-centers-drought-vote/)deceleration.news

[Delaware Public Media: Harrington shoots down ordinance that would allow data centers in city limits](https://www.delawarepublic.org/science-health-tech/2026-08-18/harrington-shoots-down-ordinance-that-would-allow-data-centers-in-city-limits)delawarepublic.org

[delawarepublic.org](https://www.delawarepublic.org/science-health-tech/2026-03-26/dnrec-board-affirms-decisio-to-prohibit-starwood-digital-data-center-in-coastal-zone)delawarepublic.org

[Broomfield approves 18-month pause on data center development](https://www.denver7.com/news/local-news/in-your-community/north-metro/broomfield-approves-18-month-pause-on-data-center-development)denver7.com

[Georgia County Puts Off Key Data Center Vote After Public Backlash](https://www.desmog.com/2025/08/20/georgia-county-puts-off-key-data-center-vote-after-public-backlash/)desmog.com

[desmog.com](https://www.desmog.com/2026/03/31/archbald-pennsylvania-residents-vote-no-data-center-provident-realty-advisors/)desmog.com

[dglobe.com](https://www.dglobe.com/news/local/nobles-county-planning-commission-votes-against-data-centers-in-ag-district)dglobe.com

[dglobe.com](https://www.dglobe.com/news/local/geronimo-power-to-seek-alternative-sites-for-data-center)dglobe.com

[diodeventures.com](https://www.diodeventures.com/projects/gptp)diodeventures.com

[Microsoft rejects NDAs, tax abatements in Ohio data center expansion](https://www.dispatch.com/story/news/politics/2026/06/04/microsoft-vows-no-ndas-tax-abatements-ohio-data-centers/90401633007/)dispatch.com

[Sunbury, Pataskala residents seek fall vote to block big data centers](https://www.dispatch.com/story/news/politics/elections/2026/06/26/ohio-towns-local-bans-hyperscale-data-centers-statewide-delay/90693916007/)dispatch.com

[docs.legis.wisconsin.gov](https://docs.legis.wisconsin.gov/2025/proposals/sb729)docs.legis.wisconsin.gov

[docs.legis.wisconsin.gov](https://docs.legis.wisconsin.gov/2025/proposals/sb1061)docs.legis.wisconsin.gov

[douglascountysentinel.com](https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html)douglascountysentinel.com

[Louisiana Regulators Asked to Investigate Shady Meta Financing Deal](https://earthjustice.org/press/2026/louisiana-regulators-asked-to-investigate-shady-meta-financing-deal-that-could-leave-households-paying-for-tech-giants-electricity)earthjustice.org

[eastcobbnews.com](https://eastcobbnews.com/marietta-delays-data-center-request-issues-moratorium/)eastcobbnews.com

[eastidahonews.com](https://www.eastidahonews.com/2026/07/pocatello-city-council-to-hear-ai-data-center-appeal/)eastidahonews.com

[Arizona city rejects data center after AI lobbying push](https://www.eenews.net/articles/arizona-city-rejects-data-center-after-ai-lobbying-push/)eenews.net

[E&E News, Lawsuit: $15B Wisconsin DC lacks required review](https://www.eenews.net/articles/lawsuit-15b-wisconsin-data-center-lacks-required-environmental-review/)eenews.net

[Red Oak rezones land for data center campus despite protests](https://www.elliscountypress.com/news/red-oak-rezones-land-data-center-campus-despite-protests)elliscountypress.com

[elpc.org](https://elpc.org/news/power-act-introduced-to-set-standards-for-illinois-data-centers/)elpc.org

[evolveincorporated.com](https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas)evolveincorporated.com

[ExecGraph, Texas DC Power Procurement 2026](https://execgraphenergy.com/blog/data-center-power-procurement-texas-2026)execgraphenergy.com

[Douglas County commissioners unanimously rejected plans for a 320,000 sq ft data center](https://www.facebook.com/douglascountysentinel/posts/douglas-county-commissioners-unanimously-rejected-plans-tuesday-for-a-320000-squ/1547348607391170/)facebook.com

[Community rallies against county's data center expansion](https://www.fairfaxtimes.com/articles/fairfax_county/community-rallies-against-county-s-data-center-expansion/article_97db5e00-2419-11ef-b7b5-7b7a8975d46f.html)fairfaxtimes.com

[fauquier.com](https://www.fauquier.com/news/developer-withdraws-application-to-rezone-for-catlett-data-centers/article_d0b1a26e-436f-11ef-a9b2-d71f39f9e76e.html)fauquier.com

[fauquier.com](https://www.fauquier.com/localnews/gigaland-resubmits-scaled-down-data-center-project/article_86348ee7-cefa-4d0f-b28c-33ced39ae9ff.html)fauquier.com

[Fauquier Planning Commission opposes Gigaland data centers](https://www.fauquiernow.com/news/business/fauquier-county-planning-commission-recommends-denial-of-gigaland-data-center-campus/article_3d41a18b-026e-4405-a947-c88e5d9b588c.html)fauquiernow.com

[fauquiernow.com](https://www.fauquiernow.com/news/developer-withdraws-plans-for-catlett-station-data-center-project/article_29d5165e-4385-11ef-ad9e-db32dab80435.html)fauquiernow.com

[fauquiernow.com](https://www.fauquiernow.com/news/gigaland-developers-withdraw-remington-data-center-application-new-filing-anticipated/article_ea7c2fd1-97a0-416f-9a1b-4e68e72cc496.html)fauquiernow.com

[fauquiernow.com](https://www.fauquiernow.com/news/fauquier-planning-commission-recommends-denial-of-gigaland-data-center-project-in-remington/article_0aa8068e-1c6e-437e-917b-6f32d2a6f836.html)fauquiernow.com

[fayetteville-ga.gov](https://www.fayetteville-ga.gov/746/Data-Center-Discussion)fayetteville-ga.gov

[Kevin O'Leary wants to build a 40,000-acre data center in Utah - but locals fight back](https://finance.yahoo.com/sectors/technology/articles/kevin-oleary-wants-build-40-192500445.html)finance.yahoo.com

[Brookhaven Approves 18-Month Data Center Moratorium After Marathon Hearing](https://www.fireislandnews.com/suffolk-county/brookhaven-approves-18-month-data-center-moratorium-after-marathon-hearing/)fireislandnews.com

[floridaphoenix.com](https://floridaphoenix.com/2026/01/01/thirsty-ai-data-center-runs-into-florida-community-opposition-2/)floridaphoenix.com

[Food and Water Watch, Orangetown EIS decision](https://www.foodandwaterwatch.org/2026/07/09/orangetown-planning-board-requires-environmental-impact-study-for-controversial-data-center-expansion-delaying-project-indefinitely/)foodandwaterwatch.org

[foodandwaterwatch.org](https://www.foodandwaterwatch.org/2025/11/18/hazle-township-pa-unanimously-rejects-data-center-campus/)foodandwaterwatch.org

[foodandwaterwatch.org](https://www.foodandwaterwatch.org/2026/05/22/east-vincent-pa-supervisors-unanimously-reject-data-center-proposal/)foodandwaterwatch.org

[A giant OpenAI-Oracle data center was voted down by a Michigan township](https://fortune.com/2026/05/06/ai-data-center-michigan-saline-politics-farmland/)fortune.com

[Fortune, DC hate is snowballing](https://fortune.com/2026/06/16/data-center-opposition-construction-delays-blocks-report/)fortune.com

[Fortune, Harvard study, zoning pushback](https://fortune.com/2026/06/21/data-center-backlash-harvard-study-zoning-local-pushback/)fortune.com

[FOX19: Pierce Township trustees rule out data center, extend zoning moratorium](https://www.fox19.com/2026/09/10/pierce-township-trustees-rule-out-data-center-extend-zoning-moratorium/)fox19.com

[St. Charles County approves halt on new data centers](https://fox2now.com/news/missouri/st-charles-county-approves-halt-on-new-data-centers/)fox2now.com

[fox4kc.com](https://fox4kc.com/news/independence-city-council-votes-to-approve-tax-breaks-for-nebius-data-center/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/community-comes-together-to-voice-concerns-about-independence-data-center/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/citizens-file-lawsuit-against-city-of-independence-over-data-center-referendum/)fox4kc.com

[fox56.com](https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds)fox56.com

[fox59.com](https://fox59.com/news/washington-based-sabey-aims-to-build-900000-square-foot-data-center-campus-in-decatur-township/)fox59.com

[fox59.com](https://fox59.com/indiana-news/developer-withdraws-proposed-pike-township-data-center/)fox59.com

[Douglas County imposes 90-day halt on data centers](https://www.fox5atlanta.com/news/douglas-county-data-centers-moratorium)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/fayetteville-propose-data-center-withdrawn)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/backlash-over-proposed-data-center-near-adairsville)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/douglas-county-leaders-just-killed-massive-data-center-project)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/douglas-county-data-center-sparks-resident-pushback)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/marietta-data-center-rezoning-freeze-approved-after-massive-public-outcry)fox5atlanta.com

[fox5dc.com](https://www.fox5dc.com/news/prince-william-county-leaders-shut-down-plan-build-substation-power-data-centers)fox5dc.com

[Boulder City council votes to appeal federal approval of data center on BLM land](https://www.fox5vegas.com/2026/07/15/boulder-city-council-votes-appeal-federal-approval-data-center-blm-land/)fox5vegas.com

[Environmental groups appeal BLM approval of Boulder City data center on public land](https://www.fox5vegas.com/2026/07/27/environmental-groups-appeal-blm-approval-boulder-city-data-center-public-land/)fox5vegas.com

[Federal board halts data center project near Boulder City (FOX5 Las Vegas, Sept. 1, 2026)](https://www.fox5vegas.com/2026/09/01/federal-board-halts-data-center-project-near-boulder-city/)fox5vegas.com

[FOX 9: Developer scraps plans for proposed data center at Star Tribune site](https://www.fox9.com/news/developer-scraps-plans-proposed-data-center-star-tribune-site)fox9.com

[Pine Island Google data center construction halted by court](https://www.fox9.com/news/pine-island-google-data-center-construction-halted-court)fox9.com

[fox9.com](https://www.fox9.com/news/minnesota-data-centers-bill-ban-nondisclosure-agreements-march-12)fox9.com

[foxbusiness.com](https://www.foxbusiness.com/economy/mystery-companys-1-6b-data-center-proposed-wisconsin-farmland-draws-residents-ire)foxbusiness.com

[Greenwood County Council advances one-year moratorium on data centers in 4-3 vote](https://www.foxcarolina.com/2026/07/08/greenwood-county-council-advances-one-year-moratorium-data-centers-4-3-vote/)foxcarolina.com

[foxcarolina.com](https://www.foxcarolina.com/2026/02/12/threat-our-community-canton-halts-data-center-construction-with-one-year-moratorium/)foxcarolina.com

[foxcarolina.com](https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/)foxcarolina.com

[foxcarolina.com](https://www.foxcarolina.com/2026/02/27/spartanburg-county-vote-no-project-spero-tax-incentive-after-public-backlash/)foxcarolina.com

[foxcarolina.com](https://www.foxcarolina.com/2026/03/07/ai-is-anti-human-protestors-express-concerns-regarding-data-centers-coming-upstate/)foxcarolina.com

[foxcarolina.com](https://www.foxcarolina.com/2026/02/17/data-center-one-step-closer-reality-after-spartanburg-county-council-approval/)foxcarolina.com

[fractracker.org](https://www.fractracker.org/2026/01/howell-township-data-center-win/)fractracker.org

['Zombie' data center project still has life in Caroline County](https://www.fredericksburgfreepress.com/2024/05/12/zombie-data-center-project-still-has-life-in-caroline-county/)fredericksburgfreepress.com

[Caroline supervisors reject proposed data center project, again](https://www.fredericksburgfreepress.com/2024/06/20/caroline-supervisors-reject-proposed-data-center-project-again/)fredericksburgfreepress.com

[fredericksburgfreepress.com](https://www.fredericksburgfreepress.com/2025/12/11/second-time-not-the-charm-for-proposed-gateway-boulevard-data-center/)fredericksburgfreepress.com

[Frontier DCSI](https://frontier.datacenterstress.com/)frontier.datacenterstress.com

[Four City Council Members Say Hard No to 1500 Gateway](https://www.fxbgadvance.com/p/four-city-council-members-say-hard)fxbgadvance.com

[King George Board of Zoning Appeals Denies](https://www.fxbgadvance.com/p/king-george-board-of-zoning-appeals)fxbgadvance.com

[Colorado Springs City Council punts decision on Project Taurus data center to April 2027 after raucous meeting (The Gazette, Sept. 17, 2026)](https://gazette.com/2026/09/17/colorado-springs-city-council-punts-decision-on-project-taurus-data-center-to-april-2027-after-raucous-meeting-2/)gazette.com

[georgiarecorder.com](https://georgiarecorder.com/2026/02/26/data-center-bill-stalls-after-last-minute-change-opposed-by-industry-finds-support/)georgiarecorder.com

[goodjobsfirst.org](https://goodjobsfirst.org/data-center-moratorium-bills-are-spreading-in-2026/)goodjobsfirst.org

[goodjobsfirst.org](https://goodjobsfirst.org/independence-missouri-data-center-nebius/)goodjobsfirst.org

[Governor Abbott, East Texas DC withdraws](https://gov.texas.gov/news/post/east-texas-data-center-withdraws-after-falling-short-of-governor-abbotts-standards)gov.texas.gov

[Executive Order No. 62: Establishing a Temporary Moratorium on Data Centers in New York](https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops)governor.ny.gov

[Campbell County, Va., Rejects Rezoning to Draw Data Centers](https://www.govtech.com/artificial-intelligence/campbell-county-va-rejects-rezoning-to-draw-data-centers)govtech.com

[Farmington, Minn., Residents Sue to Stop Data Center Park](https://www.govtech.com/infrastructure/farmington-minn-residents-sue-to-stop-data-center-park)govtech.com

[Grant County, Wash., Utility to Cap Data Center Electricity](https://www.govtech.com/artificial-intelligence/grant-county-wash-utility-to-cap-data-center-electricity)govtech.com

[Washington Farmers Say Land Being Stolen for Data Centers](https://www.govtech.com/artificial-intelligence/washington-farmers-say-land-being-stolen-for-data-centers)govtech.com

[With One Day's Notice, Hillsboro, Ore., Pauses Data Centers](https://www.govtech.com/policy/with-one-days-notice-hillsboro-ore-pauses-data-centers)govtech.com

[govtech.com](https://www.govtech.com/artificial-intelligence/ohio-communities-grapple-with-data-center-approval-decisions)govtech.com

[govtech.com](https://www.govtech.com/policy/developer-pulls-out-of-hyperscale-data-center-in-nevada)govtech.com

[harrisondaily.com](https://harrisondaily.com/stories/more-about-moratorium-on-crypto,204197)harrisondaily.com

[heatmap.news](https://heatmap.news/energy/meta-solar-alabama)heatmap.news

[henricocitizen.com](https://www.henricocitizen.com/proposed-data-center-incites-opposition-from-hundreds-of-henrico-hanover-residents/)henricocitizen.com

[heraldextra.com](https://www.heraldextra.com/news/2026/mar/11/provo-city-council-denies-rezoning-request-for-data-center-at-east-bay/)heraldextra.com

[heraldextra.com](https://www.heraldextra.com/news/2026/feb/18/provo-planning-commission-recommends-to-city-council-rezoning-approval-for-data-center/)heraldextra.com

[hillsboroherald.com](https://hillsboroherald.com/signatures-sought-on-hillsboro-data-center-moratorium-petition-brought-by-kipperlyn-sinclair/)hillsboroherald.com

[Texas Gov. Abbott Directs Data Center Audit; ERCOT Seeks to Suspend Deadlines](https://www.hklaw.com/en/insights/publications/2026/08/texas-gov-abbott-directs-data-center-audit)hklaw.com

[hometownsource.com](https://www.hometownsource.com/sun_thisweek/community/apple_valley/land-use-change-for-data-center-denied-in-apple-valley/article_d8ed4b90-5341-4544-87a1-08417f5b9d57.html)hometownsource.com

[house.mo.gov](https://house.mo.gov/PressRelease.aspx?prid=387)house.mo.gov

[Powhatan County Greenlights $4B Data Center for Newport Equities and JMS Investments](https://hs.getobedio.com/blog/powhatan-county-greenlights-4b-data-center-for-newport-equities-and-jms-investments)hs.getobedio.com

[ibj.com](https://www.ibj.com/articles/seattle-firm-plans-4b-data-center-project-in-indianapolis)ibj.com

[idahostatejournal.com](https://www.idahostatejournal.com/news/local/pocatello-hearing-examiner-denies-hoku-site-data-center-permit-but-lex-developments-vows-return/article_c80a0e12-3fe8-4ed0-b755-89321377a95d.html)idahostatejournal.com

[idahostatejournal.com](https://www.idahostatejournal.com/news/local/shoshone-bannock-tribes-reaffirm-opposition-to-proposed-ai-data-center-in-pocatello/article_82fd4eeb-2f92-597e-aefa-7a91f47e5ff8.html)idahostatejournal.com

[idahostatejournal.com](https://www.idahostatejournal.com/news/local/hoku-data-center-appeal-headed-to-city-council-july-16/article_4f734cbd-27ed-499f-8447-08c09b850857.html)idahostatejournal.com

[New Idaho law would end Kuna's plan for Meta industrial park](https://www.idahostatesman.com/news/local/community/west-ada/article274420745.html)idahostatesman.com

[ideastream.org](https://www.ideastream.org/government-politics/2026-04-28/no-more-data-centers-in-cleveland-council-member-proposes-one-year-moratorium)ideastream.org

[City of Inver Grove Heights: Proposed Data Center, September 14, 2026 Meeting Recap](https://www.ighmn.gov/CivicAlerts.aspx?AID=2896)ighmn.gov

[ilga.gov](https://www.ilga.gov/Legislation/BillStatus?DocNum=4016&GAID=18&DocTypeID=SB&SessionID=114&GA=104)ilga.gov

[ilhousedems.com](https://ilhousedems.com/2026/04/09/rep-ann-williams-holds-hearings-on-illinois-data-centers/)ilhousedems.com

[indianaeconomicdigest.net](https://indianaeconomicdigest.net/MobileContent/Most-Recent/Sunday/Article/Burns-Harbor-Plan-Commission-postpones-vote-on-controversial-data-center-rezone-amid-public-outcry/31/134/117105)indianaeconomicdigest.net

[Madison County commissioners extend data center moratorium](https://indianapublicradio.org/news/2026/08/madison-county-full-year-data-center-moratorium/)indianapublicradio.org

[California's largest data center plan rouses Imperial County](https://inewsource.org/2026/04/05/data-center-developer-imperial-county/)inewsource.org

[Hammond Announces Expiration Of $7B Data Center Development Agreement](https://www.inkfreenews.com/2026/07/03/hammond-announces-expiration-of-7b-data-center-development-agreement/)inkfreenews.com

[inkfreenews.com](https://www.inkfreenews.com/2025/05/05/data-center-wave-stalls-as-indiana-communities-push-back/)inkfreenews.com

[inkfreenews.com](https://www.inkfreenews.com/2025/11/21/4b-data-center-planned-for-indianapolis/)inkfreenews.com

[inkfreenews.com](https://www.inkfreenews.com/2025/04/02/county-apc-unanimously-denies-rezoning-request-for-data-center-near-leesburg/)inkfreenews.com

[A controversial 1.6M-square-foot data center in Chesco could shrink](https://www.inquirer.com/news/pennsylvania/east-whiteland-chester-county-data-center-20260415.html)inquirer.com

[East Whiteland data center project survives community appeals](https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-judge-denial-challenges-20260611.html)inquirer.com

[North Coventry officials reject data center before formal submission](https://www.inquirer.com/news/pennsylvania/north-coventry-data-center-20260224.html)inquirer.com

[Officials deny controversial 1.9 million square foot data center at Pennhurst](https://www.inquirer.com/news/pennsylvania/pennhurst-data-center-rejected-east-vincent-20260522.html)inquirer.com

[inquirer.com](https://www.inquirer.com/news/pennsylvania/ai-data-center-construction-conshohocken-proposal-withdrawn-20251118.html)inquirer.com

[inquirer.com](https://www.inquirer.com/consumer/technology/ai-center-plan-plymouth-conshohocken-20251003.html)inquirer.com

[inquirer.com](https://www.inquirer.com/news/pennsylvania/pennhurst-data-center-east-vincent-20260410.html)inquirer.com

[insideclimatenews.org](https://insideclimatenews.org/news/19022026/illinois-data-center-impacts-bill/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/19032026/north-carolina-county-data-center-rezoning-lawsuit/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/03032026/pennsylvania-data-center-resistance/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/09072026/montana-county-seeks-data-center-moratorium/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/01032026/iowa-county-data-center-ordinance/)insideclimatenews.org

[insideindianabusiness.com](https://www.insideindianabusiness.com/articles/chesterton-data-center-project-withdrawn)insideindianabusiness.com

[insidenova.com](https://www.insidenova.com/news/business/prince-william-planning-commission-shuts-down-proposed-novec-substation-in-bristow/article_59a31369-9d53-494b-bee7-c8097c94cf73.html)insidenova.com

[insidenova.com](https://www.insidenova.com/news/prince_william/update-second-ruling-voids-digital-gateway-data-center-project-in-prince-william/article_846b8581-c99e-4f00-bb67-512c78952773.html)insidenova.com

[Serverfarm Faces Community Scrutiny as Its $6.6 Billion Clarksville Data Center Advances](https://insight.tmcnet.com/insight/serverfarm-faces-community-scrutiny-as-its-6-6-billion-clarksville-data-center-advances-mrwr3um9)insight.tmcnet.com

[Palm Beach Rejects Data Center Near Mar-a-Lago After Backlash](https://www.insurancejournal.com/news/southeast/2026/07/16/877882.htm)insurancejournal.com

[interlochenpublicradio.org](https://www.interlochenpublicradio.org/2025-11-20/after-chilly-response-from-public-rocklocker-calls-off-plans-for-kalkaska-data-center)interlochenpublicradio.org

[Future of STAMP data center now uncertain](https://investigativepost.org/2026/07/15/future-of-stamp-data-center-now-uncertain/)investigativepost.org

[iowacapitaldispatch.com](https://iowacapitaldispatch.com/2026/05/04/the-2026-legislative-session-is-over-heres-what-passed-failed-and-what-is-already-iowa-law/)iowacapitaldispatch.com

[iowacounties.org](https://www.iowacounties.org/)iowacounties.org

[ipetitions.com](https://www.ipetitions.com/petition/no-data-centers)ipetitions.com

[Data center moratorium advances for Indianapolis](https://www.ipm.org/news/2026-07-14/data-center-moratorium-advances-for-indianapolis)ipm.org

[ipm.org](https://www.ipm.org/news/2026-05-12/washington-city-council-cancels-data-center-development-will-explore-moratorium)ipm.org

[Jefferson County Issues Temporary Moratorium on Data Centers](https://www.jeffco.us/m/newsflash/Home/Detail/2596)jeffco.us

[De Soto advances $3.1 billion data center project near Panasonic plant](https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/)johnsoncountypost.com

[johnsoncountypost.com](https://johnsoncountypost.com/2026/04/16/kansas-new-laws-2026-legislative-session-284237/)johnsoncountypost.com

[johnsoncountypost.com](https://johnsoncountypost.com/2026/06/11/edgerton-denies-data-center-288433/)johnsoncountypost.com

[johnsoncountypost.com](https://johnsoncountypost.com/2026/06/16/edgerton-denies-data-center-moratorium-288799/)johnsoncountypost.com

[journalnow.com](https://journalnow.com/news/local/government-politics/article_e3217294-5ef8-4039-881e-8e2fb1818e16.html)journalnow.com

[journalnow.com](https://journalnow.com/news/local/business/development/article_ecd6167b-aac8-4828-81e1-3d50a447416d.html)journalnow.com

[JS Online, Environmental groups sue DNR over Port Washington DC](https://www.jsonline.com/story/communities/north/2026/07/10/lawsuit-alleges-dnr-was-lax-in-environmental-reviews-for-data-center/90876821007/)jsonline.com

['I don't want you' say Northampton County residents fuming data center farm takeovers](https://justthenews.com/nation/states/center-square/i-dont-want-you-say-residents-fuming-data-center-farm-takeovers)justthenews.com

[kait8.com](https://www.kait8.com/2026/05/25/missouri-lawmakers-fail-pass-ai-regulations-during-2026-legislative-session/)kait8.com

[kansascitydefender.com](https://kansascitydefender.com/technology-ai/independence-residents-fight-a-6-6-billion-data-center-as-mondays-tax-break-vote-looms/)kansascitydefender.com

[New Amazon data centers in Umatilla County cause money spat](https://katu.com/news/local/new-amazon-data-centers-in-umatilla-county-cause-money-spat)katu.com

[katu.com](https://katu.com/news/local/hillsboro-petition-seeks-pause-data-centers-amid-energy-and-farmland-concerns-washington-county-oregon-city-councilor-kipperlyn-sinclair-jacob-roloff-tammy-carpenter-illsboro-herald-editor-dirk-knudsen-tualatin-riverkeepers-pge)katu.com

[katv.com](https://katv.com/news/local/arkansas-towns-vs-chinese-supercomputers-how-recent-legislation-removes-local-governments-ability-to-regulate-cryptocurrency-mines-antbox-group-green-digital-llc-nancy-cartwright-harrison-vilonia-metahash-global-act-851-hb-1799-sarah-huckabee-sanders)katv.com

[kcbd.com](https://www.kcbd.com/2026/01/16/lubbock-data-center-proposal-heads-city-council-after-planning-commission-rejection/)kcbd.com

[kcentv.com](https://www.kcentv.com/article/news/local/hill-county-sued-data-center-moratorium/500-e126be5f-7043-4906-8319-b709a5ac04a1)kcentv.com

[kctv5.com](https://www.kctv5.com/2026/03/25/court-kills-residents-bid-vote-nebius-ai-data-center-tax-deal/)kctv5.com

[Kansas City officials denied a plan for downtown data center](https://www.kcur.org/housing-development-section/2026-08-10/kansas-city-officials-denied-a-plan-for-downtown-data-center-some-residents-vow-to-keep-fighting)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-02-26/missouri-data-center-rules-water-electricity)kcur.org

[kcur.org](https://www.kcur.org/housing-development-section/2026-02-13/independence-data-center-tax-breaks-opposition)kcur.org

[kcur.org](https://www.kcur.org/housing-development-section/2026-03-02/independence-to-vote-on-6-billion-tax-break-for-massive-ai-data-center-heres-what-to-know)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-03-03/independence-gives-billions-in-tax-breaks-for-a-massive-data-center-despite-outcry-from-residents)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-03-12/independence-residents-sue-tax-breaks-data-center)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-03-25/judge-says-independence-residents-cant-force-vote-on-data-center-tax-breaks)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-04-09/after-these-independence-councilmembers-supported-an-ai-data-center-voters-ousted-them)kcur.org

[kelo.com](https://kelo.com/2026/02/26/889056/)kelo.com

[keloland.com](https://www.keloland.com/news/local-news/where-to-sign-petitions-to-bring-data-center-to-a-vote/)keloland.com

[Hood County approves Comanche Circle data center without conditions after contentious meeting](https://www.keranews.org/government/2026-06-09/hood-county-approves-comanche-circle-data-center-without-conditions-after-contentious-meeting)keranews.org

[Hood County judge dismisses lawsuit seeking automatic approval of proposed data centers](https://www.keranews.org/energy-environment/2026-07-20/hood-county-judge-dismisses-lawsuit-seeking-automatic-approval-of-proposed-data-centers)keranews.org

[Texas data center project pulled after facing community backlash](https://www.keranews.org/news/2026-07-23/texas-data-center-project-pulled-after-facing-community-backlash)keranews.org

[keranews.org](https://www.keranews.org/energy-environment/2026-02-25/data-center-moratorium-texas-hood-county-ken-paxton)keranews.org

[keranews.org](https://www.keranews.org/energy-environment/2026-01-13/hood-county-data-centers-comanche-circle)keranews.org

[keranews.org](https://www.keranews.org/energy-environment/2026-02-10/hood-county-data-center-moratorium-fails)keranews.org

[keyc.com](https://www.keyc.com/2026/04/08/minnesota-lawmakers-push-ban-ndas-with-data-centers-bipartisan-effort/)keyc.com

[Federal Way passes one-year data center moratorium](https://www.king5.com/article/news/local/federal-way-passes-one-year-data-center-moratorium/281-48c5192e-b53a-4cac-86b0-4c09e703322c)king5.com

[KIOW: Rezoning Change in Hancock County Denied](https://kiow.com/2026/09/10/rezoning-change-in-hancock-county-denied/)kiow.com

[Rejected by Tucson and abandoned by Amazon, Project Blue data center moves forward](https://www.kjzz.org/the-show/2025-12-09/rejected-by-tucson-and-abandoned-by-amazon-project-blue-data-center-moves-forward)kjzz.org

[Facing a Federal Lawsuit, Hill County Repeals Blanket Pause on Data Center Construction, Adopting New Approval Procedures Instead](https://www.klgates.com/thought-leadership/Facing-a-Federal-Lawsuit-Hill-County-Repeals-Blanket-Pause-on-Data-Center-Construction-Adopting-New-Approval-Procedures-Instead-6-10-2026)klgates.com

[Judge rules Project Jupiter lawsuit can move forward](https://www.kob.com/news/top-news/judge-rules-project-jupiter-lawsuit-can-move-forward/)kob.com

['Secrecy, extraction and exploitation': Petition calls for eastern Oregon data center moratorium](https://www.koin.com/news/oregon/secrecy-extraction-and-exploitation-petition-calls-for-eastern-oregon-data-center-moratorium/)koin.com

[After months of public pressure, Imperial County passes temporary moratorium on data centers](https://www.kpbs.org/news/politics/2026/06/17/after-months-of-public-pressure-imperial-county-passes-temporary-moratorium-on-data-centers)kpbs.org

[kpvi.com](https://www.kpvi.com/news/ai-data-center-appeal-denied-by-pocatello/article_64a52255-83b5-40e3-b3fe-d5f6119e2e0a.html)kpvi.com

[Developer, Councilmember Say Proposed Oakland Data Center Isn't What You Might Think](https://www.kqed.org/news/12095308/developer-councilmember-say-proposed-oakland-data-center-isnt-what-you-might-think)kqed.org

[Colorado Springs Planning Commission denies appeals in 'Project Taurus' data center](https://krdo.com/news/2026/07/23/colorado-springs-planning-commission-denies-appeals-in-project-taurus-data-center/)krdo.com

[Data center developer says it is 'evaluating' partnership after tense Colorado Springs City Council meeting (KRDO, Sept. 18, 2026)](https://krdo.com/news/2026/09/18/project-taurus-decision-postponed/)krdo.com

[krmg.com](https://krmg.com/2026/03/31/beale-infrastructure-pulls-application-for-project-atlas-in-coweta/)krmg.com

[KCMO City Plan Commission votes to deny application](https://www.kshb.com/news/local-news/missouri/kansas-city/kcmo-city-plan-commission-votes-to-deny-application-for-proposed-downtown-data-center)kshb.com

[kshb.com](https://www.kshb.com/news/local-news/peculiar-reverses-zoning-for-data-center-after-cries-from-neighbors)kshb.com

[kshb.com](https://www.kshb.com/news/local-news/missouri/jackson-county/independence-approves-hyperscale-ai-data-center-issues-150-billion-in-bonds)kshb.com

[kshb.com](https://www.kshb.com/news/local-news/missouri/jackson-county/court-rules-in-favor-of-independence-nebius-data-center-project-wont-go-to-vote)kshb.com

[kshb.com](https://www.kshb.com/news/local-news/gardner-neighbors-overcome-data-center-proposal-developer-wanted-tax-breaks-for-project)kshb.com

[West Jordan pulls plug on Facebook data center deal](https://www.ksl.com/article/news/utah/west-jordan-pulls-plug-on-facebook-data-center-deal/41188475)ksl.com

[ksl.com](https://www.ksl.com/article/51461110/provo-city-council-denies-zoning-change-for-proposed-data-center)ksl.com

[kslegislature.gov](https://www.kslegislature.gov/li/b2025_26/measures/sb400/)kslegislature.gov

[kslegislature.gov](https://www.kslegislature.gov/li/b2025_26/measures/sb526/)kslegislature.gov

[KSTP: Inver Grove Heights saves taxpayers millions by avoiding lawsuit; data center moves forward](https://kstp.com/tracking-your-tax-dollars/inver-grove-heights-saves-taxpayers-millions-by-avoiding-lawsuit-data-center-moves-forward/)kstp.com

[Rosemount city leaders hear update on possible Meta data site](https://kstp.com/kstp-news/local-news/rosemount-councilors-to-consider-plans-for-proposed-data-center-site-at-tuesday-meeting/)kstp.com

[kten.com](https://www.kten.com/news/oklahoma-headlines/proposed-data-center-could-be-coming-to-ardmore/article_eca6d954-4a8e-48fa-a05c-0becf3dc1a27.html)kten.com

[Taylor data center lawsuit centers on decades-old parkland deed restriction](https://www.kut.org/energy-environment/2025-09-30/taylor-data-center-lawsuit-parkland-blueprint)kut.org

[kut.org](https://www.kut.org/energy-environment/2026-02-26/hays-county-tx-data-centers-water-resources)kut.org

[kut.org](https://www.kut.org/energy-environment/2026-02-18/san-marcos-city-council-blocks-proposed-data-center)kut.org

[kut.org](https://www.kut.org/energy-environment/2026-04-20/hutto-tx-zydeco-data-center-rezoning-request)kut.org

[kutv.com](https://kutv.com/news/local/proposed-provo-data-center-raises-questions-about-power-use)kutv.com

[Coachella considers moratorium on data centers as community pushes back](https://kvcr.org/news/local/2026-05-28/coachella-considers-moratorium-on-data-centers-as-community-pushes-back-against-proposed-tech-campus)kvcr.org

[kvrr.com](https://www.kvrr.com/2026/04/09/bipartisan-bill-banning-local-officials-from-signing-ndas-moving-through-legislature/)kvrr.com

[kvue.com](https://www.kvue.com/article/news/local/hays-county/hays-county-judge-industrial-water-aquifer-record-lows/269-6f7f165a-0133-4c65-abcf-2084ecf3cdec)kvue.com

[kvue.com](https://www.kvue.com/article/news/local/hays-county/san-marcos-data-center-debate/269-26ebd1b0-1dfa-443b-b5ec-05016bcc0b7c)kvue.com

[kvue.com](https://www.kvue.com/article/news/local/williamson-county/hutto-data-center-resident-concerns/269-f1fcb072-1224-4b97-8c77-c02108eae987)kvue.com

[kwtx.com](https://www.kwtx.com/2026/05/28/illegal-under-texas-law-data-center-developer-files-lawsuit-against-hill-county-moratorium/)kwtx.com

[kwtx.com](https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/)kwtx.com

[kwtx.com](https://www.kwtx.com/2026/07/15/hill-county-dropped-its-data-center-moratorium-after-100-million-lawsuit-now-developer-has-dismissed-case/)kwtx.com

[kxan.com](https://www.kxan.com/news/local/hutto/proposed-hutto-data-center-faces-opposition-from-nearby-residents/)kxan.com

[kxan.com](https://www.kxan.com/news/local/hutto/hutto-data-center-rezoning-request-withdrawn-by-developer/)kxan.com

[kxii.com](https://www.kxii.com/2026/03/12/applicant-pulls-proposed-ardmore-data-center-rezoning-request/)kxii.com

[kxxv.com](https://www.kxxv.com/news/local-news/in-your-neighborhood/100m-lawsuit-filed-against-hill-county-officials-over-data-center-moratorium)kxxv.com

[ky3.com](https://www.ky3.com/2026/02/27/missouri-future-caucus-prioritizes-legislation-regulate-ai-data-centers/)ky3.com

[ky3.com](https://www.ky3.com/2023/11/29/harrison-ark-city-council-votes-remove-moratorium-crypto-mining-center-during-special-meeting/)ky3.com

[Lake County residents file lawsuit to block 472-acre data center campus](https://www.lakemchenryscanner.com/2026/08/08/project-of-unprecedented-scale-lake-county-residents-file-lawsuit-to-block-472-acre-data-center-campus-in-grayslake/)lakemchenryscanner.com

[Lake McHenry Scanner, Grayslake DC lawsuit](https://www.lakemchenryscanner.com/2026/08/09/lake-county-residents-file-lawsuit-to-block-472-acre-data-center-campus-in-grayslake/)lakemchenryscanner.com

[lanereport.com](https://www.lanereport.com/180437/2025/04/6b-data-center-project-proposed-for-oldham-county/)lanereport.com

[In a first for the country, voters in Monterey Park ban data centers](https://www.latimes.com/environment/story/2026-06-03/in-first-for-country-voters-in-monterey-park-ban-data-centers)latimes.com

[lebtown.com](https://lebtown.com/2026/05/13/south-annville-twp-data-center-project-scrapped-after-grass-roots-opposition/)lebtown.com

[Leesburg Town Council Denies Oaklawn Rezoning](https://www.leesburgva.gov/Home/Components/News/News/11614/5957)leesburgva.gov

[legis.ga.gov](https://www.legis.ga.gov/legislation/72365)legis.ga.gov

[legis.ga.gov](https://www.legis.ga.gov/legislation/69016)legis.ga.gov

[legiscan.com](https://legiscan.com/KS/bill/SB526/2025)legiscan.com

[legiscan.com](https://legiscan.com/KS/bill/SB526/2025?guid=4gs4zxc5fRgM64pXcptHwK)legiscan.com

[legiscan.com](https://legiscan.com/OK/bill/HB4424/2026)legiscan.com

[legislature.maine.gov](https://legislature.maine.gov/backend/app/services/getDocument.aspx?documentId=122054)legislature.maine.gov

[limitless-news.com](https://www.limitless-news.com/local/apple-valley-technology-park-update)limitless-news.com

[localnews8.com](https://localnews8.com/news/2026/07/16/pocatello-city-council-upholds-hearing-examiners-decision-says-no-to-proposed-ai-data-center/)localnews8.com

[Proposed AI data center in Yaphank meets opposition from residents and town leaders](https://longisland.news12.com/2026/06/26/proposed-ai-data-center-in-yaphank-meets-opposition-from-residents-and-town-leaders/4dG9mouCvXwvgvC6Mjsvkr)longisland.news12.com

[The debate about data centers as state leaders place moratorium](https://www.longislandpress.com/2026/07/15/moratorium-data-centers-state/)longislandpress.com

[lpm.org](https://www.lpm.org/news/2025-10-31/louisville-officials-grapple-with-how-to-regulate-large-data-centers)lpm.org

[lpm.org](https://www.lpm.org/news/2026-02-09/survey-vast-majority-of-louisville-residents-oppose-building-new-data-centers)lpm.org

[lpm.org](https://www.lpm.org/news/2025-07-02/oldham-county-passes-sweeping-data-center-moratorium-executive-fired-over-recording)lpm.org

[lpm.org](https://www.lpm.org/news/2025-06-03/oldham-county-data-center-switches-sites-reduces-size-amid-local-resistance)lpm.org

[maine.gov](https://www.maine.gov/governor/mills/news/governor-mills-announces-decision-ld-307-2026-04-24)maine.gov

[maine.gov](https://www.maine.gov/governor/mills/official_documents/veto_messages/2026-04-ld-307-act-establish-maine-data-center-coordination)maine.gov

[mainemorningstar.com](https://mainemorningstar.com/2026/04/24/gov-mills-vetoes-landmark-data-center-ban/)mainemorningstar.com

[mainemorningstar.com](https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/)mainemorningstar.com

[Residents raise AI data center concerns in Alachua](https://www.mainstreetdailynews.com/govt-politics/residents-raise-ai-data-center-concerns-in-alachua)mainstreetdailynews.com

[mankatofreepress.com](https://www.mankatofreepress.com/news/local_news/data-center-plans-stalled-in-north-mankato-after-developer-backs-out/article_d0617045-9eed-4633-a055-aed5b0405879.html)mankatofreepress.com

[Prince George's County extends pause on hyperscale data center development](https://marylandmatters.org/2026/07/08/prince-georges-county-extends-pause-on-hyperscale-data-center-development/)marylandmatters.org

[meic.org](https://meic.org/data-centers/)meic.org

[meic.org](https://meic.org/not-so-fast-groups-warn-of-downsides-to-potential-data-centers-in-butte/)meic.org

[meic.org](https://meic.org/)meic.org

[Frederick County, Md., Pauses New Data Center Applications Through End of 2026](https://www.meritalkslg.com/articles/frederick-county-md-pauses-new-data-center-applications-through-end-of-2026/)meritalkslg.com

[michiganadvance.com](https://michiganadvance.com/2025/11/21/local-michigan-township-trustee-says-meta-is-behind-data-center-project-planned-near-howell/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2025/12/08/rezoning-request-for-rural-michigan-data-center-project-pulled-from-consideration/)michiganadvance.com

[minnpost.com](https://www.minnpost.com/state-government/2026/04/ndas-setback-in-house-ban-on-secretive-agreements/)minnpost.com

[mirrorindy.org](https://mirrorindy.org/google-behind-proposed-indianapolis-data-center-franklin-township/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/google-withdraws-southside-data-center-proposal-franklin-township/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/pike-township-data-center-petition-withdrawn/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/pike-township-indianapolis-data-center-company-answers-questions/)mirrorindy.org

[missoulacountyvoice.com](https://missoulacountyvoice.com/bonner-data-center)missoulacountyvoice.com

[missouriindependent.com](https://missouriindependent.com/2026/05/15/missouri-legislature-ends-2026-session-marked-by-gop-wins-fewer-meltdowns/)missouriindependent.com

[missourinet.com](https://www.missourinet.com/2026/02/26/missouris-data-boom-prompts-bills-targeting-high-water-use-and-energy-costs/)missourinet.com

[missourinet.com](https://www.missourinet.com/2026/02/27/missouris-josh-hawley-says-major-tech-companies-should-pay-for-energy-and-water-usage-generated-by-their-data-centers/)missourinet.com

[mitchellrepublic.com](https://www.mitchellrepublic.com/news/south-dakota/lincoln-county-backs-down-on-hyperscale-data-center-moratorium)mitchellrepublic.com

[West Michigan residents protest data centers in front of developer roundtable](https://www.mlive.com/news/grand-rapids/2026/06/west-michigan-residents-protest-data-centers-in-front-of-developer-roundtable.html)mlive.com

[MLQ.ai, Loudoun rejects 780MW campus](https://mlq.ai/news/loudoun-county-moves-toward-data-center-moratorium-rejects-780mw-active-infrastructure-campus/)mlq.ai

[Wisconsin Regulator Upholds $7B Collateral Requirement for Oracle's 1GW Lighthouse Campus](https://mlq.ai/news/wisconsin-regulator-upholds-7b-collateral-requirement-for-oracles-1gw-lighthouse-campus-1/)mlq.ai

[mlq.ai](https://mlq.ai/news/sabey-data-centers-terminates-606-acre-butte-land-deal-after-rec-silicon-exercises-right-of-first-refusal/)mlq.ai

[mncenter.org](https://www.mncenter.org/latest-our-data-center-lawsuits-mceas-chief-legal-officer)mncenter.org

[mncenter.org](https://www.mncenter.org/press-release-new-lawsuits-highlight-shortcomings-and-lack-transparency-surrounding-environmental)mncenter.org

[montanafreepress.org](https://montanafreepress.org/2025/11/18/groups-push-back-on-montanas-data-center-boom/)montanafreepress.org

[montanafreepress.org](https://montanafreepress.org/2026/06/18/how-some-montanans-are-taking-data-center-regulation-into-their-own-hands/)montanafreepress.org

[montanafreepress.org](https://montanafreepress.org/2026/04/03/whats-next-for-the-proposed-bonner-data-center/)montanafreepress.org

[montco.today](https://montco.today/2025/11/fight-against-conshohocken-data-center/)montco.today

[morethanthecurve.com](https://morethanthecurve.com/developer-brian-oneill-behind-proposed-data-center-on-steel-plant-property-in-conshohocken/)morethanthecurve.com

[morethanthecurve.com](https://morethanthecurve.com/oneill-withdraws-zoning-application-for-proposed-data-center-in-conshohocken-during-zoning-hearing-in-plymouth-township/)morethanthecurve.com

[City of Eagan faces lawsuit over data center moratorium](https://www.mprnews.org/story/2026/07/07/city-of-eagan-faces-lawsuit-over-data-center-moratorium)mprnews.org

[MPR News: Developer Legacy Investing withdraws proposed data center plan for former Star Tribune site](https://www.mprnews.org/story/2026/09/11/developer-legacy-investing-withdraws-proposed-star-tribune-data-center)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2025/05/23/amazon-pulls-back-on-plans-for-large-data-center-in-becker)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2026/04/21/nobles-county-board-to-vote-on-whether-to-allow-massive-data-centers-on-farm-land)mprnews.org

[Tract withdraws data center application after Chesterfield recommends against it](https://www.msn.com/en-us/money/companies/tract-withdraws-data-center-application-after-chesterfield-recommends-against-it/ar-AA1HR0Nc)msn.com

[mtpr.org](https://www.mtpr.org/montana-news/2026-03-27/bonner-data-center-proposal-draws-concerns-over-noise-power-demands)mtpr.org

[multistate.us](https://www.multistate.us/insider/2026/3/3/state-data-center-water-usage-legislation-gains-momentum)multistate.us

[multistate.us](https://www.multistate.us/insider/2026/2/20/state-data-center-legislation-in-2026-tackles-energy-and-tax-issues)multistate.us

[multistate.us](https://www.multistate.us/insider/2026/2/4/states-rethink-data-center-tax-incentives-as-costs-soar)multistate.us

[multistate.us](https://www.multistate.us/insider/2026/3/3/state-data-center-water-usage-legislation-gains-momentum-in-2025)multistate.us

[mvskokemedia.com](https://www.mvskokemedia.com/mvskoke-tech-park-bill-fails-in-4-11-vote/)mvskokemedia.com

[mvskokemedia.com](https://www.mvskokemedia.com/mvskoke-tech-park-plan-crashes/)mvskokemedia.com

[Spokane City Council Passes One-Year Moratorium on Data Centers](https://my.spokanecity.org/news/releases/2026/06/23/spokane-city-council-passes-one-year-moratorium-on-data-centers/)my.spokanecity.org

[Sarasota County blocks hyperscale data centers for at least one year](https://www.mysuncoast.com/2026/07/09/sarasota-county-blocks-hyperscale-data-centers-least-one-year/)mysuncoast.com

[National Today, Lawsuit to block Hobart Amazon DC](https://nationaltoday.com/us/in/hobart/news/2026/02/08/lawsuit-seeks-to-block-amazon-data-center-permit-in-hobart-ind/)nationaltoday.com

[Tribal Advocates, Residents Protest Secrecy Around Meta-backed Tulsa Data Center](https://nativenewsonline.net/environment/tribal-advocates-residents-protest-secrecy-around-meta-backed-tulsa-data-center/)nativenewsonline.net

[nbcchicago.com](https://www.nbcchicago.com/news/local/data-center-proposed-for-lisle-site-with-storied-past-met-with-strong-opposition/3879461/)nbcchicago.com

[nbcmontana.com](https://nbcmontana.com/news/local/proposed-butte-data-center-stirs-debate)nbcmontana.com

[nbcnews.com](https://www.nbcnews.com/politics/politics-news/gov-jb-pritzker-suspending-tax-incentives-data-centers-illinois-rcna259297)nbcnews.com

[nbcnews.com](https://www.nbcnews.com/news/us-news/dale-earnhardt-widow-son-battle-data-center-mooresville-north-carolina-rcna223895)nbcnews.com

[nbcnews.com](https://www.nbcnews.com/news/us-news/dale-earnhardt-widow-data-center-backs-off-mooresville-north-carolina-rcna224827)nbcnews.com

[Amazon settles Oregon data center pollution lawsuit for $20.5M](https://www.nbcrightnow.com/news/amazon-settles-oregon-data-center-pollution-lawsuit-for-20-5m/article_aa1e0c52-c6be-42c8-bf90-091b3670b75b.html)nbcrightnow.com

[Loudoun County considers putting pause on data center development](https://www.nbcwashington.com/news/local/northern-virginia/loudoun-county-considers-putting-pause-on-data-center-development/4134004/)nbcwashington.com

[nbcwashington.com](https://www.nbcwashington.com/news/local/prince-william-digital-gateway-project-halted-by-virginia-court-of-appeals/4084112/)nbcwashington.com

[nclcv.org](https://nclcv.org/cib03162026-data-centers-tipping-point/)nclcv.org

[nclocal.org](https://nclocal.org/2026/02/12/town-of-canton-blocks-any-potential-data-center-for-one-year/)nclocal.org

[ncnewsline.com](https://ncnewsline.com/2026/03/13/community-groups-sue-over-planned-data-center-in-stokes-county/)ncnewsline.com

[nebius.com](https://nebius.com/independencemo)nebius.com

[neighbors4change.com](https://neighbors4change.com/hhhunt-faces-strong-opposition-to-data-center-plan/)neighbors4change.com

[neo-trans.blog](https://neo-trans.blog/2026/05/15/clevelands-proposed-data-center-moratorium-in-a-race-against-time-technology/)neo-trans.blog

[nepm.org](https://www.nepm.org/regional-news/2025-08-26/westfield-planning-4m-data-center-with-help-from-state-tax-breaks)nepm.org

[12-Month Pause Pitched For Data Center Dev](https://www.newhavenindependent.org/2026/07/06/12-month-pause-pitched-for-data-center-dev/)newhavenindependent.org

[news-herald.com](https://www.news-herald.com/2025/07/11/perry-village-government-provides-updates-regarding-proposed-data-center/)news-herald.com

[news-herald.com](https://www.news-herald.com/2025/06/24/perry-village-amends-zoning-code-to-include-data-center-campuses/)news-herald.com

[news-herald.com](https://www.news-herald.com/2025/08/10/perry-village-getting-ready-to-post-more-answers-to-data-center-questions/)news-herald.com

[news.google.com](https://news.google.com/rss/articles/CBMinwFBVV95cUxPMkYwQlZaYmtqLXJVNTVCUUZ1eUxaYkF3a2RzRjU1X25uc1h6UnVNVDJSWldqRjFmUmtZTkVoQVNtaVZsX0ZEWmp1c21PX0tNb1c5NGZpMnRMUUtoajBPWXZSVVVZR0Vud2wwNk1XM2JTUkU4aUVwZ1J3QU1sNFJrRHdqODFtU0RvV05lejNUX09MYzVnaGZvSDVzVGRsN1k)news.google.com

[Chatham County puts 1-year pause on new data centers](https://www.newsobserver.com/news/politics-government/article314678612.html)newsobserver.com

[NC developer sues Chatham County over data center moratorium](https://www.newsobserver.com/news/business/article315547697.html)newsobserver.com

[newson6.com](https://www.newson6.com/tulsa-oklahoma-news/cowetas-planning-commission-votes-4-1-to-deny-rezoning-request-for-proposed-data-center)newson6.com

[newson6.com](https://www.newson6.com/tulsa-oklahoma-news/coweta-data-center-project-atlas-proposal-canceled-by-beale-infrastructure)newson6.com

[newstribune.com](https://www.newstribune.com/news/2026/feb/26/legislation-would-prevent-data-centers-from/)newstribune.com

[New Haven moves closer to halting new data centers for a year](https://www.nhregister.com/news/article/new-haven-data-center-moratorim-22375154.php)nhregister.com

[NJ.com, $300M lawsuit for banning AI data centers](https://www.nj.com/business/2026/07/this-nj-town-just-got-hit-with-a-300m-lawsuit-for-banning-massive-ai-data-centers.html)nj.com

[This N.J. town banned AI data centers and then rejected a huge project to prove it](https://www.nj.com/business/2026/05/this-nj-town-banned-ai-data-centers-and-then-rejected-a-huge-project-to-prove-it.html)nj.com

[nmstatelands.org](https://www.nmstatelands.org/2026/07/15/commissioner-garcia-richard-again-denies-request-to-run-portion-of-project-jupiter-pipeline-through-state-lands/)nmstatelands.org

[nodatacentermooresvillenc.com](https://nodatacentermooresvillenc.com/)nodatacentermooresvillenc.com

[northcarolinahealthnews.org](https://www.northcarolinahealthnews.org/2026/03/25/nc-communities-push-back-ai-data-centers-project-delta-lawsuit/)northcarolinahealthnews.org

[nprillinois.org](https://www.nprillinois.org/illinois/2026-02-20/battle-over-data-centers-in-illinois-pits-consumer-costs-vs-state-competitiveness)nprillinois.org

[nprillinois.org](https://www.nprillinois.org/illinois/2026-03-16/illinois-lawmakers-look-to-regulate-data-centers-as-local-governments-propose-their-own-rules)nprillinois.org

[nprillinois.org](https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin)nprillinois.org

[nrcm.org](https://www.nrcm.org/blog/four-ways-maine-can-address-energy-impact-data-centers/)nrcm.org

[nrdc.org](https://www.nrdc.org/press-releases/pritzker-announces-two-year-suspension-state-tax-incentives-new-data-center)nrdc.org

[Chatham County faces lawsuit over data center moratorium](https://nsjonline.com/article/2026/05/chatham-county-faces-lawsuit-over-data-center-moratorium/)nsjonline.com

[nvdaily.com](https://www.nvdaily.com/nvdaily/frederick-county-quashes-two-data-center-proposals/article_1021d4f1-e8d2-5cd5-8b90-747884ff48c3.html)nvdaily.com

[nwitimes.com](https://www.nwitimes.com/news/local/business/brassie-golf-course-provident-realty-advisors-data-center/article_f3650940-19d5-11ef-a122-d76b20ae0b48.html)nwitimes.com

[nwitimes.com](https://www.nwitimes.com/news/local/jenny-hansen-chesterton-data-center-provident-realty-advisors/article_74c63836-1d16-11ef-87f9-fbc5e91dccff.html)nwitimes.com

[nwitimes.com](https://www.nwitimes.com/news/local/business/chesterton-data-center-provident-realty-advisors/article_cfa2c0e8-27e4-11ef-82c9-13d5c84f02ce.html)nwitimes.com

[nwitimes.com](https://www.nwitimes.com/news/local/business/data-center-provident-realty-advisors-chesterton/article_da2f9234-1f42-11ef-b4ef-f35b554f7907.html)nwitimes.com

[nwitimes.com](https://www.nwitimes.com/news/local/nwi-burns-harbor-data-center/article_b835a314-7b61-11ef-9626-2bd80bf9f2ca.html)nwitimes.com

[nwitimes.com](https://www.nwitimes.com/news/local/article_b835a314-7b61-11ef-9626-2bd80bf9f2ca.html)nwitimes.com

[Proposed data center still looms over Smithfield, even after town council enacts ban](https://www.oceanstatemedia.org/technology/2026-05-13/proposed-data-center-still-looms-over-smithfield-even-after-town-council-enacts-ban)oceanstatemedia.org

[okenergytoday.com](https://www.okenergytoday.com/2026/04/data-center-bill-awaits-state-senate-vote/)okenergytoday.com

[okenergytoday.com](https://www.okenergytoday.com/2026/02/data-center-project-to-be-subject-of-another-coweta-city-council-meeting/)okenergytoday.com

[okenergytoday.com](https://www.okenergytoday.com/2026/03/backer-of-oklahoma-data-centers-faces-financial-challenges/)okenergytoday.com

[okenergytoday.com](https://www.okenergytoday.com/2026/03/ardmore-data-center-developer-withdraws/)okenergytoday.com

[okhouse.gov](https://www.okhouse.gov/posts/news-20260217_6)okhouse.gov

[oksenate.gov](https://www.oksenate.gov/press-releases/senator-sacchieri-files-legislation-address-unknown-impacts-data-centers-oklahoma?back=/press-releases/2026-01)oksenate.gov

[Gold mining company sues to re-route portion of $1.5B Oregon transmission line](https://www.opb.org/article/2026/07/15/gold-mining-company-sues-to-re-route-portion-of-oregon-transmission-line/)opb.org

[Hillsboro approves data center moratorium](https://www.opb.org/article/2026/07/27/hillsboro-approves-data-center-moratorium/)opb.org

[opb.org](https://www.opb.org/article/2026/03/03/hillsboro-will-not-get-more-industrial-land-for-high-tech-data-centers/)opb.org

[opb.org](https://www.opb.org/article/2026/02/17/oregon-senators-tech-development-hillsboro-farm-group/)opb.org

[oregoncapitalchronicle.com](https://oregoncapitalchronicle.com/2026/03/02/oregon-would-temporarily-bar-expanded-tax-benefits-for-data-centers-under-changes-to-governors-bill/)oregoncapitalchronicle.com

[Oregon regulators uphold approval for controversial transmission line that may serve a single data center](https://www.oregonlive.com/environment/2025/11/oregon-regulators-uphold-approval-for-controversial-transmission-line-that-may-serve-a-single-data-center-rather-than-the-public.html)oregonlive.com

[Two data centers beat Hillsboro to the finish line on permitting ban](https://www.oregonlive.com/silicon-forest/2026/08/two-data-centers-beat-hillsboro-to-the-finish-line-on-permitting-ban.html)oregonlive.com

[New Mexico judge dismisses Project Jupiter data center lawsuit, but allows refiling](https://www.organmountainnews.com/project-jupiter-data-center-lawsuit-dismissed-refile-derrick-pacheco-2026/)organmountainnews.com

[Tonawanda Seneca Nation, Sierra Club sue to stop massive data center at STAMP](https://orleanshub.com/tonawanda-seneca-nation-sierra-club-sue-to-stop-massive-data-center-at-stamp/)orleanshub.com

[palmettostatewatchfoundation.com](https://palmettostatewatchfoundation.com/2026/01/06/petitions-protests-and-power-bills-spartanburg-faces-data-center-debacle/)palmettostatewatchfoundation.com

[2 Data Center Applications Head To Loudoun Board Of Supervisors, Staff Recommend Denial](https://patch.com/virginia/ashburn/2-data-center-applications-head-loudoun-board-supervisors)patch.com

[RivCo Town Terminates Data Center Project, More Cities Put Similar Projects On Pause](https://patch.com/california/palmdesert/two-rivco-towns-ax-data-center-projects-say-no-further-projects)patch.com

[patch.com](https://patch.com/illinois/lisle/lisle-data-center-application-withdrawn-developer)patch.com

[patch.com](https://patch.com/illinois/lisle/lisle-considers-move-effectively-prohibit-data-centers-village)patch.com

[patch.com](https://patch.com/pennsylvania/plymouthwhitemarsh/residents-local-officials-intensely-oppose-conshohocken-data-center)patch.com

[pecva.org](https://www.pecva.org/resources/press/pec-statement-on-prince-william-digital-gateway-latest-legal-win/)pecva.org

[pecva.org](https://www.pecva.org/region/fauquier/gigaland-application-withdrawn-our-communitys-voice-was-heard/)pecva.org

[penncapital-star.com](https://penncapital-star.com/energy-environment/could-abandoned-mines-house-pennsylvanias-unwanted-data-centers/)penncapital-star.com

[peoplesworld.org](https://www.peoplesworld.org/article/pekin-illinois-residents-turn-out-to-oppose-building-of-ai-data-center/)peoplesworld.org

[$140M Claim Puts Casa Grande Data Center Entitlement in Question](https://pinalpost.com/casa-grande-data-center-prop-207-waiver/)pinalpost.com

[Casa Grande Approves Data Center Waivers 7-0, Settling Prop 207 Claims](https://pinalpost.com/casa-grande-data-center-waiver-approved/)pinalpost.com

[Ypsilanti City Council calls for halt to University of Michigan data center](https://planetdetroit.org/2025/10/ypsilanti-council-data-center-vote/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/12/billion-dollar-data-center-paused/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/11/meta-data-center-howell-township/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/09/saline-denies-data-center/)planetdetroit.org

[Politico, Amazon in Texas, it's all about the gas](https://www.politico.com/newsletters/power-switch/2026/08/11/amazon-in-texas-its-all-about-the-gas-01034090)politico.com

[Post and Courier: Spartanburg data center at 300 Jones Road heads to appeal](https://www.postandcourier.com/spartanburg/news/spartanburg-data-center-300-jones-road-appeal-moratorium/article_63dc64e8-55ad-426d-9f17-79a2a0a8b136.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/spartanburg/business/tigerdc-data-center-spartanburg-county-project-spero/article_08f63d91-4108-4439-92c9-51b51c081232.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/spartanburg/news/spartanburg-county-project-spero-tigerdc-data-center-vote/article_8eb0af10-4ca5-464a-8016-6961bfe61cad.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/spartanburg/news/spartanburg-project-spero-data-center-withdrawn/article_bfb9e61e-2282-4d22-9806-7aa4a934be27.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/spartanburg/news/spartanburg-county-data-center-pollution/article_5ff08496-ab3b-4462-8f83-70396747b96a.html)postandcourier.com

[Fredericksburg Planning Commission Rejects 1500 Gateway Data Center 7-0](https://www.potomaclocal.com/2025/12/11/fredericksburg-planning-commission-rejects-1500-gateway-data-center-7-0/)potomaclocal.com

[Proposed Bristow Campus data center defers hearing amid community concerns](https://www.potomaclocal.com/2024/11/07/proposed-bristow-campus-data-center-defers-hearing-amid-community-concerns/)potomaclocal.com

[potomaclocal.com](https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/)potomaclocal.com

[PW Digital Gateway landowners sue the county over their soaring tax bills](https://www.princewilliamtimes.com/news/pw-digital-gateway-landowners-sue-the-county-over-their-soaring-tax-bills/article_f20cb938-454c-11ef-8a81-e350918e2336.html)princewilliamtimes.com

[Warrenton rejects latest effort to block Amazon data center](https://www.princewilliamtimes.com/news/warrenton-rejects-latest-effort-to-block-amazon-data-center/article_0da742cb-5261-5f17-8623-b72a9eed548e.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/localnews/planning-commission-denies-substation-for-data-centers-in-bristow/article_442f4d3b-2bea-42f5-ac48-af6167e1a709.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/news/breaking-judge-overturns-prince-william-digital-gateway/article_951d6362-1bbd-416f-89c5-ff322bf49fa8.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/localnews/supervisors-vote-to-spend-another-400k-to-defend-the-pw-digital-gateway/article_79abd8cb-bf32-5c46-8a7d-ba39bb676c57.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/localnews/county-staff-recommends-supervisors-deny-massive-dulles-innovation-south/article_c445ef25-61ed-4196-8dce-59a678ee43dd.html)princewilliamtimes.com

[protectpaluxy.com](https://www.protectpaluxy.com/about/)protectpaluxy.com

[protectpaluxy.com](https://www.protectpaluxy.com/comanche-circle-data-center-opposition/)protectpaluxy.com

[protectpwc.org](https://protectpwc.org/2026/04/01/digital-gateway-lawsuit-appellate-court-decision-033126/)protectpwc.org

[protectpwc.org](https://protectpwc.org/2026/04/01/pwc-bocs-withdraw-from-the-digital-gateway-lawsuit/)protectpwc.org

[Grant PUD Plans to Impose Load Growth Limits for Data Centers](https://www.publicpower.org/periodical/article/grant-pud-plans-impose-load-growth-limits-data-centers)publicpower.org

[publicradiotulsa.org](https://www.publicradiotulsa.org/local-regional/2025-10-07/indigenous-environmental-advocates-say-data-centers-risk-water-culture-and-informed-consent)publicradiotulsa.org

[pv-magazine-usa.com](https://pv-magazine-usa.com/2026/03/16/alabama-senator-seeks-statewide-ban-on-solar-installations/)pv-magazine-usa.com

[qcnews.com](https://www.qcnews.com/news/u-s/north-carolina/mecklenburg-county/matthews/developer-of-proposed-data-center-in-matthews-withdraws-application-mayor-says/)qcnews.com

[racinecountyeye.com](https://racinecountyeye.com/2025/09/23/microsoft-data-center-in-caledonia/)racinecountyeye.com

[Eight Iowa counties have moratoriums on data center development](https://www.radioiowa.com/2026/07/08/eight-iowa-counties-have-moratoriums-on-data-center-development/)radioiowa.com

[Radio Iowa: Northern Iowa county panel becomes latest to reject call for data center](https://www.radioiowa.com/2026/09/10/northern-iowa-county-panel-becomes-latest-to-reject-call-for-data-center/)radioiowa.com

[radiomankato.com](https://radiomankato.com/mcea-sues-lakeville-and-north-mankato-over-data-center-proposals/)radiomankato.com

[readfrontier.org](https://www.readfrontier.org/stories/from-limiting-tax-breaks-to-moratoriums-oklahoma-legislators-eye-new-rules-for-data-centers/)readfrontier.org

[Reuters, Oracle/OpenAI end Texas expansion plans](https://www.reuters.com/business/oracle-openai-end-plans-expand-texas-data-center-site-bloomberg-news-reports-2026-03-06/)reuters.com

[A legal shortcut greenlit a data center on public land and shut the public out](https://www.reviewjournal.com/news/environment/a-legal-shortcut-greenlit-a-data-center-on-public-land-and-shut-the-public-out-3852246/)reviewjournal.com

[richmondbizsense.com](https://richmondbizsense.com/2026/02/20/hanover-planning-commission-defers-vote-on-430-acre-data-center-project/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2026/01/16/hanover-planning-commission-rejects-hhhunt-data-center-project-near-wyndham/)richmondbizsense.com

[Google Strives To Keep Data Center Water Use Secret After Judge Orders Records Released](https://www.roanokerambler.com/google-strives-keep-data-center-botetourt-county-water-use-secret-judge-orders-records-released/)roanokerambler.com

[Amazon Pulls Louisa County Data Center Proposal After Strong Resistance](https://royalexaminer.com/amazon-pulls-louisa-county-data-center-proposal-after-strong-resistance/)royalexaminer.com

[Microsoft Pauses $1 Bln Ohio Data Center Amid AI Demand Reassessments](https://www.rttnews.com/3527794/microsoft-pauses-1-bln-ohio-data-center-amid-ai-demand-reassessments.aspx)rttnews.com

[5 takeaways ahead of Salem city council's data center moratorium meeting](https://www.salemreporter.com/2026/08/03/5-takeaways-ahead-of-salem-city-councils-data-center-moratorium-meeting/)salemreporter.com

[City manager calls special council meeting Monday to consider moratorium on data centers](https://www.salemreporter.com/2026/07/29/city-manager-calls-special-council-meeting-monday-to-consider-moratorium-on-data-centers/)salemreporter.com

[salinetownship.org](https://salinetownship.org/uploads/minutes/1761140618_August%205.pdf)salinetownship.org

[salinetownship.org](https://salinetownship.org/uploads/notices/QA%20Data%20Center%20Proposal.pdf)salinetownship.org

[Skybox Datacenters controversy in San Angelo](https://sanangelolive.com/news/business/2025-12-31/skybox-datacenter-controversy)sanangelolive.com

[San Jose residents push for data center moratorium](https://sanjosespotlight.com/san-jose-residents-push-for-data-center-moratorium/)sanjosespotlight.com

[santafenewmexican.com](https://www.santafenewmexican.com/news/local_news/new-mexico-agency-rejects-project-jupiter-data-centers-applications-for-gas-pipeline-right-of-way/article_00f190f7-2328-4e2e-82c0-012651387638.html)santafenewmexican.com

[savepennsylvania.com](https://www.savepennsylvania.com/petitions)savepennsylvania.com

[SC counties enacting data center moratoriums](https://scdailygazette.com/2026/06/26/sc-counties-enacting-data-center-moratoriums/)scdailygazette.com

[sdnewswatch.org](https://www.sdnewswatch.org/gemini-data-center-power-usage-sioux-falls-sd-ai-electricty/)sdnewswatch.org

[sdpb.org](https://www.sdpb.org/business-economics/2025-08-15/la-based-company-looking-to-build-data-center-in-sioux-falls)sdpb.org

[CleanSpark 10-Q (Q/E June 30, 2026)](https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm)sec.gov

[Fermi Q1 2026 Earnings Release](https://www.sec.gov/Archives/edgar/data/2071778/000207177826000027/fermi1q26erex_991.htm)sec.gov

[selc.org](https://www.selc.org/press-release/community-groups-residents-file-lawsuit-over-stokes-county-data-center-rezoning/)selc.org

[Petition against Endeavour Energy's 560-acre data center in DeKalb circulating](https://www.shawlocal.com/daily-chronicle/2025/12/07/petition-against-endeavour-energys-560-acre-data-center-in-dekalb-circulating/)shawlocal.com

[Petition against South Elgin data center: 4,800 signatures in less than 48 hours](https://www.shawlocal.com/kane-county-chronicle/2026/07/20/petition-against-south-elgin-data-center-4800-signatures-in-less-than-48-hours/)shawlocal.com

[shawlocal.com](https://www.shawlocal.com/news/2026/04/09/illinois-weighs-new-data-center-limits-as-massive-projects-reshape-towns/)shawlocal.com

[shawlocal.com](https://www.shawlocal.com/northwest-herald/news/2026/01/29/2-billion-data-center-proposal-in-barrington-hills-withdrawn/)shawlocal.com

[shawlocal.com](https://www.shawlocal.com/kendall-county-now/2026/04/01/80-acre-data-center-near-caledonia-tabled-in-yorkville/)shawlocal.com

[sierraclub.org](https://www.sierraclub.org/press-releases/2025/11/sierra-club-wisconsin-applauds-new-data-center-accountability-legislation)sierraclub.org

[signalcleveland.org](https://signalcleveland.org/cleveland-rejects-data-center-permit-for-slavic-village/)signalcleveland.org

[signalohio.org](https://signalohio.org/ohio-data-center-boom-faces-political-resistence/)signalohio.org

[siouxfalls.business](https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/)siouxfalls.business

[siouxfalls.business](https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/)siouxfalls.business

[siouxfallslive.com](https://www.siouxfallslive.com/news/sioux-falls/sioux-falls-group-wants-citywide-vote-on-data-center-rezone)siouxfallslive.com

[siouxfallslive.com](https://www.siouxfallslive.com/news/sioux-falls/planned-data-center-sparks-outrage-in-downtown-sioux-falls)siouxfallslive.com

[Developer drops El Segundo data center plan after power consumption backlash](https://smmirror.com/developer-drops-el-segundo-data-center-plan-after-power-consumption-backlash/)smmirror.com

[Southern NM lawmakers seek public hearing on Project Jupiter permits](https://sourcenm.com/2026/03/20/southern-nm-lawmakers-seek-public-hearing-on-project-jupiter-permits/)sourcenm.com

[sourcenm.com](https://sourcenm.com/2026/03/31/nm-state-land-commissioner-rejects-application-for-gas-pipeline-to-power-project-jupiter-data-center/)sourcenm.com

[sourcenm.com](https://sourcenm.com/2026/03/04/texas-energy-company-seeks-federal-approval-for-pipeline-through-new-mexico-to-power-data-center/)sourcenm.com

[Grant County: Data Center FOIA Lawsuit](https://www.southarkansasreckoning.com/the-grant-county-data-center-foia-c/)southarkansasreckoning.com

[southdakotasearchlight.com](https://southdakotasearchlight.com/2026/04/02/one-data-center-project-unchanged-while-another-doesnt-make-sense-after-rejected-incentives/)southdakotasearchlight.com

[southerncoalition.org](https://southerncoalition.org/community-groups-residents-file-lawsuit-over-stokes-county-data-center-rezoning/)southerncoalition.org

[Commissioners Pull Data Center Plan, Weigh Task Force](https://southernmarylandchronicle.com/2026/07/24/commissioners-pull-data-center-plan-weigh-task-force/)southernmarylandchronicle.com

[Spectrum News, Hays County DC pushback](https://spectrumlocalnews.com/tx/austin/news/2026/02/23/hays-county-data-centers)spectrumlocalnews.com

[spectrumlocalnews.com](https://spectrumlocalnews.com/tx/austin/news/2026/03/06/data-center-moratoriums)spectrumlocalnews.com

[spectrumnews1.com](https://spectrumnews1.com/wi/green-bay/news/2026/03/19/wisconsin-senate-adjourns-without-a-vote-on-data-centers)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/wi/milwaukee/news/2026/02/12/data-center-a-i--technology)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/oh/columbus/news/2026/05/22/cleveland-data-center-moratorium)spectrumnews1.com

[Data center pause clouds Spokane's future](https://www.spokanejournal.com/articles/18470-data-center-pause-clouds-spokanes-future)spokanejournal.com

[Spotlight Delaware: Harrington denies data center proposal despite a $1 million offer](https://spotlightdelaware.org/2026/08/19/harrington-denies-data-center-proposal-despite-a-1-million-offer/)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org/2026/03/26/delaware-city-data-center-environmental-denial-upheld-by-state-board/)spotlightdelaware.org

[spotlightpa.org](https://www.spotlightpa.org/news/2026/03/pennsylvania-data-centers-archbald-ai-evictions-environment/)spotlightpa.org

[Emails show Farmington leaders tried to 'offset the opposition'](https://www.startribune.com/farmington-data-center-emails/601230281)startribune.com

[startribune.com](https://www.startribune.com/amazon-must-prove-it-needs-250-diesel-generators-at-becker-data-center-minnesota-utility-regulators-say/601229504)startribune.com

[startribune.com](https://www.startribune.com/amazon-suspends-minnesota-data-center-as-lawmakers-plan-to-reduce-big-tech-tax-breaks/601359665)startribune.com

[startribune.com](https://www.startribune.com/southwest-minnesota-board-says-no-to-proposed-4-billion-data-center-complex/601786193)startribune.com

[startribune.com](https://www.startribune.com/developer-halts-two-minnesota-data-centers-over-permits-for-backup-generators/601507579)startribune.com

[statenews.org](https://www.statenews.org/section/the-ohio-newsroom/2026-02-26/ohio-towns-are-pushing-back-against-data-centers-to-varying-degrees-of-success)statenews.org

[Salem calls special meeting to consider moratorium on AI data centers](https://www.statesmanjournal.com/story/news/local/2026/07/29/salem-city-council-ai-data-centers-moratorium/91098538007/)statesmanjournal.com

[Public opposition sinks St. Charles data center plans](https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2026-02-26/missouri-lawmakers-propose-water-power-usage-requirements-data-centers)stlpr.org

[stopmprp.com](https://stopmprp.com/)stopmprp.com

[New Albany & Licking County, Ohio: Microsoft, Meta, Google Data Centers](https://stopohiodatacenters.org/licking-county)stopohiodatacenters.org

[stopprojectspero.com](https://stopprojectspero.com/)stopprojectspero.com

[Lysander town board approves 6-month moratorium on data centers amid public concern](https://www.syracuse.com/news/2026/05/lysander-town-board-approves-6-month-moratorium-on-data-centers-amid-public-concern.html)syracuse.com

[Lysander town board moves forward on data center moratorium as massive project looms](https://www.syracuse.com/news/2026/04/lysander-town-board-moves-forward-on-data-center-moratorium-as-massive-project-looms.html)syracuse.com

[New York state halts construction of all new data centers](https://techcrunch.com/2026/07/14/new-york-state-halts-construction-of-all-new-data-centers/)techcrunch.com

[techcrunch.com](https://techcrunch.com/2026/04/25/maines-governor-vetoes-data-center-moratorium/)techcrunch.com

[PA OKs air permit for Homer City gas plant fueling data centers](https://technical.ly/civics/homer-city-indiana-county-pennsylvania-data-center-permit-approval/)technical.ly

[TechPolicy.press, MCEA v. Pine Island](https://www.techpolicy.press/environmental-lawsuits-present-roadblock-for-the-ai-data-center-boom/)techpolicy.press

[techstartups.com](https://techstartups.com/2026/06/18/meta-strikes-new-1-6-gigawatt-ai-computing-deal-with-data-center-startup-crusoe/)techstartups.com

[TechTimes, Zoning notice rule kills world's largest campus](https://www.techtimes.com/articles/319715/20260704/ai-data-center-backlash-zoning-notice-rule-kills-worlds-largest-planned-campus.htm)techtimes.com

[Tennessean, DC BLOX sues Nashville](https://www.tennessean.com/story/news/local/davidson/2026/08/12/zoo-data-center-dc-blox-lawsuit-nashville-moratorium/91276101007/)tennessean.com

[Wilson County leaders pause to study data centers' impact on water and power](https://www.tennessean.com/story/news/local/wilson/2026/07/14/data-centers-tennessee-wilson-county/90756030007/)tennessean.com

[East Texas data center project withdrawn amid community pressure](https://www.texastribune.org/2026/07/23/east-texas-data-center-withdrawn/)texastribune.org

[Texas will audit up to 300 projects, mostly data centers, amid power grid concerns](https://www.texastribune.org/2026/08/14/texas-data-center-approval-pause-ercot-power-grid/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/)texastribune.org

[theassemblync.com](https://www.theassemblync.com/news/environment/data-center-rezoning-stokes-county/)theassemblync.com

[After Hours Of Testimony And 'No Data Centers' Chants, Charles County Planning Commission Recommends Denial](https://thebaynet.com/after-hours-of-testimony-and-no-data-centers-chants-charles-county-planning-commission-recommends-denial-of-data-center-zoning-amendment/)thebaynet.com

[thebaynet.com](https://thebaynet.com/calvert-county-strikes-down-data-center-moratorium-in-2-3-vote/)thebaynet.com

[thebeaconnews.org](https://thebeaconnews.org/stories/2026/02/27/independence-tax-abatement-ai-data-center/)thebeaconnews.org

[The Citizen: Fisher Explains Vote Against Project Oak Data Center](https://thecitizen.com/2026/09/01/fisher-explains-vote-against-project-oak-data-center/)thecitizen.com

[thecitizen.com](https://thecitizen.com/2026/03/19/data-center-appeal-withdrawn-in-fayetteville-the-power-of-the-people/)thecitizen.com

[The Cool Down, 430-acre plan voted down](https://www.thecooldown.com/green-tech/tech-park-proposal-virginia-halted-opposition/)thecooldown.com

[thecooldown.com](https://www.thecooldown.com/green-business/virginia-planning-commission-denies-gigaland-data-center/)thecooldown.com

[Frederick data center: MD Supreme Court explains why it blocked referendum](https://thedailyrecord.com/2026/07/28/frederick-data-centers-maryland-supreme-court/)thedailyrecord.com

[theday.com](https://www.theday.com/local-news/20240109/siting-council-deals-initial-blow-to-waterford-data-center-project/)theday.com

[Linn County passes data center moratorium](https://www.thegazette.com/news/linn-county-passes-data-center-moratorium/article_94ac8e37-7dd1-4871-8a6f-d853f66f0b39.html)thegazette.com

['The city that draws the line': one Arizona community's fight against a huge datacenter](https://www.theguardian.com/us-news/2025/oct/15/tucson-arizona-ai-data-center-project-blue)theguardian.com

[Rage against the machine: a California community rallied against a datacenter - and won](https://www.theguardian.com/us-news/2026/feb/07/california-monterey-park-stop-datacenter-construction)theguardian.com

[Seattle enacts year-long ban on new AI datacenters](https://www.theguardian.com/us-news/2026/jun/09/seattle-ai-datacenters-ban)theguardian.com

[SpaceX, xAI face data center noise class-action lawsuit](https://thehill.com/policy/technology/5918885-spacex-xai-data-center-noise-southaven-lawsuit/)thehill.com

[The secretive plan for a data center at the Bates Mill](https://themainemonitor.org/secretive-plan-lewiston-data-center/)themainemonitor.org

[themainemonitor.org](https://themainemonitor.org/maine-considers-data-centers-moratorium/)themainemonitor.org

[themidwesterner.news](https://www.themidwesterner.news/2025/11/were-gonna-fight-like-hell-local-opposition-kills-hyperscale-data-center-in-kalkaska/)themidwesterner.news

[Nevada's electric utility is suing a major data center company. Here's why.](https://thenevadaindependent.com/article/nevadas-electric-utility-is-suing-a-major-data-center-company-heres-why)thenevadaindependent.com

[Reno extends its data center moratorium into 2027. Here's what happens next.](https://thenevadaindependent.com/article/reno-extends-its-data-center-moratorium-into-2027-heres-what-happens-next)thenevadaindependent.com

[therealdeal.com](https://therealdeal.com/national/phoenix/2024/05/02/tract-drops-14b-plan-to-build-data-centers-outside-phoenix/)therealdeal.com

[therealdeal.com](https://therealdeal.com/chicago/2026/01/27/brennans-2b-barrington-hills-data-center-scrapped/)therealdeal.com

[therealdeal.com](https://therealdeal.com/chicago/2026/03/12/lisle-plan-scrapped-as-yorkville-bets-big-on-data-centers/)therealdeal.com

[therealdeal.com](https://therealdeal.com/chicago/2026/01/22/naperville-kills-karis-data-center-after-resident-revolt/)therealdeal.com

[therealdeal.com](https://therealdeal.com/texas/austin/2026/02/26/hays-county-backs-off-data-center-pause/)therealdeal.com

[Locals speak out against $4 billion data center in Berkeley County](https://therealwv.com/2026/03/23/locals-speak-out-against-4-billion-data-center-in-berkeley-county/)therealwv.com

[theregister.com](https://www.theregister.com/on-prem/2026/03/27/microsoft-lays-claim-to-crusoes-new-900-mw-dc-campus/5222886)theregister.com

[theshoestring.org](https://theshoestring.org/2025/12/30/ai-hallucination-proposed-westfield-data-center-appears-abandoned-by-developers/)theshoestring.org

[theshoestring.org](https://theshoestring.org/2026/07/02/ban-ban-ban-data-center-discontent-reaches-western-massachusetts/)theshoestring.org

[Company drops plan for data center in SC amid latest outcry](https://www.thestate.com/news/local/environment/article316090463.html)thestate.com

[Local officials offer contrasting views on Stillwater data center at state study](https://www.thestillwegian.news/local-officials-offer-contrasting-views-on-stillwater-data-center-at-state-study/)thestillwegian.news

[thetimes-tribune.com](https://www.thetimes-tribune.com/2025/08/13/blakely-data-center-meeting-draws-large-crowd-opposition/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2025/09/12/data-center-project-withdrawn-in-blakely-days-ahead-of-zoning-hearing/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2025/11/18/blakely-applies-more-than-30-restrictions-to-data-centers/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2025/12/12/data-center-developer-tied-to-projects-in-archbald-blakely-moves-to-dickson-city/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2025/08/06/convenience-store-developer-proposes-ai-data-centers-in-blakely/)thetimes-tribune.com

[Vetoed, not dead: Maine's data center moratorium and what it means for developers](https://www.thompsonhine.com/insights/vetoed-not-dead-maines-data-center-moratorium-and-what-it-means-for-developers/)thompsonhine.com

[time.com](https://time.com/7377579/ai-data-centers-people-movement-cover/)time.com

[Newnan Times-Herald: Project Oak data center denied by commissioners](https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html)times-herald.com

[timesherald.com](https://www.timesherald.com/2025/11/19/proposed-plymouth-township-data-center-zoning-application-withdrawn/)timesherald.com

[timesleader.com](https://www.timesleader.com/news/1741051/dorrance-twp-zoning-hearing-board-finds-ordinance-did-not-exclude-data-centers)timesleader.com

[Wichita Falls City Council rejects data center rezoning](https://www.timesrecordnews.com/story/news/local/2026/05/05/wichita-falls-city-council-rejects-data-center/89943201007/)timesrecordnews.com

[tmj4.com](https://www.tmj4.com/news/racine-county/microsoft-pulls-plug-on-plans-for-244-acre-data-center-in-caledonia-after-community-pushback)tmj4.com

[Lucas County leads state in signatures to ban large data centers](https://www.toledoblade.com/local/politics/2026/05/18/lucas-county-leads-state-signatures-ban-large-data-centers/stories/20260518086)toledoblade.com

[tomshardware.com](https://www.tomshardware.com/desktops/servers/microsoft-cancels-wisconsin-data-center-after-community-pushback-244-acre-caledonia-site-on-hold-but-redmond-says-it-remains-committed-to-the-region)tomshardware.com

[tomshardware.com](https://www.tomshardware.com/tech-industry/oracle-and-openai-scrap-planned-600mw-abilene-expansion)tomshardware.com

[tpr.org](https://www.tpr.org/news/2026-02-27/with-5-data-centers-on-the-horizon-hays-county-water-advocates-see-the-fight-as-just-beginning)tpr.org

[Tract Achieves Major Court Victory Against Switch in Reno Data Center Land Dispute](https://www.tract.com/news/tract-achieves-major-court-victory-against-switch-in-reno-data-center-land-dispute/)tract.com

[transformernews.ai](https://www.transformernews.ai/p/new-playbook-for-killing-a-data-microsoft-wisconsin-prescott-balch-charlie-berens)transformernews.ai

[traverseticker.com](https://www.traverseticker.com/news/developer-pulls-plug-on-kalkaska-data-center/)traverseticker.com

[Amazon eyes Homer City site for data center campus](https://triblive.com/local/westmoreland/amazon-eyes-homer-city-site-for-data-center-campus/)triblive.com

[Tulsa will pause new data center construction for 9 months](https://tulsaflyer.org/2026/03/25/government/post/tulsa-will-pause-new-data-center-construction-for-9-months-after-council-vote/)tulsaflyer.org

[tulsaflyer.org](https://tulsaflyer.org/2026/01/20/government/post/coweta-planning-commission-says-no-to-data-center-proposal/)tulsaflyer.org

[tulsaflyer.org](https://tulsaflyer.org/2026/03/30/news/post/developer-pulls-out-of-project-atlas-data-center/)tulsaflyer.org

[Twin Cities, DC company sues Eagan](https://www.twincities.com/2026/07/06/data-center-company-sues-eagan-over-development-pause/)twincities.com

[twincities.com](https://www.twincities.com/2026/03/18/lawsuit-hampton-mn-data-center-information/)twincities.com

[ualrpublicradio.org](https://www.ualrpublicradio.org/local-regional-news/2026-05-28/pulaski-county-announces-miscount-in-data-center-moratorium-vote)ualrpublicradio.org

[universitystar.com](https://universitystar.com/34402/news/community-members-hold-meeting-discussing-data-centers/)universitystar.com

[universitystar.com](https://universitystar.com/33993/opinions/cloudburst-data-center-exploits-hays-county/)universitystar.com

[Box Elder County passes moratorium on future data centers](https://www.upr.org/utah-news/2026-06-17/box-elder-data-center-moratorium-stratos)upr.org

[urbanmilwaukee.com](https://urbanmilwaukee.com/2025/10/09/citing-opposition-microsoft-cancels-caledonia-data-center/)urbanmilwaukee.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2025/09/24/microsoft-seeks-data-center-in-caledonia/)urbanmilwaukee.com

[DOJ intervenes on behalf of xAI in data center gas turbine lawsuit](https://www.utilitydive.com/news/doj-intervenes-xai-data-center-gas-turbine-lawsuit/823267/)utilitydive.com

[vcnva.org](https://vcnva.org/denying-balico-data-center-and-gas-plant/)vcnva.org

[Amazon cancels data center in Louisa County](https://virginiabusiness.com/amazon-cancels-data-center-in-louisa-county/)virginiabusiness.com

[Chesapeake City Council rejects massive data center](https://virginiabusiness.com/chesapeake-city-council-rejects-massive-data-center/)virginiabusiness.com

[Chesapeake Planning Commission recommends against data center](https://virginiabusiness.com/chesapeake-data-center-vote/)virginiabusiness.com

[Chesapeake approves 8-month pause on data center applications](https://virginiabusiness.com/chesapeake-approves-8-month-pause-on-data-center-applications/)virginiabusiness.com

[Frederick supervisors to consider countywide ban of data centers](https://virginiabusiness.com/frederick-supervisors-to-consider-countywide-ban-of-data-centers/)virginiabusiness.com

[Prince William Digital Gateway data center project officially dies](https://virginiabusiness.com/prince-william-digital-gateway-data-center-project-officially-dies/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/frederick-county-data-centers-fact-sheet/)virginiabusiness.com

[virginiabusiness.com](http://virginiabusiness.com/virginia-appeals-court-upholds-block-on-prince-william-digital-gateway-project/)virginiabusiness.com

[virginiaindependentnews.com](https://virginiaindependentnews.com/infrastructure/data-center-cancellations-pile-up-as-virginians-voice-opposition/)virginiaindependentnews.com

[After Digital Gateway project fails, Prince William supervisors reject Dulles Cloud South data center proposal](https://virginiamercury.com/2026/07/09/after-digital-gateway-project-fails-prince-william-supervisors-reject-dulles-cloud-south-data-center-proposal/)virginiamercury.com

[Brown water, dust and loud noises: Louisa homeowner sues Amazon over data center construction](https://virginiamercury.com/2026/07/28/brown-water-dust-and-loud-noises-louisa-homeowner-sues-amazon-over-data-center-construction/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2025/07/28/amazon-pulls-louisa-county-data-center-proposal-after-strong-resistance/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2026/01/19/these-bills-aim-to-regulate-virginia-data-center-siting-generator-use-and-scc-oversight/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2026/02/20/halfway-through-the-2026-legislative-session-theres-still-no-consensus-on-data-center-bills/)virginiamercury.com

[vista.today](https://vista.today/2026/02/recommend-denial-pennhurst-data-center-project/)vista.today

[volumeone.org](https://volumeone.org/articles/2025/08/26/370164-tech-giant-is-considering-16-billion-data-center-dunn-county)volumeone.org

[Chesapeake City Council approves 8-month hold on data center applications](https://www.vpm.org/news/2026-07-22/chesapeake-city-council-data-center-application-hold-lindley-newins-whro)vpm.org

[Hanover supervisors nix Mountain Road data center project](https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble)vpm.org

[vpm.org](https://www.vpm.org/generalassembly/2026-01-16/2026-data-center-bills-thomas-hb155-mcauliff-hb503-pjm-dominion-energy)vpm.org

[vpm.org](https://www.vpm.org/news/2025-11-18/hanover-hunting-hawk-data-center-hhhunt-wyndham-banton-mendelson-cheeley)vpm.org

[vpm.org](https://www.vpm.org/news/2026-01-20/hanover-hunting-hawk-data-center-hhhunt-wyndham-ashland-road-clark)vpm.org

[washtimesherald.com](https://www.washtimesherald.com/news/local_news/washington-city-council-says-no-to-data-center/article_9e635735-d823-46b1-9c83-3c89b04934e5.html)washtimesherald.com

[wave3.com](https://www.wave3.com/2025/09/16/louisville-metro-council-considers-moratorium-data-centers/)wave3.com

[wave3.com](https://www.wave3.com/2025/10/14/meade-county-zoning-commission-votes-against-data-center/)wave3.com

[Judge rules Birmingham residents can proceed with suit to halt data center construction](https://www.wbhm.org/local-news/2026-07-10/judge-rules-birmingham-residents-can-proceed-with-suit-to-halt-data-center-construction)wbhm.org

[Judge rules Oxmoor Valley neighbors' lawsuit against Nebius data center can proceed](https://www.wbrc.com/2026/07/11/judge-rules-oxmoor-valley-neighbors-lawsuit-against-nebius-data-center-can-proceed/)wbrc.com

[wbtv.com](https://www.wbtv.com/2025/09/22/proposed-data-center-matthews-met-with-mixed-opinions-what-know/)wbtv.com

[wcbu.org](https://www.wcbu.org/local-news/2026-01-27/opponents-speak-out-against-proposed-pekin-data-center)wcbu.org

[wcnc.com](https://www.wcnc.com/article/news/local/mooresville-nc-data-center-pushback-8-6-2025/275-3f149e6b-e7c5-46dc-8e40-cc1a9d6cf6be)wcnc.com

[WCPO: 300MW data center proposed for Pierce Township near Beckjord despite moratorium](https://www.wcpo.com/news/local-news/i-team/300mw-data-center-proposed-for-pierce-township-near-beckjord-despite-moratorium)wcpo.com

[wctrib.com](https://www.wctrib.com/news/minnesota/nobles-county-planning-commission-votes-to-keep-data-center-out-of-ag-preservation-area)wctrib.com

[Botetourt Co. Planning Commission split on water pipeline permit amid Google data center concerns](https://www.wdbj7.com/2026/08/11/botetourt-co-planning-commission-split-water-pipeline-permit-amid-google-data-center-concerns/)wdbj7.com

[WDEZ: Wisconsin Rapids Plan Commission rejects permit for data center](https://wdez.com/2026/09/16/wisconsin-rapids-plan-commission-rejects-permit-for-data-center/)wdez.com

[Meade County court upholds recommendation not to rezone 138-acre site](https://www.wdrb.com/news/meade-county-court-upholds-recommendation-not-to-rezone-138-acre-site-for-proposed-data-center/article_05d308e7-72bb-461c-8b4a-7194a55ab4d3.html)wdrb.com

[wdrb.com](https://www.wdrb.com/in-depth/opponents-pack-meeting-about-6-billion-oldham-county-data-center-plan/article_cabe30e6-bd8a-4795-b03a-daffb331ce38.html)wdrb.com

[wdrb.com](https://www.wdrb.com/news/meade-county-commission-votes-unanimously-not-to-rezone-138-acre-site-for-proposed-data-center/article_05d308e7-72bb-461c-8b4a-7194a55ab4d3.html)wdrb.com

[wdrb.com](https://www.wdrb.com/news/neighbors-push-back-against-proposed-ai-data-center-in-meade-county/article_5576cf12-2e88-422a-ac08-d94b30d4cce9.html)wdrb.com

[Jefferson County committee drafts official data center moratorium](https://www.wdtimes.com/news/local/jefferson-county-committee-drafts-official-data-center-moratorium/article_a7e3b071-ec37-45d0-8396-c0fd9cffc85a.html)wdtimes.com

[wdtn.com](https://www.wdtn.com/news/300-acres-of-farmland-could-be-rezoned-for-new-data-center-near-i-70/)wdtn.com

[Chester County approves temporary moratorium for data center projects](https://www.wfae.org/charlotte-area/2026-06-18/chester-county-approves-temporary-moratorium-for-data-center-projects)wfae.org

[wfdd.org](https://www.wfdd.org/politics-government/2026-07-14/stokes-commission-rejects-six-month-data-center-moratorium)wfdd.org

[wflx.com](https://www.wflx.com/2026/02/23/scrapped-developer-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation/)wflx.com

[wfmynews2.com](https://www.wfmynews2.com/article/news/local/stokes-county-commissioners-reject-data-center-moratorium-project-delta-looms/83-dd17b48a-79f1-442c-a13c-afca1868db37)wfmynews2.com

[Indy council advances pause on data centers](https://www.wfyi.org/wfyi-news/2026-08-10/indy-council-advances-pause-on-data-centers-sends-to-commission-for-final-approval)wfyi.org

[wfyi.org](https://www.wfyi.org/news/articles/indianapolis-council-google-data-center-vote-withdrawl)wfyi.org

[WGBH, Court orders pause Lowell DC expansion](https://www.wgbh.org/news/local/2026-08-11/court-orders-pause-lowell-data-center-expansion)wgbh.org

[wglt.org](https://www.wglt.org/local-news/2026-04-13/negotiations-over-data-center-legislation-have-yet-to-ramp-up-as-environmental-groups-cite-favorable-poll)wglt.org

[wglt.org](https://www.wglt.org/illinois/2026-05-14/advocates-accusing-governor-of-lack-of-engagement-urge-passage-of-data-center-regulations-by-end-of-may)wglt.org

[wgntv.com](https://wgntv.com/news/naperville/naperville-city-council-rejects-plans-for-data-center-after-months-of-debate/)wgntv.com

[whas11.com](https://www.whas11.com/article/news/local/louisville-data-center-opposition-oldham-county/417-ea453d81-9b43-400b-908f-6de40793098f)whas11.com

[whas11.com](https://www.whas11.com/article/news/local/oldham-county-data-center-proposal-opposition/417-793370d3-51be-451a-847c-efcc84c2b48c)whas11.com

[whas11.com](https://www.whas11.com/article/news/local/meade-ocunty-data-center-proposal-rejected-community/417-dd3e0b31-e31e-4f0e-b3a2-c0cf56357b16)whas11.com

[Chesapeake's Planning Commission says no to data center proposal](https://www.whro.org/business-growth/2025-05-15/chesapeakes-planning-commission-says-no-to-data-center-proposal)whro.org

[whro.org](https://www.whro.org/business-growth/2025-06-17/chesapeake-city-council-rejects-data-center-proposal)whro.org

[whyy.org](https://whyy.org/articles/conshohocken-pennsylvania-residents-pushback-data-center-proposal/)whyy.org

[wilx.com](https://www.wilx.com/2025/11/21/meta-is-behind-proposed-howell-twp-data-center-trustee-says/)wilx.com

[winchesterstar.com](https://www.winchesterstar.com/winchester_star/panel-delays-recommendation-on-data-center-campus/article_33681399-77cd-54f6-8c3f-ac56f279b8cc.html)winchesterstar.com

[Wired, Google-funded DC with massive gas plant](https://www.wired.com/story/a-new-google-funded-data-center-will-be-powered-by-a-massive-gas-plant/)wired.com

[wisconsinexaminer.com](https://wisconsinexaminer.com/2026/02/12/democratic-lawmakers-propose-data-center-moratorium/)wisconsinexaminer.com

[wisconsinrivers.org](https://wisconsinrivers.org/data-center-bills/)wisconsinrivers.org

[wisconsinwatch.org](https://wisconsinwatch.org/2026/01/wisconsin-data-center-secrecy-deals-nda-nondisclosure-agreement/)wisconsinwatch.org

[wishtv.com](https://www.wishtv.com/news/local-news/american-tower-rezoning-petition-withdrawn/)wishtv.com

[Spotsylvania County backs call for statewide moratorium on data centers](https://wjla.com/news/local/spotsylvania-county-backs-call-for-statewide-moratorium-on-data-centers-abigail-spanberger-ai-energy-use-zoning-decisions)wjla.com

[FactCheck: Kentucky counties pause data center development amid growing concerns](https://www.wkyt.com/2026/07/24/factcheck-kentucky-counties-pause-data-center-development-amid-growing-concerns/)wkyt.com

[wlos.com](https://wlos.com/news/ask-13/ask-13-towns-counties-cities-asheville-temporary-zoning-regulations-moratoriums-data-centers-western-north-carolina-ai-artificial-intelligence)wlos.com

[New Miami-Dade data center sparks concerns in Black community](https://www.wlrn.org/government-politics/2026-04-29/new-miami-dade-data-center-sparks-concerns-in-black-community)wlrn.org

[wndu.com](https://www.wndu.com/2025/04/22/kosciusko-county-commissioners-say-no-proposed-data-center-leesburg/)wndu.com

[wnep.com](https://www.wnep.com/article/news/local/lackawanna-county/data-center-developer-withdraws-proposal-for-blakely-construction/523-976b3357-7ae2-4da0-b0f5-55eb44fb7afa)wnep.com

[Meta wants to draw power for unused New Albany electrical substation](https://www.wosu.org/2025-11-26/meta-wants-to-draw-power-for-unused-new-albany-electrical-substation-built-for-intel-project)wosu.org

[wosu.org](https://www.wosu.org/2026-02-26/ohio-towns-are-pushing-back-against-data-centers-to-varying-degrees-of-success)wosu.org

[Microsoft pauses construction on portions of Mount Pleasant project](https://www.wpr.org/economy/microsoft-pauses-construction-on-portions-of-mount-pleasant-project)wpr.org

[Oracle drops Wisconsin suit over financial requirements tied to data centers](https://www.wpr.org/news/oracle-drops-wisconsin-suit-financial-requirements-data-centers)wpr.org

[wpr.org](https://www.wpr.org/news/new-bill-ban-nondisclosure-agreements-wisconsin-data-centers-nda)wpr.org

[wpr.org](https://www.wpr.org/news/menomonie-mayor-defends-move-to-halt-massive-data-center-project)wpr.org

[wpr.org](https://www.wpr.org/news/menomonie-mayor-puts-data-center-proposal-on-hold)wpr.org

[wpr.org](https://www.wpr.org/news/data-center-proposed-menomonie-strong-response-concerned-citizens)wpr.org

[wpr.org](https://www.wpr.org/news/microsoft-caledonia-data-center-site-ozaukee-county)wpr.org

[Palm Beach County commissioners reject Project Tango AI data center](https://www.wptv.com/news/region-c-palm-beach-county/loxahatchee-acreage/palm-beach-county-commissioners-reject-project-tango-ai-data-center-after-more-than-12-hours-of-debate)wptv.com

[wptv.com](https://www.wptv.com/wptv-investigates/scrapped-developer-of-st-lucie-county-data-center-project-may-withdraw-plan-amid-new-ai-legislation)wptv.com

[wqow.com](https://www.wqow.com/news/chippewa-valley/new-data-center-ordinance-introduced-in-menomonie-residents-continue-to-protest/article_53bb6671-7f82-456c-a679-15d8c1b5c8f7.html)wqow.com

[Microsoft hosts meeting on future Person County data center amid AI opposition](https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/)wral.com

[wral.com](https://www.wral.com/news/state/duke-energy-gas-turbine-amazon-data-center-september-2026/)wral.com

[wrdw.com](https://www.wrdw.com/2026/03/08/ai-is-anti-human-sc-protestors-express-concerns-regarding-data-centers/)wrdw.com

[Strisker DC daily notes July 16](https://writing.strisker.com/data-centers-daily-notes-july-16-2026/)writing.strisker.com

[WSAW: Planning commission votes to recommend denial of data center permit](https://www.wsaw.com/2026/09/17/planning-commission-votes-recommend-denial-data-center-permit/)wsaw.com

[Microsoft holds data center open house; Residents voice concerns](https://wsbt.com/news/local/data-center-microsoft-holds-open-house-as-protests-continue-granger-project-approved-residents-major-concerns-opposition-century-center-meeting-details-jobs-energy-use-water)wsbt.com

[St. Joseph County Council denies land rezoning for data center](https://wsbt.com/news/local/st-joseph-county-council-denies-rezoning-of-land-for-data-center-votes-7-2-marathon-meeting-hours-long-public-opinion-13-billion-dollar-project-amazon-new-carlisle-approval-process-plan-commission-st-joseph-county-indiana)wsbt.com

[Permit denied for new data center proposed near I-20 in Douglas County](https://www.wsbtv.com/news/local/permit-new-proposed-data-center-denied-douglas-county/7FYNFGPB3NG4TDIUAZYP54YO3Q/)wsbtv.com

[wset.com](https://wset.com/news/local/pittsylvania-county-updates-plan-to-manage-data-center-growth-after-local-pushback-november-2025)wset.com

[DC Blox sues Metro over Nashville Zoo-area data center moratorium](https://www.wsmv.com/2026/08/12/dc-blox-sues-metro-over-nashville-zoo-area-data-center-moratorium-heres-what-we-know/)wsmv.com

[wsoctv.com](https://www.wsoctv.com/news/local/nc-neighbors-suing-protect-farmland-rezoning-data-center/4FMVUKUJ7VBAJBV46OBDT75SYU/)wsoctv.com

[WSPA: Zoning appeals leaders deny proposed Spartanburg County data center](https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/)wspa.com

[wspa.com](https://www.wspa.com/news/community-pushing-back-on-3b-spartanburg-county-data-center/)wspa.com

[wspa.com](https://www.wspa.com/news/local-news/ai-data-center-project-withdrawn-from-spartanburg-county/)wspa.com

[wspa.com](https://www.wspa.com/news/top-stories/spartanburg-delays-vote-on-3-billion-data-center-proposal/)wspa.com

[wspynews.com](https://www.wspynews.com/news/local/yorkville-tables-meyer-property-data-center-rezoning/article_ebc51183-539f-4243-91cc-83cbf03130f3.html)wspynews.com

[wthr.com](https://www.wthr.com/article/news/local/indianapolis-franklin-township-google-data-center-plan-pulled-after-city-county-council-discussion/531-b8223650-5721-4108-a927-9ac38d894b3e)wthr.com

[Prince William Co. supervisors deny 2,000-acre Dulles South data center plans](https://wtop.com/prince-william-county/2026/07/prince-william-co-supervisors-deny-2000-acre-dulles-south-data-center-plans/)wtop.com

[wtop.com](https://wtop.com/prince-william-county/2025/11/digital-gateway-data-center-builders-barred-from-beginning-construction-until-legal-challenge-plays-out/)wtop.com

[Chesterfield Zoning Appeals Board denies appeal over proposed data center](https://www.wtvr.com/news/local-news/chesterfield-county/proposed-data-center-appeal-denied-june-3-2026)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hanover-planning-commission-hhhunt-data-center-rezoning-jan-15-2026)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hhhunt-community-meeting-nov-17-2025)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/route-33-data-center-plan-feb-19-2026)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hanover-data-center-proposal-sept-8-2025)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hhhunt-withdraws-data-center-application-jan-28-2026)wtvr.com

[Proposed data center in Wake County is withdrawing its application](https://www.wunc.org/environment/2026-03-05/proposed-data-center-new-hill-digital-campus-wake-county-apex)wunc.org

[wunc.org](https://www.wunc.org/2026-03-16/developer-responds-to-lawsuit-challenging-stokes-data-center)wunc.org

[wunc.org](https://www.wunc.org/2026-03-05/data-center-approval-looms-over-stokes-county-primary-results)wunc.org

[wvia.org](https://www.wvia.org/news/local/2026-02-18/residents-raise-questions-as-developer-describes-hazle-twp-data-center-plans-at-dep-hearing)wvia.org

[WVXU: Pierce Township extends data center moratorium](https://www.wvxu.org/local-news/2026-09-09/pierce-township-data-center-moratorium-surprise-pitch)wvxu.org

[Marshall data center moratorium delays development by at least one year](https://wwmt.com/news/local/marshall-data-center-moratorium-delays-development-one-year-alterra-brooks-industrial-park-acres-wetland-lake-energy-environment-calhoun-county-west-michigan)wwmt.com

[Louisiana PSC kills ruling that would force Meta to turn over key data center information](https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information)wwno.org

[Judge rules against motion to intervene in Saline Township data center agreement](https://www.wxyz.com/news/data-centers/judge-rules-against-saline-township-residents-motion-to-intervene-in-data-center-agreement)wxyz.com

[Residents, officials push back on $1.25B University of Michigan data center plan](https://www.wxyz.com/news/data-centers/residents-and-officials-push-back-on-1-25b-university-of-michigan-data-center-plan)wxyz.com

[In Nevada, a data center planned on public land is temporarily halted (Wyoming Public Media / Mountain West News Bureau, Sept. 8, 2026)](https://www.wyomingpublicmedia.org/politics-government/2026-09-08/in-nevada-a-data-center-planned-on-public-land-is-temporarily-halted)wyomingpublicmedia.org

[wypr.org](https://www.wypr.org/wypr-news/2026-04-06/new-application-deadline-sought-for-maryland-piedmont-reliability-project)wypr.org

[California hits pause on what could be its biggest AI data center as developer sues for river water](https://www.yahoo.com/news/us/articles/california-hits-pause-could-biggest-031900686.html)yahoo.com

[Prince George's County Council votes against data centers, for now](https://www.yahoo.com/news/prince-george-county-council-votes-030201293.html)yahoo.com

[Rejected $2.6 billion Idaho data center returns for appeal, with water and grid fears still looming](https://www.yahoo.com/news/us/articles/rejected-2-6-billion-idaho-010300152.html)yahoo.com

[yourvalley.net](https://www.yourvalley.net/goodyear-independent/stories/developer-pulls-goodyear-area-data-center-application-amid-grassroots-municipal-opposition,506154)yourvalley.net

[yourvalley.net](https://www.yourvalley.net/stories/goodyear-area-529-acre-ai-data-center-campus-application-draws-opposition-water,484602)yourvalley.net

[Referendum on Box Elder County data facility won't be on November ballot](https://www.youtube.com/watch?v=IyA_2gGlSwc)youtube.com

## Jurisdictional actions

278 sources

[Apex NC approves yearlong pause on data-center projects](https://abc11.com/post/apex-nc-leaders-hold-public-hearing-proposed-data-center-moratorium/18885810/)abc11.com

[Moratorium: Another Central Ohio community is saying 'NO' to data centers](https://abc6onyourside.com/news/local/moratorium-another-central-ohio-community-is-saying-no-to-data-centers-policy-tech-energy-water-consumption)abc6onyourside.com

[Data Center Moratorium by State 2026: Every Bill, Status](https://www.ailawsbystate.com/blog/data-center-moratorium-by-state-2026)ailawsbystate.com

[DeKalb extends data center moratorium 6 months](https://www.ajc.com/news/2025/12/dekalb-extends-data-center-moratorium-6-months/)ajc.com

['Pump the brakes': Another Alabama city approves temporary ban for data centers](https://www.al.com/business/2026/06/pump-the-brakes-another-alabama-city-approves-temporary-ban-for-data-centers.html)al.com

[Patterson's 45-day moratorium chills any talks of data center construction](https://www.aol.com/articles/patterson-45-day-moratorium-chills-002234000.html)aol.com

[Local leaders challenge million-square-foot data center in Imperial](https://apnews.com/article/imperial-data-center-hyperscale-moratorium-conflict-a029128eb2458c3c197010ecbedb0cd8)apnews.com

[Neptune prohibits data centers, ICE detention centers](https://www.app.com/story/news/local/neptune-wall/neptune/2026/07/14/data-center-neptune-nj-detention-center-ordinance/90912416007/)app.com

[Oregon Governor's Office: Governor Kotek Pauses Work on Requests for State Land to Support New Data Centers (Sept. 8, 2026)](https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-pauses-work-on-requests-for-state-land-to-support-new-data-centers)apps.oregon.gov

[Chamblee City Council approves pause on data center applications](https://www.atlantanewsfirst.com/2026/07/22/chamblee-city-council-approves-pause-data-center-applications/)atlantanewsfirst.com

[Cherokee County approves data center moratorium](https://www.atlantanewsfirst.com/2026/07/22/cherokee-county-approves-data-center-moratorium/)atlantanewsfirst.com

[axios.com](https://www.axios.com/2026/09/28/ai-industry-unions-data-centers)axios.com

[axios.com](https://www.axios.com/2026/09/18/newsom-ai-2028-focus)axios.com

[Casa Grande Council Discusses Possible Damages from Data Center Rules](https://azbex.com/legislation-issues/casa-grande-council-discusses-possible-damages-from-data-center-rules/)azbex.com

[Data centers dominated 2026 session, lawmakers answered with 3-year tax incentive pause](https://azcapitoltimes.com/news/2026/07/09/data-centers-dominated-2026-session-lawmakers-answered-with-3-year-tax-incentive-pause/)azcapitoltimes.com

[Arizona's pause on data center tax breaks prompts rush before deadline](https://www.azcentral.com/story/news/politics/arizona/2026/07/08/pause-on-arizona-data-center-tax-breaks-spurs-application-rush/90842575007/)azcentral.com

[Baker Botts, ERCOT Batch Zero pause and verification](https://www.bakerbotts.com/thought-leadership/publications/2026/august/texas-large-load-interconnection-update---ercot-batch-zero-pause-and-verification-process)bakerbotts.com

[As state lawmakers stall on data center rules, Illinois cities and counties step in to fill the void](https://barringtonhillsobserver.com/2026/06/29/as-state-lawmakers-stall-on-data-center-rules-illinois-cities-and-counties-step-in-to-fill-the-void/)barringtonhillsobserver.com

[Reading adopts 180-day pause on data centers](https://berksbeat.com/meetings/reading-data-center-zoning-pause-adopted-july-2026)berksbeat.com

[Birmingham Council Enacts Temporary Ban on Large Data Centers](https://birminghamwatch.org/2026/03/03/birmingham-council-enacts-temporary-ban-on-large-data-centers/)birminghamwatch.org

[Bisnow, World's largest DC hub pursues development pause](https://www.bisnow.com/news/washington-dc/data-center-development/the-world-s-largest-data-center-hub-pursues-a-development-pause-is-it-even-legal-)bisnow.com

[bisnow.com](https://www.bisnow.com/news/national/data-center-community-relations/healey-massachusetts-data-center-restrictions-executive-order)bisnow.com

[Chatham County enacts 12-month data center moratorium](https://www.bizjournals.com/triangle/news/2026/02/18/data-center-moratorium-north-carolina-chatham-co.html)bizjournals.com

[Hendersonville moves ahead toward one-year data center moratorium](https://www.blueridgenow.com/story/news/local/2026/07/23/hendersonville-considers-temporary-data-center-ban/91022538007/)blueridgenow.com

[Boone County Commissioners Approve Moratorium on Data Centers](https://boonecounty.in.gov/2026/06/15/19190/)boonecounty.in.gov

[Data Centers and Detention Centers: Commissioners Declare Moratorium](https://bouldercounty.gov/news/data-centers-and-detention-centers-commissioners-declare-moratorium/)bouldercounty.gov

[Pennsylvania Senate Advances Bill Allowing 18-Month Data Center Moratoriums](https://broadbandbreakfast.com/pennsylvania-senate-advances-bill-allowing-18-month-data-center-moratoriums/)broadbandbreakfast.com

[Imperial Implements 45-Day Data Center Moratorium](https://calexicochronicle.com/2026/06/09/imperial-implements-45-day-data-center-moratorium/)calexicochronicle.com

[The city that said no to data centers](https://calmatters.org/newsletter/data-center-monterey-park-ban/)calmatters.org

[Senate Bill 6, 89th Legislature, large load interconnection, operation, and cost of service, signed by the Governor](https://capitol.texas.gov/BillLookup/History.aspx?LegSess=89R&Bill=SB6)capitol.texas.gov

[Virginia is developing a piecemeal data center moratorium](https://cardinalnews.org/2026/08/17/virginia-is-developing-a-piecemeal-data-center-moratorium-the-potential-impacts-are-complicated/)cardinalnews.org

[DeKalb County extends data center moratorium through September](https://www.cbsnews.com/atlanta/news/dekalb-county-extends-data-center-moratorium-through-september/)cbsnews.com

[Chandler's data center ordinance now in effect](https://www.chandleraz.gov/news-center/chandlers-data-center-ordinance-now-effect)chandleraz.gov

[Ordinance No. 5033 Data Center](https://www.chandleraz.gov/sites/default/files/departments/development-services/PLH22-0053-Ordinance-No-5033-Data-Center.pdf)chandleraz.gov

[Commissioners adopt 30-day moratorium on Data Centers](https://www.cherokeecountyga.gov/cherokee-county-news-view.php?article=296)cherokeecountyga.gov

[Chesterfield Pauses Data Center Expansion](https://chesterfieldreport.com/story/chesterfield-pauses-data-center-expansion.html)chesterfieldreport.com

[Aurora temporarily pauses data center and warehouse development approvals](https://www.chicagotribune.com/2025/09/26/aurora-temporarily-pauses-data-center-warehouse-development-approvals/)chicagotribune.com

[Hobart residents sue to block city's data center plan](https://www.chicagotribune.com/2025/12/10/hobart-residents-sue-to-citys-data-center-plan/)chicagotribune.com

[Valparaiso council votes 6-1 for data center moratorium](https://www.chicagotribune.com/2026/07/15/valparaiso-council-votes-6-1-data-center-moratorium/)chicagotribune.com

[As towns weigh costs of data centers, Hot Springs imposes moratorium](https://www.citizen-times.com/story/news/madison/2026/07/23/as-towns-weigh-costs-of-data-centers-hot-springs-imposes-moratorium/90991474007/)citizen-times.com

[Athens-Clarke County extends temporary moratorium on new data centers through June 5, 2026](https://citizenportal.ai/articles/7949658/Georgia/Clarke-County/Athens-Clarke-County-extends-temporary-moratorium-on-new-data-centers-through-June-5-2026)citizenportal.ai

[Broomfield enacts 18-month moratorium on new or expanded data centers of 10 MW or more](https://citizenportal.ai/articles/8410872/Colorado/Broomfield-County/Broomfield-City/Broomfield-enacts-18month-moratorium-on-new-or-expanded-data-centers-of-10-MW-or-more)citizenportal.ai

[Chamblee council adopts moratorium on new data centers, directs staff to draft regulations](https://citizenportal.ai/articles/8849730/georgia/dekalb-county/chamblee/chamblee-council-adopts-moratorium-on-new-data-centers-directs-staff-to-draft-regulations)citizenportal.ai

[Lawmakers hear HB 1515 seeking temporary pause on new datacenter approvals](https://citizenportal.ai/articles/7367152/Virginia/Lawmakers-hear-HB-1515-seeking-temporary-pause-on-new-datacenter-approvals-amid-energy-concerns)citizenportal.ai

[Piedmont Environmental Council urges Culpeper to ban new data centers in draft code](https://citizenportal.ai/articles/6645376/Virginia/Culpeper-County/Piedmont-Environmental-Council-urges-Culpeper-to-ban-new-data-centers-in-draft-code)citizenportal.ai

[Wendell adopts temporary moratorium on data centers while it rewrites zoning rules](https://citizenportal.ai/articles/7827151/north-carolina/wake-county/wendell/wendell-adopts-temporary-moratorium-on-data-centers-while-it-rewrites-zoning-rules)citizenportal.ai

[Woodfin council asks staff to draft temporary moratorium on data centers as LDO is updated](https://citizenportal.ai/articles/7861462/north-carolina/buncombe-county/woodfin-town/woodfin-council-asks-staff-to-draft-temporary-moratorium-on-data-centers-as-ldo-is-updated)citizenportal.ai

[Northeast Ohio data center moratoriums: What they cover](https://www.cleveland.com/metro/2026/07/four-northeast-ohio-cities-paused-data-center-approvals-heres-what-each-moratorium-does-and-when-it-ends.html)cleveland.com

[CNBC, Denmark faces data center reckoning](https://www.cnbc.com/2026/05/04/denmark-data-centers-moratorium-grid-pause-power-demand.html)cnbc.com

[CNBC, NY becomes first US state to impose AI data center ban](https://www.cnbc.com/2026/07/14/new-york-ai-data-center-ban.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2026/09/21/texas-governor-abbott-ai-data-center-permits.html)cnbc.com

[Local governments in Colorado enact moratoriums on data centers](https://coloradonewsline.com/2026/08/10/colorado-moratoriums-data-centers/)coloradonewsline.com

[Broomfield temporarily bans new data centers](https://www.coloradopolitics.com/2026/07/08/broomfield-passes-temporary-ban-on-new-data-center-construction/)coloradopolitics.com

[Denver proposes yearlong moratorium on new data centers](https://www.coloradopolitics.com/2026/03/31/denver-proposes-yearlong-moratorium-on-new-data-centers/)coloradopolitics.com

[Memphis City Council to consider temporary ban on data center development](https://www.commercialappeal.com/story/news/local/2026/08/14/memphis-data-center-development-possible-pause/91304172007/)commercialappeal.com

[Virginia siting rules and local moratoriums for AI data centers](https://computelaw.blog/real-estate/virginia-siting-rules-local-moratoriums/)computelaw.blog

[Aurora City Council rejects data center moratorium, approves new rules, water regs](https://www.cpr.org/2026/08/11/aurora-city-council-rejects-data-center-moratorium/)cpr.org

[Washington Township pauses new data centers to assess fire safety, emergency readiness](https://cwcolumbus.com/news/local/washington-township-pauses-new-data-centers-assess-fire-safety-emergency-readiness-prepardness-dublin-ohio-jerome-township)cwcolumbus.com

[Dodge County Committee Advances Discussion On Possible Data Center Moratorium](https://dailydodge.com/dodge-county-committee-advances-discussion-on-possible-data-center-moratorium/)dailydodge.com

[Proposed 8-month moratorium on data centers in unincorporated Lake County easily clears first step](https://www.dailyherald.com/20260818/environmental/proposed-8-month-moratorium-on-data-centers-in-unincorporated-lake-county-easily-clears-first-step/)dailyherald.com

[DataCenterBans.com](https://www.datacenterbans.com/)datacenterbans.com

[Reading, Pennsylvania Pauses Data Center Approvals While Drafting Rules](https://www.datacenterdigest.net/reading-pennsylvania-pauses-data-center-approvals-while-drafting-rules/)datacenterdigest.net

[Amsterdam resumes data center building, after a year's moratorium](https://www.datacenterdynamics.com/en/news/amsterdam-resumes-data-center-building-after-years-moratorium/)datacenterdynamics.com

[EirGrid pulls plug on 30 Irish data center projects](https://www.datacenterdynamics.com/en/news/eirgrid-pulls-plug-on-30-irish-data-center-projects/)datacenterdynamics.com

[Fauquier County approves policy curbing data centers in Virginia](https://www.datacenterdynamics.com/en/news/fauquier-county-approves-policy-curbing-data-centers-in-virginia/)datacenterdynamics.com

[Germany passes Energy Efficiency Act, with data center restrictions](https://www.datacenterdynamics.com/en/news/germany-expected-to-pass-energy-efficiency-act-this-week-with-data-center-restrictions/)datacenterdynamics.com

[Germany: The first regulated data center market](https://www.datacenterdynamics.com/en/analysis/germany-the-first-regulated-data-center-market/)datacenterdynamics.com

[Microsoft pauses $1bn data center plans in Licking County, Ohio](https://www.datacenterdynamics.com/en/news/microsoft-backs-away-from-1bn-data-center-plans-in-licking-county-ohio/)datacenterdynamics.com

[Officials in Virginia's Fauquier County 'indefinitely postpone' AWS data center proposal](https://www.datacenterdynamics.com/en/news/officials-in-virginias-fauquier-county-indefinitely-postpone-aws-data-center-proposal/)datacenterdynamics.com

[Singapore lifts data center moratorium - but sets conditions](https://www.datacenterdynamics.com/en/news/singapore-lifts-data-center-moratorium-but-sets-conditions/)datacenterdynamics.com

[The ongoing impact of Amsterdam's data center moratorium](https://www.datacenterdynamics.com/en/analysis/the-ongoing-impact-of-amsterdams-data-center-moratorium/)datacenterdynamics.com

[Tract's 430-acre data center rejected by local officials in Hanover County Virginia](https://www.datacenterdynamics.com/en/news/tracts-430-acre-data-center-rejected-by-local-officials-in-hanover-county-virginia/)datacenterdynamics.com

[Utility in Ypsilanti, Michigan, imposes one-year moratorium on supplying new data centers](https://www.datacenterdynamics.com/en/news/utility-in-ypsilanti-michigan-imposes-one-year-moratorium-on-supplying-new-data-centers/)datacenterdynamics.com

[Data Center Frontier, When buildability breaks](https://www.datacenterfrontier.com/hyperscale/article/55392482/when-buildability-breaks-what-prince-william-and-new-york-signal-for-data-center-development)datacenterfrontier.com

[Singapore Ends Data Center Pause As It Seeks Sustainable Growth](https://www.datacenterknowledge.com/cooling/singapore-ends-data-center-pause-as-it-seeks-sustainable-growth)datacenterknowledge.com

[Illinois DCEO: Data Center Investment Tax Exemptions and Credits](https://dceo.illinois.gov/expandrelocate/incentives/datacenters.html)dceo.illinois.gov

[US Data Center Policy Tracker: Moratoriums, Rejections](https://dcmap.us/insights/policy/)dcmap.us

[Data center moratorium gets unanimous approval in Denver](https://denverite.com/2026/05/18/denver-data-center-moratorium-passes-ban/)denverite.com

[Sunbury residents to vote on charter amendment banning data centers](https://www.dispatch.com/story/news/local/2026/07/16/data-center-ban-will-be-on-the-november-ballot-in-sunbury/90938395007/)dispatch.com

[DLA Piper: New York State Legislature passes first-in-the-nation data center moratorium](https://www.dlapiper.com/en-us/insights/publications/2026/07/new-york-state-legislature-passes-first-in-the-nation-data-center-moratorium)dlapiper.com

[Duane Morris, FERC advances DC integration](https://www.duanemorris.com/alerts/ferc_acts_advance_data_center_large_load_integration_six_rto_regions_0626.html)duanemorris.com

[Key Takeaways from New York Data Center Permitting Pause Under EO 62](https://www.dwt.com/blogs/energy--environmental-law-blog/2026/07/ny-data-center-permitting-pause-executive-order-62)dwt.com

[Ordinance No. 2026-06 - East Windsor Township](https://www.east-windsor.nj.us/media/Township%20Ordinance/2026/ordinance-2026-06-data-center-moratorium.pdf)east-windsor.nj.us

[Ireland Ends Moratorium on New Power Links to Data Centers](https://www.energyconnects.com/news/utilities/2025/december/ireland-ends-moratorium-on-new-power-links-to-data-centers/)energyconnects.com

[ERCOT Market Notice M-A080326-01](https://www.ercot.com/services/comm/mkt_notices/M-A080326-01)ercot.com

[ERCOT Market Notice M-A080326-02: PUC Approval of Good Cause Exceptions Relating To Batch Zero Process (August 21, 2026)](https://www.ercot.com/services/comm/mkt_notices/M-A080326-02)ercot.com

[ERCOT Senate Presentation July 29, 2026](https://www.ercot.com/files/docs/2026/07/29/ERCOT-Senate-July-29-Panel-1-Assessing-The-Grid.pdf)ercot.com

[Market Notice M-B062326-01, Implementation of the Batch Zero Process, PGRR145 and NPRR1325](https://www.ercot.com/services/comm/mkt_notices/M-B062326-01)ercot.com

[Market Notice M-B062326-04, Ending the Large Load Interconnection Study process under PGRR115 and Batch Zero submission deadlines](https://www.ercot.com/services/comm/mkt_notices/M-B062326-04)ercot.com

[facilitiesdive.com](https://www.facilitiesdive.com/news/cities-get-more-say-in-data-center-development-under-new-california-laws/831095/)facilitiesdive.com

[Data Centers - Adopted Zoning Ordinance Amendment](https://www.fairfaxcounty.gov/planning-development/data-centers)fairfaxcounty.gov

[Bill tracking in Virginia - HB 1515 (2026 legislative session)](https://fastdemocracy.com/bill-search/va/2026/bills/VAB00043640/)fastdemocracy.com

[Fairfax County board approves new data center restrictions](https://www.ffxnow.com/2024/09/11/fairfax-county-approves-new-restrictions-on-data-centers-supervisors-says-theres-more-to-come/)ffxnow.com

[Resolution No. 2026-08 Data Center YCUA Moratorium](https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-08-Data-Center-YCUA-Moratorium.pdf)files.ypsitownship.org

[Minneapolis City Council OKs data center moratorium](https://finance-commerce.com/2026/05/minneapolis-data-center-moratorium-approved/)finance-commerce.com

[Senate Bill 484 (2026) - The Florida Senate](https://www.flsenate.gov/Session/Bill/2026/484)flsenate.gov

[Baltimore City Council Passes One-Year Data Center Moratorium](https://www.foodandwaterwatch.org/2026/05/12/baltimore-city-council-passes-one-year-data-center-moratorium/)foodandwaterwatch.org

[Montgomery County, MD Unanimously Passes 18-Month Moratorium on Hyperscale Data Centers](https://www.foodandwaterwatch.org/2026/07/28/montgomery-county-md-unanimously-passes-18-month-moratorium-on-hyperscale-data-centers/)foodandwaterwatch.org

[Data center moratorium takes first steps after Fort Worth City Council's unanimous vote](https://fortworthreport.org/2026/08/12/data-center-moratorium-takes-first-steps-after-fort-worth-city-councils-unanimous-vote/)fortworthreport.org

[Manitowoc County Board votes unanimously to impose 18-month moratorium](https://fox11online.com/news/local/manitowoc-county-board-to-decide-on-data-center-moratorium)fox11online.com

[Inver Grove Heights City Council votes to pass data center moratorium](https://www.fox9.com/news/inver-grove-heights-data-center-moratorium-june-26-2026)fox9.com

[Minneapolis data center development pause approved by city council](https://www.fox9.com/news/minneapolis-data-center-development-pause-approved-city-council-june-25-2026)fox9.com

[County Announces Pause on New Data Center Development Following Maryland Supreme Court Decision](https://www.frederickcountymd.gov/CivicAlerts.aspx?AID=5845)frederickcountymd.gov

[Tulare County adopts temporary moratorium on data centers](https://www.fresnobee.com/news/california/central-valley/article316922154.html)fresnobee.com

[East Texas Data Center Withdraws After Falling Short of Governor Abbott's Standards](https://gov.texas.gov/news/post/east-texas-data-center-withdraws-after-falling-short-of-governor-abbotts-standards)gov.texas.gov

[Governor Abbott Announces Core Scientific, Vantage Data Centers and SB Energy Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-core-scientific-vantage-data-centers-and-sb-energy-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Edge ConneX and Stream Data Centers Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-edge-connex-and-stream-data-centers-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Galaxy, Compass Datacenters and Montera Infrastructure Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-galaxy-compass-datacenters-and-montera-infrastructure-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Google, Rowan and CleanSpark Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-google-rowan-and-cleanspark-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Meta Commits to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-meta-commits-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces OpenAI Commits to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-open-ai-commits-to-comply-with-his-data-center-standards-8-10)gov.texas.gov

[Governor Abbott Announces PUC and ERCOT Actions Protecting Residential Ratepayers From Data Center Costs](https://gov.texas.gov/news/post/governor-abbott-announces-puc-and-ercot-actions-protecting-residential-ratepayers-from-data-center-costs)gov.texas.gov

[Governor Abbott Announces QTS Data Centers Will Meet Texas Standards](https://gov.texas.gov/news/post/governor-abbott-announces-qts-data-centers-will-meet-texas-standards)gov.texas.gov

[Governor Abbott Announces Skybox, Digital Realty and MARA Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announcesskyboxdigital-realtymara-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Directs Comprehensive Data Center Audit](https://gov.texas.gov/news/post/governor-abbott-directs-comprehensive-data-center-audit)gov.texas.gov

[Governor Abbott Directs PUC and ERCOT to Shield Texans From Data Center Infrastructure Costs](https://gov.texas.gov/news/post/governor-abbott-directs-puc-and-ercot-to-shield-texans-from-data-center-infrastructure-costs)gov.texas.gov

[Office of the Texas Governor: Governor Abbott Directs TWDB To Penalize Data Center Reporting Failures (Sept. 14, 2026)](https://gov.texas.gov/news/post/governor-abbott-directs-twdb-to-penalize-data-center-reporting-failures)gov.texas.gov

[Establishing a Temporary Moratorium on Data Centers in New York](https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops)governor.ny.gov

[Governor Hochul Announces Strongest Community Investment Framework in the Nation to Protect Communities from Exploitative Data Center…](https://www.governor.ny.gov/news/governor-hochul-announces-strongest-community-investment-framework-nation-protect-communities)governor.ny.gov

[Utah Governor's Office: Executive Order 2026-03, Establishing a Higher Bar for Data Center Development in Utah (May 29, 2026)](https://governor.utah.gov/wp-content/uploads/2026.05.29-EO-Higher-Bar-for-Data-Center-Development-1.pdf)governor.utah.gov

[Office of the Governor of Virginia: Governor Spanberger Unveils Nation's Most Comprehensive & Aggressive Data Center Accountability…](https://www.governor.virginia.gov/newsroom/news-releases/2026/september-releases/name-1123696-en.html)governor.virginia.gov

[Data Center Bans Emerge in 4 More New Jersey Communities](https://www.govtech.com/artificial-intelligence/data-center-bans-emerge-in-4-more-new-jersey-communities)govtech.com

[Opinion: Douglas County, Colo., Takes New Data Center Approach](https://www.govtech.com/opinion/opinion-douglas-county-colo-takes-new-data-center-approach)govtech.com

[Greenberg Traurig, NY Executive Order pause analysis](https://www.gtlaw.com/en/insights/2026/7/new-york-executive-order-pauses-discretionary-data-center-permitting-pending-environmental-review-and-grid-cost-mitigation-framework)gtlaw.com

[Baltimore County Council Passes Unanimous 1-Year Data Center Moratorium](https://gunpowderriverkeeper.org/baltimore-county-council-passes-unanimous-1-year-data-center-moratorium-bill/)gunpowderriverkeeper.org

[York SC Planning Commission recommends data center regulation](https://www.heraldonline.com/news/politics-government/article316332198.html)heraldonline.com

[Gov. Greg Abbott pauses new data centers until ERCOT, PUCT audit](https://www.houstonpublicmedia.org/articles/news/energy-environment/2026/08/03/558529/gov-greg-abbott-pauses-new-data-centers-until-ercot-puct-audit-energy-water-usage/)houstonpublicmedia.org

[County board votes unanimously for 18-month data center moratorium](https://www.htrnews.com/story/news/local/2026/04/29/manitowoc-county-data-center-moratorium-2027-halt-wisconsin-expansion/89854870007/)htrnews.com

[Gov. Kotek pauses data centers on state land. Capitol demonstrators want her to go further (Jefferson Public Radio, Sept. 9, 2026)](https://www.ijpr.org/politics-government/2026-09-09/gov-kotek-pauses-data-centers-on-state-land-capitol-demonstrators-want-her-to-go-further)ijpr.org

[InDepthNH: Ayotte To Seek Moratorium on AI Data Centers (September 2, 2026)](https://indepthnh.org/2026/09/02/ayotte-tells-council-shell-seek-moratorium-on-ai-data-centers-in-nh-questions-raised-about-chief-justice/)indepthnh.org

[Boone County adopts 1-year data center moratorium](https://www.indystar.com/story/news/local/2026/06/15/boone-county-imposes-1-year-data-center-moratorium/90529614007/)indystar.com

[Council moves data center moratorium forward, but it's not final yet](https://www.indystar.com/story/money/business/development/2026/08/10/indianapolis-city-county-council-votes-forward-data-center-moratorium/91244973007/)indystar.com

[Indy council approves data center moratorium, overrides Hogsett's position](https://www.indystar.com/story/news/local/indianapolis/2026/08/10/indianapolis-city-county-leaders-vote-vehicle-tax-increases-data-center-moratorium-hogsett-override--live/91213369007/)indystar.com

[Valparaiso Advances Data Center Moratorium](https://www.inkfreenews.com/2026/07/15/valparaiso-advances-data-center-moratorium/)inkfreenews.com

[Monroe Township will defend data center ban in federal court](https://www.inquirer.com/south-jersey/monroe-new-jersey-data-center-ban-lawsuit-20260717.html)inquirer.com

[PUCT Project 59142, ERCOT request for good cause exceptions to Batch Zero deadlines](https://interchange.puc.texas.gov/Search/Filings?ControlNumber=59142)interchange.puc.texas.gov

[PUCT Project 59142, Item 52: ERCOT Updates on Good Cause Exceptions for PGRR 145, Batch Zero Verification and Audit Process, and Community…](https://interchange.puc.texas.gov/Documents/59142_52_1675838.PDF)interchange.puc.texas.gov

[PUCT Project 59142, Item 53: ORDER GRANTING GOOD CAUSE EXCEPTIONS (signed August 20, 2026)](https://interchange.puc.texas.gov/Documents/59142_53_1675960.PDF)interchange.puc.texas.gov

[Project 58481, Proposal for Publication of 16 TAC 25.194, large load interconnection standards](https://interchange.puc.texas.gov/Documents/58481_122_1600475.PDF)interchange.puc.texas.gov

[Interconnected Capital, US Data Center Moratorium Tracker](https://www.interconnectedcapital.com/research/data-center-moratoriums)interconnectedcapital.com

[Jackson County Missouri - Legislation Detail (File #6074)](https://jacksonco.legistar.com/LegislationDetail.aspx?From=RSS&ID=7968370&GUID=8F716A18-B731-4CB4-9A9F-3AB14D43993B&FullText=1)jacksonco.legistar.com

[Neptune Township bans data centers and ICE detention facilities](https://jerseyvindicator.org/2026/07/13/neptune-township-bans-data-centers-and-ice-detention-facilities/)jerseyvindicator.org

[City of Waterloo considering three-month data center moratorium](https://www.kcrg.com/2026/08/18/city-waterloo-considering-three-month-data-center-moratorium/)kcrg.com

[KERA News, ERCOT says it plans to complete governor's data center audit by December](https://www.keranews.org/texas-news/2026-08-21/ercot-says-it-plans-to-complete-governors-data-center-audit-by-december)keranews.org

[Federal Way passes one-year data center moratorium](https://www.king5.com/article/news/local/federal-way-passes-one-year-data-center-moratorium/281-48c5192e-b53a-4cac-86b0-4c09e703322c)king5.com

[Here is what's in Tucson's new data center rules, while city explores ban options](https://www.kjzz.org/fronteras-desk/2026-08-06/here-is-whats-in-tucsons-new-data-center-rules-while-city-explores-ban-options)kjzz.org

[Coachella extends data center moratorium as city moves toward possible ban](https://kvcr.org/news/local/2026-07-09/coachella-extends-data-center-moratorium-as-city-moves-toward-possible-ban)kvcr.org

[Mendocino County is taking a proactive approach to data centers](https://www.kwine.com/2026/07/09/mendocino-county-is-taking-a-proactive-approach-to-data-centers/)kwine.com

[Board votes to temporarily ban new data centers in unincorporated Lake County](https://www.lakemchenryscanner.com/2026/06/20/they-bring-serious-concerns-board-votes-to-temporarily-ban-new-data-centers-in-unincorporated-lake-county/)lakemchenryscanner.com

[House Bill 1059](https://www.legis.ga.gov/api/legislation/document/20252026/240599)legis.ga.gov

[Data Centers in Unincorporated Linn County](https://www.linncountyiowa.gov/1862/Data-Centers-in-Unincorporated-Linn-Coun)linncountyiowa.gov

[Washington County Commission extends data center moratorium to one year](https://localnews1.org/washington-county-commission-extends-data-center-moratorium-to-one-year/)localnews1.org

[Wilson County approves six-month data center moratorium](https://mainstreetmediatn.com/articles/chronicleofmtjuliet/wilson-county-approves-six-month-data-center-moratorium/)mainstreetmediatn.com

[Prince George's County extends pause on hyperscale data centers](https://marylandmatters.org/2026/07/08/prince-georges-county-extends-pause-on-hyperscale-data-center-development/)marylandmatters.org

[Mendocino County supervisors move toward data center moratorium](https://mendovoice.com/2026/07/mendocino-county-supervisors-move-toward-data-center-moratorium/)mendovoice.com

[Michigan lawmakers, local officials and residents renew push for statewide data center moratorium](https://michiganadvance.com/2026/06/24/michigan-lawmakers-residents-renew-push-for-statewide-data-center-moratorium/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/09/14/environmentalists-push-lawmakers-to-forge-ahead-on-moratorium-and-regulations-for-data-centers/)michiganadvance.com

[MLQ.ai, Loudoun moves toward moratorium, rejects 780MW campus](https://mlq.ai/news/loudoun-county-moves-toward-data-center-moratorium-rejects-780mw-active-infrastructure-campus/)mlq.ai

[Michigan Senator Files Statewide 365-Day Data Center Moratorium Bills](https://mlq.ai/news/michigan-senator-files-statewide-365-day-data-center-moratorium-bills/)mlq.ai

[Federal Way Ordinance No. 26-1048 (12-month moratorium)](https://mrsc.org/getmedia/976a7ae6-9dd8-4b0c-a18f-b43ea16a897d/f4o26-1048.pdf)mrsc.org

[Flint City Council passes moratorium resolution in a 7-1 vote](https://mtimes.org/2026/06/09/flint-city-council-passes-moratorium-resolution-in-a-7-1-vote/)mtimes.org

[MultiState, State Data Center Policy Shifts](https://www.multistate.us/insider/2026/6/22/state-data-center-policy-shifts-as-governors-impose-new-restrictions)multistate.us

[Sarasota County blocks hyperscale data centers for at least one year](https://www.mysuncoast.com/2026/07/09/sarasota-county-blocks-hyperscale-data-centers-least-one-year/)mysuncoast.com

[File #: BL2026-1448](https://nashville.legistar.com/LegislationDetail.aspx?ID=8063111&GUID=2A6E536A-95F6-46B9-993A-1F6E018DD389)nashville.legistar.com

[Nashville passes data center zoning and permit moratorium](https://nashvillebanner.com/2026/07/21/nashville-data-center-regulations-moratorium/)nashvillebanner.com

[Prince George's County Council passes 2-year moratorium on new data centers](https://www.nbcwashington.com/news/local/prince-georges-county-council-passes-2-year-moratorium-on-new-data-centers/4127354/)nbcwashington.com

[NCDOR Important Notice: Repeal of Exemptions for Electricity Used at Datacenters (July 23, 2026)](https://www.ncdor.gov/taxes-forms/sales-and-use-tax/other-sales-and-use-tax-resources/important-notices-issued-sales-and-use-tax-division/important-notice-repeal-exemptions-electricity-used-datacenters)ncdor.gov

[NCSL, Which States Are Banning Data Centers](https://www.ncsl.org/fiscal/which-states-are-banning-data-centers)ncsl.org

[Reno City Council extends data center moratorium, promises effort is not political](https://nevadacurrent.com/2026/06/03/reno-city-council-extends-data-center-moratorium-promises-effort-is-not-political/)nevadacurrent.com

[nevadacurrent.com](https://nevadacurrent.com/2026/09/18/lombardo-doubles-down-on-data-centers-offers-trimmed-tax-breaks-commitments-to-wary-public/)nevadacurrent.com

[State of Delaware: Governor Matt Meyer Signs Energy Consumer Protection Legislation (August 26, 2026)](https://news.delaware.gov/2026/08/26/governor-matt-meyer-signs-energy-consumer-protection-legislation/)news.delaware.gov

[news.google.com](https://news.google.com/rss/articles/CBMi5gFBVV95cUxPNUl0eVlLWkNlQXpOU2doSlBQZ0lYWHRIOXQ1NklXdkk5dG5rVzBOUGl5SXFZUWFMNlUxRnVoOG1IdnhHYjZ1ZUlRM1ktS1lWQ2ZYZHV6UXk3d0xSaDJRMm5rWlEwWWtrUTExeHpwMmM2TE5PXzBsOXBUSFdsNDBrbGx6a1NWNWdCeC1NNy03RFdwNDVlZ0QybjExSll3bndNcl84aGZpVzZCSUtLeU1wSjg5ZlhKRm9UVW5wck5ib0F0NWR1eGlHMUhkMWJibDVQc0xfZV85aXNsaFN5S2tGYXU0dEt3Zw)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMiigFBVV95cUxPSEx1ckpTZnF2SmRVby1uWFkwSUVCd2JDZTZaZzNoZHRNWU9oTzNXUG9kdzRjOFBZcXd4S3lWeTNjNmJyc0R2aU9xRE9IZk01UUxUWXFBRzlUWEFHd3I3bXRpWVFyNXJxYWtjbDRpSElHY2sxUHVxWl9pUUxET25WdzhfMWZDV3NKd0E)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMi9AFBVV95cUxQR1Z2SnY2MThqQV9RQnBZdlRaRUgxYWJQZ2llZWtaWXNVX055V2RTeU5GSmI0NGZLREhYWmk4QWZLWDJvWTFURmU5MEZvR2YydzU3V3Zra0o0WERMYWcxUy1nak1CbDBqRGp1WUFVWS14S2VTMnRyajUwSkVubkFDOU56WHI1OE1XWmltckJ5dTJDdmlWYVphMmtBcS1aR1V5dlk4cnREb1N1MWlGb3BVSy0xczhVVXlXTW5YWWxwRW1FbWNzcUJfMkk1VXhvUjhMeGk0SGtLVWlvUUllVVR1bnc2VXN1TVNUeUk4WXo5UG9HaE56)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMiwwFBVV95cUxQbTljRUIwTUxVQUVzeldXdjJYZ0RaY0s0M2Y4WGJmYmhNLUZMc2lLUW51RFN0YmJyZGtHMkRRLXYxb0ZqeEZIUnBwX3lkZG9jaC1leUNvWTRjUXV0VDZhQjlXcjdFVnFuRXRaeWdKOTl4UWNfVXdWVUNjSmJxUFlGSGlXZmN5Ymh5MEFHa3JMMFRjaERRZXpoTnlMU3I4WUlSZlhSZmY3UVpiVGF5MlMyRlFFQ0d5X3lLN0RpZUFuY2hiZzg)news.google.com

[News 5 Cleveland: DeWine halts new sales-tax breaks for data centers](https://www.news5cleveland.com/news/politics/ohio-politics/dewine-halts-new-sales-tax-breaks-for-data-centers)news5cleveland.com

[NC developer sues Chatham County over data center moratorium](https://www.newsobserver.com/news/business/article315547697.html)newsobserver.com

[NHPR: Ayotte opposes potential Bow data center, plans to propose statewide moratorium (September 2, 2026)](https://www.nhpr.org/nh-news/2026-09-02/ayotte-opposes-potential-bow-data-center-plans-to-propose-moratorium-on-data-centers-in-state)nhpr.org

[Nottingham's 12-month moratorium on data center...](https://www.nhpr.org/environment/2026-07-03/nottingham-data-center-moratorium-town-meeting-nh)nhpr.org

[Sussex County town officially bans data centers after public pushback](https://www.njherald.com/story/news/2026/05/29/andover-nj-data-centers-ban/90311423007/)njherald.com

[New Jersey Legislature: S3379 (2R) bill history, Approved P.L.2026, c.75 on 8/27/2026](https://www.njleg.state.nj.us/bill-search/2026/S3379)njleg.state.nj.us

[New Jersey Legislature: S4390 (1R) bill history, End Data Center Tax Credits Act, Approved P.L.2026, c.77 on 8/27/2026](https://www.njleg.state.nj.us/bill-search/2026/S4390)njleg.state.nj.us

[Amsterdam not allowing any more data centers in the municipality](https://nltimes.nl/2025/04/18/amsterdam-allowing-data-centers-municipality)nltimes.nl

[Champaign County Board approves 1-year data center moratorium](https://www.nprillinois.org/economy-business/2026-04-24/champaign-county-board-approves-1-year-data-center-moratorium)nprillinois.org

[NY State Senate: A11560](https://www.nysenate.gov/legislation/bills/2025/A11560)nysenate.gov

[NY State Senate: S10642 Responsible Data Center Development Act](https://www.nysenate.gov/legislation/bills/2025/S10642)nysenate.gov

[Spectrum News State of Politics: Pursuit for tax exemptions for data centers in N.Y. slammed (September 18, 2026)](https://nystateofpolitics.com/state-of-politics/new-york/politics/2026/09/18/data-center-tax-exemptions)nystateofpolitics.com

[Data center ban on the Ohio ballot? Petitioners get approval to start gathering signatures](https://ohiocapitaljournal.com/2026/04/03/data-center-ban-on-the-ohio-ballot-petitioners-get-approval-to-start-gathering-signatures/)ohiocapitaljournal.com

[ohiocapitaljournal.com](https://ohiocapitaljournal.com/2026/09/22/candidates-rune-against-data-centers-but-ohio-legislature-didnt-get-the-memo/)ohiocapitaljournal.com

[Oklahoma City Council approves moratorium on new data centers](https://www.okc.gov/News-articles/Oklahoma-City-Council-approves-moratorium-on-new-data-centers)okc.gov

[Bill Summary - SB 1488 (Oklahoma Legislature)](https://www.oklegislature.gov/cf_pdf/2025-26%20SUPPORT%20DOCUMENTS/BILLSUM/Senate/SB1488%20INT%20BILLSUM.PDF)oklegislature.gov

[Commonwealth of Pennsylvania: Executive Order 2026-05, Protecting Pennsylvania Consumers from Data Center Impacts (signed August 18, 2026)](https://www.pa.gov/content/dam/copapwp-pagov/en/governor/documents/eo2026_05_protecting%20pennsylvania%20consumers%20from%20data%20center%20impacts_final_executed.pdf)pa.gov

[Governor Shapiro Signs Executive Order on Data Center Development in PA](https://www.pa.gov/governor/newsroom/2026-press-releases/governor-shapiro-signs-executive-order-on-data-center-developmen)pa.gov

[County to put a pause on data centers, but it won't halt Project Tango](https://www.palmbeachpost.com/story/business/information-technology/2026/07/07/palm-beach-county-freeze-new-data-centers-before-project-tango-decision/90839690007/)palmbeachpost.com

[Amazon Data Center & Transmission Line Proposal in Warrenton](https://www.pecva.org/warrenton-transmission-line/)pecva.org

[Culpeper puts guardrails on data centers](https://www.pecva.org/region/culpeper/culpeper-quarterly-update-culpeper-puts-guardrails-on-data-centers/)pecva.org

[Chair Oriadha Announces Two-Year Moratorium to Prevent New Data Centers](https://pgccouncil.us/CivicAlerts.aspx?AID=2073)pgccouncil.us

[Ypsilanti utility OKs 12-month ban on water for data centers](https://planetdetroit.org/2026/04/data-center-water-moratorium-ypsilanti/)planetdetroit.org

[POWER Magazine, BNEF 49.8 GW at risk](https://www.powermag.com/texas-audit-could-delay-49-8-gw-of-data-center-load-cost-projects-up-to-15-billion-bnef-warns/)powermag.com

[Champaign County Approves 12-Month Moratorium on Data Centers](https://prairierivers.org/front-page/2026/04/champaign-county-approves-12-month-moratorium-on-data-centers/)prairierivers.org

[Gray joins growing list of towns with data center moratoriums](https://www.pressherald.com/2026/08/06/gray-joins-growing-list-of-towns-with-data-center-moratoriums/)pressherald.com

[Maine legislature approves first US moratorium on big data centers](https://www.reuters.com/sustainability/boards-policy-regulation/maine-legislature-approves-first-us-moratorium-big-data-centers-2026-04-14/)reuters.com

[New York becomes the first state to impose a data center moratorium](https://www.reuters.com/world/new-york-becomes-first-state-impose-data-center-moratorium-2026-07-14/)reuters.com

[Reuters, Hundreds of millions in grid deposits linger](https://www.reuters.com/legal/litigation/hundreds-millions-grid-deposits-linger-uncertainty-following-texas-data-center-2026-08-07/)reuters.com

[Reuters, New York issues moratorium on data centers](https://www.reuters.com/sustainability/new-york-issues-moratorium-data-centers-2026-07-16/)reuters.com

[Reuters, Texas orders pause on new data center approvals](https://www.reuters.com/business/energy/texas-governor-orders-pause-new-data-center-approvals-pending-audit-2026-08-04/)reuters.com

[Reuters, Where authorities are restricting data centres](https://www.reuters.com/legal/litigation/where-authorities-are-restricting-data-centres-amid-ai-boom-2026-07-14/)reuters.com

[Chesterfield Board indicates it won't approve any more data centers in the county](https://www.richmonder.org/chesterfield-board-indicates-it-wont-approve-any-more-data-centers-in-the-county/)richmonder.org

[Lochbuie approves five-year data center moratorium, making it the ...](https://www.rmpbs.org/news/government/lochbuie-approves-five-year-data-center-moratorium)rmpbs.org

[Rockdale County Fact Sheet: Data Centers 101](https://www.rockdalecountyga.gov/wp-content/uploads/2026/05/Rockdale-Data-Center-Fact-Sheet-5.12.26-Revised.docx.pdf)rockdalecountyga.gov

[Casa Grande approves data center waivers](https://roselawgroupreporter.com/2026/08/casa-grande-approves-data-center-waivers/)roselawgroupreporter.com

[route-fifty.com](https://www.route-fifty.com/artificial-intelligence/2026/09/governors-take-major-actions-ai/416161/)route-fifty.com

[Data Center Moratorium: 12 States, 2026 Map, The Fix](https://savrn.com/data-center-moratorium/)savrn.com

[2026 Senate Bill 135 (South Dakota Legislature)](https://sdlegislature.gov/Session/Bill/27028/297535)sdlegislature.gov

[Nottingham data center plan may be revived; town weighs 12-month ban](https://www.seacoastonline.com/story/news/local/2026/06/29/nottingham-nh-data-center-town-weighs-12-month-ban/90682952007/)seacoastonline.com

[New Jersey Data Center Policy (ServerCountry)](https://servercountry.org/policy/new-jersey/)servercountry.org

[Signal Ohio: DeWine abruptly pauses a major tax break for data centers in Ohio (May 27, 2026)](https://signalohio.org/dewine-abruptly-pauses-a-major-tax-break-for-data-centers-in-ohio/)signalohio.org

[sourcenm.com](https://sourcenm.com/2026/09/17/new-mexico-dem-governor-nominee-haaland-announces-data-center-moratorium-executive-order-if-elected/)sourcenm.com

[Stokes County Opens Door to Data Centers Despite Community Opposition](https://southerncoalition.org/stokes-county-commissioners-open-door-to-data-centers-despite-overwhelming-community-opposition/)southerncoalition.org

[Data Center Regulatory Requirements in McHenry County, IL](https://www.sparkhq.ai/states/illinois/mchenry-county/data-center-regulations)sparkhq.ai

[Andover bans data centers, Hardyston could be next](https://www.spartaindependent.com/news/local-news/andover-bans-data-centers-hardyston-could-be-next-FI5903755)spartaindependent.com

[Proposed amendment to ban huge data centers in Ohio can move to next step](https://www.statenews.org/government-politics/2026-03-26/proposed-amendment-to-ban-huge-data-centers-in-ohio-can-move-to-next-step)statenews.org

[TechCrunch, NY halts construction of all new data centers](https://techcrunch.com/2026/07/14/new-york-state-halts-construction-of-all-new-data-centers/)techcrunch.com

[Arizona freezes new data center tax breaks for three years](https://technewsday.com/arizona-freezes-new-data-center-tax-breaks-for-three-years/)technewsday.com

[York County Council approves nine month data center moratorium](https://tegacaysun.com/2026/07/14/york-county-council-approves-nine-month-data-center-moratorium/)tegacaysun.com

[Nashville bans some data centers, pauses rest and adds regulations](https://www.tennessean.com/story/news/local/davidson/2026/07/22/nashville-data-center-ban-regulations/91004069007/)tennessean.com

[Tennessean, DC BLOX sues Nashville over moratorium](https://www.tennessean.com/story/news/local/davidson/2026/08/12/zoo-data-center-dc-blox-lawsuit-nashville-moratorium/91276101007/)tennessean.com

[Wilson County leaders pause to study data centers' impact on water and power](https://www.tennessean.com/story/news/local/wilson/2026/07/14/data-centers-tennessee-wilson-county/90756030007/)tennessean.com

[Texas Tribune, Data center project audit](https://www.texastribune.org/2026/08/14/texas-data-center-approval-pause-ercot-power-grid/)texastribune.org

[Texas could penalize data centers for not reporting water use (Texas Tribune, Sept. 14, 2026)](https://www.texastribune.org/2026/09/14/texas-data-centers-abbott-water-survey-enforcement/)texastribune.org

[Texas county rescinds data center moratorium after lawsuit](https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/)texastribune.org

[Camden becomes first county on the coast to adopt data center moratorium](https://thecurrentga.org/2026/05/02/camden-set-to-vote-on-data-center-moratorium-amid-kingsland-rezone-vote/)thecurrentga.org

[Data Centers & Coastal Georgia](https://thecurrentga.org/collections/data-centers-for-coastal-georgia/)thecurrentga.org

[Garden City puts brakes on data centers](https://thecurrentga.org/2026/06/16/garden-city-puts-brakes-on-data-centers/)thecurrentga.org

[Southern MD county finds itself in the middle of a data center moratorium fight](https://thedailyrecord.com/2026/05/05/maryland-county-moratorium-data-centers/)thedailyrecord.com

[Western MD county approves data center moratorium](https://thedailyrecord.com/2026/07/01/washington-county-approves-yearlong-data-center-moratorium/)thedailyrecord.com

[Georgia leads push to ban datacenters used to power America's AI boom](https://www.theguardian.com/technology/2026/jan/26/georgia-datacenters-ai-ban)theguardian.com

[In first, California city overwhelmingly votes to permanently ban data centers](https://www.theguardian.com/us-news/2026/jun/03/california-monterey-park-datacenters-ban)theguardian.com

[thehill.com](https://thehill.com/homenews/state-watch/6098665-spanberger-data-center-accountability/)thehill.com

[Town Council to take on data centers in 2025](https://thenewenergycrisis.com/updates/town-council-to-take-on-data-centers-in-2025)thenewenergycrisis.com

[Sugar Grove weighs data center crackdown](https://therealdeal.com/chicago/2026/04/06/chicago-suburb-sugar-grove-weighs-data-center-crackdown/)therealdeal.com

[Locals speak out against $4 billion data center in Berkeley County](https://therealwv.com/2026/03/23/locals-speak-out-against-4-billion-data-center-in-berkeley-county/)therealwv.com

[theregister.com](https://www.theregister.com/systems/2026/09/18/virginia-governor-wakes-up-to-fact-datacenters-have-become-political-cancer/5297561)theregister.com

[Licking County Planning Commission OKs St. Albans Township plan to ban data centers](https://www.thereportingproject.org/licking-county-planning-commission-oks-st-albans-township-plan-to-ban-data-centers/)thereportingproject.org

[McMinnville Approves 18-Month Data Center Moratorium](https://theucnow.com/2026/06/03/mcminnville-board-unanimously-approves-center-moratorium/)theucnow.com

[Vetoed, Not Dead: Maine's Data Center Moratorium and What It Means for Developers](https://www.thompsonhine.com/insights/vetoed-not-dead-maines-data-center-moratorium-and-what-it-means-for-developers/)thompsonhine.com

[Denmark presses pause on new data center grid connections as total requests hit 60 GW](https://www.tomshardware.com/tech-industry/artificial-intelligence/denmark-presses-pause-on-new-data-center-grid-connections-as-total-requests-hit-60-gw-nordic-nation-is-the-latest-to-put-the-brakes-on-ai-buildouts)tomshardware.com

[Lordstown extends data center moratorium](https://www.tribtoday.com/news/local-news/2026/06/lordstown-extends-data-center-moratorium/)tribtoday.com

[Officials considering a moratorium on data centers in unincorporated Kane County](https://www.tricitiescentral.com/p/officials-considering-a-moratorium-on-data-centers-in-unincorporated-kane-county)tricitiescentral.com

[Twin Cities, Data center company sues Eagan](https://www.twincities.com/2026/07/06/data-center-company-sues-eagan-over-development-pause/)twincities.com

[Arkansas' most populous county approves data center moratorium, but with exemption](https://www.ualrpublicradio.org/local-regional-news/2026-05-27/arkansas-most-populous-county-approves-data-center-moratorium-but-with-exemption)ualrpublicradio.org

[Lochbuie, Colorado Enacts Five-Year Data Center Moratorium](https://usdatacenterprojects.com/colorado/lochbuie-colorado-passes-five-year-data-center-moratorium)usdatacenterprojects.com

[Utility Dive, ERCOT aims to complete Texas governor's data center audit by December](https://www.utilitydive.com/news/ercot-texas-puc-data-center-audit/828472/)utilitydive.com

[Data Center Moratoria Spread Across the DMV](https://www.venable.com/insights/publications/2026/07/data-center-moratoria-spread-across-the-dmv)venable.com

[Chesapeake approves 8-month pause on data center applications](https://virginiabusiness.com/chesapeake-approves-8-month-pause-on-data-center-applications/)virginiabusiness.com

[Hanover supervisors reject 430-acre data center campus](https://virginiabusiness.com/hanover-supervisors-reject-430-acre-data-center-campus/)virginiabusiness.com

[Virginia Business, Loudoun supervisors mull moratorium](https://virginiabusiness.com/loudoun-supervisors-mull-data-center-moratorium/)virginiabusiness.com

[Va. Court of Appeals stops major data center development in Prince William County](https://virginiamercury.com/briefs/va-court-of-appeals-stops-major-data-center-development-in-prince-william-county/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2026/09/24/virginia-lawmakers-call-for-study-on-ai-use-in-virginia-colleges-and-more-headlines/)virginiamercury.com

[Chesapeake City Council approves 8-month hold on data center applications](https://www.vpm.org/news/2026-07-22/chesapeake-city-council-data-center-application-hold-lindley-newins-whro)vpm.org

[Prince William County supervisors abandon fight for Manassas data centers](https://www.washingtontimes.com/news/2026/apr/15/prince-william-county-supervisors-abandon-fight-manassas-data-centers/)washingtontimes.com

[Boone Town Council Passes One-Year Data Center Moratorium 5-0](https://wataugaonline.com/boone-town-council-passes-one-year-data-center-moratorium-5-0-watauga-county-commissioners-move-toward-county-wide-restrictions/)wataugaonline.com

[Fort Worth City Council approves 90-day pause on new data center projects](https://www.wbap.com/2026/08/12/fort-worth-city-council-approves-90-day-pause-on-new-data-center-projects/)wbap.com

[Stokes planning board backs pause on data center development](https://www.wfdd.org/politics-government/2026-07-10/stokes-planning-board-backs-pause-on-data-center-development)wfdd.org

[White & Case, FERC orders on grid interconnection](https://www.whitecase.com/insight-alert/ferc-orders-grid-operators-promptly-revise-or-justify-interconnection-rules-data)whitecase.com

[CRU Publishes Long Awaited Final Policy on Data Centre Connections](https://www.williamfry.com/knowledge/cru-publishes-long-awaited-final-policy-on-data-centre-connections/)williamfry.com

[Woodfin Town Council approves 1-year pause on data center development](https://wlos.com/news/local/woodfin-town-council-approves-12-month-pause-data-center-development-moratorium-facilites-community-facilities-western-north-carolina)wlos.com

[Sunbury City Council passes moratorium on data centers](https://www.wosu.org/politics-government/2026-04-16/sunbury-city-council-passes-moratorium-on-data-centers)wosu.org

[Palm Beach County halts new AI data center applications under moratorium](https://www.wpbf.com/article/florida-palm-beach-county-ai-data-center-moratorium/71872991)wpbf.com

[Wendell leaders to consider hold on data center construction](https://www.wral.com/news/local/wendell-nc-commissioners-consider-pausing-data-centers-march-2026/)wral.com

[ACC Commission pauses new data centers, Manager says Athena Studios data center would need rezone](https://www.wuga.org/local-news/2025-12-03/acc-commission-pauses-new-data-centers-manager-says-athena-studios-data-center-would-need-rezone)wuga.org

[Apex plans to adopt data center moratorium](https://www.wunc.org/environment/2026-03-11/apex-data-center-moratorium-wake-county)wunc.org

[Boone approves data center development moratorium](https://www.wunc.org/2026-03-23/boone-approves-data-center-development-moratorium)wunc.org

[Officials in Berkeley County, site of first high impact data center seek more clarity on tax split](https://wvmetronews.com/2026/06/09/officials-in-berkeley-county-site-of-first-high-impact-data-center-seek-more-clarity-on-tax-split/)wvmetronews.com

[Court blocks construction of 37 data centers beside historic battlefield in Manassas](https://www.wvtf.org/news/2026-04-07/court-blocks-construction-of-37-data-centers-beside-historic-battlefield-in-manassas)wvtf.org

[No moratorium, but no green light: Douglas County keeps data centers and crypto mines on hold](https://www2.ljworld.com/news/county-government/2026/apr/25/no-moratorium-but-no-green-light-douglas-county-keeps-data-centers-and-crypto-mines-on-hold-until-regulations-developed/)www2.ljworld.com

[Data centers in Patterson? Here's why city leaders could extend moratorium](https://www.yahoo.com/news/us/articles/data-centers-patterson-why-city-195935165.html)yahoo.com

['No, not now, never:' Sarasota Co. makes clear stance on large data centers](https://www.yoursun.com/venice/news/no-not-now-never-sarasota-co-makes-clear-stance-on-large-data-centers/article_2c133c82-4049-496b-88c7-de8df6103db3.html)yoursun.com

## Local restrictions

2,879 sources

[www.1011now.com](https://www.1011now.com/2026/04/17/otoe-county-planning-commission-recommends-data-center-moratorium/)1011now.com

[www.1011now.com](https://www.1011now.com/2026/06/30/seward-county-approves-one-year-pause-data-center-permits-construction/)1011now.com

[www.1011now.com](https://www.1011now.com/2026/07/14/recall-drive-targets-three-lincoln-county-commissioners-after-data-center-moratorium-vote/)1011now.com

[1077thebounce.com](https://1077thebounce.com/2026/04/23/cumberland-county-approves-1-45m-generator-contract-schedules-data-center-moratorium-hearing/)1077thebounce.com

[10tv.com](https://www.10tv.com/article/news/local/boomtown-ohio/hilliard-residents-voice-concerns-amazon-fuel-cells-project-aep-open-house/530-15e5c601-f8cc-4f05-944a-558e18f4841c)10tv.com

[10tv.com](https://www.10tv.com/article/news/local/boomtown-ohio/ashville-residents-push-back-proposed-data-center-plans/530-485aa583-7c22-4665-88e4-4e902f093c65)10tv.com

[www.10tv.com](https://www.10tv.com/article/news/local/boomtown-ohio/amazon-new-data-center-delaware-county-ohio/530-df6756a8-47e3-4e04-a78d-189d4d014168)10tv.com

[www.10tv.com](https://www.10tv.com/article/news/local/boomtown-ohio/federal-officials-announce-data-center-power-plant-pike-county/530-e1c1c245-48f2-4512-82c0-234349b73705)10tv.com

[www.11alive.com](https://www.11alive.com/article/news/local/troup-county-moratorium-on-data-centers/85-87d5c110-12db-4a48-88dd-70bda4ac47c9)11alive.com

[www.12news.com](https://www.12news.com/article/news/local/valley/new-data-center-regulations-approved-by-mesa-leaders-arizona/75-db14238c-61cd-4f89-9cfa-f7759baa5cf3)12news.com

[www.12news.com](https://www.12news.com/article/news/local/valley/chandler-arizona-city-council-shoots-down-proposed-ai-data-center/75-7e385023-85da-4f7c-ad2f-91fd43c6c75f)12news.com

[www.12news.com](https://www.12news.com/article/news/local/valley/chandler-arizona-residents-rally-against-2-billion-dollar-data-center-city-council-vote-looms/75-fa2c6eed-fdb8-4001-9e5b-dddd72fb308e)12news.com

[12onyourside.com](https://www.12onyourside.com/2026/02/05/community-meeting-draws-critics-mountain-road-data-center-plan/)12onyourside.com

[www.12onyourside.com](https://www.12onyourside.com/2025/06/11/henrico-board-supervisors-passes-stricter-requirements-data-centers/)12onyourside.com

[www.12onyourside.com](https://www.12onyourside.com/2025/07/28/amazon-pulls-louisa-county-data-center-proposal-after-strong-resistance/)12onyourside.com

[1310kfka.com](https://1310kfka.com/news/01/larimer-county-hits-pause-on-data-centers-consideration/)1310kfka.com

[www.13abc.com](https://www.13abc.com/2025/10/08/data-center-dundee-takes-step-back-developers-plan-educate-public/)13abc.com

[www.13abc.com](https://www.13abc.com/2026/02/19/northwest-ohio-communities-grapple-with-data-center-developments-possible-plans/)13abc.com

[www.13abc.com](https://www.13abc.com/2026/02/10/oregon-council-denies-data-center-extension-project-jeopardy/)13abc.com

[www.13abc.com](https://www.13abc.com/2026/02/03/data-center-developer-asks-six-month-extension-oregon/)13abc.com

[www.13abc.com](https://www.13abc.com/2025/06/03/residents-pack-richfield-twp-trustee-meeting-oppose-potential-data-center/)13abc.com

[www.13abc.com](https://www.13abc.com/2026/02/18/monclova-township-places-12-month-moratorium-data-centers/)13abc.com

[13wmaz.com](https://www.13wmaz.com/article/news/local/twiggs-county-approves-5-billion-data-center-despite-large-opposition-turnout/93-2e3d70a4-abb3-4fe3-8781-96b47c76d33b)13wmaz.com

[13wmaz.com](https://www.13wmaz.com/article/news/local/twiggs/landowners-file-lawsuit-trying-stop-massive-twiggs-county-data-center/93-17c91f2c-8504-417a-a2d9-2be68d00d8ec)13wmaz.com

[www.13wmaz.com](https://www.13wmaz.com/article/news/local/jones-county-leaders-put-90-day-moratorium-on-data-centers/93-29002835-454e-4208-be1e-5a7f355edf0e)13wmaz.com

[www.13wmaz.com](https://www.13wmaz.com/article/news/local/600-acre-data-center-proposed-for-jones-county-faces-early-opposition/93-25e72bf8-9eed-47ae-a351-8b7a05ee723f)13wmaz.com

[www.13wmaz.com](https://www.13wmaz.com/article/news/local/forsyth-monroe/monroe-county-passes-data-center-moratorium-will-review-potential-limitations/93-195cbb55-5a2a-4f29-879f-c0f3f859aef2)13wmaz.com

[www.13wmaz.com](https://www.13wmaz.com/article/news/local/forsyth-monroe/monroe-residents-prepared-to-fight-58b-data-center-project-in-bolingbroke/93-03be2ea5-cad3-4a3b-acc5-6369a3c93c20)13wmaz.com

[www.13wmaz.com](https://www.13wmaz.com/article/news/local/forsyth-monroe/forsyth-pz-tables-key-vote-on-1600-acre-data-center-proposed/93-d2adb2f1-5fbd-47ec-95af-d4b1f4c26044)13wmaz.com

[www.13wmaz.com](https://www.13wmaz.com/article/news/local/peach-crawford/crawford-county-commissioners-pass-moratorium-on-data-centers/93-3f2eec12-3bb9-4963-aaee-dc7cdc800d14)13wmaz.com

[14news.com](https://14news.com)14news.com

[21alivenews.com](https://www.21alivenews.com/2026/05/05/van-wert-leaders-hold-public-hearing-potential-10b-data-center/)21alivenews.com

[256today.com](https://256today.com)256today.com

[25 News Now: Normal to consider longer moratorium on new data centers](https://www.25newsnow.com/2026/09/20/normal-consider-longer-moratorium-data-centers-bloomington-schedules-pair-public-hearings/)25newsnow.com

[25newsnow.com](https://25newsnow.com)25newsnow.com

[25newsnow.com](https://www.25newsnow.com/2026/05/07/tazewell-county-board-votes-land-amendment-crafts-data-center-ordinance/)25newsnow.com

[25newsnow.com](https://www.25newsnow.com/2026/05/19/data-center-pauses-considered-normal-bloomington/)25newsnow.com

[www.25newsnow.com](https://www.25newsnow.com/2026/03/09/pekins-mayor-announces-data-center-project-will-not-move-forward/)25newsnow.com

[2822news.com](https://www.2822news.com/news/supervisors-deny-data-center-zoning-application/)2822news.com

[2822news.com](https://www.2822news.com/news/local-news/legal-fight-over-data-center-site-continues/)2822news.com

[352today: Marion County pauses large commercial data centers for a year with a 50-megawatt cutoff](https://352today.com/news/257752-marion-county-pauses-large-commercial-data-centers-for-a-year-with-a-50-megawatt-cutoff-on-who-still-gets-through/)352today.com

[Village of Carrollton: Ordinance 2026-10, Moratorium on Data Centers](https://3a13dff1-cccc-480e-ba60-c11342b751fd.filesusr.com/ugd/3cf3a6_2d2972427dce4ab0a15a9a812d7493e4.pdf)3a13dff1-cccc-480e-ba60-c11342b751fd.filesusr.com

[607newsnow.com](https://607newsnow.com/news/258852-court-rules-lawsuit-against-terawulf-lansing-zba-can-move-forward/)607newsnow.com

[614now.com](https://614now.com/2025/hot-topics/central-ohio-township-pauses-all-new-data-center-development-after-citizens-express-concerns)614now.com

[614now.com](https://614now.com/2026/hot-topics/proposed-680-acre-data-center-in-central-ohio-denied-by-local-authorities-after-concerned-residents-push-back)614now.com

[6abc.com](https://6abc.com/post/east-whiteland-twp-residents-oppose-data-center-planners-send-revised-plan-back-review/18698080/)6abc.com

[6sqft: Jersey City bans data centers on industrial land (August 20, 2026)](https://www.6sqft.com/jersey-city-bans-data-centers-on-industrial-land/)6sqft.com

[710keel.com](https://710keel.com/shreveport-data-center-approval/)710keel.com

[www.953mnc.com](https://www.953mnc.com/2026/03/03/fulton-county-commissioners-approve-one-year-moratorium-on-new-data-center-development/)953mnc.com

[www.953mnc.com](https://www.953mnc.com/2024/09/10/bristol-residents-oppose-proposed-data-center/)953mnc.com

[www.9and10news.com](https://www.9and10news.com/2025/11/20/kalkaska-county-data-center-project-halted-after-public-opposition/)9and10news.com

[www.9news.com](https://www.9news.com/article/news/local/colorado-news/ai-data-center-plans-weld-county/73-0fa40d46-73a7-412a-93f3-5272c02b3b47)9news.com

[ABC11: Raleigh considers 6-month moratorium on new data centers](https://abc11.com/post/data-centers-nc-raleigh-considers-6-month-pause-new-city-reviews-growth-impacts/19839683/)abc11.com

[Cumberland County weighs moratorium](https://abc11.com/post/data-center-developments-hold-cumberland-county-weighs-moratorium/19126573/)abc11.com

[abc12.com](https://abc12.com)abc12.com

[www.abc12.com](https://www.abc12.com/news/local/saginaw-moratorium-proactively-blocks-data-center-projects/article_7b230f5d-0639-443c-a499-1a5a281bad49.html)abc12.com

[abc15.com](https://www.abc15.com/news/business/14-billion-west-valley-data-center-project-request-withdrawn-after-cities-push-back)abc15.com

[abc15.com](https://www.abc15.com/news/region-west-valley/community-concerned-over-major-new-data-center-project)abc15.com

[abc15.com](https://www.abc15.com/news/business/phoenix-negotiates-with-developers-after-data-center-zoning-rules-trigger-claims)abc15.com

[www.abc15.com](https://www.abc15.com/news/region-southeast-valley/chandler/chandler-data-center-to-get-key-zoning-vote-thursday)abc15.com

[abc17news.com](https://abc17news.com/news/centralia/2026/04/17/centralia-board-of-aldermen-to-discuss-data-center-ordinance-at-monday-meeting/)abc17news.com

[abc17news.com](https://abc17news.com/news/centralia/2026/04/21/centralia-aldermen-pass-data-center-ordinance/)abc17news.com

[abc17news.com](https://abc17news.com/news/2025/11/26/amazon-planning-data-center-in-montgomery-county/)abc17news.com

[abc17news.com](https://abc17news.com/news/montgomery/2025/12/04/montgomery-county-residents-push-back-against-amazon-data-center/)abc17news.com

[abc17news.com](https://abc17news.com/news/top-stories/2026/02/17/lawsuit-filed-to-stop-montgomery-county-data-center/)abc17news.com

[www.abc27.com](https://www.abc27.com/local-news/carlisle-west-shore/midstate-township-rejects-controversial-data-center-amendment/)abc27.com

[www.abc27.com](https://www.abc27.com/local-news/londonderry-township-residents-voice-concern-optimism-over-data-centers/)abc27.com

[ABC 33/40: Tarrant Approves 12-Month Moratorium on Data Centers](https://abc3340.com/news/local/alabama-tarrant-approves-12-month-moratorium-on-data-centers-mayor-tracie-threadford-september-2026)abc3340.com

[abc3340.com](https://abc3340.com/news/abc-3340-news-iteam/columbiana-town-hall-meeting-data-center-digihost-questions-answers-thursday-industrial-parkway)abc3340.com

[abc3340.com](https://abc3340.com/news/abc-3340-news-iteam/bessemer-rezoning-fight-continues-over-proposed-data-center-court-hearing-complaint-motion-to-dismiss-response-legal-ruling-complaint-amendment-dispute-follow-up)abc3340.com

[abc3340.com](https://abc3340.com/news/local/alabama-bessemer-approves-rezoning-of-914-acres-for-project-marvel-data-center-april-2026)abc3340.com

[abc3340.com](https://abc3340.com/news/local/hoover-city-council-oks-ordinance-to-review-future-data-center-projects-may-2026)abc3340.com

[www.abc4.com](https://www.abc4.com/news/central-utah/millard-county-solar-project-ai-centers-public-opposition/)abc4.com

[www.abc4.com](https://www.abc4.com/news/digital-exclusives/ai-data-centers-millard-county-concerns-water-usage-drought/)abc4.com

[www.abc4.com](https://www.abc4.com/news/wasatch-front/provo-ai-data-center-not-approved-zoning-city-council/)abc4.com

[www.abc4.com](https://www.abc4.com/news/wasatch-front/ai-data-center-coming-provo-east-bay/)abc4.com

[abc57.com](https://www.abc57.com/news/porter-township-leadership-pass-one-year-data-center-moratorium)abc57.com

[www.abc57.com](https://www.abc57.com/news/local-groups-advocate-against-third-data-center-in-st-joseph-county)abc57.com

[www.abc57.com](https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns)abc57.com

[www.abc57.com](https://www.abc57.com/news/bristol-data-center-rezoning-approved-despite-heated-opposition)abc57.com

[www.abc57.com](https://www.abc57.com/news/dowagiac-city-council-denies-a-petition-for-a-moratorium-on-data-center-expansion)abc57.com

[www.abc57.com](https://www.abc57.com/news/dowagiac-city-manager-speaks-on-potential-data-center-expansion-concerns)abc57.com

[abc6onyourside.com](https://abc6onyourside.com/news/local/sunbury-ohio-delaware-county-residents-voice-opposition-to-proposed-amazon-data-center)abc6onyourside.com

[abc6onyourside.com](https://abc6onyourside.com/news/local/dublin-ohio-city-council-tables-rezoning-plan-for-west-innovation-district)abc6onyourside.com

[abc7chicago.com](https://abc7chicago.com/post/naperville-illinois-city-council-denies-plan-karis-critical-data-center-vacant-lucent-campus-off-warrenville-road/18442413/)abc7chicago.com

[abc7chicago.com](https://abc7chicago.com/post/what-is-data-center-expect-more-centers-illinois-like-cyrusone-aurora-il-amid-noise-electric-bill-complaints/18610141/)abc7chicago.com

[abc7ny.com](https://abc7ny.com/post/nassau-county-officials-do-not-want-lithium-ion-battery-storage-facilities-long-island/16186659/)abc7ny.com

[abcnews4.com](https://abcnews4.com/news/local/new-google-data-centers-promise-jobs-but-raise-questions-about-water-usage-impact-dorchester-county-berkeley-county-weather-impacts-ai)abcnews4.com

[abcnews4.com](https://abcnews4.com/news/local/colleton-county-erupts-as-residents-clash-with-developers-over-controversial-data-center)abcnews4.com

[abqjournal.com](https://www.abqjournal.com/news/doa-ana-county-agrees-to-community-meeting-over-project-jupiter/2998531)abqjournal.com

[abqjournal.com](https://www.abqjournal.com/news/project-jupiter-air-permit-to-be-debated-in-october-hearing/3084513)abqjournal.com

[abqjournal.com](https://www.abqjournal.com/news/project-jupiter-update-sparks-scuffle-arrests/3091046)abqjournal.com

[abqjournal.com](https://www.abqjournal.com/news/lands-commissioner-nixes-project-jupiter-pipeline-for-second-time/3083075)abqjournal.com

[www.abqjournal.com](https://www.abqjournal.com/news/bernalillo-county-leaders-pass-regulations-for-artificial-intelligence-data-centers/2978906)abqjournal.com

[accesswdun.com](https://accesswdun.com/news/hall-commissioner-plans-motion-to-table-proposed-data-center)accesswdun.com

[accesswdun.com](https://accesswdun.com/news/data-center-284-acre-mixed-use-development-proposed-in-habersham-county)accesswdun.com

[acorninternational.org](https://acorninternational.org/arkansas-grassroots-united/)acorninternational.org

[actionnetwork.org](https://actionnetwork.org/petitions/shreveport-says-no-to-data-centers)actionnetwork.org

[actionnewsjax.com](https://www.actionnewsjax.com/news/local/nassau-county-consider-one-year-data-center-moratorium/CW2BDMXVEREOPHLL7TEXJUXTVI/)actionnewsjax.com

[www.actionnewsjax.com](https://www.actionnewsjax.com/news/local/clay-county-commissioners-approve-one-year-moratorium-data-centers/GM7HRVAP3ND2TJ4SNUG3HAPABI/)actionnewsjax.com

[adacounty.id.gov](https://adacounty.id.gov/blog/news/zoning-ordinance-update-public-hearing/)adacounty.id.gov

[adacounty.id.gov](https://adacounty.id.gov/developmentservices/wp-content/uploads/sites/37/1_3_2025-ORDINANCE-ENACTING-NEW-TITLE-8-ADA-COUNTY-ZONING-CODE-PDF-202000092-INTERNAL-CLIEN.pdf)adacounty.id.gov

[www.adn.com](https://www.adn.com/alaska-news/anchorage/2026/03/27/anchorage-assembly-preemptively-adopts-data-center-regulations/)adn.com

[www.advantagenews.com](https://www.advantagenews.com/news/local/godfrey-studying-data-centers-approves-moratorium-on-applications/article_cc9c3ec6-d706-4de8-a61a-bbad49c78302.html)advantagenews.com

[www.ajc.com](https://www.ajc.com/business/2026/04/georgia-lawmakers-leave-data-center-tax-breaks-intact-punt-on-energy-costs/)ajc.com

[www.ajc.com](https://www.ajc.com/news/business/5b-data-center-campus-spanning-300-plus-acres-pitched-east-of-atlanta/GPRU6WB6INAELEGM3A3N7SMW6Y/)ajc.com

[www.akron.com](https://www.akron.com/articles/city-of-norton-introduces-moratorium-on-data-centers/)akron.com

[www.akron.com](https://www.akron.com/articles/norton-city-council-rejects-data-centers/)akron.com

[www.akron.com](https://www.akron.com/articles/barberton-approves-open-ended-moratorium-on-data-centers/)akron.com

[alabamareflector.com](https://alabamareflector.com/2025/10/12/bessemer-changes-its-laws-to-accommodate-data-centers-despite-stiff-opposition/)alabamareflector.com

[alabamarivers.org](https://alabamarivers.org/bcc/)alabamarivers.org

[Alamance News: Alamance County commissioners vote unanimously for one year moratorium on data centers](https://alamancenews.com/breaking-mon-night-alamance-county-commissioners-vote-unanimously-for-one-year-moratorium-on-data-centers/)alamancenews.com

[alamancenews.com](https://alamancenews.com)alamancenews.com

[www.alleghenyfront.org](https://www.alleghenyfront.org/pennsylvania-grassroots-resistance-data-centers/)alleghenyfront.org

[www.alleghenyfront.org](https://www.alleghenyfront.org/ohio-towns-are-pushing-back-against-data-centers-to-varying-degrees-of-success/)alleghenyfront.org

[www.alleghenyfront.org](https://www.alleghenyfront.org/pennsylvania-luzerne-dorrance-data-center-zoning/)alleghenyfront.org

[www.alleghenyfront.org](https://www.alleghenyfront.org/pennsylvania-luzern/)alleghenyfront.org

[allotsego.com](https://www.allotsego.com/town-of-oneonta-moves-toward-data-center-ban/)allotsego.com

[amazonstlwest.com](https://amazonstlwest.com/)amazonstlwest.com

[americustimesrecorder.com](https://americustimesrecorder.com/2026/09/19/americus-city-council-hears-from-attorney-on-data-center-ordinance-amendment-i-hope-you-dont-approve-it-next-week/)americustimesrecorder.com

[aol.com](https://aol.com)aol.com

[aol.com](https://www.aol.com/news/smithfield-town-council-approves-ordinance-212348148.html)aol.com

[aol.com](https://www.aol.com/articles/south-carolina-county-passes-first-090447896.html)aol.com

[www.aol.com](https://www.aol.com/articles/ravenna-shalersville-limit-data-centers-130003334.html)aol.com

[www.apr.org](https://www.apr.org/news/2026-02-19/two-alabama-cities-two-very-different-receptions-for-big-data-centers)apr.org

[arizonadailyindependent.com](https://arizonadailyindependent.com/2026/02/06/arizona-corporation-commission-approves-controversial-surprise-data-center/)arizonadailyindependent.com

[Arkansas Advocate: More Arkansas communities putting data centers on hold (Aug. 24, 2026, republished by the Arkadelphian)](https://arkadelphian.com/2026/08/24/arkansas-advocate-more-arkansas-communities-putting-data-centers-on-hold/)arkadelphian.com

[Arkansas's largest city approves new data center ordinance](https://arkansasadvocate.com/2026/06/03/arkansas-largest-city-approves-new-data-center-ordinance/)arkansasadvocate.com

[arkansasadvocate.com](https://arkansasadvocate.com/2025/07/30/two-arkansas-cities-chase-data-center-gold-but-might-be-competing-against-each-other/)arkansasadvocate.com

[arkansasadvocate.com](https://arkansasadvocate.com/2025/12/12/fear-of-missing-out-on-data-center-boom-leads-arkansas-officials-to-ignore-hard-questions/)arkansasadvocate.com

[arkansasadvocate.com](https://arkansasadvocate.com)arkansasadvocate.com

[arkansasadvocate.com](https://arkansasadvocate.com/2026/05/28/data-center-moratorium-in-arkansas-most-populous-county-didnt-pass-review-finds/)arkansasadvocate.com

[arkansasonline.com](https://www.arkansasonline.com/news/2026/may/26/pulaski-county-quorum-court-passes-ordinance-to-ban-new-data-center-permits-for-a-year/)arkansasonline.com

[www.arkansasonline.com](https://www.arkansasonline.com/news/2026/jul/07/measure-to-temporarily-halt-new-data-center/)arkansasonline.com

[www.arkansasonline.com](https://www.arkansasonline.com/news/2026/jul/29/little-rock-official-will-propose-18-month-halt/)arkansasonline.com

[arktimes.com](https://arktimes.com/arkansas-blog/2026/06/04/county-to-get-second-bite-at-moratorium-on-data-center-project)arktimes.com

[athenspoliticsnerd.com](https://athenspoliticsnerd.com/commission-places-temporary-ban-on-new-data-centers-in-athens/)athenspoliticsnerd.com

[Athens Township: Athens Township Trustees Adopt Data Center Moratorium Resolution](https://athenstwp.com/athens-township-trustees-adopt-data-center-moritorium-resolution/)athenstwp.com

[atlanta.capitalbnews.org](https://atlanta.capitalbnews.org/atlanta-communities-fight-data-centers/)atlanta.capitalbnews.org

[atlanta.capitalbnews.org](https://atlanta.capitalbnews.org/black-community-in-south-fulton-fight-georgias-data-center-boom/)atlanta.capitalbnews.org

[atlantanewsfirst.com](https://www.atlantanewsfirst.com/2026/05/13/rockdale-county-extends-ban-data-centers/)atlantanewsfirst.com

[www.atlantanewsfirst.com](https://www.atlantanewsfirst.com/2026/01/06/henry-county-commissioners-look-put-guardrails-any-future-data-centers/)atlantanewsfirst.com

[www.atlantanewsfirst.com](https://www.atlantanewsfirst.com/2026/01/13/city-roswells-new-leaders-approve-moratorium-data-centers/)atlantanewsfirst.com

[www.atlantanewsfirst.com](https://www.atlantanewsfirst.com/2026/07/09/marietta-city-council-tables-vote-proposed-data-center/)atlantanewsfirst.com

[www.atlantanewsfirst.com](https://www.atlantanewsfirst.com/2026/07/22/cherokee-county-approves-data-center-moratorium/)atlantanewsfirst.com

[atmosphere-dc.com](https://atmosphere-dc.com/data-centers/dickerson-md/)atmosphere-dc.com

[Moosic Borough moves closer to passing strict data center laws (NewsRadio WILK)](https://www.audacy.com/wilknews/news/local/moosic-borough-moves-closer-to-passing-strict-data-center-laws)audacy.com

[augustaceo.com](https://augustaceo.com/news/2026/02/citizen-files-lawsuits-over-columbia-county-data-centers/)augustaceo.com

[augustatoday.com](https://augustatoday.com/2025/04/11/plans-filed-for-massive-8-million-square-foot-data-hub-near-augusta/)augustatoday.com

[axios.com](https://www.axios.com/local/columbus/2026/03/04/amazon-hilliard-data-center-fuel-cell-debate)axios.com

[axios.com](https://www.axios.com/local/indianapolis/2026/02/04/pike-township-data-center-stalls-indiana-lawmakers-incentivize)axios.com

[axios.com](https://www.axios.com/local/indianapolis/2026/05/15/the-city-county-council-passed-a-data-center-moratorium-heres-whats-next)axios.com

[axios.com](https://www.axios.com/local/indianapolis/2026/05/11/burb-bites-boone-county-mulling-data-center-moratorium)axios.com

[axios.com](https://www.axios.com/local/charlotte/2026/05/11/data-center-moratorium-city-council-ai-150)axios.com

[www.axios.com](https://www.axios.com/local/atlanta/2024/09/05/atlanta-data-center-ban-beltline-central-business-district)axios.com

[www.axios.com](https://www.axios.com/local/raleigh/2026/02/23/data-center-opposition-grows-across-north-carolina)axios.com

[www.axios.com](https://www.axios.com/local/columbus/2026/03/04/ohio-data-center-boom-moratorium-laws)axios.com

[azbex.com](https://azbex.com/planning-development/maricopa-county-board-approves-rezoning-for-638-acre-data-center-solar-site/)azbex.com

[azcentral.com](https://www.azcentral.com/story/news/local/arizona/2026/04/09/maricopa-county-planning-zoning-approves-project-baccara-data-center/)azcentral.com

[azfamily.com](https://www.azfamily.com/2026/03/26/phoenix-faces-growing-legal-pressure-over-new-data-center-rules/)azfamily.com

[www.azfamily.com](https://www.azfamily.com/2025/12/12/chandler-unanimously-votes-against-proposed-ai-data-center/)azfamily.com

[azfreenews.com](https://azfreenews.com/2025/12/pima-county-moves-forward-with-rejected-data-center/)azfreenews.com

[azluminaria.org](https://azluminaria.org/2026/01/08/marana-arizona-data-center-updates/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2025/12/11/unanimous-vote-in-marana-for-data-center-met-with-boos/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2025/08/06/tucson-city-council-rejects-project-blue-amid-intense-community-pressure/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2025/07/21/the-project-blue-data-center-sprang-up-fast-so-did-the-organizing/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2025/08/27/project-blue-data-center-pima-county-beale-infrastructure-tep/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2025/09/17/project-blue-data-center-pushes-ahead-in-pima-county-promising-new-low-water-cooling-tech/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2026/01/14/project-blue-opponents-sue-pima-county-over-alleged-open-meeting-law-violations/)azluminaria.org

[azluminaria.org](https://azluminaria.org/2026/06/22/marana-2026-election-guide-what-candidates-say-about-ice-detention-center-data-center/)azluminaria.org

ballotpedia.orgballotpedia.org

[baltimorebrew.com](https://baltimorebrew.com/2026/03/24/trying-to-get-in-front-of-an-issue-thats-dogged-him-cohen-calls-for-a-one-year-ban-on-data-centers/)baltimorebrew.com

[baltimorefishbowl.com](https://baltimorefishbowl.com/stories/harford-county-council-data-center-moratorium-cassillys-ban/)baltimorefishbowl.com

[Baltimore Sun: Baltimore County Council set to vote on extending data center moratorium](https://www.baltimoresun.com/2026/09/21/baltimore-county-data-center-moratorium/)baltimoresun.com

[baltimoresun.com](https://www.baltimoresun.com/2026/07/17/data-centers-baltimore-county-regulations/)baltimoresun.com

[baltimoresun.com](https://www.baltimoresun.com/2026/07/18/baltimore-county-democrats-data-center-moratorium/)baltimoresun.com

[baltimoresun.com](https://www.baltimoresun.com/2026/05/07/cassilly-proposes-permanent-data-center-ban/)baltimoresun.com

[www.baltimoresun.com](https://www.baltimoresun.com/2026/03/23/data-center-moratorium/)baltimoresun.com

[www.baltimoresun.com](https://www.baltimoresun.com/2026/04/21/harford-council-mulls-data-center-pause/)baltimoresun.com

[www.baltimoresun.com](https://www.baltimoresun.com/2026/04/20/harford-moratorium-data-centers/)baltimoresun.com

[www.bangordailynews.com](https://www.bangordailynews.com/2025/09/23/midcoast/midcoast-business/wiscasset-maine-data-center-proposal/)bangordailynews.com

[www.bangordailynews.com](https://www.bangordailynews.com/2026/04/06/bangor/bangor-government/bangor-data-center-moratorium/)bangordailynews.com

[barrenside.com](https://www.barrenside.com/court-fight-begins-over-cave-city-data-center-moratorium/)barrenside.com

[Broken Arrow approves 6-month data center moratorium - Broken Arrow Sentinel](https://basentinel.com/broken-arrow-approves-6-month-data-center-moratorium/)basentinel.com

[basinandrangewatch2.org](https://www.basinandrangewatch2.org/transmission-projects/greenlink-west)basinandrangewatch2.org

[www.battlefields.org](https://www.battlefields.org/give/save-battlefields/dont-let-data-centers-destroy-wilderness)battlefields.org

[baxtel.com](https://baxtel.com/data-center/amazon-new-carlisle-i-dc1)baxtel.com

[baxtel.com](https://baxtel.com/data-center/grindcap-marietta-campus)baxtel.com

[baxtel.com](https://baxtel.com/data-center/trammel-crow-white-oak-tech-park)baxtel.com

[baxtel.com](https://baxtel.com/data-center/project-avemore)baxtel.com

[www.bayjournal.com](https://www.bayjournal.com/news/energy/maryland-counties-to-data-center-industry-slow-down/article_c8362372-9a29-4ef9-925a-c81840390a95.html)bayjournal.com

[baynews9.com](https://baynews9.com/fl/tampa/news/2026/02/11/fort-meade-residents-data-center-concern)baynews9.com

[bealeinfra.com](https://bealeinfra.com/claremore-oklahoma/)bealeinfra.com

[beankinney.com](https://www.beankinney.com/data-center-infrastructure-under-siege-lessons-from-virginias-digital-gateway-decision/)beankinney.com

[City of Bellevue: Regular City Council Minutes, June 8, 2026](https://www.bellevueohio.gov/Documents/Government/City%20Council/Agenda%20and%20Minutes/2026/6-8-26%20Minutes.pdf?t=202606171510150)bellevueohio.gov

[www.bernco.gov](https://www.bernco.gov/blog/2026/02/11/data-center-project-guardrails-resolution-approved-by-bernalillo-county-commission/)bernco.gov

[bethesdamagazine.com](https://bethesdamagazine.com/2026/02/25/dickerson-data-center-developers-have-right-to-go-forward-elrich-says/)bethesdamagazine.com

[bethesdamagazine.com](https://bethesdamagazine.com/2026/02/07/moco-residents-air-concerns-about-utility-rates-environmental-impacts-of-data-centers/)bethesdamagazine.com

[bethesdamagazine.com](https://bethesdamagazine.com/2025/12/18/data-center-dickerson-potomac-river-water/)bethesdamagazine.com

[bethesdamagazine.com](https://bethesdamagazine.com/2026/02/17/planning-advances-moco-data-center-debate-zta/)bethesdamagazine.com

[bethesdamagazine.com](https://bethesdamagazine.com/2026/05/06/the-urgency-is-real-glass-introduces-bill-to-halt-data-center-permits/)bethesdamagazine.com

[bethesdamagazine.com](https://bethesdamagazine.com/2026/07/28/county-council-unanimously-approves-data-center-moratorium/)bethesdamagazine.com

[betterpathcoalition.org](https://www.betterpathcoalition.org/)betterpathcoalition.org

[Calexico Moves Toward Permanent Citywide Ban on New Data Centers (Beyond Borders News)](https://beyondbordersnews.com/calexico-moves-toward-permanent-citywide-ban-on-new-data-centers/)beyondbordersnews.com

[bgdailynews.com](https://bgdailynews.com/2026/07/02/butler-county-oks-data-center-moratorium/)bgdailynews.com

[bgdailynews.com](https://bgdailynews.com/2026/02/22/simpson-fiscal-court-answers-data-center-lawsuit/)bgdailynews.com

[bgdailynews.com](https://bgdailynews.com/2025/10/22/proposed-data-center-hits-stumbling-block-in-franklin/)bgdailynews.com

[bgdailynews.com](https://bgdailynews.com/2026/04/15/rulings-to-come-in-data-center-suit/)bgdailynews.com

[bgdailynews.com](https://bgdailynews.com/2026/05/19/hearings-scheduled-in-franklin-data-center-lawsuits/)bgdailynews.com

[bgdailynews.com](https://bgdailynews.com/2026/05/12/data-center-regulations-in-cave-city-voted-down-council-supports-moratorium/)bgdailynews.com

[bgdailynews.com](https://bgdailynews.com/2026/06/09/lawsuit-filed-over-cave-city-data-center-moratorium/)bgdailynews.com

[BG Independent News: In split vote, Middleton Twp. trustees put the brakes on Meta zoning request for more parking lots (September 3, 2026)](https://bgindependentmedia.org/in-split-vote-middleton-twp-trustees-put-the-brakes-on-meta-zoning-request-for-more-parking-lots/)bgindependentmedia.org

[bgindependentmedia.org](https://bgindependentmedia.org/meta-data-center-how-it-went-from-economic-development-coup-to-project-local-residents-rue/)bgindependentmedia.org

[bgindependentmedia.org](https://bgindependentmedia.org/temporary-moratoriums-on-data-centers-7-townships-in-wood-county-have-adopted-8-have-discussed/)bgindependentmedia.org

[bgindependentmedia.org](https://bgindependentmedia.org/power-plant-for-meta-data-center-in-wood-county-fast-tracked-approved-with-no-public-hearings/)bgindependentmedia.org

[bgindependentmedia.org](https://bgindependentmedia.org/tempers-flare-as-citizens-seek-moratorium-on-any-more-data-centers-in-wood-county/)bgindependentmedia.org

[bgindependentmedia.org](https://bgindependentmedia.org/with-split-vote-middleton-township-approves-zoning-change-for-acreage-bordering-data-center/)bgindependentmedia.org

[bigbendsentinel.com](https://bigbendsentinel.com/2026/02/04/massive-ai-data-center-coming-to-pecos-county/)bigbendsentinel.com

[www.bigrapidsnews.com](https://www.bigrapidsnews.com/news/article/new-ordinance-bans-data-centers-big-rapids-21225421.php)bigrapidsnews.com

[www.birminghamal.gov](https://www.birminghamal.gov/news/city-birmingham-proposes-temporary-pause-new-data-center-applications)birminghamal.gov

[birminghamtimes.com](https://www.birminghamtimes.com/2026/07/new-hearing-set-in-birmingham-ai-data-center-lawsuit-following-judges-recusal/)birminghamtimes.com

[birminghamtimes.com](https://www.birminghamtimes.com/2026/07/judge-recuses-herself-in-birmingham-ai-data-center-lawsuit-forcing-trial-to-restart/)birminghamtimes.com

[birminghamwatch.org](https://birminghamwatch.org/2026/01/13/birmingham-leaders-weigh-180-day-moratorium-on-data-centers-amid-power-and-water-concerns/)birminghamwatch.org

[birminghamwatch.org](https://birminghamwatch.org/2026/03/03/birmingham-council-enacts-temporary-ban-on-large-data-centers/)birminghamwatch.org

[birminghamwatch.org](https://birminghamwatch.org/2026/05/28/new-legal-filing-suggests-birmingham-helped-developers-evade-data-center-moratorium/)birminghamwatch.org

[birminghamwatch.org](https://birminghamwatch.org/2026/06/29/new-lawsuit-against-nebius-data-center-challenges-validity-of-regs-and-decisions/)birminghamwatch.org

[bismarcktribune.com](https://bismarcktribune.com/news/community/mandannews/carbon-capture-data-center-moratorium-morton-county/article_71da3208-1d20-11ef-842b-c363d5088882.html)bismarcktribune.com

[bismarcktribune.com](https://bismarcktribune.com/news/state-regional/morton-county-hold-public-hearing-data-center-moratorium/article_c37d4074-58bb-11ef-bf47-03f5dd52259d.html)bismarcktribune.com

[bismarcktribune.com](https://bismarcktribune.com/news/state-regional/article_7008bcf1-5d9d-4007-96c7-a2f8bf697d75.html)bismarcktribune.com

[bismarcktribune.com](https://bismarcktribune.com/news/state-regional/business/article_18bb7bd2-89bf-47ef-9a52-ce5e49524f38.html)bismarcktribune.com

[bismarcktribune.com](https://bismarcktribune.com/news/state-regional/government-politics/article_564db95a-eb0d-4750-9ec4-629b1b70c102.html)bismarcktribune.com

[bisnow.com](https://www.bisnow.com/national/news/data-center/virginia-county-backtracks-on-agreement-with-amazon-for-6b-data-center-campus-122327)bisnow.com

[bisnow.com](https://www.bisnow.com/news/washington-dc/data-center/loudoun-county-data-center-pause-moratorium)bisnow.com

[www.bisnow.com](https://www.bisnow.com/raleigh-durham/news/construction-development/north-carolina-towns-counties-consider-moratoriums-on-data-centers-133779)bisnow.com

[www.bisnow.com](https://www.bisnow.com/phoenix/news/data-center-community-relations/maricopa-county-to-modernize-zoning-rules-around-data-centers-132394)bisnow.com

[biztimes.com](https://biztimes.com/yorkville-puts-up-a-hard-no-on-data-center-talk/)biztimes.com

[biztimes.com](https://biztimes.com/port-washington-approves-8-billion-vantage-data-centers-project/)biztimes.com

[BizWest: Loveland imposes 12-month data center moratorium](https://bizwest.com/2026/09/16/loveland-imposes-12-month-data-center-moratorium/)bizwest.com

[bizwest.com](https://bizwest.com/2026/05/20/longmont-advances-ban-on-large-scale-data-centers/)bizwest.com

[blackridgeresearch.com](https://www.blackridgeresearch.com/blog/latest-list-of-biggest-largest-upcoming-data-centers-north-carolina-united-states-us)blackridgeresearch.com

[www.blackridgeresearch.com](https://www.blackridgeresearch.com/blog/latest-list-upcoming-data-centers-in-georgia-ga-united-states-us)blackridgeresearch.com

[bluewaterhealthyliving.com](https://bluewaterhealthyliving.com/news/local-news/michigan/where-does-dundee-township-stand-on-the-proposed-data-center/)bluewaterhealthyliving.com

[bluewaterhealthyliving.com](https://bluewaterhealthyliving.com/news/local-news/michigan/as-project-flex-proceeds-lyon-township-hits-pause-on-new-data-centers/)bluewaterhealthyliving.com

[bluewaterhealthyliving.com](https://bluewaterhealthyliving.com/news/national-news/wisconsin/data-center-ban-cannot-pass-until-public-hearing-city-attorney-says/)bluewaterhealthyliving.com

[boisedev.com](https://boisedev.com/news/2025/04/03/kuna-data-center-diode-ventures/)boisedev.com

[boisedev.com](https://boisedev.com/news/2026/02/03/data-center-suit/)boisedev.com

[boisedev.com](https://boisedev.com/news/2025/01/29/diode-ventures-kuna-data-center/)boisedev.com

[The Bond Buyer: Indiana counties' response to data centers reflects broader political risk](https://www.bondbuyer.com/news/indiana-counties-response-to-data-centers-reflects-broader-political-risk)bondbuyer.com

[boonecounty.in.gov](https://boonecounty.in.gov)boonecounty.in.gov

[boston.com](https://www.boston.com/news/local-news/2026/04/08/everett-restricts-data-centers-development/)boston.com

[boston.com](https://www.boston.com/news/local-news/2026/05/07/lowell-residents-file-massachusetts-first-lawsuit-against-a-data-center/)boston.com

[www.bostonglobe.com](https://www.bostonglobe.com/2026/07/14/business/westfield-data-center-backlash-healey/)bostonglobe.com

[www.bourboncountymonitor.com](https://www.bourboncountymonitor.com/bourbon-county-enacts-365-day-development-moratorium-selects-planning-zoning-consulting-firm/)bourboncountymonitor.com

[boylecountyky.gov](https://boylecountyky.gov)boylecountyky.gov

[bpr.org](https://www.bpr.org/bpr-news/2024-05-08/last-night-at-commission-buncombe-extends-moratorium-on-cryptocurrency-mining)bpr.org

[www.bpr.org](https://www.bpr.org/2025-11-25/opposition-mounts-to-proposed-large-data-center-in-edgecombe-county)bpr.org

[www.bpr.org](https://www.bpr.org/climate-environment/2026-04-01/swain-county-joins-the-list-of-wnc-communities-considering-a-temporary-ban-on-data-centers)bpr.org

[www.bpr.org](https://www.bpr.org/climate-environment/2026-04-22/swain-county-unanimously-passes-data-center-moratorium)bpr.org

[www.bpr.org](https://www.bpr.org/2026-04-22/orange-county-moratorium-data-centers)bpr.org

[breckinridgeky.com](https://breckinridgeky.com/ordinances/)breckinridgeky.com

[www.bridgedetroit.com](https://www.bridgedetroit.com/data-center-moratorium-for-detroit/)bridgedetroit.com

[www.bridgedetroit.com](https://www.bridgedetroit.com/detroit-convenes-working-group-for-data-center-zoning-policy/)bridgedetroit.com

[bridgemi.com](https://bridgemi.com/michigan-environment-watch/at-least-19-michigan-towns-pause-data-centers-no-one-knows-if-itll-work/)bridgemi.com

[bridgemi.com](https://bridgemi.com/michigan-environment-watch/tiny-michigan-town-hopes-to-stop-data-center-with-ballot-initiative/)bridgemi.com

[bridgemi.com](https://bridgemi.com/michigan-environment-watch/michigan-regulators-approve-contract-for-michigans-first-hyperscale-data-center/)bridgemi.com

[bridgemi.com](https://bridgemi.com/michigan-environment-watch/dte-consumers-advance-plans-for-power-hungry-data-centers-in-michigan/)bridgemi.com

[Brimfield Township: Regular Meeting Minutes, April 20, 2026](https://brimfieldohio.gov/wp-content/uploads/2026/05/April-20-2026-Regular-Meeting.pdf)brimfieldohio.gov

[bringmethenews.com](https://bringmethenews.com/minnesota-news/carver-becomes-latest-city-to-impose-moratorium-on-data-centers)bringmethenews.com

[bringmethenews.com](https://bringmethenews.com/minnesota-news/farmington-residents-file-lawsuit-against-city-to-prevent-5b-data-center-plan)bringmethenews.com

[broadbandbreakfast.com](https://broadbandbreakfast.com/anchorage-blocks-new-data-centers-in-residential-zones/)broadbandbreakfast.com

[www.brookingsregister.com](https://www.brookingsregister.com/2026/02/26/brookings-city-council-denies-data-center-tax-incentive/)brookingsregister.com

[www.brookvilleindiana.com](https://www.brookvilleindiana.com/story/2026/01/07/news/data-center-introduced/1057.html)brookvilleindiana.com

[browncountypress.com](https://browncountypress.com/news/19073/breaking-news-purchase-and-sale-agreement-on-mt-orab-mega-site-lists-data-center-as-intended-use-for-property)browncountypress.com

[Village of Buckeye Lake: Council Meeting Minutes, July 27, 2026](https://buckeyelakevillage.com/documents/334/July_27__2026_-_Council_Meeting_Minutes.pdf)buckeyelakevillage.com

[buckscountybeacon.com](https://buckscountybeacon.com/2025/08/not-everyone-is-sold-on-the-benefits-of-amazons-data-center-coming-to-falls-township/)buckscountybeacon.com

[www.bucksindependence.com](https://www.bucksindependence.com/east-rockhill-supervisors-advance-data-center-ordinance/)bucksindependence.com

[businessjournaldaily.com](https://businessjournaldaily.com/company-proposes-3-6b-data-center-in-lordstown/)businessjournaldaily.com

[byrdstreet.substack.com](https://byrdstreet.substack.com/p/orange-county-planning-commission)byrdstreet.substack.com

[c-ville.com](https://c-ville.com/albemarle-county-weighs-regulation-on-data-center-development/)c-ville.com

[cachevalleydaily.com](https://www.cachevalleydaily.com/news/stratos-project-opponents-file-promised-referendum-appeal-with-utah-first-district-court/article_d89e1640-d5cb-4ad6-814a-b90a9fec4c11.html)cachevalleydaily.com

[Board of Supervisors considers data center resolution](https://calexicochronicle.com/2026/06/03/board-of-supervisors-considers-data-center-resolution/)calexicochronicle.com

[Brawley and Imperial speak on data center moratoriums](https://calexicochronicle.com/2026/05/27/brawley-and-imperial-speak-on-data-center-moratoriums/)calexicochronicle.com

[Calexico Enacts Permanent Data Center Ban (Calexico Chronicle, Sept. 18, 2026)](https://calexicochronicle.com/2026/09/18/calexico-enacts-permanent-data-center-ban/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/07/16/calexico-places-amendment-to-city-ordinance-on-future-agenda/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/03/28/no-data-center-chants-ring-out-at-imperial-county-board-meeting/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/01/07/where-imperial-data-center-project-and-opposition-stands/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/04/27/supervisor-peggy-price-recall-effort-third-times-a-charm/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/05/13/calipatria-council-introduces-data-center-moratorium/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/07/15/imperial-county-extends-data-center-moratorium/)calexicochronicle.com

[C&G Newspapers (Warren Weekly): Warren City Council votes to approve 12-month data center moratorium](https://www.candgnews.com/articles/government-news/warren-city-council-votes-to-approve-12-month-data-center-moratorium/)candgnews.com

[capitalbnews.org](https://capitalbnews.org/data-centers-black-communities-south/)capitalbnews.org

[capitalbnews.org](https://capitalbnews.org/meta-richland-parish-ai-data-center/)capitalbnews.org

[capitolnewsillinois.com](https://capitolnewsillinois.com/news/lawmakers-seek-ways-to-prevent-data-centers-from-straining-illinois-power-grids/)capitolnewsillinois.com

[captimes.com](https://captimes.com/news/government/madison-punts-on-joining-data-center-boom-passes-one-year-moratorium/article_d632970a-af9a-45ea-aa5a-9668d3040006.html)captimes.com

[cardinalnews.org](https://cardinalnews.org/2025/04/10/data-centers-can-bring-high-paying-jobs-and-millions-in-tax-revenue-is-that-what-southside-will-get/)cardinalnews.org

[cardinalnews.org](https://cardinalnews.org/2026/03/05/some-rural-legislators-worry-that-ending-tax-incentives-for-data-centers-would-also-end-rural-virginias-opportunity-to-cash-in/)cardinalnews.org

[carsonnow.org](https://www.carsonnow.org/11/25/2025/blm-reports-new-policy-limits-public-involvement-on-development-lyon-hears-update-on-massive-victory-district)carsonnow.org

[www.carsonnow.org](https://www.carsonnow.org/12/07/2025/lyon-county-commissioners-ok-master-plan-amendment-for-data-center)carsonnow.org

[www.cascadiadaily.com](https://www.cascadiadaily.com/2026/jun/01/skagit-county-temporarily-bans-data-centers-to-protect-farmland-water/)cascadiadaily.com

[www.cbs17.com](https://www.cbs17.com/news/local-news/tarboro-data-center-project-appeals-rejection-by-town-council-saying-site-would-generate-11-million-per-year-in-revenue/)cbs17.com

[www.cbs17.com](https://www.cbs17.com/news/north-carolina-news/nc-city-pauses-potential-data-center-projects-amid-community-concerns/amp/)cbs17.com

[cbs2iowa.com](https://cbs2iowa.com/news/local/johnson-county-imposes-moratorium-on-data-centers-to-protect-resources-and-assess-impacts)cbs2iowa.com

[cbs2iowa.com](https://cbs2iowa.com/news/local/palo-delays-vote-on-data-center-ordinance)cbs2iowa.com

[cbs2iowa.com](https://cbs2iowa.com/news/local/google-shifts-data-center-plan-to-palo-water-study-now-on-hold)cbs2iowa.com

[www.cbs58.com](https://www.cbs58.com/news/port-washington-planning-commission-approves-tax-district-for-incoming-data-center)cbs58.com

[cbsaustin.com](https://cbsaustin.com/news/local/hays-county-officials-push-back-on-proposed-ai-data-centers-over-water-concerns)cbsaustin.com

[cbsaustin.com](https://cbsaustin.com/news/local/san-marcos-city-council-votes-5-2-to-deny-ai-data-center-proposal)cbsaustin.com

[cbsnews.com](https://www.cbsnews.com/detroit/news/michigan-ag-appeals-approval-of-dte-saline-data-center-contracts/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/minnesota/news/farmington-hyperscale-data-center-pushback/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/texas/news/hood-county-residents-concerns-proposed-data-center/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/news/meta-ai-data-center-richland-parish-louisiana-energy-costs/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/detroit/news/saline-township-related-digital-data-center-financing-construction/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/detroit/news/saline-township-trustees-vote-no-data-center-tax-abatement/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/baltimore/news/harford-county-executives-proposed-bill-aims-to-ban-data-centers/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/minnesota/news/inver-grove-heights-data-center-moratorium/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/atlanta/news/dekalb-leaders-extend-data-center-moratorium-to-june-as-residents-raise-health-cost-concerns/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/detroit/news/sterling-heights-passes-1-year-moratorium-on-data-center-site-requests/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/amp/detroit/news/sterling-heights-passes-1-year-moratorium-on-data-center-site-requests/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/texas/news/hood-county-commissioners-reject-data-center-moratorium-again-3-2-vote-residents-call-for-resignations/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/colorado/news/data-ai-centers-colorado-globalai-windsor/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/baltimore/news/baltimore-city-data-center-bill-energy-moratorium/)cbsnews.com

[www.cbsnews.com](https://www.cbsnews.com/texas/news/fort-worth-data-center-tax-abatement-delayed-after-community-opposition/)cbsnews.com

[ccpulse.org](https://ccpulse.org/2026/01/23/oakley-residents-push-against-project-that-could-later-house-a-i-data-center/)ccpulse.org

[ccpulse.org](https://ccpulse.org/2026/03/11/oakley-approves-bridgehead-project-without-a-i-data-centers/)ccpulse.org

[www.cedarbognp.org](https://www.cedarbognp.org/say-no-to-data-centers-please-sign-the-petition/)cedarbognp.org

[Cedar County, MO: Order and Ordinance Enacting a Temporary Moratorium on Solar Energy Systems, Wind Energy Conversion Systems, Battery…](https://cedarcountymo.gov/images/Temporary_Moratorium_on_Data_Centers_2026.09.08.pdf)cedarcountymo.gov

[centralbucksnews.com](https://centralbucksnews.com/news/2026/feb/26/west-rockhill-supervisors-advance-data-center-regulations/)centralbucksnews.com

[centralbucksnews.com](https://centralbucksnews.com/news/2026/mar/31/east-rockhill-supervisors-advance-data-center-ordinance/)centralbucksnews.com

[www.centraliamo.gov](https://www.centraliamo.gov/media/1826)centraliamo.gov

[www.centralmaine.com](https://www.centralmaine.com/2025/12/11/lewiston-mill-eyed-for-300-million-ai-data-center/)centralmaine.com

[cfpublic.org](https://www.cfpublic.org/politics/2026-09-15/orange-county-plans-a-moratorium-on-ai-data-centers)cfpublic.org

[change.org](https://www.change.org/p/stop-the-massive-ai-data-center-in-saline-township-in-michigan)change.org

[change.org](https://www.change.org/p/stop-new-data-centers-in-tucson-protect-our-desert-our-water-our-communities)change.org

[change.org](https://www.change.org/p/halt-the-construction-of-columbia-county-data-centers-quarry)change.org

[change.org](https://www.change.org/p/halt-the-construction-of-the-meta-data-center-in-appling-ga)change.org

[change.org](https://www.change.org/p/petition-from-csra-residents)change.org

[change.org](https://www.change.org/p/stop-the-hickman-property-data-center-in-villa-rica-ga)change.org

[change.org](https://www.change.org/p/oppose-the-data-center-proposal-for-franklin-kentucky)change.org

[change.org](https://www.change.org/p/citizens-against-over-development-in-lyon-county-nv)change.org

[change.org](https://www.change.org/p/prevent-ai-data-center-development-in-wilmington-oh)change.org

[change.org](https://www.change.org/p/pause-data-center-development-in-hood-county-to-protect-our-water-community)change.org

[change.org](https://www.change.org/p/stop-the-intrusion-of-disruptive-data-centers-in-hood-county)change.org

[change.org](https://www.change.org/p/protect-virginia-communities-regulate-data-center-growth-before-it-s-too-late)change.org

[www.change.org](https://www.change.org/p/halt-data-factory-austin-s-proposed-bitcoin-factory-in-thorndale)change.org

[www.change.org](https://www.change.org/p/don-t-dump-data-on-peculiar)change.org

[www.change.org](https://www.change.org/p/stop-gilmer-county-from-allowing-a-crypto-mining-facility-in-our-county)change.org

[www.change.org](https://www.change.org/p/halt-construction-of-ai-data-center-in-little-rock-ar)change.org

[www.change.org](https://www.change.org/p/stop-data-centers-coming-to-upstate-sc)change.org

[www.change.org](https://www.change.org/p/stop-the-ai-data-centers-in-gilroy)change.org

[www.change.org](https://www.change.org/p/banning-regulating-data-centers-in-gilroy)change.org

[www.change.org](https://www.change.org/p/stop-the-monarch-data-center-in-yerington-nevada)change.org

[www.change.org](https://www.change.org/p/stop-the-mega-data-center-coming-to-yerington-nevada)change.org

[www.change.org](https://www.change.org/p/no-more-data-centers-in-st-louis)change.org

[www.change.org](https://www.change.org/p/save-mason-county-no-data-center-please-do-not-donate)change.org

[www.change.org](https://www.change.org/p/prevent-the-construction-of-ai-data-center-in-lordstown)change.org

[www.change.org](https://www.change.org/p/no-conshy-or-plymouth-data-centers)change.org

[www.change.org](https://www.change.org/p/stop-data-center-construction-in-lackawanna-county)change.org

[www.change.org](https://www.change.org/p/stop-the-ai-data-center-construction-in-ekron-ky)change.org

[www.change.org](https://www.change.org/p/ban-ai-data-centers-in-michigan)change.org

[www.change.org](https://www.change.org/p/stop-rezoning-for-data-center-in-concord-district)change.org

[www.change.org](https://www.change.org/p/stop-ai-data-center-lufkin-tx)change.org

[www.change.org](https://www.change.org/p/oppose-high-impact-data-center-development-and-demand-sustainable-growth-for-rockford-il)change.org

[www.change.org](https://www.change.org/p/stop-the-qts-data-center-in-york-county-sc)change.org

[www.change.org](https://www.change.org/p/stop-data-centers-in-cumberland-county-protect-fayetteville-s-health-and-water)change.org

[www.change.org](https://www.change.org/p/will-we-lose-our-water-petition-to-disapprove-of-data-centers)change.org

[www.change.org](https://www.change.org/p/stop-the-ai-data-centers-in-lawrence-county-ohio)change.org

[www.change.org](https://www.change.org/p/oppose-the-construction-of-a-data-center-in-starke-county)change.org

[www.change.org](https://www.change.org/p/stop-data-centers-from-being-built-in-maumee-monclova-waterville-whitehouse-areas)change.org

[www.change.org](https://www.change.org/p/big-tech-wants-our-community-lowell-mi-and-great-lakes-allies-say-no)change.org

[www.change.org](https://www.change.org/p/stop-ai-data-centers-in-conewago-township-york-co)change.org

[www.change.org](https://www.change.org/p/stop-the-data-center-on-robertsville-road-in-villa-ridge-missouri)change.org

[www.change.org](https://www.change.org/p/deny-the-proposed-data-centers)change.org

[www.change.org](https://www.change.org/p/stop-data-center-from-being-built-in-carroll-county-georgia)change.org

[www.change.org](https://www.change.org/p/deny-data-centers-in-barrington-hills)change.org

[www.change.org](https://www.change.org/p/no-data-centers-in-champaign-county-ohio)change.org

[www.change.org](https://www.change.org/p/muhlenberg-twp-and-community-against-data-center-and-or-power-distribution-build)change.org

[www.change.org](https://www.change.org/p/stand-against-data-center-new-hill-nc)change.org

[www.change.org](https://www.change.org/p/stop-the-construction-of-data-centers-in-rural-mercer-co-ky)change.org

[www.change.org](https://www.change.org/p/demand-transparency-on-data-center-records-in-pacific-mo-under-missouri-sunshine-law)change.org

[www.change.org](https://www.change.org/p/protect-pacific-and-the-meramec-valley-from-a-massive-data-center)change.org

[www.change.org](https://www.change.org/p/stop-data-center-development-at-crooked-creek-beef-farm-pacific-mo)change.org

[www.change.org](https://www.change.org/p/stop-the-building-of-an-ai-data-center-in-lyon-township)change.org

[www.change.org](https://www.change.org/p/stop-mega-data-centers-in-hidalgo-county-protect-our-water-grid-and-public-health)change.org

[www.change.org](https://www.change.org/p/protect-irwin-county-from-data-centers)change.org

[www.change.org](https://www.change.org/p/urge-vance-county-board-to-vote-no-on-rezoning-for-the-data-center)change.org

[Hillsborough budget updates, data center moratorium](https://chapelboro.com/news-on-the-hill-with-andrew-stuckey/conversations-with-the-mayors/hillsborough-budget-updates-data-center-moratorium-longtime-employee-retires)chapelboro.com

[chattahoochee.org](https://chattahoochee.org/publications/coweta-county-project-sail-data-center-faq/)chattahoochee.org

[www.chicagotribune.com](https://www.chicagotribune.com/2024/08/06/burns-harbor-residents-blast-data-center-plan-plan-commission-meeting-on-sept-9-for-discussion/)chicagotribune.com

[www.chicagotribune.com](https://www.chicagotribune.com/2025/02/02/texas-firm-yet-to-make-move-on-burns-harbor-data-center-proposal/)chicagotribune.com

[www.chicagotribune.com](https://www.chicagotribune.com/2026/02/19/aurora-considers-new-data-center-regulations-around-noise-water-and-power/)chicagotribune.com

[www.chicagotribune.com](https://www.chicagotribune.com/2026/02/09/aurora-to-host-open-house-on-data-centers-amid-moratorium/)chicagotribune.com

[www.chicagotribune.com](https://www.chicagotribune.com/2025/12/19/lake-county-plan-commission-mulls-data-center-proposal-near-lowell/)chicagotribune.com

[www.chicagotribune.com](https://www.chicagotribune.com/2026/03/11/frankfort-environmental-advocates-data-centers/)chicagotribune.com

[chooseclintoncountyoh.org](https://www.chooseclintoncountyoh.org/news/data-center-faqs)chooseclintoncountyoh.org

[www.chronicle-tribune.com](https://www.chronicle-tribune.com/news/commissioners-pass-data-center-moratorium/article_a55a569b-62b5-578c-912e-f183d461f1b9.html)chronicle-tribune.com

[Citrus County Chronicle: Levy County approves moratorium on data centers](https://www.chronicleonline.com/news/local/levy-county-approves-moratorium-on-data-centers/article_177dad48-7ddc-55b8-a945-cedb2a3a0013.html)chronicleonline.com

[www.chronicleonline.com](https://www.chronicleonline.com/news/local/data-center-debate-heads-to-planning-board/article_c998935f-03bb-5f47-8592-bc118bb1cdcd.html)chronicleonline.com

[www.chronicleonline.com](https://www.chronicleonline.com/news/local/county-backs-pause-on-data-centers-temporary-moratorium-gives-county-time-to-gather-information/article_98795fb9-6580-5f53-97a3-10a3b68b6711.html)chronicleonline.com

[circlevilleherald.com](https://www.circlevilleherald.com/comment/protect-pickaway-alliance-calls-meeting-for-sunday/article_978ce97d-f7d1-4119-80ad-2befa2b5a22b.html)circlevilleherald.com

[www.circlevilleherald.com](https://www.circlevilleherald.com/community/townhouses-voted-against-nda-won-t-renew-in-july/article_599b482c-f9b6-48ce-b951-464119fd7752.html)circlevilleherald.com

[www.circlevilleherald.com](https://www.circlevilleherald.com/community/muhlenberg-trustees-pass-12-month-moratorium-on-data-centers/article_1669c51d-3606-432b-b2c5-633b7e5a25fb.html)circlevilleherald.com

[www.circlevilleherald.com](https://www.circlevilleherald.com/news/muhlenberg-trustees-inform-residents-of-application-for-zoning-change-for-data-center/article_4f341ad1-f5fe-49cc-a2fa-9374625d50ac.html)circlevilleherald.com

[www.circlevilleherald.com](https://www.circlevilleherald.com/news/ashville-village-council-votes-to-impose-180-day-moratorium-on-data-center-zoning/article_dd0358a7-dc90-4d1f-8641-ad0e3b6e3901.html)circlevilleherald.com

[citact.org](https://www.citact.org/news/27-public-interest-organizations-call-indiana-local-governments-enact-data-center-moratorium)citact.org

[www.citact.org](https://www.citact.org/about)citact.org

[citizen.org](https://www.citizen.org/article/texas-gas-rush-lee-county/)citizen.org

[www.citizen.org](https://www.citizen.org/news/hood-county-residents-left-vulnerable-as-commissioners-reject-data-center-moratorium/)citizen.org

[www.citizenjournal.us](https://www.citizenjournal.us/saline-county-commission-summary-2/)citizenjournal.us

[Citizen Portal meeting record: Minnetrista council approves 12-month moratorium on new data center applications (August 3, 2026)](https://citizenportal.ai/articles/9061476/minnesota/hennepin-county/minnetrista-city/council-approves-12month-moratorium-on-new-data-center-applications)citizenportal.ai

[Citizen Portal meeting record: Switzerland County adopts temporary moratorium on commercial/intermediate solar and data center…](https://citizenportal.ai/articles/9935697/Indiana/Switzerland-County/Switzerland-County-adopts-temporary-moratorium-on-commercialintermediate-solar-and-data-center-applications)citizenportal.ai

[citizenportal.ai](https://citizenportal.ai/articles/7784846/Illinois/Champaign-County/Champaign-County-committee-approves-9month-moratorium-on-large-data-centers-after-public-comment-and-scheduling-debate)citizenportal.ai

[citizenportal.ai](https://citizenportal.ai/articles/7011680/Fluvanna-County/Virginia/Fluvanna-supervisors-ask-planning-commission-for-clearer-plan-on-Technology-Zone-and-moratorium-options)citizenportal.ai

[citizenportal.ai](https://citizenportal.ai/articles/6450447/port-washington-plan-panel-approves-tid-for-vantage-data-center-after-hours-of-public-comment)citizenportal.ai

[www.citizensforfauquier.org](https://www.citizensforfauquier.org/data-centers-overview)citizensforfauquier.org

[www.citizensforfauquier.org](https://www.citizensforfauquier.org/)citizensforfauquier.org

[citizensvoice.com](https://www.citizensvoice.com/2026/03/02/hollenback-twp-data-center-rezoning-request-heads-to-court/)citizensvoice.com

[citizensvoice.com](https://www.citizensvoice.com/2026/02/04/claim-hollenback-twp-rural-landowners-offered-175k-per-acre-for-data-center-takeover/)citizensvoice.com

[www.citizensvoice.com](https://www.citizensvoice.com/2026/03/12/luzerne-county-continues-work-on-zoning-plan-for-data-centers/)citizensvoice.com

[citydesk.org](https://citydesk.org/2026/02/11/bernco-commission-oks-data-center-restrictions/)citydesk.org

[City of Avon: City Council Minutes, April 13, 2026](https://www.cityofavon.com/AgendaCenter/ViewFile/Minutes/_04132026-1605)cityofavon.com

[City of Miamisburg: City Council Approves Nine-Month Moratorium on Data Centers (September 2, 2026)](https://cityofmiamisburg.com/city-council-approves-nine-month-moratorium-on-data-centers/)cityofmiamisburg.com

[City of Port Angeles: September 1, 2026 Council Agenda](https://cityofpa.us/DocumentCenter/View/19158/09012026-CC-Agenda)cityofpa.us

[City of Port Angeles: September 15, 2026 Council Agenda Packet (draft Sept 1 minutes and Moratorium on Data Centers public hearing,…](https://www.cityofpa.us/DocumentCenter/View/19195/09152026-CC-Agenda-Packet)cityofpa.us

[City of Warren: City Council Meeting August 25, 2026 Agenda (item: Consideration and adoption of a resolution approving a moratorium on…](https://www.cityofwarren.org/wp-content/uploads/2026/08/City-Council-Meeting-%E2%80%93-August-25-2026-Agenda.pdf)cityofwarren.org

[Cumberland County holds moratorium hearing](https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/)cityviewnc.com

[cityviewnc.com](https://www.cityviewnc.com/stories/3-commissioners-back-data-center-moratorium-as-public-opposition-intensifies/)cityviewnc.com

[www.cityviewnc.com](https://www.cityviewnc.com/stories/residents-push-for-clarity-as-data-centers-consider-fayetteville/)cityviewnc.com

[www.cityviewnc.com](https://www.cityviewnc.com/stories/cumberland-county-drafting-its-first-rules-for-data-centers/)cityviewnc.com

[www.cityviewnc.com](https://www.cityviewnc.com/stories/newsletter/%F0%9F%96%A5%EF%B8%8F-data-centers-under-scrutiny-in-cumberland-county/)cityviewnc.com

[www.cityviewnc.com](https://www.cityviewnc.com/stories/fayetteville-council-clashes-over-who-should-shape-citys-data-center-rules/)cityviewnc.com

[www.cityviewnc.com](https://www.cityviewnc.com/stories/cumberland-commissioners-schedule-hearing-on-data-center-moratorium/)cityviewnc.com

[claremore.com](https://claremore.com/project-mustang-faq/)claremore.com

[clarkecounty.iowa.gov](https://clarkecounty.iowa.gov/wp-content/uploads/2025/07/6-23-2025.pdf)clarkecounty.iowa.gov

[City of Clayton: Legislation adopted July 16, 2026 (Resolution R-07-26-46)](https://www.clayton.oh.us/DocumentCenter/View/7246/Legislation-07-16-2026)clayton.oh.us

[www.claytoncountyga.gov](https://www.claytoncountyga.gov/news/clayton-county-board-of-commissioners-approves-moratorium-on-new-data-centers-in-clayton-county/)claytoncountyga.gov

[www.claytoncountyia.gov](https://www.claytoncountyia.gov/AgendaCenter/ViewFile/Minutes/_02252025-1054)claytoncountyia.gov

[claytoncountyianews.com](https://claytoncountyianews.com/local-news/clayton-county-bos-extends-moratorium-on-data-centers/)claytoncountyianews.com

[Packed House Confronts County Commission Over Data Centers (Clay Views)](https://www.clayviews.com/p/packed-house-confronts-county-commission)clayviews.com

[cleancayugalake.org](https://cleancayugalake.org/terawulf/)cleancayugalake.org

[www.clermontsun.com](https://www.clermontsun.com/2026/02/04/mt-orab-council-member-takes-steps-to-stop-possible-data-center-construction)clermontsun.com

[cleveland19.com](https://www.cleveland19.com/2026/07/16/3-month-long-moratorium-put-data-centers-cleveland/)cleveland19.com

[clevelandohio.gov](https://clevelandohio.gov)clevelandohio.gov

[clickondetroit.com](https://www.clickondetroit.com/news/local/2025/12/14/saline-township-resident-files-lawsuit-to-stop-massive-data-center-project/)clickondetroit.com

[www.clickondetroit.com](https://www.clickondetroit.com/news/local/2026/01/29/saline-township-residents-frustrated-after-zoning-vote-blocks-referendum-on-ai-data-center/)clickondetroit.com

[clintoncounty-ia.gov](https://clintoncounty-ia.gov/files/meetings/2025-12-08_minutes_825.pdf)clintoncounty-ia.gov

[clintoncountydailynews.com](https://clintoncountydailynews.com/clinton-county-commissioners-deny-rezoning-request-for-proposed-data-center/)clintoncountydailynews.com

[www.clintonherald.com](https://www.clintonherald.com/news/county-supervisors-place-moratorium-on-wind-project-applications/article_1a96408a-29d3-11ef-9b45-47e3bc50532b.html)clintonherald.com

[www.clintonherald.com](https://www.clintonherald.com/news/local_news/clinton-county-extends-wind-energy-moratorium/article_daa9b8a4-8f7b-4e0a-a574-d86e0bddba4a.html)clintonherald.com

[www.clintonherald.com](https://www.clintonherald.com/news/local_news/county-adopts-new-wind-turbine-rules-developer-warns-of-litigation/article_c8dbdae2-84ed-43e4-a7f0-1f14eeef93b7.html)clintonherald.com

[Village of Clinton: Regular Council Meeting Minutes, June 16, 2026](https://clintonoh.gov/wp-content/uploads/2026/07/June-16-2026.pdf)clintonoh.gov

[City of North Royalton: Ordinance 26-118, Temporary Moratorium on Data Centers for One Year](https://cms7files.revize.com/northroyalton/Government/Legislation/2026/26-118%20TEMPORARY%20MORATORIUM%20ON%20DATA%20CENTERS%20FOR%20ONE%20YEAR.pdf?t=202607221231330)cms7files.revize.com

[cnbc.com](https://www.cnbc.com/2026/03/10/elon-musk-xai-permit-for-mississippi-plant-despite-pollution-concerns.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2026/02/13/musks-xai-faces-threat-of-naacp-lawsuit-over-pollution-in-mississippi.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2026/03/09/mississippi-regulators-to-hold-xai-permit-meeting-on-election-day.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2026/04/14/elon-musk-xai-memphis-data-centers.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2026/06/16/usdepartment-of-justice-calls-for-dismissal-of-naacp-xai-lawsuit-.html)cnbc.com

[cnbc.com](https://www.cnbc.com/2025/10/28/google-nextera-iowa-duane-arnold-nuclear-power-plant-ai-energy-demand-data-centers.html)cnbc.com

[www.cnbc.com](https://www.cnbc.com/2025/11/25/microsoft-ai-data-center-rejection-vs-support.html)cnbc.com

[www.cnbc.com](https://www.cnbc.com/2026/01/07/microsoft-behind-controversial-data-center-in-michigan-township.html)cnbc.com

[www.cnbc.com](https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html)cnbc.com

[www.cnbc.com](https://www.cnbc.com/2026/01/26/microsoft-wins-approval-for-15-data-centers-at-wisconsin-foxconn-site.html)cnbc.com

[cnn.com](https://www.cnn.com/2026/05/09/tech/ai-data-center-utah-kevin-oleary-opposition)cnn.com

[Steuben County Board of Commissioners: Agenda, September 15, 2026 (Data Center Moratorium)](https://www.co.steuben.in.us/Agenda%2009-15-2026.pdf)co.steuben.in.us

[www.cochise.az.gov](https://www.cochise.az.gov/m/newsflash/home/detail/415)cochise.az.gov

[www.coloradoboulevard.net](https://www.coloradoboulevard.net/monterey-park-moves-toward-permanent-citywide-ban-on-data-centers/)coloradoboulevard.net

[coloradonewsline.com](https://coloradonewsline.com/2026/09/10/weld-comissioners-global-ai-data-center/)coloradonewsline.com

[coloradosun.com](https://coloradosun.com/2026/02/24/denver-data-center-moratorium-state-legislature-opposition/)coloradosun.com

[www.columbiamissourian.com](https://www.columbiamissourian.com/news/local/residents-speak-against-rezoning-farmland-for-possible-data-center/article_7b90506f-981e-4054-b2f6-e316da47de6e.html)columbiamissourian.com

[commercialobserver.com](https://commercialobserver.com/2026/02/meta-data-center-lebanon-indiana/)commercialobserver.com

[commercialobserver.com](https://commercialobserver.com/2025/09/data-center-pause-prince-george-maryland/)commercialobserver.com

[www.commondreams.org](https://www.commondreams.org/news/new-brunswick-ai-data-center)commondreams.org

[commonwealthbeacon.org](https://commonwealthbeacon.org/environment/lowell-residents-sue-data-center-state-over-air-quality-permit/)commonwealthbeacon.org

[community.triblive.com](https://community.triblive.com/news/3990268)community.triblive.com

[communityimpact.com](https://communityimpact.com/austin/pflugerville-hutto/development/2026/04/09/hutto-residents-air-concerns-over-proposed-data-center/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/pflugerville-hutto/government/2026/04/22/zydeco-development-withdraws-zoning-request-for-data-center-in-hutto/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/san-marcos-buda-kyle/development/2025/05/21/new-data-center-planned-near-new-braunfels-and-san-marcos-sparks-debate/)communityimpact.com

[communityimpact.com](https://communityimpact.com/austin/san-marcos-buda-kyle/government/2026/02/18/san-marcos-council-denies-map-change-stops-data-center-development/)communityimpact.com

[concentratemedia.com](https://concentratemedia.com/data-centers-in-washtenaw-county-economic-boon-or-environmental-liability/)concentratemedia.com

[connectcre.com](https://www.connectcre.com/stories/energy-storage-solutions-seeking-permit-for-6-4b-data-center/)connectcre.com

[www.constructiondive.com](https://www.constructiondive.com/news/terawulf-fluor-data-center-preconstruction-kentucky-megaproject/815027/)constructiondive.com

[constructionowners.com](https://www.constructionowners.com/news/court-halts-digital-gateway-construction-in-virginia)constructionowners.com

[Lake County, IL: Lake County Board Approves Moratorium on Data Centers in Unincorporated Lake County (September 8, 2026)](https://content.govdelivery.com/accounts/ILLAKE/bulletins/42810a1)content.govdelivery.com

[contracosta.news](https://contracosta.news/2026/03/11/with-data-centers-removed-oakley-approves-bridgehead-industrial-project/)contracosta.news

[cornellsun.com](https://www.cornellsun.com/article/2025/12/lansing-board-withdraws-ordinance-that-would-have-stalled-terawulf-data-center)cornellsun.com

[cornellsun.com](https://www.cornellsun.com/article/2025/11/tensions-over-terawulf-data-center-in-tompkins-county-grow-with-threatened-lawsuit)cornellsun.com

[cornellsun.com](https://www.cornellsun.com/article/2026/02/tompkins-county-legislature-calls-on-dec-to-reconsider-water-permit-for-terawulf-data-center)cornellsun.com

[cornellsun.com](https://www.cornellsun.com/article/2026/07/k9fstjzcajbc)cornellsun.com

[corridorbusiness.com](https://corridorbusiness.com/linn-county-data-center-moratorium-approved-how-the-board-got-to-2-1-and-what-happens-next/)corridorbusiness.com

[www.cortlandstandard.com](https://www.cortlandstandard.com/news/official-dryden-is-first-town-in-ny-to-outlaw-data-centers/article_ad4e8336-307e-430a-88af-fec269f938d1.html)cortlandstandard.com

[council.nola.gov](https://council.nola.gov/news/january-2026/new-orleans-city-council-approves-motions-to-study/)council.nola.gov

[council.seattle.gov](https://council.seattle.gov/2026/04/30/councilmembers-introducing-moratorium-on-data-centers-in-seattle/)council.seattle.gov

[courthousenews.com](https://www.courthousenews.com/nonprofit-sues-to-block-165-billion-openai-data-center-in-rural-new-mexico/)courthousenews.com

[www.covnews.com](https://www.covnews.com/news/cities/social-circle-enacts-90-day-moratorium-data-centers-vote-annexations/)covnews.com

[www.covnews.com](https://www.covnews.com/news/cities/social-circle-council-lifts-moratorium-new-data-center-requests/)covnews.com

[www.covnews.com](https://www.covnews.com/news/cities/city-covington-enacts-moratorium-moves-reject-two-annexation-requests/)covnews.com

[www.covnews.com](https://www.covnews.com/news/county/newton-county-enacts-moratoriums-data-centers-convenience-stores/)covnews.com

[www.covnews.com](https://www.covnews.com/news/cities/city-covington-imposes-moratorium-new-data-center-requests/)covnews.com

[crainscleveland.com](https://www.crainscleveland.com/politics-policy/ccl-shortened-data-center-moratorium-20260715/)crainscleveland.com

[www.crainsdetroit.com](https://www.crainsdetroit.com/real-estate/concord-infrastructure-partners-pitches-data-center-deadline)crainsdetroit.com

[www.crainsgrandrapids.com](https://www.crainsgrandrapids.com/news/economic-development/microsoft-faces-the-public-as-it-pursues-two-grand-rapids-area-data-center-projects/)crainsgrandrapids.com

[cramerscrossing.org](https://cramerscrossing.org/dublin-city-council-to-vote-on-west-innovation-district-rezoning-changes-july-1st/)cramerscrossing.org

[www.crozetgazette.com](https://www.crozetgazette.com/2025/10/03/county-supervisors-consider-data-center-regulations/)crozetgazette.com

[csmonitor.com](https://www.csmonitor.com/Environment/2026/0605/utah-stratos-data-center-kevin-oleary)csmonitor.com

[ctexaminer.com](https://ctexaminer.com/2022/06/15/groton-approves-one-year-moratorium-on-data-centers/)ctexaminer.com

[ctmirror.org](https://ctmirror.org/2024/04/19/ct-data-center-nuclear-plant-bill/)ctmirror.org

[cubofmichigan.org](https://cubofmichigan.org/blog/mpsc-grants-expedited-approval-for-dte-contracts-with-hyperscale-data-center/)cubofmichigan.org

[www.cullmantribune.com](https://www.cullmantribune.com/2026/06/23/cullman-city-council-imposes-temporary-moratorium-on-data-centers/)cullmantribune.com

[cumberlandcountync.gov](https://www.cumberlandcountync.gov/departments/public-information-group/public-information/news-releases/news-release-full-story/2026/03/10/board-of-commissioners-to-hold-special-meeting-and-public-comment-period-on-proposed-data-centers)cumberlandcountync.gov

[www.cvilletomorrow.org](https://www.cvilletomorrow.org/how-should-albemarle-county-regulate-data-centers-officials-want-to-hear-what-residents-think/)cvilletomorrow.org

[Grove City data center moratorium passes](https://cwcolumbus.com/news/local/grove-city-data-center-moratorium-passes)cwcolumbus.com

[cwfnc.org](https://cwfnc.org/nofracklee/)cwfnc.org

[www.cyrusone.com](https://www.cyrusone.com/resources/press-releases/cyrusone-breaks-ground-on-new-data-center-in-aurora)cyrusone.com

[daily-tribune.com](https://www.daily-tribune.com/news/springbank-data-center-application-withdrawn/article_4038268b-78d8-5d26-9e10-2bf514aac3a3.html)daily-tribune.com

[dailycaller.com](https://dailycaller.com/2026/04/13/missouri-voters-give-boot-to-2-city-council-members-who-backed-multi-billion-dollar-ai-data-center-bonanza/)dailycaller.com

[www.dailycardinal.com](https://www.dailycardinal.com/article/2026/01/deforest-residents-organize-to-stop-proposed-data-center-after-emails-go-public)dailycardinal.com

[dailydodge.com](https://dailydodge.com/dodge-county-data-center-vote-was-advisory-not-a-moratorium/)dailydodge.com

[dailygazette.com](https://dailygazette.com)dailygazette.com

[www.dailyherald.com](https://www.dailyherald.com/20260127/real-estate/2-billion-data-center-proposal-in-barrington-hills-withdrawn/)dailyherald.com

[dailyillini.com](https://dailyillini.com/news-stories/world-news/state-news/2026/03/31/champaign-county-arms-against-big-data-centers/)dailyillini.com

[dailyindependent.com](https://www.dailyindependent.com/news/boyd-approves-data-center-moratorium/article_f56ffafa-d2a7-4c69-b0d3-154bd192fc59.html)dailyindependent.com

[dailyiowan.com](https://dailyiowan.com/2025/11/06/joco-supervisors-discuss-possible-data-center-moratorium/)dailyiowan.com

[dailyjournal.net](https://dailyjournal.net/2026/02/12/meta-begins-construction-on-10b-data-center-campus-at-leap-district-in-lebanon/)dailyjournal.net

[dailyjournal.net](https://dailyjournal.net/2025/11/24/3-counties-put-moratoriums-on-data-center-projects/)dailyjournal.net

[dailymemphian.com](https://dailymemphian.com/section/metrocity-of-memphis/article/50612/xai-memphis-city-council-final-approval-land-deal-southwest)dailymemphian.com

[dailymemphian.com](https://dailymemphian.com/article/60703)dailymemphian.com

[dailymontanan.com](https://dailymontanan.com/2026/02/23/eleven-data-center-developers-in-talks-with-northwestern-group-says/)dailymontanan.com

[dailymontanan.com](https://dailymontanan.com/2026/03/31/northwestern-doesnt-have-to-turn-over-more-data-center-information-in-merger-case/)dailymontanan.com

[dailymontanan.com](https://dailymontanan.com/2026/03/13/public-service-commission-cant-keep-data-center-information-secret-says-group/)dailymontanan.com

[dailyprogress.com](https://dailyprogress.com/news/state-regional/business/article_01ab4690-f617-4e84-b1d8-3b535771a116.html)dailyprogress.com

[Brown County declines data center moratorium](https://dailyreporter.com/2026/06/03/brown-county-declines-data-center-moratorium-zoning/)dailyreporter.com

[dailyreporter.com](https://dailyreporter.com/2025/11/07/qts-12b-deforest-data-center-development/)dailyreporter.com

[dakotafreepress.com](https://dakotafreepress.com/2026/01/17/sioux-falls-loses-11-of-voters-in-one-year-anti-data-center-petitioners-need-1000-fewer-signatures-than-expected/)dakotafreepress.com

[dakotafreepress.com](https://dakotafreepress.com/2026/01/31/sioux-falls-data-center-referendum-petition-fails-january-chills-signature-collection/)dakotafreepress.com

[www.dakotanewsnetwork.com](https://www.dakotanewsnetwork.com/2026/02/27/lincoln-county-commissioners-discuss-moratorium-on-building-data-centers)dakotanewsnetwork.com

[www.dakotanewsnetwork.com](https://www.dakotanewsnetwork.com/2026/03/04/mercer-county-commission-holds-meeting-on-data-centers)dakotanewsnetwork.com

[www.dakotanewsnow.com](https://www.dakotanewsnow.com/2026/04/09/nobles-county-residents-pushing-back-proposed-data-center/)dakotanewsnow.com

[dasselcokato.com](https://www.dasselcokato.com/articles/enterprisedispatch-news/wright-county-enacts-one-year-emergency-freeze-on-data-centers-following-citizen-outcry/)dasselcokato.com

[datacenterdynamics.com](https://datacenterdynamics.com)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/planned-stargate-data-center-encounters-opposition-in-saline-township-michigan/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/oracle-revealed-as-tenant-of-project-jupiter-data-center-campus-in-new-mexico/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/groups-sue-to-stall-data-center-project-in-do%C3%B1a-ana-county-new-mexico/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/city-of-hilliard-challenges-amazon-fuel-cell-project-at-ohio-data-center-report/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/blueprint-projects-gets-greenlight-for-data-center-in-taylor-texas/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/loudoun-countys-innovation-gateway-data-center-project-met-with-board-opposition/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/blackchamber-secures-12-billion-for-construction-of-virginia-data-centers-totaling-740mw/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/tract-announces-18gw-data-center-park-in-phoenix-arizona/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/beale-infrastructure-plans-second-data-center-campus-outside-tucson-arizona-and-two-outside-tulsa-oklahoma/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/groton-connecticut-announces-year-long-moratorium-on-large-data-centers/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/starwood-files-to-develop-12gw-11-building-data-center-campus-in-delaware/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/44-million-sq-ft-data-center-campus-gets-zoning-approval-in-fort-meade-florida/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/plans-filed-for-8-million-sq-ft-data-center-and-technology-park-outside-augusta-georgia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/three-proposals-for-data-centers-in-columbia-county-georgia-meet-stiff-opposition/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/atlas-files-for-428-acre-technology-and-data-park-outside-atlanta-georgia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/4bn-data-center-in-indianapolis-indiana-gets-go-ahead/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-outside-kansas-city-kansas/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/independence-missouri-faces-lawsuit-after-rejecting-petition-against-tax-breaks-for-nebius-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/1000-acre-aws-data-center-campus-under-consideration-in-montgomery-county-missouri/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-outside-toledo-ohio/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/beale-infrastructure-in-talks-to-build-data-center-campus-outside-tulsa-oklahoma/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/21bn-data-center-campus-proposed-in-archbald-pennsylvania/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/aws-acquires-talens-nuclear-data-center-campus-in-pennsylvania/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/26-million-sq-ft-data-center-campus-proposed-in-pennsylvania/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-in-franklin-county-tennessee-deny-zoning-request-for-cryptomine-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/cloudburst-signs-natural-gas-deal-with-energy-transfer-to-power-texas-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/plans-for-800mw-gigaland-data-center-campus-withdrawn-in-fauquier-county-virginia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/900mw-data-center-campus-plan-withdrawn-in-hanover-county-virginia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/planners-oppose-data-center-campus-in-varina-virginia/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/prince-william-county-supervisors-shelve-amazon-data-center-proposal-indefinitely/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/diode-ventures-plans-620-acre-data-center-park-in-kuna-idaho/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/american-tower-pauses-plans-for-edge-data-center-in-indianapolis-indiana/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/14bn-project-marvel-data-center-approved-by-bessemer-city-council-amidst-fierce-opposition/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/developer-eyes-240-acre-data-center-campus-in-festus-missouri/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/lawsuit-filed-to-lift-data-center-moratorium-in-eagan-minnesota/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/northern-virginias-prince-william-county-puts-controls-on-new-data-center-projects/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/google-looks-to-build-up-to-six-data-centers-near-nuclear-power-site-in-linn-county-iowa/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/gi-partners-secures-planning-permission-for-72mw-data-center-in-santa-clara-california/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/applied-digital-faces-opposition-to-planned-data-center-in-adair-county-iowa/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/application-for-13bn-data-center-in-chesterton-indiana-withdrawn/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/atlanta-city-council-passes-rules-limiting-data-center-locations/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/peculiar-officials-in-missouri-remove-data-centers-from-ordinance-blocking-15bn-diode-project/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/peculiar-data-center-faces-opposition-in-missouri/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/company-seeks-to-rezone-434-acres-for-data-center-in-osceola-county-florida/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/openai-pledges-to-pay-its-own-way-to-power-stargate-data-centers/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/sierra-club-appeals-against-82000-sq-ft-data-center-in-reno-nevada/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/provident-realty-proposes-seven-building-campus-in-burns-harbor-indiana/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/cielo-digital-infrastructure-plans-300mw-data-center-campus-in-south-carolina/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/planned-data-center-project-in-kentuckys-oldham-county-relocated-and-downsized-amid-backlash/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/microsoft-shares-details-on-ohio-data-center-in-perry-township/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/amazon-data-services-gains-approval-for-data-center-on-56-acres-in-gilroy-california/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/mesa-planning-officials-recommend-approval-for-cyrusone-and-pacific-proving-data-center-campuses/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/local-officials-recommend-denial-of-thor-equities-data-center-in-michigan/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/developer-withdraws-proposal-for-250mw-data-center-in-apex-north-carolina/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/meta-set-to-develop-1500-acre-data-center-campus-outside-indianapolis-indiana/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/ta-realty-gets-green-light-for-data-center-outside-atlanta-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/college-station-texas-rejects-land-sale-for-data-center/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-in-texas/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/developers-to-appeal-data-center-rejection-in-tarboro-north-carolina/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-developers-withdraw-plans-to-rezone-more-than-600-acres-in-jones-county-georgia-after-local-pushback/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/application-for-data-center-in-preble-county-ohio-withdrawn/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-in-kansas-city-speak-out-against-tax-breaks-for-google-linked-data-center-campus/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/plan-to-convert-former-psychiatric-hospital-near-philadelphia-into-data-center-set-to-be-blocked/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/cloverleaf-drops-initial-plans-for-michigan-data-center-council-votes-to-block-water-supply/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/microsoft-cancels-plans-for-data-center-caledonia-wisconsin/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-in-meade-county-kentucky-reject-data-center-rezoning-plan/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-plan-for-campbell-county-virginia-rejected/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/multi-gigawatt-data-center-campus-planned-in-east-texas/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/qts-to-build-data-center-in-york-county-south-carolina/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for-16gw-data-center-park/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/land-rezoning-approved-for-data-center-in-lyon-county-nevada/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/vampire-data-center-scheme-irks-residents-in-wiscasset-maine/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/wilmington-city-council-postpones-vote-on-aws-data-center-in-southwest-ohio/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/900mw-data-center-campus-proposed-outside-macon-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/permission-denied-to-data-center-in-athens-clarke-county-georgia-talks-of-a-potential-moratorium/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/cloverleaf-walks-away-from-data-center-site-project-in-kewaunee-wisconsin/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-project-in-lawrence-county-ohio-sparks-calls-for-moratorium-in-neighboring-city/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/st-joseph-county-leaders-approve-11bn-amazon-data-center-in-indiana/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/project-sail-data-center-newnan-atlanta-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/tier-iii-ai-data-center-proposed-for-lewiston-bates-mill-in-maine/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/developer-in-lowell-township-michigan-withdraws-data-center-application-following-opposition/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/microsoft-plans-data-centers-in-dorr-and-lowell-townships-applies-for-property-rezoning-in-gaines-townships/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-proposal-in-luther-oklahoma-faces-opposition-prior-to-official-filing/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/another-data-center-campus-is-being-planned-outside-atlanta-georgia-hampton-technology-park-owner-llc-has-filed-a-developments-of-regional-impact-dri-application-with-the-georgia-department-of-community-affairs-for-a-new-campus-in-the-city-of-hampto/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/qts-drops-plan-for-data-center-near-madison-wisconsin-amid-opposition-from-local-officials/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/planned-project-atlas-data-center-campus-in-coweta-oklahoma-fails-to-secure-backing-from-planners/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/45-day-data-center-moratorium-passed-in-monterey-park-california-with-more-permanent-regulations-to-come/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/karis-critical-plans-36mw-data-center-in-naperville-illinois/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-proposal-rejected-in-pekin-illinois/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/400-acres-to-be-annexed-rezoned-for-data-centers-in-fayetteville-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/atlas-development-files-for-12-building-data-center-campus-in-temple-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/brennan-investment-group-withdraws-plans-for-2bn-data-center-outside-chicago-illinois/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/pacifico-energy-unveils-5gw-offgrid-natural-gas-project-in-texas-slated-to-serve-a-hyperscale-data-center/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/150mw-data-center-proposed-for-baltimore-county-maryland/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/local-authorities-in-ashville-ohio-deny-annexation-request-for-data-center-project/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/proposed-edgeconnex-data-center-in-pickaway-county-ohio-facing-criticism/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/mason-city-michigan-repeals-data-center-ordinance-to-strengthen-regulation-ahead-of-potential-project/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/muhlenberg-ohio-introduces-year-long-moratorium-on-new-data-centers/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/aws-data-center-project-tabled-in-wilmington-ohio/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/aws-likely-behind-48bn-data-center-in-walla-walla-washington/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/aws-plans-2bn-data-center-campus-in-sunbury-ohio/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/proposal-for-3bn-data-center-faces-opposition-in-spartanburg-county-south-carolina/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/tigerdc-pulls-planned-data-center-project-from-south-carolina-county-after-officials-deny-tax-deal/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/global-ai-set-to-develop-data-center-outside-denver-colorado/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/google-pledges-7bn-to-expand-iowa-data-center-footprint/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-recommend-data-center-moratorium-for-approval-in-fulton-county-indiana/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/180-acre-data-center-set-to-be-built-in-lyon-township-michigan/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/950-acre-data-center-campus-proposed-in-pittsylvania-county-virginia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/aws-withdraws-plans-for-third-data-center-campus-in-louisa-county-virginia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/northpoint-proposes-15-building-1280-acre-data-center-campus-in-pennsylvania/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/municipal-leaders-debate-data-center-zoning-ordinance-in-dorrance-township-pennsylvania/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/936-acre-data-center-could-come-to-lubbock-texas/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/crusoe-data-center-could-be-built-west-of-st-louis-missouri/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/verdantas-proposes-new-data-center-in-newark-delaware/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/two-data-center-campuses-totaling-446-million-sq-ft-seek-zoning-permission-in-virginias-culpeper-county/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/oppidan-gains-approval-for-5mw-data-center-in-reno-nevada/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/prologis-data-center-proposal-in-kosciusko-county-indiana-denied/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/1600-acre-data-center-approved-by-local-authorities-in-forsyth-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/data-center-campus-recommended-for-disapproval-by-fredericksburg-planning-commission/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/city-council-of-provo-utah-votes-against-data-center-rezoning-proposal/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/pennsylvanias-londonderry-township-weighs-data-center-zoning-ordinance-change/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/qts-targets-two-data-center-campuses-in-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/land-rezoning-proposal-for-300mw-data-center-in-frankfort-indiana-rescinded-by-developer/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/locals-voice-concerns-over-upcoming-data-center-in-bristol-indiana/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/opposition-leads-developer-to-withdraw-data-center-proposal-in-kalkaska-county-michigan/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/westdulles-properties-files-for-3-million-sq-ft-data-center-park-outside-richmond-virginia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/softbank-eyes-10gw-data-center-at-former-doe-nuclear-enrichment-site-in-ohio/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/officials-in-north-carolina-county-give-ok-for-rezoning-potential-data-center-incoming/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/mayor-of-mansfield-ohio-says-city-will-no-longer-pursue-data-center-project/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/225-million-sq-ft-data-center-campus-proposed-outside-phoenix-arizona/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/harford-county-maryland-could-impose-90-day-moratorium-on-data-centers/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/county-officials-deny-data-center-zoning-request-in-georgia/)datacenterdynamics.com

[www.datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/kentuckys-oldham-county-passes-150-day-data-center-moratorium/)datacenterdynamics.com

[datacenterfrontier.com](https://www.datacenterfrontier.com/hyperscale/article/33038288/aws-eyes-960-mw-for-newly-acquired-nuclear-power-data-center-in-pennsylvania)datacenterfrontier.com

[www.datacenterfrontier.com](https://www.datacenterfrontier.com/site-selection/article/55139905/northern-virginias-fairfax-county-tightens-data-center-rules)datacenterfrontier.com

[www.datacenterfrontier.com](https://www.datacenterfrontier.com/hyperscale/article/55296394/henrico-county-virginia-moves-to-slow-data-center-growth)datacenterfrontier.com

[www.datacenterknowledge.com](https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds)datacenterknowledge.com

[datacenterresponsibility.com](https://www.datacenterresponsibility.com/)datacenterresponsibility.com

[datacenters.atmeta.com](https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Kuna-Data-Center.pdf)datacenters.atmeta.com

[www.datacenters.com](https://www.datacenters.com/t5-charlotte-campus)datacenters.com

[www.datacenterwatch.org](https://www.datacenterwatch.org/report)datacenterwatch.org

[datacenterwatch.substack.com](https://datacenterwatch.substack.com/p/briefing-10172025)datacenterwatch.substack.com

[datacenterwatch.substack.com](https://datacenterwatch.substack.com/p/briefing-12192025)datacenterwatch.substack.com

[datacenterwatch.substack.com](https://datacenterwatch.substack.com/p/briefing-10032025)datacenterwatch.substack.com

[dayton247now.com](https://dayton247now.com/news/local/trustees-enact-360-day-moratorium-on-data-center-zoning-in-washington-township)dayton247now.com

[www.daytondailynews.com](https://www.daytondailynews.com/local/large-data-centers-could-be-banned-from-dayton-under-zoning-proposal/article_76b7992f-0baa-475a-af7f-883102de75f4.html)daytondailynews.com

[dbknews.com](https://dbknews.com/2025/12/04/prince-georges-county-data-centers/)dbknews.com

[www.dcblox.com](https://www.dcblox.com/data-centers/douglas-county-ga-hyperscale-data-center-campus/)dcblox.com

[www.dcblox.com](https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/)dcblox.com

[www.dcblox.com](https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/)dcblox.com

[dchieftain.com](https://dchieftain.com)dchieftain.com

[dchieftain.com](https://www.dchieftain.com/news/county-approves-first-step-toward-moratorium/3042475)dchieftain.com

[www.decaturish.com](https://www.decaturish.com/news/dekalb/dekalb-extends-data-center-moratorium-defers-regulations/article_1b2415a2-81c3-4c18-bd9b-ffa628e58635.html)decaturish.com

[deceleration.news](https://deceleration.news/san-marcos-data-centers-drought-vote/)deceleration.news

[delawarebusinesstimes.com](https://delawarebusinesstimes.com/news/new-castle-data-center-campus/)delawarebusinesstimes.com

[delawarebusinesstimes.com](https://delawarebusinesstimes.com/news/starwood-appeals-coastal-zone-permit-denial/)delawarebusinesstimes.com

[Delaware Public Media: Harrington shoots down ordinance that would allow data centers in city limits (August 18, 2026)](https://www.delawarepublic.org/science-health-tech/2026-08-18/harrington-shoots-down-ordinance-that-would-allow-data-centers-in-city-limits)delawarepublic.org

[delawarepublic.org](https://www.delawarepublic.org/politics-government/2026-02-04/dnrec-says-planned-data-center-near-delaware-city-prohibited-under-coastal-zone-act)delawarepublic.org

[www.delawarepublic.org](https://www.delawarepublic.org/science-health-tech/2026-02-25/starwood-appeals-denial-of-permit-for-data-center-in-ncc)delawarepublic.org

[www.delawarepublic.org](https://www.delawarepublic.org/show/the-green/2025-10-24/as-delaware-mulls-plans-for-massive-data-center-worries-persist-over-electric-rates)delawarepublic.org

[www.delawarepublic.org](https://www.delawarepublic.org/politics-government/2026-03-11/new-castle-county-council-unanimously-approves-data-center-regulations-after-hours-long-meeting)delawarepublic.org

[democracynow.org](https://www.democracynow.org/2026/6/18/abre_conner_naacp)democracynow.org

[Jefferson County imposes temporary moratorium on development of new data centers, Denver7](https://www.denver7.com/news/front-range/jefferson-county-imposes-temporary-moratorium-on-development-of-new-data-centers)denver7.com

[denver7.com](https://www.denver7.com/news/local-news/longmont-considers-ban-on-hyperscale-data-centers-amid-growing-energy-and-water-concerns)denver7.com

[www.denvergazette.com](https://www.denvergazette.com/2026/03/31/denver-proposes-yearlong-moratorium-on-new-data-centers/)denvergazette.com

[www.denvergazette.com](https://www.denvergazette.com/2026/04/10/denver-city-council-to-consider-data-centers-buffalo-on-call-landscape-deals/)denvergazette.com

[www.denvergazette.com](https://www.denvergazette.com/2026/02/27/weld-county-wades-into-data-center-issue/)denvergazette.com

[denverite.com](https://denverite.com/2026/03/31/denvers-data-center-moratorium-ban/)denverite.com

[denverite.com](https://denverite.com/2026/05/18/denver-data-center-moratorium-passes-ban/)denverite.com

[www.derbyinformer.com](https://www.derbyinformer.com/news/area_news/community-group-to-discuss-data-centers/article_7c28f839-185a-4aa8-b9e5-17d3196cd463.html)derbyinformer.com

[www.deseret.com](https://www.deseret.com/business/2025/08/15/worlds-largest-data-center-campus-could-be-coming-to-central-utah/)deseret.com

[desmog.com](https://www.desmog.com/2026/03/11/data-centers-are-poised-to-engulf-a-pennsylvania-town/)desmog.com

[www.desmog.com](https://www.desmog.com/2025/08/20/georgia-county-puts-off-key-data-center-vote-after-public-backlash/)desmog.com

[www.desmog.com](https://www.desmog.com/2025/08/18/arthur-edge-data-center-lobbyists-project-sail-sargent-coweta-county-georgia/)desmog.com

[www.desmog.com](https://www.desmog.com/2026/03/31/archbald-pennsylvania-residents-vote-no-data-center-provident-realty-advisors/)desmog.com

[detroitnews.com](https://www.detroitnews.com/story/news/local/michigan/2026/02/20/judge-denies-request-to-slow-construction-of-oracle-openai-chatgpt-data-center-saline-michigan/88759349007/)detroitnews.com

[www.detroitnews.com](https://www.detroitnews.com/story/news/local/oakland-county/2026/01/07/springfield-twp-passes-temporary-data-center-moratorium/88049214007/)detroitnews.com

[www.detroitnews.com](https://www.detroitnews.com/story/news/local/macomb-county/2025/12/30/northern-macomb-co-washington-residents-rally-proposed-data-center-tax-base-boost/87832882007/)detroitnews.com

[www.detroitnews.com](https://www.detroitnews.com/story/news/local/oakland-county/2026/01/21/pontiac-latest-community-to-pass-data-center-moratorium/88286730007/)detroitnews.com

[www.dextertownshipmi.gov](https://www.dextertownshipmi.gov/resolution-26-705-resolution-adopting-data-center-application-moratorium-2/)dextertownshipmi.gov

[www.dglobe.com](https://www.dglobe.com/news/local/nobles-county-planning-commission-votes-against-data-centers-in-ag-district)dglobe.com

[dgtlinfra.com](https://dgtlinfra.com/blackchamber-group-data-centers-northern-virginia/)dgtlinfra.com

[www.diodeventures.com](https://www.diodeventures.com/projects/gptp)diodeventures.com

[donaana.gov](https://www.donaana.gov/news_detail_T7_R35.php)donaana.gov

[dorchestercountysc.gov](https://www.dorchestercountysc.gov/business/data-center-fact-sheet)dorchestercountysc.gov

[Dougherty County: County Extends Review Period for Large-Scale Data Center Development (August 31, 2026)](https://www.dougherty.ga.us/Government/News/DOUGHERTY-COUNTY-EXTENDS-REVIEW-PERIOD-FOR-LARGE-SCALE-DATA-CENTER-DEVELOPMENT)dougherty.ga.us

[douglascountysentinel.com](https://www.douglascountysentinel.com/douglasville_sentinel/data-center-moratorium-extended-to-determine-impact-on-ratepayers/article_3d610d7f-cec8-5be2-a4dc-9f3591440adc.html)douglascountysentinel.com

[www.douglascountysentinel.com](https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html)douglascountysentinel.com

[www.dwt.com](https://www.dwt.com/blogs/energy--environmental-law-blog/2026/04/anchorage-adopts-data-center-framework)dwt.com

[www.eaglecountryonline.com](https://www.eaglecountryonline.com/news/local-news/franklin-co-commissioners-place-year-long-moratorium-on-data-centers/)eaglecountryonline.com

[www.eaglecountryonline.com](https://www.eaglecountryonline.com/news/local-news/dearborn-co-commissioners-approve-one-year-moratorium-on-solar-farms/)eaglecountryonline.com

[www.earlycountynews.com](https://www.earlycountynews.com/articles/qts-data-centers-considers-a-location-in-blakely/)earlycountynews.com

[earth.org](https://earth.org/trump-administration-seeks-dismissal-of-lawsuit-against-elon-musks-ai-data-center-near-memphis/)earth.org

[earthisland.org](https://www.earthisland.org/journal/index.php/articles/entry/how-one-arizona-city-blocked-a-data-center/)earthisland.org

[earthjustice.org](https://earthjustice.org/press/2024/victory-new-york-court-rescinds-approval-of-fracked-gas-power-plant-sale-to-cryptocurrency-mining-company-in-north-tonawanda)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2025/groups-file-complaint-to-stop-northwestern-energy-from-shifting-data-center-costs-to-residential-customers)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2026/groups-challenge-montana-psc-order-that-shields-data-center-plans-from-public-view)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2024/granbury-residents-sue-local-bitcoin-mine-over-health-threatening-noise-pollution)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2025/granbury-residents-demand-answers-from-maras-bitcoin-mine-as-lawsuit-over-noise-nuisance-continues)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2026/louisiana-regulators-asked-to-investigate-shady-meta-financing-deal-that-could-leave-households-paying-for-tech-giants-electricity)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2026/naacp-asks-court-for-emergency-action-to-stop-illegal-air-pollution-from-xais-data-center-power-plant)earthjustice.org

[earthjustice.org](https://earthjustice.org/press/2026/xai-sued-for-illegal-power-plant)earthjustice.org

[eastbayinsiders.substack.com](https://eastbayinsiders.substack.com/p/oakland-weighs-data-center-moratorium)eastbayinsiders.substack.com

[East Bay Times: Richmond data center ban](https://www.eastbaytimes.com/2026/09/16/richmond-data-center-ban/)eastbaytimes.com

[eastcobbnews.com](https://eastcobbnews.com/marietta-delays-data-center-request-issues-moratorium/)eastcobbnews.com

[easternecho.com](https://www.easternecho.com/article/2026/03/city-of-ypsilanti-considers-emergency-moratorium-concerning-data-center-zoning)easternecho.com

[easternecho.com](https://www.easternecho.com/article/2026/04/new-ypsilanti-township-data-center-resolution-requests-moratorium-on-local-resources)easternecho.com

[City of Eastlake: Regular Council Meeting Minutes, November 25, 2025](https://eastlakeohio.com/wp-content/uploads/2025/12/2025-M-11-25.pdf)eastlakeohio.com

[eastlansinginfo.news](https://eastlansinginfo.news/east-lansing-council-delays-vote-on-apartment-places-moratorium-on-data-centers-officially-discontinues-el-fresco/)eastlansinginfo.news

[edraofmi.org](https://edraofmi.org/about-edra-mi)edraofmi.org

[edraofmi.org](https://edraofmi.org/)edraofmi.org

[edtechinnovationhub.com](https://www.edtechinnovationhub.com/news/openai-and-oracle-commit-to-union-built-stargate-data-center-in-michigan)edtechinnovationhub.com

[eenews.net](https://www.eenews.net/articles/texas-county-passes-1-year-data-center-construction-ban/)eenews.net

[www.ehstigertimesonline.com](https://www.ehstigertimesonline.com/news/2026/01/30/data-centers-flock-to-madison-county-met-with-popular-disapproval/)ehstigertimesonline.com

[www.elkharttruth.com](https://www.elkharttruth.com/news/bristol-annexes-land-that-neighbors-fear-will-host-data-center/article_4fe63ad4-f0b0-5ab9-9e5b-03bd73240ce5.html)elkharttruth.com

[Town of Lockport: Notice of Public Hearing, August 5, 2026, Local Law Establishing a Moratorium on Data Center Permitting and Approval for…](https://elockport.gov/download/notice-of-public-hearing-august-5-2026-630-p-m-a-local-law-establishing-a-moratorium-on-data-center-permitting-and-approval-within-the-town-for-a-period-of-eighteen-months/)elockport.gov

[Town of Lockport: Notice of Public Hearing, July 8, 2026, Local Law Establishing a Moratorium on Data Center Permitting and Approval for…](https://elockport.gov/download/notice-of-public-hearing-july-8-2026-630-p-m-local-law-establishing-a-moratorium-on-data-center-permitting-and-approval-within-the-town-for-a-period-of-eighteen-months/)elockport.gov

[Elon News Network: Alamance County Commissioners pass one-year data center moratorium](https://www.elonnewsnetwork.com/article/2026/08/alamance-county-commissioners-pass-one-year-data-center-moratorium)elonnewsnetwork.com

[elpasomatters.org](https://elpasomatters.org/2026/03/29/meta-data-center-el-paso-10-billion-expansion-water-gas-electricity-usage/)elpasomatters.org

[www.elpasotexas.gov](https://www.elpasotexas.gov/assets/Press-Releases/2026.04.02-NEWS-RELEASE_City-of-El-Paso-Continues-Community-Engagement-on-Data-Center-Policy-Framework.pdf)elpasotexas.gov

[emanchestertwp.com](https://emanchestertwp.com/overview-of-data-centers-rezoning-public-comments/)emanchestertwp.com

[embrydevelopmentcorp.com](https://embrydevelopmentcorp.com/portfolio/villarica/)embrydevelopmentcorp.com

[energycentral.com](https://www.energycentral.com/r-announcements-l1zjzoox/post/news-from-the-county-to-federal-level-officials-are-accelerating-the-P7qZRgdiF79p0yf)energycentral.com

[energycentral.com](https://www.energycentral.com/r-announcements-l1zjzoox/post/news-protections-against-hyperscalers-get-hyperlocal-xyrrUCPYAkTC7DC)energycentral.com

[energystoragesolutionsllc.com](https://energystoragesolutionsllc.com/)energystoragesolutionsllc.com

[engagedekalb.dekalbcountyga.gov](https://engagedekalb.dekalbcountyga.gov/data-center-text-amendment)engagedekalb.dekalbcountyga.gov

[esgdive.com](https://www.esgdive.com/news/doj-may-intervene-in-naacp-lawsuit-over-xais-data-center-gas-turbines/820607/)esgdive.com

[eu.detroitnews.com](https://eu.detroitnews.com/story/business/2026/01/08/microsoft-eyeing-property-near-grand-rapids-future-data-center/88086211007/)eu.detroitnews.com

[eu.detroitnews.com](https://eu.detroitnews.com/story/news/local/michigan/2026/03/03/microsoft-terminates-nda-non-disclosure-confidentiality-michigan-data-centers/88949102007/)eu.detroitnews.com

[eu.detroitnews.com](https://eu.detroitnews.com/story/news/local/michigan/2026/04/02/mason-mayor-whipple-council-woman-ferris-face-possible-recall-data-center-votes/89435998007/)eu.detroitnews.com

[eu.detroitnews.com](https://eu.detroitnews.com/story/news/local/macomb-county/2026/02/03/sterling-heights-passes-moratorium-on-data-centers/88493407007/)eu.detroitnews.com

[eu.detroitnews.com](https://eu.detroitnews.com/story/news/local/michigan/2026/02/16/metro-detroit-communities-scramble-regulate-restrict-data-centers-moratoriums-zoning-limits/88516840007/)eu.detroitnews.com

[eu.detroitnews.com](https://eu.detroitnews.com/story/news/local/michigan/2025/12/18/mpsc-approves-dte-saline-township-data-center-contracts-conditions/87813803007/)eu.detroitnews.com

[evolveincorporated.com](https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas)evolveincorporated.com

[www.fairfaxcounty.gov](https://www.fairfaxcounty.gov/planning-development/data-centers)fairfaxcounty.gov

[www.fairfaxcounty.gov](https://www.fairfaxcounty.gov/board-supervisors-approves-new-data-center-zoning-ordinance-amendment)fairfaxcounty.gov

[farmoffice.osu.edu](https://farmoffice.osu.edu/blog/mon-04062026-1124am/data-center-controversies-continue-ohio)farmoffice.osu.edu

[www.fauquier.com](https://www.fauquier.com/news/town-council-votes-to-ban-data-centers-from-warrenton/article_0f58d64e-f89e-4dbd-8825-c06e65f1a4b7.html)fauquier.com

[www.fauquier.com](https://www.fauquier.com/localnews/gigaland-resubmits-scaled-down-data-center-project/article_86348ee7-cefa-4d0f-b28c-33ced39ae9ff.html)fauquier.com

[www.fauquier.com](https://www.fauquier.com/news/developer-withdraws-application-to-rezone-for-catlett-data-centers/article_d0b1a26e-436f-11ef-a9b2-d71f39f9e76e.html)fauquier.com

[www.fauquiernow.com](https://www.fauquiernow.com/news/gigaland-developers-withdraw-remington-data-center-application-new-filing-anticipated/article_ea7c2fd1-97a0-416f-9a1b-4e68e72cc496.html)fauquiernow.com

[www.fauquiernow.com](https://www.fauquiernow.com/news/fauquier-planning-commission-recommends-denial-of-gigaland-data-center-project-in-remington/article_0aa8068e-1c6e-437e-917b-6f32d2a6f836.html)fauquiernow.com

[www.fauquiernow.com](https://www.fauquiernow.com/news/developer-withdraws-plans-for-catlett-station-data-center-project/article_29d5165e-4385-11ef-ad9e-db32dab80435.html)fauquiernow.com

[Fayette County Commissioners: Agenda, September 14, 2026](https://www.fayette-co-oh.com/AgendaCenter/ViewFile/Agenda/_09142026-381)fayette-co-oh.com

[Fayette County Commissioners: Agenda, September 21, 2026](https://www.fayette-co-oh.com/AgendaCenter/ViewFile/Agenda/_09212026-382)fayette-co-oh.com

[www.fayette-news.net](https://www.fayette-news.net/news/fayetteville-planning-commission-denies-data-center-conceptual-site-plan/article_cecdfd07-7856-4a3e-b354-21648486dd0b.html)fayette-news.net

[www.fayetteville-ga.gov](https://www.fayetteville-ga.gov/746/Data-Center-Discussion)fayetteville-ga.gov

[fidelisinfra.com](https://fidelisinfra.com/project/monarch-compute-campus/)fidelisinfra.com

[Village of Garrettsville: Council Minutes, August 12, 2026](https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/4423/Garrettsville/c61915eb-564e-4797-92ae-57cc4266d810/8.12.26-Council-Minutes.pdf?disposition=inline)files-backend.assets.thrillshare.com

[finance.yahoo.com](https://finance.yahoo.com/news/openais-100-billion-texas-stargate-180016053.html)finance.yahoo.com

[finance.yahoo.com](https://finance.yahoo.com/news/official-amazon-5b-mystery-data-185754206.html)finance.yahoo.com

[finance.yahoo.com](https://finance.yahoo.com/news/high-tech-developer-proposes-8-100409179.html)finance.yahoo.com

[fingerlakes1.com](https://www.fingerlakes1.com/2026/05/16/new-york-bill-would-halt-new-ai-data-centers-as-cayuga-lake-project-fuels-growing-backlash/)fingerlakes1.com

[firstalert4.com](https://www.firstalert4.com/2026/03/31/festus-data-center-plans-move-forward-after-emotional-city-council-vote/)firstalert4.com

[www.firstalert4.com](https://www.firstalert4.com/2025/08/23/st-charles-places-1-year-pause-data-center-projects/)firstalert4.com

[www.firstalert4.com](https://www.firstalert4.com/2026/02/26/pacific-data-center-rezoning-meeting-ends-abruptly-after-developer-withdraws-request/)firstalert4.com

[www.firstalert4.com](https://www.firstalert4.com/2026/02/11/hundreds-pack-troy-data-center-meeting-held-by-developer-residents-push-back-controversial-project/)firstalert4.com

[www.firstalert4.com](https://www.firstalert4.com/2026/03/18/franklin-county-data-center-projects-draw-packed-crowd-opposition-planning-meeting/)firstalert4.com

[www.firstalert4.com](https://www.firstalert4.com/2026/03/14/franklin-county-data-center-projects-return-planning-commission-tuesday-with-frustration-about-process/)firstalert4.com

[www.firstalert4.com](https://www.firstalert4.com/2026/07/14/st-charles-county-approves-6-month-data-center-moratorium/)firstalert4.com

[Clay County hearing on data center pause draws large crowd (First Coast News)](https://www.firstcoastnews.com/article/news/community/clay-county-commissioners-consider-one-year-pause-on-data-centers/77-27ed60eb-d1b8-4a41-8902-8a7963a0d7af)firstcoastnews.com

[www.firstcoastnews.com](https://www.firstcoastnews.com/article/news/local/clay-county-approves-1-year-moratorium-data-center-development/77-b4f84bb0-cf9e-41ab-bfc1-7770c9dd6c12)firstcoastnews.com

[flaglerlive.com](https://flaglerlive.com/data-alliances/)flaglerlive.com

[flagpole.com](https://flagpole.com/news/news-features/2026/02/25/athens-clarke-county-commissioners-want-to-outright-ban-data-centers/)flagpole.com

[flatheadbeacon.com](https://flatheadbeacon.com/2026/07/10/missoula-county-adopts-temporary-moratorium-on-data-centers/)flatheadbeacon.com

[A Nebraska county just banned new data centers for up to a year](https://flatwaterfreepress.org/a-nebraska-county-just-banned-new-data-centers-for-up-to-a-year-more-could-follow/)flatwaterfreepress.org

[floridaphoenix.com](https://floridaphoenix.com/2026/01/01/thirsty-ai-data-center-runs-into-florida-community-opposition-2/)floridaphoenix.com

[fltimes.com](https://www.fltimes.com/news/seneca-county-board-of-supervisors-to-dec-reject-terawulfs-modified-permit-request/article_cce901b6-e44d-41b6-ae0c-e0f9bf79e1d7.html)fltimes.com

[fluvannareview.com](https://fluvannareview.com/2025/11/commission-backs-data-center-restrictions/)fluvannareview.com

[followsouthjersey.com](https://followsouthjersey.com/2026/03/10/how-a-data-center-tore-vinelands-public-and-government-apart/)followsouthjersey.com

[East Vincent supervisors unanimously reject data center](https://www.foodandwaterwatch.org/2026/05/22/east-vincent-pa-supervisors-unanimously-reject-data-center-proposal/)foodandwaterwatch.org

[www.foodandwaterwatch.org](https://www.foodandwaterwatch.org/2026/02/24/md-advocates-residents-call-for-data-center-moratorium-at-town-hall/)foodandwaterwatch.org

[www.foodandwaterwatch.org](https://www.foodandwaterwatch.org/2026/02/20/new-brunswick-city-council-rejects-data-center/)foodandwaterwatch.org

[www.foodandwaterwatch.org](https://www.foodandwaterwatch.org/2026/02/26/sprigg-township-oh-passes-data-center-moratorium/)foodandwaterwatch.org

[www.foodandwaterwatch.org](https://www.foodandwaterwatch.org/2025/11/18/hazle-township-pa-unanimously-rejects-data-center-campus/)foodandwaterwatch.org

[www.foodandwaterwatch.org](https://www.foodandwaterwatch.org/2026/03/09/monroe-township-oh-unanimously-passes-data-center-moratorium/)foodandwaterwatch.org

[www.fortscott.biz](https://www.fortscott.biz/)fortscott.biz

[fortune.com](https://fortune.com/2026/04/07/indianapolis-councilmember-ai-data-center-backlash/)fortune.com

[fortune.com](https://fortune.com/2026/05/06/ai-data-center-michigan-saline-politics-farmland/)fortune.com

[Fort Worth could ban cryptocurrency mining; data centers might be here to stay](https://fortworthreport.org/2026/06/03/fort-worth-could-ban-cryptocurrency-mining-data-centers-might-be-here-to-stay/)fortworthreport.org

[fortworthreport.org](https://fortworthreport.org/2026/02/11/10b-data-center-hits-wall-after-fort-worth-leaders-cite-resources-land-usage-concerns/)fortworthreport.org

[fortworthreport.org](https://fortworthreport.org/2026/03/31/enough-concern-today-1b-data-center-stalls-city-residents-raise-questions-about-tax-break/)fortworthreport.org

[fortworthreport.org](https://fortworthreport.org/2026/07/08/zoning-commissioners-deny-data-center-rules-return-ordinance-to-fort-worth-city-council/)fortworthreport.org

[fortworthreport.org](https://fortworthreport.org/2026/07/09/majority-of-fort-worth-council-members-call-for-data-center-moratorium/)fortworthreport.org

[fortworthreport.org](https://fortworthreport.org/2026/07/21/can-proposed-data-center-moratorium-in-fort-worth-lead-to-meaningful-long-term-solutions/)fortworthreport.org

[FOX10: Baldwin County city sets six-month data center moratorium](https://www.fox10tv.com/2026/09/13/baldwin-county-city-sets-six-month-data-center-moratorium/)fox10tv.com

[Winnebago County will pursue 12-month data center moratorium, FOX 11](https://fox11online.com/news/local/winnebago-county-to-pursue-12-month-data-center-moratorium)fox11online.com

[fox11online.com](https://fox11online.com/news/local/company-discontinues-possible-ai-data-center-project-in-greenleaf-after-community-backlash)fox11online.com

[fox11online.com](https://fox11online.com/news/local/manitowoc-county-towns-band-together-petitioning-to-hold-off-new-data-centers-artificial-intelligence-economic-development)fox11online.com

[fox11online.com](https://fox11online.com/news/local/mishicot-area-residents-and-family-farms-rally-against-proposed-ai-data-center-cloverleaf-infrastructure-nsi-land-services-two-creeks-anthony-barta-northeast-wisconsin-artificial-intelligence)fox11online.com

[www.fox13memphis.com](https://www.fox13memphis.com/news/city-council-approves-tax-benefits-from-xai-for-surrounding-communities-in-south-memphis/article_2e980200-40a7-4a6e-8d23-e97e4dc1314d.html)fox13memphis.com

[fox13news.com](https://www.fox13news.com/news/citrus-county-commission-approves-freeze-ai-data-center-rezoning-applications.amp)fox13news.com

[fox13news.com](https://www.fox13news.com/news/grassroots-group-launches-fort-meade-recall-petition-targeting-3-city-officials-over-ai-data-center-project)fox13news.com

[www.fox13news.com](https://www.fox13news.com/news/citrus-county-residents-commissioners-battle-over-potential-data-center-holder)fox13news.com

[www.fox13news.com](https://www.fox13news.com/news/residents-fort-meade-protest-proposed-data-center-developers-respond-questions)fox13news.com

[www.fox13news.com](https://www.fox13news.com/news/protesters-against-proposed-fort-meade-data-center-gather-outside-city-hall)fox13news.com

[Box Elder imposes 180-day data center moratorium, with a catch (Fox13)](https://www.fox13now.com/news/local-news/box-elder-county/box-elder-county-imposes-180-day-moratorium-on-new-data-centers-with-a-catch)fox13now.com

[fox13now.com](https://www.fox13now.com/news/local-news/box-elder-county/utah-data-center-investor-kevin-oleary-accuses-opposition-groups-of-being-funded-by-china)fox13now.com

[fox17.com](https://fox17.com/news/local/cedar-hill-mayor-calls-for-data-center-moratorium-in-tennessee)fox17.com

[FOX 17: Kalamazoo City Commission votes in favor of data center pause](https://www.fox17online.com/news/local-news/kzoo-bc/kalamazoo/kalamazoo-city-commission-votes-in-favor-of-data-center-pause)fox17online.com

[www.fox17online.com](https://www.fox17online.com/news/local-news/kent/caledonia-township-puts-6-month-pause-on-data-center-development-to-review-industrial-standards)fox17online.com

[www.fox17online.com](https://www.fox17online.com/news/local-news/rockford-cedar-springs-sparta/solon-township-approves-6-month-moratorium-on-data-center-proposals)fox17online.com

[www.fox17online.com](https://www.fox17online.com/news/local-news/holland-zeeland/zeeland-township-approves-data-center-moratorium-as-solar-farm-debate-continues)fox17online.com

[www.fox17online.com](https://www.fox17online.com/news/local-news/east-grand-rapids-forest-hills-cascade/cascade-township-pauses-data-center-development-for-six-months)fox17online.com

[FOX19: Pierce Township trustees rule out data center, extend zoning moratorium (September 10, 2026)](https://www.fox19.com/2026/09/10/pierce-township-trustees-rule-out-data-center-extend-zoning-moratorium/)fox19.com

[fox19.com](https://www.fox19.com/2026/04/23/tri-state-residents-take-legal-action-halt-proposed-amazon-data-center/)fox19.com

[fox19.com](https://www.fox19.com/2026/09/19/wilmington-data-center-opponents-lose-bid-november-ballot-measure/)fox19.com

[www.fox19.com](https://www.fox19.com/2026/02/19/manchester-residents-voice-concerns-over-potential-data-center-construction/)fox19.com

[www.fox23.com](https://www.fox23.com/news/in-depth-tulsa-leaders-consider-pause-on-new-data-centers-as-debate-grows-across-green/article_b2038fa2-74d4-4adc-9cfa-e8b5b0a041af.html)fox23.com

[fox2now.com](https://fox2now.com/news/missouri/franklin-county-residents-protest-possible-data-center-plans/)fox2now.com

[fox2now.com](https://fox2now.com/news/missouri/festus-city-council-approves-data-center-plan/)fox2now.com

[www.fox43.com](https://www.fox43.com/article/news/local/york-county/east-manchester-township-approves-two-new-data-center-ordinances-community-tech-york-county/521-de93d1bf-7139-4092-b5fc-2c61bd715273)fox43.com

[www.fox43.com](https://www.fox43.com/article/news/local/dauphin-county/londonderry-township-ai-data-center/521-1ebd6dbb-1c0a-4ee1-97f7-42346a8e33eb)fox43.com

[www.fox47news.com](https://www.fox47news.com/news/state/mason-city-council-votes-to-repeal-data-center-ordinance-leaving-citys-future-regulation-unclear)fox47news.com

[www.fox47news.com](https://www.fox47news.com/neighborhoods/downtown-old-town-reo-town/tonight-lansing-city-council-expected-to-vote-on-proposed-120-million-deep-green-data-center-project)fox47news.com

[fox4kc.com](https://fox4kc.com/news/platte-county-commissioner-cant-support-100-billion-northland-data-center/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/the-cost-of-ai-local-leaders-advocates-share-concerns-about-kcs-data-center-boom/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/independence-city-council-votes-to-approve-tax-breaks-for-nebius-data-center/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/spring-hill-residents-raise-concerns-over-rezoning-plan-for-data-center/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/new-1-4-billion-ai-data-center-heading-to-liberty-missouri/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/community-comes-together-to-voice-concerns-about-independence-data-center/)fox4kc.com

[fox4kc.com](https://fox4kc.com/news/citizens-file-lawsuit-against-city-of-independence-over-data-center-referendum/)fox4kc.com

[fox56.com](https://fox56.com/news/local/blakely-borough-data-center-plans-scrapped-amid-community-pushback-borough-responds)fox56.com

[fox56.com](https://fox56.com/news/local/montour-data-center-rezoning-hearing-draws-crowd-raises-concerns)fox56.com

[fox56.com](https://fox56.com/news/local/we-dont-want-this-montour-county-residents-push-back-against-rezoning-for-data-centers)fox56.com

[fox56.com](https://fox56.com/news/local/not-a-sacrifice-zone-dickson-city-borough-council-passes-data-center-ordinance)fox56.com

[fox56.com](https://fox56.com/news/local/olyphant-council-rejects-data-center-zoning-plan-then-opens-180-day-curative-amendment)fox56.com

[fox56.com](https://fox56.com/news/local/hollenback-township-residents-pack-garage-demand-answers-on-data-center-rezoning-plan)fox56.com

[fox56.com](https://fox56.com/news/local/community-opposes-proposed-data-center-in-ransom-township)fox56.com

[fox56.com](https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay)fox56.com

[fox56news.com](https://fox56news.com/news/local/proposal-to-build-data-center-in-mercer-county-sparks-debate-among-community-members/)fox56news.com

[fox56news.com](https://fox56news.com/news/local/questions-surround-proposed-mercer-county-data-center-development/)fox56news.com

[fox56news.com](https://fox56news.com/news/kentucky/boyd-county-approves-six-month-moratorium-on-new-data-centers-terawulf-project-exempt/)fox56news.com

[fox59.com](https://fox59.com/news/more-negative-than-positive-clinton-county-commissioners-reject-data-center-project/)fox59.com

[fox59.com](https://fox59.com/indiana-news/decatur-township-data-center-fight-continues-as-residents-file-for-judicial-review/)fox59.com

[fox59.com](https://fox59.com/indiana-news/developer-withdraws-proposed-pike-township-data-center/)fox59.com

[fox59.com](https://fox59.com/indiana-news/indianapolis-rebuffs-calls-for-data-center-moratorium-and-advances-special-zoning-district/)fox59.com

[fox59.com](https://fox59.com/news/indianapolis-city-county-council-seeks-to-halt-data-center-developments-until-may-2027/)fox59.com

[fox5atlanta.com](https://fox5atlanta.com)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/backlash-over-proposed-data-center-near-adairsville)fox5atlanta.com

[fox5atlanta.com](https://www.fox5atlanta.com/news/amazon-buys-118-acres-douglas-county-possible-data-center-amid-concerns-about-sustainability)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/gilmer-county-residents-clash-over-proposed-cryptocurrency-farm)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/activists-warn-proposed-ellenwood-data-center-could-create-wasteland)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/troup-countys-90-day-pause-data-centers)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/douglas-county-data-centers-moratorium)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/henry-county-weighs-new-rules-data-centers-after-public-hearing)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/roswell-approves-temporary-moratorium-new-data-centers)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/cobb-county-temporarily-pauses-new-data-center-development)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/fayetteville-propose-data-center-withdrawn)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/douglas-county-leaders-just-killed-massive-data-center-project)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/douglas-county-data-center-sparks-resident-pushback)fox5atlanta.com

[www.fox5atlanta.com](https://www.fox5atlanta.com/news/marietta-data-center-rezoning-freeze-approved-after-massive-public-outcry)fox5atlanta.com

[fox5dc.com](https://www.fox5dc.com/news/prince-william-county-leaders-shut-down-plan-build-substation-power-data-centers)fox5dc.com

[fox6now.com](https://www.fox6now.com/news/port-washington-data-center-lawsuit-alleges-open-meetings-violations)fox6now.com

[www.fox6now.com](https://www.fox6now.com/news/port-washington-data-center-common-council-approves-development-agreement)fox6now.com

[www.fox8live.com](https://www.fox8live.com/2026/01/29/new-orleans-council-bans-data-center-development/)fox8live.com

[fox9.com](https://www.fox9.com/news/monticello-residents-rally-against-proposed-data-centers-march-2026)fox9.com

[www.fox9.com](https://www.fox9.com/news/minnesota-data-centers-carver-city-council-1-year-moratorium-april-11)fox9.com

[Howard County Council passes temporary pause on data center development](https://foxbaltimore.com/news/local/howard-county-council-temporary-pause-data-center-development-energy-water-zoning)foxbaltimore.com

[foxbaltimore.com](https://foxbaltimore.com/news/local/data-centers-energy-woodlawn-baltimore-county-maryland)foxbaltimore.com

[foxbaltimore.com](https://foxbaltimore.com/news/local/harford-county-council-member-plans-to-introduce-data-center-moratorium-energy)foxbaltimore.com

[foxbaltimore.com](https://foxbaltimore.com/news/local/prince-georges-county-data-centers-zoning-electric-grid-energy-maryland)foxbaltimore.com

[www.foxbusiness.com](https://www.foxbusiness.com/economy/north-caroilna-residents-fight-back-against-massive-tech-project-potentially-coming-their-town)foxbusiness.com

[www.foxbusiness.com](https://www.foxbusiness.com/economy/mystery-companys-1-6b-data-center-proposed-wisconsin-farmland-draws-residents-ire)foxbusiness.com

[FOX Carolina: Laurens County Council votes to approve one-year data center pause](https://www.foxcarolina.com/2026/09/14/laurens-county-council-votes-approve-one-year-data-center-pause/)foxcarolina.com

[foxcarolina.com](https://www.foxcarolina.com/2023/05/01/henderson-county-hold-public-hearing-cryptocurrency-mining/)foxcarolina.com

[www.foxcarolina.com](https://www.foxcarolina.com/2026/02/12/threat-our-community-canton-halts-data-center-construction-with-one-year-moratorium/)foxcarolina.com

[www.foxcarolina.com](https://www.foxcarolina.com/2026/07/16/newberry-county-council-unanimously-confirms-year-long-moratorium-data-centers/)foxcarolina.com

[www.foxcarolina.com](https://www.foxcarolina.com/2026/07/07/greenwood-county-faces-dueling-votes-data-centers-tuesday-night-meeting/)foxcarolina.com

[www.foxcarolina.com](https://www.foxcarolina.com/2026/06/22/spartanburg-county-votes-pause-data-center-applications-one-year/)foxcarolina.com

[www.foxcarolina.com](https://www.foxcarolina.com/2026/07/21/spartanburg-co-council-advances-data-center-moratorium-discusses-flock-cameras/)foxcarolina.com

[www.fractracker.org](https://www.fractracker.org/2026/01/howell-township-data-center-win/)fractracker.org

[franklinfavorite.com](https://www.franklinfavorite.com/russellville/russellville/news/article_91f3b170-14b7-54a0-a602-9819af557f7c.html)franklinfavorite.com

[Franklin Park Borough, PA Official Website](https://www.franklinparkborough.us/)franklinparkborough.us

[www.fredericksburgfreepress.com](https://www.fredericksburgfreepress.com/2025/10/22/a-home-run-for-data-center-critics-stafford-supervisors-adopt-750-foot-setback/)fredericksburgfreepress.com

[www.fredericksburgfreepress.com](https://www.fredericksburgfreepress.com/2026/02/25/spotsylvania-board-of-supervisors-vote-to-require-sup-for-data-centers-set-advertised-tax-rate/)fredericksburgfreepress.com

[www.fredericksburgfreepress.com](https://www.fredericksburgfreepress.com/2025/12/10/spotsylvania-board-of-supervisors-approves-data-center-design-standards-but-they-may-be-short-lived/)fredericksburgfreepress.com

[www.fredericksburgfreepress.com](https://www.fredericksburgfreepress.com/2025/12/11/second-time-not-the-charm-for-proposed-gateway-boulevard-data-center/)fredericksburgfreepress.com

[www.fstribune.com](https://www.fstribune.com/news/bourbon-county-commissioners-on-monday-unanimously-approved-a-new-moratorium-a7f87cf9)fstribune.com

[www.fwbusiness.com](https://www.fwbusiness.com/news/article_d485f49a-350b-5590-b151-7bb11f8d0e46.html)fwbusiness.com

[www.gadgetreview.com](https://www.gadgetreview.com/local-democracy-vs-big-tech-monroe-township-moves-to-block-massive-ai-data-center)gadgetreview.com

[gandernewsroom.com](https://gandernewsroom.com/2026/03/02/how-many-ai-data-centers-are-planned-in-michigan-we-counted/)gandernewsroom.com

[gaspgroup.org](https://gaspgroup.org/birmingham-residents-must-stay-engaged-on-the-proposed-data-center/)gaspgroup.org

[www.gatescountyindex.com](https://www.gatescountyindex.com/news/data-center-moratorium-approved-f56883de)gatescountyindex.com

[www.gatescountyindex.com](https://www.gatescountyindex.com/news/is-a-data-center-in-gates-countys-future-c8f66c53)gatescountyindex.com

[Holyoke first in state to ban development of AI data centers - Daily Hampshire Gazette](https://gazettenet.com/2026/06/17/holyoke-first-in-state-to-ban-development-of-ai-data-centers/)gazettenet.com

[gazettenet.com](https://gazettenet.com/2025/09/12/shutesbury-eyes-moratorium-on-data-centers/)gazettenet.com

[www.gem.wiki](https://www.gem.wiki/Digihost_Fortistar_Niagara_County_facility)gem.wiki

[georgiarecorder.com](https://georgiarecorder.com/2026/01/20/outrage-over-surge-of-data-centers-in-georgia-inspires-wave-of-bipartisan-bills/)georgiarecorder.com

[georgiarecorder.com](https://georgiarecorder.com/2026/01/06/data-center-gold-rush-pits-local-officials-hunt-for-new-revenue-against-residents-concerns/)georgiarecorder.com

[gilroydispatch.com](https://gilroydispatch.com/residents-raise-concerns-over-new-data-center-in-gilroy/)gilroydispatch.com

[gizmodo.com](https://gizmodo.com/openais-stargate-data-center-approved-in-michigan-as-american-anger-starts-to-boil-2000701890)gizmodo.com

[gmtoday.com](https://www.gmtoday.com/news_graphic/news/port-washington-open-meetings-lawsuit/article_09c74de4-e280-4fd2-baf6-b526803f78ac.html)gmtoday.com

[www.gmtoday.com](https://www.gmtoday.com/news_graphic/business/data-center-outdoor-work-restrictions/article_e58113ba-5e1c-4175-b947-39f33863cc35.html)gmtoday.com

[goodjobsfirst.org](https://goodjobsfirst.org/data-center-moratorium-bills-are-spreading-in-2026/)goodjobsfirst.org

[goodjobsfirst.org](https://goodjobsfirst.org/independence-missouri-data-center-nebius/)goodjobsfirst.org

[www.goskagit.com](https://www.goskagit.com/news/local_news/skagit-county-adopts-temporary-ban-on-data-centers/article_9eb23e59-e782-45b5-abdf-525bf03da8e9.html)goskagit.com

[www.governing.com](https://www.governing.com/infrastructure/texas-towns-push-back-on-data-center-expansion)governing.com

[governor.nebraska.gov](https://governor.nebraska.gov/gov-pillen-signs-bill-protect-power-grid-cryptocurrency-operation-use)governor.nebraska.gov

[governor.sc.gov](https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development)governor.sc.gov

[Data Center Bans Emerge in 4 More New Jersey Communities - GovTech](https://www.govtech.com/artificial-intelligence/data-center-bans-emerge-in-4-more-new-jersey-communities)govtech.com

[GovTech: Durham County, N.C., Votes for Pause on Data Centers](https://www.govtech.com/artificial-intelligence/durham-county-n-c-votes-for-pause-on-data-centers)govtech.com

[govtech.com](https://www.govtech.com/artificial-intelligence/michigan-attorney-general-challenges-data-center-power-deal)govtech.com

[govtech.com](https://www.govtech.com/artificial-intelligence/lima-ohio-passes-18-month-data-center-moratorium)govtech.com

[govtech.com](https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans)govtech.com

[govtech.com](https://www.govtech.com/products/richmond-va-area-counties-split-on-data-centers)govtech.com

[govtech.com](https://www.govtech.com/artificial-intelligence/how-long-will-charlotte-n-c-extend-data-center-moratorium)govtech.com

[www.govtech.com](https://www.govtech.com/policy/morton-county-n-d-will-consider-data-center-moratorium)govtech.com

[www.govtech.com](https://www.govtech.com/infrastructure/fort-worth-data-center-approved-over-residents-opposition)govtech.com

[www.govtech.com](https://www.govtech.com/policy/north-tonawanda-n-y-bans-new-crypto-mining-for-2-years)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/pennsylvania-townships-move-fast-with-data-center-guardrails)govtech.com

[www.govtech.com](https://www.govtech.com/products/residents-push-indiana-community-toward-halt-on-data-centers)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/ohio-communities-grapple-with-data-center-approval-decisions)govtech.com

[www.govtech.com](https://www.govtech.com/infrastructure/logan-county-colo-pauses-future-energy-data-center-projects)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/campbell-county-va-rejects-rezoning-to-draw-data-centers)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/michigan-township-passes-temporary-data-center-moratorium)govtech.com

[www.govtech.com](https://www.govtech.com/products/north-carolina-county-pauses-data-center-crypto-mines)govtech.com

[www.govtech.com](https://www.govtech.com/security/public-outcry-surrounds-west-virginia-data-center-tax-break-bill)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/data-center-debate-settles-into-minnesota-city-halls)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/can-bangor-maine-pause-construction-of-data-centers)govtech.com

[www.govtech.com](https://www.govtech.com/products/michigan-township-defends-decision-on-openai-data-center)govtech.com

[www.govtech.com](https://www.govtech.com/artificial-intelligence/north-texas-counties-continue-weighing-data-center-proposals)govtech.com

[gpb.org](https://www.gpb.org/news/2025/09/19/rural-twiggs-county-approves-rezoning-for-data-center-city-sized-appetite-for-power)gpb.org

[gpb.org](https://www.gpb.org/news/2026/05/06/camden-becomes-first-county-on-the-coast-adopt-data-center-moratorium)gpb.org

[www.gpb.org](https://www.gpb.org/news/2024/09/04/atlanta-city-council-bans-data-centers-along-beltline)gpb.org

[www.gpb.org](https://www.gpb.org/news/2025/12/04/the-costs-of-crypto-mining-in-georgia-will-it-be-regulated-along-new-data-center)gpb.org

[www.gpb.org](https://www.gpb.org/news/2025/11/26/why-are-troup-county-residents-saying-no-600-mw-data-center-in-hogansville)gpb.org

[www.gpb.org](https://www.gpb.org/news/2025/10/22/wave-of-data-center-ordinances-sweep-through-ga-counties-how-strict-are-they)gpb.org

[www.gpb.org](https://www.gpb.org/news/2025/07/29/monroe-county-data-center-loses-zoning-vote-in-face-of-community-opposition)gpb.org

[www.gpb.org](https://www.gpb.org/news/2025/08/06/despite-the-promise-of-millions-of-dollars-every-year-monroe-county-says-no-data)gpb.org

[gradickcommunications.com](https://gradickcommunications.com/developer-pulls-data-center-proposal-at-least-for-now/)gradickcommunications.com

[gradickcommunications.com](https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/)gradickcommunications.com

[gradickcommunications.com](https://gradickcommunications.com/carroll-county-residents-file-petition-vs-developer-city-of-villa-rica-hope-to-stop-development-of-reported-400-acre-data-center-between-hickory-level-van-wert-road/)gradickcommunications.com

[greatergroton.com](https://www.greatergroton.com/data-centers-in-groton)greatergroton.com

[Greensboro Thread: City Council Approves Data Center Moratorium, Residents Push for Longer](https://greensborothread.com/news/politics/greensboro-nc-data-center-moratorium-denise-roth/)greensborothread.com

[Grice Connect: Bulloch commissioners reject data center prohibition](https://www.griceconnect.com/local-news/bulloch-commissioners-reject-data-center-prohibition-deny-highway-24-liquor-store-12723872)griceconnect.com

[www.griffindailynews.com](https://www.griffindailynews.com/news/griffin-puts-180-day-moratorium-on-data-centers-and-other-technological-facilities/article_a57b3fe6-cedf-54ec-8a84-a66c93da27da.html)griffindailynews.com

[www.griffindailynews.com](https://www.griffindailynews.com/news/city-of-griffin-working-on-zoning-amendments-to-initially-only-allow-smaller-data-centers/article_8932563b-39ad-5b85-bc41-591adf00e608.html)griffindailynews.com

[grist.org](https://grist.org/elections/a-michigan-town-hopes-to-stop-a-data-center-with-a-2026-ballot-initiative/)grist.org

[gtnj.org](https://gtnj.org)gtnj.org

[Hamilton Township: Resolution 26-0520B, Data Center Moratorium](https://www.hamilton-township.org/media/Resolutions/26-0520B%20Data%20Center%20Moratorium.pdf)hamilton-township.org

[Hancock County Board of Supervisors: Agenda, September 21, 2026](https://hancockcountyia.gov/files/meetings/2026-09-21_agenda_board_of_supervisors_38234.pdf)hancockcountyia.gov

[www.harborcountry-news.com](https://www.harborcountry-news.com/news/new-buffalo-township-moves-to-pause-data-centers/article_c168fca1-853e-5cd6-a357-e6d876ac80b5.html)harborcountry-news.com

[harrisondaily.com](https://harrisondaily.com/stories/more-about-moratorium-on-crypto,204197)harrisondaily.com

[www.harrodsburgherald.com](https://www.harrodsburgherald.com/2026/07/16/fiscal-court-votes-to-draft-data-center-moratorium/)harrodsburgherald.com

[www.harrodsburgherald.com](https://www.harrodsburgherald.com/2026/07/16/burgin-city-council-cancels-second-reading-of-controversial-annexation/)harrodsburgherald.com

[www.harrodsburgherald.com](https://www.harrodsburgherald.com/2026/07/16/harrodsburg-objects-to-burgin-annexation/)harrodsburgherald.com

[www.harrodsburgherald.com](https://www.harrodsburgherald.com/2026/07/30/fiscal-court-gives-first-reading-to-data-center-moratorium/)harrodsburgherald.com

[hartfordbusiness.com](https://hartfordbusiness.com/article/new-haven-weighs-12-month-moratorium-on-data-center-development/)hartfordbusiness.com

[heatmap.news](https://heatmap.news/plus/the-fight/spotlight/sulphur-springs-data-center-msb-global-vistra)heatmap.news

[hendersoncountync.gov](https://www.hendersoncountync.gov/sites/default/files/fileattachments/planning_board/meeting/136698/4.20.23_plbd_item_-_text_amendment_for_cryptocurrency_mining.pdf)hendersoncountync.gov

[henricocitizen.com](https://www.henricocitizen.com/proposed-data-center-incites-opposition-from-hundreds-of-henrico-hanover-residents/)henricocitizen.com

[www.henricocitizen.com](https://www.henricocitizen.com/henricos-board-of-zoning-appeals-denies-data-center-companys-appeal-for-varina-site/)henricocitizen.com

[www.henricocitizen.com](https://www.henricocitizen.com/data-center-detour-inside-henrico-countys-shifting-mindset-one-developers-attempt-to-overcome-it-and-a-community-fighting-back/)henricocitizen.com

[heraldbulletin.com](https://www.heraldbulletin.com/news/local_news/madison-county-being-asked-for-data-center-moratorium/article_57dc7598-1ead-4570-81c9-2e8306d8268a.html)heraldbulletin.com

[heraldcourier.com](https://heraldcourier.com/news/local/government-politics/article_6d17d036-28fb-484d-9f0d-b28e4310216d.html)heraldcourier.com

[heraldcourier.com](https://heraldcourier.com/news/article_9b6dc9dc-7dee-4370-a502-5ac8fb794474.html)heraldcourier.com

[www.heraldextra.com](https://www.heraldextra.com/news/2026/mar/11/provo-city-council-denies-rezoning-request-for-data-center-at-east-bay/)heraldextra.com

[heraldnet.com](https://heraldnet.com)heraldnet.com

[www.heraldpalladium.com](https://www.heraldpalladium.com/communities/new_buffalo/new-buffalo-township-moves-to-pause-data-centers/article_ae807e06-310b-5d6e-a346-f4952041d0a6.html)heraldpalladium.com

[Herald-Standard: Springhill Township adopts data center, power generation ordinances](https://www.heraldstandard.com/news/local_news/2026/sep/19/springhill-township-adopts-data-center-power-generation-ordinances/)heraldstandard.com

[heraldstandard.com](https://www.heraldstandard.com/news/local_news/2026/may/19/amwell-supervisors-table-vote-on-data-center-ordinance/)heraldstandard.com

[www.heraldstandard.com](https://www.heraldstandard.com/news/local_news/2026/mar/21/south-strabane-planning-commission-recommends-supervisors-approve-data-center-ordinance/)heraldstandard.com

[Hernando County commissioners approve one-year data center moratorium](https://www.hernandosun.com/2026/06/05/hernando-county-commissioners-approve-one-year-data-center-moratorium/)hernandosun.com

[hilliardohio.gov](https://hilliardohio.gov/fuel-cells/)hilliardohio.gov

[hitchcockcounty.ne.gov](https://hitchcockcounty.ne.gov/webpages/planning_zoning/planning_zoning.html)hitchcockcounty.ne.gov

[hjnews.com](https://hjnews.com)hjnews.com

[hklaw.com](https://www.hklaw.com/en/insights/publications/2025/04/loudoun-county-virginia-eliminates-by-right-data-center-development)hklaw.com

[www.hklaw.com](https://www.hklaw.com/en/insights/publications/2024/09/fairfax-county-virginia-approves-updated-zoning-regulations)hklaw.com

[Laker Pioneer (hometownsource.com): Minnetrista puts 1-year moratorium on data center development](https://www.hometownsource.com/laker_pioneer/community/minnetrista-puts-1-year-moratorium-on-data-center-development/article_4196c64e-61c7-4bc6-b2a9-ae95c4e50864.html)hometownsource.com

[hometownsource.com](https://www.hometownsource.com/press_and_news/wright-county-enacts-emergency-data-center-moratorium/article_715edbe0-3ac0-4e77-9db0-57ee1a901567.html)hometownsource.com

[hometownsource.com](https://www.hometownsource.com/monticello_times/environmental-group-files-lawsuit-challenging-monticello-data-center-review/article_d5ffa609-757b-485d-b8b4-ef8e3ead2694.html)hometownsource.com

[hometownsource.com](https://www.hometownsource.com/monticello_times/data-center-pushback-gains-momentum/article_289f1599-95ad-4b59-9298-482b565dbf14.html)hometownsource.com

[www.hometownsource.com](https://www.hometownsource.com/sun_thisweek/community/apple_valley/land-use-change-for-data-center-denied-in-apple-valley/article_d8ed4b90-5341-4544-87a1-08417f5b9d57.html)hometownsource.com

[www.hometownstations.com](https://www.hometownstations.com/news/allen_county/shawnee-township-approves-18-month-moratorium-on-data-centers-energy-projects/article_431ac6ec-8564-4865-9b2f-a243d933bf4d.html)hometownstations.com

[hoodline.com](https://hoodline.com/2026/03/apex-neighbors-help-ax-mega-new-hill-data-center-plan/)hoodline.com

[hoodline.com](https://hoodline.com/2026/02/sterling-heights-city-council-enacts-one-year-moratorium-on-data-center-development-amid-zoning-ordinance-review/)hoodline.com

[hoodline.com](https://hoodline.com/2026/02/port-washington-neighbors-cry-foul-over-secret-data-center-deal/)hoodline.com

[hotaugusta.com](https://hotaugusta.com/2025/10/22/appling-residents-protest-secretive-data-center-plans-amid-rapid-expansion-fears/)hotaugusta.com

[Hudson County View: Bayonne council intros ordinance to ban data centers in every zoning district (July 23, 2026)](http://hudsoncountyview.com/bayonne-council-intros-ordinance-to-ban-data-centers-in-every-zoning-district/)hudsoncountyview.com

[Hudson County View: Bayonne council unanimously approves measure to ban data centers citywide (August 13, 2026)](http://hudsoncountyview.com/bayonne-council-unanimously-approves-measure-to-ban-data-centers-citywide/)hudsoncountyview.com

[Hudson County View: Jersey City Council votes unanimously for ban on standalone data centers (August 20, 2026)](http://hudsoncountyview.com/jersey-city-council-votes-unanimously-for-ban-on-standalone-data-centers/)hudsoncountyview.com

[hutchtribune.com](https://hutchtribune.com/2026/01/16/sedgwick-harvey-county-put-moratorium-on-data-center-development/)hutchtribune.com

[ibj.com](https://www.ibj.com/articles/decatur-township-residents-sue-to-overturn-data-center-approval)ibj.com

[ibj.com](https://www.ibj.com/articles/indy-council-asks-for-data-center-approval-pause-denies-martindale-brightwood-appeal)ibj.com

[ibj.com](https://www.ibj.com/articles/boone-county-considering-moratorium-on-data-centers)ibj.com

[ibj.com](https://www.ibj.com/articles/boone-county-passes-moratorium-on-data-center-development)ibj.com

[www.ibj.com](https://www.ibj.com/articles/3-counties-put-moratoriums-on-data-center-projects)ibj.com

[ideastream.org](https://www.ideastream.org/government-politics/2026-04-28/no-more-data-centers-in-cleveland-council-member-proposes-one-year-moratorium)ideastream.org

[www.ideastream.org](https://www.ideastream.org/2026-02-26/ohio-towns-are-pushing-back-against-data-centers-to-varying-degrees-of-success)ideastream.org

[iedc.in.gov](https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district)iedc.in.gov

[www.illinoistimes.com](https://www.illinoistimes.com/news/both-data-center-plans-move-forward/)illinoistimes.com

[www.illinoistimes.com](https://www.illinoistimes.com/news/data-center-opposition/)illinoistimes.com

[www.illinoistimes.com](https://www.illinoistimes.com/news/logan-county-takes-its-time-on-data-center-proposal/)illinoistimes.com

[www.indexjournal.com](https://www.indexjournal.com/news/greenwood-county-council-moves-data-center-moratorium-forward/article_5a49005a-9961-4db1-b78b-6bb5bad87d21.html)indexjournal.com

[indianacapitalchronicle.com](https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/)indianacapitalchronicle.com

[indianapublicradio.org](https://indianapublicradio.org/news/2026/07/madison-county-planning-commission-recommends-extended-data-center-moratorium/)indianapublicradio.org

[indio.org](https://indio.org)indio.org

[indystar.com](https://www.indystar.com/story/news/local/2026/04/17/decatur-township-residents-file-judicial-review-sabey-data-center/)indystar.com

[indyweek.com](https://indyweek.com/news/as-chatham-considers-moratorium-wake-county-residents-continue-opposition-to-proposed-apex-data-center/)indyweek.com

[indyweek.com](https://indyweek.com/news/apex-initiates-moratorium-on-data-centers/)indyweek.com

[Imperial County considers data center moratorium](https://inewsource.org/2026/06/04/imperial-county-data-center-moratorium-vote-supervisors-ceqa/)inewsource.org

[inewsource.org](https://inewsource.org/2026/07/14/data-center-moratorium-imperial-county/)inewsource.org

[inewsource.org](https://inewsource.org/2026/04/05/data-center-developer-imperial-county/)inewsource.org

[inewsource.org](https://inewsource.org/2026/05/13/data-center-moratorium-imperial-county-salton-sea-calipatria/)inewsource.org

[www.inforney.com](https://www.inforney.com/local-news/forney-proposes-new-rules-for-data-centers/article_51ff32ba-83f3-44aa-91c1-73c022a88384.html)inforney.com

[www.inforum.com](https://www.inforum.com/news/north-dakota/data-center-concerns-rise-in-2nd-western-north-dakota-county-as-nextera-basin-eye-project)inforum.com

[inkfreenews.com](https://www.inkfreenews.com/2026/09/18/fort-wayne-considers-pause-on-data-center-development/)inkfreenews.com

[www.inkfreenews.com](https://www.inkfreenews.com/2025/05/05/data-center-wave-stalls-as-indiana-communities-push-back/)inkfreenews.com

[www.inkfreenews.com](https://www.inkfreenews.com/2025/11/26/three-indiana-counties-pass-data-center-moratoriums/)inkfreenews.com

[www.inkfreenews.com](https://www.inkfreenews.com/2025/12/08/starke-county-considers-data-center-moratorium/)inkfreenews.com

[www.inkfreenews.com](https://www.inkfreenews.com/2025/04/02/county-apc-unanimously-denies-rezoning-request-for-data-center-near-leesburg/)inkfreenews.com

[Pennhurst data center rejected by East Vincent](https://www.inquirer.com/news/pennsylvania/pennhurst-data-center-rejected-east-vincent-20260522.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/news/pennsylvania/pennhurst-data-center-east-vincent-20260410.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/south-jersey/data-center-ban-lawsuit-monroe-township-george-norcross-inquirer-journalist-notes-20260717.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/news/pennsylvania/north-coventry-data-center-20260224.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/news/pennsylvania/east-whiteland-data-center-zoning-20260401.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/news/pennsylvania/tredyffrin-data-center-ordinance-20260421.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/news/pennsylvania/conshohocken-ai-data-center-proposal-zoning-20260505.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/news/pennsylvania/conshohocken-ai-data-center-brian-oneill-king-of-prussia-20260728.html)inquirer.com

[www.inquirer.com](https://www.inquirer.com/south-jersey/cherry-hill-nj-data-center-ban-20260728.html)inquirer.com

[insideclimatenews.org](https://insideclimatenews.org/news/01032026/iowa-county-data-center-ordinance/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/09102025/michigan-town-effots-to-stop-data-center/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/25092025/naacp-opposes-massive-alabama-data-center/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/15102025/pennsylvania-communities-restrict-data-center-development/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/03032026/pennsylvania-data-center-resistance/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/19032026/north-carolina-county-data-center-rezoning-lawsuit/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/29012026/developer-calls-gw-ranch-in-pecos-county-texas-the-largest-power-project-in-u-s/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/11022026/pennsylvania-talen-energy-data-center-rezoning-denied/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/16062025/illinois-data-centers-water-use/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/26102025/related-digital-michigan-data-center-settlement/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/11052025/bessemer-alabama-proposed-data-center/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/14012026/bessemer-alabama-data-center-to-ask-for-additional-900-acres/)insideclimatenews.org

[insideindianabusiness.com](https://www.insideindianabusiness.com/articles/indy-council-asks-for-pause-in-data-center-approvals-denies-martindale-brightwood-appeal)insideindianabusiness.com

[insideindianabusiness.com](https://www.insideindianabusiness.com/articles/boone-county-considering-moratorium-on-data-center-development)insideindianabusiness.com

[www.insideindianabusiness.com](https://www.insideindianabusiness.com/articles/another-potential-data-center-entering-lake-county)insideindianabusiness.com

[insidenova.com](https://www.insidenova.com/headlines/amazons-ashton-data-center-proposal-near-manassas-deferred-again/article_30eea6ec-cec4-11ef-8243-8b8e46bf17a3.html)insidenova.com

[insidenova.com](https://www.insidenova.com/news/business/prince-william-planning-commission-shuts-down-proposed-novec-substation-in-bristow/article_59a31369-9d53-494b-bee7-c8097c94cf73.html)insidenova.com

[insidenova.com](https://www.insidenova.com/news/prince_william/update-second-ruling-voids-digital-gateway-data-center-project-in-prince-william/article_846b8581-c99e-4f00-bb67-512c78952773.html)insidenova.com

[Red Bank bans data centers, calls on NJ to do the same (InsiderNJ)](https://www.insidernj.com/press-release/red-bank-bans-data-centers-calls-on-new-jersey-to-do-the-same/)insidernj.com

[www.insidernj.com](https://www.insidernj.com/neptune-township-bans-data-centers-and-immigration-detention-facilities/)insidernj.com

[insightnews.com](https://www.insightnews.com/news/bigger-and-harder-than-it-looked-the-minneapolis-data-center-moratorium-comes-to-a-may/article_c54a3cd0-6dbf-4b1b-80af-142203d4b26f.html)insightnews.com

[insightsfromanalytics.com](https://www.insightsfromanalytics.com/post/how-dc-blox-built-trust-while-others-face-rejection)insightsfromanalytics.com

[www.interlochenpublicradio.org](https://www.interlochenpublicradio.org/ipr-news/2026-02-10/charlevoix-area-township-passes-data-center-moratorium)interlochenpublicradio.org

[www.interlochenpublicradio.org](https://www.interlochenpublicradio.org/2025-11-20/after-chilly-response-from-public-rocklocker-calls-off-plans-for-kalkaska-data-center)interlochenpublicradio.org

[investigatela.org](https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/)investigatela.org

[investigativepost.org](https://www.investigativepost.org/2026/02/04/data-center-subsidies-of-6-4-million-per-job/)investigativepost.org

[investigativepost.org](https://www.investigativepost.org/2026/01/30/genesee-ida-has-conflict-of-interest-in-stamp-data-center/)investigativepost.org

[investigativepost.org](https://investigativepost.org/2026/07/15/future-of-stamp-data-center-now-uncertain/)investigativepost.org

[investors.terawulf.com](https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio)investors.terawulf.com

[www.iowapublicradio.org](https://www.iowapublicradio.org/ipr-news/2026-03-25/palo-google-data-center-mayor-townhall-linn-county)iowapublicradio.org

[www.iowapublicradio.org](https://www.iowapublicradio.org/ipr-news/2026-03-04/google-data-center-palo-linn-county)iowapublicradio.org

[www.iowapublicradio.org](https://www.iowapublicradio.org/ipr-news/2026-07-21/palo-linn-county-google-data-center-duane-arnold-nuclear-plant)iowapublicradio.org

[www.iowapublicradio.org](https://www.iowapublicradio.org/ipr-news/2026-06-17/potential-data-center-sparks-moratorium-push-in-northwest-iowa)iowapublicradio.org

[ipetitions.com](https://www.ipetitions.com/petition/no-data-centers)ipetitions.com

[ipm.org](https://www.ipm.org/news/2026-04-22/decatur-township-residents-sue-to-block-4b-data-center)ipm.org

[ipm.org](https://www.ipm.org/news/2026-05-12/washington-city-council-cancels-data-center-development-will-explore-moratorium)ipm.org

[ipmnewsroom.org](https://ipmnewsroom.org/champaign-county-takes-first-step-towards-a-one-year-data-center-moratorium/)ipmnewsroom.org

[irontontribune.com](https://irontontribune.com/2025/12/25/jan-8-meeting-set-on-data-center/)irontontribune.com

[irontontribune.com](https://irontontribune.com/2026/01/14/council-questions-ledc-director-on-ai-data-center/)irontontribune.com

[ironwooddatacenter.com](https://ironwooddatacenter.com/)ironwooddatacenter.com

[Village of Boston Heights: Council Meeting Minutes, November 12, 2025](https://irp.cdn-website.com/41b5a2e4/files/uploaded/11.12.2025+Council+Meeting+Minutes-+signed.pdf)irp.cdn-website.com

[Dane County Board approves data center moratorium](https://isthmus.com/news/news/dane-county-board-approves-data-center-moratorium/)isthmus.com

[isthmus.com](https://isthmus.com/news/news/madison-moves-to-enact-one-year-moratorium-on-data-center-construction/)isthmus.com

[isthmus.com](https://isthmus.com/news/news/deforest-announces-no-data-center/)isthmus.com

[ithaca.com](https://www.ithaca.com/news/lansing/flx-strong-clean-file-lawsuit-against-lansing-zba-terawulf-to-block-data-center/article_97b45f0f-c849-497c-9daa-6040f1f1710b.html)ithaca.com

[ithaca.com](https://www.ithaca.com/news/regional_news/tompkins-county-legislature-urges-state-to-deny-water-permit-for-lansing-data-center/article_1d89f22d-fcd0-43b3-97e2-173e08a483ea.html)ithaca.com

[ithaca.com](https://www.ithaca.com/news/regional_news/terawulf-s-proposed-data-center-faces-local-delays-pushback/article_8949eab1-47fd-46df-87ec-841b76a6527b.html)ithaca.com

[ithacavoice.org](https://ithacavoice.org/2026/02/the-town-of-dryden-just-banned-data-centers-heres-why/)ithacavoice.org

[ithacavoice.org](https://ithacavoice.org/2025/11/data-center-company-terawulf-threatens-legal-action-against-lansing-town-board/)ithacavoice.org

[ithacavoice.org](https://ithacavoice.org/2026/01/local-groups-file-suit-against-terawulf-lansing-zoning-board-over-data-center/)ithacavoice.org

[ithacavoice.org](https://ithacavoice.org/2026/02/county-calls-on-state-to-reject-water-permit-for-ai-data-center/)ithacavoice.org

[ithacavoice.org](https://ithacavoice.org/2026/06/petition-opposing-lansing-ai-data-center-garners-over-20000-signatures/)ithacavoice.org

[ithacavoice.org](https://ithacavoice.org/2026/07/lansing-official-who-opposed-data-center-faces-legal-action/)ithacavoice.org

[Brawley targets hyperscale tech growth with proposed moratorium](https://www.ivpressonline.com/news/brawley-targets-hyperscale-tech-growth-with-proposed-data-center-moratorium/article_495ce2ac-c352-4f86-bfbe-5d14939ae51c.html)ivpressonline.com

[Calexico City Council to consider data center ban, downtown food distribution rules, and EMS overhaul (Imperial Valley Press)](https://www.ivpressonline.com/news/calexico-city-council-to-consider-data-center-ban-downtown-food-distribution-rules-and-ems-overhaul/article_9ef8f3aa-03a6-4cc7-b8a8-8658e5a2aa94.html)ivpressonline.com

[Imperial County moves to strip by-right status for data centers](https://www.ivpressonline.com/news/imperial-county-moves-to-strip-by-right-status-for-data-center-developments/article_67468b5d-a469-4e68-98b8-cb278c72f776.html)ivpressonline.com

[ivpressonline.com](https://www.ivpressonline.com/news/imperial-county-lawsuit-challenges-data-center-prohibition-act-over-claims-of-voter-overreach/article_0524e7f6-f8f4-4be5-aa12-e7b04e6dab18.html)ivpressonline.com

[www.ivpressonline.com](https://www.ivpressonline.com/news/calexico-city-council-to-consider-public-safety-budgeting-mandate-and-data-center-moratorium/article_3dc38980-49ad-4f2d-ac2f-ca34c7c7627c.html)ivpressonline.com

[jacksoncounty.iowa.gov](https://jacksoncounty.iowa.gov/supervisors/resolutions/)jacksoncounty.iowa.gov

[jacksoncounty.iowa.gov](https://jacksoncounty.iowa.gov/files/meetings/2025-05-19_minutes_9199.pdf)jacksoncounty.iowa.gov

[jacksonms.gov](https://jacksonms.gov/wp-content/uploads/2026/04/Regular-City-Council-Meeting-Agenda-4.20.2026-REVISED.pdf)jacksonms.gov

[jaxdailyrecord.com](https://www.jaxdailyrecord.com/news/2026/apr/14/nassau-county-pursuing-12-month-moratorium-on-data-center-development/)jaxdailyrecord.com

[jaxtoday.org](https://jaxtoday.org/2026/04/15/data-center-development-nassau/)jaxtoday.org

[Jefferson County Issues Temporary Moratorium on Data Centers, Jefferson County, CO](https://www.jeffco.us/m/newsflash/home/detail/2596)jeffco.us

[www.jerseycitynj.gov](https://www.jerseycitynj.gov/news/jersey_city_introduces_law_to_ban_data_centers)jerseycitynj.gov

[jerseyvindicator.org](https://jerseyvindicator.org/2026/03/15/the-ai-data-center-boom-is-the-next-environmental-crisis-and-its-already-starting/)jerseyvindicator.org

[jerseyvindicator.org](https://jerseyvindicator.org/2026/02/21/new-brunswick-rejects-data-center-plan-following-public-backlash/)jerseyvindicator.org

[Edgerton City Council denies data center moratorium (Johnson County Post)](https://johnsoncountypost.com/2026/06/16/edgerton-denies-data-center-moratorium-288799/)johnsoncountypost.com

[Edgerton Planning Commission denies DAMAC data center (Johnson County Post)](https://johnsoncountypost.com/2026/06/11/edgerton-denies-data-center-288433/)johnsoncountypost.com

[Gardner data center moratorium fizzles, Edgerton is next (Johnson County Post)](https://johnsoncountypost.com/2026/06/02/gardner-edgerton-data-center-moratoriums-287614/)johnsoncountypost.com

[www.jonescountyiowa.gov](https://www.jonescountyiowa.gov/files/land_use/jones_county_cryptocurrency_and_data_center_ordinance_78407.pdf)jonescountyiowa.gov

[joplinglobe.com](https://joplinglobe.com)joplinglobe.com

[www.journal-advocate.com](https://www.journal-advocate.com/2025/10/22/county-imposes-6-month-moratorium-on-solar-wind-data-center-and-battery-storage-permits/)journal-advocate.com

[Butler County approves 6-month data center moratorium, Journal-News](https://www.journal-news.com/local/butler-county-approves-6-month-data-center-moratorium/article_cdf1ab44-e310-5697-8a14-ebbf0311f198.html)journal-news.com

[www.journal-news.com](https://www.journal-news.com/community/data-centers-area-township-adds-moratorium-as-others-weigh-these-huge-projects/article_b9578880-2346-57d1-8d45-8151a7cb1441.html)journal-news.com

[www.journal-news.com](https://www.journal-news.com/local/liberty-twp-advances-data-center-restrictions-to-trustees-for-final-vote/article_c375e13a-1a1e-5099-a373-7c302d465c37.html)journal-news.com

[journalnow.com](https://journalnow.com/news/local/government-politics/article_8cfefcf3-42fd-5ec7-a097-f02e4bdcff71.html)journalnow.com

[KAAL ABC 6: Hancock County Board of Supervisors to vote on data center moratorium](https://www.kaaltv.com/news/hancock-county-board-of-supervisors-to-vote-on-data-center-moratorium/)kaaltv.com

[www.kake.com](https://www.kake.com/home/harvey-county-places-moratorium-on-data-center-development/article_efbcdf2e-22f6-4aef-889f-4e0000bb25cb.html)kake.com

[kansascitydefender.com](https://kansascitydefender.com/technology-ai/independence-residents-fight-a-6-6-billion-data-center-as-mondays-tax-break-vote-looms/)kansascitydefender.com

[kansasreflector.com](https://kansasreflector.com/2026/07/19/the-developer-of-a-kansas-data-center-swore-under-oath-he-wasnt-involved-my-town-is-bamboozled/)kansasreflector.com

[kansasreflector.com](https://kansasreflector.com/2025/11/07/lawsuit-delays-12b-data-center-in-kansas-city-as-community-environmental-group-voice-concerns/)kansasreflector.com

[kare11.com](https://www.kare11.com/article/news/local/proposed-data-centers-in-monticello-spark-community-backlash/89-9f0aa475-3d16-4ab5-8b06-27f4cea6b408)kare11.com

[Madison County Quorum Court approves three-year moratorium on data centers (KATV)](https://katv.com/news/local/madison-county-quorum-court-approves-three-year-moratorium-on-data-centers)katv.com

[katv.com](https://katv.com/news/local/ai-ready-data-center-coming-to-little-rock-6-billion-investment-largest-in-state-history)katv.com

[katv.com](https://katv.com/news/local/arkansas-towns-vs-chinese-supercomputers-how-recent-legislation-removes-local-governments-ability-to-regulate-cryptocurrency-mines-antbox-group-green-digital-llc-nancy-cartwright-harrison-vilonia-metahash-global-act-851-hb-1799-sarah-huckabee-sanders)katv.com

[kaxe.org](https://www.kaxe.org/local-news/2026-04-06/public-meetings-april-6-9-for-proposed-iron-range-tranmission-line)kaxe.org

[www.kbia.org](https://www.kbia.org/kbia-news/2025-10-08/rezoning-request-could-open-door-for-data-center)kbia.org

[www.kbtx.com](https://www.kbtx.com/2025/09/12/college-station-city-council-unanimously-rejects-land-sale-ai-data-center/)kbtx.com

[www.kbtx.com](https://www.kbtx.com/2025/09/07/college-station-city-council-discuss-potential-data-center-midtown-drive-sept-11-meeting/)kbtx.com

[www.kbtx.com](https://www.kbtx.com/2025/09/17/bryan-annexes-land-near-rellis-campus-with-potential-retail-data-center-use/)kbtx.com

[kbzk.com](https://www.kbzk.com/news/broadview-resident-proposes-putting-data-center-approval-to-voters)kbzk.com

[www.kcbd.com](https://www.kcbd.com/2026/02/01/texas-approves-largest-permitted-data-center-campus-us/)kcbd.com

[www.kcbd.com](https://www.kcbd.com/2026/01/16/lubbock-data-center-proposal-heads-city-council-after-planning-commission-rejection/)kcbd.com

[kcentv.com](https://www.kcentv.com/article/news/local/hill-county-sued-data-center-moratorium/500-e126be5f-7043-4906-8319-b709a5ac04a1)kcentv.com

[kcrg.com](https://kcrg.com)kcrg.com

[kcrg.com](https://www.kcrg.com/2026/06/16/linn-county-residents-push-back-against-proposed-power-plant-data-centers/)kcrg.com

[kcrg.com](https://www.kcrg.com/2026/06/02/palo-city-council-advances-google-data-center-ordinance/?outputType=amp)kcrg.com

[kcrg.com](https://www.kcrg.com/2026/02/05/linn-county-supervisors-advance-data-center-zoning-ordinance/)kcrg.com

[kcrg.com](https://www.kcrg.com/2026/02/16/linn-county-residents-share-concerns-with-data-center-ordinance-second-hearing-passes/)kcrg.com

[kcrg.com](https://www.kcrg.com/2026/03/04/google-pulls-out-proposal-build-data-center-unincorporated-linn-co-build-palo-instead/)kcrg.com

[www.kcrg.com](https://www.kcrg.com/2025/10/06/google-making-push-data-center-linn-county/)kcrg.com

[www.kcrg.com](https://www.kcrg.com/2026/02/19/linn-county-approves-new-data-center-rules-after-months-public-debate/)kcrg.com

[www.kcrg.com](https://www.kcrg.com/2026/04/04/i9-investigation-documents-show-palo-negotiated-with-google-while-publicly-downplaying-involvement/)kcrg.com

[www.kcrg.com](https://www.kcrg.com/2026/03/25/palo-residents-question-google-data-center-plans-town-hall/)kcrg.com

[www.kcrg.com](https://www.kcrg.com/2026/05/12/palo-commission-recommends-new-regulations-google-data-center/)kcrg.com

[www.kcrg.com](https://www.kcrg.com/2026/07/01/despite-putting-ordinance-place-linn-county-passes-data-center-moratorium/)kcrg.com

[Jackson County MO legislature advances 180-day data center moratorium (KCTV5)](https://www.kctv5.com/2026/06/09/legislature-advances-ordinance-extending-jackson-county-data-center-moratorium-180-days/)kctv5.com

[Jackson County legislature passes 180-day moratorium on data center applications](https://www.kctv5.com/2026/06/22/jackson-county-legislature-passes-180-day-moratorium-data-center-applications/)kctv5.com

[kctv5.com](https://www.kctv5.com/2026/03/25/court-kills-residents-bid-vote-nebius-ai-data-center-tax-deal/)kctv5.com

[www.kctv5.com](https://www.kctv5.com/2026/02/12/google-confirms-new-data-center-development-kansas-citys-northland/)kctv5.com

[www.kctv5.com](https://www.kctv5.com/2026/03/06/spring-hill-residents-voice-concerns-over-rezoning-request-possible-data-center/)kctv5.com

[kcur.org](https://www.kcur.org/environment-agriculture/2025-11-09/data-center-kansas-city-wyandotte-county)kcur.org

[kcur.org](https://www.kcur.org/housing-development-section/2026-01-29/wyandotte-county-data-centers-would-require-a-lot-of-power-will-that-raise-your-energy-bill)kcur.org

[kcur.org](https://www.kcur.org/housing-development-section/2026-02-13/independence-data-center-tax-breaks-opposition)kcur.org

[kcur.org](https://www.kcur.org/housing-development-section/2026-03-02/independence-to-vote-on-6-billion-tax-break-for-massive-ai-data-center-heres-what-to-know)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-03-03/independence-gives-billions-in-tax-breaks-for-a-massive-data-center-despite-outcry-from-residents)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-03-12/independence-residents-sue-tax-breaks-data-center)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-03-25/judge-says-independence-residents-cant-force-vote-on-data-center-tax-breaks)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-04-09/after-these-independence-councilmembers-supported-an-ai-data-center-voters-ousted-them)kcur.org

[kcur.org](https://www.kcur.org/housing-development-section/2025-11-15/data-center-developer-missouri-festus-st-charles)kcur.org

[kcur.org](https://www.kcur.org/politics-elections-and-government/2026-04-09/festus-missouri-data-center-election-city-council)kcur.org

[www.kcur.org](https://www.kcur.org/housing-development-section/2025-08-19/st-charles-data-center-secret-public-opposition)kcur.org

[www.kcur.org](https://www.kcur.org/housing-development-section/2025-09-08/google-missouri-data-center-st-charles)kcur.org

[www.kcur.org](https://www.kcur.org/housing-development-section/2026-03-17/two-data-center-companies-are-trying-to-buy-more-than-1-000-acres-of-kansas-land)kcur.org

[www.kcur.org](https://www.kcur.org/housing-development-section/2026-01-16/kansas-city-zoning-data-centers)kcur.org

[www.kcur.org](https://www.kcur.org/housing-development-section/2026-03-24/liberty-missouri-ai-data-center-tax-breaks)kcur.org

[kelo.com](https://kelo.com/2026/02/26/889056/)kelo.com

[kentohio.gov](https://kentohio.gov)kentohio.gov

[kentuckylantern.com](https://kentuckylantern.com/2025/08/21/kentucky-could-be-on-the-eve-of-a-data-center-boom-but-in-mason-county-details-are-sketchy/)kentuckylantern.com

[kentuckylantern.com](https://kentuckylantern.com/2026/07/20/a-mercer-county-city-wants-to-annex-land-for-a-potential-data-center-another-city-has-concerns/)kentuckylantern.com

[kentuckylantern.com](https://kentuckylantern.com/2026/09/21/a-data-center-ban-or-data-center-regulations-catch-up-on-kentucky-data-center-news/)kentuckylantern.com

[kentuckylantern.com](https://kentuckylantern.com/2026/09/29/mercer-county-officials-reject-regulations-to-allow-data-centers-next-to-coal-fired-power-plant/)kentuckylantern.com

[Rural North Texas counties face data center lawsuits (KERA)](https://www.keranews.org/energy-environment/2026-06-17/rural-north-texas-counties-data-center-moratorium-regulation-lawsuits)keranews.org

[keranews.org](https://www.keranews.org/energy-environment/2026-02-10/hood-county-data-center-moratorium-fails)keranews.org

[keranews.org](https://www.keranews.org/news/2025-10-30/hood-county-mitchell-bend-election-incorporate-bitcoin-mine-marathon)keranews.org

[www.keranews.org](https://www.keranews.org/environment-nature/2025-10-01/data-center-on-431-acres-in-southeast-fort-worth-moving-forward-amid-environmental-concerns)keranews.org

[www.keranews.org](https://www.keranews.org/energy-environment/2026-02-25/data-center-moratorium-texas-hood-county-ken-paxton)keranews.org

[www.keranews.org](https://www.keranews.org/energy-environment/2026-01-13/hood-county-data-centers-comanche-circle)keranews.org

[www.keranews.org](https://www.keranews.org/news/2026-04-01/enough-concern-today-1b-data-center-stalls-city-residents-raise-questions-about-tax-break)keranews.org

[Coachella City Council passes permanent ban on data centers (KESQ, Aug. 26, 2026)](https://kesq.com/news/2026/08/25/coachella-city-council-passes-permanent-ban-on-data-centers/)kesq.com

[Palm Springs City Council approves temporary data center moratorium (KESQ, Aug. 26, 2026)](https://kesq.com/news/2026/08/26/palm-springs-city-council-approves-temporary-data-center-moratorium/)kesq.com

[kesq.com](https://kesq.com)kesq.com

[www.ketk.com](https://www.ketk.com/news/local-news/1b-ai-data-center-project-planned-near-lufkin-officials-release-details/)ketk.com

[www.kewauneecountystarnews.com](https://www.kewauneecountystarnews.com/stories/carlton-staves-off-interest-from-data-center-developers,317099)kewauneecountystarnews.com

[keyc.com](https://www.keyc.com/2026/09/17/spotlight-north-mankato-city-leaders-discuss-proposed-data-center-moratorium-upcoming-budget-fall-community-events/)keyc.com

[www.keyc.com](https://www.keyc.com/2026/07/14/mankato-city-council-passes-one-year-moratorium-data-centers/)keyc.com

[keystonenewsroom.com](https://keystonenewsroom.com/2026/04/14/west-rockhill-considers-these-new-data-center-regulations/)keystonenewsroom.com

[keystonenewsroom.com](https://keystonenewsroom.com/2025/12/15/lancaster-residents-oppose-plans-for-new-ai-data-centers/)keystonenewsroom.com

[kfgo.com](https://kfgo.com/2026/05/12/twin-cities-city-imposes-moratorium-on-data-centers/)kfgo.com

[kfor.com](https://kfor.com/news/local/luther-community-hosts-meeting-on-power-line-project-and-proposed-data-center/)kfor.com

[kfoxtv.com](https://kfoxtv.com/news/local/judge-denies-dona-ana-county-bid-to-dismiss-project-jupiter-open-meetings-lawsuit)kfoxtv.com

[kfvs12.com](https://kfvs12.com)kfvs12.com

[www.kfyrtv.com](https://www.kfyrtv.com/2026/03/04/mercer-county-issues-moratorium-data-centers/)kfyrtv.com

[kgou.org](https://kgou.org)kgou.org

[www.kgou.org](https://www.kgou.org/politics-and-government/2026-04-22/oklahoma-city-leaders-approve-data-center-moratorium)kgou.org

[www.kgun9.com](https://www.kgun9.com/news/community-inspired-journalism/marana/maranas-data-center-ordinance)kgun9.com

[www.khq.com](https://www.khq.com/news/kootenai-county-imposes-moratorium-on-data-center-building-permits/article_f622e15a-f79e-11ef-87ed-1bd380bdd67e.html)khq.com

[KIOW: Rezoning Change in Hancock County Denied (September 10, 2026)](https://kiow.com/2026/09/10/rezoning-change-in-hancock-county-denied/)kiow.com

[www.kjrh.com](https://www.kjrh.com/news/local-news/tulsa-city-council-to-consider-data-center-moratorium)kjrh.com

[Largest proposed data center in Arizona to be scaled back 80% after opposition](https://www.kjzz.org/fronteras-desk/2026-05-28/largest-proposed-data-center-in-arizona-to-be-scaled-back-80-after-opposition)kjzz.org

[kjzz.org](https://www.kjzz.org/fronteras-desk/2026-02-20/mayes-asks-court-to-vacate-corporation-commission-approval-of-tucson-data-center-project-blue)kjzz.org

[kjzz.org](https://www.kjzz.org/fronteras-desk/2026-03-30/tucson-public-has-until-end-of-month-to-weigh-in-on-proposed-amendment-for-data-centers)kjzz.org

[kjzz.org](https://www.kjzz.org/fronteras-desk/2026-04-06/tucson-leaders-will-discuss-a-proposal-on-data-center-restrictions-this-week)kjzz.org

[kjzz.org](https://www.kjzz.org/fronteras-desk/2026-06-04/tucson-officials-move-closer-to-passing-tighter-rules-for-data-center-development)kjzz.org

[www.kjzz.org](https://www.kjzz.org/business/2025-07-14/mesa-city-council-approves-new-data-center-zoning-rules)kjzz.org

[www.kjzz.org](https://www.kjzz.org/business/2025-12-11/maricopa-county-is-the-latest-arizona-government-to-set-up-data-center-zoning-rules)kjzz.org

[klem1410.com](https://klem1410.com)klem1410.com

[kltv.com](https://www.kltv.com/2026/02/10/judge-denies-major-motion-city-sulphur-springs-data-center-lawsuits/)kltv.com

[kltv.com](https://www.kltv.com/2026/05/06/residents-protest-sulphur-springs-allots-12-million-cost-data-center-lawsuits/)kltv.com

[Council Bluffs denies proposed data center moratorium (KMAland)](https://www.kmaland.com/news/council-bluffs-council-denies-proposed-moratorium-on-new-data-centers/article_57610dda-a991-41c5-99a5-d4bd772cd936.html)kmaland.com

[www.knopnews2.com](https://www.knopnews2.com/2026/07/13/lincoln-county-debates-data-center-commissioners-vote-down-moratorium/)knopnews2.com

[knoxvilletn.gov](https://knoxvilletn.gov)knoxvilletn.gov

[knsiradio.com](https://knsiradio.com/2026/05/04/waite-park-council-to-hear-public-input-tonight-on-data-center-moratorium/)knsiradio.com

[Another New Mexico county considers a moratorium on data centers (KOB)](https://www.kob.com/news/top-news/another-new-mexico-county-considers-a-moratorium-on-data-centers/)kob.com

[kob.com](https://www.kob.com/news/top-news/project-jupiter-demonstrators-arrested-at-contentious-meeting/)kob.com

[Tucson City Council adopts data center regulations in 6-1 vote (KOLD, Aug. 6, 2026)](https://www.kold.com/2026/08/06/tucson-city-council-adopts-data-center-regulations-6-1-vote/)kold.com

[kold.com](https://www.kold.com/2025/08/19/pima-county-explores-zoning-amendments-data-centers/)kold.com

[komu.com](https://www.komu.com/news/midmissourinews/lawsuit-asks-judge-to-set-back-montgomery-county-data-center-approval-process/article_7dd0c0f6-6bea-43e3-8ca2-b67522429c90.html)komu.com

[komu.com](https://www.komu.com/news/midmissourinews/montgomery-county-residents-attend-town-hall-on-data-center-proposals/article_9f2c275a-c156-4561-8085-867812927293.html)komu.com

[www.komu.com](https://www.komu.com/news/midmissourinews/missouri-leadership-pushes-data-center-development-despite-electricity-environmental-fears/article_73d1d49a-b2d2-4d9d-8187-0e891f613f52.html)komu.com

[kpbs.org](https://kpbs.org)kpbs.org

[kpbs.org](https://www.kpbs.org/news/environment/2026/01/21/the-plan-to-build-a-massive-data-center-in-imperial-county-without-environmental-review)kpbs.org

[kpbs.org](https://www.kpbs.org/news/environment/2026/04/03/imperial-county-supervisors-to-hold-key-vote-on-controversial-data-center-project)kpbs.org

[kpbs.org](https://www.kpbs.org/news/environment/2026/04/07/imperial-county-supervisors-clear-path-for-massive-data-center-complex-amid-fierce-opposition)kpbs.org

[kpbs.org](https://www.kpbs.org/news/environment/2026/04/16/imperial-valley-utility-could-decide-fate-of-massive-data-center-following-key-vote)kpbs.org

[kpbs.org](https://www.kpbs.org/news/environment/2026/05/27/sierra-club-sues-imperial-county-over-approval-of-massive-data-center-complex)kpbs.org

[KPC News (Herald Republican): Commissioners approve data center moratorium](https://www.kpcnews.com/heraldrepublican/article_f163bcfe-f248-4ac7-b10e-ca18a7e10e42.html)kpcnews.com

[www.kpcnews.com](https://www.kpcnews.com/thestar/article_a68d5dcb-09aa-46bf-9158-a17661e990e6.html)kpcnews.com

[San Francisco Supervisors Push for Moratorium on New Data Centers (KQED)](https://www.kqed.org/news/12099583/san-francisco-supervisors-push-for-moratorium-on-new-data-centers)kqed.org

[www.kqed.org](https://www.kqed.org/news/12076074/oakley-drops-data-center-plans-approves-massive-industrial-project)kqed.org

[www.kqed.org](https://www.kqed.org/news/2026/04/15/oakley-first-bay-area-city-data-center-moratorium/)kqed.org

[krcgtv.com](https://krcgtv.com/news/local/centralia-leaders-consider-zoning-changes-to-regulate-data-centers)krcgtv.com

[krcgtv.com](https://krcgtv.com)krcgtv.com

[krcgtv.com](https://krcgtv.com/news/local/lawsuit-filed-to-halt-amazon-data-center-in-montgomery-county)krcgtv.com

[krcgtv.com](https://krcgtv.com/news/local/residents-resist-proposed-amazon-development-data-center-projects-in-montgomery-county)krcgtv.com

[krcgtv.com](https://krcgtv.com/news/local/camdenton-aldermen-pass-data-center-moratorium-rescind-opportunity-zone-support)krcgtv.com

[krgv.com](https://www.krgv.com/news/harlingen-officials-approve-120-day-moratorium-to-study-impact-of-potential-data-centers/)krgv.com

[krmg.com](https://krmg.com/2026/03/26/tulsa-city-council-votes-to-approve-moratorium-on-data-center-construction-for-a-year/)krmg.com

[krmsradio.com](https://www.krmsradio.com/camdenton-says-no-to-opportunity-zone-support-issues-12-month-moratorium-on-data-centers/)krmsradio.com

[www.kron4.com](https://www.kron4.com/news/technology-ai/gilroy-community-fights-against-amazon-from-constructing-data-center/)kron4.com

[krqe.com](https://www.krqe.com/news/new-mexico/massive-data-center-project-in-dona-ana-county-facing-one-hurdle/)krqe.com

[ksdk.com](https://www.ksdk.com/article/news/local/business-journal/citizens-group-sues-to-void-35b-amazon-data-center-incentive-package/63-beeb260e-33c4-4e6e-bf3d-ec3629a88446)ksdk.com

[ksdk.com](https://www.ksdk.com/article/news/politics/festus-residents-clash-over-data-center-proposal-at-city-council-meeting/63-c21a8c0d-169b-47ec-aa06-107395cdb6f7)ksdk.com

[ksdk.com](https://www.ksdk.com/article/news/local/business-journal/festus-six-billion-dollar-data-center-crg-agreement-benefits/63-17639cf1-a110-4322-b7eb-679907668f5e)ksdk.com

[www.ksdk.com](https://www.ksdk.com/article/news/local/st-charles-ai-data-center-ban-first-in-nation/63-2c50fbcf-fcad-4b8d-bbcb-3711f6c2d29d)ksdk.com

[www.ksdk.com](https://www.ksdk.com/article/news/local/mayor-cara-spencer-city-board-postpone-vote-armory-data-center/63-4586cc07-32c7-46ad-a71b-5a92ba7b4323)ksdk.com

[www.ksdk.com](https://www.ksdk.com/article/news/local/data-center-proposal-sparks-intense-opposition-in-rural-franklin-county/63-1df17e92-1d31-4a96-a64f-b4a10bf99527)ksdk.com

[www.ksdk.com](https://www.ksdk.com/article/news/local/no-turning-back-neighbors-ecologist-warn-proposed-data-centers-threaten-meramec-river/63-eab3fc47-9e80-4158-b290-b5e9814e1b9b)ksdk.com

[Jackson County Legislature approves 180-day moratorium on processing data center land use applications](https://www.kshb.com/news/local-news/jackson-county-legislature-approves-180-day-moratorium-on-processing-data-center-land-use-applications)kshb.com

[kshb.com](https://www.kshb.com/news/local-news/missouri/jackson-county/independence-approves-hyperscale-ai-data-center-issues-150-billion-in-bonds)kshb.com

[kshb.com](https://www.kshb.com/news/local-news/missouri/jackson-county/court-rules-in-favor-of-independence-nebius-data-center-project-wont-go-to-vote)kshb.com

[www.kshb.com](https://www.kshb.com/news/local-news/peculiar-reverses-zoning-for-data-center-after-cries-from-neighbors)kshb.com

[www.kshb.com](https://www.kshb.com/news/local-news/kansas/miami-county/could-massive-project-be-coming-to-spring-hill-neighbors-plan-fight-against-300-acre-rezoning-bid)kshb.com

[www.kshb.com](https://www.kshb.com/news/local-news/kansas/miami-county/spring-hill-delays-major-industrial-zoning-hearing-for-march-25-calls-special-meeting)kshb.com

[www.kshb.com](https://www.kshb.com/news/local-news/liberty-officials-approve-1-4-billion-in-bonds-and-tax-abatements-for-new-metrobloks-data-center)kshb.com

[Box Elder commissioners approve data-center moratorium; Stratos exempt (KSL)](https://www.ksl.com/article/news/business/box-elder-county-commissioners-approve-data-center-moratorium-stratos-project-exempt/51509683)ksl.com

[Clearfield leaders OK 180-day moratorium on data center development (KSL.com)](https://www.ksl.com/article/51622427/clearfield-leaders-ok-180-day-moratorium-on-data-center-development)ksl.com

[Iron County presses pause on new AI data center proposals](https://www.ksl.com/article/51503330/iron-county-presses-pause-on-new-ai-data-center-proposals-to-review-current-regulations)ksl.com

[ksl.com](https://www.ksl.com/article/51505220/utah-senate-president-calls-for-drastic-reduction-to-box-elder-county-data-center)ksl.com

[ksl.com](https://www.ksl.com/article/51506536/box-elder-county-data-center-foes-sue-to-reverse-decision-stalling-their-efforts-against-project)ksl.com

[www.ksl.com](https://www.ksl.com/article/51487925/creekstone-energy-secures-largest-solar-lease-in-utah-history-to-help-power-delta-gigasite/)ksl.com

[www.ksl.com](https://www.ksl.com/article/51461110/provo-city-council-denies-zoning-change-for-proposed-data-center)ksl.com

[ksla.com](https://www.ksla.com/2025/12/12/documents-show-proposed-shreveport-data-center-would-use-75-million-gallons-water-daily/)ksla.com

[ksla.com](https://www.ksla.com/2026/02/24/shreveport-data-center-lawsuit-petition-alleges-city-withheld-public-information/)ksla.com

[www.ksla.com](https://www.ksla.com/video/2026/03/02/rural-community-hosting-boycott-data-center-meeting/)ksla.com

[www.ksla.com](https://www.ksla.com/2026/02/23/community-meeting-north-caddo-data-center-project-scheduled-march-3/)ksla.com

[www.ksla.com](https://www.ksla.com/2025/12/06/shreveport-planning-commission-denies-28-million-square-foot-data-center/)ksla.com

[www.ksla.com](https://www.ksla.com/2025/12/18/shreveport-city-council-hearing-appeal-data-center-thurs-afternoon/)ksla.com

[www.ksn.com](https://www.ksn.com/news/local/harvey-county-bans-data-centers-for-now/)ksn.com

[www.ksn.com](https://www.ksn.com/news/local/sedgwick-county-may-extend-its-data-center-pause/)ksn.com

[www.ksn.com](https://www.ksn.com/news/kansas-county-puts-moratorium-on-data-centers-and-nuclear-hydrogen-plants/)ksn.com

[ksnblocal4.com](https://ksnblocal4.com)ksnblocal4.com

[KSNT: Six-month moratorium approved for new data center applications in Shawnee County (August 13, 2026)](https://www.ksnt.com/news/local-news/six-month-moratorium-approved-for-new-data-center-applications-in-shawnee-county/)ksnt.com

[www.kswo.com](https://www.kswo.com/2026/02/25/divided-city-council-passes-data-center-zoning-ordinance/)kswo.com

[ktalnews.com](https://www.ktalnews.com/news/local-news/shreveport-petition-against-proposed-data-center/)ktalnews.com

[www.ktalnews.com](https://www.ktalnews.com/news/louisiana/mccormick-investigates-shreveport-blanchard-ndas/)ktalnews.com

[ktar.com](https://ktar.com/arizona-business/valley-data-center-scrutiny/5812647/)ktar.com

[ktbs.com](https://www.ktbs.com/news/city-of-shreveport-sued-over-data-center-vote/article_0bc5e38c-1443-4943-99b4-d30f77849960.html)ktbs.com

[www.ktbs.com](https://www.ktbs.com/community/temporary-caddo-lake-water-restriction-proposal-fails-to-advance/article_e195336c-9f18-400e-b970-473450aa4892.html)ktbs.com

[www.ktbs.com](https://www.ktbs.com/news/city-council-votes-yes-to-shreveport-data-center/article_f75ee252-d0b1-4a8e-988e-40efbd6d4bee.html)ktbs.com

[ktiv.com](https://ktiv.com)ktiv.com

[www.ktiv.com](https://www.ktiv.com/2026/06/23/woodbury-county-passes-moratorium-data-center-projects/)ktiv.com

[kttc.com](https://www.kttc.com/2025/10/09/pine-island-data-center-project-faces-community-opposition/)kttc.com

[ktul.com](https://ktul.com/news/local/tulsa-city-council-considers-365-day-moratorium-on-new-data-centers-citywide)ktul.com

[ktul.com](https://ktul.com/news/local/claremore-residents-speak-out-against-project-mustang-data-center)ktul.com

[ktvb.com](https://www.ktvb.com/article/news/local/kuna-community-reacts-new-data-center-approval/277-3785f039-7a80-405d-9dc9-988037c89174)ktvb.com

[kuer.org](https://www.kuer.org/business-economy/2026-06-04/kevin-oleary-shrinks-project-stratos-box-elder-data-center-20000-acres)kuer.org

[kunc.org](https://kunc.org)kunc.org

[www.kunc.org](https://www.kunc.org/2026-03-27/some-mountain-west-counties-impose-moratoriums-on-data-centers-as-national-pause-is-proposed)kunc.org

[Reno City Council extends data center moratorium into 2027](https://www.kunr.org/local-stories/2026-06-05/reno-city-council-extends-data-center-moratorium-into-2027)kunr.org

[kunr.org](https://www.kunr.org/local-stories/2026-05-19/reno-city-council-approves-30-day-moratorium-on-construction-permits-for-data-centers)kunr.org

[www.kunr.org](https://www.kunr.org/local-stories/2026-04-23/reno-city-council-takes-first-step-toward-changing-data-center-development-rules)kunr.org

[kuow.org](https://www.kuow.org/stories/seattle-could-ban-big-new-data-centers-for-one-year)kuow.org

[kut.org](https://www.kut.org/energy-environment/2025-09-26/taylor-texas-blueprint-data-centers-lawsuit)kut.org

[kut.org](https://www.kut.org/energy-environment/2025-10-08/judge-dismissed-lawsuit-taylor-data-center-blueprint-texas)kut.org

[kut.org](https://www.kut.org/energy-environment/2026-02-26/hays-county-tx-data-centers-water-resources)kut.org

[kut.org](https://www.kut.org/energy-environment/2026-02-18/san-marcos-city-council-blocks-proposed-data-center)kut.org

[www.kut.org](https://www.kut.org/energy-environment/2026-04-20/hutto-tx-zydeco-data-center-rezoning-request)kut.org

[Coachella becomes second California city to ban data centers as opposition swells in Golden State (KVCR, Aug. 28, 2026)](https://www.kvcrnews.org/local-news/2026-08-28/coachella-becomes-second-california-city-to-ban-data-centers-as-opposition-swells-in-golden-state)kvcrnews.org

[kvia.com](https://kvia.com/news/2026/04/14/city-of-el-paso-gives-update-on-meta-data-center-project-policy-framework/)kvia.com

[kvoe.com](https://kvoe.com/2026/07/08/data-center-emporia-neighbors-united-submits-nearly-1400-petition-signatures-to-halt-digital-campus/)kvoe.com

[kvue.com](https://www.kvue.com/article/news/local/taylor-residents-data-center-concerns/269-5a505a20-d721-4c49-85a4-4f78c27bfc7c)kvue.com

[kvue.com](https://www.kvue.com/article/news/local/hays-county/hays-county-judge-industrial-water-aquifer-record-lows/269-6f7f165a-0133-4c65-abcf-2084ecf3cdec)kvue.com

[kvue.com](https://www.kvue.com/article/news/local/hays-county/san-marcos-data-center-debate/269-26ebd1b0-1dfa-443b-b5ec-05016bcc0b7c)kvue.com

[www.kvue.com](https://www.kvue.com/article/news/local/williamson-county/hutto-data-center-resident-concerns/269-f1fcb072-1224-4b97-8c77-c02108eae987)kvue.com

[www.kwch.com](https://www.kwch.com/2026/01/13/harvey-county-commission-places-moratorium-data-center-construction/)kwch.com

[www.kwch.com](https://www.kwch.com/2026/03/04/sedgwick-county-extends-pause-data-center-applications/)kwch.com

[www.kwch.com](https://www.kwch.com/2026/01/15/sedgwick-county-suspends-data-center-permits-90-days/)kwch.com

[kwtx.com](https://www.kwtx.com/2026/05/12/hill-county-commissioners-approve-1-year-moratorium-data-center-construction/)kwtx.com

[kwtx.com](https://www.kwtx.com/2026/05/28/illegal-under-texas-law-data-center-developer-files-lawsuit-against-hill-county-moratorium/)kwtx.com

[kwtx.com](https://www.kwtx.com/2026/06/04/hill-county-commissioners-court-rescinds-moratorium-data-center-wake-lawsuit/)kwtx.com

[kwtx.com](https://www.kwtx.com/2026/07/15/hill-county-dropped-its-data-center-moratorium-after-100-million-lawsuit-now-developer-has-dismissed-case/)kwtx.com

[kwwl.com](https://kwwl.com)kwwl.com

[kxan.com](https://www.kxan.com/news/lee-county-proposed-power-plant-gets-pushback/)kxan.com

[www.kxan.com](https://www.kxan.com/news/local/hutto/proposed-hutto-data-center-faces-opposition-from-nearby-residents/)kxan.com

[www.kxnet.com](https://www.kxnet.com/news/local-news/debate-ignites-over-proposed-data-center-in-oliver-county/)kxnet.com

[www.kxnet.com](https://www.kxnet.com/news/local-news/mercercounty-data-center-ordinance-planned/)kxnet.com

[kxxv.com](https://www.kxxv.com/news/local-news/in-your-neighborhood/100m-lawsuit-filed-against-hill-county-officials-over-data-center-moratorium)kxxv.com

[www.kxxv.com](https://www.kxxv.com/news/local-news/in-your-neighborhood/thorndale-residents-voice-concerns-over-proposed-bitcoin-mining-company)kxxv.com

[Carroll County unanimously passes 1-year moratorium on data centers - KY3](https://www.ky3.com/2026/06/17/carroll-county-unanimously-passes-1-year-moratorium-data-centers-other-high-intensity-digital-infrastructure-facilities/)ky3.com

[KY3: Cedar County pauses solar, wind, data center projects for one year (September 15, 2026)](https://www.ky3.com/2026/09/15/cedar-county-pauses-solar-wind-data-center-projects-one-year/)ky3.com

[ky3.com](https://www.ky3.com/2023/11/29/harrison-ark-city-council-votes-remove-moratorium-crypto-mining-center-during-special-meeting/)ky3.com

[ky3.com](https://www.ky3.com/2026/05/06/camdenton-mo-residents-pack-city-hall-voice-opinions-citys-proposed-ai-data-center-moratorium/)ky3.com

[Imperial moves toward moratorium on hyperscale data centers](https://kyma.com/news/top-stories/2026/05/21/imperial-moves-toward-moratorium-on-hyperscale-data-centers/)kyma.com

[kyma.com](https://kyma.com/news/top-stories/2026/05/13/calipatria-city-council-approves-data-center-moratorium-on-heels-of-council-recall-notices/)kyma.com

[kymnradio.net](https://kymnradio.net/2026/04/08/northfield-an-outlier-and-potential-model-in-minnesotas-data-center-debacle/)kymnradio.net

[kymnradio.net](https://kymnradio.net/2024/12/10/city-allows-data-centers-in-the-northwest-industrial-area-highest-efficency-standards-in-mn-implemented/)kymnradio.net

[Yankton County considers data center moratorium (KYNT)](https://www.kynt1450.com/2026/06/16/285378/)kynt1450.com

[www.lagrangenews.com](https://www.lagrangenews.com/2025/09/09/citizens-raise-concerns-over-data-centers-in-town-hall-meeting/)lagrangenews.com

[www.lagrangenews.com](https://www.lagrangenews.com/2025/09/16/185894/)lagrangenews.com

[lailluminator.com](https://lailluminator.com/2026/02/23/amazon-data-center/)lailluminator.com

[laist.com](https://laist.com/news/monterey-park-data-center-ballot-question)laist.com

[www.lakelandgov.net](https://www.lakelandgov.net/news/posts/2026/july/legal-notice-proposed-moratorium-on-data-center-and-large-load-customers/)lakelandgov.net

[Lake and McHenry County Scanner: County board bans data centers in unincorporated Lake County until mid-2027 (September 8, 2026)](https://www.lakemchenryscanner.com/2026/09/08/we-choose-our-citizens-county-board-bans-data-centers-in-unincorporated-lake-county-until-mid-2027/)lakemchenryscanner.com

[lakeorionreview.com](https://lakeorionreview.com)lakeorionreview.com

[lancasteronline.com](https://lancasteronline.com/news/regional/residents-push-back-against-proposed-6b-data-center-in-lancaster-city/article_640500c2-4f80-418f-a368-9d4596ecbfeb.html)lancasteronline.com

[www.lanereport.com](https://www.lanereport.com/180437/2025/04/6b-data-center-project-proposed-for-oldham-county/)lanereport.com

[lapublicpress.org](https://lapublicpress.org/2026/01/a-data-center-boom-is-coming-to-the-san-gabriel-valley-residents-had-no-idea/)lapublicpress.org

[www.larimer.gov](https://www.larimer.gov/sites/default/files/recorded-resolution-establish-temporary-moratorium-data-center-facilities-larimer-county-colorado.pdf)larimer.gov

[lasvegassun.com](https://lasvegassun.com/news/2026/jul/22/henderson-council-opts-for-strict-development-agre/)lasvegassun.com

[law.yale.edu](https://law.yale.edu/yls-today/news/clinic-lawsuit-challenges-data-center-expansion-lowell-massachusetts)law.yale.edu

[law360.com](https://www.law360.com/energy/articles/2528093)law360.com

[lawrencekstimes.com](https://lawrencekstimes.com/2026/07/14/lawrencecitycomm-oks-2yr-moratorium/)lawrencekstimes.com

[www.lawtonok.gov](https://www.lawtonok.gov/m/newsflash/home/detail/173)lawtonok.gov

[lcnme.com](https://lcnme.com/currentnews/wiscasset-in-early-talks-for-data-center/)lcnme.com

[lebanon.in.gov](https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/)lebanon.in.gov

[lebtown.com](https://lebtown.com/2026/04/23/data-centers-old-comprehensive-plan-highlight-bethel-twp-planning-session/)lebtown.com

[lebtown.com](https://lebtown.com/2026/05/14/south-londonderry-authorizes-revised-data-center-ordinance-for-advertisement/)lebtown.com

[leecountyga.gov](https://www.leecountyga.gov/zoning-notices/june-4-2026-public-hearing)leecountyga.gov

[Allentown officials delay vote on data center regulations after marathon meeting](https://www.lehighvalleynews.com/local-news/allentown-officials-delay-vote-on-data-center-regulations-after-marathon-meeting)lehighvalleynews.com

[lehighvalleynews.com](https://www.lehighvalleynews.com/business/giant-data-center-proposal-in-upper-macungie-township-is-in-the-works)lehighvalleynews.com

[lehighvalleynews.com](https://www.lehighvalleynews.com/business/more-data-required-lvpc-formally-asks-for-more-information-for-proposed-data-center-in-upper-macungie-township)lehighvalleynews.com

[lehighvalleynews.com](https://www.lehighvalleynews.com/business/as-data-center-boom-approaches-lehigh-valley-officials-working-to-prepare)lehighvalleynews.com

[www.lehighvalleynews.com](https://www.lehighvalleynews.com/local-news/lehigh-valley-lining-up-to-regulate-data-centers-with-proposals-rolling-in)lehighvalleynews.com

[www.lenox-mi.gov](http://www.lenox-mi.gov/m/newsflash?cat=7)lenox-mi.gov

[levittownnow.com](https://levittownnow.com/2026/07/28/falls-twp-declares-part-of-zoning-ordinance-invalid-after-data-center-outcry/)levittownnow.com

[Lexington City Council passes data center moratorium (LEX18)](https://www.lex18.com/news/covering-kentucky/lexington-city-council-passes-moratorium-on-data-center-development)lex18.com

[Versailles City Council enacts moratorium on data centers through 2026 - LEX18](https://www.lex18.com/news/covering-kentucky/versailles-city-council-enacts-moratorium-on-data-centers-through-2026)lex18.com

[lex18.com](https://www.lex18.com/news/covering-kentucky/mercer-county-residents-rally-against-proposed-data-center-development)lex18.com

[www.lex18.com](https://www.lex18.com/news/covering-kentucky/mason-county-residents-weigh-billion-dollar-data-center-proposal-amid-growing-concerns)lex18.com

[www.lex18.com](https://www.lex18.com/news/covering-kentucky/data-center-opposition-grows-in-mercer-county-as-residents-voice-concerns)lex18.com

[library.municode.com](https://library.municode.com/tn/metro_government_of_nashville_and_davidson_county/codes/code_of_ordinances?nodeId=CD_TIT17ZO)library.municode.com

[www.limitless-news.com](https://www.limitless-news.com/local/apple-valley-technology-park-update)limitless-news.com

[linktr.ee](https://linktr.ee/nodesertdatacenter)linktr.ee

[www.linncountyiowa.gov](https://www.linncountyiowa.gov/CivicAlerts.aspx?AID=4487)linncountyiowa.gov

[live5news.com](https://www.live5news.com/2026/02/05/colleton-county-lawmakers-oppose-proposed-data-center-ace-basin/)live5news.com

[www.live5news.com](https://www.live5news.com/2026/07/08/6-month-pause-data-center-developments-colleton-county-lawsuit-paused/)live5news.com

[www.live5news.com](https://www.live5news.com/2026/07/20/sc-80m-investment-in-data-centers-draw-scrutiny-over-power-jobs/)live5news.com

[www.lkldnow.com](https://www.lkldnow.com/data-center-moratorium-draws-crowd-and-lakeland-revises-hearing-dates/)lkldnow.com

[local12.com](https://local12.com/news/local/clinton-county-wilmington-residents-for-responsible-development-hold-town-hall-response-proposed-billion-billions-dollars-money-data-center-tech-technology-power-grid-noise-pollution-bills-environment-city-council-job-creation-jobs-cincinnati)local12.com

[www.localmemphis.com](https://www.localmemphis.com/article/money/business/memphis-32m-xai-taxes-into-neighborhoods/522-b062ee6f-d9cc-40be-9816-cfd6b614076c)localmemphis.com

[lockhaven.com](https://www.lockhaven.com/news/local-news/2026/05/pc-twp-to-consider-data-center-zoning-amendment/)lockhaven.com

[loganbanner.com](https://www.loganbanner.com/news/local-residents-file-federal-lawsuit-to-block-major-data-center-project-near-wharncliffe/article_c89961af-2c6d-4a86-9e05-7619e775b21e.html)loganbanner.com

[www.longislandpress.com](https://www.longislandpress.com/2025/11/19/north-hempstead-moratorium/)longislandpress.com

[Lost Coast Outpost: All Right, That's It, No More Data Centers For a While, Says Arcata City Council](https://lostcoastoutpost.com/2026/sep/17/all-right-s-it-no-more-data-centers-while-said-arc/)lostcoastoutpost.com

[loudoun.gov](https://www.loudoun.gov/6222/Phase-2-Data-Center-Standards-Locations)loudoun.gov

[loudounnow.com](https://www.loudounnow.com/news/by-right-data-centers-eliminated-in-loudoun-existing-applications-grandfathered/article_130515be-0478-11f0-ab4f-7771b6b47f71.html)loudounnow.com

[loudounnow.com](https://www.loudounnow.com/news/work-begins-on-next-phase-of-loudoun-county-data-center-regulations/article_d9a0c8fa-3ea6-4a13-814e-83a62820d06d.html)loudounnow.com

[louisvilleky.gov](https://louisvilleky.gov/news/councilwoman-chappell-reintroduces-temporary-moratorium-data-centers)louisvilleky.gov

[lowerbuckstimes.com](https://lowerbuckstimes.com/2026/07/29/falls-township-zoning-code-data-center-vote/)lowerbuckstimes.com

[lpm.org](https://lpm.org)lpm.org

[lpm.org](https://www.lpm.org/news/2026-01-28/data-center-developer-sues-simpson-county-government-over-land-use-ordinance)lpm.org

[lpm.org](https://www.lpm.org/news/2026-02-09/for-a-second-time-franklin-zoning-regulators-table-vote-on-data-center-proposal)lpm.org

[lpm.org](https://www.lpm.org/news/2026-01-21/zoning-regulators-table-preliminary-development-plan-for-southern-kentucky-data-center)lpm.org

[lpm.org](https://www.lpm.org/news/2026-03-05/feet-to-the-fire-preliminary-plan-for-franklin-data-center-approved)lpm.org

[lpm.org](https://www.lpm.org/news/2026-06-17/indiana-community-passes-short-term-data-center-moratorium)lpm.org

[www.lpm.org](https://www.lpm.org/news/2025-07-02/oldham-county-passes-sweeping-data-center-moratorium-executive-fired-over-recording)lpm.org

[www.lpm.org](https://www.lpm.org/news/2025-06-03/oldham-county-data-center-switches-sites-reduces-size-amid-local-resistance)lpm.org

[www.lpm.org](https://www.lpm.org/news/2025-10-31/louisville-officials-grapple-with-how-to-regulate-large-data-centers)lpm.org

[www.lpm.org](https://www.lpm.org/news/2026-02-09/survey-vast-majority-of-louisville-residents-oppose-building-new-data-centers)lpm.org

[www.lpm.org](https://www.lpm.org/news/2025-12-09/the-ai-data-center-boom-is-coming-for-kentucky-what-will-lawmakers-do-about-it)lpm.org

[www.lpm.org](https://www.lpm.org/2026-02-04/data-center-developer-purchases-former-western-kentucky-aluminum-smelter)lpm.org

[www.lpm.org](https://www.lpm.org/news/2026-02-12/gop-bill-seeks-guardrails-for-new-data-centers-to-pay-their-own-way-in-kentucky)lpm.org

[www.lpm.org](https://www.lpm.org/news/2026-07-10/city-council-in-mercer-county-advances-annexation-that-could-clear-way-for-data-center)lpm.org

[lufkindailynews.com](https://lufkindailynews.com/news/community/texas-county-rejects-a-moratorium-on-data-center-development-amid-ai-boom/article_8c75c882-3ed8-5d5a-8ec0-508b9f6d6fb0.html)lufkindailynews.com

[lufkindailynews.com](https://lufkindailynews.com/news/local/ai-data-center-planned-on-1-000-acres-at-former-southland-paper-mill-site/article_ff9e97bf-361d-5649-835b-68a75818bd94.html)lufkindailynews.com

[lutherregister.news](https://lutherregister.news/2026/03/31/luther-has-more-going-on-than-data-centers/)lutherregister.news

[www.macombdaily.com](https://www.macombdaily.com/2026/03/11/washington-twp-data-center-zoning-request-postponed-yet-again-heres-why/)macombdaily.com

[maconmelody.com](https://maconmelody.com/concerned-twiggs-residents-sue-to-stop-data-center/)maconmelody.com

[Sayreville Council Approves 18-Month Data Center Moratorium, Rejects Permanent Ban - Magic 98.3 FM](https://magic983.com/2026/06/22/sayreville-council-approves-18-month-data-center-moratorium-rejects-permanent-ban/)magic983.com

[magic983.com](https://magic983.com)magic983.com

[mainemorningstar.com](https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/)mainemorningstar.com

[www.mainepublic.org](https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal)mainepublic.org

[www.mainepublic.org](https://www.mainepublic.org/business-and-economy/2025-12-12/lewiston-to-decide-on-a-i-data-center-for-bates-mill-property)mainepublic.org

[mankatofreepress.com](https://www.mankatofreepress.com/news/local_news/data-center-plans-stalled-in-north-mankato-after-developer-backs-out/article_d0617045-9eed-4633-a055-aed5b0405879.html)mankatofreepress.com

[marylandmatters.org](https://marylandmatters.org/2026/01/03/data-center-regulations-2026/)marylandmatters.org

[marylandmatters.org](https://marylandmatters.org/2025/09/17/prince-georges-county-moves-to-put-data-center-development-on-pause/)marylandmatters.org

[marylandmatters.org](https://marylandmatters.org/2026/07/08/prince-georges-county-extends-pause-on-hyperscale-data-center-development/)marylandmatters.org

[maryvilleforum.com](https://maryvilleforum.com)maryvilleforum.com

[mcall.com](https://www.mcall.com/2026/02/26/upper-macungie-zoning-board-data-center/)mcall.com

[mcall.com](https://www.mcall.com/2025/11/12/large-data-center-in-the-works-for-former-air-products-site-in-upper-macungie/)mcall.com

[mcobserver.news](https://mcobserver.news/news/metro-council-to-consider-data-center-moratorium/)mcobserver.news

[Mendocino County supes ban data centers, for the moment at least (The Mendocino Voice)](https://mendovoice.com/2026/09/mendocino-county-supes-ban-data-centers-for-the-moment-at-least/)mendovoice.com

[www.messenger-inquirer.com](https://www.messenger-inquirer.com/hancock-county-residents-question-ai-data-centers-officials-at-town-meeting/article_4dbf68c0-acb8-5d52-9f24-aa42f423f547.html)messenger-inquirer.com

[metro.newschannelnebraska.com](https://metro.newschannelnebraska.com)metro.newschannelnebraska.com

[metrotimes.com](https://www.metrotimes.com/news/michigan-news/residents-raise-alarms-over-environmental-risks-tied-to-massive-data-center-in-saline-township/)metrotimes.com

[michigan.gov](https://www.michigan.gov/ag/news/press-releases/2026/04/17/ag-nessel-files-appeal-of-mpsc-approval-of-dtes-saline-data-center-contracts)michigan.gov

[michigan.gov](https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center)michigan.gov

[michiganadvance.com](https://michiganadvance.com/2025/10/09/a-michigan-town-hopes-to-stop-a-data-center-with-a-2026-ballot-initiative/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2025/11/21/local-michigan-township-trustee-says-meta-is-behind-data-center-project-planned-near-howell/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2025/12/08/rezoning-request-for-rural-michigan-data-center-project-pulled-from-consideration/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/04/06/deep-green-pulls-request-to-rezone-downtown-lansing-parcel-axing-data-center-proposal/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/04/10/community-pushback-prompts-sault-tribe-leadership-to-adopt-moratorium-on-data-centers/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2025/10/30/whitmer-multi-billion-dollar-saline-township-data-center-largest-investment-in-michigan-history/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/briefs/nessel-appeals-dte-data-center-contracts-in-continued-push-for-contested-case/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2025/12/18/public-service-commission-approves-dte-data-center-contracts-with-strings-attached/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/05/27/federal-class-action-lawsuit-filed-over-dowagiac-data-center-noise/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2025/10/27/data-center-developer-takes-a-small-michigan-farming-community-to-court/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/01/09/nessel-and-advocates-seek-rehearing-on-conditional-approval-of-dte-data-center-contracts/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/09/14/michigan-data-centers-the-weekly-download-4-2-2-2/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/09/28/michigan-data-centers-the-weekly-download-4-2-2-2-2-2/)michiganadvance.com

[michigandaily.com](https://www.michigandaily.com/news/news-briefs/saline-township-resident-takes-legal-action-to-stop-data-center/)michigandaily.com

[www.michigandaily.com](https://www.michigandaily.com/news/ann-arbor/stop-the-data-center-organizes-assembly-to-discuss-winter-action-plan/)michigandaily.com

[michiganpublic.org](https://www.michiganpublic.org/politics-government/2025-12-02/saline-residents-protest-data-center-project-chant-no-secret-deals)michiganpublic.org

[michiganpublic.org](https://www.michiganpublic.org/economy/2026-04-25/saline-township-data-center-major-construction-underway-financing-secured)michiganpublic.org

[michiganpublic.org](https://www.michiganpublic.org/transportation-infrastructure/2026-04-23/michigan-utility-oks-12-month-ban-on-supplying-water-for-data-centers)michiganpublic.org

[www.michiganpublic.org](https://www.michiganpublic.org/environment-climate-change/2026-03-18/detroit-city-council-asks-mayor-to-consider-data-center-moratorium)michiganpublic.org

[www.michiganpublic.org](https://www.michiganpublic.org/2026-07-15/lansing-passes-6-month-data-center-moratorium)michiganpublic.org

[midbaynews.com](https://midbaynews.com/post/okaloosa-commissioners-reject-12-month-data-center-moratorium-3-2-after-hours-of-public-opposition?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=okaloosa-commissioners-reject-12-month-data-center-moratorium-3-2-after-hours-of-public-opposition)midbaynews.com

[midcoastvillager.com](https://www.midcoastvillager.com/news/warren-voters-to-vote-july-8-on-data-center-moratorium/article_7866d875-1119-4649-919e-b99a5d0dd73c.html)midcoastvillager.com

[midriversnewsmagazine.com](https://midriversnewsmagazine.com)midriversnewsmagazine.com

[www.midriversnewsmagazine.com](https://www.midriversnewsmagazine.com/news/st-charles-residents-push-back-on-hyperscale-data-center-near-city-s-water-source/article_0892c124-6c4c-4ca0-a741-ee7275fbfeb0.html)midriversnewsmagazine.com

[www.millardccp.com](https://www.millardccp.com/articles/featured-news/planners-reject-data-center-solar-rezone/)millardccp.com

[www.mininggazette.com](https://www.mininggazette.com/news/outdoors/2026/04/sault-tribe-adopts-moratorium-on-data-centers/)mininggazette.com

[mirrorindy.org](https://mirrorindy.org/decatur-township-data-center-ai-technology-metropolitan-development-commission/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/martindale-brightwood-data-center-ron-gibson-east-indianapolis-metrobloks/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/pike-township-data-center-petition-withdrawn/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/pike-township-indianapolis-data-center-company-answers-questions/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/indianapolis-city-county-council-sustainability-committee-data-centers/)mirrorindy.org

[mirrorindy.org](https://mirrorindy.org/indianapolis-data-centers-regulations-moratorium/)mirrorindy.org

[mississippifreepress.org](https://www.mississippifreepress.org/xai-faces-fierce-opposition-over-southaven-mississippi-power-plant-permit/)mississippifreepress.org

[mississippitoday.org](https://mississippitoday.org/2026/06/23/data-centers-jackson-regulations-moratorium/)mississippitoday.org

[mississippitoday.org](https://mississippitoday.org)mississippitoday.org

[mississippitoday.org](https://mississippitoday.org/2026/03/10/xai-permit-approved-southaven/)mississippitoday.org

[mississippitoday.org](https://mississippitoday.org/2026/04/10/xai-southaven-permit-appeal/)mississippitoday.org

[mississippitoday.org](https://mississippitoday.org/2026/02/18/xai-southaven-permit-public-resounding-no/)mississippitoday.org

[mississippitoday.org](https://mississippitoday.org/2026/05/25/elon-musk-xai-dater-center-mississippi/)mississippitoday.org

[mississippitoday.org](https://mississippitoday.org/2026/04/15/data-center-turbines-southaven/)mississippitoday.org

[www.missourian.com](https://www.missourian.com/local_news/next-franklin-county-data-center-meeting-will-be-held-at-union-high-school/article_9f6016ad-b548-4014-a173-64c831798930.html)missourian.com

[mitchellcounty.iowa.gov](https://mitchellcounty.iowa.gov/wp-content/uploads/Board-Proceedings-11-12-25.pdf)mitchellcounty.iowa.gov

[mitchellcounty.iowa.gov](https://mitchellcounty.iowa.gov/wp-content/uploads/Board-Proceedings-11-25-25.pdf)mitchellcounty.iowa.gov

[www.mitchellrepublic.com](https://www.mitchellrepublic.com/news/south-dakota/lincoln-county-backs-down-on-hyperscale-data-center-moratorium)mitchellrepublic.com

[mitechnews.com](https://mitechnews.com/featured/billion-openai-data-center-clears-major-legal-hurdle-in-saline/)mitechnews.com

[mlk50.com](https://mlk50.com/2025/07/18/38109-residents-asked-how-to-spend-money-from-xai-tax-payments/)mlk50.com

[mncenter.org](https://www.mncenter.org/release-hermantown-data-center-environmental-study-appealed)mncenter.org

[mncenter.org](https://www.mncenter.org/press-release-pine-island-data-center-environmental-study-appealed)mncenter.org

[mncenter.org](https://www.mncenter.org/latest-our-data-center-lawsuits-mceas-chief-legal-officer)mncenter.org

[mncenter.org](https://www.mncenter.org/press-release-new-lawsuits-highlight-shortcomings-and-lack-transparency-surrounding-environmental)mncenter.org

[moenvironment.org](https://moenvironment.org/about/contact-us/)moenvironment.org

[monroecountypa.com](https://monroecountypa.com/event/2026/03/tobyhanna-township-zoning-hearing-board-re-data-center-overlay-validity)monroecountypa.com

[montanafreepress.org](https://montanafreepress.org/2025/11/18/groups-push-back-on-montanas-data-center-boom/)montanafreepress.org

[montanafreepress.org](https://montanafreepress.org/2026/06/18/how-some-montanans-are-taking-data-center-regulation-into-their-own-hands/)montanafreepress.org

[montanafreepress.org](https://montanafreepress.org/2026/09/21/right-to-compute-act-regulatory-authority/)montanafreepress.org

[montco.today](https://montco.today/2025/11/fight-against-conshohocken-data-center/)montco.today

[montco.today](https://montco.today/2026/05/conshohocken-data-center-fight-reignites/)montco.today

[montco.today](https://montco.today/2026/07/plymouth-township-data-center-fight-oneill-conditions/)montco.today

[www.montereypark.ca.gov](https://www.montereypark.ca.gov/1710/Data-Center-Information)montereypark.ca.gov

[www.montereypark.ca.gov](https://www.montereypark.ca.gov/m/newsflash/home/detail/1306)montereypark.ca.gov

[County Executive signs data center moratorium executive order (official)](https://www.montgomerycountymd.gov/news/montgomery-update-county-executive-signs-data-center-moratorium-executive-order-preserving-affordable-housing-upcoming-red-line-disruptions)montgomerycountymd.gov

[www.montgomerycountymd.gov](https://www.montgomerycountymd.gov/news/council-approves-18-month-data-center-moratorium-places-limitations-data-center-development)montgomerycountymd.gov

[www.montgomerytwp.org](https://www.montgomerytwp.org/department/index.php?structureid=11)montgomerytwp.org

[morethanthecurve.com](https://morethanthecurve.com/developer-brian-oneill-behind-proposed-data-center-on-steel-plant-property-in-conshohocken/)morethanthecurve.com

[mountainstatespotlight.org](https://mountainstatespotlight.org/2025/12/14/data-center-pushback-lawmakers-respond/)mountainstatespotlight.org

[mountaintrue.org](https://mountaintrue.org/upper-new-riverkeeper-press-release/)mountaintrue.org

[mountainx.com](https://mountainx.com/news/environment/canton-passes-12-month-moratorium-on-data-centers-and-cryptocurrency-mining/)mountainx.com

[mountainx.com](https://mountainx.com/news/commissioners-approve-one-year-ban-on-crypto-mining/)mountainx.com

[MPR News: Inver Grove Heights exempts data center project from city moratorium](https://www.mprnews.org/story/2026/09/15/inver-grove-heights-data-center-project-exempted-from-city-moratorium)mprnews.org

[mprnews.org](https://mprnews.org)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2024/12/11/data-centers-spark-opposition-from-residents-concerns-over-energy-use)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2026/04/08/opponents-of-data-centers-join-with-critics-of-power-line-proposal-in-northern-minnesota)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2026/06/26/inver-grove-heights-approves-moratorium-data-centers)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2026/06/23/inver-grove-heights-meeting-erupts-into-shouts-after-data-center-moratorium-delayed)mprnews.org

[mprnews.org](https://www.mprnews.org/story/2026/07/07/city-of-eagan-faces-lawsuit-over-data-center-moratorium)mprnews.org

[www.mprnews.org](https://www.mprnews.org/story/2026/04/21/nobles-county-board-to-vote-on-whether-to-allow-massive-data-centers-on-farm-land)mprnews.org

[mrsc.org](https://mrsc.org/stay-informed/mrsc-insight/may-2018/bitcoin-comes-to-washington)mrsc.org

[www.mtpr.org](https://www.mtpr.org/montana-news/2026-07-10/missoula-county-approves-one-year-pause-in-data-center-development)mtpr.org

[multistate.us](https://www.multistate.us/resources/state-data-center-policy-101)multistate.us

[www.mvskokemedia.com](https://www.mvskokemedia.com/mvskoke-tech-park-bill-fails-in-4-11-vote/)mvskokemedia.com

[www.mvskokemedia.com](https://www.mvskokemedia.com/mvskoke-tech-park-plan-crashes/)mvskokemedia.com

[www.mykxlg.com](https://www.mykxlg.com/news/state/brookings-rejects-tax-rebate-for-proposed-data-center/article_333bb788-4bf6-4d95-969e-4ac71b8d99e0.html)mykxlg.com

[myleaderpaper.com](https://www.myleaderpaper.com/news/festus-second-data-center-lawsuit-filed/article_576699c7-2a83-48e4-a3bd-824b9ae760d1.html)myleaderpaper.com

[mynews13.com](https://mynews13.com/fl/orlando/news/2026/04/08/fort-meade-data-center-proposal-advances-despite-resident-concerns)mynews13.com

[mynews4.com](https://mynews4.com/news/local/reno-city-council-advances-data-center-regulations-ai-artificial-intellegience-possible-moratorium-vote-future-meeting-devon-reese)mynews4.com

[myrgv.com](https://myrgv.com/local-news/2026/04/02/harlingen-calls-for-public-hearings-on-proposed-data-center-moratorium/)myrgv.com

[myrgv.com](https://myrgv.com/local-news/2026/02/19/harlingen-drafting-ordinance-aimed-at-data-centers/)myrgv.com

[mystandardnews.com](https://www.mystandardnews.com/stories/amazon-announces-it-will-own-data-center-in-montgomery-county,136956)mystandardnews.com

[mystandardnews.com](https://www.mystandardnews.com/stories/amazon-releases-projected-water-usage-for-data-center,140529)mystandardnews.com

[mystandardnews.com](https://www.mystandardnews.com/stories/hundreds-demand-answers-from-county-leaders-on-data-centers,140519)mystandardnews.com

[www.mystateline.com](https://www.mystateline.com/news/monarch-energy-finalizing-12-billion-investment-into-rockford-data-center/)mystateline.com

[mytarborotoday.com](https://mytarborotoday.com/ess-plans-to-file-appeal-of-tarboros-sup-denial-p2853-106.htm)mytarborotoday.com

[naacp.org](https://naacp.org/articles/naacp-issues-letter-opposing-project-marvel-data-center-alabama-growing-concerns)naacp.org

[naacp.org](https://naacp.org/articles/naacp-demands-mississippi-regulators-reschedule-data-center-permit-hearing)naacp.org

[naacp.org](https://naacp.org/articles/naacp-and-advocacy-groups-appeal-air-permit-xais-personal-power-plant-north-mississippi)naacp.org

[nashvillebanner.com](https://nashvillebanner.com/2026/07/21/nashville-data-center-regulations-moratorium/)nashvillebanner.com

[nassaucountyfl.com](https://nassaucountyfl.com)nassaucountyfl.com

[www.nationalcoalitionagainstcryptomining.com](https://www.nationalcoalitionagainstcryptomining.com/local-chapters/)nationalcoalitionagainstcryptomining.com

[nbc26.com](https://nbc26.com)nbc26.com

[www.nbc26.com](https://www.nbc26.com/lakeshore/wisconsin-lakeshore-towns-resist-data-center-development-on-farmland)nbc26.com

[www.nbc26.com](https://www.nbc26.com/lakeshore/three-wisconsin-lakeshore-communities-unite-to-pass-data-center-moratorium)nbc26.com

[www.nbc26.com](https://www.nbc26.com/news/local-news/wrightstown-adopts-a-one-year-moratorium-on-data-center-projects)nbc26.com

[nbc4i.com](https://www.nbc4i.com/news/local-news/pickaway-county/amid-a-data-center-fight-pickaway-county-government-pushes-for-collaboration/)nbc4i.com

[www.nbc4i.com](https://www.nbc4i.com/news/local-news/pickaway-county/after-public-pushback-pickaway-county-village-enacts-data-center-pause/)nbc4i.com

[www.nbc4i.com](https://www.nbc4i.com/news/local-news/sunbury/sunbury-residents-push-back-against-data-center-development/)nbc4i.com

[NBC Bay Area (Bay City News): Richmond becomes 3rd Bay Area city to impose data center moratorium](https://www.nbcbayarea.com/news/local/richmond-data-center-moratorium/4143766/)nbcbayarea.com

[NBC Bay Area: Gilroy approves temporary moratorium on new data centers](https://www.nbcbayarea.com/news/local/gilroy-amazon-data-center-moratorium/4142478/)nbcbayarea.com

[San Francisco supervisors propose 45-day moratorium on new data centers (NBC Bay Area)](https://www.nbcbayarea.com/news/local/san-francisco-supervisors-moratorium-new-data-centers/4143257/)nbcbayarea.com

[www.nbcboston.com](https://www.nbcboston.com/boston-business-journal/lowell-imposes-moratorium-on-data-centers-targeting-states-largest-facility/3913800/)nbcboston.com

[www.nbcdfw.com](https://www.nbcdfw.com/news/local/fort-worth-data-center-zoning-approval/3649273/)nbcdfw.com

[nbcnews.com](https://www.nbcnews.com/news/us-news/indianapolis-data-center-city-councilor-home-shot-rcna267156)nbcnews.com

[nbcnews.com](https://www.nbcnews.com/news/us-news/dale-earnhardt-widow-son-battle-data-center-mooresville-north-carolina-rcna223895)nbcnews.com

[nbcnews.com](https://www.nbcnews.com/news/us-news/dale-earnhardt-widow-data-center-backs-off-mooresville-north-carolina-rcna224827)nbcnews.com

[www.nbcnews.com](https://www.nbcnews.com/news/us-news/reno-nevada-data-centers-water-drought-rcna235966)nbcnews.com

[NBC Right Now: City of Pasco to hold Sept. 8 hearing on data center rules](https://www.nbcrightnow.com/news/city-of-pasco-to-hold-sept-8-hearing-on-data-center-rules/article_b12f02ff-8669-4c1f-aca4-a1f2b2af06b6.html)nbcrightnow.com

[nbcwashington.com](https://www.nbcwashington.com/news/local/prince-william-digital-gateway-project-halted-by-virginia-court-of-appeals/4084112/)nbcwashington.com

[nbcwashington.com](https://www.nbcwashington.com/news/local/northern-virginia/loudoun-county-board-pauses-data-center-applications/4155005/)nbcwashington.com

[ncejn.org](https://ncejn.org/updates-on-the-fight-against-data-centers-edgecombe-county/)ncejn.org

[ncejn.org](https://ncejn.org/)ncejn.org

[ncejn.org](https://ncejn.org/event/chatham-county-fight-for-a-temporary-moratorium-on-data-centers/)ncejn.org

[nclocal.org](https://nclocal.org/2026/02/12/town-of-canton-blocks-any-potential-data-center-for-one-year/)nclocal.org

[ncnewsline.com](https://ncnewsline.com/2026/03/16/apex-weighs-pause-on-data-centers-as-resistance-spreads-across-nc/)ncnewsline.com

[ncnewsline.com](https://ncnewsline.com/2026/03/13/community-groups-sue-over-planned-data-center-in-stokes-county/)ncnewsline.com

[ncnewsline.com](https://ncnewsline.com/2026/09/22/judge-rules-chatham-county-data-center-can-proceed-despite-moratorium/)ncnewsline.com

[ncnewsonline.com](https://www.ncnewsonline.com/news/local_news/attorney-to-file-motions-against-data-center-lawsuits/article_a39b337a-43b8-47e2-9aa7-1126e6a49def.html)ncnewsonline.com

[ncwlife.com](https://www.ncwlife.com/news/east-wenatchee-passes-bitcoin-zoning-ordinance/article_1dc9a008-a6e5-5d08-a5c4-67c3dc64f300.html)ncwlife.com

[nebius.com](https://nebius.com/independencemo)nebius.com

[nebraskaexaminer.com](https://nebraskaexaminer.com/2026/09/22/data-center-opposition-is-growing-with-nebraskans-crossing-party-lines-in-protest/)nebraskaexaminer.com

[nebraskapublicmedia.org](https://nebraskapublicmedia.org/en/news/news-articles/seward-county-becomes-latest-nebraska-county-to-put-moratorium-on-data-centers/)nebraskapublicmedia.org

[nebraskapublicmedia.org](https://nebraskapublicmedia.org/en/news/news-articles/cass-county-moves-closer-to-moratorium-on-data-centers/)nebraskapublicmedia.org

[nebraskapublicmedia.org](https://nebraskapublicmedia.org/en/news/news-articles/twelfth-nebraska-county-temporarily-bans-data-centers/)nebraskapublicmedia.org

[neighbors4change.com](https://neighbors4change.com/hhhunt-faces-strong-opposition-to-data-center-plan/)neighbors4change.com

[neo-trans.blog](https://neo-trans.blog/2026/05/15/clevelands-proposed-data-center-moratorium-in-a-race-against-time-technology/)neo-trans.blog

[nevadacurrent.com](https://nevadacurrent.com/2025/01/10/effort-to-block-reno-data-center-offers-glimpse-of-increasingly-thorny-issue-in-nevada/)nevadacurrent.com

[nevadacurrent.com](https://nevadacurrent.com/2026/02/09/data-center-water-power-needs-regulatory-challenges-strain-rural-communities/)nevadacurrent.com

[nevadacurrent.com](https://nevadacurrent.com/2026/01/12/data-centers-greenlink-and-your-electricity-bill/)nevadacurrent.com

[www.newarkpostonline.com](https://www.newarkpostonline.com/news/data-center-complex-proposed-near-newark/article_25f31b5b-71d7-4975-9ace-213c3dbf35ff.html)newarkpostonline.com

[City of New Carlisle: Council Packet, March 2, 2026 (includes February 17, 2026 minutes)](https://newcarlisleohio.gov/wp-content/uploads/2026/02/CouncilPacket-2026-0302.pdf)newcarlisleohio.gov

[www.newhavenindependent.org](https://www.newhavenindependent.org/2026/07/06/12-month-pause-pitched-for-data-center-dev/)newhavenindependent.org

[www.newhavenindependent.org](https://www.newhavenindependent.org/2026/07/20/legislation-committee-agenda-august-4/)newhavenindependent.org

[Old Bridge considers preventative AI data center ban (News12 NJ)](https://newjersey.news12.com/2026/06/12/old-bridge-considers-preventative-ai-data-center-ban-following-heated-public-meeting/zbG6eY9Z5eWpVNGexLQU0)newjersey.news12.com

[newjersey.news12.com](https://newjersey.news12.com/2026/05/10/andover-plans-ban-on-ai-data-centers-after-tense-meeting-and-viral-video/5ouXiKxrUSaKWwCIz4Fflg)newjersey.news12.com

[newjersey.news12.com](https://newjersey.news12.com/2026/05/20/millville-bans-data-centers-killing-largest-proposed-facility-in-new-jersey-history/77eDMHsKNvb6HkPeGLzLLN)newjersey.news12.com

[www.newkent-va.us](https://www.newkent-va.us/m/NewsFlash/Home/Detail/538)newkent-va.us

[newmedia-wi.com](https://www.newmedia-wi.com/tigerton-puts-moratorium-data-centers)newmedia-wi.com

[newprojectmedia.com](https://newprojectmedia.com/origination-copia-power-plans-usd-11bn-data-center-campus-with-carlyle-backing-in-lyon-county-nv/)newprojectmedia.com

[www.news-daily.com](https://www.news-daily.com/news/clayton-boc-passes-data-center-moratorium/article_e3ebec5c-f6ce-432f-a584-8968556756ae.html)news-daily.com

[www.news-herald.com](https://www.news-herald.com/2025/07/11/perry-village-government-provides-updates-regarding-proposed-data-center/)news-herald.com

[www.news-herald.com](https://www.news-herald.com/2025/06/24/perry-village-amends-zoning-code-to-include-data-center-campuses/)news-herald.com

[www.news-herald.com](https://www.news-herald.com/2025/08/10/perry-village-getting-ready-to-post-more-answers-to-data-center-questions/)news-herald.com

[news.azpm.org](https://news.azpm.org/p/news-articles/2026/1/8/227908-marana-town-council-approves-rezoning-for-luckett-road-project-600-acre-hyperscale-data-center/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/azpmnews/2026/2/10/228403-marana-residents-submit-petitions-to-put-data-center-project-to-a-vote/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/azpmnews/2026/4/10/229272-cochise-county-will-regulate-data-centers-but-some-residents-want-more/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/newsheadlines/2026/2/18/228535-marana-rejects-data-center-referendum-petitions/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/newsheadlines/2026/2/27/228668-marana-residents-sue-town-over-rejected-data-center-referendum-petitions/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/azpmnews/2025/6/17/225239-pima-county-approves-36-billion-data-center-project-near-fairgrounds/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/azpmnews/2026/1/14/227982-activists-file-to-sue-pima-county-over-project-blue-approval-process/)news.azpm.org

[news.azpm.org](https://news.azpm.org/s/102339-pima-county-approves-project-blue-data-center-agreement/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/news-articles/2026/2/18/228535-marana-rejects-data-center-referendum-petitions/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/azpmnews/2026/2/27/228668-marana-residents-sue-town-over-rejected-data-center-referendum-petitions/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/azpmnews/2025/12/12/227629-marana-planning-commission-backs-rezoning-for-600-acre-data-center-project/)news.azpm.org

[news.azpm.org](https://news.azpm.org/p/environmentnews/2026/6/5/230034-tucson-planning-commission-has-more-questions-about-proposed-data-center-regulations/)news.azpm.org

[news.constructconnect.com](https://news.constructconnect.com/initial-plans-revealed-for-1900-acre-1b-data-center-in-port-washington-wisconsin)news.constructconnect.com

[news.constructconnect.com](https://news.constructconnect.com/global-ai-data-center-clears-weld-county-zoning-hurdle-project-could-be-colorados-largest)news.constructconnect.com

[news.google.com](https://news.google.com/rss/articles/CBMingFBVV95cUxQZ2owc3E1VG9UQnpaTkJlOWl2Q0Q2UHN3RHNCbUlGX3VWMnZuY0d3Z3JaR08tbDVkVU1WSUluMjdwM0wwTFR4SXBRazBidUk0SmZEc01nM2xJTnNFaFlPTjdxajdudkUtVkY2RGlNMFNtNUJ1OXVmcXFGaUo3bFBhNWZMNldMLVAyVWFGNUdqSXRsSk9QLXZ3blEySG5KZw)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMimwFBVV95cUxNNWZ2aHhUUFU5SU5NS0NLWUJ4UWVYaHM0azBYdTBHSFprV3gzdUFhZXZQNUlaYXlGdmxzNTNTUkVTQzZEZGtrN3hLVWdkTFFaQ2FfejVXVm9TSVctWnZuNWtMdlpUeFAtSG85OGFHaTA0TmlPUWVxLXFMNDRtR2c2dVhBZUl4MU5UYUlsX0NkRTRWaks3czhqRGZWaw)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMiogFBVV95cUxPUldhWFRaU2tfcm5EWFZQelhSWFZLMFExd0hwbnU3anYtUkhfOTEwWkpLNEtfQl9OTmdobGhVZGRZc0hMRlVrRlNsRi1naHJURExRUTd2N2UtZGpJeV9iWFJVWE1KOVF0cm5kcW81Y3VoWmxOTFhrNzFjU2JQOC1VTUFoTWdMUXRwc3hFN2RWSEZKRTFfSFhTNzM4NjZ0V0NFd1HSAacBQVVfeXFMTjBUWmswMm8yTnpqZWg4T3g3aTd2OG5UTTd2XzRIS1NzUG9SWWdYT24weXBRdk1sWlFzOEwyZUNtZlkyYTVfLWhibGJsRmxuZXBYV09TemhucjVYNjB5d29va1RIZGZDUURHdlpvVGNnYlp1NmhFMEpJT3lwWE51alZEeXA2clVZX2FaNVdfQmY5akFYZFJ0RHlocHhLaV9Ub182aEJMM3M)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMinAFBVV95cUxPQVI0WXkyZDFMWkkwQjQyeVBZbW82T2l0a1pnUUdGSDB1Z1Y1bWlnMmI5Z3l4YVRRb1dxaG1sQ3Fna2M4dVZ3b0c0eXg0TGlwakV4aVlZdG9JMkE1Z0JOM3QtOXhkR29uV0VQMzJYZDN0VUxhNzVzcE12RW5rRnBERDZXY1RsRkNyZlU1N1NzeldMZDd5YW1NZGc3ZWk)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMinAFBVV95cUxNOXZIazZuUWN4TXYxUTBxZHU3VXFQdGg3M2g2aGtGTlJFQVpsdXRRa1VsS0R2eDZDX1d5LS1sWHg5ZHd6dmJldVdLT2FCV0lkQkU0RnYyb2U3Y3g2N0hhSV9sVl9OZnc1S1dIYlFmUWxFMDFUOHRuMTlTMG5XcDJsNFY1NUFDdk13UFljeVY0VmRTaXkxWF9maERsNkXSAbABQVVfeXFMTzZEb0F6WjQ4NWcxNjJlS0FHSGxMakNBQTh5cHExcGl5WXQzeDBYeUhuQUJuaVhWT3pqTXdCSjFpMGpIVmg4eHNkQ2k2REtHVjlscGNZbVY5dXUzZHRhMThzd2llRGFlRG1tenU5QjRMVGdCUkJZb09qNTdmaEtxbmVjemJVck9Tdl85WnNxeVpycllqR2VuX3BvS3FEczFid0NIVldycE44b3N1aEt0N1M)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMiywFBVV95cUxOcS1acnhqQUQ3NXhUbHF5eEl5M1AwOEN3Wmt2ajZfVWp2eHgtZlZ0alZQaWV3STB6MldTQjh0V0Z0SXRSMENrbC1qV3VNNkpLMWp5UFJqVU5lM2NmOFU1dy1YR2V1RnY2eGM4YmM2TG9Db2gtUTg1M1RGeHRsLTF4anZtTzcyU2RydEVkclJqbDIySHkyS3ZtNlJZc2FGaXRrTktfOTViazkzWXVHU01HVWl2a0lrd3NCRzluWEhlVE15QUo3UVZGWl9vVQ)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMimAFBVV95cUxNa0lQek80TzNpdXNiVFZTb2NNZV9KR1p6OXRNdC1WaHVHVjFFQW4wYnRkZ0FPLWw3U2JsNlNVaWlsUTQySzRac0pmLXVQUW53Z2g0SVpkSXlGekhwMWJGelF2OGhEMkhudGZfSjJXcFN3WGpRWVprTzEtRVhIQzI1ZE9nNWZWazFFYXRQSTNLbGVoUmM2dFQzTw)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMi1AFBVV95cUxNWm43U2JsWXpyVGRQbjgzdXdBSXo3dmluMzhtQ0lqN2dGaTRaZ2phMFdXZ3J5T1o2Mm05VW9QV1g4UnpVSUhyS1YwZTdCdnRlQ1lIQVpzZTBvTkpaVnpqal9XaWZCUFRxLTU2Nm9uX3FxaHJ5NHRFTHVQQW9TNWpsRTNSOUt4eVd2NU1WU19JR1FMOGpvZEQzWmhkYTF0MzNoaEtqUHJwNnZQcjRWMWlXb2U3WldDVUVFTUZ0QmxmRnVNa3hSLUoyQk83TEpZUGpsTjk5Ng)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMingFBVV95cUxObU0yR2loWERoMEszaEQwTVRXMUhCWUlVajRWWDEyWHRSd3dHTmRqaHYtclFvVTZ3OGVTMndhVldhdDlCWF9tdFpxbnl4bjRUMTZwN05DNnVtdWRYNDZtSHA0SWZrRHpWNE5KbEdLcVo3NnFGeTNPMzN2YXZDb3g0ZTNPN3U4aVBHbTFXWVhZNTZzNVNpN0V2ZHBGWjJUQQ)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMie0FVX3lxTE5FOVpoQkZPUDJqQ29MV1lQZzFKcnVjVGdXdmQtNFpsSV9WbUt5T1pkZUozWm5DM3RncFlvQ3RMbFFncWpZd0N4eEhVSnFrMVdVQjhUNXFkU0dVY2lxS1RSY0ZEbTRsYkNVekZ4X3BNMXpfMVYxTnZYVzhjRQ)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMisgFBVV95cUxQQnZsYU5hbVhzSVN1R1Q2a1p6dDc3M2J3VXY1VEVPSHEzellETk1DS2JOWEpMUWtqVVdnQVlXZG43S1dPeDkwVDJOVVA0enJ5VkJEMmw3OEJ2NXhqdFdWMjJhNkthZGIwQ3FaUVVSMExmYUp6WDYyRUVFZ0x4QUlWZFVDQ3FqYnpaNWkwZWFIVTd2RGZvN1prUUxSaTd0aGY0RHVjRm1FRTdoQnNxVTdlZjlB)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMi1wFBVV95cUxNZjU3b3JNRDN1bC1jTFZwYWFsVTYzNDhkTVhQUEFiZG1kRVZrZzdvX2JLa1ZmRkpoZklieHRZSFEzelAwdDlXZS1SU3VFREZZQkZfSzVCOGRwSU5zckczV0dSTGhxRzdlQkRvOGtXNDlyXzR3SjkwaEZMdG0xeWlxZk5zY3FHRkxhTFEzT0tIeWhValdJVzBhUnZFYW1hR093bjU4bGltaTBRVFVZUjc1Rm81VDhkenBuaHc2UXhXRkpKdUJTdnRZV2dyZG5saVRkVXFfYWpIdw)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMixwFBVV95cUxNcHNiZUFZQWRDWUgyd1A3ZVRTaG9RU2kzc0tXVS0wTFZyeGY0UWNVRDVOSGZNRFlDeFN1YmU4VWNnU2ZCajRLUWhQM0lRa21iay1hLVpCWWszOGJYVTktSW5rd3R3Wm1sdEp4cXN3c001ckJvczhFT1Q3VVpGSXN5aEFiamFra2FzNF9jX3NwbWhQQ18tb0FwXzdOWlp2cU5yMGtfVGJITFhYeHVzdXlfZWxGVEtmNjJjZ1BBUUtyd21ILXgyb3RB)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMiyAFBVV95cUxOZV9VeTJvUkJLblFKMEV4QW1uS0tOb3BvdUdyX0RkZjVPT21tczFRWEZWbDZKbmJDQ3RVeFhBdTFOUGNiMXhiX2ZFSDdEdmk4OEhieWtGS3VFWVEtT0dkdE1BWWgwSTFOcGVyaGtwZ3ZMT3RzZm1RZlE5bnZUQ25vSWdyaWJxRERFSHFKUm91MFB4X0ZMaFhUZ0Fmck01TVk2RXBNaTh3WUdlb3prcGZ4X0VJci1SQ3NPMEVCS003RFBVY3I5dThlNQ)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMimAFBVV95cUxQb2F4aFp5UGpjakhFeHk1Y1hzOXE1M3NsTkJiUVhrdV96RFJVdzNpeE5saDVjSkpudm1LX2ZrSWxzaDE4UlNacEd4SHFpVms1bnAwZU1BeFY1Y0JMVTd1NFhtMV9tdWFFWkxsd2lkRFpmekJ1SGZSYkUtZktQdkxHOFdsbmctVl9nVFdDQ256Y2NObHdCUTNrRg)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMifEFVX3lxTFB2WFZQajQydmtTUUxNeXVXSlZMcTZhUjhqZnFDbExHUVZHbUp2eEphU3Fpd3N0T0Y2T1RLdGY4UDdQamtpcC1JNDMxTHA3d1hVOWN4SDBaczBnQ2wzT3ljaU9CVDE5M0R3UVBzZmtmcDdIRUI3SGpiZzJqenbSAXxBVV95cUxQXzI0SEVHSTFpWklQQWJhcFMwU3o4QTl6a1JmbWY5OFNtcmtwOHpKbnlCMmhZNVlRcUJteEY1UHhXNlVqd2R4UmVXRTlTVng3ekJwQ0NTNUJBQVZpY0l3cmUtcm5QbFBsYmJTQmVhczh2eDVyd0xPaEV5LUdV)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMiygFBVV95cUxOMTFMQWFBQi1tekVaWWNLd1BJY0ctMEU5WG95R2dGc1dLd1FQekpnRmpDS0VHbHdMY2FzSHF4RmxMdmpNUVZ5MDM1QlppdGJSbFBHTWliTFFCS0ZhUkZaamY2WmRzTmRQd2tITUFGQmxwbm1xdkoxQmRzWC1mZWdJbVU4MzU3S0NjbEJ2cHpFMGdRNlpoRGY2clRDM2Zfa3loZ0VESkdiU0JOMDdsemRCR2xKenpBM01jQklhRHVyeFk4TjdqejRfNkpB)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMizgFBVV95cUxQQ2JraGNTNmh5d1JlSWxjQlVtNWJuNnpxcGVyZC1PQ1RSZUtwMHZJNkY4QUFfUzB3TGlnd2hwei04QnNVODRaUVhHYU5SamZZYlAzN3AzQzF3NGRiZElZdmpzdVZKZ0JIeE1oLUFlTUhRUWltM0diWjFfQ0pkZVZwY1NtT2x3cC1oRHhNSzZXUEJ3emlZckJPVWl5OUNuX000QXd4ek5pZWl2WjZCREdyMTAxTnpnSEduTDlPeGg5NlVmcEtEemRZb3VJUENaZw)news.google.com

[news.google.com](https://news.google.com/rss/articles/CBMilAFBVV95cUxPaHkxYkIzME9VU3pwckRlNlczM19uNk8zSHBuSVpkR3Nqa0RhWU9JQ3hSa2NPOWZSV0pqb0xGYm04bE9vQXJqTkZxcmhiZWpKLXhST1UwSExjN25WdjIyRHRLM0pSMHo5Wk5mQzNsVEF0U2ZfUmxNcHJjMHVTSmRxS0JsS2VsQkt1VWZwektRYkhxWGNH)news.google.com

[news.wfsu.org](https://news.wfsu.org/state-news/2026-04-20/floridas-commerce-secretary-comes-out-against-a-proposed-ai-data-center)news.wfsu.org

[news.yahoo.com](https://news.yahoo.com)news.yahoo.com

[news3lv.com](https://news3lv.com/news/local/henderson-to-revise-data-center-rules-instead-of-approving-moratorium)news3lv.com

[news4jax.com](https://www.news4jax.com/news/local/2026/06/01/nassau-county-creates-fact-finding-committee-to-study-data-centers-as-moratorium-moves-forward/)news4jax.com

[news5cleveland.com](https://www.news5cleveland.com/news/local-news/more-northeast-ohio-communities-are-blocking-data-centers-business-leaders-are-worried)news5cleveland.com

[news5cleveland.com](https://www.news5cleveland.com/news/local-news/oh-lorain/were-just-being-proactive-this-small-lorain-county-town-is-banning-data-centers)news5cleveland.com

[www.news9.com](https://www.news9.com/story/68dc6593b59e144c5aa9c263/yukon-weighs-data-center-deal-amid-water-power-and-resident-concern)news9.com

[newsandtribune.com](https://newsandtribune.com)newsandtribune.com

[This Tenn. city just passed a pause on data centers (NewsChannel 5)](https://www.newschannel5.com/news/state/tennessee/warren-county/this-tenn-city-just-passed-a-pause-on-data-centers-town-hall-scheduled-to-discuss-future-regulations)newschannel5.com

[newschannel5.com](https://newschannel5.com)newschannel5.com

[newschannel5.com](https://www.newschannel5.com/news/state/tennessee/robertson-county/cedar-hill-in-robertson-county-passes-2-year-moratorium-on-data-centers-amid-rural-preservation-concerns)newschannel5.com

[newsdakota.com](https://newsdakota.com)newsdakota.com

[www.newsdemocrat.com](https://www.newsdemocrat.com/2026/02/01/mt-orab-residents-seek-answers-on-mega-site/)newsdemocrat.com

[newsitem.com](https://newsitem.com/news/local/mount-carmel-township-enacts-180-day-moratorium-on-data-center-proposals-to-upgrade-zoning/article_a4d04477-9509-4b5b-97bd-d30598b04cee.html)newsitem.com

[Broken Arrow City Council approves 6-month moratorium on data centers - NewsOn6](https://www.newson6.com/data-centers-in-oklahoma/broken-arrow-city-council-approves-6-month-moratorium-on-data-centers)newson6.com

[newson6.com](https://www.newson6.com/tulsa-oklahoma-news/arrest-made-during-heated-claremore-meeting-over-proposed-data-center)newson6.com

[newson6.com](https://www.newson6.com/tulsa-oklahoma-news/claremore-residents-to-question-proposed-data-center-at-public-meeting)newson6.com

[newson6.com](https://www.newson6.com/tulsa-oklahoma-news/claremore-project-mustang-data-center-approved)newson6.com

[www.newson6.com](https://www.newson6.com/tulsa-oklahoma-news/cowetas-planning-commission-votes-4-1-to-deny-rezoning-request-for-proposed-data-center)newson6.com

[www.newstalkkzrg.com](https://www.newstalkkzrg.com/2026/07/06/joplin-city-council-to-hold-public-meeting-on-proposed-data-center-rules/)newstalkkzrg.com

[nightpeak.energy](https://nightpeak.energy/project/old-ocean-data-center/)nightpeak.energy

[nj1015.com](https://nj1015.com/andover-township-data-center-ban/)nj1015.com

[njtoday.news](https://njtoday.news/2026/05/08/secret-andover-township-data-center-scheme-triggers-fireworks-amid-denials/)njtoday.news

[nkccnews.com](https://nkccnews.com/local-news/2026/03/08/consideration-for-development-of-technology-overlay-district-targets-data-center-development/)nkccnews.com

[nmborderplex.com](https://www.nmborderplex.com/project-jupiter-approved-a-transformative-leap-for-the-new-mexico-borderplex/)nmborderplex.com

[nmelc.org](https://nmelc.org/2026/02/09/nmelc-files-lawsuit-against-dona-ana-county-commission-for-oma-violations/)nmelc.org

[nmstatelands.org](https://www.nmstatelands.org/2026/07/15/commissioner-garcia-richard-again-denies-request-to-run-portion-of-project-jupiter-pipeline-through-state-lands/)nmstatelands.org

[nodatacenter.net](https://nodatacenter.net/)nodatacenter.net

[nodatacentermooresvillenc.com](https://nodatacentermooresvillenc.com/)nodatacentermooresvillenc.com

[nodesertdatacenter.com](https://nodesertdatacenter.com/)nodesertdatacenter.com

[Edmond approves data center moratorium as dialogue grows (NonDoc)](https://nondoc.com/2026/06/09/edmond-city-council-data-centers-dialogue-moratorium/)nondoc.com

[City Council denies proposed pause on new data centers in Council Bluffs - Daily Nonpareil](https://nonpareilonline.com/news/local/government-politics/article_9b0aef1f-c84b-4eb0-a8a8-bfd4c4b1ef31.html)nonpareilonline.com

[northcarolinahealthnews.org](https://www.northcarolinahealthnews.org/2026/05/08/northampton-data-center-moratorium/)northcarolinahealthnews.org

[www.northcarolinahealthnews.org](https://www.northcarolinahealthnews.org/2026/03/25/nc-communities-push-back-ai-data-centers-project-delta-lawsuit/)northcarolinahealthnews.org

[northdakotamonitor.com](https://northdakotamonitor.com/2026/09/29/2nd-fargo-area-data-center-would-use-double-the-power-of-harwood-site/)northdakotamonitor.com

[northfieldorg.substack.com](https://northfieldorg.substack.com/p/will-new-hyperscale-data-centers-shock-your-electric-bill)northfieldorg.substack.com

[Northglenn-Thornton Sentinel: Thornton clamps on 12-month moratorium on new data centers](https://www.northglenn-thorntonsentinel.com/news/thornton-clamps-on-12-month-moratorium-on-new-data-centers/article_92f708f1-dee2-420d-968b-02e9a65b0900.html)northglenn-thorntonsentinel.com

[northpennnow.com](https://northpennnow.com/news/2026/apr/04/east-rockhill-supervisors-advance-data-center-ordi/)northpennnow.com

[northpennnow.com](https://northpennnow.com/news/2026/mar/27/montgomery-township-moves-to-fix-zoning-gap-on-data-centers/)northpennnow.com

[northpennnow.com](https://northpennnow.com/news/2026/mar/25/montgomery-township-moves-to-fix-zoning-gap-on-data-centers/)northpennnow.com

[northpennnow.com](https://northpennnow.com/news/2026/apr/15/upper-gwynedd-becomes-latest-township-to-work-to-get-data-center-rules-on-the-books/)northpennnow.com

[northpennnow.com](https://northpennnow.com/news/2026/may/06/towamencin-board-adopts-data-center-regulations/)northpennnow.com

[www.northtamatelegraph.com](https://www.northtamatelegraph.com/news/local-news/2025/11/21/last-weeks-tama-county-supervisors-meeting/)northtamatelegraph.com

[www.northwestgeorgianews.com](https://www.northwestgeorgianews.com/calhoun_times/news/local/gordon-county-enacts-preemptive-data-center-moratorium/article_aee14801-6dd3-4b94-a453-2a3e684a8318.html)northwestgeorgianews.com

[www.northwestgeorgianews.com](https://www.northwestgeorgianews.com/calhoun_times/news/local/gordon-county-extends-stop-on-data-centers-as-zoning-language-is-updated/article_e989102c-da68-4047-8989-78fc5ad79e1c.html)northwestgeorgianews.com

[nottinghammd.com](https://nottinghammd.com/2026/05/07/county-executive-cassilly-proposes-legislation-to-permanently-ban-data-centers-in-harford-county/)nottinghammd.com

[nowgeorgia.com](https://nowgeorgia.com/cornelia-confronts-growth-governance-and-misinformation-in-its-proposed-annexation-in-cornelia/)nowgeorgia.com

[nowhabersham.com](https://nowhabersham.com/athens-commission-calls-for-moratorium-on-data-centers-after-potential-hyperscale-project-denied/)nowhabersham.com

[www.nprillinois.org](https://www.nprillinois.org/illinois/2026-03-09/data-center-wont-be-built-in-pekin)nprillinois.org

[www.nprillinois.org](https://www.nprillinois.org/economy-business/2025-11-04/plans-for-sangamon-county-data-center-raise-hopes-concerns)nprillinois.org

[www.nprillinois.org](https://www.nprillinois.org/economy-business/2026-04-24/champaign-county-board-approves-1-year-data-center-moratorium)nprillinois.org

[www.nprillinois.org](https://www.nprillinois.org/illinois/2026-03-16/illinois-lawmakers-look-to-regulate-data-centers-as-local-governments-propose-their-own-rules)nprillinois.org

[The News Reporter: Whiteville approves one-year ban on data centers (August 31, 2026)](https://www.nrcolumbus.com/news/whiteville-approves-one-year-ban-on-data-centers/article_e3c512a1-c3e2-4228-994e-0f5c849be15f.html)nrcolumbus.com

[North State Journal: Data center moratorium count rises again (September 4, 2026)](https://nsjonline.com/article/2026/09/data-center-moratorium-count-rises-again/)nsjonline.com

[nsjonline.com](https://nsjonline.com/article/2026/05/chatham-county-faces-lawsuit-over-data-center-moratorium/)nsjonline.com

[www.nvdaily.com](https://www.nvdaily.com/nvdaily/frederick-county-quashes-two-data-center-proposals/article_1021d4f1-e8d2-5cd5-8b90-747884ff48c3.html)nvdaily.com

[www.nvdaily.com](https://www.nvdaily.com/nvdaily/planners-vote-down-clear-brook-data-center-campus/article_8e6c14d9-ce6f-51fd-9c04-e46953e6b6e5.html)nvdaily.com

[www.nvdaily.com](https://www.nvdaily.com/nvdaily/council-oks-moratorium-on-data-center-applications/article_8bbfc9ce-d84e-5dd8-a4be-e8f9ee95cc94.html)nvdaily.com

[Fayetteville council working to beef up data center regulations (NWA Democrat-Gazette)](https://www.nwaonline.com/news/2026/jun/09/fayetteville-city-council-working-to-beef-up/)nwaonline.com

[www.nwaonline.com](https://www.nwaonline.com/news/2026/jul/07/measure-to-temporarily-halt-new-data-center/)nwaonline.com

[www.nwaonline.com](https://www.nwaonline.com/news/2026/jul/29/little-rock-official-will-propose-18-month-halt/)nwaonline.com

[www.nwitimes.com](https://www.nwitimes.com/news/local/business/brassie-golf-course-provident-realty-advisors-data-center/article_f3650940-19d5-11ef-a122-d76b20ae0b48.html)nwitimes.com

[www.nwitimes.com](https://www.nwitimes.com/news/local/jenny-hansen-chesterton-data-center-provident-realty-advisors/article_74c63836-1d16-11ef-87f9-fbc5e91dccff.html)nwitimes.com

[www.nwitimes.com](https://www.nwitimes.com/news/local/nwi-burns-harbor-data-center/article_b835a314-7b61-11ef-9626-2bd80bf9f2ca.html)nwitimes.com

[observer-reporter.com](https://www.observer-reporter.com/news/local-news/2026/may/15/amwell-supervisors-table-vote-on-data-center-ordinance/)observer-reporter.com

[www.observer-reporter.com](https://www.observer-reporter.com/news/local_news/2026/apr/02/south-strabane-residents-pack-fire-hall-for-data-center-hearing/)observer-reporter.com

[www.observer-reporter.com](https://www.observer-reporter.com/news/local_news/2026/feb/28/data-center-ordinance-draws-crowd-in-south-strabane/)observer-reporter.com

[www.observer-reporter.com](https://www.observer-reporter.com/news/local_news/2026/apr/16/north-franklin-township-adopts-ordinances-regulating-data-centers-electric-generation/)observer-reporter.com

[www.observer-reporter.com](https://www.observer-reporter.com/news/local_news/2026/mar/12/north-franklin-considering-data-center-ordinance/)observer-reporter.com

[Ocala-News.com: Marion County approves 12-month moratorium on large-scale data centers](https://www.ocala-news.com/2026/09/16/marion-county-approves-12-month-moratorium-on-large-scale-data-centers/)ocala-news.com

[ocgnews.com](https://ocgnews.com/rockdale-county-extends-data-center-and-battery-energy-storage-moratorium-through-sept-8/)ocgnews.com

[www.ohio.news](https://www.ohio.news/stories/sunbury-data-center-postponed-while-lawmakers-consider-new-commission-to-dispel-inaccurate-myths/)ohio.news

[Ohio Capital Journal: Ohio now has over 125 active moratoriums on data centers. See where they are. (September 18, 2026)](https://ohiocapitaljournal.com/2026/09/18/ohio-now-has-over-125-active-moratoriums-on-data-centers-see-where-they-are/)ohiocapitaljournal.com

[www.okc.gov](https://www.okc.gov/News-articles/Oklahoma-City-Council-approves-moratorium-on-new-data-centers)okc.gov

[okcfox.com](https://okcfox.com/news/project-oklahoma/new-data-center-coming-to-yukon-generating-contention)okcfox.com

[Broken Arrow pauses data center applications - Oklahoma Energy Today](https://okenergytoday.com/2026/06/broken-arrow-pauses-data-center-applications/)okenergytoday.com

[Edmond approves data center moratorium (Oklahoma Energy Today)](https://okenergytoday.com/2026/06/edmond-approves-data-center-moratorium/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2026/01/luther-residents-rally-against-a-proposed-data-center/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2026/01/data-center-debate-grows-in-kansas-where-a-county-adopted-a-moratorium/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2026/01/yukon-city-council-approves-another-step-toward-data-center/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2025/12/proposed-yukon-data-center-not-a-done-deal/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2026/02/data-center-project-to-be-subject-of-another-coweta-city-council-meeting/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2026/03/backer-of-oklahoma-data-centers-faces-financial-challenges/)okenergytoday.com

[www.okenergytoday.com](https://www.okenergytoday.com/2026/03/tulsa-city-council-asked-to-implement-data-center-moratorium/)okenergytoday.com

[olivercountynd.org](https://olivercountynd.org/index.asp?SEC=AA1FE418-4509-4D80-9397-3CA011E32E88)olivercountynd.org

[opb.org](https://opb.org)opb.org

[oracle.com](https://www.oracle.com/news/announcement/blog/oracle-advances-american-ai-innovation-in-new-mexico-2026-01-23/)oracle.com

[orangecountync.gov](https://orangecountync.gov/CivicAlerts.aspx?AID=1391)orangecountync.gov

[organmountainnews.com](https://www.organmountainnews.com/project-jupiter-air-permits-hearing-decision-delayed/)organmountainnews.com

[orlandosentinel.com](https://www.orlandosentinel.com/2026/09/16/orange-county-commissioners-favor-data-center-moratorium/)orlandosentinel.com

[Orlando Weekly: Orange County moves closer to temporarily banning data centers](https://www.orlandoweekly.com/news/orlando-area-news/orange-county-moves-closer-to-temporarily-banning-data-centers/)orlandoweekly.com

[orleanshub.com](https://orleanshub.com/allies-of-tonawanda-seneca-nation-strongly-oppose-monstrous-data-center-proposed-for-stamp/)orleanshub.com

[Six townships voted to support a data center moratorium. What now?, Oxford Free Press](https://www.oxfreepress.com/six-townships-voted-to-support-data-center-moratorium-what-now/)oxfreepress.com

[www.ozaukeepress.com](https://www.ozaukeepress.com/content/residents-blast-data-center-work-compromise)ozaukeepress.com

[palmettostatewatchfoundation.com](https://palmettostatewatchfoundation.com/2026/01/06/petitions-protests-and-power-bills-spartanburg-faces-data-center-debacle/)palmettostatewatchfoundation.com

[pantagraph.com](https://pantagraph.com/news/local/government-politics/article_1ef081f1-62ae-4c65-8b34-48ae6483a7fb.html)pantagraph.com

[Asbury Park Passes Data Center Ban - Patch](https://patch.com/new-jersey/asbury-park/asbury-park-passes-data-center-ban-within-city-limits)patch.com

[Bernards Township Moves To Ban Data Centers - Patch](https://patch.com/new-jersey/baskingridge/bernards-township-moves-ban-data-centers)patch.com

[Cranford Moves To Ban Data Centers As Residents Raise Concerns (Cranford Patch)](https://patch.com/new-jersey/cranford/cranford-moves-ban-data-centers-residents-raise-concerns)patch.com

[Cranford moves to block AI data centers after nearby Kenilworth project](https://patch.com/new-jersey/cranford/cranford-moves-block-ai-data-centers-after-nearby-kenilworth-project-sparks)patch.com

[Data Center Ban Ordinance Backed By Bernards Township Planning Board - Patch](https://patch.com/new-jersey/baskingridge/data-center-ban-ordinance-backed-bernards-township-planning-board)patch.com

[Data center debate heats up in Summit](https://patch.com/new-jersey/summit/data-center-debate-heats-summit)patch.com

[Patch: Data Center Ban Approved In Stafford Township (August 24, 2026)](https://patch.com/new-jersey/barnegat-manahawkin/data-center-ban-approved-stafford-township)patch.com

[Patch: Data Centers Banned In East Brunswick, Environmental Group Applauds Move (August 26, 2026)](https://patch.com/new-jersey/eastbrunswick/data-centers-banned-east-brunswick-environmental-group-applauds-move)patch.com

[Sayreville The Latest NJ Town To Question Data Centers - Patch](https://patch.com/new-jersey/matawan-aberdeen/sayreville-latest-nj-town-question-data-centers)patch.com

[Summit Passes AI Data Center Ban, But Many Say It Falls Short - Patch](https://patch.com/new-jersey/summit/summit-passes-ai-data-center-ban-many-say-it-falls-short)patch.com

[Warren Township moves to ban data centers in all zoning districts (Patch)](https://patch.com/new-jersey/warren/warren-township-moves-ban-data-centers-all-zoning-districts)patch.com

[patch.com](https://patch.com/pennsylvania/plymouthwhitemarsh/residents-local-officials-intensely-oppose-conshohocken-data-center)patch.com

[patch.com](https://patch.com/maryland/towson/woodlawn-data-center-proposal-meets-pushback-over-power-water-concerns)patch.com

[patch.com](https://patch.com/new-jersey/newbrunswick/new-brunswick-city-council-kills-proposal-build-ai-data-center-100-jersey)patch.com

[patch.com](https://patch.com/illinois/aurora/ground-breaks-350m-data-center-aurora)patch.com

[patch.com](https://patch.com/illinois/plainfield/data-center-moratorium-imposed-plainfield-after-unanimous-village-board-vote)patch.com

[patch.com](https://patch.com/new-jersey/baskingridge/data-centers-banned-bernards-township-after-committee-vote)patch.com

[patch.com](https://patch.com/maryland/belair/county-executive-bob-cassilly-proposes-legislation-permanently-ban-data-centers)patch.com

[pbn.com](https://pbn.com/as-smithfield-moves-to-ban-data-centers-lawmakers-debate-how-to-define-them/)pbn.com

[pbswisconsin.org](https://pbswisconsin.org/news-item/kewaunee-county-town-staves-off-plan-for-a-land-purchase-by-a-data-center-developer/)pbswisconsin.org

[pbswisconsin.org](https://pbswisconsin.org/news-item/another-billion-dollar-wisconsin-data-center-is-eyed-for-cassville-in-grant-county/)pbswisconsin.org

[peachbytesolutions.com](https://peachbytesolutions.com/blog/how-community-action-in-jones-county-halted-a-major-data-center-plan)peachbytesolutions.com

[www.peakofohio.com](https://www.peakofohio.com/local-news/champaign-county-commissioners-release-statement-for-clarity-on-proposed-data-center-project/)peakofohio.com

[www.peakofohio.com](https://www.peakofohio.com/featured-news/urbana-city-council-approves-moratorium-to-suspend-progress-on-data-center-project/)peakofohio.com

[pecva.org](https://www.pecva.org/resources/press/pec-statement-on-prince-william-digital-gateway-latest-legal-win/)pecva.org

[www.pecva.org](https://www.pecva.org/region/fauquier/gigaland/)pecva.org

[www.pecva.org](https://www.pecva.org/region/fauquier/gigaland-application-withdrawn-our-communitys-voice-was-heard/)pecva.org

[www.pecva.org](https://www.pecva.org/region/orange/orange-county-proposes-new-technology-zoning-district/)pecva.org

[www.pecva.org](https://www.pecva.org/region/culpeper/support-more-data-center-regulation-in-culpeper-county/)pecva.org

[www.pemberton-twp.com](https://www.pemberton-twp.com/government/minutes_ordinances/ordinances.php)pemberton-twp.com

[Peninsula Daily News: Port Angeles City Council puts pause on data centers](https://www.peninsuladailynews.com/2026/09/03/port-angeles-city-council-puts-pause-on-data-centers/)peninsuladailynews.com

[Peninsula Daily News: Public provides feedback on data centers](https://www.peninsuladailynews.com/2026/09/18/public-provides-feedback-on-data-centers/)peninsuladailynews.com

[pennfuture.org](https://pennfuture.org/post/DATA-CENTER-2026-LEGISLATION-DEBRIEF)pennfuture.org

[www.pennfuture.org](https://www.pennfuture.org/Publication-Data-Center-Model-Ordinance)pennfuture.org

[pennwatch.org](https://pennwatch.org/hampden-township-commissioners-say-yes-to-wawa-no-to-data-center/)pennwatch.org

[www.peoplesworld.org](https://www.peoplesworld.org/article/pekin-illinois-residents-turn-out-to-oppose-building-of-ai-data-center/)peoplesworld.org

[www.phoenixnewtimes.com](https://www.phoenixnewtimes.com/news/chandler-city-council-unanimously-kills-sinema-backed-data-center-40628102/)phoenixnewtimes.com

[www.pinalcentral.com](https://www.pinalcentral.com/eloy_enterprise/massive-pinal-data-center-tabled-after-public-backlash/article_24e7ee19-cc37-405f-b947-f199fc329aaa.html)pinalcentral.com

[pinelandsalliance.org](https://pinelandsalliance.org/data-center-victories-local-actions-drive-regional-change/)pinelandsalliance.org

[Long Island town approves moratorium on data center after public pushback](https://pix11.com/news/local-news/long-island/long-island-town-approves-moratorium-on-data-center-after-public-pushback/)pix11.com

[pizenswitchtimes.com](https://pizenswitchtimes.com/2025/08/05/penrose-lane-in-yerington-nv-proposed-master-plan-amendment-to-specific-plan-for-4-6-million-square-feet-of-data-centers/)pizenswitchtimes.com

[https://planetdetroit.org/2026/04/washington-township-weighs-data-center-impacts/](https://planetdetroit.org/2026/04/washington-township-weighs-data-center-impacts/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/08/augusta-data-center-opposition/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/12/billion-dollar-data-center-paused/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/11/meta-data-center-howell-township/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/12/michigan-ai-data-center-protest/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/01/data-center-moratorium-northville/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/01/dte-agrees-saline-data-center-conditions/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/12/york-township-data-center-concerns/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/01/lyon-township-data-center-plan/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/03/lawmakers-propose-michigan-data-center-moratorium/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/03/gibraltar-data-center-moratorium/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/03/washington-township-delays-data-center-decision/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/03/detroit-data-center-moratorium/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/09/saline-denies-data-center/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/07/warren-data-center-moratorium-power-outages/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/12/saline-data-center-settlement-challenge/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/02/judge-denies-data-center-intervention/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/10/saline-hyperscale-data-center/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/02/saline-data-center-air-wetlands-permits/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/12/dte-data-center-contracts-approved/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/01/university-michigan-data-center-ypsilanti/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/06/university-michigan-data-center-concerns/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/02/los-alamos-nuclear-research-ypsilanti/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/04/ypsilanti-water-supply-data-centers/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/04/data-center-water-moratorium-ypsilanti/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2025/09/saline-township-data-center-lawsuit/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/01/dte-energy-data-center-contracts/)planetdetroit.org

[planetizen.com](https://www.planetizen.com/news/2026/05/137613-denver-bans-new-data-centers-one-year)planetizen.com

[www.planetizen.com](https://www.planetizen.com/news/2026/03/137049-iowa-county-passes-restrictive-data-center-ordinance)planetizen.com

[plattecountylandmark.com](https://plattecountylandmark.com/2025/10/29/data-center-project-should-be-restructured/)plattecountylandmark.com

[www.plymouthtownship.org](https://www.plymouthtownship.org/plymouth-township-receives-zoning-hearing-board-application-for-proposed-data-center/)plymouthtownship.org

[policymattersohio.org](https://policymattersohio.org/news/2026/01/07/amazon-data-center-proposal-a-bad-deal-for-wilmington/)policymattersohio.org

[www.portagemi.gov](https://www.portagemi.gov/m/newsflash/home/detail/1831)portagemi.gov

[portcitydaily.com](https://portcitydaily.com/latest-news/2026/02/27/leland-braces-for-ai-surge-with-strict-proposed-data-center-rules/)portcitydaily.com

[portcitydaily.com](https://portcitydaily.com/latest-news/2026/07/17/southport-pushes-for-data-center-moratorium-as-it-workshops-zoning-rules/)portcitydaily.com

[www.post-gazette.com](https://www.post-gazette.com/business/tech-news/2026/02/08/beaver-valley-data-centers-shippingport-aligned/stories/202602080033)post-gazette.com

[Spartanburg County Council directs data center moratorium (Post and Courier)](https://www.postandcourier.com/spartanburg/news/spartanburg-county-council-data-center-moratorium-northmark/article_ac402d07-de2f-4e55-9d28-b4dbcdb570e0.html)postandcourier.com

[Spartanburg County Council votes for data center moratorium (Post and Courier)](https://www.postandcourier.com/spartanburg/news/spartanburg-county-data-center-moratorium-vote/article_e0eba019-fc7a-45ef-bc5d-46cb02e56a3f.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/business/dorchester-google-data-center-foia-lawsuit-water-charleston/article_13536bb8-fe45-11ee-8e2c-ab63a46ae251.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/myrtle-beach/news/horry-county-data-centers-regulate/article_048033ab-67df-41df-b6da-71d98e4edd1c.html)postandcourier.com

[www.postandcourier.com](https://www.postandcourier.com/york-county/news/resident-concerns-york-county-qts-data-center/article_475e41a6-a73b-4288-a23d-2cdefd0bedec.html)postandcourier.com

[www.postandcourier.com](https://www.postandcourier.com/rising-waters/colleton-county-data-center-moratorium-council/article_69012926-1f61-4283-b0ec-786c5673158f.html)postandcourier.com

[www.postandcourier.com](https://www.postandcourier.com/columbia/news/orangeburg-data-center-moratorium-sc/article_947fef3f-b818-49b1-b9d9-e4cf1afa0e66.html)postandcourier.com

[postbulletin.com](https://www.postbulletin.com/news/local/flurry-of-filings-come-as-court-dates-draw-near-for-pine-island-data-center)postbulletin.com

[potomaclocal.com](https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/)potomaclocal.com

[www.potomaclocal.com](https://www.potomaclocal.com/2025/05/21/stafford-residents-push-back-on-data-centers-county-promises-stricter-rules/)potomaclocal.com

[www.potomaclocal.com](https://www.potomaclocal.com/2025/12/11/fredericksburg-planning-commission-rejects-1500-gateway-data-center-7-0/)potomaclocal.com

[www.pottsmerc.com](https://www.pottsmerc.com/2026/03/03/north-coventry-rejects-boutique-data-center-idea/)pottsmerc.com

[Mendocino County adopts temporary data center moratorium (The Press Democrat, Sept. 3, 2026)](https://www.pressdemocrat.com/2026/09/03/mendocino-county-adopts-temporary-data-center-moratorium/)pressdemocrat.com

[Brunswick passes data center moratorium (Portland Press Herald)](https://www.pressherald.com/2026/06/01/brunswick-passes-data-center-moratorium/)pressherald.com

[Scarborough Town Council imposes data center moratorium](https://www.pressherald.com/2026/06/03/scarborough-town-council-imposes-data-center-moratorium/)pressherald.com

[Westbrook City Council approves 180-day data center moratorium](https://www.pressherald.com/2026/06/01/westbrook-city-council-approves-180-day-data-center-moratorium/)pressherald.com

[pressherald.com](https://www.pressherald.com/2026/05/19/sanford-imposes-emergency-data-center-moratorium-halting-mousam-river-project/)pressherald.com

[www.pressherald.com](https://www.pressherald.com/2025/09/23/large-data-center-could-come-to-wiscasset/)pressherald.com

[www.pressherald.com](https://www.pressherald.com/2025/12/16/lewiston-votes-down-ai-data-center-project-after-public-outcry/)pressherald.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/localnews/planning-commission-denies-substation-for-data-centers-in-bristow/article_442f4d3b-2bea-42f5-ac48-af6167e1a709.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/news/breaking-judge-overturns-prince-william-digital-gateway/article_951d6362-1bbd-416f-89c5-ff322bf49fa8.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/localnews/supervisors-vote-to-spend-another-400k-to-defend-the-pw-digital-gateway/article_79abd8cb-bf32-5c46-8a7d-ba39bb676c57.html)princewilliamtimes.com

[princewilliamtimes.com](https://www.princewilliamtimes.com/localnews/county-staff-recommends-supervisors-deny-massive-dulles-innovation-south/article_c445ef25-61ed-4196-8dce-59a678ee43dd.html)princewilliamtimes.com

[progressive-charlestown.com](https://progressive-charlestown.com)progressive-charlestown.com

[projectjupitertogether.com](https://projectjupitertogether.com/)projectjupitertogether.com

[protectpaluxy.com](https://www.protectpaluxy.com/about/)protectpaluxy.com

[protectpaluxy.com](https://www.protectpaluxy.com/comanche-circle-data-center-opposition/)protectpaluxy.com

[protectpwc.org](https://protectpwc.org/2026/04/01/digital-gateway-lawsuit-appellate-court-decision-033126/)protectpwc.org

[protectpwc.org](https://protectpwc.org/2026/04/01/pwc-bocs-withdraw-from-the-digital-gateway-lawsuit/)protectpwc.org

[Public Radio East: Vote on proposed one-year data center moratorium in Beaufort County postponed](https://www.publicradioeast.org/2026-09-14/vote-on-proposed-one-year-data-center-moratorium-in-beaufort-county-postponed)publicradioeast.org

[www.publicradiotulsa.org](https://www.publicradiotulsa.org/local-regional/2025-10-07/indigenous-environmental-advocates-say-data-centers-risk-water-culture-and-informed-consent)publicradiotulsa.org

[pv-magazine-usa.com](https://pv-magazine-usa.com/2026/03/11/creekstone-energy-secures-13000-acre-lease-for-1-gw-solar-project-in-utah/)pv-magazine-usa.com

[www.qcnews.com](https://www.qcnews.com/news/u-s/north-carolina/kings-mountain/kings-mountain-leaders-pause-potential-data-center-projects-amid-community-concerns/)qcnews.com

[qtsdatacenters.com](https://qtsdatacenters.com/data-centers/york/)qtsdatacenters.com

[qz.com](https://qz.com/trump-doj-naacp-xai-clean-air-act-lawsuit-memphis-061726)qz.com

[racinecountyeye.com](https://racinecountyeye.com/2026/01/27/microsoft-site-plans-approved-data/)racinecountyeye.com

[Council Bluffs City Council rejects data center moratorium - Radio Iowa](https://www.radioiowa.com/2026/06/18/council-bluffs-city-council-rejects-data-center-moratorium/)radioiowa.com

[Radio Iowa: Northern Iowa county panel becomes latest to reject call for data center (September 10, 2026)](https://www.radioiowa.com/2026/09/10/northern-iowa-county-panel-becomes-latest-to-reject-call-for-data-center/)radioiowa.com

[radiomankato.com](https://radiomankato.com/mcea-sues-lakeville-and-north-mankato-over-data-center-proposals/)radiomankato.com

[rantnc.com](https://rantnc.com/2026/04/08/commissioners-hear-proposed-data-center-standards/)rantnc.com

[www.readingeagle.com](https://www.readingeagle.com/2026/03/03/north-coventry-rejects-boutique-data-center-idea/)readingeagle.com

[recorder.com](https://recorder.com/2025/09/12/shutesbury-data-center-moratorium/)recorder.com

[The Daily Reflector (APG): Commissioners approve two-year moratorium on data centers (August 7, 2026)](https://www.reflector.com/apgstate/commissioners-approve-two-year-moratorium-on-data-centers/article_d746111c-f601-5252-9055-22af0e2b292e.html)reflector.com

[www.registerherald.com](https://www.registerherald.com/2026/04/20/trustees-place-moratorium-on-data-centers/)registerherald.com

[www.related-digital.com](https://www.related-digital.com/news/openai-oracle-and-related-digital-announce-stargate-data-center-site-in-michigan)related-digital.com

[Loveland Reporter-Herald: Loveland suspends large-scale data center applications for a year](https://www.reporterherald.com/2026/09/16/loveland-data-center-moratorium-2/)reporterherald.com

[www.reporterherald.com](https://www.reporterherald.com/2026/01/26/larimer-county-eyes-30-day-moratorium-on-data-center-permits/)reporterherald.com

[www.republicanherald.com](https://www.republicanherald.com/2025/09/10/frackville-residents-ask-new-castle-twp-officials-to-block-data-center/)republicanherald.com

[Henderson City Council introduces moratorium on new data centers, Las Vegas Review-Journal](https://www.reviewjournal.com/local/henderson/henderson-city-council-introduces-moratorium-on-new-data-centers-3839299/)reviewjournal.com

[Switch proposal to add another data center to its Las Vegas headquarters moves forward, Las Vegas Review-Journal](https://www.reviewjournal.com/news/politics-and-government/clark-county/switchs-plan-to-add-another-data-center-to-las-vegas-hq-moves-forward-3839760/)reviewjournal.com

[reviewjournal.com](https://www.reviewjournal.com/news/environment/this-nevada-city-is-the-first-to-pause-new-data-centers-3824360/)reviewjournal.com

[rgp.org](https://rgp.org/regional-growth-partnership-and-jobsohio-welcome-meta-to-northwest-ohio-with-new-800-million-data-center-announcement/)rgp.org

[www.rgvbusinessjournal.com](https://www.rgvbusinessjournal.com/news/02/04/2026/harlingen-considers-a-temporary-ban-on-data-centers-heres-what-comes-next/)rgvbusinessjournal.com

[www.rgvbusinessjournal.com](https://www.rgvbusinessjournal.com/news/28/02/2026/harlingen-data-center-regulation-eneus-energy/)rgvbusinessjournal.com

[rhodeislandcurrent.com](https://rhodeislandcurrent.com/2026/04/13/as-smithfield-moves-to-ban-data-centers-smith-hill-is-still-debating-how-to-define-them/)rhodeislandcurrent.com

[www.richlandsource.com](https://www.richlandsource.com/2026/04/21/mansfield-mayor-says-city-will-no-longer-pursue-data-center-project/)richlandsource.com

[www.richlandsource.com](https://www.richlandsource.com/2026/04/24/all-3-richland-county-commissioners-declare-no-interest-in-data-center-development/)richlandsource.com

[richmondbizsense.com](https://richmondbizsense.com/2025/05/15/henrico-looks-to-limit-data-center-development-with-new-white-oak-overlay-district/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2026/02/27/henrico-denies-vested-rights-appeal-for-data-centers-at-darbytown-site/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2026/03/09/developer-appealing-permit-requirement-for-data-center-project-in-chesterfield/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2025/10/29/powhatan-supervisors-approve-60-acre-addition-to-planned-data-center-campus/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2025/10/16/powhatan-county-planning-commission-recommends-denial-of-60-acre-addition-to-planned-data-center-campus/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2026/02/19/following-goochlands-lead-new-kent-county-mulling-data-center-centric-tech-overlay-district/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2025/07/16/new-chesterfield-zoning-ordinance-endorsed-by-planning-commission/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2026/02/20/hanover-planning-commission-defers-vote-on-430-acre-data-center-project/)richmondbizsense.com

[richmondbizsense.com](https://richmondbizsense.com/2026/01/16/hanover-planning-commission-rejects-hhhunt-data-center-project-near-wyndham/)richmondbizsense.com

[www.rockdalenewtoncitizen.com](https://www.rockdalenewtoncitizen.com/news/social-circle-enacts-moratorium-on-data-centers/article_4b9299ba-d144-4af8-a695-57c4a6a99e23.html)rockdalenewtoncitizen.com

[www.rockdalenewtoncitizen.com](https://www.rockdalenewtoncitizen.com/news/newton-county-puts-moratorium-on-data-center-applications/article_9dec6ba2-6c6c-408f-afbd-d10a63f09add.html)rockdalenewtoncitizen.com

[www.rockrivercurrent.com](https://www.rockrivercurrent.com/2026/03/how-a-landfill-waste-to-energy-project-gave-way-to-a-rockford-data-center/)rockrivercurrent.com

[www.rockymounttelegram.com](https://www.rockymounttelegram.com/news/local/county-oks-amending-ordinance-to-allow-for-a-data-center-at-kingsboro-business-park/article_64e09f70-9b18-48fd-84a9-a6ec6dae950e.html)rockymounttelegram.com

[ROI-NJ: Bayonne becomes latest municipality to ban data centers (August 17, 2026)](https://www.roi-nj.com/2026/08/17/industry/energy-utilities/bayonne-becomes-latest-municipality-to-ban-data-centers/)roi-nj.com

[ROI-NJ: North Brunswick, East Brunswick, and Stafford Township ban data centers (August 25, 2026)](https://www.roi-nj.com/2026/08/25/industry/energy-utilities/north-brunswick-east-brunswick-and-stafford-township-ban-data-centers/)roi-nj.com

[Red Bank bans data centers, calls on state to pause construction (ROI-NJ)](https://www.roi-nj.com/2026/06/15/industry/energy-utilities/red-bank-council-votes-to-ban-data-centers-calls-on-state-to-pause-construction-of-facilities-in-other-towns/)roi-nj.com

[roi-nj.com](https://www.roi-nj.com/2026/05/20/tech/millville-bans-data-centers-rejecting-largest-proposed-facility-in-n-j/)roi-nj.com

[www.roi-nj.com](https://www.roi-nj.com/2026/07/20/politics/jersey-city-introduces-ordinance-to-ban-data-centers-on-industrial-land/)roi-nj.com

[www.roi-nj.com](https://www.roi-nj.com/2026/07/14/industry/energy-utilities/neptune-township-becomes-25th-n-j-municipality-to-ban-data-centers/)roi-nj.com

[roughdraftatlanta.com](https://roughdraftatlanta.com/2024/12/03/atlanta-data-center-proposal/)roughdraftatlanta.com

[roughdraftatlanta.com](https://roughdraftatlanta.com/2025/12/16/dekalb-county-data-center-pause/)roughdraftatlanta.com

[roughdraftatlanta.com](https://roughdraftatlanta.com/2026/01/28/data-center-regulation-dekalb-county/)roughdraftatlanta.com

[Las Vegas data center expansion approved as officials ponder need for future regulations, Route Fifty](https://www.route-fifty.com/infrastructure/2026/06/las-vegas-data-center-expansion-approved-officials-ponder-need-future-regulations/414270/)route-fifty.com

[rtoinsider.com](https://www.rtoinsider.com/87009-blm-oks-nv-energy-greenlink-west-line/)rtoinsider.com

[runonclimate.org](https://runonclimate.org/stories/a-very-bad-deal-how-local-organizing-halted-a-massive-data-center-development-for-nownbsp)runonclimate.org

[salinetownship.org](https://salinetownship.org/uploads/minutes/1761140618_August%205.pdf)salinetownship.org

[salinetownship.org](https://salinetownship.org/uploads/notices/QA%20Data%20Center%20Proposal.pdf)salinetownship.org

[www.salisburypost.com](https://www.salisburypost.com/2026/04/21/roco-passes-data-center-moratorium-over-100-residents-express-data-center-opposition/)salisburypost.com

[sandhills.news](https://sandhills.news/2026/01/06/lee-county-nc-fracking-and-data-center/)sandhills.news

[sandhills.news](https://sandhills.news/2026/04/21/harnett-moratorium-on-data-centers-public-hearing-scheduled/)sandhills.news

[sandhills.news](https://sandhills.news/2026/03/18/sanford-releases-faq-document-on-data-centers/)sandhills.news

[sanfordherald.com](https://www.sanfordherald.com/news/hearing-set-for-including-data-center-requirements-in-udo/article_0a1cc03e-61d3-5901-9789-b59938aee7f9.html)sanfordherald.com

[sanfordherald.com](https://www.sanfordherald.com/archives/sanford-approves-data-center-regulations/article_98338ccc-9aa9-57c4-9fb6-981168df96ea.html)sanfordherald.com

[www.sanfordherald.com](https://www.sanfordherald.com/news/lee-commissioners-adopt-data-center-regulations/article_18d8f60f-25b7-5391-8faa-f6419a63919b.html)sanfordherald.com

[www.sanfordherald.com](https://www.sanfordherald.com/archives/harnett-commissioners-approve-one-year-data-center-moratorium/article_17ded063-c0fe-548e-bab0-20cd6df6c922.html)sanfordherald.com

[San Jose Inside: Gilroy City Council Adopts Moratorium on New Data Centers](https://www.sanjoseinside.com/business/gilroy-city-council-adopts-moratorium-on-new-data-centers/)sanjoseinside.com

[Santa Fe County eyes yearlong data center moratorium (Santa Fe New Mexican)](https://www.santafenewmexican.com/news/local_news/santa-fe-county-eyes-yearlong-data-center-moratorium/article_12c46f96-6c21-42f7-9f3d-273c0efec0f8.html)santafenewmexican.com

[santafenewmexican.com](https://www.santafenewmexican.com/news/local_news/new-mexico-agency-rejects-project-jupiter-data-centers-applications-for-gas-pipeline-right-of-way/article_00f190f7-2328-4e2e-82c0-012651387638.html)santafenewmexican.com

[www.savepennsylvania.com](https://www.savepennsylvania.com/petitions)savepennsylvania.com

[www.saveportwashington.com](https://www.saveportwashington.com/the-project/)saveportwashington.com

[sbj.net](https://sbj.net)sbj.net

[www.sccommerce.com](https://www.sccommerce.com/news/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development-project)sccommerce.com

[scdailygazette.com](https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/)scdailygazette.com

[scdailygazette.com](https://scdailygazette.com/2025/12/23/who-will-pay-to-run-the-colleton-county-data-center/)scdailygazette.com

[scdailygazette.com](https://scdailygazette.com/2026/02/05/sc-legislators-denounce-lowcountry-data-center-while-mulling-regulations-for-the-industry/)scdailygazette.com

[sciotopost.com](https://www.sciotopost.com/south-bloomfield-mayor-launches-protect-pickaway-alliance-to-safeguard-rural-communities-and-local-control/)sciotopost.com

[www.sciotopost.com](https://www.sciotopost.com/proposed-152-acre-data-center-campus-in-commercial-point-borders-housing-development-in-pickaway-county/)sciotopost.com

[www.sciotopost.com](https://www.sciotopost.com/south-bloomfield-ashville-move-to-block-data-centers-as-pickaway-county-opposition-grows/)sciotopost.com

[www.sciotopost.com](https://www.sciotopost.com/ai-data-center-boom-vertiv-announces-49m-infrastructure-expansion-in-ironton/)sciotopost.com

[www.sciotopost.com](https://www.sciotopost.com/scioto-township-enacts-12-month-data-center-moratorium-amid-statewide-tech-surge/)sciotopost.com

[sciotovalleyguardian.com](https://sciotovalleyguardian.com/2026/03/20/piketon-set-to-become-ground-zero-for-new-energy-megasite/)sciotovalleyguardian.com

[sciotovalleyguardian.com](https://sciotovalleyguardian.com/2026/04/21/aep-ohio-proposes-50-mile-transmission-line-through-pike-jackson-and-gallia-counties-to-power-piketon-data-center/)sciotovalleyguardian.com

[sciotovalleyguardian.com](https://sciotovalleyguardian.com/2026/03/11/amazon-data-center-wants-to-run-158-generators-in-a-columbus-suburb-ohio-epa-is-taking-public-comments/)sciotovalleyguardian.com

[www.sdpb.org](https://www.sdpb.org/business-economics/2025-08-15/la-based-company-looking-to-build-data-center-in-sioux-falls)sdpb.org

[searchlightnm.org](https://searchlightnm.org/demonstrators-arrested-jobs-promised-at-rowdy-project-jupiter-meeting/)searchlightnm.org

[seehafernews.com](https://www.seehafernews.com/2026/05/08/sheboygan-common-council-sends-data-center-moratorium-to-plan-commission/)seehafernews.com

[www.seehafernews.com](https://www.seehafernews.com/2026/01/27/speakers-express-concern-to-mishicot-residents-about-proposed-ai-data-center/)seehafernews.com

[www.seehafernews.com](https://www.seehafernews.com/2026/03/31/county-commission-passes-data-center-moratorium-now-moves-to-county-board/)seehafernews.com

[selc.org](https://www.selc.org/press-release/mississippi-regulators-rubber-stamp-air-permit-for-xai-power-plant-ignoring-overwhelming-public-pushback/)selc.org

[selc.org](https://www.selc.org/press-release/groups-appeal-air-permit-for-xais-personal-power-plant-in-north-mississippi/)selc.org

[selc.org](https://www.selc.org/press-release/landowners-sue-colleton-county-over-data-center-ordinance/)selc.org

[selc.org](https://www.selc.org/press-release/bessemer-city-council-greenlights-controversial-data-center-rezoning/)selc.org

[selc.org](https://www.selc.org/press-release/civil-rights-group-sues-xai-for-illegal-pollution-from-data-center-power-plant/)selc.org

[www.selc.org](https://www.selc.org/press-release/community-groups-residents-file-lawsuit-over-stokes-county-data-center-rezoning/)selc.org

[Sentinel-Tribune: Middleton Twp. denies data center rezoning request (September 4, 2026)](https://www.sent-trib.com/2026/09/04/middleton-twp-denies-data-center-rezoning-request/)sent-trib.com

[www.sent-trib.com](https://www.sent-trib.com/2026/07/07/middleton-twp-oks-rezoning-request-county-planning-commission-recommends-rezoning-of-additional-39-acres/)sent-trib.com

[www.sgvtribune.com](https://www.sgvtribune.com/2026/03/05/monterey-park-approves-ballot-measure-to-prohibit-data-centers/)sgvtribune.com

[www.sgvtribune.com](https://www.sgvtribune.com/2026/02/27/could-puente-hills-mall-become-a-data-center-city-developer-are-discussing-it/)sgvtribune.com

[www.sgvtribune.com](https://www.sgvtribune.com/2026/01/28/a-city-of-industry-plan-for-a-massive-energy-storage-facility-takes-step-forward-amid-pushback-on-data-centers/)sgvtribune.com

[www.sgvtribune.com](https://www.sgvtribune.com/2026/03/12/in-el-monte-verbal-altercation-in-city-council-chambers-postpones-debate-on-data-centers-and-sanctuary-law/)sgvtribune.com

[www.sgvtribune.com](https://www.sgvtribune.com/2026/03/17/el-monte-city-council-set-to-meet-again-after-verbal-altercation-ended-last-meeting/)sgvtribune.com

[www.sgvtribune.com](https://www.sgvtribune.com/2026/03/19/data-center-moratorium-sanctuary-city-rules-pass-in-el-monte/)sgvtribune.com

[www.shawlocal.com](https://www.shawlocal.com/northwest-herald/news/2026/01/29/2-billion-data-center-proposal-in-barrington-hills-withdrawn/)shawlocal.com

[www.shawlocal.com](https://www.shawlocal.com/illinois-valley/2026/03/11/ottawa-city-council-establishes-six-month-moratorium-on-data-centers/)shawlocal.com

[www.shawlocal.com](https://www.shawlocal.com/kendall-county-now/2026/04/01/80-acre-data-center-near-caledonia-tabled-in-yorkville/)shawlocal.com

[www.shawlocal.com](https://www.shawlocal.com/the-herald-news/2026/04/22/plainfield-adopts-temporary-moratorium-on-data-centers/)shawlocal.com

[www.shelbycountyreporter.com](https://www.shelbycountyreporter.com/news/columbiana-places-restrictions-on-future-data-centers-a848fc15/)shelbycountyreporter.com

[shepherdexpress.com](https://shepherdexpress.com/news/features/the-struggle-against-hyperscale-data-centers-across-wisconsin/)shepherdexpress.com

[sherwood.news](https://sherwood.news/tech/hyperion/)sherwood.news

[showmeinstitute.org](https://showmeinstitute.org/article/energy/data-centers-subsidies-and-electricity-in-platte-county-and-across-missouri/)showmeinstitute.org

[shreveportbossieradvocate.com](https://www.shreveportbossieradvocate.com/business/a-growing-data-center-site-in-west-shreveport-needs-approval-of-mpc/article_8bb0dc98-970b-445b-a7c5-3c9f4bd239b7.html)shreveportbossieradvocate.com

[www.shreveportbossieradvocate.com](https://www.shreveportbossieradvocate.com/business/staack-and-aws-to-host-first-data-center-meeting-for-caddo-parish/article_7824f681-e203-475e-ab4b-71ab2835a5ad.html)shreveportbossieradvocate.com

[shutesbury.org](https://www.shutesbury.org/zoning-bylaw-maps-and-amendments)shutesbury.org

[sierraclub.org](https://www.sierraclub.org/san-gorgonio/box-springs/blog/2026/03/contesting-imperial-valley-data-center)sierraclub.org

[sierraclub.org](https://www.sierraclub.org/delaware/proposed-data-center-projects)sierraclub.org

[www.sierraclub.org](https://www.sierraclub.org/georgia/datacenters)sierraclub.org

[www.sierraclub.org](https://www.sierraclub.org/delaware/data-centers)sierraclub.org

[signalcleveland.org](https://signalcleveland.org/cleveland-rejects-data-center-permit-for-slavic-village/)signalcleveland.org

[signalohio.org](https://signalohio.org/ohio-data-center-boom-faces-political-resistence/)signalohio.org

[signalohio.org](https://signalohio.org/columbus-suburb-sues-to-block-amazon-data-centers-six-acre-array-of-228-fuel-cells-ohio/)signalohio.org

[silverstatechronicle.com](https://www.silverstatechronicle.com/article/801,greenlink-north-transmission-project-updates)silverstatechronicle.com

[siouxfalls.business](https://siouxfalls.business/hyperscale-data-center-gains-rezoning-vote-after-hours-of-opposing-testimony/)siouxfalls.business

[siouxfalls.business](https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/)siouxfalls.business

[www.siouxfallslive.com](https://www.siouxfallslive.com/news/sioux-falls/planned-data-center-sparks-outrage-in-downtown-sioux-falls)siouxfallslive.com

[sites.google.com](https://sites.google.com/view/savebrenmar/home)sites.google.com

[sjodaily.com](https://sjodaily.com/2026/04/24/champaign-county-board-places-yearlong-halt-on-large-data-centers-in-rural-areas/)sjodaily.com

[www.skagitcounty.net](https://www.skagitcounty.net/Departments/Home/press/060126.htm)skagitcounty.net

[Iron County bans approval of new data centers for 180 days](https://www.sltrib.com/news/2026/05/26/iron-county-bans-approval-new-data/)sltrib.com

[O'Leary data center still coming even after Box Elder moratorium (Salt Lake Tribune)](https://www.sltrib.com/news/2026/06/10/box-elder-county-consider/)sltrib.com

[sltrib.com](https://www.sltrib.com/news/2026/05/04/utah-data-center-final-vote-box/)sltrib.com

[sltrib.com](https://www.sltrib.com/news/politics/2026/05/06/utah-voters-file-referendum/)sltrib.com

[sltrib.com](https://www.sltrib.com/news/2026/06/04/box-elder-county-data-center/)sltrib.com

[sltrib.com](https://www.sltrib.com/news/2026/06/03/box-elder-data-center-opponents/)sltrib.com

[www.sltrib.com](https://www.sltrib.com/news/2026/07/10/grand-county-pauses-data-center/)sltrib.com

[www.smartcitiesdive.com](https://www.smartcitiesdive.com/news/data-centers-kansas-city-zoning-ordinance/811587/)smartcitiesdive.com

[smokymountainnews.com](https://smokymountainnews.com/news/item/41144-swain-public-hearing-brings-moratorium-support-data-center-opposition)smokymountainnews.com

[snjtoday.com](https://snjtoday.com/sign-petition-ask-governor-for-moratorium-on-data-centers/)snjtoday.com

[www.somdnews.com](https://www.somdnews.com/independent/news/local/charles-public-hearing-addresses-data-centers/article_107ec9cc-a8b3-493b-b9fe-14d09bd4c9e9.html)somdnews.com

[soundrivers.org](https://soundrivers.org/kingsboro-data-center-concerns-spark-big-turnout/)soundrivers.org

[sourcenm.com](https://sourcenm.com)sourcenm.com

[sourcenm.com](https://sourcenm.com/2026/03/31/nm-state-land-commissioner-rejects-application-for-gas-pipeline-to-power-project-jupiter-data-center/)sourcenm.com

[sourcenm.com](https://sourcenm.com/2026/09/17/new-mexico-supreme-court-rejects-2-project-jupiter-challenges-allows-permitting-process-to-resume/)sourcenm.com

[sourcenm.com](https://sourcenm.com/2026/03/04/texas-energy-company-seeks-federal-approval-for-pipeline-through-new-mexico-to-power-data-center/)sourcenm.com

[sourcenm.com](https://sourcenm.com/2026/05/13/new-mexico-county-officials-approve-process-to-consider-data-center-moratorium/)sourcenm.com

[Chester County Council approves first reading to pause future data center applications (SC Public Radio)](https://www.southcarolinapublicradio.org/sc-news/2026-06-18/chester-county-council-considers-temporary-pause-on-data-center-applications)southcarolinapublicradio.org

[southdakotasearchlight.com](https://southdakotasearchlight.com/2026/02/24/a-missing-senator-a-failed-search-and-two-dead-data-center-bills-the-south-dakota-senates-chaotic-day/)southdakotasearchlight.com

[southdakotasearchlight.com](https://southdakotasearchlight.com/2026/02/04/data-center-tax-break-proposal-fails-in-south-dakota-legislative-committee/)southdakotasearchlight.com

[southeastiowaunion.com](https://www.southeastiowaunion.com/mt-pleasant/news/henry-county-imposes-moratorium-to-draft-policy-on-data-centers/article_f77b58eb-7ee3-498c-a16d-4e220d9da36e.html)southeastiowaunion.com

[southerncoalition.org](https://southerncoalition.org/community-groups-residents-file-lawsuit-over-stokes-county-data-center-rezoning/)southerncoalition.org

[southernmarylandchronicle.com](https://southernmarylandchronicle.com)southernmarylandchronicle.com

[southernminn.com](https://www.southernminn.com/lonsdale_area_news_review/news/lonsdale-passes-1-year-moratorium-on-data-centers-we-need-to-do-this-right/article_97d6fa97-4659-4551-b2c6-a5e6e5fc47d9.html)southernminn.com

[southjersey.media](https://southjersey.media/moorestown-news/redevelopment-in-town/)southjersey.media

[southjersey.media](https://southjersey.media/williamstown-news/council-introduces-ordinance-banning-data-center-usage-from-redevelopment-plan/)southjersey.media

[www.southstrabane.com](https://www.southstrabane.com/home/news/data-center-update)southstrabane.com

[www.southstrabane.com](https://www.southstrabane.com/sites/g/files/vyhlif1236/f/uploads/sst-_draft_data_center_ordinance_2-4-26.pdf)southstrabane.com

[www.southwestledger.news](https://www.southwestledger.news/news/temporary-bans-data-centers-proposed-12-states-lawton-imposed-limits)southwestledger.news

[www.sovanow.com](https://www.sovanow.com/articles/data-center-debates/)sovanow.com

[www.sovanow.com](https://www.sovanow.com/articles/data-center-expansion-request-put-on-hold-until-january/)sovanow.com

[Brunswick, Scarborough enact data center moratoriums (Spectrum News Maine)](https://spectrumlocalnews.com/me/maine/news/2026/06/08/brunswick--scarborough-enact-data-center-moratoriums)spectrumlocalnews.com

[spectrumlocalnews.com](https://spectrumlocalnews.com/nc/charlotte/news/2026/02/26/microsoft-makes-plans-for-datacenter-in-north-carolina)spectrumlocalnews.com

[spectrumlocalnews.com](https://spectrumlocalnews.com)spectrumlocalnews.com

[spectrumlocalnews.com](https://spectrumlocalnews.com/tx/austin/news/2026/03/06/data-center-moratoriums)spectrumlocalnews.com

[spectrumlocalnews.com](https://spectrumlocalnews.com/mo/st-louis/news/2026/03/31/st-louis-festus-data-center-project-crg)spectrumlocalnews.com

[Shawano County recommends data center moratorium](https://spectrumnews1.com/wi/milwaukee/news/2026/06/03/wisconsin-data-center-shawano-county-moritorium)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/wi/milwaukee/news/2025/12/09/yorkville--backup-data-center--update)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/oh/dayton/news/2026/02/24/lordstown-ohio-data-center-lawsuit)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/wi/milwaukee/news/2026/01/13/data-center-withdraws-plans-to-build-in-brown-county-following-community-pushback-greenleaf-)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/wi/milwaukee/news/2026/02/01/madison-passes-temporary-data-center-moratorium)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/ky/louisville/news/2026/02/14/ai-database-hawesville)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/wi/milwaukee/news/2026/01/28/deforest--data-center--qts--village-board--rejection)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/ky/louisville/news/2026/02/22/mercer-county-residents-petition-against-data-center)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/wi/milwaukee/news/2025/10/20/port-washington-city-council-meetings)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/ky/lexington/news/2026/07/18/cave-city-residents-push-back-on-proposed-data-center-near-mammoth-cave)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/oh/columbus/news/2026/05/22/cleveland-data-center-moratorium)spectrumnews1.com

[spectrumnews1.com](https://spectrumnews1.com/oh/columbus/news/2026/05/21/grafton-data-center-development)spectrumnews1.com

[Spotlight Delaware: Harrington denies data center proposal despite a $1 million offer (August 19, 2026)](https://spotlightdelaware.org/2026/08/19/harrington-denies-data-center-proposal-despite-a-1-million-offer/)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org/2026/03/19/new-data-center-regulations-go-into-effect-but-not-for-del-city-proposal/)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org/2025/07/20/proposed-delaware-data-center-energy/)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org/2026/02/25/delaware-city-data-center-developer-appeals-its-coastal-zone-denial/)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org/2025/08/05/plans-for-de-data-center-submitted-starting-the-clock-on-the-controversial-proposal/)spotlightdelaware.org

[spotlightdelaware.org](https://spotlightdelaware.org/2026/02/04/delaware-city-data-center-faces-major-setback-after-environmental-denial/)spotlightdelaware.org

[www.spotlightpa.org](https://www.spotlightpa.org/news/2025/10/pennsylvania-data-centers-community-opposition-ai-development-environment/)spotlightpa.org

[www.spotlightpa.org](https://www.spotlightpa.org/news/2026/03/pennsylvania-data-centers-archbald-ai-evictions-environment/)spotlightpa.org

[Springfield considering 6-month moratorium on new data centers, Springfield News-Sun](https://www.springfieldnewssun.com/local/springfield-considering-6-month-moratorium-on-new-data-centers/article_b76c9ce1-5c85-52df-966d-98a08848711c.html)springfieldnewssun.com

[www.springfieldnewssun.com](https://www.springfieldnewssun.com/news/urbana-city-council-passes-12-month-moratorium-on-data-centers/KAKNRLK2Q5FQNBJ2VKTOPSTXDI/)springfieldnewssun.com

[www.springfieldnewssun.com](https://www.springfieldnewssun.com/local/springfield-passes-6-month-moratorium-on-data-centers/article_d9587a42-4cb0-5262-a191-c5dee6a6bfc1.html)springfieldnewssun.com

[Springhill Township: Special Meetings on Ordinances to be held on September 3, 2026 (Ordinance No. 2026-6)](https://www.springhilltownshippa.org/post/special-meetings-on-ordinances-to-be-held-on-september-3-2026-at-6-00-pm)springhilltownshippa.org

[springtownepigraph.com](https://www.springtownepigraph.com/article/1548,parker-county-approves-resolution-opposing-data-centers)springtownepigraph.com

[www.springtownepigraph.com](https://www.springtownepigraph.com/article/1488,no-action-regarding-proposed-data-center)springtownepigraph.com

[Clearfield City Council passes data center moratorium in wake of 'grandiose scale of Stratos' (Standard-Examiner, Sept. 9, 2026)](https://www.standard.net/news/local/2026/sep/09/clearfield-city-council-passes-data-center-moratorium-in-wake-of-grandiose-scale-of-stratos/)standard.net

[www.standardjournal.com](https://www.standardjournal.com/news/local/article_montour-county-zoning-amendment-data-center-april-2026.html)standardjournal.com

[standardspeaker.com](https://www.standardspeaker.com/2026/02/04/claim-hollenback-twp-rural-landowners-offered-175k-per-acre-for-data-center-takeover/)standardspeaker.com

[standardspeaker.com](https://www.standardspeaker.com/2026/02/14/family-feud-data-center-proposal-divisive-in-hollenback-twp-pitting-preservation-vs-generational-wealth/)standardspeaker.com

[standardspeaker.com](https://www.standardspeaker.com/2026/02/08/proposed-hollenback-twp-zoning-ordinance-allows-for-data-centers-with-conditions/)standardspeaker.com

[www.standardspeaker.com](https://www.standardspeaker.com/2025/08/17/dorrance-twp-supervisors-look-at-blocking-data-centers-2/)standardspeaker.com

[www.star-telegram.com](https://www.star-telegram.com/news/local/article315770666.html)star-telegram.com

[star1025fm.com](https://star1025fm.com/sanford-nc-data-center-rules-udo/)star1025fm.com

[starbeacon.com](https://starbeacon.com)starbeacon.com

[startribune.com](https://www.startribune.com/farmington-data-center-tract/601173097)startribune.com

[startribune.com](https://www.startribune.com/farmington-mayor-resign-data-center/601577290)startribune.com

[startribune.com](https://www.startribune.com/data-center-moratorium-lawsuit-eagan-minnesota/601865008)startribune.com

[startribune.com](https://www.startribune.com/minneapolis-data-centers-moratorium/601846955)startribune.com

[www.startribune.com](https://www.startribune.com/southwest-minnesota-board-says-no-to-proposed-4-billion-data-center-complex/601786193)startribune.com

[stateline.org](https://stateline.org/2026/03/06/temporarily-banning-data-centers-draws-more-interest-from-state-local-officials/)stateline.org

[www.statenews.org](https://www.statenews.org/section/the-ohio-newsroom/2026-02-26/ohio-towns-are-pushing-back-against-data-centers-to-varying-degrees-of-success)statenews.org

[statesboroherald.com](https://www.statesboroherald.com/local/commissioners-extend-both-moratoriums-step-toward-outright-ban-on-data-centers/)statesboroherald.com

[www.stlmag.com](https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/)stlmag.com

[www.stlmag.com](https://www.stlmag.com/business/rural-missouri-data-center-battleground/)stlmag.com

[www.stlmag.com](https://www.stlmag.com/business/shaw-nature-reserve-data-center/)stlmag.com

[stlpr.org](https://www.stlpr.org/economy-business/2025-12-19/montgomery-county-commission-approves-amazon-data-center-tax-incentive-framework)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2026-02-27/festus-leaders-next-step-approving-proposed-data-center)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2025-11-13/developer-eyes-festus-site-new-data-center-development)stlpr.org

[stlpr.org](https://www.stlpr.org/economy-business/2025-09-08/documents-link-secretive-st-charles-data-center-google)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2026-03-31/festus-data-center-development-approval)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2026-04-08/6b-data-center-festus-voters-oust-every-incumbent-council-member)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2026-04-10/data-center-opposition-group-sues-city-festus-proposed-developer)stlpr.org

[stlpr.org](https://www.stlpr.org/government-politics-issues/2026-04-17/festus-council-member-steps-down-data-center-backlash)stlpr.org

[www.stlpr.org](https://www.stlpr.org/government-politics-issues/2026-03-31/st-louis-mayor-cara-spencer-armory-data-center-zoning)stlpr.org

[www.stlpr.org](https://www.stlpr.org/government-politics-issues/2026-04-21/data-center-project-near-armory-final-approval-st-louis)stlpr.org

[www.stlpr.org](https://www.stlpr.org/government-politics-issues/2026-02-22/edwardsville-data-center-city-emails-cloverleaf)stlpr.org

[www.stlpr.org](https://www.stlpr.org/government-politics-issues/2026-07-14/st-charles-county-officials-approve-half-year-ban-on-data-center-projects-alter-senior-tax-freeze)stlpr.org

[stltoday.com](https://www.stltoday.com/news/local/crime-courts/article_40c7f648-9c2a-428f-b1d0-c0485ef3ce62.html)stltoday.com

[www.stltoday.com](https://www.stltoday.com/news/local/business/article_5c90e5b8-234e-4059-ab35-e7bedb3aafb3.html)stltoday.com

[stopprojectspero.com](https://stopprojectspero.com/)stopprojectspero.com

[stopsail.com](https://stopsail.com/)stopsail.com

[stopsalinedatacenter.org](https://www.stopsalinedatacenter.org/legal/Blog%20Post%20Title%20One-3zaa9-zlxng-67tfc-8aja7)stopsalinedatacenter.org

[stopsolontownshipdatacenter.com](https://stopsolontownshipdatacenter.com/)stopsolontownshipdatacenter.com

[stopstratos.org](https://www.stopstratos.org/post/press-release-referendum-denied)stopstratos.org

[stopthehermantowndatacenter.org](https://stopthehermantowndatacenter.org/)stopthehermantowndatacenter.org

[stopwtdatacenter.org](https://stopwtdatacenter.org/)stopwtdatacenter.org

[streets.mn](https://streets.mn/2025/11/07/deep-dive-the-farmington-push-for-responsible-hyper-scale-data-centers/)streets.mn

[strongtownscharco.substack.com](https://strongtownscharco.substack.com/p/reject-zta-25-187-data-centers-we)strongtownscharco.substack.com

[suburbanrealtorsalliance.com](https://suburbanrealtorsalliance.com)suburbanrealtorsalliance.com

[www.suburbanrealtorsalliance.com](https://www.suburbanrealtorsalliance.com/news/2026/05/08/montgomery-county/conshohocken-area-data-center-plans-resubmitted-in-plymouth-township/)suburbanrealtorsalliance.com

[www.sunews.net](https://www.sunews.net/post/utah-s-data-center-boom-brings-big-promises-and-big-questions-for-rural-counties)sunews.net

[sungazette.com](https://www.sungazette.com/news/top-news/2026/05/pine-creek-township-to-consider-ordinance-amendment-to-address-data-centers/)sungazette.com

[www.supertalk929.com](https://www.supertalk929.com/2025/06/06/one-year-moratorium-in-johnson-city-for-data-centers/)supertalk929.com

[www.supertalk929.com](https://www.supertalk929.com/2026/03/24/washington-county-tn-approves-1-year-moratorium-on-data-centers/)supertalk929.com

[sustainablefingerlakes.org](https://sustainablefingerlakes.org/2026/03/13/seneca-county-board-of-supervisors-to-dec-reject-terawulfs-modified-permit-request/)sustainablefingerlakes.org

[www.svvoice.com](https://www.svvoice.com/planning-commission-blocks-data-center-project/)svvoice.com

[City of Tallmadge: Council Meeting Minutes, April 13, 2026](https://www.tallmadgeoh.gov/AgendaCenter/ViewFile/Minutes/_04132026-1451)tallmadgeoh.gov

[tamacounty.iowa.gov](https://tamacounty.iowa.gov/files/meetings/2025-11-17_minutes_7402.pdf)tamacounty.iowa.gov

[www.tamatoledonews.com](https://www.tamatoledonews.com/news/local-news/2025/11/21/fixing-typos-this-weeks-tama-county-supervisors-meeting/)tamatoledonews.com

[tampabay.com](https://www.tampabay.com/news/florida-politics/2026/04/16/florida-data-center-fort-meade-desantis-utilities-water-ai/)tampabay.com

[www.tampabay.com](https://www.tampabay.com/news/business/2026/02/26/florida-data-center-desantis-amazon-meta-ai-chatgpt-citrus-polk/)tampabay.com

[tampabay28.com](https://www.tampabay28.com/news/region-polk/fort-meade-commissioners-hear-more-public-concerns-over-proposed-data-center)tampabay28.com

[Asbury Park Calls for Statewide Halt on New Data Center Construction - TAPinto](https://www.tapinto.net/towns/asbury-park/sections/government/articles/asbury-park-calls-for-statewide-halt-on-new-data-center-construction)tapinto.net

[tapinto.net](https://www.tapinto.net/towns/roselle-park/articles/roselle-park-moves-to-ban-data-centers-seeks-answers-on-kenilworth-project)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/phillipsburg/sections/government/articles/phillipsburg-to-vote-to-ban-data-centers-citing-major-energy-and-water-demands)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/phillipsburg/articles/phillipsburg-council-votes-unanimously-to-shut-the-door-on-data-centers)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/east-windsor-hightstown/sections/government/articles/east-windsor-council-votes-down-redevelopment-plan-after-rambunctious-residents-raise-questions-about-data-center-component)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/east-windsor-hightstown/sections/government/articles/a-packed-planning-board-hearing-debated-the-future-of-an-east-windsor-data-center-expansion)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/east-windsor-hightstown/sections/business-and-finance/articles/economic-boost-or-energy-zapper-the-data-center-discussion-comes-to-east-windsor)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/east-windsor-hightstown/sections/government/articles/east-windsor-council-postpones-votes-on-redevelopment-plans-involving-potential-data-center-light-manufacturing)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/phillipsburg/articles/commissioner-kern-shares-model-ordinance-to-assist-municipalities-in-evaluating-data-center-siting)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/phillipsburg/categories/press-releases/articles/commissioner-kern-shares-model-ordinance-to-assist-municipalities-in-evaluating-data-center-siting)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/phillipsburg/sections/government/articles/phillipsburg-council-votes-unanimously-to-shut-the-door-on-data-centers)tapinto.net

[www.tapinto.net](https://www.tapinto.net/towns/phillipsburg/sections/government/articles/digital-deserts-why-pburg-is-saying-no-to-data-centers)tapinto.net

[taylortx.gov](https://taylortx.gov/1293/Blueprint-Projects-Data-Center)taylortx.gov

[telegraphherald.com](https://www.telegraphherald.com/news/tri-state/article_42dd2f99-3897-40ad-94f3-c5497f60fcc7.html)telegraphherald.com

[www.telegraphherald.com](https://www.telegraphherald.com/news/tri-state/article_efb5a5f4-c946-11ef-bf6a-8f5650901c78.html)telegraphherald.com

[Tennessee officials put data center plans on ice (Tennessee Lookout)](https://tennesseelookout.com/2026/06/15/local-tennessee-officials-are-putting-data-center-plans-on-ice-to-consider-regulations/)tennesseelookout.com

[tennesseelookout.com](https://tennesseelookout.com/2026/07/30/east-tennessee-cities-are-gearing-up-to-fight-data-center/)tennesseelookout.com

[www.texasmonthly.com](https://www.texasmonthly.com/news-politics/abilene-stargate-artificial-intelligence/)texasmonthly.com

[www.texasobserver.org](https://www.texasobserver.org/crypto-energy-grid-texas-bitcoin-water/)texasobserver.org

[www.texasobserver.org](https://www.texasobserver.org/abilene-texas-stargate-natural-gas-plant-harms/)texasobserver.org

[texastribune.org](https://texastribune.org)texastribune.org

[texastribune.org](https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/)texastribune.org

[texastribune.org](https://www.texastribune.org/2025/06/05/texas-data-centers-gas-power-plants-ai/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/05/12/texas-hill-county-approves-data-center-construction-pause-ai/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/)texastribune.org

[www.texastribune.org](https://www.texastribune.org/2026/01/26/texas-el-paso-meta-data-center-natural-gas-power-plant/)texastribune.org

[www.texastribune.org](https://www.texastribune.org/2026/02/13/texas-data-centers-local-governments-power/)texastribune.org

[www.texastribune.org](https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/)texastribune.org

[theaugustapress.com](https://theaugustapress.com/columbia-county-observer-investigates-the-proposed-data-center/)theaugustapress.com

[theaugustapress.com](https://theaugustapress.com/harlem-citizen-follows-legal-action-over-quarry-with-two-more-lawsuits-about-columbia-county-data-center-projects/)theaugustapress.com

[theaugustapress.com](https://theaugustapress.com/augusta-moves-toward-data-center-moratorium/)theaugustapress.com

[theaugustapress.com](https://theaugustapress.com/augusta-approves-data-center-moratorium-2b-project-marches-on/)theaugustapress.com

[thebanner.com](https://www.thebanner.com/community/local-news/harford-county-data-center-ban-EXHKIBRN35AO3IHMMVITZLI7KI/)thebanner.com

[thebanner.com](https://www.thebanner.com/politics-power/local-government/data-center-moratorium-ban-energy-water-defense-P2VUK3R45VH6XP5XY4AYFXXM3M/)thebanner.com

[www.thebanner.com](https://www.thebanner.com/economy/growth-development/montgomery-county-data-centers-elrich-moratorium-regulations-GIJORCK4OJHZ7P3QCWFDB75HLE/)thebanner.com

[www.thebanner.com](https://www.thebanner.com/economy/growth-development/baltimore-county-data-center-moratorium-EVIJFJDL5VGCDNC22K52NQBMGI/)thebanner.com

[Reno City Council will consider moratorium](https://thebarberbrief.substack.com/p/reno-city-council-will-consider-a)thebarberbrief.substack.com

[www.thebarbertongazette.com](https://www.thebarbertongazette.com/2025/10/17/norton-data-center-proposal-withdrawn/)thebarbertongazette.com

[thebaynet.com](https://thebaynet.com/charles-county-planning-commission-votes-to-deny-data-center-zoning-amendment/)thebaynet.com

[thebaynet.com](https://thebaynet.com/planning-commission-delays-action-on-data-center-zoning-in-charles-county/)thebaynet.com

[thebaynet.com](https://thebaynet.com/maryland-groups-join-forces-upcoming-data-center-decisions/)thebaynet.com

[thebaynet.com](https://thebaynet.com/calvert-county-strikes-down-data-center-moratorium-in-2-3-vote/)thebaynet.com

[Jackson County legislators mull data center moratorium (The Beacon)](https://thebeaconnews.org/stories/2026/06/08/jackson-county-legislators-mull-data-center-moratorium/)thebeaconnews.org

[thebeaconnews.org](https://thebeaconnews.org/stories/2026/02/27/independence-tax-abatement-ai-data-center/)thebeaconnews.org

[thecentersquare.com](https://www.thecentersquare.com/michigan/article_bb893282-cfcc-442b-8471-be2256a61905.html)thecentersquare.com

[www.thecentersquare.com](https://www.thecentersquare.com/louisiana/article_9b293a27-28ee-49c8-b9b6-86cccb79f3b4.html)thecentersquare.com

[www.thecentersquare.com](https://www.thecentersquare.com/illinois/article_05a303b2-1a7c-430a-ab7f-8a7c9ed27437.html)thecentersquare.com

[www.thecentersquare.com](https://www.thecentersquare.com/wisconsin/article_10bed70d-6f44-4941-95d7-814e1aa68b9e.html)thecentersquare.com

[thecitizen.com](https://thecitizen.com/2026/01/28/fayetteville-planning-commission-denies-data-center/)thecitizen.com

[thecitizen.com](https://thecitizen.com/2026/03/16/data-center-decision-comes-thursday-for-fayetteville-council/)thecitizen.com

[thecitizen.com](https://thecitizen.com/2026/03/19/data-center-appeal-withdrawn-in-fayetteville-the-power-of-the-people/)thecitizen.com

[thecooldown.com](https://www.thecooldown.com/green-tech/data-center-moratorium-lee-county-extension/)thecooldown.com

[thecooldown.com](https://www.thecooldown.com/green-business/painesville-township-ohio-data-center/)thecooldown.com

[www.thecooldown.com](https://www.thecooldown.com/green-business/amazon-data-centers-jerome-township-ohio-community-freeze/)thecooldown.com

[www.thecooldown.com](https://www.thecooldown.com/green-business/greenleaf-wisconsin-residents-oppose-data-center/)thecooldown.com

[www.thecooldown.com](https://www.thecooldown.com/green-business/new-brunswick-nj-ai-data-center-defeated/)thecooldown.com

[www.thecooldown.com](https://www.thecooldown.com/green-business/virginia-planning-commission-denies-gigaland-data-center/)thecooldown.com

[www.thecooldown.com](https://www.thecooldown.com/green-business/massillon-data-centers-zoning-vote-august/)thecooldown.com

[thecr.com](https://www.thecr.com/news/rules-approved-for-data-centers-and-battery-storage/article_d1e08843-27f1-4d1a-8ef3-742607be0bad.html)thecr.com

[thecurrentga.org](https://thecurrentga.org/2024/06/01/cryptocurrency-mining-stirs-concerns-across-rural-georgia/)thecurrentga.org

[thecurrentga.org](https://thecurrentga.org/2026/04/03/georgia-lawmakers-failure-to-act-on-data-center-concerns-draws-community-ire/)thecurrentga.org

[thecurrentga.org](https://thecurrentga.org/2026/04/15/glynn-county-to-vote-on-zoning-residents-ask-to-delay-data-center-rule/)thecurrentga.org

[thedailynewsonline.com](https://www.thedailynewsonline.com/news/tonawanda-seneca-nation-sierra-club-sue-to-block-stamp-development/article_21afefcb-6318-4bf3-adf8-6f45dcdeabce.html)thedailynewsonline.com

[thedailyrecord.com](https://thedailyrecord.com)thedailyrecord.com

[thedailystar.com](https://www.thedailystar.com/news/local_news/oneonta-town-board-sets-public-hearing-on-data-center-moratorium/article_369cff18-b2d9-465e-ac44-211dd075f1b8.html)thedailystar.com

[theday.com](https://www.theday.com/local-news/20240109/siting-council-deals-initial-blow-to-waterford-data-center-project/)theday.com

[Brawley council approves moratorium on data center](https://www.thedesertreview.com/business/brawley-council-approves-moratorium-on-data-center/article_702beb39-c98b-4e10-8024-c0eb5466ad19.html)thedesertreview.com

[thedesertreview.com](https://www.thedesertreview.com/business/city-of-imperial-prepares-for-upcoming-data-center-court-case/article_1ee31a32-f2fa-4375-a3b4-7fc325f7bb80.html)thedesertreview.com

[thedesertreview.com](https://www.thedesertreview.com/news/county-data-center-developer-file-motion-to-dismiss-imperial-lawsuit/article_ed141397-5555-45a7-955a-50a9aaffbad1.html)thedesertreview.com

[thedesertreview.com](https://www.thedesertreview.com/news/local/sierra-club-seeks-to-join-lawsuit-challenging-imperial-county-data-center-approval/article_af478516-f23e-4fe9-945d-2374a79e9d72.html)thedesertreview.com

[thefacts.com](https://thefacts.com/news/brazoria-county-rejects-tax-abatement-package-for-data-center/article_132f70fc-473b-4ab2-bcb0-bb11b8b16fae.html)thefacts.com

[www.thefencepost.com](https://www.thefencepost.com/news/growing-microprocessors-instead-of-wheat)thefencepost.com

[thegazette.com](https://www.thegazette.com/data_centers/across_america/montana-data-center-concerns-dominate-custer-county-zoning-hearing/article_89a6f06a-e37b-55b5-a6b3-073549bdb619.html)thegazette.com

[thegazette.com](https://www.thegazette.com/local-government/linn-county-residents-air-concerns-on-proposed-data-center-ordinance/)thegazette.com

[www.thegazette.com](https://www.thegazette.com/local-government/johnson-county-board-of-supervisors-to-consider-data-center-moratorium/)thegazette.com

[www.thegazette.com](https://www.thegazette.com/local-government/johnson-county-looks-toward-future-beyond-data-center-moratorium/)thegazette.com

[thehill.com](https://thehill.com/policy/technology/5910463-kevin-oleary-utah-data-center/)thehill.com

[thelensnola.org](https://thelensnola.org/2025/09/25/data-centers-spark-fears-of-a-digital-cancer-alley-in-louisiana/)thelensnola.org

[thelensnola.org](https://thelensnola.org/2026/01/29/meta-datacenter-louisiana-corruption-water-power-utilities/)thelensnola.org

[thelocallens.org](https://thelocallens.org/monroe-town-council-considers-moratorium-on-ai-data-centers-amid-growing-community-concerns/)thelocallens.org

[thelynchburgtimes.com](https://thelynchburgtimes.com/what-happens-next-with-moore-countys-proposed-ai-moratorium/)thelynchburgtimes.com

[thelynchburgtimes.com](https://thelynchburgtimes.com/planning-commission-recap-ai-010625/)thelynchburgtimes.com

[themanchestermirror.com](https://themanchestermirror.com/2026/02/09/data-center-moratoriums-pile-up-in-michigan-no-one-knows-if-theyll-work/)themanchestermirror.com

[themanchestermirror.com](https://themanchestermirror.com/2026/01/05/regulators-approve-dte-contracts-for-saline-township-data-center/)themanchestermirror.com

[themercury.com](https://themercury.com)themercury.com

[themesatribune.com](https://www.themesatribune.com/news/big-data-center-in-se-mesa-passes-first-review/article_91081b9b-d2d1-47f6-91d2-b600115e4a55.html)themesatribune.com

[www.themesatribune.com](https://www.themesatribune.com/news/despite-opposition-mesa-board-oks-big-data-center/article_1ef491b0-4b8c-11ef-8b1a-cb99887dca3d.html)themesatribune.com

[www.themidwesterner.news](https://www.themidwesterner.news/2025/11/were-gonna-fight-like-hell-local-opposition-kills-hyperscale-data-center-in-kalkaska/)themidwesterner.news

[theminermag.com](https://theminermag.com/news/2024-10-11/thorndale-bitcoin-mine-oppose)theminermag.com

[themissouritimes.com](https://themissouritimes.com/aws-responds-to-montgomery-county-commission-with-detailed-water-use-commitments/)themissouritimes.com

[themissouritimes.com](https://themissouritimes.com/twmp-column-montgomery-countys-data-center-debate-boils-down-to-water/)themissouritimes.com

[Henderson considers data center pause amid construction boom across Clark County, The Nevada Independent](https://thenevadaindependent.com/article/henderson-considers-data-center-pause-amid-construction-boom-across-clark-county)thenevadaindependent.com

[thenevadaindependent.com](https://thenevadaindependent.com/article/massive-4-2b-nv-energy-transmission-line-gets-federal-ok)thenevadaindependent.com

[thenextweb.com](https://thenextweb.com/news/xai-59-unpermitted-gas-turbines-memphis-southaven)thenextweb.com

[www.theohioregister.com](https://www.theohioregister.com/findlay-city-council-passes-data-center-moratorium/)theohioregister.com

[Palm Springs joins other valley cities in temporary ban on data centers (The Palm Springs Post)](https://thepalmspringspost.com/palm-springs-joins-other-valley-cities-in-temporary-ban-on-data-centers/)thepalmspringspost.com

[theportager.com](https://theportager.com/ravenna-city-council-rushes-to-block-potential-data-center-proposal)theportager.com

[therealdeal.com](https://therealdeal.com/chicago/2026/01/22/naperville-kills-karis-data-center-after-resident-revolt/)therealdeal.com

[therealdeal.com](https://therealdeal.com/chicago/2026/01/27/brennans-2b-barrington-hills-data-center-scrapped/)therealdeal.com

[therealdeal.com](https://therealdeal.com/texas/2026/03/13/brazoria-county-rejects-tax-break-for-3-5b-data-center/)therealdeal.com

[therealdeal.com](https://therealdeal.com/chicago/2025/03/24/rural-illinois-embraces-resource-sapping-data-centers/)therealdeal.com

[therealdeal.com](https://therealdeal.com/texas/2026/04/02/fort-worth-delays-tax-incentives-for-1b-plus-data-center/)therealdeal.com

[therealdeal.com](https://therealdeal.com/national/phoenix/2024/05/02/tract-drops-14b-plan-to-build-data-centers-outside-phoenix/)therealdeal.com

[therealdeal.com](https://therealdeal.com/texas/austin/2026/02/26/hays-county-backs-off-data-center-pause/)therealdeal.com

[therealwv.com](https://therealwv.com/2026/02/06/monroe-county-commission-denies-data-center-discussions/)therealwv.com

[www.theregister.com](https://www.theregister.com/2026/03/18/ohio_datacenter_petition/)theregister.com

[www.thereporteronline.com](https://www.thereporteronline.com/2026/02/23/west-rockhill-supervisors-advance-data-center-regulations/)thereporteronline.com

[www.thereportingproject.org](https://www.thereportingproject.org/hearing-on-proposed-data-center-ban-in-st-albans-township-will-be-on-march-17-in-alexandria/)thereportingproject.org

[thesalinepost.com](https://thesalinepost.com/g/saline-mi/n/349655/pittsfield-township-considers-moratorium-approval-data-centers)thesalinepost.com

[thesalinepost.com](https://thesalinepost.com/g/saline-mi/n/362588/saline-township-reverses-decision-rezone-land-data-center-project-goes-forward)thesalinepost.com

[thesuntimesnews.com](https://thesuntimesnews.com/sylvan-township-decides-on-data-center-moratorium-and-new-computers/)thesuntimesnews.com

[thesuntimesnews.com](https://thesuntimesnews.com/saline-township-board-denies-rezoning-request-for-data-center/)thesuntimesnews.com

[thesuntimesnews.com](https://thesuntimesnews.com/saline-twp-rescinds-industrial-zoning-ends-data-center-referendum-path/)thesuntimesnews.com

[thesuntimesnews.com](https://thesuntimesnews.com/saline-township-sued-data-center-zoning/)thesuntimesnews.com

[thesuntimesnews.com](https://thesuntimesnews.com/ypsilanti-township-seeks-utility-pause-for-data-centers/)thesuntimesnews.com

[thesuntimesnews.com](https://thesuntimesnews.com/saline-twp-resident-appeals-denial-of-her-suit-to-intervene/)thesuntimesnews.com

[thesuntimesnews.com](https://thesuntimesnews.com/saline-township-delays-vote-on-oracle-data-center-tax-break/)thesuntimesnews.com

[www.thetelegramnews.com](https://www.thetelegramnews.com/articles/scioto-township-residents-concerned-about-potential-data-center/)thetelegramnews.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/01/18/wildcat-ridge-data-center-in-archbald-to-use-huge-amounts-of-power-water/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/27/data-centers-join-archbald-to-defend-zoning-against-residents-appeal/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/12/data-centers-are-coming-developer-addresses-archbald-at-public-hearing/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/03/11/wildcat-ridge-data-center-campus-faces-major-opposition-in-archbald/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/03/judge-tosses-settlement-between-clifton-twp-data-center-developer/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2025/07/10/developer-looks-to-build-30-plus-data-centers-in-north-pocono/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/27/scranton-materials-appeals-ransom-twp-denial-of-data-center-zoning-change/)thetimes-tribune.com

[thetimes-tribune.com](https://www.thetimes-tribune.com/2026/01/16/dozens-turn-out-to-oppose-proposed-ransom-twp-data-center/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2025/08/13/blakely-data-center-meeting-draws-large-crowd-opposition/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2025/09/12/data-center-project-withdrawn-in-blakely-days-ahead-of-zoning-hearing/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2025/11/18/blakely-applies-more-than-30-restrictions-to-data-centers/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/25/local-lawmakers-target-data-centers-back-moratoriums/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/17/gaughan-urges-three-year-state-moratorium-on-data-center-development/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2026/02/13/dickson-city-adopts-data-center-regulations-halts-bell-mountain-campus/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2025/12/12/data-center-developer-tied-to-projects-in-archbald-blakely-moves-to-dickson-city/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2026/03/08/olyphant-archbald-to-hold-hearings-on-data-centers/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2026/01/02/olyphant-prepares-data-center-legislation/)thetimes-tribune.com

[www.thetimes-tribune.com](https://www.thetimes-tribune.com/2026/03/09/scranton-to-amend-zoning-to-regulate-data-centers/)thetimes-tribune.com

[McMinnville board unanimously approves moratorium](https://theucnow.com/2026/06/03/mcminnville-board-unanimously-approves-center-moratorium/)theucnow.com

[theurbanist.org](https://www.theurbanist.org/seattle-advances-data-center-moratorium-amid-public-backlash/)theurbanist.org

[thevwindependent.com](https://thevwindependent.com/news/2026/05/11/council-unanimously-approves-data-center-legislation/)thevwindependent.com

[Washington Daily News: Residents weigh in on proposed one year moratorium on data centers](https://www.thewashingtondailynews.com/news/you-cant-drink-dataresidents-weigh-in-on-proposed-one-year-moratorium-on-data-centers-c645c6af)thewashingtondailynews.com

[The Westerly Sun: Town council passes one-year moratorium on data centers (July 30, 2026)](https://www.thewesterlysun.com/daily-news-alerts/town-council-passes-one-year-moratorium-on-data-centers/article_db53e249-5410-424f-a7fe-e080b2b423cc.html)thewesterlysun.com

[www.thewestervillenews.com](https://www.thewestervillenews.com/p/central-ohio-weekly-news-brief-june-3b1)thewestervillenews.com

[thexradio.com](https://thexradio.com)thexradio.com

[Reno City Council to consider data center moratorium](https://thisisreno.com/2026/05/reno-city-council-data-center-moratorium-2/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2025/01/effort-to-block-reno-data-center-offers-glimpse-of-increasingly-thorny-issue-in-nevada/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2024/12/former-city-manager-returns-pushing-data-center/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2025/01/city-council-denies-north-valleys-data-center-appeal-after-multiple-messy-meetings/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2025/02/reno-planning-commission-data-center-moratorium/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2025/02/reno-city-council-data-center-moratorium/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2025/05/reno-city-council-approves-industrial-development/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2025/03/reno-data-center-approval/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2026/04/reno-city-council-data-center-standards/)thisisreno.com

[thisisreno.com](https://thisisreno.com/2026/02/nevada-data-centers-growth/)thisisreno.com

[City of Thornton: Ordinance establishing a temporary moratorium on applications related to new or expanding data centers](https://www.thorntonco.gov/government/public-notices/approved-ordinances/ordinance-establishing-temporary-moratorium)thorntonco.gov

[thrivekingsmountain.com](https://thrivekingsmountain.com/)thrivekingsmountain.com

[thrivekingsmountain.com](https://thrivekingsmountain.com/petition/)thrivekingsmountain.com

[thv11.com](https://www.thv11.com/article/news/local/new-6-billion-data-center-coming-little-rock/91-b9d829d5-5d78-431a-be6d-9433da379967)thv11.com

[tiffinohio.net](https://tiffinohio.net/posts/tiffin-city-council-approves-12-month-data-center-moratorium/)tiffinohio.net

[time.com](https://time.com/7362401/ai-stargate-data-center-abilene-housing-crisis/)time.com

[time.com](https://time.com/7377579/ai-data-centers-people-movement-cover/)time.com

[www.times-georgian.com](https://www.times-georgian.com/news/local/data-center-backlash-comes-to-commission/article_da4b99ba-eba6-592a-98a5-8a02ea390b66.html)times-georgian.com

[www.times-georgian.com](https://www.times-georgian.com/news/local/anti-data-center-group-we-will-continue-to-show-up/article_373d4ee8-a4e3-5e07-bac4-17d78cec0742.html)times-georgian.com

[Times-Standard: Arcata City Council OKs 45-day moratorium for data centers](https://www.times-standard.com/2026/09/17/arcata-city-council-oks-45-day-moratorium-for-data-centers/)times-standard.com

[www.timesherald.com](https://www.timesherald.com/2025/11/19/proposed-plymouth-township-data-center-zoning-application-withdrawn/)timesherald.com

[timesleader.com](https://www.timesleader.com/news/1734179/rezoning-request-to-move-to-court-in-hollenback-township)timesleader.com

[timesleader.com](https://www.timesleader.com/news/1733163/hollenback-twp-residents-urge-supervisors-to-protect-resources-amid-data-center-boom)timesleader.com

[timesleader.com](https://www.timesleader.com/news/1741051/dorrance-twp-zoning-hearing-board-finds-ordinance-did-not-exclude-data-centers)timesleader.com

[timesleader.com](https://www.timesleader.com/news/1740939/exeter-borough-council-approves-data-center-zoning-amendment)timesleader.com

[www.timesleader.com](https://www.timesleader.com/news/1737209/dorrance-twp-hearing-on-possible-data-center-continued-until-may)timesleader.com

[www.timesleader.com](https://www.timesleader.com/news/1731917/data-center-zoning-amendment-proposed-for-20-luzerne-county-covered-municipalities)timesleader.com

[www.timesleader.com](https://www.timesleader.com/news/1735244/officials-still-revising-proposed-data-center-zoning-ordinance-covering-19-luzerne-county-municipalities)timesleader.com

[www.timesleader.com](https://www.timesleader.com/news/1737257/jenkins-twp-holds-hearing-on-data-center-ordinance)timesleader.com

[www.timesleader.com](https://www.timesleader.com/news/1734520/jenkins-twp-to-hold-public-hearing-on-data-center-ordinance)timesleader.com

[timesnews.net](https://timesnews.net/news/340782/data-center-discussions-develop-around-region/)timesnews.net

[www.timesnewspapers.com](https://www.timesnewspapers.com/webster-kirkwoodtimes/aldermen-weigh-regulations-on-data-centers-marijuana-facilities/article_7ed373bb-5e4b-4eb1-a27d-7ebd52bc4f27.html)timesnewspapers.com

[Times-Republican: P&Z Commission discusses initial draft of proposed data center regulations](https://www.timesrepublican.com/news/todays-news/2026/09/pz-commission-discusses-initial-draft-of-proposed-data-center-regulations/)timesrepublican.com

[www.timestribunenews.com](https://www.timestribunenews.com/2026/03/13/troy-planning-commission-approves-six-month-moratorium-on-data-processing-centers/)timestribunenews.com

[www.timestribunenews.com](https://www.timestribunenews.com/2026/03/18/troy-city-council-approves-six-month-moratorium-on-data-processing-centers/)timestribunenews.com

[titletrackmichigan.org](https://titletrackmichigan.org/datacenters/)titletrackmichigan.org

[tmj4.com](https://www.tmj4.com/news/racine-county/serious-dispute-between-racine-co-officials-threatens-microsoft-data-center)tmj4.com

[www.tmj4.com](https://www.tmj4.com/news/racine-county/microsoft-pulls-plug-on-plans-for-244-acre-data-center-in-caledonia-after-community-pushback)tmj4.com

[www.tmj4.com](https://www.tmj4.com/news/ozaukee-county/neighbors-split-as-port-washington-officially-approves-tid-for-data-center-campus-infrastructure)tmj4.com

[www.tmj4.com](https://www.tmj4.com/news/ozaukee-county/24-hour-construction-at-the-port-washington-data-center-is-set-to-end-in-april-neighbors-say-the-new-city-rules-dont-go-far-enough)tmj4.com

[www.tnonline.com](https://www.tnonline.com/20260304/penn-forest-oks-data-ordinance/)tnonline.com

[toledoblade.com](https://www.toledoblade.com/business/development/2025/04/09/data-center-middleton-township-meta-facebook-800-million-dollar-ohio-wood-county/stories/20250407109)toledoblade.com

[www.toledoblade.com](https://www.toledoblade.com/local/suburbs/2026/01/06/wood-county-data-centers-residents-angry-planning-ohio/stories/20260106103)toledoblade.com

[www.toledoblade.com](https://www.toledoblade.com/local/suburbs/2026/02/03/maumee-becomes-latest-northwest-ohio-community-to-pass-data-center-moratorium/stories/20260203114)toledoblade.com

[www.toledoblade.com](https://www.toledoblade.com/local/suburbs/2026/02/20/oregon-s-rejection-of-data-center-extension-overturned-by-law-director/stories/20260220092)toledoblade.com

[www.toledoblade.com](https://www.toledoblade.com/local/politics/2026/02/18/monclova-richfield-townships-latest-to-pass-data-center-moratoriums/stories/20260218126)toledoblade.com

[toledofreepress.com](https://toledofreepress.com/anthony-wayne-news-waterville-approves-6-month-moratorium/)toledofreepress.com

[toledofreepress.com](https://toledofreepress.com/waterville-township-passes-12-month-moratorium-on-data-centers/)toledofreepress.com

[tompkinsweekly.com](https://tompkinsweekly.com/articles/terawulf-outlines-plans-for-lansing-ai-data-center-as-residents-seek-more-answers/)tompkinsweekly.com

[www.tompkinsweekly.com](https://www.tompkinsweekly.com/news/dryden-community-speaks-out-against-data-centers-e4f63f86)tompkinsweekly.com

[Multiple small Tennessee counties pass temporary data center bans (Tom's Hardware)](https://www.tomshardware.com/tech-industry/artificial-intelligence/multiple-small-tennessee-counties-pass-temporary-data-center-bans-nashville-also-passed-near-unanimous-moratorium-on-first-reading)tomshardware.com

[tomshardware.com](https://www.tomshardware.com/tech-industry/artificial-intelligence/seattle-to-pass-one-year-ai-data-center-moratorium-next-week-will-use-window-to-study-community-impact-of-ai-buildouts)tomshardware.com

[www.tomshardware.com](https://www.tomshardware.com/desktops/servers/microsoft-cancels-wisconsin-data-center-after-community-pushback-244-acre-caledonia-site-on-hold-but-redmond-says-it-remains-committed-to-the-region)tomshardware.com

[www.tomshardware.com](https://www.tomshardware.com/tech-industry/artificial-intelligence/openais-stargate-data-center-gets-approval-to-receive-1-4-gigawatts-of-power-in-michigan-some-residents-furious-as-energy-company-is-given-go-ahead-by-regulatory-body-without-hearing-opposition)tomshardware.com

[Town of Highland: Local Law No. 1 of 2026 Notice](https://townofhighlandny.gov/local-law-no-1-of-2026-notice/)townofhighlandny.gov

[townoflutherok.com](http://townoflutherok.com/data-center-status-update/)townoflutherok.com

[townoflysander.org](https://townoflysander.org)townoflysander.org

[townofmanlius.gov](https://townofmanlius.gov)townofmanlius.gov

[townshipjournal.com](https://www.townshipjournal.com/news/local-news/andover-township-moves-to-ban-data-centers-after-heated-public-backlash-KL5841840)townshipjournal.com

[tpr.org](https://www.tpr.org/news/2026-02-27/with-5-data-centers-on-the-horizon-hays-county-water-advocates-see-the-fight-as-just-beginning)tpr.org

[www.tract.com](https://www.tract.com/news/tract-expands-its-greater-reno-portfolio-closing-on-1060-acres-in-silver-springs-nevada-following-successful-rezoning-and-development-agreement-with-lyon-county/)tract.com

[www.traverseticker.com](https://www.traverseticker.com/news/developer-pulls-plug-on-kalkaska-data-center/)traverseticker.com

[Lordstown eyes moratorium on businesses using battery storage systems - Tribune Chronicle](https://www.tribtoday.com/news/local-news/2026/06/lordstown-eyes-moratorium-on-businesses-using-battery-storage-systems/)tribtoday.com

[Tribune Chronicle: Warren OKs one-year data center moratorium](https://www.tribtoday.com/news/local-news/2026/09/warren-oks-one-year-data-center-moratorium/)tribtoday.com

[tribtoday.com](https://www.tribtoday.com/news/local-news/2026/05/lordstown-looks-to-extend-moratorium-on-data-centers/)tribtoday.com

[tribtoday.com](https://www.tribtoday.com/news/local-news/2026/06/lordstown-extends-data-center-moratorium/)tribtoday.com

[tribtoday.com](https://www.tribtoday.com/news/local-news/2026/05/hubbard-prepares-legislation-for-data-center-moratorium/)tribtoday.com

[tribtoday.com](https://www.tribtoday.com/news/local-news/2026/06/hubbard-passes-1-year-data-center-halt/)tribtoday.com

[www.tribtoday.com](https://www.tribtoday.com/news/local-news/2026/02/vienna-places-moratorium-on-data-centers/)tribtoday.com

[www.tribtoday.com](https://www.tribtoday.com/news/local-news/2026/02/hubbard-township-oks-moratorium-on-data-centers/)tribtoday.com

[www.tribtoday.com](https://www.tribtoday.com/news/local-news/2026/04/niles-council-considers-data-center-moratorium/)tribtoday.com

[www.tribtoday.com](https://www.tribtoday.com/news/local-news/2026/05/niles-oks-data-center-moratorium/)tribtoday.com

[truthout.org](https://truthout.org/articles/secretive-new-mexico-data-center-plan-races-forward-despite-community-pushback/)truthout.org

[City of Tucson: Regulations for Large-Scale Data Centers (UDC amendment, Ordinance O12268)](https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Initiatives/Data-Centers-Unified-Development-Code-Amendment)tucsonaz.gov

[tucsonsentinel.com](https://www.tucsonsentinel.com/local/report/020626_data_center_referendum/data-center-opponents-submit-signatures-voter-referendum-marana)tucsonsentinel.com

[tucsonsentinel.com](https://www.tucsonsentinel.com/local/report/021826_data_referendum_fails/marana-rejects-referendums-against-data-center-center-rezoning/)tucsonsentinel.com

[tucsonsentinel.com](https://www.tucsonsentinel.com/local/report/022026_datacenter_zoning/tucson-considers-new-zoning-rules-data-centers/)tucsonsentinel.com

[www.tucsonspotlight.org](https://www.tucsonspotlight.org/you-didnt-listen-marana-data-center-vote-met-with-outrage/)tucsonspotlight.org

[tulsaflyer.org](https://tulsaflyer.org/2026/01/20/government/post/coweta-planning-commission-says-no-to-data-center-proposal/)tulsaflyer.org

[tulsaworld.com](https://tulsaworld.com/news/local/business/article_05f3d63d-3145-4161-8490-f94ca225b1f5.html)tulsaworld.com

[tuscaloosathread.com](https://tuscaloosathread.com/alabama-data-center-election-debate/)tuscaloosathread.com

[tuscaloosathread.com](https://tuscaloosathread.com/brookwood-rezoning-vote-youngwoo-data-center/)tuscaloosathread.com

[www.tuscolatoday.com](https://www.tuscolatoday.com/news/elmwood-acts-on-data-center-moratorium/article_989c5d64-6088-4222-8f1c-e9d099776f71.html)tuscolatoday.com

[twiggsdatacenterwatch.com](https://twiggsdatacenterwatch.com/)twiggsdatacenterwatch.com

[twiggsdatacenterwatch.com](https://twiggsdatacenterwatch.com/petition/)twiggsdatacenterwatch.com

[Pioneer Press: Inver Grove Heights amends data center moratorium to avoid multi-million dollar lawsuit](https://www.twincities.com/2026/09/15/inver-grove-heights-amends-data-center-moratorium/)twincities.com

[ualrpublicradio.org](https://ualrpublicradio.org)ualrpublicradio.org

[ualrpublicradio.org](https://www.ualrpublicradio.org/local-regional-news/2026-05-28/pulaski-county-announces-miscount-in-data-center-moratorium-vote)ualrpublicradio.org

[underthehardhat.org](https://underthehardhat.org/port-washington-data-center/)underthehardhat.org

[union-bulletin.com](https://www.union-bulletin.com/news/local/governments/walla-walla-county-commissioners-wont-consider-data-center-moratorium/article_ad58a5a6-ea34-4e28-8624-efe7565870d4.html)union-bulletin.com

[www.union-bulletin.com](https://www.union-bulletin.com/news/local/business/port-of-walla-walla-approves-36m-sale-of-property-for-amazon-data-center/article_0830f222-47e3-46c0-9a9f-45557bc8d1db.html)union-bulletin.com

[universitystar.com](https://universitystar.com/34402/news/community-members-hold-meeting-discussing-data-centers/)universitystar.com

[universitystar.com](https://universitystar.com/33993/opinions/cloudburst-data-center-exploits-hays-county/)universitystar.com

[upnorthlive.com](https://upnorthlive.com/news/local/hayes-township-considers-moratorium-on-data-center-applications)upnorthlive.com

[www.uppermichiganssource.com](https://www.uppermichiganssource.com/2026/03/03/delta-county-could-prevent-data-center-development-year/)uppermichiganssource.com

[www.uppermichiganssource.com](https://www.uppermichiganssource.com/2026/07/07/delta-county-planning-commission-approves-data-center-moratorium/)uppermichiganssource.com

[www.uppermichiganssource.com](https://www.uppermichiganssource.com/2026/07/09/houghton-city-council-approves-temporary-data-center-moratorium/)uppermichiganssource.com

[Box Elder County approves moratorium on data centers. Too late, some say. | Utah Public Radio](https://www.upr.org/utah-news/2026-06-17/box-elder-data-center-moratorium-stratos)upr.org

[upr.org](https://www.upr.org/utah-news/2026-09-18/daily-news-iron-county-data-center-navajo-nation-flooding-emergency-museum-dinosaur-art-contest)upr.org

[www.upr.org](https://www.upr.org/politics/2026-07-01/as-data-centers-weigh-on-utahns-minds-another-county-has-hit-pause)upr.org

[Uprise RI: As NY Pauses Data Centers, RI Towns Act on Expansion (August 11, 2026)](https://upriseri.com/article/as-ny-pauses-data-centers-ri-towns-take-control/)upriseri.com

[upriseri.com](https://upriseri.com/article/cumberland-council-bans-data-centers-in-zoning-ordinance-on-6-1-vote/)upriseri.com

[www.urbanacitizen.com](https://www.urbanacitizen.com/2026/02/18/data-center-plans-revealed-at-city-meeting/)urbanacitizen.com

[www.urbanacitizen.com](https://www.urbanacitizen.com/2026/03/03/council-presses-pause-button-on-data-center-opposition-celebrates-temporary-moratorium/)urbanacitizen.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2025/10/09/citing-opposition-microsoft-cancels-caledonia-data-center/)urbanmilwaukee.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2025/08/08/port-washington-data-center-would-include-175-million-of-public-infrastructure-costs/)urbanmilwaukee.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2026/03/15/neighbors-push-back-on-24-hour-data-center-work-in-port-washington/)urbanmilwaukee.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2024/09/18/mount-pleasant-racine-in-legal-battle-over-water-after-foxconn-failure/)urbanmilwaukee.com

[usnews.com](https://www.usnews.com/news/top-news/articles/2026-02-17/mississippi-holds-hearing-on-xai-data-center-amid-environmental-lawsuit-threat)usnews.com

[usnews.com](https://www.usnews.com/news/top-news/articles/2026-07-14/pollution-from-musks-unpermitted-xai-power-project-hits-hardest-in-black-communities)usnews.com

[www.utahbusiness.com](https://www.utahbusiness.com/press-releases/2026/04/22/creekstone-energy-secures-largest-solar-lease-utah-millard-county-delta/)utahbusiness.com

[utahnewsdispatch.com](https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/)utahnewsdispatch.com

[utahnewsdispatch.com](https://utahnewsdispatch.com/2026/05/14/box-elder-county-group-wants-referendum-on-proposed-data-center/)utahnewsdispatch.com

[utahnewsdispatch.com](https://utahnewsdispatch.com/2026/06/04/stratos-data-center-referendum-group-appeal-to-a-judge/)utahnewsdispatch.com

[utilitydive.com](https://www.utilitydive.com/news/doj-may-intervene-in-naacp-lawsuit-over-xais-data-center-gas-turbines/820363/)utilitydive.com

[utilitydive.com](https://www.utilitydive.com/news/doj-intervenes-xai-data-center-gas-turbine-lawsuit/823267/)utilitydive.com

[vcnva.org](https://vcnva.org/denying-balico-data-center-and-gas-plant/)vcnva.org

[www.vedp.org](https://www.vedp.org/press-release/2025-11/vantage-stafford)vedp.org

[veritenews.org](https://veritenews.org/2026/01/28/data-centers-ban-new-orleans-council/)veritenews.org

[veritenews.org](https://veritenews.org/2026/03/25/data-centers-new-orleans-east-council/)veritenews.org

[vermontpublic.org](https://www.vermontpublic.org/show/vermont-edition/2026-03-04/vermont-looks-to-study-and-possibly-block-data-centers)vermontpublic.org

[videonewsservice.net](https://videonewsservice.net/index.php/2025/10/21/genesee-county-tonawanda-seneca-nation-and-sierra-club-declare-victory-in-litigation-against-massive-data-center-seek-dismissal-of-suit-following-rescission-of-approvals/)videonewsservice.net

[videonewsservice.net](https://videonewsservice.net/index.php/2025/11/06/genesee-county-residents-of-the-glow-region-plan-rally-and-press-conference-to-celebrate-recent-victory-against-the-stamp-data-center/)videonewsservice.net

[Village of Waynesville: Council Meeting Minutes, May 18, 2026](https://www.villageofwaynesville.org/media/site/meetings/05.18.26%20Council.pdf)villageofwaynesville.org

[vindy.com](https://www.vindy.com/news/local-news/2026/05/lordstown-officials-plan-to-re-up-180-day-moratorium-on-data-centers/)vindy.com

[vindy.com](https://www.vindy.com/news/local-news/2026/05/hubbard-mayor-addresses-data-center-concerns/)vindy.com

[vindy.com](https://www.vindy.com/uncategorized/2026/05/hubbard-plans-data-center-moratorium/)vindy.com

[www.vindy.com](https://www.vindy.com/news/local-news/2026/02/hubbard-township-places-moratorium-on-data-centers/)vindy.com

[virginiabusiness.com](https://virginiabusiness.com/stafford-data-center-growth-i95-2025/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/amazon-cancels-data-center-in-louisa-county/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/frederick-county-data-centers-fact-sheet/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/powhatan-approves-2-7b-data-center-campus/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/frederick-supervisors-to-consider-countywide-ban-of-data-centers/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/loudoun-county-advances-changes-to-data-center-regulations/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/chesapeake-city-council-rejects-massive-data-center/)virginiabusiness.com

[virginiabusiness.com](https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/)virginiabusiness.com

[virginiabusiness.com](http://virginiabusiness.com/virginia-appeals-court-upholds-block-on-prince-william-digital-gateway-project/)virginiabusiness.com

[virginiaindependentnews.com](https://virginiaindependentnews.com/infrastructure/data-center-cancellations-pile-up-as-virginians-voice-opposition/)virginiaindependentnews.com

[virginiamercury.com](https://virginiamercury.com/2025/07/28/amazon-pulls-louisa-county-data-center-proposal-after-strong-resistance/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/briefs/goochland-nears-approval-of-rezoning-for-data-centers-power-plants/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2025/11/10/goochland-approves-tech-overlay-district-after-hours-of-resident-backlash/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2026/09/14/loudoun-to-consider-data-center-pause-removing-by-right-grandfather-clause/)virginiamercury.com

[virginiamercury.com](https://virginiamercury.com/2026/07/09/after-digital-gateway-project-fails-prince-william-supervisors-reject-dulles-cloud-south-data-center-proposal/)virginiamercury.com

[vista.today](https://vista.today/2026/02/recommend-denial-pennhurst-data-center-project/)vista.today

[vista.today](https://vista.today/2026/02/north-coventry-data-center-scrap/)vista.today

[vnews.com](https://vnews.com/2026/03/03/royalton-ai-crypto-moratorium-approved/)vnews.com

[vpm.org](https://www.vpm.org/news/2025-11-10/goochland-county-data-centers-tech-district-lyle-vaughters-levet)vpm.org

[vpm.org](https://www.vpm.org/news/2025-11-18/hanover-hunting-hawk-data-center-hhhunt-wyndham-banton-mendelson-cheeley)vpm.org

[vpm.org](https://www.vpm.org/news/2026-01-20/hanover-hunting-hawk-data-center-hhhunt-wyndham-ashland-road-clark)vpm.org

[wabe.org](https://www.wabe.org/data-centers-use-a-lot-of-water-georgia-counties-and-conservationists-are-looking-for-solutions/)wabe.org

[wabe.org](https://www.wabe.org/camden-becomes-first-county-on-the-coast-to-adopt-data-center-moratorium/)wabe.org

[www.wabe.org](https://www.wabe.org/georgia-lawmakers-debating-data-center-moratorium-and-regulation-bills-in-legislature/)wabe.org

[www.wabe.org](https://www.wabe.org/roswell-enacts-moratorium-on-new-data-centers/)wabe.org

[WALB: Moratorium for Dougherty County data centers extended for another 180 days](https://www.walb.com/2026/08/31/dougherty-county-extends-data-center-moratorium-another-180-days/)walb.com

[walb.com](https://www.walb.com/2026/05/27/this-protection-not-invitation-lee-co-commissioners-consider-extending-moratorium-data-center-ordinance/)walb.com

[www.walb.com](https://www.walb.com/2026/02/10/rural-communities-raise-concerns-data-centers-expand-across-georgia-beyond/)walb.com

[www.walb.com](https://www.walb.com/2026/02/16/2nd-south-georgia-county-moves-dissolve-industrial-authority-what-it-could-mean-future-data-center-builds/)walb.com

[www.walb.com](https://www.walb.com/2026/07/21/data-centers-are-already-georgia-albany-commissioners-weigh-618-month-data-center-pause/)walb.com

[Holyoke City Council approves data center ban - WAMC](https://www.wamc.org/news/2026-06-17/holyoke-city-council-approves-data-center-ban)wamc.org

[wane.com](https://www.wane.com/news/local-news/hearing-on-10-billion-data-center-set-for-van-wert-ohio/)wane.com

[www.warrencountyrecord.com](https://www.warrencountyrecord.com/stories/aldermen-approve-data-center-site-plan,181278)warrencountyrecord.com

[Warren Township advances ordinance prohibiting data centers in all zones (official)](https://www.warrennj.org/m/newsflash/home/detail/606)warrennj.org

[www.washingtoncountytn.org](https://www.washingtoncountytn.org/m/newsflash/home/detail/268)washingtoncountytn.org

[washingtonstatestandard.com](https://washingtonstatestandard.com/2026/02/11/how-wa-lawmakers-are-trying-to-regulate-data-centers/)washingtonstatestandard.com

[www.washtenaw.org](https://www.washtenaw.org/4635/Data-Centers)washtenaw.org

[washtimesherald.com](https://www.washtimesherald.com/news/local_news/washington-city-council-says-no-to-data-center/article_9e635735-d823-46b1-9c83-3c89b04934e5.html)washtimesherald.com

[www.wataugademocrat.com](https://www.wataugademocrat.com/news/local/boone-discusses-moratorium-on-data-center-construction/article_d5389de8-1ba0-4827-9193-d49864d3a5f3.html)wataugademocrat.com

[www.wataugademocrat.com](https://www.wataugademocrat.com/news/local/commissioners-move-toward-data-center-moratorium/article_d6f97008-ebf5-4ac5-ab70-43746bb9e4a0.html)wataugademocrat.com

[wataugaonline.com](https://wataugaonline.com/boone-town-council-passes-one-year-data-center-moratorium-5-0-watauga-county-commissioners-move-toward-county-wide-restrictions/)wataugaonline.com

[wate.com](https://wate.com)wate.com

[wate.com](https://www.wate.com/news/knox-county-news/knox-county-commissioner-to-propose-moratorium-for-data-centers/)wate.com

[www.wate.com](https://www.wate.com/news/local-news/loudon-county-data-center-moratorium/)wate.com

[waterfordmi.gov](https://waterfordmi.gov)waterfordmi.gov

[www.wave3.com](https://www.wave3.com/2025/09/16/louisville-metro-council-considers-moratorium-data-centers/)wave3.com

[www.wave3.com](https://www.wave3.com/2025/10/14/meade-county-zoning-commission-votes-against-data-center/)wave3.com

[www.waypointidaho.com](https://www.waypointidaho.com/blog/meta-kuna-data-center-impact-guide-2025/)waypointidaho.com

[WBAL: Baltimore County weighs two-year extension of data center moratorium](https://www.wbal.com/baltimore-county-weighs-two-year-extension-of-data-center-moratorium)wbal.com

[Shawano County considers data center moratorium](https://www.wbay.com/2026/06/03/shawano-county-considers-data-center-moratorium/)wbay.com

[www.wbay.com](https://www.wbay.com/2026/01/27/mishicot-community-voices-concern-over-proposed-ai-data-centers/)wbay.com

[www.wbay.com](https://www.wbay.com/video/2026/06/17/wrightstown-passes-moratorium-data-center-projects/)wbay.com

[wbhm.org](https://www.wbhm.org/local-news/2026-07-17/court-hearing-in-case-challenging-birmingham-data-center-to-resume-next-month)wbhm.org

[wbir.com](https://www.wbir.com/article/news/local/knoxville/knox-county-commission-starts-process-regulate-ai-data-centers/51-1057813d-0169-4c2f-9ce2-e58c03954617)wbir.com

[www.wbir.com](https://www.wbir.com/article/news/local/rocky-top-regulate-location-of-any-future-ai-data-centers-in-city/51-d109d822-3a2d-4c45-bc0d-e30b3065b70f)wbir.com

[wbko.com](https://www.wbko.com/2026/01/16/data-center-seeks-preliminary-site-development-plan-for-simpson-county/)wbko.com

[wbko.com](https://www.wbko.com/2026/01/28/tenkey-landco-sues-simpson-county-over-data-center-ordinance/)wbko.com

[wbko.com](https://www.wbko.com/2026/01/20/massive-data-center-is-being-pushed-blink-you-miss-us-kentucky-town-locals-are-pushing-back/)wbko.com

[wbko.com](https://www.wbko.com/2026/05/21/cave-city-council-enacts-12-month-moratorium-data-centers/)wbko.com

[wbko.com](https://www.wbko.com/2026/06/09/developer-sues-cave-city-over-data-center-zoning-moratorium/)wbko.com

[wbng.com](https://wbng.com)wbng.com

[wbng.com](https://www.wbng.com/2026/03/12/oneonta-town-board-introduces-12-month-moratorium-ai-data-centers/)wbng.com

[www.wbng.com](https://www.wbng.com/2026/02/23/town-dryden-passes-resolution-ban-construction-data-centers/)wbng.com

[wboy.com](https://www.wboy.com/news/west-virginia/residents-share-concerns-about-data-centers-at-wvcag-press-conference/)wboy.com

[WBRC: Tarrant passes 1-year moratorium on data center business licenses](https://www.wbrc.com/2026/09/09/tarrant-passes-1-year-moratorium-data-center-business-licenses/)wbrc.com

[wbrc.com](https://www.wbrc.com/2026/01/20/bessemer-says-controversial-data-center-plan-is-changing-adding-buffer-land/)wbrc.com

[wbrc.com](https://www.wbrc.com/2026/04/22/this-project-feels-like-an-invasion-bessemer-council-approves-major-data-center-rezoning-amid-community-divide/)wbrc.com

[wbrc.com](https://www.wbrc.com/2026/05/29/oxmoor-valley-residents-expand-lawsuit-over-nebius-ai-factory-target-90m-milan-parkway-land-flip/)wbrc.com

[www.wbrc.com](https://www.wbrc.com/2025/11/19/bessemer-city-council-approves-149-billion-data-center-project-despite-transparency-concerns/)wbrc.com

[www.wbrc.com](https://www.wbrc.com/2026/02/18/columbiana-passes-new-zoning-restrictions-data-centers/)wbrc.com

[www.wbrc.com](https://www.wbrc.com/2026/06/26/cullman-city-council-unanimously-passes-12-month-temporary-moratorium-data-centers/)wbrc.com

[Chester County data center moratorium (WBTV)](https://www.wbtv.com/2026/06/19/york-county-discusses-project-palmetto-rock-chester-county-data-center-moratorium-rock-hill-juneteenth-celebration/)wbtv.com

[wbtv.com](https://wbtv.com)wbtv.com

[www.wbtv.com](https://www.wbtv.com/2026/04/21/rowan-county-commission-passes-data-center-moratorium/)wbtv.com

[wbtw.com](https://www.wbtw.com/news/grand-strand/horry-county/horry-county-committee-tables-discussion-on-data-center-regulation-ordinance/)wbtw.com

[wbtw.com](https://www.wbtw.com/growthtracker/horry-county-looking-at-local-data-center-control-policy-amid-state-level-talks/)wbtw.com

[wbur.org](https://www.wbur.org/news/2026/07/29/lowell-data-center-massachusetts-markley-group-environmental-justice)wbur.org

[wbur.org](https://www.wbur.org/news/2026/09/18/boston-data-center-ban-proposal)wbur.org

[www.wbur.org](https://www.wbur.org/news/2026/04/06/data-centers-ai-massachusetts-pollution-pushback)wbur.org

[wcax.com](https://www.wcax.com/2026/03/04/royalton-voters-say-no-ai-data-centers/)wcax.com

[www.wcbu.org](https://www.wcbu.org/local-news/2026-01-27/opponents-speak-out-against-proposed-pekin-data-center)wcbu.org

[wchstv.com](https://wchstv.com/news/local/a-i-infrastructure-being-developed-in-lawrence-county-ohio)wchstv.com

[www.wcia.com](https://www.wcia.com/news/sangamon-county/sangamon-county-will-not-adopt-6-month-moratorium-on-data-centers/)wcia.com

[www.wcia.com](https://www.wcia.com/news/sangamon-county/hearing-on-proposed-sangamon-co-data-center-brings-hundreds-of-supporters-opposers/)wcia.com

[WCJB: Levy County Commission passes moratorium for large scale data centers](https://www.wcjb.com/2026/09/09/levy-county-commission-passes-moratorium-large-scale-data-centers/?outputType=amp)wcjb.com

[wcluradio.com](https://www.wcluradio.com/2026/05/21/cave-city-approves-second-reading-for-data-center-moratorium/)wcluradio.com

[wcluradio.com](https://www.wcluradio.com/2026/07/07/cave-city-moves-to-toss-lawsuit-over-data-center-moratorium/)wcluradio.com

[wcnc.com](https://www.wcnc.com/article/news/local/mooresville-nc-data-center-pushback-8-6-2025/275-3f149e6b-e7c5-46dc-8e40-cc1a9d6cf6be)wcnc.com

[www.wcnc.com](https://www.wcnc.com/article/news/local/data-center-debate-in-rowan-county-hits-a-boiling-point-with-a-vote-a-missing-commissioner-and-protests/275-d52cf75a-a25e-4364-85e8-1f1257721d17)wcnc.com

[Liberty Township advances data center restrictions to trustees (WCPO)](https://www.wcpo.com/news/local-news/butler-county/liberty-township/liberty-township-zoning-commission-advances-data-center-restrictions-to-trustees-for-final-vote)wcpo.com

[wcpo.com](https://www.wcpo.com/news/local-news/i-team/300mw-data-center-proposed-for-pierce-township-near-beckjord-despite-moratorium)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/northern-kentucky/im-feeling-more-disappointment-rules-governing-mason-county-data-centers-approved-in-packed-meeting)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/4-billion-amazon-data-center-proposal-in-wilmington-advances-to-next-stage-residents-want-pause)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/wilmington-delays-amazon-data-center-approval-after-resident-outcry-more-public-input-slated)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/mt-orab-council-introduces-data-center-moratorium-amid-community-opposition-to-mysterious-mega-site-project)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/brown-county/mt-orab-residents-pack-gymnasium-demanding-transparency-on-mysterious-mega-site-project)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/finding-solutions/you-have-your-moratorium-what-comes-after-critical-vote-on-solar-farms-data-centers-in-dearborn-county)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/i-team/adams-county-data-center-could-be-one-of-ohios-biggest-power-guzzlers)wcpo.com

[www.wcpo.com](https://www.wcpo.com/news/local-news/i-team/adams-county-data-center-gets-federal-permit-as-voters-sign-petitions-to-block-it)wcpo.com

[www.wcsjnews.com](https://www.wcsjnews.com/news/local/progress-update-on-equinix-data-center-in-minooka/article_a83b2af7-f341-4bf8-a050-cb64e461edba.html)wcsjnews.com

[www.wctrib.com](https://www.wctrib.com/news/minnesota/nobles-county-planning-commission-votes-to-keep-data-center-out-of-ag-preservation-area)wctrib.com

[wctv.tv](https://www.wctv.tv/2026/05/26/jackson-county-commissioners-vote-moratorium-ai-data-centers/)wctv.tv

[www.wctv.tv](https://www.wctv.tv/2026/01/20/thomas-county-board-commissioners-approve-12-month-pause-ai-data-centers-coming-area/)wctv.tv

[wcyb.com](https://wcyb.com/news/local/brightridge-puts-moratorium-on-data-center-project-proposals-in-region)wcyb.com

[wdbj7.com](https://www.wdbj7.com/2026/05/06/proposed-zoning-rewrite-sparks-data-center-questions-franklin-county/)wdbj7.com

[www.wdbj7.com](https://www.wdbj7.com/2025/11/03/data-center-could-still-be-coming-campbell-county-despite-denial-vote-supervisors/)wdbj7.com

[wdet.org](https://wdet.org/2026/04/16/the-metro-detroit-is-trying-to-write-the-rules-before-big-tech-moves-in/)wdet.org

[wdrb.com](https://www.wdrb.com/news/neighbors-push-back-against-proposed-ai-data-center-in-meade-county/article_5576cf12-2e88-422a-ac08-d94b30d4cce9.html)wdrb.com

[www.wdrb.com](https://www.wdrb.com/in-depth/oldham-county-looks-to-pause-data-center-deals-amid-pushback-over-6b-project/article_d51c7f32-ff65-4e5e-a982-ddd9eae91e47.html)wdrb.com

[www.wdrb.com](https://www.wdrb.com/in-depth/opponents-pack-meeting-about-6-billion-oldham-county-data-center-plan/article_cabe30e6-bd8a-4795-b03a-daffb331ce38.html)wdrb.com

[www.wdrb.com](https://www.wdrb.com/news/meade-county-commission-votes-unanimously-not-to-rezone-138-acre-site-for-proposed-data-center/article_05d308e7-72bb-461c-8b4a-7194a55ab4d3.html)wdrb.com

[www.wdtimes.com](http://www.wdtimes.com/news/local/permits-dont-equal-protection-dodge-county-supervisors-pass-moratorium-on-data-centers/article_00ffa50e-7a96-4598-b676-94c2165d643d.html)wdtimes.com

[www.wdtn.com](https://www.wdtn.com/news/300-acres-of-farmland-could-be-rezoned-for-new-data-center-near-i-70/)wdtn.com

[Shawano County board to vote on recommended data center moratorium](https://www.wearegreenbay.com/news/local-news/shawano-county-board-to-vote-on-recommended-data-center-moratorium/)wearegreenbay.com

[wearegreenbay.com](https://wearegreenbay.com)wearegreenbay.com

[www.wearegreenbay.com](https://www.wearegreenbay.com/news/local-news/because-of-community-opposition-village-of-greenleaf-no-longer-considered-for-data-center-project/)wearegreenbay.com

[www.wearegreenbay.com](https://www.wearegreenbay.com/news/local-news/houston-based-real-estate-developer-responds-to-data-center-proposal-concerns-in-northeast-wisconsin/)wearegreenbay.com

[www.wearegreenbay.com](https://www.wearegreenbay.com/top-stories/manitowoc-county-towns-ask-for-moratorium-on-data-center-projects/)wearegreenbay.com

[weatherfordtx.gov](https://weatherfordtx.gov/m/newsflash/home/detail/647)weatherfordtx.gov

[weatherfordtx.gov](https://weatherfordtx.gov/m/newsflash/Home/Detail/657)weatherfordtx.gov

[wect.com](https://www.wect.com/2026/05/14/data-center-moratorium-proposed-boiling-spring-lakes/)wect.com

[www.wect.com](https://www.wect.com/2026/02/25/leland-town-council-hold-public-hearing-data-center-zoning-rules/)wect.com

[www.weku.org](https://www.weku.org/the-commonwealth/2025-08-21/mason-county-official-says-data-center-could-bring-400-jobs-averaging-80-000-would-require-massive-amounts-of-power-and-water)weku.org

[www.weku.org](https://www.weku.org/the-commonwealth/2026-02-20/data-center-debate-draws-hundreds-to-meeting-in-mercer-county)weku.org

[www.weld.gov](https://www.weld.gov/Newsroom/2026-News/Weld-County-extends-timeline-for-proposed-data-center-ordinance)weld.gov

[WEMU: Ypsilanti Township passes moratorium on new major electric infrastructure (August 19, 2026)](https://www.wemu.org/wemu-news/2026-08-19/ypsilanti-township-passes-moratorium-on-new-major-electric-infrastructure)wemu.org

[wemu.org](https://www.wemu.org/wemu-news/2026-02-20/lawsuit-aimed-at-stopping-saline-township-data-center-rejected-by-washtenaw-county-judge)wemu.org

[wemu.org](https://www.wemu.org/wemu-news/2026-03-03/ypsilanti-city-council-likely-to-pass-data-center-moratorium)wemu.org

[wemu.org](https://www.wemu.org/wemu-news/2026-03-04/city-of-ypsilanti-passes-data-center-moratorium)wemu.org

[wemu.org](https://www.wemu.org/wemu-news/2026-04-16/ypsilanti-township-asks-for-ycuas-help-to-slow-down-u-m-los-alamos-project)wemu.org

[wemu.org](https://www.wemu.org/wemu-news/2026-04-23/ycua-board-of-commissioners-approves-data-center-moratorium)wemu.org

[www.wemu.org](https://www.wemu.org/wemu-news/2025-11-17/pittsfield-township-to-vote-on-data-center-moratorium)wemu.org

[www.wemu.org](https://www.wemu.org/wemu-news/2026-02-12/york-township-places-six-month-moratorium-on-data-center-plans)wemu.org

[www.wemu.org](https://www.wemu.org/wemu-news/2026-02-17/ann-arbor-township-passes-12-month-moratorium-on-data-centers)wemu.org

[www.wemu.org](https://www.wemu.org/wemu-news/2025-09-11/saline-township-rejects-data-center-rezoning)wemu.org

[wenatcheeworld.com](https://www.wenatcheeworld.com/news/local/cryptocurrency-temporarily-banned-in-east-wenatchee-residential-zones/article_13d14c5b-9597-5bac-aa93-2784c8251565.html)wenatcheeworld.com

[weny.com](https://www.weny.com/news/tompkins-co-legislature-passes-resolution-calling-on-nysdec-to-reject-water-withdrawal-permit-for-proposed/article_d0835648-25e5-4bef-825c-4f46e4bfb9b7.html)weny.com

[westchicago.org](https://westchicago.org)westchicago.org

[westerniowatoday.com](https://westerniowatoday.com/2024/04/10/adair-county-supervisors-discuss-proposed-data-center-and-set-public-hearing-on-an-ordinance-creating-setbacks/)westerniowatoday.com

[www.westernmassnews.com](https://www.westernmassnews.com/2026/07/07/westfield-votes-moratorium-data-centers/)westernmassnews.com

[www.westvalleyview.com](https://www.westvalleyview.com/news/goodyear-updates-zoning-ordinance/article_77028a57-b824-4794-92f5-f981749e0570.html)westvalleyview.com

[westvirginiawatch.com](https://westvirginiawatch.com/2025/09/02/enough-devastation-mingo-logan-residents-worry-about-proposed-power-plants-data-centers-in-wv/)westvirginiawatch.com

[westvirginiawatch.com](https://westvirginiawatch.com/2025/12/05/mingo-county-residents-file-federal-lawsuit-against-company-building-power-plants-data-center-in-wv/)westvirginiawatch.com

[www.wfaa.com](https://www.wfaa.com/article/news/local/tarrant-county/fort-worth-council-delays-proposed-450-acre-data-center-rezoning-vote/287-3ac6b783-f553-47d5-8106-b009d799bec5)wfaa.com

[Chester County approves temporary moratorium for data center projects (WFAE)](https://www.wfae.org/charlotte-area/2026-06-18/chester-county-approves-temporary-moratorium-for-data-center-projects)wfae.org

[wfae.org](https://www.wfae.org/energy-environment/2026-05-27/charlotte-residents-demand-moratorium-on-data-centers-during-public-hearing)wfae.org

[www.wfae.org](https://www.wfae.org/energy-environment/2025-12-02/proposed-edgecombe-county-data-center-draws-criticism-during-county-meeting)wfae.org

[www.wfae.org](https://www.wfae.org/2026-03-23/boone-approves-data-center-development-moratorium)wfae.org

[www.wfae.org](https://www.wfae.org/politics/2026-04-21/rowan-county-approves-one-year-moratorium-on-new-data-centers)wfae.org

[WFDD: Yadkinville data center projects not affected by county moratorium](https://www.wfdd.org/politics-government/2026-08-24/yadkinville-data-center-projects-not-affected-by-county-moratorium)wfdd.org

[wfdd.org](https://wfdd.org)wfdd.org

[www.wfdd.org](https://www.wfdd.org/politics-government/2026-03-23/boone-approves-data-center-development-moratorium)wfdd.org

[Hernando County moves forward with proposed data center moratorium (WFLA)](https://www.wfla.com/news/local-news/hernando-county/hernando-county-moves-forward-with-proposed-data-center-moratorium-after-resident-concerns/)wfla.com

[wfla.com](https://www.wfla.com/news/polk-county/state-pushes-back-on-polk-county-ai-data-center-approval-fundamentally-flawed/)wfla.com

[Lordstown council members vote on moratoriums concerning data centers - WFMJ](https://www.wfmj.com/news/local-news/lordstown/lordstown-council-members-vote-on-moratoriums-concerning-data-centers/article_d3ae04a1-b7a7-48f4-b611-6fb377f06d5b.html)wfmj.com

[WFMJ: 1-year data center ban unanimously passed in Warren](https://www.wfmj.com/news/local-news/warren/1-year-data-center-ban-unanimously-passed-in-warren/article_3dbd80aa-0e8d-47aa-94e6-97ad0e9a281c.html)wfmj.com

[wfmj.com](https://www.wfmj.com/news/local-news/lordstown/lordstown-council-approves-extension-of-data-center-moratorium/article_2695b8e2-8772-480c-96ab-3ad135749e46.html)wfmj.com

[www.wfmj.com](https://www.wfmj.com/story/53363329/lordstown-answers-data-center-developers-legal-action-in-ohio-supreme-court)wfmj.com

[www.wfmj.com](https://www.wfmj.com/story/53248144/developer-takes-fight-over-lordstown-data-center-to-ohio-supreme-court)wfmj.com

[www.wfmj.com](https://www.wfmj.com/story/53141480/hubbard-residents-petition-against-potential-data-center-project-at-deer-creek)wfmj.com

[www.wfmj.com](https://www.wfmj.com/news/local-news/niles/city-of-niles-no-further-action-on-proposed-annexation-related-to-bitdeer-data-center-project/article_9a921062-8dd2-4528-bbff-57e0777f25ab.html)wfmj.com

[Allentown City Council tables proposed bill to regulate data centers](https://www.wfmz.com/news/area/lehighvalley/lehigh-county/allentown-area/allentown-city-council-tables-proposed-bill-to-regulate-data-centers/article_79b84a9b-4add-4f41-aa05-2de69e86952d.html)wfmz.com

[wfmz.com](https://www.wfmz.com/news/local_government/zoning_planning/public-hearing-for-proposed-2-6m-square-foot-data-center-in-upper-macungie-paused-until/article_25031a5b-5a73-4e10-be0b-dc137a20609a.html)wfmz.com

[wfmz.com](https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/update-upper-macungie-air-products-data-center-discussion-delayed-until-2026/article_3efb655a-3bef-497f-9cc1-fc844aaaafcc.html)wfmz.com

[wfmz.com](https://www.wfmz.com/news/area/lehighvalley/lehigh-county/western-lehigh-county/air-products-hits-pause-on-2-6m-square-foot-data-center-appeal-in-upper-macungie/article_3efb655a-3bef-497f-9cc1-fc844aaaafcc.html)wfmz.com

[www.wfmz.com](https://www.wfmz.com/news/area/western-newjersey/warren-county/phillipsburg-prepares-to-ban-data-centers-updates-sewer-user-costs/article_a5c18c8c-5745-44cf-8636-dbddcef7e456.html)wfmz.com

[www.wfmz.com](https://www.wfmz.com/news/area/lehighvalley/lehigh-county/northern-lehigh-county/lowhill-township-establishes-zoning-requirements-for-data-centers/article_8fea69d6-a0dc-4a62-a1ab-11c9089fabe9.html)wfmz.com

[wfyi.org](https://www.wfyi.org/news/articles/indiana-data-center-protest-lebanon-meta)wfyi.org

[wfyi.org](https://www.wfyi.org/news/articles/decatur-township-data-center-mdc-vote)wfyi.org

[wfyi.org](https://www.wfyi.org/wfyi-news/2026-04-20/decatur-township-residents-sue-to-block-sabey-data-center)wfyi.org

[wfyi.org](https://www.wfyi.org/wfyi-news/2026-04-01/controversial-data-center-is-approved-for-martindale-brightwood)wfyi.org

[wfyi.org](https://www.wfyi.org/2026-04-06/indy-city-county-councilor-ron-gibson--home-targeted-in-shooting)wfyi.org

[wfyi.org](https://www.wfyi.org/wfyi-news/2026-04-23/indianapolis-data-center-zoning-rules-proposal)wfyi.org

[wfyi.org](https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood)wfyi.org

[wfyi.org](https://www.wfyi.org/wfyi-news/2026-05-12/martindale-brightwood-data-center-court-challenge)wfyi.org

[wfyi.org](https://www.wfyi.org/statewide/2026-07-06/indiana-counties-data-center-moratoriums-bans-2026)wfyi.org

[wfyi.org](https://www.wfyi.org/wfyi-news/2026-07-13/data-center-moratorium-advances-for-indianapolis)wfyi.org

[wgbh.org](https://www.wgbh.org/news/local/2026-07-29/in-one-mass-city-the-fight-over-a-data-center-has-hit-a-crisis-point)wgbh.org

[WGLT: Normal proposes 6-month extension to data center moratorium](https://www.wglt.org/local-news/2026-09-18/normal-proposes-6-month-extension-to-data-center-moratorium)wglt.org

[wglt.org](https://wglt.org)wglt.org

[www.wglt.org](https://www.wglt.org/illinois/2026-03-18/political-will-grows-for-data-center-regulations-as-power-act-remains-in-committee)wglt.org

[wgntv.com](https://wgntv.com/news/naperville/naperville-city-council-rejects-plans-for-data-center-after-months-of-debate/)wgntv.com

[www.wgrz.com](https://www.wgrz.com/article/news/local/north-tonawanda-residents-join-forces-to-rally-against-digihost-bitcoin-mining-project/71-79ff4df5-4553-47de-8502-22c3ea6cddc9)wgrz.com

[wgtd.org](https://www.wgtd.org/news/water-war-dispute-threatens-microsoft-and-other-mt-pleasant-projects)wgtd.org

[wgxa.tv](https://wgxa.tv/news/local/developers-withdraw-rezoning-application-jones-county-data-center-ahead-of-planning-and-zoning-hearing-thomas-hutton-engineering-eagle-rock-partners-crooked-creek-technology-park-intersection-of-highway-18-and-bethlehem-church-road-tim-pitrowski)wgxa.tv

[wgxa.tv](https://wgxa.tv/news/local/crawford-county-commissioners-pass-180-day-moratorium-on-data-center-applications)wgxa.tv

[wgxa.tv](https://wgxa.tv/news/local/twiggs-county-residents-oppose-rezoning-for-data-center-without-impact-study)wgxa.tv

[whas11.com](https://www.whas11.com/article/news/local/meade-ocunty-data-center-proposal-rejected-community/417-dd3e0b31-e31e-4f0e-b3a2-c0cf56357b16)whas11.com

[www.whas11.com](https://www.whas11.com/article/news/local/oldham-county-data-center-proposal-opposition/417-793370d3-51be-451a-847c-efcc84c2b48c)whas11.com

[www.whas11.com](https://www.whas11.com/article/news/local/louisville-data-center-opposition-oldham-county/417-ea453d81-9b43-400b-908f-6de40793098f)whas11.com

[whbl.com](https://whbl.com/2026/05/05/city-of-sheboygan-sends-data-center-limits-to-plan-commission/)whbl.com

[whec.com](https://www.whec.com/top-news/house-passes-bill-to-protect-people-from-energy-price-hikes-due-to-data-centers-comes-amid-nys-moratorium/)whec.com

[www.whio.com](https://www.whio.com/news/local/another-500-acres-land-zoned-second-data-center-wilmington/KXXP722G6ZD4LMQV2Z6U4UJUQE/)whio.com

[whiterivernow.com](https://whiterivernow.com)whiterivernow.com

[whitmanwire.com](https://whitmanwire.com/news/2026/02/27/amazons-data-center-project-raises-concerns-in-walla-walla/)whitmanwire.com

[www.whittierdailynews.com](https://www.whittierdailynews.com/2026/03/12/in-el-monte-verbal-altercation-in-city-council-chambers-postpones-debate-on-data-centers-and-sanctuary-law/)whittierdailynews.com

[www.whmi.com](https://www.whmi.com/news/article/city-of-south-lyon-adopts-12-month-moratorium-on-data-center-applications)whmi.com

[www.whmi.com](https://www.whmi.com/news/article/lyon-twp-board-enacts-six-month-moratorium-on-new-data-center-projects)whmi.com

[Massive data centers aren’t welcome in Virginia Beach, council says](https://www.whro.org/2026-06-03/massive-data-centers-arent-welcome-in-virginia-beach-council-says)whro.org

[whro.org](https://www.whro.org/business-growth/2025-06-17/chesapeake-city-council-rejects-data-center-proposal)whro.org

[whyy.org](https://whyy.org/articles/data-center-artificial-intelligence-vineland-new-jersey/)whyy.org

[whyy.org](https://whyy.org/articles/data-center-delaware-city-energy-water/)whyy.org

[whyy.org](https://whyy.org/articles/delaware-city-data-center-setback-environment/)whyy.org

[WIBW: Shawnee County commissioners approve temporary moratorium for new data center applications (August 13, 2026)](https://www.wibw.com/2026/08/13/shawnee-co-commissioners-approve-moratorium-new-data-centers/)wibw.com

[www.wibw.com](https://www.wibw.com/2026/07/17/report-lyon-co-commission-drafting-moratorium-data-centers-consideration-next-week/)wibw.com

[www.wibw.com](https://www.wibw.com/2026/07/23/emporia-city-commission-votes-next-steps-with-data-centers-man-arrested-meeting/)wibw.com

[wifc.com](https://wifc.com/2026/07/14/wausau-city-council-approves-data-center-ordinance/)wifc.com

[www.williamsburgindependent.com](https://www.williamsburgindependent.com/p/data-center-rules-diverge-in-york-county-james-city-county)williamsburgindependent.com

[www.williamsburgindependent.com](https://www.williamsburgindependent.com/p/news-data-center-zoning-ordinance-comes-before-york-county-supervisors)williamsburgindependent.com

[Village of Williamsburg: Ordinance 1249-26, Data Center Moratorium](https://williamsburgohio.org/wp-content/uploads/2026/05/Ordinance-1249-26-2026-Data-Center-Moratorium.pdf)williamsburgohio.org

[Williamsburg Township: Trustee Meeting Minutes, July 13, 2026](https://williamsburgtownship.org/wp-content/uploads/2026/08/Minutes-7-13-2026.pdf)williamsburgtownship.org

[wilmingtondatacenter.org](https://wilmingtondatacenter.org/)wilmingtondatacenter.org

[wilsontimes.com](https://wilsontimes.com)wilsontimes.com

[www.winchesterstar.com](https://www.winchesterstar.com/winchester_star/panel-delays-recommendation-on-data-center-campus/article_33681399-77cd-54f6-8c3f-ac56f279b8cc.html)winchesterstar.com

[www.winchesterstar.com](https://www.winchesterstar.com/winchester_star/planners-vote-down-clear-brook-data-center-campus/article_761656a5-972d-5f60-bd60-870c89d3f257.html)winchesterstar.com

[www.winchesterstar.com](https://www.winchesterstar.com/winchester_star/board-to-consider-ordinance-disallowing-data-centers/article_b87af9ff-4836-5293-ad46-91540371fd86.html)winchesterstar.com

[Dane County Board approves 18-month pause on hyperscale data center development](https://www.wisbusiness.com/2026/dane-county-board-approves-18-month-pause-on-hyperscale-data-center-development/)wisbusiness.com

[wisconsinwatch.org](https://wisconsinwatch.org/2026/01/deforest-wisconsin-data-center-project-village-board-government/)wisconsinwatch.org

[wisconsinwatch.org](https://wisconsinwatch.org/2026/04/wisconsin-data-center-driftless-area-new-details-emerge-grant-county-cassville/)wisconsinwatch.org

[wishtv.com](https://www.wishtv.com/news/local-news/american-tower-rezoning-petition-withdrawn/)wishtv.com

[wishtv.com](https://www.wishtv.com/news/local-news/data-centers-regulation-council-concerns/)wishtv.com

[wishtv.com](https://www.wishtv.com/news/i-team-8/proposed-ordinance-seeks-to-set-rules-for-data-centers-in-indianapolis/)wishtv.com

[wishtv.com](https://www.wishtv.com/news/politics/boone-county-indiana-approves-moratorium-on-new-data-centers/)wishtv.com

[www.wishtv.com](https://www.wishtv.com/news/local-news/clinton-county-rejects-data-center/)wishtv.com

[www.wistv.com](https://www.wistv.com/2026/07/23/orangeburg-county-considers-one-year-pause-data-center-developments/)wistv.com

[www.wivb.com](https://www.wivb.com/news/local-news/niagara-county/north-tonawanda/north-tonawanda-implements-2-year-ban-on-crypto-mining-establishments/)wivb.com

[www.wivk.com](https://www.wivk.com/2026/06/23/knox-county-commission-approves-one-year-moratorium-on-data-centers/)wivk.com

[www.wivk.com](https://www.wivk.com/2026/07/08/knoxville-approves-one-year-moratorium-on-large-data-centers/)wivk.com

[Dillon Mader on La Crosse County Board passing 18-month data center moratorium, WIZM](https://www.wizmnews.com/2026/06/18/mader-on-data-center-moratorium/)wizmnews.com

[wjbf.com](https://www.wjbf.com/news/col-co-approves-white-oak-technology-and-pumpkin-center-data-centers-votes-no-on-byrd-farm/)wjbf.com

[wjbf.com](https://www.wjbf.com/news/ive-honestly-been-feeling-a-lot-of-grief-pushback-grows-after-col-co-board-of-commissioners-approve-two-data-centers/)wjbf.com

[Holmes County moves forward with moratorium on AI data centers](https://www.wjhg.com/2026/06/03/holmes-county-moves-forward-with-moratorium-ai-data-centers/)wjhg.com

[wjhg.com](https://www.wjhg.com/2026/05/28/walton-county-commission-votes-write-up-ban-ai-data-centers/)wjhg.com

[www.wjhl.com](https://www.wjhl.com/news/local/brightridge-pauses-any-new-data-center-projects/)wjhl.com

[www.wjhl.com](https://www.wjhl.com/news/local/johnson-city-commission-approves-moratorium-on-data-centers/)wjhl.com

[www.wjhl.com](https://www.wjhl.com/news/local/data-center-moratorium-approved-by-bristol-tn-city-council/)wjhl.com

[www.wjhl.com](https://www.wjhl.com/news/local/washington-co-commissioners-to-consider-data-center-moratorium/)wjhl.com

[www.wjhl.com](https://www.wjhl.com/news/local/washington-county-commission-approves-data-center-moratorium/)wjhl.com

[www.wjhl.com](https://www.wjhl.com/news/local/washington-county-tn-data-center-moratorium/)wjhl.com

[www.wjle.com](https://www.wjle.com/county-commission-to-renew-discussion-about-proposed-data-center-regulations-view-video-here/)wjle.com

[www.wjle.com](https://www.wjle.com/dekalb-location-regulations-on-quarries-and-other-operations-now-unenforceable-after-state-supreme-court-ruling-in-grundy-county-case/)wjle.com

[www.wjle.com](https://www.wjle.com/could-dekalb-county-be-getting-a-nuclear-powered-data-center/)wjle.com

[www.wjle.com](https://www.wjle.com/county-commission-to-hear-from-public-on-proposed-data-center-regulations-under-county-powers-act/)wjle.com

[wjon.com](https://wjon.com/rice-city-council-data-center-vote/)wjon.com

[wkar.org](https://wkar.org)wkar.org

[www.wkar.org](https://www.wkar.org/wkar-news/2026-02-27/michigan-data-center-tracker-moratoria-legislation-and-grid-impact)wkar.org

[www.wkar.org](https://www.wkar.org/michigans-data-center-divide/2026-03-03/effort-to-hold-referendum-on-mason-data-center-ordinance-now-in-front-of-city-council)wkar.org

[www.wkar.org](https://www.wkar.org/wkar-news/2026-02-13/mason-data-center-referendum-signature-drive-enters-final-weekend)wkar.org

[www.wkar.org](https://www.wkar.org/michigans-data-center-divide/2026-04-06/proposed-data-center-wont-move-forward-in-lansing-as-deep-green-withdraws)wkar.org

[www.wkar.org](https://www.wkar.org/wkar-news/2026-03-18/east-lansing-passes-data-center-moratorium-while-evaluating-zoning-ordinances)wkar.org

[www.wkbn.com](https://www.wkbn.com/news/local-news/lordstown-news/developer-proposes-building-data-center-in-lordstown-area/)wkbn.com

[www.wkbn.com](https://www.wkbn.com/news/local-news/niles-news/niles-announces-decision-on-proposed-data-center-annexation/)wkbn.com

[wkbw.com](https://www.wkbw.com/genesee-county/genesee-county-residents-voice-concerns-over-planned-multi-billion-dollar-data-center)wkbw.com

[wkml.com](https://wkml.com/2026/01/29/fayetteville-economic-group-hosts-public-forum-on-data-center-plans-thursday/)wkml.com

[wkvi.com](https://wkvi.com/2025/12/starke-county-plan-commission-unanimously-recommend-a-moratorium-on-data-centers/)wkvi.com

[www.wkyc.com](https://www.wkyc.com/article/news/local/summit-county/norton-data-center-project-will-not-move-forward-city-council-ppg-mine-site-limestone-drive/95-13c2926a-e2b2-4e81-b9fb-0cdae35bb7ca)wkyc.com

[www.wkyc.com](https://www.wkyc.com/article/news/local/summit-county/norton-residents-push-back-proposed-data-center-quantum-hpc/95-bded910f-b3ba-496f-8a62-f41b5a0506c0)wkyc.com

[DartPoints data center won't get Lexington city incentives (WKYT)](https://www.wkyt.com/2026/06/08/dartpoints-data-center-coming-lexington-wont-get-city-incentives/)wkyt.com

[Versailles City Council approves data center moratorium - WKYT](https://www.wkyt.com/2026/06/17/versailles-city-council-approves-data-center-moratorium/)wkyt.com

[Woodford County, Midway working together on data center ban - WKYT](https://www.wkyt.com/2026/06/23/woodford-county-midway-working-together-data-center-ban/)wkyt.com

[wkyt.com](https://wkyt.com)wkyt.com

[www.wkyt.com](https://www.wkyt.com/2026/02/17/mercer-county-residents-oppose-proposed-data-center-farmland/)wkyt.com

[www.wkyt.com](https://www.wkyt.com/2026/07/16/burgin-city-council-cancels-special-called-meeting-regarding-annexation-ordinance/)wkyt.com

[www.wkyt.com](https://www.wkyt.com/2026/07/29/mercer-county-fiscal-court-approves-motion-data-center-moratorium/)wkyt.com

[wkyufm.org](https://www.wkyufm.org/news/2026-01-21/zoning-regulators-table-preliminary-development-plan-for-franklin-data-center)wkyufm.org

[wkyufm.org](https://www.wkyufm.org/news/2026-02-05/for-a-second-time-franklin-zoning-regulators-table-vote-on-data-center-proposal)wkyufm.org

[wkyufm.org](https://www.wkyufm.org/news/2026-03-04/feet-to-the-fire-preliminary-plan-for-franklin-data-center-approved)wkyufm.org

[wkyufm.org](https://www.wkyufm.org/news/2026-04-14/second-lawsuit-filed-over-proposed-data-center-in-simpson-county)wkyufm.org

[WKZO: Data center moratorium on Kalamazoo city commission agenda tonight](https://wkzo.com/2026/09/21/971915/)wkzo.com

[WKZO: Kalamazoo's data center moratorium moving forward](https://wkzo.com/2026/09/09/968129/)wkzo.com

[wkzo.com](https://wkzo.com/2026/02/25/894892/)wkzo.com

[wlbt.com](https://www.wlbt.com/2026/03/11/mdeq-approves-air-permit-xai-data-center-southaven-amid-community-opposition/)wlbt.com

[www.wlbt.com](https://www.wlbt.com/2026/04/20/jackson-city-councilman-seeking-temporary-moratorium-data-centers/)wlbt.com

[www.wlbt.com](https://www.wlbt.com/2026/05/20/public-sees-who-did-it-council-tables-ordinance-putting-moratorium-data-centers/)wlbt.com

[www.wlbt.com](https://www.wlbt.com/2026/06/18/data-center-rezoning-vote-postponed-city-works-amend-zoning-ordinance/)wlbt.com

[wlos.com](https://wlos.com/news/local/town-canton-moratorium-pause-data-centers-crypto-mining-noise-public-hearing-paper-mill-nature-resources-water-energy-technology-jobs-infrastructure-future-community-feb-11)wlos.com

[wlos.com](https://wlos.com/news/local/new-data-center-moratorium-hearing-meeting-clyde-wnc-western-north-carolina-leaders-local-residents-town-leaders-crypto-ai-server-farms)wlos.com

[wlrn.org](https://www.wlrn.org/florida-news/2026-06-30/polk-dad-suing-fort-meade-over-ai-data-center-has-concerns-about-living-next-door)wlrn.org

[www.wmar2news.com](https://www.wmar2news.com/news/region/harford-county/harford-county-council-introduces-bill-to-pause-data-center-development-after-community-pushback)wmar2news.com

[www.wmra.org](https://www.wmra.org/2025-09-17/data-centers-boom-or-bust-for-albemarle-county)wmra.org

[Dane County votes temporary stop on data center permits](https://www.wmtv15news.com/2026/06/05/dane-county-board-supervisors-votes-temporary-stop-permits-data-centers-unincorporated-areas/)wmtv15news.com

[wmtv15news.com](https://wmtv15news.com)wmtv15news.com

[www.wmtv15news.com](https://www.wmtv15news.com/2026/07/29/town-janesville-planning-zoning-committee-recommends-data-center-moratorium/)wmtv15news.com

[wnanews.com](https://wnanews.com/2026/02/23/group-alleges-port-washington-city-officials-violated-open-meetings-law/)wnanews.com

[wndu.com](https://www.wndu.com/2026/04/25/vandalia-holds-town-hall-meeting-discuss-potential-data-center-developers-cass-county/)wndu.com

[wndu.com](https://www.wndu.com/2026/07/14/dowagiac-residents-confront-data-center-over-noise-water-concerns-expansion-looms/)wndu.com

[wndu.com](https://www.wndu.com/2026/05/12/officials-approve-30-day-moratorium-data-center-penn-township-residents-request-longer-term-option/)wndu.com

[wndu.com](https://www.wndu.com/2026/05/13/porter-township-approves-one-year-moratorium-establish-data-center-guidelines/)wndu.com

[www.wndu.com](https://www.wndu.com/2025/12/05/starke-county-planning-commission-approves-one-year-data-center-moratorium/)wndu.com

[www.wndu.com](https://www.wndu.com/2025/12/10/st-joseph-county-council-meets-vote-data-center-proposal-new-carlisle/)wndu.com

[www.wndu.com](https://www.wndu.com/2026/03/03/fulton-county-commissioners-approve-one-year-moratorium-data-center-construction/)wndu.com

[www.wndu.com](https://www.wndu.com/2026/02/11/fulton-county-approves-12-month-data-center-moratorium-after-heated-public-hearing/)wndu.com

[www.wndu.com](https://www.wndu.com/2025/04/22/kosciusko-county-commissioners-say-no-proposed-data-center-leesburg/)wndu.com

[www.wndu.com](https://www.wndu.com/2025/12/26/proposed-ai-data-center-expansion-raises-concerns-among-dowagiac-residents/)wndu.com

[www.wndu.com](https://www.wndu.com/2026/04/17/new-buffalo-township-pauses-data-center-development-one-year/)wndu.com

[www.wnem.com](https://www.wnem.com/2026/01/13/city-saginaw-placing-moratorium-data-centers/)wnem.com

[www.wnem.com](https://www.wnem.com/2026/01/22/grand-blanc-twp-passes-moratorium-data-centers/)wnem.com

[wnep.com](https://www.wnep.com/article/news/local/lackawanna-county/data-center-lackawanna-county-archbald-blakely-jessup-council-votes/523-627d1d15-f8e2-436e-be39-732ec3ee3b26)wnep.com

[www.wnep.com](https://www.wnep.com/article/news/local/lackawanna-county/data-center-developer-withdraws-proposal-for-blakely-construction/523-976b3357-7ae2-4da0-b0f5-55eb44fb7afa)wnep.com

[www.wnep.com](https://www.wnep.com/article/news/local/lackawanna-county/lackawanna-county-residents-oppose-development-of-proposed-data-center-covington-township/523-b0e39051-dc3e-406e-a10d-7b59a62f3ca4)wnep.com

[www.wnep.com](https://www.wnep.com/article/news/local/lackawanna-county/dickson-city-limits-data-centers-amid-resident-concerns-lackawanna-county/523-553a4711-331e-48d0-9ead-eabe295b60c8)wnep.com

[www.wnep.com](https://www.wnep.com/article/news/local/schuylkill-county/schuylkill-county-frackville-data-center-new-castle-krnl-zoning/523-1e14d019-77cd-4b00-ab8e-b4cbbbaeba93)wnep.com

[www.wnep.com](https://www.wnep.com/article/news/local/luzerne-county/luzerne-county-drafts-zoning-rules-to-manage-potential-data-center-influx-northeastern-central-pennsylvania/523-ca8c448a-ce59-4dd4-aa94-ed206182a395)wnep.com

[wnewsj.com](https://www.wnewsj.com/2026/02/25/wilmington-group-seeks-signatures-to-halt-data-center-development/)wnewsj.com

[wnewsj.com](https://www.wnewsj.com/2025/11/21/protest-planned-ahead-of-council-vote-on-proposed-amazon-data-center/)wnewsj.com

[wnewsj.com](https://www.wnewsj.com/2025/12/18/officials-address-water-power-concerns-at-data-center-town-hall/)wnewsj.com

[wnewsj.com](https://www.wnewsj.com/2026/03/12/wilmington-planning-commission-tables-data-center-zoning-amendment/)wnewsj.com

[wnewsj.com](https://www.wnewsj.com/2026/04/23/residents-file-lawsuit-over-proposed-aws-data-center-in-wilmington/)wnewsj.com

[www.wnewsj.com](https://www.wnewsj.com/2026/01/05/wilmington-group-calls-for-added-protections-in-proposed-aws-data-center-project/)wnewsj.com

[www.wnewsj.com](https://www.wnewsj.com/2026/02/20/blanchester-council-approves-data-center-moratorium-speed-limit-reductions/)wnewsj.com

[www.wnewsj.com](https://www.wnewsj.com/2025/12/03/officials-detail-4b-aws-data-center-proposal-infrastructure-plans/)wnewsj.com

[www.wnewsj.com](https://www.wnewsj.com/2026/02/20/council-approves-rezonings-in-a-split-vote-amid-data-center-debate/)wnewsj.com

[www.wnir.com](https://www.wnir.com/2026/04/15/data-center-ban/)wnir.com

[wnky.com](https://wnky.com)wnky.com

[wnky.com](https://www.wnky.com/city-of-franklin-planning-zoning-commission-tables-data-center-vote-for-4th-time/)wnky.com

[wnky.com](https://www.wnky.com/judge-hears-oral-arguments-in-franklin-data-center-lawsuit-takes-motions-under-advisement/)wnky.com

[woodburycountyiowa.gov](https://woodburycountyiowa.gov)woodburycountyiowa.gov

[www.woodburycountyiowa.gov](https://www.woodburycountyiowa.gov/supervisors/resolutions/14064/)woodburycountyiowa.gov

[www.woodtv.com](https://www.woodtv.com/news/kent-county/data-center-concerns-shared-at-solon-township-meeting/)woodtv.com

[www.woodtv.com](https://www.woodtv.com/news/kent-county/gaines-township-planning-commission-to-hold-hearing-on-data-center-rezoning/)woodtv.com

[wordinblack.com](https://wordinblack.com/2025/09/alabama-data-center-is-hush-hush/)wordinblack.com

[www.world-nuclear-news.org](https://www.world-nuclear-news.org/articles/new-supply-agreement-expands-talen-amazon-partnership)world-nuclear-news.org

[www.wosu.org](https://www.wosu.org/politics-government/2025-09-09/jerome-township-puts-pause-on-new-data-center-development-for-nine-months)wosu.org

[www.wosu.org](https://www.wosu.org/2026-03-04/urbana-passes-moratorium-on-new-data-centers-leaving-1b-proposal-in-limbo)wosu.org

[woub.org](https://woub.org/2026/04/13/data-centers-boost-appalachian-ohio-experts-say-complicated/)woub.org

[www.wowktv.com](https://www.wowktv.com/news/ohio/lawrence-county-oh/lawrence-county-residents-unhappy-with-data-center-deal/)wowktv.com

[www.wowktv.com](https://www.wowktv.com/news/ohio/lawrence-county-oh/new-ai-and-data-center-coming-to-lawrence-county-ohio/)wowktv.com

[www.wowktv.com](https://www.wowktv.com/news/ohio/lawrence-county-oh/lawrence-county-leaders-to-discuss-new-ai-data-center/)wowktv.com

[wpbf.com](https://www.wpbf.com/article/florida-fort-pierce-data-center-rezoning/73780241)wpbf.com

[wpr.org](https://wpr.org)wpr.org

[www.wpr.org](https://www.wpr.org/news/menomonie-mayor-defends-move-to-halt-massive-data-center-project)wpr.org

[www.wpr.org](https://www.wpr.org/news/menomonie-mayor-puts-data-center-proposal-on-hold)wpr.org

[www.wpr.org](https://www.wpr.org/news/data-center-proposed-menomonie-strong-response-concerned-citizens)wpr.org

[www.wpr.org](https://www.wpr.org/energy/deforest-wont-move-forward-data-center)wpr.org

[www.wpr.org](https://www.wpr.org/news/northeast-wisconsin-towns-1-year-moratorium-data-centers)wpr.org

[www.wpr.org](https://www.wpr.org/news/manitowoc-county-committee-recommends-moratorium-data-center-permitting)wpr.org

[www.wpr.org](https://www.wpr.org/wp-content/uploads/2025/08/Data-Center-Press-Release-8-20-25.pdf)wpr.org

[www.wpr.org](https://www.wpr.org/news/port-washington-council-approves-tid)wpr.org

[www.wpr.org](https://www.wpr.org/news/port-washington-limits-construction-hours-data-center-project-after-complaints)wpr.org

[www.wpr.org](https://www.wpr.org/news/mount-pleasant-approves-site-plans-microsoft-data-center-expansion)wpr.org

[wqcs.org](https://www.wqcs.org/wqcs-news/2026-09-18/martin-county-commission-compromises-on-rezoning-application-amidst-data-center-concerns)wqcs.org

[www.wqow.com](https://www.wqow.com/news/chippewa-valley/new-data-center-ordinance-introduced-in-menomonie-residents-continue-to-protest/article_53bb6671-7f82-456c-a679-15d8c1b5c8f7.html)wqow.com

[wral.com](https://wral.com)wral.com

[wral.com](https://www.wral.com/news/local/durham-city-council-data-center-meeting-may-2026/)wral.com

[www.wral.com](https://www.wral.com/news/local/natelli-withdraws-apex-data-center-project-shearon-harris-march-2026/)wral.com

[www.wral.com](https://www.wral.com/news/local/qts-data-center-lake-wylie-york-county-sc-feb-2026/)wral.com

[www.wral.com](https://www.wral.com/news/local/apex-data-center-moratorium-public-hearing-march-2026/)wral.com

[www.wral.com](https://www.wral.com/news/local/central-north-carolina-data-center-plans-april-2026/)wral.com

[www.wral.com](https://www.wral.com/news/local/vance-county-board-approves-rezoning-potential-data-center-development-april-2026/)wral.com

[www.wral.com](https://www.wral.com/news/local/orange-county-one-year-pause-building-new-data-centers-april-2026/)wral.com

[wrbiradio.com](https://wrbiradio.com/fc-commissioners-ok-data-center-moratorium-extension/)wrbiradio.com

[wrbiradio.com](https://wrbiradio.com/crowd-packs-meeting-on-data-center/)wrbiradio.com

[wrdw.com](https://www.wrdw.com/2025/11/17/columbia-county-leaders-hold-hearing-proposed-data-center/)wrdw.com

[wrdw.com](https://www.wrdw.com/2026/02/04/columbia-co-passes-one-data-center-others-be-voted/)wrdw.com

[wrdw.com](https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/)wrdw.com

[wrdw.com](https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/)wrdw.com

[wrdw.com](https://www.wrdw.com/2026/07/21/augusta-leaders-extend-moratorium-new-data-centers/)wrdw.com

[www.wrdw.com](https://www.wrdw.com/2026/06/05/newberry-county-passes-1-year-data-center-moratorium/)wrdw.com

[wreg.com](https://wreg.com/news/memphis-city-council-approves-xai-land-deal/)wreg.com

[wric.com](https://www.wric.com/news/local-news/goochland-county/technology-overlay-district-advances-narrowly/)wric.com

[www.wric.com](https://www.wric.com/news/local-news/henrico-county/zoning-appeals-denies-centra-logistics-data-center/)wric.com

[Data Centers daily notes May 19 2026 (Otoe County)](https://writing.strisker.com/data-centers-daily-notes-may-19-2026/)writing.strisker.com

[Data Centers daily notes May 25 2026 (Washington Twp Macomb)](https://writing.strisker.com/data-centers-daily-notes-may-25-2026/)writing.strisker.com

[Data Centers: Daily Notes | June 17, 2026 - Strisker](https://writing.strisker.com/data-centers-daily-notes-june-17-2026/)writing.strisker.com

[Data Centers: Daily Notes | June 18, 2026 - Strisker](https://writing.strisker.com/data-centers-daily-notes-june-18-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-april-15-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-march-19-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-march-30-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-weekly-briefing-march-30-april-3-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-april-2-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-april-1-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-april-7-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-april-16-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-july-15-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-weekly-briefing-april-13-17-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-daily-notes-may-11-2026/)writing.strisker.com

[writing.strisker.com](https://writing.strisker.com/data-centers-weekly-briefing-september-14-18-2026/)writing.strisker.com

[wrnjradio.com](https://wrnjradio.com/warren-county-commissioner-shares-model-ordinance-on-data-center-siting/)wrnjradio.com

[wrvo.org](https://wrvo.org)wrvo.org

[WSAV: Bulloch County commissioners deny data center ban in narrow vote](https://www.wsav.com/news/local-news/bulloch-county-commissioners-deny-data-center-ban-in-narrow-vote/)wsav.com

[wsaz.com](https://www.wsaz.com/2026/06/02/neighbors-ask-questions-address-concerns-data-center-town-hall/)wsaz.com

[www.wsbradio.com](https://www.wsbradio.com/news/local/cobb-county-approves-temporary-ban-new-data-centers/2L4HP572S5ENLO2RQQYH7RO2TY/)wsbradio.com

[wsbt.com](https://wsbt.com/news/local/data-center-new-plans-email-leak-screenshots-abei-energy-meeting-community-discussion-planning-commission-board-starke-county-indiana)wsbt.com

[wsbt.com](https://wsbt.com/news/local/st-joseph-county-council-denies-rezoning-of-land-for-data-center-votes-7-2-marathon-meeting-hours-long-public-opinion-13-billion-dollar-project-amazon-new-carlisle-approval-process-plan-commission-st-joseph-county-indiana)wsbt.com

[wsbt.com](https://wsbt.com/news/local/dowagiac-residents-hold-anti-data-center-rally-ask-city-leaders-for-moratorium)wsbt.com

[wsbt.com](https://wsbt.com/news/local/penn-township-michigan-board-considers-data-center-moratorium-in-cass-county)wsbt.com

[wsbt.com](https://wsbt.com/news/local/st-joseph-county-council-to-decide-rezoning-of-land-for-data-center-new-carlisle-third-water-electrical-supply-county-city-building-protestors-south-bend-indiana)wsbt.com

[wsbt.com](https://wsbt.com/news/local/bristol-residents-demand-data-center-pause-no-data-center-agenda-discussion-taking-place-moratorium-no-authority-zoning-elkhart-county-decision-town-council-indiana)wsbt.com

[wsbtv.com](https://www.wsbtv.com/news/local/data-centers-water-secrets-companies-using-ndas-hide-water-usage-georgia/ESYQS4GRDVAM7A6EJUQKGXTPWY/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/clayton-county/clayton-county-commissioners-pass-data-center-moratorium-through-end-year/Z6267BV7TVAEPG7I35KHP2PFT4/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/lagrange-city-council-passes-180-day-moratorium-data-centers/LFCNYS3HWRE3VJ3AJBBLRT3COA/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/spalding-county/griffin-city-council-passes-data-center-moratorium-through-mid-july/FW2ZW2LYFZEGJJLRHZYLUD3VXA/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/walton-county/city-social-circle-bans-new-data-center-applications-90-days/JGRPK34JC5AGRA5V5KH6YCXVWA/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/fulton-county/roswell-city-council-passes-data-center-moratorium/T7ADKHVC65GP7B336YFAHDXXCU/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/cobb-county/cobb-county-commissioners-discuss-possible-data-center-moratorium/2ZSO5R6PHBF37EOPULZWQFDXZU/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/hall-county/hall-county-commission-debating-180-day-data-center-moratorium/OOHPTCO4TJEL3H7MBY2FIVJZQM/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/hall-county/plans-12b-data-center-abandoned-hall-county/3T36FITZWRBMXD5USUERFBILRY/)wsbtv.com

[www.wsbtv.com](https://www.wsbtv.com/news/local/newton-county/data-center-gas-station-store-moratoriums-extended-metro-atlanta-community/L3ABWDQG5FBIFBE4HZ6HOZZWME/)wsbtv.com

[wset.com](https://wset.com/news/local/campbell-county-faces-data-center-proposals-as-residents-call-for-stricter-regulations-route-460-concord-cabin-field-road-mesh-capital-llc-supervisor-matthew-kline-november-2025)wset.com

[wset.com](https://wset.com/news/local/pittsylvania-county-updates-plan-to-manage-data-center-growth-after-local-pushback-november-2025)wset.com

[wset.com](https://wset.com/news/local/campbell-county-requires-special-use-permits-for-data-centers-after-unanimous-board-vote-may-2026)wset.com

[wset.com](https://wset.com/news/local/franklin-county-leaders-halt-new-zoning-ordinance-proposal-amid-community-backlashfeedback-livestock-chickens-beekeeping-data-centers-land-property-14-may-2026)wset.com

[www.wskg.org](https://www.wskg.org/regional-news/2026-02-27/dryden-says-no-to-data-centers-cryptocurrency-mines)wskg.org

[wsls.com](https://www.wsls.com/news/local/2026/05/10/franklin-county-zoning-debate-raises-questions-about-data-centers/)wsls.com

[wsmv.com](https://www.wsmv.com/2026/06/14/petition-against-proposed-data-center-next-nashville-zoo-gets-more-than-400000-signatures/)wsmv.com

[wsmv.com](https://www.wsmv.com/2026/07/08/data-center-outrage-hundreds-pack-protest-during-hours-long-meeting-nashville/)wsmv.com

[wsmv.com](https://www.wsmv.com/2026/07/08/nashville-data-center-restrictions-advance-after-record-setting-council-meeting-heres-what-you-should-know/)wsmv.com

[wsmv.com](https://www.wsmv.com/2026/01/20/massive-data-center-is-being-pushed-blink-you-miss-us-kentucky-town-locals-are-pushing-back/)wsmv.com

[wsmv.com](https://www.wsmv.com/2026/06/02/cedar-hill-imposes-two-year-moratorium-data-centers/)wsmv.com

[wsmv.com](https://www.wsmv.com/2026/04/14/naacp-sues-xai-alleging-unlawful-operation-gas-turbines-southaven/)wsmv.com

[Greenwood County considers data center regulations (WSPA)](https://www.wspa.com/news/local-news/greenwood-co-considers-data-center-regulations-residents-question-motives/)wspa.com

[Spartanburg County Council gives first approval of data center moratorium (WSPA)](https://www.wspa.com/news/local-news/spartanburg-county-council-gives-first-approval-of-data-center-moratorium/)wspa.com

[Spartanburg County to explore data center moratorium (WSPA)](https://www.wspa.com/news/local-news/spartanburg-county-council-to-explore-data-center-moratorium/)wspa.com

[WSPA: Laurens County approves one-year data center moratorium](https://www.wspa.com/news/laurens-county-data-center-moratorium-approved/)wspa.com

[www.wspa.com](https://www.wspa.com/news/if-they-come-they-need-their-own-power-cherokee-co-sets-limits-on-data-centers/)wspa.com

[www.wspynews.com](https://www.wspynews.com/news/local/yorkville-tables-meyer-property-data-center-rezoning/article_ebc51183-539f-4243-91cc-83cbf03130f3.html)wspynews.com

[www.wthr.com](https://www.wthr.com/article/news/local/constructions-begins-10-billion-dollar-meta-data-center-campus-leap-district-lebanon-boone-county/531-c85df967-1125-4606-b7cd-2323e7efc019)wthr.com

[www.wthr.com](https://www.wthr.com/article/news/local/clinton-county-commissioners-reject-data-center-project-over-growing-concerns-rezoning-plan-proposal/531-30cc9c05-69e5-4fb6-b510-78929ce6751b)wthr.com

[Virginia Beach City Council unanimously rejects future data centers](https://www.wtkr.com/news/in-the-community/virginia-beach/virginia-beach-city-council-unanimously-rejects-future-data-centers-residents-applaud-the-decision)wtkr.com

[wtmj.com](https://wtmj.com/news/2025/12/23/a-look-back-at-wisconsins-year-of-the-data-center/)wtmj.com

[www.wtol.com](https://www.wtol.com/article/news/local/oregon-residents-push-back-proposed-data-center-seek-answers-town-hall/512-41138c04-fee2-4ef3-bc8a-531620f642e6)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/oregon-law-director-says-data-center-ordinance-passed-despite-abstention/512-df0cbd9d-4d23-47ce-afed-d228ff493820)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/richfield-township-residents-pushback-proposed-rezoning-data-center/512-1d509772-05e2-49bb-8813-68f74e0adf42)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/monclova-township-approves-12-month-moratorium-on-data-centers/512-9307862d-1a3c-45f9-acf2-8b49f0222efc)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/monclova-township-community-pushback-possible-data-center/512-db210b53-6e11-4808-b049-d59871972754)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/monclova-twp-residents-protest-potential-data-center-development/512-bc9d6813-3c34-4809-b3ee-ab7c48d16d6f)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/middleton-township-trustees-rezoning-withdrawal-near-meta-data-center/512-5da23a41-89d4-442c-a42b-9bf31ed90e0d)wtol.com

[www.wtol.com](https://www.wtol.com/article/news/local/findlay-and-tiffin-pass-12-month-data-center-moratoriums-tuesday/512-cd6a8b2a-c423-404d-abbc-2e2b1c7afe4b)wtol.com

[Montgomery County rolls out 6-month data center permit moratorium (WTOP)](https://wtop.com/maryland/2026/06/montgomery-county-rolls-out-a-6-month-moratorium-on-permits-for-data-centers/)wtop.com

[wtop.com](https://wtop.com/montgomery-county/2026/02/coming-at-us-way-too-fast-public-comment-on-data-centers-in-montgomery-county/)wtop.com

[wtop.com](https://wtop.com/prince-william-county/2025/11/digital-gateway-data-center-builders-barred-from-beginning-construction-until-legal-challenge-plays-out/)wtop.com

[wtop.com](https://wtop.com/prince-georges-county/2026/07/prince-georges-co-extends-pause-on-hyperscale-data-center-development/)wtop.com

[wtop.com](https://wtop.com/prince-william-county/2026/07/prince-william-co-supervisors-deny-2000-acre-dulles-south-data-center-plans/)wtop.com

[wtsp.com](https://www.wtsp.com/article/news/local/polkcounty/fort-meade-data-center-town-hall/67-4cceada6-6b09-44b3-9457-1b9cb466a941)wtsp.com

[wtvm.com](https://www.wtvm.com/2026/06/26/upatoi-residents-file-lawsuit-block-columbus-data-center-overlay-district/)wtvm.com

[wtvr.com](https://www.wtvr.com/news/local-news/hanover-planning-commission-hhhunt-data-center-rezoning-jan-15-2026)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hhhunt-community-meeting-nov-17-2025)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/route-33-data-center-plan-feb-19-2026)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hanover-data-center-proposal-sept-8-2025)wtvr.com

[wtvr.com](https://www.wtvr.com/news/local-news/hhhunt-withdraws-data-center-application-jan-28-2026)wtvr.com

[www.wtvr.com](https://www.wtvr.com/news/local-news/data-center-site-denied-feb-27-2026)wtvr.com

[www.wtvr.com](https://www.wtvr.com/news/local-news/chesterfield-data-centers-jan-5-2026)wtvr.com

[www.wtxl.com](https://www.wtxl.com/news/local-news/in-your-neighborhood/lowndes-county/lowndes-county-citizens-push-back-on-potential-data-centers-during-town-hall)wtxl.com

[www.wuga.org](https://www.wuga.org/local-news/2025-12-03/acc-commission-pauses-new-data-centers-manager-says-athena-studios-data-center-would-need-rezone)wuga.org

[WUNC: Durham County approves a nine-month moratorium on large data centers](https://www.wunc.org/environment/2026-08-26/durham-county-data-center-moratorium)wunc.org

[WUNC: Raleigh City Council will soon consider a six-month pause](https://www.wunc.org/environment/2026-09-16/raleigh-cary-data-center-moratorium)wunc.org

[wunc.org](https://wunc.org)wunc.org

[www.wunc.org](https://www.wunc.org/environment/2026-03-05/proposed-data-center-new-hill-digital-campus-wake-county-apex)wunc.org

[www.wunc.org](https://www.wunc.org/environment/2026-03-11/apex-data-center-moratorium-wake-county)wunc.org

[www.wunc.org](https://www.wunc.org/2026-03-17/lee-county-residents-ask-for-a-data-center-moratorium)wunc.org

[www.wunc.org](https://www.wunc.org/2026-03-23/boone-approves-data-center-development-moratorium)wunc.org

[www.wunc.org](https://www.wunc.org/environment/2026-04-10/opposition-to-data-centers-is-catching-a-fire-across-north-carolina-spurring-political-challenges)wunc.org

[www.wunc.org](https://www.wunc.org/environment/2026-04-22/orange-county-moratorium-data-centers)wunc.org

[www.wunc.org](https://www.wunc.org/2026-07-21/surry-county-enacts-two-year-data-center-development-moratorium)wunc.org

[Central Florida Public Media (via WUSF): Orange County plans a moratorium on AI data centers](https://www.wusf.org/politics-issues/2026-09-16/orange-county-plans-a-moratorium-on-ai-data-centers)wusf.org

[wusf.org](https://wusf.org/text/politics-issues/2026-07-03/lakeland-releases-proposed-data-center-moratorium-ordinance)wusf.org

[wusf.org](https://wusf.org)wusf.org

[wusf.org](https://www.wusf.org/environment/2026-06-30/polk-county-father-suing-fort-meade-ai-data-center-concerns)wusf.org

[www.wusf.org](https://www.wusf.org/environment/2026-02-16/proposals-massive-data-centers-across-florida-are-local-governments-prepared)wusf.org

[wuwf.org](https://wuwf.org)wuwf.org

[wvhighlands.org](https://www.wvhighlands.org/article/despite-public-pushback-west-virginia-approves-air-quality-permits-for-data-center-energy-campus-in-mingo-county/)wvhighlands.org

[wvhighlands.org](https://www.wvhighlands.org/2026/03/11/air-quality-permit-fight-continues-against-proposed-ridgeline-power-plant-and-data-center/)wvhighlands.org

[wvia.org](https://www.wvia.org/news/local/2025-11-25/crammed-angered-archbald-residents-express-disapproval-as-council-approves-controversial-data-center-zoning-amendment)wvia.org

[wvia.org](https://www.wvia.org/news/local/2026-01-29/archbald-council-hears-from-data-center-developer-eyeing-500-acre-site-possible-mine-water-use)wvia.org

[wvia.org](https://www.wvia.org/news/local/2026-03-19/data-center-concerns-prompt-regime-change-in-archbald)wvia.org

[wvia.org](https://www.wvia.org/news/local/2026-03-27/archbald-denies-18-building-data-center-campus-during-special-friday-afternoon-meeting)wvia.org

[wvia.org](https://www.wvia.org/news/local/2026-01-03/clifton-twp-supervisors-settle-with-data-center-developer-residents-promise-litigation)wvia.org

[wvia.org](https://www.wvia.org/news/local/2026-01-21/data-centers-ransom-twp-denies-zoning-amendment-request-after-residents-lawyer-points-out-flaws)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-02-17/lackawanna-county-commissioner-gaughan-asks-shapiro-and-pa-legislature-for-statewide-data-center-moratorium)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-01-28/lackawanna-county-judge-holds-hearing-on-clifton-twp-data-center-settlement-challenges)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-02-04/data-centers-residents-fear-negative-impacts-on-water-resources-as-data-centers-are-proposed-across-northeast-pa)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-02-13/dickson-city-council-oks-zoning-ordinance-allowing-data-centers-in-boroughs-manufacturing-district)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-03-03/penn-forest-twp-supervisors-approve-regulations-for-data-center-development)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-02-28/least-worst-option-carbon-county-community-faces-data-center-challenges)wvia.org

[www.wvia.org](https://www.wvia.org/news/local/2026-02-18/residents-raise-questions-as-developer-describes-hazle-twp-data-center-plans-at-dep-hearing)wvia.org

[Anderson County 2-year data center moratorium (WVLT)](https://www.wvlt.tv/2026/06/16/anderson-county-commission-proposes-2-year-moratorium-local-data-centers/)wvlt.tv

[wvlt.tv](https://www.wvlt.tv/2026/05/08/knox-county-consider-limits-data-centers-noise-looks-utilities/)wvlt.tv

[www.wvlt.tv](https://www.wvlt.tv/2026/07/14/they-are-monster-deal-with-during-emergency-events-another-east-tennessee-county-moves-closer-pausing-data-centers/)wvlt.tv

[wvmetronews.com](https://wvmetronews.com/2026/02/07/air-quality-board-sides-with-developers-of-tucker-county-data-center/)wvmetronews.com

[www.wvpe.org](https://www.wvpe.org/wvpe-news/2024-09-20/bristol-approves-controversial-data-center-rezoning)wvpe.org

[wvpublic.org](https://wvpublic.org/story/energy-environment/state-regulators-hear-two-days-of-evidence-in-appeal-of-tucker-county-data-center-permits/)wvpublic.org

[Butler County Commissioners approve short-term data center moratorium, WVXU](https://www.wvxu.org/environment/2026-06-17/butler-county-approves-data-center-moratorium)wvxu.org

[WVXU: Pierce Township extends data center moratorium (September 9, 2026)](https://www.wvxu.org/local-news/2026-09-09/pierce-township-data-center-moratorium-surprise-pitch)wvxu.org

[www.wvxu.org](https://www.wvxu.org/environment/2026-02-25/dearborn-county-moratorium-solar-farms-data-center)wvxu.org

[www.wvxu.org](https://www.wvxu.org/politics/2026-02-06/cincinnati-regulate-data-centers-zoning-code)wvxu.org

[www.wvxu.org](https://www.wvxu.org/politics/2026-03-06/planning-commission-data-center-regulations)wvxu.org

[wwals.net](https://wwals.net/2026/02/23/datacenters-meeting-lowndes-county-ga-2026-02-17/)wwals.net

[wwals.net](https://wwals.net/2026/03/16/irwinville-data-center-withdrawn-by-applicant-irwin-county-commission-2026-03-02/)wwals.net

[wwals.net](https://wwals.net/2026/03/02/datacenter-special-exception-public-hearing-irwin-county-commission-2026-03-02/)wwals.net

[wwals.net](https://wwals.net/2026/03/24/suggested-additional-sections-for-irwin-county-datacenter-ordinance-wwals-2026-03-17/)wwals.net

[wweek.com](https://www.wweek.com/news/courts/2026/06/23/opponents-sue-to-block-17-proposed-data-centers-in-hillsboro/)wweek.com

[www.wwlp.com](https://www.wwlp.com/news/local-news/hampden-county/westfield-council-halts-new-data-center-projects-for-a-year/)wwlp.com

[wwmt.com](https://wwmt.com/news/local/oshtemo-charter-township-considers-data-center-moratorium-portage-ai-artificial-intelligence-debate-development-battery-energy-bess-west-michigan)wwmt.com

[wwmt.com](https://wwmt.com/news/local/microsoft-data-center-proposal-protest-processing-information-farm-life-community-dorr-township-allegan-county-west-michigan-infrastructure-development)wwmt.com

[wwmt.com](https://wwmt.com/news/local/portage-considers-one-year-moratorium-data-centers-battery-energy-storage-systems-bess-facilities-development-michigan-wwmt)wwmt.com

[wwmt.com](https://wwmt.com/news/local/cass-county-urges-more-transparency-data-center-development-new-resolution-dowagiac-hyperscale-energy-water-cooling-noise)wwmt.com

[www.wwno.org](https://www.wwno.org/economy/2026-01-29/new-orleans-city-council-bans-data-center-development-for-a-year-heres-why)wwno.org

[La Crosse County Board approves data center moratorium, WXOW](https://www.wxow.com/news/la-crosse-county-board-approves-data-center-moratorium/article_89162c21-3240-4d86-9e2d-8a6c3489ddc8.html)wxow.com

[wxxinews.org](https://www.wxxinews.org/local-news/2025-02-06/big-data-centers-eying-genesee-county-tech-park-face-widespread-opposition)wxxinews.org

[wxxinews.org](https://www.wxxinews.org/local-news/2025-09-18/genesee-county-stamp-site-data-center-on-hold-as-expansion-gets-pursued)wxxinews.org

[www.wxyz.com](https://www.wxyz.com/news/data-centers/northville-city-council-unanimously-approves-12-month-data-center-moratorium)wxyz.com

[www.wxyz.com](https://www.wxyz.com/news/data-centers/sterling-heights-city-council-approves-moratorium-on-data-centers)wxyz.com

[wxyz.com](https://www.wxyz.com/news/data-centers/judge-rules-against-saline-township-residents-motion-to-intervene-in-data-center-agreement)wxyz.com

[wxyz.com](https://www.wxyz.com/news/data-centers/michigan-public-service-commission-approves-dte-contract-for-saline-township-data-center-project)wxyz.com

[www.wymt.com](https://www.wymt.com/2026/07/02/bell-county-passes-data-center-moratorium-halting-construction-2-years/)wymt.com

[wymt.com](https://wymt.com)wymt.com

[www.wyomingpublicmedia.org](https://www.wyomingpublicmedia.org/natural-resources-energy/2026-03-27/some-mountain-west-counties-impose-moratoriums-on-data-centers-as-national-pause-is-proposed)wyomingpublicmedia.org

[WYPR: Extending Baltimore County's data center moratorium: needed time or political theater?](https://www.wypr.org/wypr-news/2026-09-01/extending-baltimore-countys-data-center-moratorium-needed-time-or-political-theater)wypr.org

[wypr.org](https://www.wypr.org/wypr-news/2026-07-24/klausmeier-supports-baltimore-county-data-center-moratorium-extension)wypr.org

[www.wyshradio.com](https://www.wyshradio.com/2026/04/data-centers-will-be-allowed-in-rocky-top/)wyshradio.com

[www.wyso.org](https://www.wyso.org/news/2025-12-02/amazon-proposes-4b-data-center-in-wilmington-seeks-tax-abatement)wyso.org

[wysu.org](https://wysu.org/ohio-news/2026-03-26/proposed-amendment-to-ban-huge-data-centers-in-ohio-can-move-to-next-step)wysu.org

[www.wzzm13.com](https://www.wzzm13.com/article/news/local/dorr-township-microsoft-data-center-push-back/69-5e4a1d67-c97d-42c5-8568-37ce6fe69485)wzzm13.com

[www.wzzm13.com](https://www.wzzm13.com/article/news/local/caledonia-data-center-moratorium/69-6fe38f60-5ecf-4404-bfbc-7a5e1b377d7e)wzzm13.com

[www.wzzm13.com](https://www.wzzm13.com/article/news/local/cascade-township-board-unanimously-approves-6-month-moratorium-data-center-approvals/69-77ed781c-e14a-4390-b8e4-cbe0234416a7)wzzm13.com

[Yadkin Ripple: Moratorium approved for Yadkin County as potential Yadkinville data center project announced](https://www.yadkinripple.com/news/moratorium-approved-for-yadkin-county-as-potential-yadkinville-data-center-project-announced/article_485d48fb-c61b-4167-b885-3d469e9a6bbe.html)yadkinripple.com

[AL.com (via Yahoo News): Fast-growing Foley moves to get ahead of data centers with proposed moratorium](https://www.yahoo.com/news/us/articles/fast-growing-foley-moves-ahead-110154791.html)yahoo.com

[Moosic to work on ordinance regulating data centers](https://www.yahoo.com/news/articles/moosic-ordinance-regulating-data-centers-190600840.html)yahoo.com

[WHO 13 (via Yahoo News): Marshalltown temporarily pauses data center development](https://www.yahoo.com/news/us/articles/marshalltown-temporarily-pauses-data-center-031843005.html)yahoo.com

[www.yahoo.com](https://www.yahoo.com/news/articles/gibraltar-presses-pause-data-centers-023007498.html)yahoo.com

[www.yahoo.com](https://www.yahoo.com/news/articles/kansas-county-puts-moratorium-data-230922244.html)yahoo.com

[www.yahoo.com](https://www.yahoo.com/news/us/articles/massillon-adjusting-proposed-zoning-rules-001651578.html)yahoo.com

[www.yahoo.com](https://www.yahoo.com/news/articles/dayton-city-plan-board-recommends-220603880.html)yahoo.com

[www.yahoo.com](https://www.yahoo.com/news/us/articles/florida-citys-proposed-data-center-171700505.html)yahoo.com

[yahoo.com](https://www.yahoo.com/news/us/articles/overwhelming-outrage-public-floods-courthouse-191100405.html)yahoo.com

[yahoo.com](https://www.yahoo.com/news/us/articles/mexico-judge-dismisses-project-jupiter-223024861.html)yahoo.com

[yahoo.com](https://www.yahoo.com/news/articles/sanford-approves-data-center-regulations-181800351.html)yahoo.com

[Tri-City Herald (via Yakima Herald-Republic): Pasco residents push back on data centers, ask city to extend moratorium](https://www.yakimaherald.com/news/northwest/pasco-residents-push-back-on-data-centers-ask-city-to-extend-moratorium/article_be0dc845-c880-4e68-85e0-5aa738f0ad14.html)yakimaherald.com

[Yankton County data center moratorium first reading (Yankton Daily Press)](https://www.yankton.net/community/article_ba8fb3d6-f80e-4123-8a79-3f6bbe395390.html)yankton.net

[yellowhammernews.com](https://yellowhammernews.com)yellowhammernews.com

[www.yorkdispatch.com](https://www.yorkdispatch.com/story/news/local/2026/01/26/york-county-pennsylvania-josh-shapiro-data-centers-donald-trump-ai/88365256007/)yorkdispatch.com

[youarecurrent.com](https://youarecurrent.com/2026/05/21/boone-county-area-plan-commission-to-have-public-hearing-on-data-center-moratorium/)youarecurrent.com

[yourvalley.net](https://www.yourvalley.net/goodyear-independent/stories/developer-pulls-goodyear-area-data-center-application-amid-grassroots-municipal-opposition,506154)yourvalley.net

[yourvalley.net](https://www.yourvalley.net/stories/goodyear-area-529-acre-ai-data-center-campus-application-draws-opposition-water,484602)yourvalley.net

[Ypsilanti Township: Data Center Information (Resolution 2026-21 approved August 18, 2026)](https://ypsitownship.org/government/boards___commissions/board_of_trustees/data_center_information.php)ypsitownship.org

[ysnews.com](https://ysnews.com/news/2026/05/village-council-considers-data-center-moratorium-in-yellow-springs)ysnews.com

## Lawsuits

143 sources

[ABC17 News: Judge dismisses state from Montgomery County data center lawsuit (September 18, 2026)](https://abc17news.com/news/montgomery/2026/09/18/judge-dismisses-state-from-montgomery-county-data-center-lawsuit/)abc17news.com

[ABC17 News: Lawsuit filed to stop Montgomery County data center (February 17, 2026)](https://abc17news.com/news/top-stories/2026/02/17/lawsuit-filed-to-stop-montgomery-county-data-center/)abc17news.com

[abcnews4.com](https://abcnews4.com/news/local/colleton-county-residents-file-lawsuit-challenging-zoning-ordinance-for-new-data-center-ace-basin)abcnews4.com

[Atlanta Journal-Constitution: Georgia families sue Meta, accuse its data center of tainting their water (September 2026)](https://www.ajc.com/news/2026/09/georgia-families-sue-meta-accuse-its-data-center-of-tainting-their-water/)ajc.com

[Wisconsin residents sue Microsoft over noise caused by new data center](https://www.aol.com/articles/wisconsin-residents-sue-microsoft-over-123512000.html)aol.com

[DC Blox sues over Metro's data center moratorium](https://www.axios.com/local/nashville/2026/08/11/dc-blox-sues-over-metros-data-center-moratorium)axios.com

[Stop the Prince William Digital Gateway and Protect Manassas Battlefield](https://www.battlefields.org/preserve/speak-out/stop-prince-william-digital-gateway-and-protect-manassas-battlefield)battlefields.org

[Local Officials Slam Brakes On 3 Virginia Data Center Campuses](https://www.bisnow.com/national/news/data-center/local-lawmakers-slam-brakes-on-three-virginia-data-center-campuses-129863)bisnow.com

[Sierra Club sues DNR over Port Washington data center project permitting](https://biztimes.com/sierra-club-sues-dnr-over-port-washington-data-center-project-permitting/)biztimes.com

[Lowell residents file Massachusetts' first lawsuit against a data center](https://www.boston.com/news/local-news/2026/05/07/lowell-residents-file-massachusetts-first-lawsuit-against-a-data-center/)boston.com

[AI Data Center Lawsuit Highlights Colorado River Water Issues](https://www.businessinsider.com/ai-data-center-lawsuit-california-imperial-valley-colorado-river-water-2026-6)businessinsider.com

[Developer of $10B Data Center Sues City of Imperial in Fed Court](https://calexicochronicle.com/2026/01/12/developer-of-10b-data-center-sues-city-of-imperial-in-fed-court/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/01/07/where-imperial-data-center-project-and-opposition-stands/)calexicochronicle.com

[calexicochronicle.com](https://calexicochronicle.com/2026/04/02/judge-denies-imperials-ex-parte-application-county-board-vote-on-data-center-lot-merger-to-continue-as-scheduled/)calexicochronicle.com

[Canton Repository: Residents sue over approvals tied to Perry Township data center (September 4, 2026)](https://www.cantonrep.com/story/news/local/perry/2026/09/04/residents-sue-over-approvals-tied-to-perry-township-data-center/91609027007/)cantonrep.com

[Carolina Journal: Judge allows Chatham data center to proceed despite moratorium (September 18, 2026)](https://www.carolinajournal.com/judge-allows-chatham-data-center-to-proceed-despite-moratorium/)carolinajournal.com

[change.org](https://www.change.org/p/stop-the-data-center-from-coming-to-walterboro-sc)change.org

[Data center project paused amid county lawsuits](https://chesterfieldreport.com/story/data-center-project-paused-amid-county-lawsuits.html)chesterfieldreport.com

[Hobart residents sue to block city's data center plan](https://www.chicagotribune.com/2025/12/10/hobart-residents-sue-to-block-citys-data-center-plan/)chicagotribune.com

[Judge dismisses Hobart data center challenge](https://www.chicagotribune.com/2026/03/29/judge-dismisses-hobart-data-center-challenge/)chicagotribune.com

[Lawsuit filed against planned Grayslake data center: 'We have a really strong case'](https://www.chicagotribune.com/2026/08/07/grayslake-data-center-lawsuit/)chicagotribune.com

[Press Release: CFFC's Zoning Board Appeal on Amazon Data Center Rejected Illegally by Warrenton Officials](https://www.citizensforfauquier.org/post/press-release-cffc-s-zoning-board-appeal-on-amazon-data-center-rejected-illegally-by-warrenton-offi)citizensforfauquier.org

[Port Washington data center could harm Wisconsinites' health to the tune of $1.3 million annually](https://www.cleanwisconsin.org/port-washington-data-center-could-harm-wisconsinites-health-to-the-tune-of-1-3-million-annually/)cleanwisconsin.org

[Rise St. James v. Louisiana Department of Environmental Quality (case tracker)](https://www.climatecasechart.com/collections/rise-st-james-v-louisiana-department-of-environmental_5b8707)climatecasechart.com

[Residents Sue To Stop Building of Nation's Largest Data Center Cluster in DC Suburb](https://www.costar.com/article/106528374/residents-sue-to-stop-building-of-nations-largest-data-center-cluster-in-dc-suburb)costar.com

[Courthouse News Service: California judge halts state's largest data center (September 10, 2026)](https://www.courthousenews.com/california-judge-halts-states-largest-data-center/)courthousenews.com

[courtlistener.com](https://www.courtlistener.com/docket/73622608/41/4/kanter-v-oleary/)courtlistener.com

[courtlistener.com](https://www.courtlistener.com/opinion/10974419/anand-v-us-department-of-health-and-human-services/)courtlistener.com

[courtlistener.com](https://www.courtlistener.com/docket/73522518/17/stealth-consulting-management-inc-v-viking-data-centers-llc/)courtlistener.com

[courtlistener.com](https://www.courtlistener.com/opinion/10976954/state-ex-rel-kidd-v-clinton-cty-bd-of-elections/)courtlistener.com

[courtlistener.com](https://www.courtlistener.com/docket/69611320/24/popescu-v-iron-mountain-data-centers-llc/)courtlistener.com

[courtlistener.com](https://www.courtlistener.com/docket/66812353/2078/1/united-states-v-palacios-palacios/)courtlistener.com

[Court News Ohio: Trenton Must Place Data-Center-Ban Amendment on Special Election Ballot (September 1, 2026)](https://www.courtnewsohio.gov/cases/2026/SCO/0901/261035.asp)courtnewsohio.gov

[Covington News: Eight sue Meta over contaminated well water (September 11, 2026)](https://www.covnews.com/news/eight-sue-meta-over-contaminated-well-water/article_593b4710-71f0-4f9d-8c38-b348faa7e702.html)covnews.com

[Dallas Observer: Red Oak resident files lawsuit against city for data center development (September 4, 2026)](https://www.dallasobserver.com/news/red-oak-resident-files-lawsuit-against-city-for-data-center-development-40710655/)dallasobserver.com

[Lawsuit filed to lift data center moratorium in Eagan, Minnesota](https://www.datacenterdynamics.com/en/news/lawsuit-filed-to-lift-data-center-moratorium-in-eagan-minnesota/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/calethos-launches-geothermal-subsidiary-targeting-behind-the-meter-power-for-data-centers/)datacenterdynamics.com

[Documented Actions tracker - Hill County TX](https://dcmap.us/insights/policy/)dcmap.us

[Groups Sue Over Formosa Plastics' Permit Extensions](https://earthjustice.org/press/2026/groups-sue-over-formosa-plastics-permit-extensions)earthjustice.org

[Illegal Pollution from Data Center Power Plants Shouldn't Be Allowed (Earthjustice case page)](https://earthjustice.org/case/xai-illegal-gas-power-plant-data-center-colossus)earthjustice.org

[City of Edgerton: Statement on District Court Ruling (September 4, 2026)](https://edgertonks.org/statement-on-district-court-ruling/)edgertonks.org

[Judge Dismisses Challenge to Meta's Louisiana Data Center](https://eelp.law.harvard.edu/judge-dismisses-challenge-to-metas-louisiana-data-center/)eelp.law.harvard.edu

[$15B Wisconsin data center lacks required environmental review](https://www.eenews.net/articles/lawsuit-15b-wisconsin-data-center-lacks-required-environmental-review/)eenews.net

[Lawsuit targets air permit amid Georgia data center build-out](https://www.eenews.net/articles/lawsuit-targets-air-permit-amid-georgia-data-center-build-out/)eenews.net

[Effingham Herald: Effingham County Residents Sue Over Data Center Zoning Change](https://www.effinghamherald.net/data-centers/effingham-county-residents-sue-over-data-center-zoning-change-openai-lawsuit/)effinghamherald.net

[Citizens for Fauquier County, Warrenton residents seek to amend Amazon data center lawsuit](https://www.fauquiernow.com/news/business/citizens-for-fauquier-county-warrenton-residents-seek-to-amend-amazon-data-center-lawsuit/article_9e765b3c-2642-11ee-a641-f3afeb474752.html)fauquiernow.com

[Court of Appeals sides with Fauquier nonprofit in case against town of Warrenton involving Amazon data center](https://www.fauquiernow.com/news/court-of-appeals-sides-with-fauquier-nonprofit-in-case-against-town-of-warrenton-involving-amazon/article_035d6028-4e8c-11ef-8e36-4b2140d13395.html)fauquiernow.com

[Judge: Citizens for Fauquier County's lawsuit against Warrenton, Amazon can proceed](https://www.fauquiernow.com/news/judge-citizens-for-fauquier-countys-lawsuit-against-warrenton-amazon-can-proceed/article_4e6ba05e-9e27-11ee-90e8-8b4647ae881a.html)fauquiernow.com

[FERC Orders Action on Co-Location Issues Related to Data Centers Running AI](https://ferc.gov/news-events/news/ferc-orders-action-co-location-issues-related-data-centers-running-ai)ferc.gov

[Lawsuit seeks to block Amazon data center permit in Hobart, Ind.](https://www.fox32chicago.com/news/lawsuit-seeks-block-amazon-data-center-permit-hobart-ind)fox32chicago.com

[FERC Directs PJM and Transmission Owners to Resolve Co-Located Load Issues](https://www.gibsondunn.com/ferc-directs-pjm-and-transmission-owners-to-resolve-co-located-load-issues-including-for-data-centers/)gibsondunn.com

[Greater Milwaukee Today: Great Lakes Neighbors lawsuit over Port Washington TID dismissed (September 19, 2026)](https://www.gmtoday.com/news_graphic/news/judge-dismisses-port-washington-tid-lawsuit/article_adc26714-2ac6-40d8-8923-8e0c48c5a617.html)gmtoday.com

[New Jersey Neighbors Sue Over Humming Noise From Data Center](https://www.govtech.com/artificial-intelligence/new-jersey-neighbors-sue-over-humming-noise-from-data-center)govtech.com

[New Jersey Town Hit With Lawsuit Over Data Center Ban](https://www.govtech.com/artificial-intelligence/new-jersey-town-hit-with-lawsuit-over-data-center-ban)govtech.com

[Residents Sue Georgia County Over Data Center Plans](https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans)govtech.com

[Covington Data Center Builders Accused Of Skipping Permits](https://hoodline.com/2026/07/covington-uproar-activists-say-data-hub-power-plant-is-building-first-asking-later/)hoodline.com

[Ideastream Public Media: Stark County residents sue township trustees alleging lack of transparency in data center project (September 3,…](https://www.ideastream.org/environment-energy/2026-09-03/stark-county-residents-sue-township-trustees-alleging-lack-of-transparency-in-data-center-project)ideastream.org

[Monroe Township will defend data center ban in federal court](https://www.inquirer.com/south-jersey/monroe-new-jersey-data-center-ban-lawsuit-20260717.html)inquirer.com

[Philadelphia Inquirer: Developer sues Upper Merion Township over rejected King of Prussia data center proposals (September 18, 2026)](https://www.inquirer.com/news/pennsylvania/data-centers-upper-merion-township-lawsuit-20260918.html)inquirer.com

[Environmental Groups Challenge Air Permit for Natural Gas plant (Bowen)](https://insideclimatenews.org/news/02032026/georgia-regulators-sued-over-plant-bowen-gas-turbines/)insideclimatenews.org

[Eagan Capital Sues City of Eagan Over Data Center Moratorium](https://insight.tmcnet.com/insight/eagan-capital-sues-city-of-eagan-over-data-center-moratorium-as-minnesota-pushback-widens-mrdrtvty)insight.tmcnet.com

[Developer challenges Gloucester County data center ban on free-speech grounds](https://jerseyvindicator.org/2026/08/01/developer-challenges-gloucester-county-data-center-ban-on-free-speech-grounds/)jerseyvindicator.org

[Johnson County Post: Judge dismisses City of Edgerton's lawsuit against two residents over data center petition (September 10, 2026)](https://johnsoncountypost.com/2026/09/10/judge-dismisses-city-of-edgertons-lawsuit-295865/)johnsoncountypost.com

[KERA News / Fort Worth Report: Hood County judge dismisses lawsuit seeking automatic approval of proposed data centers (July 20, 2026)](https://www.keranews.org/energy-environment/2026-07-20/hood-county-judge-dismisses-lawsuit-seeking-automatic-approval-of-proposed-data-centers)keranews.org

[KOMU 8: Montgomery County group can continue data center challenges (September 2026)](https://www.komu.com/news/midmissourinews/advocacy-group-can-continue-to-challenge-montgomery-county-data-centers-judge-rules/article_ef6a4987-a980-56cf-bfcb-7c19e62f70bb.html)komu.com

[Imperial Valley data center developer files lawsuit seeking access to Colorado River water](https://www.kpbs.org/news/environment/2026/06/15/imperial-valley-data-center-developer-files-lawsuit-seeking-access-to-colorado-river-water)kpbs.org

[KPBS: Court overturns approval of Imperial County data center, orders environmental review (September 9, 2026)](https://www.kpbs.org/news/environment/2026/09/09/court-overturns-approval-of-imperial-county-data-center-orders-environmental-review)kpbs.org

[Sierra Club sues Imperial County over approval of massive data center complex](https://www.kpbs.org/news/environment/2026/05/27/sierra-club-sues-imperial-county-over-approval-of-massive-data-center-complex)kpbs.org

[kpbs.org](https://www.kpbs.org/news/environment/2025/12/12/imperial-valley-city-sues-to-force-environmental-review-of-massive-data-center-project)kpbs.org

[KSHB: Judge dismisses Edgerton, Kansas, lawsuit against citizens in data center debate](https://www.kshb.com/news/local-news/data-centers/judge-dismisses-edgerton-kansas-lawsuit-against-citizens-in-data-center-debate)kshb.com

[Court pauses development on planned Google data center in Pine Island](https://kstp.com/kstp-news/top-news/court-pauses-development-on-planned-google-data-center-in-pine-island/)kstp.com

[Lake County residents file lawsuit to block 472-acre data center campus in Grayslake](https://www.lakemchenryscanner.com/2026/08/08/project-of-unprecedented-scale-lake-county-residents-file-lawsuit-to-block-472-acre-data-center-campus-in-grayslake/)lakemchenryscanner.com

[MCEA Pine Island Complaint (PDF)](https://legalectric.org/f/2025/12/MCEA-Pine-Island-Complaint_MCRO_25-CV-25-2298_Complaint-Civil_2025-10-16_20251230105028.pdf)legalectric.org

[live5news.com](https://www.live5news.com/2026/01/09/landowners-sue-colleton-county-over-data-center-ordinance/)live5news.com

[live5news.com](https://www.live5news.com/2026/02/05/colleton-county-lawmakers-oppose-proposed-data-center-ace-basin/)live5news.com

[live5news.com](https://www.live5news.com/2025/12/15/9-new-data-centers-proposed-colleton-county/)live5news.com

[live5news.com](https://www.live5news.com/2026/07/08/6-month-pause-data-center-developments-colleton-county-lawsuit-paused/)live5news.com

[Markley Lowell, city dismiss data center moratorium lawsuit](https://www.lowellsun.com/2026/07/13/markley-lowell-city-dismiss-data-center-moratorium-lawsuit/)lowellsun.com

[Residents file class action suit against Markley Lowell](https://www.lowellsun.com/2026/07/19/residents-file-class-action-suit-against-markley-lowell/)lowellsun.com

[FERC Issues Section 206 Show Cause Orders Directing All Six RTOs/ISOs](https://www.mcguirewoods.com/client-resources/alerts/2026/6/ferc-issues-section-206-show-cause-orders-directing-all-six-rtos-isos-to-justify-or-reform-large-load-integration-rules/)mcguirewoods.com

[Comments of Sierra Club Wisconsin Chapter on construction permit (PDF)](https://midwestadvocates.org/wp-content/uploads/Vantage-Air-Permit-Comment-Sierra-Club.pdf)midwestadvocates.org

[Lawsuit opposing data center alleges numerous Sunshine Law violations](https://www.mystandardnews.com/stories/lawsuit-opposing-data-center-alleges-numerous-sunshine-law-violations,149413)mystandardnews.com

[Prince William Digital Gateway project halted by Virginia court](https://www.nbcwashington.com/news/local/prince-william-digital-gateway-project-halted-by-virginia-court-of-appeals/4084112/)nbcwashington.com

[Community groups sue over planned data center in Stokes County](https://ncnewsline.com/2026/03/13/community-groups-sue-over-planned-data-center-in-stokes-county/)ncnewsline.com

[Meta data center pollution permit doesn't account for all its emissions](https://neworleanscitybusiness.com/blog/2026/08/04/meta-hyperion-air-permit-challenge/)neworleanscitybusiness.com

[Springfield News-Leader: Developer behind Springfield data center plan sues city (September 18, 2026)](https://www.news-leader.com/story/news/local/ozarks/2026/09/18/springfield-data-center-moratorium-developer-lawsuit/91829080007/)news-leader.com

[Chatham County data center moratorium draws developer lawsuit (News & Observer coverage)](https://www.newsobserver.com)newsobserver.com

[Data center opposition group sues Missouri city and proposed developer](https://www.nprillinois.org/illinois/2026-04-20/data-center-opposition-group-sues-missouri-city-and-proposed-developer)nprillinois.org

[Ohio Capital Journal: Ohio now has over 125 active moratoriums on data centers. See where they are. (September 18, 2026)](https://ohiocapitaljournal.com/2026/09/18/ohio-now-has-over-125-active-moratoriums-on-data-centers-see-where-they-are/)ohiocapitaljournal.com

[Ozaukee Press: Data center TIF challenge paused for a rewrite (March 18, 2026)](https://www.ozaukeepress.com/content/data-center-tif-challenge-paused-rewrite)ozaukeepress.com

[Ozaukee Press: Group sues city to block data center TIF district (January 7, 2026)](https://www.ozaukeepress.com/content/group-sues-city-block-data-center-tif-district)ozaukeepress.com

[Post and Courier: Spartanburg County data center lawsuit (July 23, 2026)](https://www.postandcourier.com/spartanburg/news/spartanburg-county-data-center-lawsuit-northmark-valara/article_9d7d957b-7bd3-4253-9c6c-bc79d3271320.html)postandcourier.com

[postandcourier.com](https://www.postandcourier.com/rising-waters/data-center-secrecy-water-power-electric-colleton-county/article_5434700a-6506-4115-980f-51cf7440b5fb.html)postandcourier.com

[Musk's xAI, SpaceX hit with class action over data center 'nuisance'](https://www.reuters.com/legal/government/musks-xai-spacex-hit-with-class-action-over-data-center-nuisance-2026-06-09/)reuters.com

[Trump administration backs Musk's xAI in NAACP data center lawsuit](https://www.reuters.com/legal/government/trump-administration-backs-musks-xai-naacp-data-center-lawsuit-2026-06-16/)reuters.com

[scdailygazette.com](https://scdailygazette.com/2026/02/05/sc-legislators-denounce-lowcountry-data-center-while-mulling-regulations-for-the-industry/)scdailygazette.com

[scdailygazette.com](https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/)scdailygazette.com

[selc.org](https://www.selc.org/press-release/landowners-sue-colleton-county-over-data-center-ordinance/)selc.org

[selc.org](https://www.selc.org/news/were-suing-to-protect-one-of-the-most-important-conservation-areas-in-the-south-from-data-centers/)selc.org

[Springfield Daily Citizen: Developer behind proposed data center on South National sues city over moratorium (September 18, 2026)](https://sgfcitizen.org/government/springfield-greene-county/springfield-data-center-moratorium-lawsuit/)sgfcitizen.org

[Lawsuit challenges zoning, approval process for Joliet data center](https://www.shawlocal.com/the-herald-news/2026/05/26/lawsuit-challenges-zoning-approval-process-for-joliet-data-center/)shawlocal.com

[sourcenm.com](https://sourcenm.com/2026/09/17/new-mexico-supreme-court-rejects-2-project-jupiter-challenges-allows-permitting-process-to-resume/)sourcenm.com

[Michigan Residents Sue Data Center Over Constant Noise](https://spectrumlocalnews.com/mi/michigan/news/2026/05/29/residents-sue-data-center-company-over-constant-noise--health-concerns)spectrumlocalnews.com

[Amazon-Duke Energy diesel power plans for NC data center face legal pushback](https://www.spglobal.com/market-intelligence/en/news-insights/articles/2026/8/amazon-duke-energy-diesel-power-plans-for-nc-data-center-face-legal-pushback-104564092)spglobal.com

[sqxalts.com](https://sqxalts.com/calethos-secures-15m-loan-to-advance-data-center-power-plant-project/)sqxalts.com

[St. Louis Public Radio: Developer behind controversial St. Louis data center near Armory files lawsuit against the city (September 17, 2026)](https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city)stlpr.org

[DC BLOX sues Nashville over moratorium blocking data center](https://www.tennessean.com/story/news/local/davidson/2026/08/12/zoo-data-center-dc-blox-lawsuit-nashville-moratorium/91276101007/)tennessean.com

[Texas Scorecard: Data Center Developers Appeal Hood County Judge's Ruling Rejecting Automatic Approval Argument (July 20, 2026)](https://texasscorecard.com/local/data-center-developers-appeal-hood-county-judges-ruling-rejecting-automatic-approval-argument/)texasscorecard.com

[Data center legal challenge resolved without derailing project](https://www.thecentersquare.com/louisiana/article_8d1be11e-90bf-440b-af95-1f6395b75f27.html)thecentersquare.com

[Coweta Residents Sue to Block Project Sail Data Center](https://thecitizen.com/2026/05/11/coweta-residents-sue-to-block-project-sail-data-center/)thecitizen.com

[thedesertreview.com](https://www.thedesertreview.com/business/data-center-company-to-build-315-acre-center-in-lithium-valley/article_aff75860-4f82-11ef-a8b5-7f739e431385.html)thedesertreview.com

[thedesertreview.com](https://www.thedesertreview.com/news/developer-of-imperial-valley-ai-data-center-sues-activist-and-environmental-nonprofit-for-defamation-alleged/article_d9ca8730-b133-401b-a605-94bf8a61f702.html)thedesertreview.com

[SpaceX, xAI face data center noise class-action lawsuit](https://thehill.com/policy/technology/5918885-spacex-xai-data-center-noise-southaven-lawsuit/)thehill.com

[Fort Meade residents sue city to block hyperscale data center deal](https://www.theledger.com/story/news/politics/government/2026/06/23/fort-meade-lawsuit-hyperscale-data-center-deal/90642858007/)theledger.com

[The Times Herald: Upper Merion officials to send solicitor to data center zoning meeting (September 16, 2026)](https://www.timesherald.com/2026/09/16/upper-merion-officials-to-send-solicitor-to-data-center-zoning-meeting/)timesherald.com

[Data center company sues Eagan over development pause](https://www.twincities.com/2026/07/06/data-center-company-sues-eagan-over-development-pause/)twincities.com

[utilitydive.com](https://www.utilitydive.com/news/microsoft-virginia-scc-data-center-transmission/830775/)utilitydive.com

[Prince William Digital Gateway data center project officially dies](https://virginiabusiness.com/prince-william-digital-gateway-data-center-project-officially-dies/)virginiabusiness.com

[Brown water, dust and loud noises: Louisa homeowner sues Amazon over data center construction](https://virginiamercury.com/2026/07/28/brown-water-dust-and-loud-noises-louisa-homeowner-sues-amazon-over-data-center-construction/)virginiamercury.com

[Group files suit over Prince William Digital Gateway data center](https://www.washingtonpost.com/dc-md-va/2024/01/12/prince-william-digital-gateway-lawsuit-virginia-data-centers/)washingtonpost.com

[Developer of $10b data center sues city of Imperial in fed court](https://www.watereducation.org/aquafornia-news/developer-10b-data-center-sues-city-imperial-fed-court)watereducation.org

[Waxahachie Daily Light: Residents sue Red Oak, council over data center rezoning (September 7, 2026)](https://www.waxahachietx.com/2026/09/residents-sue-red-oak-council-over-data-center-rezoning/)waxahachietx.com

[Residents want a judge to pause Lowell data center expansion](https://www.wbur.org/news/2026/07/29/lowell-data-center-massachusetts-markley-group-environmental-justice)wbur.org

[Massachusetts' largest data center faces pushback over Lowell expansion](https://www.wcvb.com/article/markley-group-lowell-generator-plan-lawsuit/73298452)wcvb.com

[Loudoun homeowners appear to lose battle with Dominion Energy data center transmission lines](https://wjla.com/news/local/loudoun-county-homeowners-appear-to-lose-battle-with-dominion-energy-data-center-transmission-lines-state-corporation-commission-july-2026)wjla.com

[Franklin Coalition sues Data Center Developers, challenges approval process](https://www.wnky.com/franklin-coalition-sues-data-center-developers-challenges-approval-process/)wnky.com

[Hexa Builders Sues Monroe Township Over Data Center Ban, Seeks More Than $300 Million in Damages](https://woodburywarbler.com/hexa-builders-sues-monroe-township-over-data-center-ban-seeks-more-than-300-million-in-damages/)woodburywarbler.com

[Groups sue Wisconsin DNR over environmental review of Port Washington data centers](https://www.wpr.org/news/lawsuit-wisconsin-dnr-environmental-review-port-washington-data-centers)wpr.org

[Lawsuit seeks to force release of projected water use by Microsoft data centers](https://www.wpr.org/news/microsoft-data-centers-lawsuit-force-release-projected-water-use)wpr.org

[Port Washington residents urge DNR to deny air quality permits for data center](https://www.wpr.org/news/port-washington-residents-urge-dnr-to-deny-air-quality-permits-for-data-center)wpr.org

[Class action lawsuit filed over data center in Dowagiac](https://www.wsjm.com/2026/05/27/class-action-lawsuit-filed-over-data-center-in-dowagiac/)wsjm.com

[DC Blox sues Metro over Nashville Zoo-area data center](https://www.wsmv.com/2026/08/12/dc-blox-sues-metro-over-nashville-zoo-area-data-center-moratorium-heres-what-we-know/)wsmv.com

[WSPA 7News: Valara data center construction at center of Spartanburg Co. court hearing (September 17, 2026)](https://www.wspa.com/news/local-news/valara-data-center-court-hearing-spartanburg/)wspa.com

[WTOC: Effingham County residents sue county over data center zoning ordinance, demand transparency (September 3, 2026)](https://www.wtoc.com/2026/09/03/effingham-county-residents-sue-county-over-data-center-zoning-ordinance-demand-transparency/)wtoc.com

['Drops a bomb on the community:' Bristow-area residents sue to block Devlin Technology Park data center](https://wtop.com/prince-william-county/2024/01/drops-a-bomb-on-the-community-bristow-area-residents-sue-to-block-devlin-technology-park-data-center/)wtop.com

[Prince William Co. withdraws from Digital Gateway lawsuit](https://wtop.com/virginia/2026/04/prince-william-co-withdraws-from-digital-gateway-lawsuit-reversing-course-from-2023/)wtop.com

[WYFF 4: Data center approved despite environmental group lawsuit (August 28, 2026)](https://www.wyff4.com/article/data-center-approved-despite-environmental-group-lawsuit/73549328)wyff4.com

[WYFF 4: Lawsuit filed to stop Spartanburg County data center (August 20, 2026)](https://www.wyff4.com/article/lawsuit-filed-to-stop-spartanburg-county-data-center/73486156)wyff4.com

[Judge grants temporary restraining order to halt construction](https://www.yahoo.com/news/us/articles/judge-grants-temporary-restraining-order-180800971.html)yahoo.com

[St. Louis Business Journal via Yahoo News: Opponents ask court to halt and reverse Midtown data center permit approval (August 31, 2026)](https://www.yahoo.com/news/us/articles/opponents-ask-court-halt-reverse-142753525.html)yahoo.com

[The Independent via Yahoo News: Data center developer sues city after requiring company to supply renewable energy on-site (September 17,…](https://www.yahoo.com/news/us/articles/data-center-developer-sues-city-210532557.html)yahoo.com

[The News & Observer via Yahoo News: Chatham County data center can proceed despite moratorium, judge rules (September 18, 2026)](https://www.yahoo.com/news/us/articles/chatham-county-data-center-proceed-161029602.html)yahoo.com

[Video recorded from homeowner's porch shows sound emitted '24/7' by massive Michigan data center](https://www.yahoo.com/news/us/articles/video-recorded-homeowners-porch-shows-160300462.html)yahoo.com

## Federal actions

116 sources

[alabamareflector.com](https://alabamareflector.com/2026/09/21/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)alabamareflector.com

[alaskabeacon.com](https://alaskabeacon.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)alaskabeacon.com

[arkansasadvocate.com](https://arkansasadvocate.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)arkansasadvocate.com

[The 60-Day Clock: FERC Just Forced Six Grid Operators to Rewrite Rules](https://avanzaenergy.substack.com/p/the-60-day-clock-ferc-just-forced)avanzaenergy.substack.com

[axios.com](https://www.axios.com/2026/09/19/trump-ai-czar-space-force-safety)axios.com

[azmirror.com](https://azmirror.com/2026/09/21/repub/trump-likes-ai-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)azmirror.com

[FERC Orders PJM to Create Clear Rules for Co-Located Data Centers and Large Loads](https://www.bdlaw.com/publications/ferc-orders-pjm-to-create-clear-rules-for-co-located-data-centers-and-large-loads/)bdlaw.com

[bisnow.com](https://www.bisnow.com/news/national/data-center-community-relations/healey-massachusetts-data-center-restrictions-executive-order)bisnow.com

[bisnow.com](https://www.bisnow.com/news/national/data-center-power/data-center-energy-bill-stalls-ai-building-boom-becomes-midterms-flashpoint)bisnow.com

[cardinalnews.org](https://cardinalnews.org/2026/09/18/spanberger-issues-executive-order-to-hold-data-centers-accountable-form-ai-task-force/)cardinalnews.org

[cardinalnews.org](https://cardinalnews.org/2026/09/28/headlines-from-across-the-state-judge-michael-urbanski-to-retire-after-long-tenure-on-the-federal-bench-more/)cardinalnews.org

[CBS News: Senate Democrat blocks House-passed bill to shield Americans from data center energy costs, proposing alternate measure…](https://www.cbsnews.com/news/senate-data-center-energy-bill-martin-heinrich/)cbsnews.com

[EPA Proposes Air Pollution Exemption 'Deal' for Data Centers in Georgia](https://cleantechnica.com/2026/07/08/epa-proposes-air-pollution-exemption-deal-for-data-centers-in-georgia/)cleantechnica.com

[GRID Act (S.3852) forces large data centers off the electric grid or to...](https://codifylegalpublishing.com/blog-article?id=bill-us-united-states-119th-sb3852-impose-requirements-data-centers-ensure)codifylegalpublishing.com

[Power for the People Act of 2026: FERC-directed data center load queues](https://codifylegalpublishing.com/blog-article?id=bill-us-united-states-119th-hb8241-power-people-act)codifylegalpublishing.com

[AI Data Center Site Selection Transparency Act of 2026 (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/8488)congress.gov

[Actions - H.R.9825 (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/9825/all-actions-without-amendments)congress.gov

[H.R.8033 - No Harm Data Centers Act (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/8033/all-info)congress.gov

[H.R.8033 text (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/8033/text)congress.gov

[H.R.9340 - Ratepayer Protection Act (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/9340/all-info)congress.gov

[S.3585 - DATA Act of 2026 (Congress.gov)](https://www.congress.gov/bill/119th-congress/senate-bill/3585/all-info)congress.gov

[S.3682 - Power for the People Act of 2026 (Congress.gov)](https://www.congress.gov/bill/119th-congress/senate-bill/3682/all-info)congress.gov

[S.3852 - GRID Act (Congress.gov)](https://www.congress.gov/bill/119th-congress/senate-bill/3852/all-info)congress.gov

[S.4214 - Artificial Intelligence Data Center Moratorium Act (Congress.gov)](https://www.congress.gov/bill/119th-congress/senate-bill/4214)congress.gov

[S.4214 text (Congress.gov)](https://www.congress.gov/bill/119th-congress/senate-bill/4214/text)congress.gov

[S.4806 - POWER Up Act (Congress.gov)](https://www.congress.gov/bill/119th-congress/senate-bill/4806)congress.gov

[Text - H.R.8241 (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/8241/text)congress.gov

[Text - H.R.9442 (Congress.gov)](https://www.congress.gov/bill/119th-congress/house-bill/9442/text)congress.gov

[constructiondive.com](https://www.constructiondive.com/news/virginia-data-center-executive-order-questions-construction/831237/)constructiondive.com

[EPA Steps Back from AI Data Center Regulation](https://www.crowell.com/en/insights/client-alerts/epa-hands-over-ai-data-center-regulation-to-states-and-communities-to-develop-best-practices)crowell.com

[In a Move Affecting the Future of Data Centers, DOE Directs FERC to Act on Large Load Interconnections](https://www.crowell.com/en/insights/client-alerts/in-a-move-affecting-the-future-of-data-centers-doe-directs-ferc-to-act-on-large-load-interconnections)crowell.com

[AWS reaffirms commitment to nuclear data center despite regulatory rejection](https://www.datacenterdynamics.com/en/news/aws-reaffirms-commitment-to-nuclear-data-center-despite-regulatory-rejection/)datacenterdynamics.com

[Data Center Knowledge: DOE Keeps Eddystone Power Plant Online Amid Data Center Demand Surge](https://www.datacenterknowledge.com/energy-power-supply/doe-extends-eddystone-as-pjm-faces-data-center-power-surge)datacenterknowledge.com

[PJM divided over data center response ahead of key actions](https://www.eenews.net/articles/pjm-divided-over-data-center-response-ahead-of-key-actions/)eenews.net

[2026 DOE 202(c) Orders - Department of Energy](https://www.energy.gov/ceser/2026-doe-202c-orders)energy.gov

[National Transmission Needs Study: Supplemental Material (PDF)](https://www.energy.gov/documents/national-transmission-needs-study-supplemental-material-july-2026)energy.gov

[Senate Energy and Natural Resources Committee: Heinrich Introduces Legislation to Ensure Large Users of Electricity Pay for Grid Upgrades…](https://www.energy.senate.gov/2026/8/heinrich-introduces-legislation-to-ensure-large-users-of-electricity-pay-for-grid-upgrades-protect-customers-from-costs-of-data-center-expansion)energy.senate.gov

[Federal Register: Executive Order 14421, Declaring a National Emergency To Secure the United States Bulk-Power System (91 FR 55995)](https://www.federalregister.gov/documents/2026/08/31/2026-17843/declaring-a-national-emergency-to-secure-the-united-states-bulk-power-system)federalregister.gov

[federalregister.gov](https://www.federalregister.gov/documents/2026/09/09/2026-18370/securing-the-united-states-bulk-power-system)federalregister.gov

[Fedorchak applauds Committee passage of bipartisan Ratepayer Protection Act](https://fedorchak.house.gov/media/press-releases/fedorchak-applauds-committee-passage-bipartisan-ratepayer-protection-act)fedorchak.house.gov

[FERC fact sheet: FERC Takes Action to Supercharge America's Grid](https://www.ferc.gov/news-events/news/fact-sheet-ferc-takes-action-supercharge-americas-grid-efficiency-reliability-and)ferc.gov

[FERC news release: FERC Launches Aggressive Targeted Action to Speed Large Load Integration (June 18, 2026)](https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration)ferc.gov

[floridaphoenix.com](https://floridaphoenix.com/2026/09/22/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)floridaphoenix.com

[fox5vegas.com](https://www.fox5vegas.com/2026/09/18/lombardo-signs-executive-order-setting-standards-data-center-development/)fox5vegas.com

[georgiarecorder.com](https://georgiarecorder.com/2026/09/20/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)georgiarecorder.com

[Congress.gov bill status (GovInfo BILLSTATUS XML): S. 5199, GRID Savings Act of 2026](https://www.govinfo.gov/bulkdata/BILLSTATUS/119/s/BILLSTATUS-119s5199.xml)govinfo.gov

[Data Center Tax Accountability and Disclosure Act of 2026 (GovInfo)](https://www.govinfo.gov/app/details/BILLS-119s5054is)govinfo.gov

[H.R. 8037 (IH) - Protect American AI Act of 2026 (GovInfo)](https://www.govinfo.gov/app/details/BILLS-119hr8037ih)govinfo.gov

[H.R. 9825 (GovInfo)](https://www.govinfo.gov/app/details/BILLS-119hr9825ih)govinfo.gov

[S. 4806 (GovInfo PDF)](https://www.govinfo.gov/content/pkg/BILLS-119s4806is/pdf/BILLS-119s4806is.pdf)govinfo.gov

[Text (GovInfo)](https://www.govinfo.gov/content/pkg/BILLS-119hr8488ih/html/BILLS-119hr8488ih.htm)govinfo.gov

[Govwatch bill tracker S.5054](https://www.govwatch.app/bills/119/S/5054)govwatch.app

[grist.org](https://grist.org/politics/permitting-reform-data-centers-senate-gas-solar/)grist.org

[FERC to Act on Large-Load Interconnection Docket in June](https://www.hklaw.com/en/insights/publications/2026/04/ferc-to-act-on-large-load-interconnection-docket-in-june/)hklaw.com

[idahocapitalsun.com](https://idahocapitalsun.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)idahocapitalsun.com

[idahocapitalsun.com](https://idahocapitalsun.com/2026/09/28/repub/data-centers-proposed-on-federal-land-in-eastern-oregon-idaho-and-other-western-states/)idahocapitalsun.com

[indianacapitalchronicle.com](https://indianacapitalchronicle.com/2026/09/21/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)indianacapitalchronicle.com

[iowacapitaldispatch.com](https://iowacapitaldispatch.com/2026/09/19/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)iowacapitaldispatch.com

[kansasreflector.com](https://kansasreflector.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)kansasreflector.com

[kentuckylantern.com](https://kentuckylantern.com/2026/09/21/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)kentuckylantern.com

[FERC Orders PJM to Reform Tariff for Co-Located Generation and Load](https://www.klgates.com/thought-leadership/FERC-Orders-PJM-to-Reform-Tariff-for-Co-Located-Generation-and-Load-1-15-2026)klgates.com

[lailluminator.com](https://lailluminator.com/2026/09/21/repub/trump-data-centers/)lailluminator.com

[Georgia data center activists are alarmed. EPA wants to change Clean Air Act](https://www.ledger-enquirer.com/news/environment/article316751432.html)ledger-enquirer.com

[Lummis Introduces Legislation to Modernize Rules for High-Power Grid Connections](https://www.lummis.senate.gov/press-releases/lummis-introduces-legislation-to-modernize-rules-for-high-power-grid-connections/)lummis.senate.gov

[mainemorningstar.com](https://mainemorningstar.com/2026/09/20/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)mainemorningstar.com

[marylandmatters.org](https://marylandmatters.org/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)marylandmatters.org

[FERC Issues Section 206 Show Cause Orders Directing All Six RTOs/ISOs](https://www.mcguirewoods.com/client-resources/alerts/2026/6/ferc-issues-section-206-show-cause-orders-directing-all-six-rtos-isos-to-justify-or-reform-large-load-integration-rules/)mcguirewoods.com

[Sen. Cotton Pushes Off-Grid Power Plan for AI Data Centers](https://www.meritalk.com/articles/sen-cotton-pushes-off-grid-power-plan-for-ai-data-centers/)meritalk.com

[michiganadvance.com](https://michiganadvance.com/2026/09/19/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/2026/09/21/michigan-data-centers-the-weekly-download-4-2-2-2-2/)michiganadvance.com

[missouriindependent.com](https://missouriindependent.com/2026/09/21/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)missouriindependent.com

[Comments of the Independent Market Monitor for PJM (Docket EL26-63)](https://www.monitoringanalytics.com/filings/2026/IMM_Comments_re_Complaint_Docket_No_EL26-63_20260727.pdf)monitoringanalytics.com

[FERC Issues Order on PJM Compliance Filings](https://natlawreview.com/article/ferc-provides-further-guidance-co-located-load-interconnection)natlawreview.com

[nebraskaexaminer.com](https://nebraskaexaminer.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)nebraskaexaminer.com

[nevadacurrent.com](https://nevadacurrent.com/2026/09/18/lombardo-doubles-down-on-data-centers-offers-trimmed-tax-breaks-commitments-to-wary-public/)nevadacurrent.com

[nevadacurrent.com](https://nevadacurrent.com/2026/09/20/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)nevadacurrent.com

[newhampshirebulletin.com](https://newhampshirebulletin.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)newhampshirebulletin.com

[Bipartisan Data Center Ratepayer Protection Gets Committee Nod](https://news.bgov.com/bloomberg-government-news/bipartisan-data-center-ratepayer-protection-gets-committee-nod)news.bgov.com

[northdakotamonitor.com](https://northdakotamonitor.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)northdakotamonitor.com

[ohiocapitaljournal.com](https://ohiocapitaljournal.com/2026/09/21/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)ohiocapitaljournal.com

[ohiocapitaljournal.com](https://ohiocapitaljournal.com/2026/10/02/congressional-republicans-want-permitting-reform-an-ohio-project-shows-how-tricky-that-could-be/)ohiocapitaljournal.com

[oregoncapitalchronicle.com](https://oregoncapitalchronicle.com/2026/09/19/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)oregoncapitalchronicle.com

[oregoncapitalchronicle.com](https://oregoncapitalchronicle.com/2026/09/28/data-centers-proposed-on-federal-land-in-eastern-oregon-western-states/)oregoncapitalchronicle.com

[penncapital-star.com](https://penncapital-star.com/2026/09/22/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)penncapital-star.com

[Trump EO, DOE Site Selections Accelerate AI & Data Center Development](https://www.pillsburylaw.com/en/news-and-insights/AI-data-center-DOE-site-trump.html)pillsburylaw.com

[FERC Blocks PJM Proposal to Expand Amazon Data Center Load at Susquehanna Nuclear Plant](https://www.powermag.com/ferc-blocks-pjm-proposal-to-expand-amazon-data-center-load-at-susquehanna-nuclear-plant/)powermag.com

[rhodeislandcurrent.com](https://rhodeislandcurrent.com/2026/09/21/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)rhodeislandcurrent.com

[route-fifty.com](https://www.route-fifty.com/artificial-intelligence/2026/09/governors-take-major-actions-ai/416161/)route-fifty.com

[Constellation Pushes Ahead on Co-located Data Centers](https://www.rtoinsider.com/91150-constellation-pushes-ahead-co-located-data-centers/)rtoinsider.com

[sourcenm.com](https://sourcenm.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)sourcenm.com

[southdakotasearchlight.com](https://southdakotasearchlight.com/2026/09/19/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)southdakotasearchlight.com

[Executive Order 14318 (PDF)](https://static.carahsoft.com/concrete/files/3817/6047/0795/Executive_Order_14318_Accelerating_Federal_Permitting_of_Data_Center_Infrastructure.pdf)static.carahsoft.com

[Senate GRID Act: $100B Data Center Energy Rules [2026]](https://tech-insider.org/senate-grid-act-data-center-energy-regulation-2026/)tech-insider.org

[tennesseelookout.com](https://tennesseelookout.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)tennesseelookout.com

[tennesseelookout.com](https://tennesseelookout.com/2026/09/24/democrat-leaning-pac-goes-after-republican-congressional-candidate-over-data-centers/)tennesseelookout.com

[tennesseelookout.com](https://tennesseelookout.com/2026/09/24/democratic-leaning-pac-goes-after-republican-congressional-candidate-over-data-centers/)tennesseelookout.com

[thecurrentga.org](https://thecurrentga.org/2026/09/18/how-the-epa-rollback-of-carbon-emission-rules-could-play-out-in-georgias-coal-fired-power-plants/)thecurrentga.org

[FERC Commits to June 2026 Action in Large Load Interconnection Rulemaking](https://www.troutmanenergyreport.com/2026/04/ferc-commits-to-june-2026-action-in-large-load-interconnection-rulemaking/)troutmanenergyreport.com

[utahnewsdispatch.com](https://utahnewsdispatch.com/2026/09/19/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)utahnewsdispatch.com

[AEP, Exelon challenge PJM interconnection pact for Amazon data center](https://www.utilitydive.com/news/aep-exelon-pjm-interconnection-amazon-data-center-talen-ferc-isa/719869/)utilitydive.com

[Constellation asks FERC for PJM rules on data centers and other co-located load](https://www.utilitydive.com/news/constellation-ferc-complaint-pjm-co-located-load-data-center/734001/)utilitydive.com

[FERC rejects interconnection pact for Talen-Amazon data center at Susquehanna](https://www.utilitydive.com/news/ferc-interconnection-isa-talen-amazon-data-center-susquehanna-exelon/731841/)utilitydive.com

[No more PJM data centers unless they can be reliably served](https://www.utilitydive.com/news/pjm-data-center-interconnection-market-monitor-ferc-complaint/806527/)utilitydive.com

[Senate bill exempts fully isolated large loads from FERC/DOE regulation](https://www.utilitydive.com/news/senate-bill-exempts-fully-isolated-large-loads-from-ferc-doe-regulation/809330/)utilitydive.com

[utilitydive.com](https://www.utilitydive.com/news/north-carolina-regulators-deny-dukes-gas-turbine-request-over-staggering/831015/)utilitydive.com

[utilitydive.com](https://www.utilitydive.com/news/ferc-exelon-comed-powerhouse-hillwood-data-center/831127/)utilitydive.com

[utilitydive.com](https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/)utilitydive.com

[virginiabusiness.com](https://virginiabusiness.com/spanberger-bans-by-right-approvals-ndas-for-data-centers/)virginiabusiness.com

[washingtonstatestandard.com](https://washingtonstatestandard.com/2026/09/20/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)washingtonstatestandard.com

[washingtonstatestandard.com](https://washingtonstatestandard.com/2026/09/29/repub/data-centers-proposed-on-federal-land-in-eastern-oregon-western-states/)washingtonstatestandard.com

[westvirginiawatch.com](https://westvirginiawatch.com/2026/09/18/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)westvirginiawatch.com

[westvirginiawatch.com](https://westvirginiawatch.com/2026/10/02/candidates-for-wvs-2nd-congressional-district-seat-support-different-legislation-for-data-centers/)westvirginiawatch.com

[FERC orders grid operators to promptly revise or justify interconnection rules](https://www.whitecase.com/insight-alert/ferc-orders-grid-operators-promptly-revise-or-justify-interconnection-rules-data)whitecase.com

[Accelerating Federal Permitting of Data Center Infrastructure](https://www.whitehouse.gov/presidential-actions/2025/07/accelerating-federal-permitting-of-data-center-infrastructure/)whitehouse.gov

[wisconsinexaminer.com](https://wisconsinexaminer.com/2026/09/20/repub/trump-likes-data-centers-congress-seems-stuck-the-midterms-could-deliver-a-verdict/)wisconsinexaminer.com

[wral.com](https://www.wral.com/news/local/epa-panel-meet-raleigh-polution-linked-to-asthma-september-2026/)wral.com

## Utility actions

371 sources

[2news.com](https://www.2news.com/townnews/hydrography/lawmakers-discuss-data-centers-at-nevada-legislature/article_31a461fa-4a9e-40b1-a64e-dcfc84b300a8.html)2news.com

[Indiana Michigan Power Receives Order in Large Load Settlement](https://www.aep.com/news/stories/view/10037/)aep.com

[AEP Ohio Updates PUCO on Data Center Load](https://www.aepohio.com/company/news/view?releaseID=10753)aepohio.com

[Data Center Tariff](https://www.aepohio.com/company/about/rates/data-center-tariff/)aepohio.com

[Texas Pauses Data Center Interconnections Pending ...](https://www.akingump.com/en/insights/alerts/texas-pauses-data-center-interconnections-pending-statewide-audit)akingump.com

[Data Centers and Bills - Alabama Power](https://www.alabamapower.com/tools/data-centers-and-bills.html)alabamapower.com

[Rider ICR, Individual Customer Rate](https://www.alliantenergy.com/-/media/alliant/documents/accountandbilling/ratesandtariffs/iowaelectricrates/electricindividualcustomerrate.pdf)alliantenergy.com

[OPUC Docket UM 2459: In the Matter of PORTLAND GENERAL ELECTRIC COMPANY, Application for Deferred Accounting Treatment of Exceedance…](https://apps.puc.state.or.us/edockets/edocs.asp?FileType=HAA&FileName=haa347569029.pdf)apps.puc.state.or.us

[Rate Case 2025: Update - APS](https://www.aps.com/en/Utility/Regulatory-and-Legal/Rate-case)aps.com

[[PDF] RATE SCHEDULE XHLF GENERAL SERVICE EXTRA HIGH LOAD ...](https://www.aps.com/-/media/APS/APSCOM-PDFs/Utility/Regulatory-and-Legal/Regulatory-Plan-Details-Tariffs/Business/Business-NonResidential-Plans/ExtraHighLoadFactor.ashx?la=en)aps.com

[Arizona Utilities Say Data Centers Won't Raise Electric Bills](https://arizonadailyindependent.com/2026/04/21/arizona-utilities-say-data-centers-wont-raise-electric-bills/)arizonadailyindependent.com

[arkansasadvocate.com](https://arkansasadvocate.com/2026/09/15/arkansas-lawmakers-question-utility-on-data-center-projects-impact-on-ratepayers/)arkansasadvocate.com

[JOINT OVERSIGHT HEARING AI's Energy Impacts](https://autl.assembly.ca.gov/system/files/2026-01/01.28.2026_joint-privacy_ai-oversight-hearing-background.pdf)autl.assembly.ca.gov

[azcapitoltimes.com](https://azcapitoltimes.com/news/2026/05/19/aps-rate-case-kicks-off-with-hours-of-protest-over-14-rate-increase/)azcapitoltimes.com

[ACC Approves TEP Energy Supply Agreement, Ensures ...](https://www.azcc.gov/Rene-Lopez/news/2025/12/05/acc-approves-tep-energy-supply-agreement--ensures-customer-protections-from-costs-related-to-data-center-project)azcc.gov

[ACC Data Center/Large Load Workshop Highlights](https://www.azcc.gov/news/home/2026/04/20/acc-large-load-data-center-workshop-highlights)azcc.gov

[Highlights from Large Load Users Development Workshop](https://azcc.gov/nick-myers/news/2026/04/17/chairman-myers--highlights-from-large-load-users-development-workshop)azcc.gov

[What's Next in the APS Rate Case? - Arizona Corporation Commission](https://www.azcc.gov/news/home/2026/07/10/what-s-next-in-the-aps-rate-case)azcc.gov

[azfamily.com](https://www.azfamily.com/2026/06/10/arizona-budget-deal-includes-3-year-pause-data-center-tax-exemptions/)azfamily.com

[Data Centers and Large-Scale Electric Growth: The Virginia and ...](https://www.belfercenter.org/research-analysis/data-centers-texas-virginia-comparison)belfercenter.org

[Forward-Looking Statements](https://berkshirehathaway.com/bhenergy/BHE2026InvestPresent.pdf)berkshirehathaway.com

[bigbendsentinel.com](https://bigbendsentinel.com/2026/02/04/massive-ai-data-center-coming-to-pecos-county/)bigbendsentinel.com

[biztimes.com](https://biztimes.com/psc-makes-significant-changes-while-approving-we-energies-data-center-electricity-rates/)biztimes.com

[blog.ucs.org](https://blog.ucs.org/paul-arbaje/louisiana-regulators-try-to-shut-public-out-of-data-center-policymaking-again/)blog.ucs.org

[Ohio Energy Report: June 2026](https://www.brakeyenergy.com/ohio-energy-report-june-2026/)brakeyenergy.com

[[PDF] Interconnection Guidebook - Brazos Electric Cooperative.](https://www.brazoselectric.com/sites/default/files/2025-12/brazos-electric-interconnection-guidebook.pdf)brazoselectric.com

[New York tests data centre load rules - BTW Media](https://btw.media/en/new-york-tests-data-centre-load-rules)btw.media

[businesswire.com](https://www.businesswire.com/news/home/20250820331187/en/Pacifico-Energy-Announces-GW-Ranch-Project-Bringing-5-Gigawatts-of-Reliable-Off-Grid-Power-for-AI-Innovation)businesswire.com

[EPIC REPORT NO. 2026-001 - Data Centers in Kentucky](https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf)caer.uky.edu

[Silicon Valley Power's Rapid Load Growth and Urgent ...](https://www.caiso.com/documents/public-comment-letter-from-svp-re-transmission-plan-mar-22-2021.pdf)caiso.com

[Duke Energy proposes special rules for data centers in…](https://www.canarymedia.com/articles/data-centers/duke-energy-proposes-special-rules-for-data-centers-in-north-carolina)canarymedia.com

[Regulators OK ComEd's plan to increase deposit costs for large ...](https://capitolnewsillinois.com/news/regulators-ok-comeds-plan-to-increase-deposit-costs-for-large-load-projects-like-data-centers/)capitolnewsillinois.com

[Appalachian Power sees 'explosive' growth from data centers, other ...](https://cardinalnews.org/2026/07/31/appalachian-power-anticipates-explosive-growth-in-large-customers-primarily-data-centers/)cardinalnews.org

[cbsnews.com](https://www.cbsnews.com/detroit/news/dte-2-year-pause-rate-hike-requests/)cbsnews.com

[cbsnews.com](https://www.cbsnews.com/texas/news/fort-worth-data-center-tax-abatement-delayed-after-community-opposition/)cbsnews.com

[Large Loads](https://www.chelanpud.org/learning-center/large-loads)chelanpud.org

[We Energies' Data Center Tariff](https://cleanenergyforum.yale.edu/2026/06/25/we-energies-data-center-tariff)cleanenergyforum.yale.edu

[2024 Dominion Energy's Integrated Resource Plan](https://www.cleanvirginia.org/wp-content/uploads/2025/01/2024-Dominion-IRP-Issue-Alert.pdf)cleanvirginia.org

[cleanwisconsin.org](https://www.cleanwisconsin.org/state-regulators-make-substantial-modifications-to-we-energies-ai-data-center-tariff-plan/)cleanwisconsin.org

[cnbc.com](https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html)cnbc.com

[A G&T coordinated approach to upstream cost allocation](https://www.cobank.com/knowledge-exchange/a-g-t-coordinated-approach-to-upstream-cost-allocation)cobank.com

[The state of large load rate design: Insights from the DELTa ...](https://www.cobank.com/knowledge-exchange/the-state-of-large-load-rate-design-insights-from-the-delta-database)cobank.com

[Who pays the power bill when data centers demand more ...](https://coloradosun.com/2025/12/10/data-center-power-demands-colorado-xcel-tri-state/)coloradosun.com

[Xcel proposes new rate scale for data centers to shield consumers from added power costs](https://coloradosun.com/2026/04/02/data-centers-xcel-energy-colorado-rate-tariff-consumers/)coloradosun.com

[Florida SB 484 large load tariffs for AI data centers](https://computelaw.blog/power/florida-sb-484-large-load-tariffs/)computelaw.blog

[Virginia PJM market and Dominion power service for AI data centers ...](https://computelaw.blog/power/dominion-pjm-power-ai-data-centers-virginia/)computelaw.blog

[content.govdelivery.com](https://content.govdelivery.com/accounts/MDOPC/bulletins/415c9b6)content.govdelivery.com

[cubofmichigan.org](https://cubofmichigan.org/blog/mpsc-grants-expedited-approval-for-dte-contracts-with-hyperscale-data-center/)cubofmichigan.org

[dailyenergyinsider.com](https://dailyenergyinsider.com/hearing-summaries/52188-georgia-power-seeks-monthly-fuel-rate-decrease-as-commissioners-press-on-data-center-cost-allocation-hedging-losses/)dailyenergyinsider.com

[PUCO Meeting Minutes](https://dam.assets.ohio.gov/image/upload/puco.ohio.gov/Commission%20minutes/2025/July_9_2025.pdf)dam.assets.ohio.gov

[AEP sees contracted capacity surge to 63GW, 90% tied to data centers](https://www.datacenterdynamics.com/en/news/aep-sees/)datacenterdynamics.com

[Dominion Energy outlines long-term strategy for Virginia's power infrastructure](https://www.datacenterdynamics.com/en/news/dominion-energy-outlines-long-term-strategy-for-virginia-power-infrastructure/)datacenterdynamics.com

[Dominion proposes new rate class for data centers in Virginia](https://www.datacenterdynamics.com/en/news/dominion-proposes-new-rate-class-for-data-centers-in-virginia/)datacenterdynamics.com

[Duke Energy to include take-or-pay provisions in US data center agreements](https://www.datacenterdynamics.com/en/news/duke-energy-to-include-take-or-pay-provisions-in-us-data-center-agreements/)datacenterdynamics.com

[New Jersey utility PSEG sees large load pipeline surge to ...](https://www.datacenterdynamics.com/en/news/new-jersey-utility-pseg-sees-large-load-pipeline-surge-to-94gw-90-from-data-centers/)datacenterdynamics.com

[Oregon regulators approve PacifiCorp penalties for high-load energy users despite industry pushback](https://www.datacenterdynamics.com/en/news/oregon-regulators-approve-pacificorp-penalties-for-high-load-energy-users-despite-industry-pushback/)datacenterdynamics.com

[Silicon Valley Power says data center load to double by 2035, will need geothermal power and batteries](https://www.datacenterdynamics.com/en/news/silicon-valley-power-says-data-center-load-to-double-by-2035-will-need-geothermal-power-and-batteries/)datacenterdynamics.com

[South Carolina utility Santee Cooper enacts new electricity rates for ...](https://www.datacenterdynamics.com/en/news/south-carolina-utility-santee-cooper-enacts-new-electricity-rates-for-data-centers-and-other-large-loads/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/pacifico-energy-unveils-5gw-offgrid-natural-gas-project-in-texas-slated-to-serve-a-hyperscale-data-center/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/pacifico-secures-765gw-air-permit-for-gw-ranch-project-in-west-texas/)datacenterdynamics.com

[datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/florida-enacts-data-center-law-covering-ratepayer-protections-water-use-and-local-zoning-powers/)datacenterdynamics.com

[New York Confronts the Data Center Boom](https://www.datacenterknowledge.com/regulations/new-york-confronts-the-data-center-boom-balancing-growth-and-grid-reform)datacenterknowledge.com

[Large Power Contract Service Tariff - Black Hills Energy | Data Centers](https://datacenters.blackhillsenergy.com/resources/energy-solutions-data-centers)datacenters.blackhillsenergy.com

[Potential Data Center Drives Energy Policy](https://delawarelive.com/data-center-and-cost-drive-delaware-energy-policy/)delawarelive.com

[Delaware PSC Opens Docket for Large Load Tariff, Pauses ...](https://depsc.delaware.gov/2025/10/14/delaware-psc-opens-docket-for-large-load-tariff-pauses-interconnections/)depsc.delaware.gov

[[PDF] before the public service commission](https://depsc.delaware.gov/wp-content/uploads/sites/54/2025/09/Regular-Item-5d-Docket-25-0826-Order-10816-09-03-2025.pdf)depsc.delaware.gov

[detroitnews.com](https://www.detroitnews.com/story/business/2026/04/24/dte-to-seek-473m-rate-hike-but-promises-relief-if-data-centers-open/89776997007/)detroitnews.com

[PUCO Case 26-0113-EL-ATA: Finding & Order in which the Commission grants Ohio Power Company’s request for interim relief regarding the…](https://dis.puc.state.oh.us/ViewImage.aspx?CMID=A1001001A26H05B14108F04660)dis.puc.state.oh.us

[PUCO Case 26-0755-EL-ATA: Application of Duke Energy Ohio, Inc. for Approval of a New Service and Tariffs For Serving Data Center Load](https://dis.puc.state.oh.us/ViewImage.aspx?CMID=A1001001A26G27B53203B03422)dis.puc.state.oh.us

[BEFORE THE PUBLIC UTILITIES ...](https://docs.cpuc.ca.gov/PublishedDocs/SupDoc/A2406014;A2412008/8871/595345004.pdf)docs.cpuc.ca.gov

[PROPOSED DECISION](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M604/K449/604449740.PDF)docs.cpuc.ca.gov

[[PDF] BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF ...](https://docs.cpuc.ca.gov/PublishedDocs/SupDoc/A2412008;A2406014/8963/599154478.pdf)docs.cpuc.ca.gov

[[PDF] Schedule 19 - Large Power Service - Idaho Power](https://docs.idahopower.com/pdfs/aboutus/ratesregulatory/tariffs/191.pdf)docs.idahopower.com

[1 May 13, 2026 Honorable Michelle L. Phillips Secretary of the ...](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA098269E-0000-C41E-AD44-5B0BF868040F%7D&DocTitle=%20Large%20Load%20Proceeding%20PULP%20Comments)documents.dps.ny.gov

[Comments on Large Load Interconnection](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC09D229E-0000-CE41-9CD3-6DBFED1234DC%7D&DocTitle=Comments%20on%20Large%20Load%20Interconnection)documents.dps.ny.gov

[On February 12, 2026, the New York State Public Service ...](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BA06BCC9E-0000-C772-8DDF-E77D6C0A957B%7D&DocTitle=JU%20-%20Reply%20re%20Large%20Loads)documents.dps.ny.gov

[STATE OF NEW YORK PUBLIC SERVICE COMMISSION](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BD010239E-0000-CD1D-B286-42B93EF7294F%7D&DocTitle=Comments%20on%20the%20PSC%20Order%20on%20Large%20Load%20Interconnection)documents.dps.ny.gov

[STATE OF NEW YORK PUBLIC SERVICE COMMISSION ...](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B50A0229E-0000-C918-98E5-E6908F25CE56%7D&DocTitle=CECONY%20ORU%20Responses%20-%20PSC%20Large%20Load%20Questions)documents.dps.ny.gov

[STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a ...](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BB040539C-0000-CB26-AEB3-8C865EF3724D%7D&DocTitle=Order+Instituting+Proceeding+and+Soliciting+Comments)documents.dps.ny.gov

[[PDF] 1 National Grid Ventures | May 13, 2026 - Search / Commission Files](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC0DC229E-0000-CF5F-BCAE-CDB38CE3F36F%7D&DocTitle=NGV%20Comments%20Large%20Loads)documents.dps.ny.gov

[[PDF] In the Matter of Proactive Planning for Upgraded Electric Grid Inf](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BB064FE9A-0000-C719-9222-DB74607066D3%7D&DocTitle=NRDC%20and%20Sierra%20Club%20Comments%20on%20Large%20Load%20Interconnection)documents.dps.ny.gov

[before the new york state - Search / Commission Files](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B40CC229E-0000-CE29-ACC4-CFC3A9B8721C%7D&DocTitle=EJSC%20Comments)documents.dps.ny.gov

[state of new york - Search / Commission Files](https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC0F2229E-0000-CB4A-ACB1-7638211C6B93%7D&DocTitle=National%20Grid%20Comments%20re%20Interconnection%20Reforms%20for%20Large%20Loads)documents.dps.ny.gov

[Mon Power's proposed new gas-fired plant: PSC hears testimony for ...](https://www.dominionpost.com/2026/06/01/mon-powers-proposed-new-gas-fired-plant-psc-hears-testimony-for-and-against-the-project/)dominionpost.com

[Data Centers and Customer Rate Protection](https://www.dteenergy.com/us/en/quicklinks/data-center-facts.html)dteenergy.com

[dwt.com](https://www.dwt.com/blogs/energy--environmental-law-blog/2026/03/washington-legislature-delays-data-center-bill)dwt.com

[Groups Seek Intervention in NorthWestern Energy Data ...](https://earthjustice.org/press/2026/groups-seek-intervention-in-northwestern-energy-data-center-tariff-proceeding)earthjustice.org

[easternecho.com](https://www.easternecho.com/article/2026/04/new-ypsilanti-township-data-center-resolution-requests-moratorium-on-local-resources)easternecho.com

[Large Load Projects and Tariffs (August 2026)](https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs)eei.org

[Florida PSC allows Duke Energy data center rate petition to move ...](https://www.eenews.net/articles/florida-psc-allows-duke-energy-data-center-rate-petition-to-move-forward/)eenews.net

[eenews.net](https://www.eenews.net/articles/data-center-extension-cord-draws-landowners-ire/)eenews.net

[June 26, 2026 Nancy Dippell Secretary of the Commission ...](https://efis.psc.mo.gov/Document/Display/880663)efis.psc.mo.gov

[ORDER REGARDING AMEREN MISSOURI'S REQUEST ...](https://efis.psc.mo.gov/Document/Display/858399)efis.psc.mo.gov

[Surrebuttal Testimony of Dr. Albert W. Bremser on behalf of ...](https://efis.psc.mo.gov/Document/Display/855877)efis.psc.mo.gov

[[PDF] before the public service commission - efis.psc.mo.gov](https://efis.psc.mo.gov/Document/Display/855407)efis.psc.mo.gov

[N.C. attorney general will not sign new Duke Energy settlement](https://www.elonnewsnetwork.com/article/2026/07/nc-attorney-general-will-not-sign-new-duke-energy-settlement)elonnewsnetwork.com

[elpasomatters.org](https://elpasomatters.org/2026/03/29/meta-data-center-el-paso-10-billion-expansion-water-gas-electricity-usage/)elpasomatters.org

[elpasomatters.org](https://elpasomatters.org/2026/06/03/el-paso-texas-meta-data-center-tax-breaks-cancel-contract-water-air-pollution/)elpasomatters.org

[elpasomatters.org](https://elpasomatters.org/2026/06/18/meta-data-center-el-paso-texas-water-electricity-rates-community-benefit-agreement/)elpasomatters.org

[elpasomatters.org](https://elpasomatters.org/2026/07/20/meta-data-center-el-paso-texas-policy-framework-rules-city-council/)elpasomatters.org

[City Council Authorizes Intervention in El Paso Electric ...](https://www.elpasotexas.gov/assets/Press-Releases/2026.07.20-NEWS-RELEASE_City-Council-Authorizes-Intervention-in-EP-Electric-EDR.pdf)elpasotexas.gov

[elpasotexas.gov](https://www.elpasotexas.gov/assets/Press-Releases/2026.04.02-NEWS-RELEASE_City-of-El-Paso-Continues-Community-Engagement-on-Data-Center-Policy-Framework.pdf)elpasotexas.gov

[Docket 33709: Large Load Data Center Contracts](https://energyalabama.org/knowledge-center/docket-33709-large-load-data-center-contracts/)energyalabama.org

[Utility Rate Case Settlement Addresses Default Service For Data ...](http://www.energychoicematters.com/stories/20260721aa.html)energychoicematters.com

[PGE Energy Storage 2026, 20 MW Load Tariffs & PacifiCorp - EnkiAI](https://enkiai.com/policy-and-regulations/data-center-tariffs-pge-pacificorp/)enkiai.com

[issues “Fair Share Plus” pledge](https://www.entergy.com/news/5b-in-customer-savings-delivered-by-data-center-agreements-issues-fair-share-plus-pledge)entergy.com

[[PDF] Large Power High Load Density Service (LPHLDS) - Entergy Arkansas](https://www.entergyarkansas.com/wp-content/uploads/2024/11/eal_lphlds.pdf)entergyarkansas.com

[Large Load, High Load Factor Power Service Rate Schedule](https://www.entergylouisiana.com/wp-content/uploads/ell_elec_llhlfps-l.pdf)entergylouisiana.com

[Large Power High Load Factor Service Rate Schedule](https://www.entergylouisiana.com/wp-content/uploads/ell_elec_lphlf-g.pdf)entergylouisiana.com

[NPRR1234 Issue](https://www.ercot.com/mktrules/issues/NPRR1234)ercot.com

[25-EKME-315-TAR](https://estar.kcc.ks.gov/estar/portal/kscc/PSC/DocketDetails.aspx?DocketId=af2fbd6a-5ee7-4ad1-a3ae-4dfff1afcb87)estar.kcc.ks.gov

[[PDF] 20251106105515 Kansas Corporation Commission](https://estar.kcc.ks.gov/estar/ViewFile.aspx/25-315_Settlement_Agreement.pdf?Id=f65c8223-c3d3-47a7-b83b-877f318cf355)estar.kcc.ks.gov

[eu.detroitnews.com](https://eu.detroitnews.com/story/business/2026/04/29/dte-wants-a-nearly-10-electric-rate-hike-nessel-says-shell-fight-it/89853725007/)eu.detroitnews.com

[Behind the New York data center pause is legislation that could ...](https://www.facilitiesdive.com/news/behind-the-new-york-data-center-pause-is-legislation-that-could-impact-exis/826260/)facilitiesdive.com

[Video Details, FastDemocracy](https://fastdemocracy.com/video-details/de_2026-02-26T08-59-40_joint_DelawarePublicServiceCommissionPUBLICCOMMENTSESSIONFEBRUARY262026DOCKET250826_/)fastdemocracy.com

[MidAmerican's energy demand will double by mid-2030s, fueled by data center, AI demand](https://finance.yahoo.com/news/midamericans-energy-demand-double-mid-001254415.html)finance.yahoo.com

[SOUTHERN CO. (SO.MX) Q2 FY2026 earnings call transcript](https://finance.yahoo.com/quote/SO.MX/earnings/SO.MX-Q2-2026-earnings_call-658272.html)finance.yahoo.com

[XEL's Unit to Supply 200 MW Electric to Fermi's Project Matador Campus](https://finance.yahoo.com/news/xels-unit-supply-200-mw-184000535.html)finance.yahoo.com

[Mon Power and Potomac Edison Submit Plan to Support Power ...](https://www.firstenergycorp.com/newsroom/news_articles/mp-pe-submit-plan-to-support-power-needs-in-wv.html)firstenergycorp.com

[flgov.com](https://www.flgov.com/eog/news/press/2026/governor-ron-desantis-signs-law-protect-floridians-subsidizing-data-centers)flgov.com

[fortune.com](https://fortune.com/2026/04/09/data-centers-are-destroying-states-clean-energy-dreams/)fortune.com

[fortworthreport.org](https://fortworthreport.org/2026/03/31/enough-concern-today-1b-data-center-stalls-city-residents-raise-questions-about-tax-break/)fortworthreport.org

[fox2detroit.com](https://www.fox2detroit.com/news/dte-says-will-pause-rate-hike-requests-2-years-citing-increased-revenue-from-data-centers)fox2detroit.com

[gmtoday.com](https://www.gmtoday.com/news_graphic/business/atc-transmission-line-proposal/article_a082f14b-f0d2-5f2b-a596-e64b2fb3e1fd.html)gmtoday.com

[Duke Energy proposes "large load tariff" for data centers and ...](https://www.gofoothills.com/2026/07/08/duke-energy-proposes-large-load-tariff-for-data-centers-and-other-massive-energy-users-in-north-carolina/)gofoothills.com

[gov.texas.gov](https://gov.texas.gov/news/post/governor-abbott-announces-puc-and-ercot-actions-protecting-residential-ratepayers-from-data-center-costs)gov.texas.gov

[governor.maryland.gov](https://governor.maryland.gov/news/press-releases/governor-moore-signs-landmark-legislation-lower-energy-costs-maryland-families-and-strengthen)governor.maryland.gov

[North Carolina Energy Policy Task Force](https://governor.nc.gov/documents/files/nc-energy-policy-task-force-2026-report/open)governor.nc.gov

[governor.nebraska.gov](https://governor.nebraska.gov/gov-pillen-signs-executive-order-data-centers)governor.nebraska.gov

[Establishing a Temporary Moratorium on Data Centers in New York ...](https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops)governor.ny.gov

[Governor Hochul Announces PSC Proceeding on Her Plan to ...](https://www.governor.ny.gov/news/governor-hochul-announces-psc-proceeding-her-plan-ensure-data-centers-pay-their-fair-share)governor.ny.gov

[Grant County, Wash., Utility to Cap Data Center Electricity - GovTech](https://www.govtech.com/artificial-intelligence/grant-county-wash-utility-to-cap-data-center-electricity)govtech.com

[Ohio, Neighboring States Safeguard Electric Customers](https://www.govtech.com/artificial-intelligence/ohio-neighboring-states-safeguard-electric-customers)govtech.com

[Pa. Proposes Tariff Model to Offset Data Center Power Consumption](https://www.govtech.com/infrastructure/pa-proposes-tariff-model-to-offset-data-center-power-consumption)govtech.com

[Texas Senate Bill 6 Update: What Data Centers and Large Load ...](https://www.gtlaw.com/en/insights/2026/3/texas-senate-bill-6-update-what-data-centers-large-load-customers-should-know-about-proposed-interconnection-standards)gtlaw.com

[What Data Centers and Large Load Customers Should ...](https://www.gtlaw.com/-/media/files/insights/alerts/2026/03/gt-alert_texas-senate-bill-6-update-what-data-centers-and-large-load-customers-should-know-about-proposed-interconnection-standards.pdf?rev=6dbf3460e37546b0964437d268dfa59b)gtlaw.com

[NY Passes First Data Center Moratorium - Harris Beach Murtha](https://www.harrisbeachmurtha.com/insights/new-york-state-legislature-passes-first-in-the-nation-data-center-moratorium/)harrisbeachmurtha.com

[Infrakey Signs MoU with HILCO Electric Cooperative | News](https://infrakeyglobal.com/news/hilco-mou)infrakeyglobal.com

[insideclimatenews.org](https://insideclimatenews.org/news/29012026/developer-calls-gw-ranch-in-pecos-county-texas-the-largest-power-project-in-u-s/)insideclimatenews.org

[insideclimatenews.org](https://insideclimatenews.org/news/13072026/virginias-governor-spanberger-data-center-transmission-costs/)insideclimatenews.org

[Filings for 58481 - PUC Interchange - Texas.gov](https://interchange.puc.texas.gov/Search/Filings?ControlNumber=58481)interchange.puc.texas.gov

[PUCT Docket No. 59220, Item 69: Order (July 24, 2026)](https://interchange.puc.texas.gov/Documents/59220_69_1668205.PDF)interchange.puc.texas.gov

[PUCT Docket No. 59220, Item 73: Ensign Infrastructure, LLC's Motion for Rehearing (August 18, 2026)](https://interchange.puc.texas.gov/Documents/59220_73_1675222.PDF)interchange.puc.texas.gov

[PUCT Docket No. 59220, Item 74: Ballot memorandum on motion for rehearing (August 31, 2026)](https://interchange.puc.texas.gov/Documents/59220_74_1678681.PDF)interchange.puc.texas.gov

[PUCT Project No. 58481, Item 218: Order Adopting New 16 TAC §25.194 (filed September 18, 2026)](https://interchange.puc.texas.gov/Documents/58481_218_1684654.PDF)interchange.puc.texas.gov

[PUCT Project No. 58481, Item 219: Texas Register acknowledgment of receipt, adopted rulemaking TRD 202604027 (September 18, 2026)](https://interchange.puc.texas.gov/Documents/58481_219_1684678.PDF)interchange.puc.texas.gov

[Black Hills continues 1.8-gigawatt Wyoming data center ...](https://www.investing.com/news/company-news/black-hills-continues-18gigawatt-wyoming-data-center-project-93CH-4735293)investing.com

[Earnings call: Black Hills Corporation reports Q1 growth, eyes renewables By Investing.com](https://www.investing.com/news/stock-market-news/earnings-call-black-hills-corporation-reports-q1-growth-eyes-renewables-93CH-3433007)investing.com

[[PDF] Investor Meetings](https://investors.exeloncorp.com/static-files/528dfa92-47e6-4410-b037-f2930d30ef28)investors.exeloncorp.com

[Black Hills Corp. to Power Meta's New Data Center in Wyoming with ...](https://ir.blackhillscorp.com/news-releases/news-release-details/black-hills-corp-power-metas-new-data-center-wyoming-innovative/)ir.blackhillscorp.com

[California Public Utilities Commission Stretches Out the ... - JD Supra](https://www.jdsupra.com/legalnews/california-public-utilities-commission-9602222/)jdsupra.com

[Regulators in Wisconsin and Minnesota Issue Decisions ...](https://www.jdsupra.com/legalnews/regulators-in-wisconsin-and-minnesota-3343661/)jdsupra.com

[JLARC Virginia Data Center Study](https://jlarc.virginia.gov/pdfs/presentations/JLARC%20Virginia%20Data%20Center%20Study_FINAL_12-09-2024.pdf)jlarc.virginia.gov

[OCC to consider Oklahoma's first large load tariff as soon ...](https://journalrecord.com/2026/07/01/pso-proposes-electricity-rate-large-load-oklahoma/)journalrecord.com

[Google data center in Lincoln adds 423 MW wind](https://journalstar.com/news/local/business/article_b5b348c0-7a81-4394-80db-2ed7cc837a50.html)journalstar.com

[Kansas City, Kansas planning commission advances plans for $12.6B data center](https://kansasreflector.com/2025/05/29/kansas-city-kansas-planning-commission-advances-plans-for-12-6b-data-center/)kansasreflector.com

[kcbd.com](https://www.kcbd.com/2026/02/01/texas-approves-largest-permitted-data-center-campus-us/)kcbd.com

[Data Centers Help Support Long-Term Affordability - Kentucky Power](https://www.kentuckypower.com/company/about/rates/data-centers)kentuckypower.com

[keranews.org](https://www.keranews.org/news/2026-04-01/enough-concern-today-1b-data-center-stalls-city-residents-raise-questions-about-tax-break)keranews.org

[KESQ: IID board unanimously approves large load tariff (September 15, 2026)](https://kesq.com/news/2026/09/15/iid-board-unanimously-approves-large-load-tariff/)kesq.com

[kfoxtv.com](https://kfoxtv.com/news/local/meta-data-center-water-cap-set-at-25m-gallons-a-day-average-pegged-at-480000)kfoxtv.com

[OG&E proposes new data center agreement intended to ...](https://www.kgou.org/energy/2026-06-18/og-e-proposes-new-data-center-agreement-intended-to-prevent-residential-utility-cost-spikes)kgou.org

[Stitt signs bill to prevent higher utility costs from data ...](https://www.kgou.org/energy/2026-05-13/stitt-signs-bill-to-prevent-higher-utility-costs-from-data-centers-into-law)kgou.org

[khq.com](https://www.khq.com/news/state-of-washington-opens-new-review-of-big-power-users-as-data-center-demand-grows/article_b9e659b2-2f81-42d5-8089-c9c637fb5563.html)khq.com

[Pennsylvania Public Utility Commission Adopts Model ... - K&L Gates](https://www.klgates.com/thought-leadership/Pennsylvania-Public-Utility-Commission-Adopts-Model-Interconnection-Tariff-for-Large-Load-Customers-5-29-2026)klgates.com

[knpr.org](https://knpr.org/environment/2026-04-09/nevada-is-one-state-struggling-to-meet-its-clean-energy-goals-data-centers-are-to-blame)knpr.org

[KPBS: Imperial Valley utility adopts new pricing rules, putting data centers first for power cuts (September 16, 2026)](https://www.kpbs.org/news/environment/2026/09/16/imperial-valley-utility-adopts-new-pricing-rules-putting-data-centers-first-for-power-cuts)kpbs.org

[ksla.com](https://www.ksla.com/2025/12/15/commissioner-introduce-proposed-rules-large-electric-loads-amid-data-center-expansion/)ksla.com

[ktar.com](https://ktar.com/arizona-business/data-centers-aps-rate-hike/5812611/)ktar.com

[Will data centers show up in Colorado's rural areas?](https://www.kunc.org/news/2025-10-26/will-data-centers-show-up-in-colorados-rural-areas)kunc.org

[kvia.com](https://kvia.com/news/2026/04/14/city-of-el-paso-gives-update-on-meta-data-center-project-policy-framework/)kvia.com

[kvia.com](https://kvia.com/news/business-technology/2026/07/07/el-paso-water-reassures-public-on-meta-data-centers-water-usage/)kvia.com

[kvia.com](https://kvia.com/news/business-technology/2026/07/20/el-paso-city-council-approves-data-center-policy-framework/)kvia.com

[KYMA: IID unanimously approved Large Load Tariff (September 16, 2026)](https://kyma.com/news/imperial-county/2026/09/16/iid-unanimously-approved-large-load-tariff/)kyma.com

[lailluminator.com](https://lailluminator.com/2025/12/19/electricity-data-centers/)lailluminator.com

[The multimillion dollar debate over powering data centers ...](https://www.latitudemedia.com/news/the-multimillion-dollar-debate-over-powering-data-centers-in-texas/)latitudemedia.com

[1 STATE OF MINNESOTA Katie Sieben Chair Joseph K. ...](https://legalectric.org/f/2025/10/Docket-M-25-289_OAG-RUD_202510-223857-02.pdf)legalectric.org

[July 16, 2025, Via Electronic Filing](https://legalectric.org/f/2025/10/Xcel-Tariff-Petition_20257-221060-01.pdf)legalectric.org

[[PDF] Tract Comments re Xcel Large Load Tariff - Legalectric](https://legalectric.org/f/2025/10/Tract-Comments-re-Xcel-Large-Load-Tariff-10.13.205232560586.7-2-202510-223860-02-Public.pdf)legalectric.org

[Entergy Louisiana data center maximum exposure: 7+ GW Meta load](https://louisianai.com/briefs/entergy-louisiana-data-center-load-forecast-2026)louisianai.com

[Kentucky regulators approve power co-ops' rates, terms for future ...](https://www.lpm.org/news/2025-10-31/kentucky-regulators-approve-power-co-ops-rates-terms-for-future-data-centers)lpm.org

[LG&E says $3B expansion will protect Kentucky ratepayers from ...](https://www.lpm.org/news/2025-08-28/lg-e-says-3b-expansion-will-protect-kentucky-ratepayers-from-data-center-costs-others-are-doubtful)lpm.org

[LPSC Docket U-38035: Cleco Power LLC, ex parte.](https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/DocumentDetails?documentId=180948)lpscpubvalence.lpsc.louisiana.gov

[[PDF] REU E NE E - LPSC](https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=tknxmkXCYSY=)lpscpubvalence.lpsc.louisiana.gov

[Portland General Electric Announces Second Quarter 2026 ...](https://markets.ft.com/data/announce/detail?dockey=600-202607310500PR_NEWS_USPRX____SF16417-1)markets.ft.com

[State data center ratepayer tracker - Dr. Mark McNees](https://markmcnees.com/press/data-center-tracker.html)markmcnees.com

[House Bill 1532, Continuing the Next Generation Energy Act](https://mgaleg.maryland.gov/cmte_testimony/2026/ent/35217_03022026_92642-805.pdf)mgaleg.maryland.gov

[[PDF] HB 1532 - Continuing the Next Generation Energy Act - Maryland](https://mgaleg.maryland.gov/cmte_testimony/2026/ent/1sChlrcKQtbK7cCPI4uLB2O3txPW2Hwdi.pdf)mgaleg.maryland.gov

[[PDF] Position Statement - Maryland](https://mgaleg.maryland.gov/cmte_testimony/2025/ecm/16oJIGPMxFShzWIpBJfC1KRmYJKOe36kI.pdf)mgaleg.maryland.gov

[Powering Data Centers - Madison Gas and Electric - MGE](https://www.mge.com/community/partnerships/economic-development/powering-data-centers)mge.com

[CPUC Pushes Its Vote on PG&E's 250 MW Google Data Center ...](https://mgrid.org/2026/08/14/cpuc-pushes-its-vote-on-pges-250-mw-google-data-center-deal-in-san-jose-to-september-3/)mgrid.org

[PJM Proposes Firm Capacity Service Agreement for Data ...](https://mgrid.org/2024/11/05/pjm-proposes-firm-capacity-service-agreement-for-data-centers-exceeding-100-mw-as-queue-hits-47-gw/)mgrid.org

[Pennsylvania PUC Approves 50 MW Large-Load Tariff Rule](https://mgrid.org/2026/05/13/pennsylvania-puc-approves-50-mw-large-load-tariff-rule-shifting-data-center-grid-costs-off-households/)mgrid.org

[MPSC approves DTE Electric energy contracts for data center with ...](https://www.michigan.gov/mpsc/commission/news-releases/2025/12/18/mpsc-approves-dte-electric-energy-contracts-for-data-center)michigan.gov

[MPSC approves terms of service between Consumers ...](https://www.michigan.gov/mpsc/commission/news-releases/2025/11/06/mpsc-approves-terms-of-service-between-consumers-energy-and-data-centers)michigan.gov

[michigan.gov](https://www.michigan.gov/ag/news/press-releases/2026/04/28/ag-nessel-to-intervene-in-dte)michigan.gov

[MPSC approves $242.2 million rate increase for DTE customers](https://michiganadvance.com/2026/02/19/mpsc-approves-242-2-million-rate-increase-for-dte-customers/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/briefs/as-dte-seeks-474-million-rate-hike-nessel-pledges-to-intervene/)michiganadvance.com

[michiganadvance.com](https://michiganadvance.com/briefs/wortz-spearheads-bipartisan-effort-to-halt-data-center-construction-in-michigan/)michiganadvance.com

[michiganpublic.org](https://www.michiganpublic.org/transportation-infrastructure/2026-04-23/michigan-utility-oks-12-month-ban-on-supplying-water-for-data-centers)michiganpublic.org

[mississippitoday.org](https://mississippitoday.org/2026/04/22/ridgeland-data-center-entergy-mississippi-power/)mississippitoday.org

[Very large electric customers / Public Utilities Commission](https://mn.gov/puc/activities/v-l-e-c/)mn.gov

[What to know about data centers and your energy - Avista Utilities](https://www.myavista.com/about-us/data-centers-and-energy)myavista.com

[[PDF] Texas Senate Bill 6](https://www.naseo.org/Data/Sites/1/media/tknaseo/sb6-puct-17-oct-2025.pdf)naseo.org

[Gov. Stein, AG Jackson Will Hold Duke Energy to New ...](https://ncdoj.gov/gov-stein-ag-jackson-will-hold-duke-energy-to-new-federal-data-center-pledge/)ncdoj.gov

[North Carolina Department of Justice: Attorney General Jeff Jackson Proposes Framework to Ensure Data Centers Pay Their Fair Share for…](https://ncdoj.gov/attorney-general-jeff-jackson-proposes-framework-to-ensure-data-centers-pay-their-fair-share-for-energy-costs/)ncdoj.gov

[nebraskaexaminer.com](https://nebraskaexaminer.com/2026/07/20/pillen-rescinds-imagine-act-tax-incentives-for-new-nebraska-data-centers/)nebraskaexaminer.com

[Public Utility District No. 1 of Chelan County Rate Optimization ...](https://nectarclimate.com/rates/chelan-pud)nectarclimate.com

[Developments on How Duke Energy Integrates Data ...](https://www.nelsonmullins.com/insights/blogs/megawatt-minute-blog/power-generation/developments-on-how-duke-energy-integrates-data-centers-and-other-new-large-load-customers-in-north-carolina)nelsonmullins.com

[nevadacurrent.com](https://nevadacurrent.com/2026/03/26/lawmakers-in-driest-state-weigh-excessive-water-and-energy-needs-of-data-centers-they-court/)nevadacurrent.com

[NJ lawmakers OK plan to charge data centers for spiking electric costs](https://newjerseymonitor.com/briefs/nj-bill-data-centers-electric-costs/)newjerseymonitor.com

[news.bloomberglaw.com](https://news.bloomberglaw.com/ip-law/arizona-data-center-tax-incentive-pause-signed-by-governor-hobbs)news.bloomberglaw.com

[State of Delaware News: Governor Matt Meyer Signs Energy Consumer Protection Legislation (August 26, 2026)](https://news.delaware.gov/2026/08/26/governor-matt-meyer-signs-energy-consumer-protection-legislation/)news.delaware.gov

[news.fundsforngos.org](https://news.fundsforngos.org/2026/05/11/maryland-files-ferc-complaint-over-1-6b-data-center-power-bill/)news.fundsforngos.org

[We Energies rate filing focuses on reliability, protecting customers ...](https://news.we-energies.com/we-energies-rate-filing-focuses-on-reliability-protecting-customers-and-supporting-wisconsins-economy/)news.we-energies.com

[Xcel Energy proposal protects customers from higher bills as data ...](https://newsroom.xcelenergy.com/news/releases-20260622)newsroom.xcelenergy.com

[nj.gov](https://www.nj.gov/governor/news/2026/20260707a.shtml)nj.gov

[Montana Data Centers](https://www.northwesternenergy.com/in-your-community/economic-development/data-centers-and-montanas-energy-future)northwesternenergy.com

[ODEC CEO Shares Risks, Opportunities of Adding Data Center Load in Southern Virginia | CFC Solutions News Bulletin](https://www.nrucfc.coop/content/solutions/en/stories/co-op-news/odec-ceo-shares-risks--opportunities-of-adding-data-center-load-.html?root_responsivegrid_4x12_list_copy_copy_copy__start=8)nrucfc.coop

[nsjonline.com](https://nsjonline.com/article/2026/09/jackson-seeks-separate-duke-energy-rate-class-for-data-centers/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=jackson-seeks-separate-duke-energy-rate-class-for-data-centers)nsjonline.com

[[PDF] LARGE CUSTOMER MARKET PRICE ENERGY - NV Energy](https://www.nvenergy.com/publish/content/dam/nvenergy/brochures_arch/about-nvenergy/rates-regulatory/electric-schedules-south/LCMPE_South.pdf)nvenergy.com

[PUCO Staff Backs AES Tariff Before Proof Exists](https://www.ohiomfg.com/our-communities/puco-staff-backs-aes-tariff-before-proof-exists/)ohiomfg.com

[[PDF] September 5, 2025 This summary contains confidential and ...](https://www.ohiomfg.com/wp-content/uploads/2025/10/9_5_2025_OMA_EnergyWeeklyBriefing.pdf)ohiomfg.com

[okcfox.com](https://okcfox.com/news/local/as-ai-data-centers-expand-oklahoma-moves-to-protect-residential-ratepayers-07-25-2026)okcfox.com

[Gann Appeals $1.3B OCC Preapproval of New PSO ...](https://www.okhouse.gov/posts/news-20260602_2)okhouse.gov

[okhouse.gov](https://www.okhouse.gov/posts/News-20260506_2)okhouse.gov

[Data Center Customer Ratepayer Protection Act of 2026](https://oklahoma.gov/occ/divisions/public-utility/energy/electric-utility/data-center-customer-ratepayer-protection-act.html)oklahoma.gov

[oklahomavoice.com](https://oklahomavoice.com/briefs/ratepayer-protections-signed-into-law-by-oklahoma-governor/)oklahomavoice.com

[OG&E filing puts Boles-authored data center law into action](https://okpoliticstoday.com/2026/06/oge-filing-puts-boles-law-into-action/)okpoliticstoday.com

[oksenate.gov](https://oksenate.gov/press-releases/senate-passes-data-center-ratepayer-protection-act-added-transparency-requirements)oksenate.gov

[before the](https://opc.maryland.gov/LinkClick.aspx?fileticket=xsePOG1mZR8=&tabid=1151&portalid=0&mid=2652)opc.maryland.gov

[pacificoenergy.com](https://www.pacificoenergy.com/gw-ranch)pacificoenergy.com

[ODEC’s Data center load adjustment submission to pjm for the Dom zone](https://www.pjm.com/-/media/DotCom/planning/res-adeq/load-forecast/odec-documentation.pdf)pjm.com

[PJM TEAC (September 8, 2026): Item 01-1, Ohio State Agreement Approach Request](https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260908/20260908-item-01---1---ohio-state-agreement-approach-request.pdf)pjm.com

[PJM TEAC (September 8, 2026): Item 01-2, Ohio Request to use the SAA Process](https://www.pjm.com/-/media/DotCom/committees-groups/committees/teac/2026/20260908/20260908-item-01---2---ohio-request-to-use-the-saa-process.pdf)pjm.com

[planetdetroit.org](https://planetdetroit.org/2026/04/dte-rate-hike-data-centers/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/04/ypsilanti-water-supply-data-centers/)planetdetroit.org

[planetdetroit.org](https://planetdetroit.org/2026/04/data-center-water-moratorium-ypsilanti/)planetdetroit.org

[PGE delivers on commitment to ensure growth pays for growth](https://portlandgeneral.com/news/2026-06-pge-delivers-on-commitment-to-ensure-growth-pays-for-growth)portlandgeneral.com

[Getting Ahead of Data Center Power Demands - Powerlines](https://powerlines.seattle.gov/2026/06/12/getting-ahead-of-data-center-power-demands/)powerlines.seattle.gov

[Texas Audit Could Delay 49.8 GW of Data Center Load, Cost ...](https://www.powermag.com/texas-audit-could-delay-49-8-gw-of-data-center-load-cost-projects-up-to-15-billion-bnef-warns/)powermag.com

[powermag.com](https://www.powermag.com/pacifico-energy-building-massive-gas-energy-storage-project-to-serve-texas-data-centers/)powermag.com

[Virginia State Corporation](https://protectpwc.org/wp-content/uploads/2026/02/Dominion-Large-Load-SCC-case-021026.pdf)protectpwc.org

[psats.org](https://www.psats.org/puc-accepting-public-comment-on-plan-to-charge-electric-tariffs-on-data-centers-large-load-customers/)psats.org

[Resources](https://psc.alabama.gov/)psc.alabama.gov

[DATA CENTER FACT SHEET - psc.ga.gov](https://psc.ga.gov/site/downloads/datacenterfactsheet.pdf)psc.ga.gov

[Doc Document Filing #220461 - Georgia Public Service Commission](https://psc.ga.gov/search/facts-document/?documentId=220461)psc.ga.gov

[Doc Document Filing #224615 - Georgia Public Service Commission](https://psc.ga.gov/search/facts-document/?documentId=224615)psc.ga.gov

[[PDF] PSC Approves Rule to Allow New Power Usage Terms for Data ...](https://psc.ga.gov/site/assets/files/8617/media_advisory_data_centers_rule_1-23-2025.pdf)psc.ga.gov

[[PDF] commonwealth of kentucky - KY PSC](https://psc.ky.gov/pscecf/2025-00045/duncan.crosby@skofirm.com/09172025031459/KU-LGE_2025_CPCN_Post-Hearing_Reply_Brief.pdf)psc.ky.gov

[Utility Tariffs for Large Load Customers in Missouri](https://psc.mo.gov/General/Utility_Tariffs_for_Large_Load_Customers)psc.mo.gov

[PSC Ensures Stronger Public Transparency, Customer ...](https://psc.wi.gov/Documents/PressReleases/05.08.26PressRelease.PDF)psc.wi.gov

[[PDF] PSC Overhauls We Energies' Data Center Tariff, Makes ...](https://psc.wi.gov/Documents/PressReleases/04.24.2026PressRelease.PDF)psc.wi.gov

[Data Centers Help Keep Your Bills Affordable - Rates](https://www.psoklahoma.com/company/about/rates/data-centers)psoklahoma.com

[A2770 - NJ Legislature](https://pub.njleg.gov/Bills/2026/A3000/2770_I1.HTM)pub.njleg.gov

[A796](https://pub.njleg.gov/bills/2026/A1000/796_I1.HTM)pub.njleg.gov

[Complaint Filed at FERC Challenges PJM Rules Tied ...](https://www.publicpower.org/periodical/article/complaint-filed-ferc-challenges-pjm-rules-tied-data-center-driven-transmission-costs)publicpower.org

[Grant PUD Plans to Impose Load Growth Limits for Data ...](https://www.publicpower.org/periodical/article/grant-pud-plans-impose-load-growth-limits-data-centers)publicpower.org

[How Public Power Is Keeping Communities First in Data Center ...](https://www.publicpower.org/periodical/article/how-public-power-keeping-communities-first-data-center-development)publicpower.org

[publicradiotulsa.org](https://www.publicradiotulsa.org/local-regional/2026-05-05/oklahoma-lawmakers-to-make-final-changes-to-data-center-customer-protection-bill)publicradiotulsa.org

[IPUC Open Electric Cases - Idaho Public Utilities Commission](https://puc.idaho.gov/Case?util=1&closed=0&pn=1&ps=100&sc=1&sd=1&fc=2&fv=idaho+power)puc.idaho.gov

[En Banc Hearing on Interconnection and Tariffs for Large Load ...](https://www.puc.pa.gov/filing-resources/issues-laws-regulations/en-banc-hearing-on-interconnection-and-tariffs-for-large-load-customers/)puc.pa.gov

[PA PUC: PUC Moves to Address Data Center Impacts on Electric Reliability and Consumer Costs (September 10, 2026)](https://www.puc.pa.gov/press-release/2026/puc-moves-to-address-data-center-impacts-on-electric-reliability-and-consumer-costs-09102026)puc.pa.gov

[PUC Acts to Protect Ratepayers, Guide Data Center Growth with ...](https://www.puc.pa.gov/press-release/2026/puc-acts-to-protect-ratepayers-guide-data-center-growth-with-new-large-load-tariff-framework-4-30-26)puc.pa.gov

[PUC Advances Plan to Balance Data Center Growth and Consumer ...](https://www.puc.pa.gov/press-release/2025/puc-advances-plan-to-balance-data-center-growth-and-consumer-protection-11062025)puc.pa.gov

[PUC Issues Decision in PPL Electric Rate Proceeding | PA PUC](https://www.puc.pa.gov/press-release/2026/puc-issues-decision-in-ppl-electric-rate-proceeding-06042026)puc.pa.gov

[PUC Releases Final Order Establishing First-of-Its-Kind ...](https://www.puc.pa.gov/press-release/2026/puc-releases-final-order-establishing-first-of-its-kind-large-load-model-tariff-framework-05132026)puc.pa.gov

[AI boom sparks energy showdown in South Carolina, data centers ...](https://www.rcrwireless.com/20250429/ai-infrastructure/ai-boom-energy-showdown)rcrwireless.com

[ReisingerGooch: Virginia Energy Regulatory Updates (July 2026)](https://reisingergooch.com/virginia-energy-regulatory-updates-july-2026/)reisingergooch.com

[SCC approves new rate schedule for Appalachian Power large energy users, including data centers - ReisingerGooch](https://reisingergooch.com/scc-approves-new-rate-schedule-for-appalachian-power-large-energy-users-including-data-centers/)reisingergooch.com

[Virginia Energy Regulatory Updates (November 2025)](https://reisingergooch.com/virginia-energy-regulatory-updates-november-2025/)reisingergooch.com

[Virginia SCC Schedules Technical Conference to Evaluate Impacts ...](https://reisingergooch.com/virginia-scc-schedules-technical-conference-to-evaluate-impacts-of-data-centers/)reisingergooch.com

[[PDF] Regulatory, Policy, and Technology Trends Digest - EPRI](https://restservice.epri.com/publicattachment/95247)restservice.epri.com

[reviewjournal.com](https://www.reviewjournal.com/news/politics-and-government/nevada/the-data-center-tsunami-has-flooded-nevada-are-lawmakers-too-late-to-regulate-3729604/)reviewjournal.com

[[PDF] PSC No: 19 - Electricity Leaf No. 166 Rochester Gas and ... - RG&E](https://www.rge.com/documents/d/rge/psc19serviceclassification_3)rge.com

[roi-nj.com](https://www.roi-nj.com/2026/07/08/industry/energy-utilities/sherrill-signs-bills-for-ratepayer-relief-along-with-holding-utility-companies-and-data-centers-accountable/)roi-nj.com

[RTO Insider: Ohio, PJM to Use State Agreement Approach for 10-GW Data Center, Gas Plant (September 7, 2026)](https://www.rtoinsider.com/142390-ohio-pjm-state-agreement-approach-data-center-gas-generator/)rtoinsider.com

[Adapting Utility Tariffs: Data Center Driven Load Growth](https://www.scottmadden.com/insight/adapting-utility-tariffs-for-data-center-driven-load-growth/)scottmadden.com

[Rate Class: Large Power](https://scppd.com/wp-content/uploads/2025-Large-Power-LP3-Rate-60-61-62-1.pdf)scppd.com

[In comments on Delmarva Power's proposed large load tariff ...](https://sea-ee.com/in-comments-on-delmarva-powers-proposed-large-load-tariff-stakeholders-agree-to-raise-eligibility-threshold-from-25-mw-to-50-mw-exclude-existing-customers-joint-agencies-urge-more-stringen/)sea-ee.com

[Nebraska Power Infrastructure | Server Country](https://servercountry.org/power/nebraska/)servercountry.org

[New York Power Infrastructure](https://servercountry.org/power/new-york/)servercountry.org

[South Carolina Power Infrastructure | Server Country](https://servercountry.org/power/south-carolina/)servercountry.org

[Tennessee Power Infrastructure | Server Country](https://servercountry.org/power/tennessee/)servercountry.org

[Austin Energy Utility Oversight Committee](https://services.austintexas.gov/edims/document.cfm?id=460265)services.austintexas.gov

[[PDF] Kerrica Laake, Chief Informaon Offic - City of Austin](https://services.austintexas.gov/edims/document.cfm?id=464924)services.austintexas.gov

[Large electrical load project growth - Sacramento - SMUD](https://www.smud.org/Corporate/About-us/Reliability/Large-electrical-load-project-growth)smud.org

[Presentation for Agenda Item #2 - Board Energy ...](https://www.smud.org/-/media/Documents/Corporate/About-Us/Board-Meetings-and-Agendas/2026/June/2026-06-17_Exhibit-to-Agenda-Item-2.ashx)smud.org

[spotlightdelaware.org](https://spotlightdelaware.org/2026/07/01/lawmakers-pass-bills-to-limit-energy-price-hikes-regulate-data-centers/)spotlightdelaware.org

[Data center 'tariff' eyed by PA to protect consumers - Spotlight PA](https://www.spotlightpa.org/news/2025/08/data-centers-ai-utility-commission-electricity-pennsylvania-environment/)spotlightpa.org

[PDF] December 8, 2025 UNDERSTANDING ENERGY PRICESstatic1.squarespace.com

[Ameren asks for special rate policies for large data centers - STLPR](https://www.stlpr.org/health-science-environment/2025-08-25/ameren-missouri-huge-data-centers-protect-customers)stlpr.org

[Missouri approves Kansas City utility data center rates ...](https://www.stlpr.org/government-politics-issues/2025-11-15/missouri-passes-new-rules-costs-data-centers-large-power-users)stlpr.org

[Black Hills Corp (NYSE: BKH) lifts Q2 earnings and ...](https://www.stocktitan.net/sec-filings/BKH/10-q-black-hills-corp-sd-quarterly-earnings-report-cbf4dc8a162e.html)stocktitan.net

[Stoel Rives: Energy Regulatory Updates, September 2, 2026](https://www.stoel.com/insights/reports/energy-regulatory-updates/september-2-2026)stoel.com

[Ready - Southwestern Electric Power Company](https://www.swepco.com/community/ready/)swepco.com

[tdworld.com](https://www.tdworld.com/utility-business/news/55340640/michigan-regulators-approve-dte-data-center-power-contracts-with-added-ratepayer-protections)tdworld.com

[techcrunch.com](https://techcrunch.com/2026/03/26/data-centers-get-ready-the-senate-wants-to-see-your-power-bills/)techcrunch.com

[A path forward to positive economic growth - Tucson Electric Power](https://www.tep.com/news/a-path-forward-to-positive-economic-growth/)tep.com

[Five Things to Know About Powering Data Centers](https://www.tep.com/news/five-things-to-know-about-powering-data-centers/)tep.com

[Texas Tribune: Texas regulators approve two massive West Texas transmission lines amid outcry from landowners (August 28, 2026)](https://www.texastribune.org/2026/08/28/transmission-lines-texas-energy/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/01/26/texas-el-paso-meta-data-center-natural-gas-power-plant/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/06/10/texas-greg-abbott-data-centers-regulation-sales-tax/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/02/13/texas-data-centers-local-governments-power/)texastribune.org

[texastribune.org](https://www.texastribune.org/2026/02/02/texas-permian-basin-power-plant-project-data-centers/)texastribune.org

[(~ DUKE ENERGY®](https://www.theassemblync.com/wp-content/uploads/2026/05/ViewFile.pdf)theassemblync.com

[Data center boom in Kansas City area raises power questions](https://thebeaconnews.org/stories/2025/07/01/data-center-boom-kansas-city-power/)thebeaconnews.org

[Wyandotte County data centers and your utility bill - The Beacon](https://thebeaconnews.org/stories/2026/01/28/data-center-utility-bill-bpu/)thebeaconnews.org

[Delmarva Power wants to tariff large energy users like data centers](https://thedailyrecord.com/2025/12/23/delmarva-power-large-load-electric-rates-delaware/)thedailyrecord.com

[thehill.com](https://thehill.com/homenews/state-watch/5920754-abbott-texas-data-center-limits/)thehill.com

[thelensnola.org](https://thelensnola.org/2026/02/18/louisiana-lightning-amendment-ai-data-centers-ratepayer-costs/)thelensnola.org

[therealdeal.com](https://therealdeal.com/texas/2026/04/02/fort-worth-delays-tax-incentives-for-1b-plus-data-center/)therealdeal.com

[therealnews.com](https://therealnews.com/maryland-residents-to-pay-1-6-billion-more-in-power-bills-due-to-out-of-state-data-centers)therealnews.com

[theregister.com](https://www.theregister.com/2026/03/27/senators_datacenter_power_consumption/)theregister.com

[thesuntimesnews.com](https://thesuntimesnews.com/ypsilanti-township-seeks-utility-pause-for-data-centers/)thesuntimesnews.com

[Collaborative work results in FERC filing of Tri-State's High Impact ...](https://tristate.coop/collaborative-work-results-ferc-filing-tri-states-high-impact-load-tariff-and-agreement)tristate.coop

[upnorthlive.com](https://upnorthlive.com/news/local/data-center-regulation-michigan-bills-legislation-package-senate-democrats-politics-government-technology-state)upnorthlive.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2025/10/18/port-washington-data-center-requires-1-4-billion-transmission-line-project/)urbanmilwaukee.com

[urbanmilwaukee.com](https://urbanmilwaukee.com/2026/05/08/with-sharp-criticism-regulators-approve-electric-rates-for-facebook-meta-data-center/)urbanmilwaukee.com

[AEP contracted large load pipeline doubles to 56 GW - Utility Dive](https://www.utilitydive.com/news/aep-large-load-data-center-earnings/812181/)utilitydive.com

[As load grows, Southern raises spending plan to $81B - Utility Dive](https://www.utilitydive.com/news/southern-co-load-data-center-earnings/812681/)utilitydive.com

[CenterPoint to energize 8 GW of data center load by 2029 | Utility Dive](https://www.utilitydive.com/news/centerpoint-energy-data-center-load-earnings/818293/)utilitydive.com

[FirstEnergy 5-year spending plan jumps 30%, to $36B, ...](https://www.utilitydive.com/news/firstenergy-capex-transmission-doe-gas-plant-earnings/812548/)utilitydive.com

[FirstEnergy data center contracts surge 50% in Q2 - Utility Dive](https://www.utilitydive.com/news/firstenergy-data-center-west-virginia-maidsville-earnings/826558/)utilitydive.com

[Indiana regulators approve 'large load' interconnection rules](https://www.utilitydive.com/news/indiana-iurc-large-load-interconnection-data-center-aep-amazon-google/740452/)utilitydive.com

[Kansas, Michigan regulators approve large load rules for Evergy ...](https://www.utilitydive.com/news/kansas-michigan-data-center-large-load-evergy-consumers/805115/)utilitydive.com

[LS Power eyes 300-MW colocated data center at Virginia power plant](https://www.utilitydive.com/news/ls-power-doswell-data-center-virginia-pjm-odec/744572/)utilitydive.com

[Large load tariffs proliferate as states take more active role in data ...](https://www.utilitydive.com/news/large-load-tariffs-proliferate-as-states-take-more-active-role-in-data-cent/816184/)utilitydive.com

[New Jersey increases transmission oversight in ' ...](https://www.utilitydive.com/news/new-jersey-transmission-oversight-data-center-affordability-sherrill/824681/)utilitydive.com

[New Jersey lawmakers send data center tariff bill to governor](https://www.utilitydive.com/news/new-jersey-lawmakers-send-data-center-tariff-bill-to-governor/824191/)utilitydive.com

[NextEra aims to build up to 30 GW in data center power ...](https://www.utilitydive.com/news/nextera-basin-electric-data-center/807405/)utilitydive.com

[PSE&G large load pipeline jumps 47%, to 9.4 GW, much of ...](https://www.utilitydive.com/news/pseg-data-centers-pjm-earnings/756911/)utilitydive.com

[Southern inks 7 GW of large load contracts, eyes 50 ...](https://www.utilitydive.com/news/southern-large-load-pipeline-50-gw-mid-2030/804374/)utilitydive.com

[Utility Dive: Dominion ordered to directly assign some transmission costs to data centers (August 12, 2026)](https://www.utilitydive.com/news/dominion-energy-scc-transmission-costs-data-center/827693/)utilitydive.com

[Utility Dive: Duke Energy Florida asks to punt on rate for large load customers (August 27, 2026)](https://www.utilitydive.com/news/duke-energy-florida-psc-large-load-rate/828951/)utilitydive.com

[Utility Dive: Microsoft 'preserving its ability' to challenge data center transmission costs decision (September 18, 2026)](https://www.utilitydive.com/news/microsoft-virginia-scc-data-center-transmission/830775/)utilitydive.com

[Utility Dive: Pennsylvania PUC to consider ratemaking, ROE and curtailment as data center load grows (September 11, 2026)](https://www.utilitydive.com/news/pennsylvania-puc-to-consider-rates-and-curtailment-as-data-centers-grow/830174/)utilitydive.com

[utilitydive.com](https://www.utilitydive.com/news/maryland-ratepayer-advocate-ferc-data-center-complaint-transmission/823244/)utilitydive.com

[utilitydive.com](https://www.utilitydive.com/news/virginia-scc-dominion-data-center-transmission-cost-allocation/825300/)utilitydive.com

[virginiamercury.com](https://virginiamercury.com/2026/07/15/scc-considers-making-data-centers-shoulder-more-of-the-cost-of-transmission-lines/)virginiamercury.com

[warren.senate.gov](https://www.warren.senate.gov/newsroom/press-releases/warren-hawley-lead-bipartisan-push-for-mandatory-energy-use-reporting-requirements-for-data-centers)warren.senate.gov

[Case Search, DMS Portal](https://webpscxb.pscmaryland.com/DMS/pc/pc72)webpscxb.pscmaryland.com

[In recent years, local power companies (“LPCs”) and TVA ...](https://wehco.media.clients.ellingtoncms.com/news/document/2026/05/28/Rate_Change_Letter_021226_Final_SIGNED.pdf)wehco.media.clients.ellingtoncms.com

[Senate Bill 6 Reforms Interconnection and Co-Location Rules ...](https://www.weil.com/-/media/files/pdfs/2025/july/weil-energy-alert--senate-bill-6-reforms-interconnection-and-colocation-rules-for-data-centers-and-o.pdf)weil.com

[wemu.org](https://www.wemu.org/wemu-news/2026-04-16/ypsilanti-township-asks-for-ycuas-help-to-slow-down-u-m-los-alamos-project)wemu.org

[wemu.org](https://www.wemu.org/wemu-news/2026-04-23/ycua-board-of-commissioners-approves-data-center-moratorium)wemu.org

[wesa.fm](https://www.wesa.fm/environment-energy/2026-05-08/pennsylvania-public-utility-commission-data-center-protection)wesa.fm

[Large Load Growth: Tariff Structures, Rate Impacts and Risk Mitigation Tools](https://www.westernenergyboard.org/wp-content/uploads/WEIB.pdf)westernenergyboard.org

[PUCT affirms curtailment authority over co-located data centers in ...](https://www.whitecase.com/insight-alert/puct-affirms-curtailment-authority-over-co-located-data-centers-first-net-metering)whitecase.com

[whqr.org](https://www.whqr.org/local/2026-07-07/who-is-on-the-nc-utilities-commission-how-do-they-decide-on-dukes-rate-hikes)whqr.org

[whyy.org](https://whyy.org/articles/pennsylvania-public-utility-commission-data-center-protection/)whyy.org

[wisbusiness.com](https://www.wisbusiness.com/2026/residents-raise-concerns-on-psc-data-center-rate-proposal/)wisbusiness.com

[wisconsinwatch.org](https://wisconsinwatch.org/2026/04/wisconsin-regulators-data-centers-must-cover-full-cost-of-their-energy-needs/)wisconsinwatch.org

[wisconsinwatch.org](https://wisconsinwatch.org/2026/05/psc-approves-alliant-meta-data-center-power-deal-while-criticizing-black-box-approach/)wisconsinwatch.org

[wispolitics.com](https://www.wispolitics.com/2026/psc-ruling-requires-data-centers-to-cover-costs-of-new-we-energies-power-generation/)wispolitics.com

[wlns.com](https://www.wlns.com/news/michigan/dte-energy-links-data-center-474m-funding-request-to-pause-in-electricity-rate-hikes/)wlns.com

[State regulators change We Energies' data center rate proposal to ...](https://www.wpr.org/news/state-regulators-change-we-energies-data-center-rate-proposal-to-protect-customers)wpr.org

[[PDF] PSC Decision on We Energies Rate Structure - WPR](https://www.wpr.org/wp-content/uploads/2026/04/QUOTE-SHEET_-PSC-Decision-on-We-Energies-Rate-Structure-3.pdf)wpr.org

[wpr.org](https://www.wpr.org/news/1-4b-transmission-line-project-proposed-port-washington-data-center)wpr.org

[wpr.org](https://www.wpr.org/news/wisconsin-regulators-approve-rates-for-metas-beaver-dam-data-center-with-sharp-criticism)wpr.org

[wral.com](https://www.wral.com/business/duke-rate-hike-hearing-july-2026/)wral.com

[wvia.org](https://www.wvia.org/news/local/2026-05-04/pa-public-utility-commission-advances-measure-that-aims-to-protect-ratepayers-from-data-center-demand)wvia.org

[Consultant testifies Mon Power gas plant planned for data centers ...](https://wvmetronews.com/2026/07/17/consultant-testifies-mon-power-gas-plant-planned-for-data-centers-not-cost-free-to-other-customers/)wvmetronews.com

[Public opposition dominates PSC hearing on FirstEnergy's ...](https://www.wvnews.com/news/wvnews/public-opposition-dominates-psc-hearing-on-firstenergys-proposed-2-48-billion-fort-martin-gas-plant/article_e2a47b44-fd7a-4028-a4e2-29d7156128f8.html)wvnews.com

[West Virginians to voice opposition to proposed $2.48B gas plant at PSC hearing](https://www.wvnews.com/news/wvnews/west-virginians-to-voice-opposition-to-proposed-2-48b-gas-plant-at-psc-hearing/article_60857a10-e48b-41d1-a66b-e43937adce8c.amp.html)wvnews.com

[Data Center Deal Struck Between Appalachian Power, Google](https://wvpublic.org/story/energy-environment/data-center-deal-struck-between-appalachian-power-google/amp/)wvpublic.org

[wwno.org](https://www.wwno.org/coastal-desk/2025-12-17/in-tense-meeting-louisiana-psc-fast-tracks-pathway-for-large-projects-like-data-centers)wwno.org

[[PDF] Wyoming Cooperative Large Load Solutions](https://wyoleg.gov/InterimCommittee/2026/07-202605216-01WY_Cooperative_Large_Load_SolutionsRev5.pdf)wyoleg.gov

[wypr.org](https://www.wypr.org/wypr-news/2026-05-12/marylands-utility-relief-act-becomes-law-key-cost-saving-measure-could-be-in-jeopardy)wypr.org

[Kansas, Michigan regulators approve large load rules for Evergy, Consumers Energy](https://www.yahoo.com/news/articles/kansas-michigan-regulators-approve-large-094641800.html)yahoo.com

[Major rate increases on the horizon for New Mexico-Texas utility](https://www.yahoo.com/news/articles/major-rate-increases-horizon-mexico-043700637.html)yahoo.com

## Interconnection queue

16 sources

[AEP Ohio Schedule DCT Load Study Letter](https://www.aepohio.com/lib/docs/ratesandtariffs/ohio/AEP-Ohio_DCT_Load_Study_Letter_25.11.7.pdf)aepohio.com

[ACC Data Center/Large Load Workshop Highlights](https://www.azcc.gov/news/home/2026/04/20/acc-large-load-data-center-workshop-highlights)azcc.gov

[Dominion files large-load connection queue plan with state regulators](https://www.datacenterdynamics.com/en/news/dominion-files-large-load-connection-queue-plan-with-state-regulators/)datacenterdynamics.com

[Meta confirms it is behind $700 million Minnesota data center project](https://www.datacenterdynamics.com/en/news/meta-confirms-it-is-behind-700-million-minnesota-data-center-project/)datacenterdynamics.com

[ERCOT 25INR0688 Giga Texas Data Center](https://www.ercot.com/misdownload/servlets/mirDownload?doclookupId=1258020955)ercot.com

[ERCOT GIS Report data product page](https://www.ercot.com/mp/data-products/data-product-details?id=PG7-200-ER)ercot.com

[ERCOT Item 16.2 System Planning and Weatherization Update (Dec 2025 Board)](https://www.ercot.com/files/docs/2025/12/02/16.2-System-Planning-and-Weatherization-Update_Revised.pdf)ercot.com

[ERCOT Item 8 Interconnection and Grid Analysis Update (May 2026 Board)](https://www.ercot.com/files/docs/2026/05/24/8-Interconnection-and-Grid-Analysis-Update.pdf)ercot.com

[ERCOT Large Load Integration](https://www.ercot.com/services/rq/large-load-integration)ercot.com

[ERCOT Market Notice M-A080326-01 (Batch Zero timelines update)](https://www.ercot.com/services/comm/mkt_notices/M-A080326-01)ercot.com

[ERCOT Market Notice M-B062326-04 (Batch Zero / PGRR145 submission deadline)](https://www.ercot.com/services/comm/mkt_notices/M-B062326-04)ercot.com

[ERCOT Senate July 29 2026 Panel 1 - Assessing The Grid](https://www.ercot.com/files/docs/2026/07/29/ERCOT-Senate-July-29-Panel-1-Assessing-The-Grid.pdf)ercot.com

[Xcel Energy proposal protects customers from higher bills as data center demand grows](https://newsroom.xcelenergy.com/news/xcel-energy-proposal-protects-customers-from-higher-bills-as-data-center-demand-grows)newsroom.xcelenergy.com

[Virginia SCC Case Document Search, PUR-2026-00011](https://scc.virginia.gov/pages/CaseDocSearch)scc.virginia.gov

[Georgia Power Q1 2026 Large Load Economic Development Report](https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/226607/107887)services.psc.ga.gov

[Duke Energy proposes new gas plant to meet load growth](https://www.utilitydive.com/news/duke-energy-gas-plant-load-growth-demand/706669/)utilitydive.com

## Public companies

51 sources

[OpenAI to lease Ohio data center backed by NVIDIA guarantee](https://www.axios.com/2026/08/17/openai-nvidia-ohio-data-center-sb-energy)axios.com

[Microsoft to rent Abilene Texas data center dropped by OpenAI and Oracle](https://www.bloomberg.com/news/articles/2026-03-24/microsoft-to-rent-texas-data-center-dropped-by-oracle-openai)bloomberg.com

[Oracle and OpenAI end plans to expand flagship Abilene Texas data center](https://www.bloomberg.com/news/articles/2026-03-06/oracle-and-openai-end-plans-to-expand-flagship-data-center)bloomberg.com

[Google to use natural gas to power off grid data center in Armstrong County Texas](https://e360.yale.edu/digest/google-natural-gas-data-center)e360.yale.edu

[Abbott data center agreement with Meta appears to have no impact on Northeast El Paso project](https://elpasomatters.org/2026/08/10/abbott-meta-el-paso-data-center-electric-infrastructure-incentives/)elpasomatters.org

[Digital Realty Welcomes Abbott Initiative](https://finance.yahoo.com/technology/articles/digital-realty-welcomes-governor-abbott-124400493.html)finance.yahoo.com

[Amazon confirmed as backer of 7.65 GW private gas power plant for Texas data centers](https://www.france24.com/en/live-news/20260807-amazon-behind-massive-private-gas-plant-for-new-data-centers)france24.com

[American Electric Power agrees to deploy up to 1 GW of Bloom Energy fuel cells](https://fuelcellsworks.com/2026/01/08/electrolyzer/american-electric-power-locks-in-2-65bn-deal-to-deploy-up-to-1gw-of-bloom-energy-fuel-cells)fuelcellsworks.com

[IREN delivers Horizon 1 to Microsoft and achieves NVIDIA exemplar cloud status on GB300 NVL72](https://www.globenewswire.com/news-release/2026/08/13/3344413/0/en/iren-delivers-horizon-1-to-microsoft-and-achieves-nvidia-exemplar-cloud-status-on-gb300-nvl72.html)globenewswire.com

[Meta announces strategic venture with BlackRock to develop El Paso Texas data center](https://investor.atmeta.com/investor-news/press-release-details/2026/Meta-Announces-New-Strategic-Venture-with-BlackRock-to-Develop-Data-Center-in-El-Paso/default.aspx)investor.atmeta.com

[Digital Realty welcomes Governor Abbott initiative for responsible Texas data center investment](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-welcomes-governor-abbotts-initiative-responsible)investor.digitalrealty.com

[Core Scientific and CoreWeave announce 1.2 billion dollar expansion at Denton Texas site](https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site)investors.corescientific.com

[Amazon pulls out of Project Blue data center campus in Tucson Arizona](https://www.kold.com/2025/12/02/county-city-leaders-amazon-pulls-out-embattled-project-blue/)kold.com

[Court halts construction on Google Pine Island Minnesota data center](https://www.mprnews.org/story/2026/05/26/pine-island-hyperscale-data-center-construction-halted-by-judge)mprnews.org

[OpenAI and NVIDIA announce strategic partnership to deploy 10 gigawatts of NVIDIA systems](https://nvidianews.nvidia.com/news/openai-and-nvidia-announce-strategic-partnership-to-deploy-10gw-of-nvidia-systems)nvidianews.nvidia.com

[Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology](https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/)oracle.com

[CleanSpark secures twenty year lease with high investment grade global technology company for data center in Sandersville Georgia](https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html)prnewswire.com

[Riot announces fee simple acquisition of land and first data center lease with AMD at the Rockdale site](https://www.riotplatforms.com/riot-announces-fee-simple-acquisition-of-land-and-first-data-center-lease-with-amd-at-the-rockdale-site/)riotplatforms.com

[Alphabet Q2 2026 Form 10-Q, quarterly report with technical infrastructure investment](https://www.sec.gov/Archives/edgar/data/1652044/000165204426000071/goog-20260630.htm)sec.gov

[Amazon.com Q2 2026 Form 10-Q, quarterly report with elevated data center capital expenditures](https://www.sec.gov/Archives/edgar/data/1018724/000101872426000026/amzn-20260630.htm)sec.gov

[Applied Digital announces 250MW AI data center lease with CoreWeave at Ellendale North Dakota](https://www.sec.gov/Archives/edgar/data/1144879/000164117225013199/form8-k.htm)sec.gov

[Applied Digital finalizes additional 150MW CoreWeave lease at Polaris Forge 1 Ellendale campus](https://www.sec.gov/Archives/edgar/data/1144879/000149315225012458/form8-k.htm)sec.gov

[Applied Digital fiscal 2026 annual report covering AI data center buildout and risk factors](https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm)sec.gov

[Applied Digital reports completion of financing tied to CoreWeave North Dakota data center lease](https://www.sec.gov/Archives/edgar/data/1144879/000149315226021333/form8-k.htm)sec.gov

[Bitdeer fiscal 2025 annual report covering AI and HPC transition and Texas operations](https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm)sec.gov

[Bitdeer reports AI and HPC colocation lease at Tydal Norway](https://www.sec.gov/Archives/edgar/data/1899123/000121390026085655/ea0300752-6k_bitdeer.htm)sec.gov

[Bitdeer reports unaudited second quarter 2026 results with AI cloud and HPC leasing update](https://www.sec.gov/Archives/edgar/data/1899123/000121390026086938/ea030131301ex99-1.htm)sec.gov

[Bloom Energy Q2 2026 Form 10-Q, quarterly report with data center fuel cell agreements](https://www.sec.gov/Archives/edgar/data/1664703/000162828026050247/be-20260630.htm)sec.gov

[CleanSpark secures twenty year Sandersville Georgia data center lease and Texas 885 MW portfolio letter of intent](https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-20260710.htm)sec.gov

[CleanSpark third quarter fiscal 2026 report disclosing August 3 2026 Abbott directive and Austin County moratorium risk](https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm)sec.gov

[Core Scientific and AMD announce infrastructure partnership for up to 2.5 GW including Texas Pecos and Hunt County sites](https://www.sec.gov/Archives/edgar/data/1839341/000183934126000012/core-20260727.htm)sec.gov

[Core Scientific reports update on merger with CoreWeave](https://www.sec.gov/Archives/edgar/data/1839341/000183934126000018/core-20260813.htm)sec.gov

[Core Scientific second quarter 2026 report covering HPC hosting expansion](https://www.sec.gov/Archives/edgar/data/1839341/000183934126000014/core-20260630.htm)sec.gov

[Digital Realty Trust Q2 2026 Form 10-Q, quarterly report with data center portfolio and development](https://www.sec.gov/Archives/edgar/data/1297996/000110465926089296/dlr-20260630x10q.htm)sec.gov

[IREN delivers Horizon 1 50MW AI data center to Microsoft at Childress Texas](https://www.sec.gov/Archives/edgar/data/1878848/000114036126032638/ef20080141_8k.htm)sec.gov

[IREN secures approximately 9.7 billion dollar AI cloud contract with Microsoft at Childress Texas](https://www.sec.gov/Archives/edgar/data/1878848/000114036125040072/ef20058139_8k.htm)sec.gov

[MARA reports Volt Texas acquisition of Texas site with 2,000 MW power capacity subject to ERCOT approval](https://www.sec.gov/Archives/edgar/data/1507605/000095014226002012/eh260804074_8k.htm)sec.gov

[MARA reports transaction with FTAI Infrastructure for 485 MW co-located data center power asset](https://www.sec.gov/Archives/edgar/data/1507605/000119312526193982/d54802d8k.htm)sec.gov

[MARA second quarter 2026 report disclosing ERCOT Batch Zero and August 3 2026 Texas directive risk](https://www.sec.gov/Archives/edgar/data/1507605/000150760526000022/mara-20260630.htm)sec.gov

[Meta Platforms Q2 2026 Form 10-Q, quarterly report with data center and AI capital expenditures](https://www.sec.gov/Archives/edgar/data/1326801/000162828026050705/meta-20260630.htm)sec.gov

[Microsoft fiscal 2026 Form 10-K, annual report with cloud and AI infrastructure spending](https://www.sec.gov/Archives/edgar/data/789019/000119312526323660/msft-20260630.htm)sec.gov

[NVIDIA Q3 fiscal 2026 Form 10-Q, quarterly report noting no assurance of definitive OpenAI agreements](https://www.sec.gov/Archives/edgar/data/1045810/000104581025000230/nvda-20251026.htm)sec.gov

[Oracle fiscal 2026 Form 10-K, annual report with cloud infrastructure and Stargate commitments](https://www.sec.gov/Archives/edgar/data/1341439/000119312526277521/orcl-20260531.htm)sec.gov

[Riot Platforms launches formal evaluation of AI and HPC uses for remaining 600 MW at Corsicana Texas](https://www.sec.gov/Archives/edgar/data/1167419/000155837025000282/riot-20250121x8k.htm)sec.gov

[Riot acquires Rockdale land and signs first data center lease with AMD in Texas](https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116x8k.htm)sec.gov

[Riot second quarter 2026 results with Rockdale AI lease expansion and Corsicana 1 GW letter of intent](https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810x8k.htm)sec.gov

[$9.1B AI lease at Rockdale + Q2 2026 results](https://www.stocktitan.net/sec-filings/RIOT/8-k-riot-platforms-inc-reports-material-event-55bed99b80cf.html)stocktitan.net

[Hobart Indiana officials sued by residents over rezoning for Amazon data center](https://www.theindianalawyer.com/articles/hobart-city-officials-sued-by-residents-over-zoning-of-new-amazon-data-center)theindianalawyer.com

[Microsoft halts work on future phases of Wisconsin Mount Pleasant data center](https://urbanmilwaukee.com/2025/03/21/microsoft-halts-work-on-future-phases-of-wisconsin-data-centers/)urbanmilwaukee.com

[Google withdraws proposed data center in Franklin Township Indiana after opposition](https://www.wfyi.org/news/articles/indianapolis-council-google-data-center-vote-withdrawl)wfyi.org

[Oracle drops lawsuit challenging Wisconsin data center credit rules](https://wisconsinwatch.org/2026/08/oracle-drops-lawsuit-challenging-wisconsin-data-center-credit-rules/)wisconsinwatch.org

## Securities filings

240 sources

[10-Q Oncor Electric Delivery](https://www.sec.gov/Archives/edgar/data/1193311/000119331126000019/c311-20260630x10q.htm)sec.gov

[10-Q StratCap Digital Infrastructure REIT, Inc.](https://www.sec.gov/Archives/edgar/data/1868516/000110465926097005/sdir-20260630x10q.htm)sec.gov

[8-K Blue Laser Fusion, Inc.](https://www.sec.gov/Archives/edgar/data/1938570/000119312526385826/d162976d8k.htm)sec.gov

[8-K Oncor Electric Delivery](https://www.sec.gov/Archives/edgar/data/1193311/000119312526336875/d171086d8k.htm)sec.gov

[ADRX 424B4 ADARx Pharmaceuticals, Inc.](https://www.sec.gov/Archives/edgar/data/1802369/000119312526403094/d903461d424b4.htm)sec.gov

[AEE 10-Q Ameren](https://www.sec.gov/Archives/edgar/data/1002910/000100291026000023/aee-20260630.htm)sec.gov

[AEE 8-K Ameren](https://www.sec.gov/Archives/edgar/data/1002910/000110465926111420/tm2626189d1_8k.htm)sec.gov

[AEP 10-Q American Electric Power](https://www.sec.gov/Archives/edgar/data/4904/000000490426000059/aep-20260630.htm)sec.gov

[AES 10-Q AES Corporation](https://www.sec.gov/Archives/edgar/data/874761/000087476126000144/aes-20260630.htm)sec.gov

[AESI 8-K Atlas Energy Solutions Inc.](https://www.sec.gov/Archives/edgar/data/1984060/000119312526401582/aesi-ex99_1.htm)sec.gov

[AGPU 10-Q Axe Compute Inc.](https://www.sec.gov/Archives/edgar/data/1446159/000117184326005556/agpu20260630_10q.htm)sec.gov

[AIB 8-K AIB Data Centers Inc.](https://www.sec.gov/Archives/edgar/data/2070542/000121390026098580/ea030497101ex99-1.htm)sec.gov

[AIB 8-K AIB Data Centers Inc.](https://www.sec.gov/Archives/edgar/data/2070542/000121390026099305/ea030512201ex10-1.htm)sec.gov

[ALMU 10-K Aeluma, Inc.](https://www.sec.gov/Archives/edgar/data/1828805/000121390026100584/ea0305364-10k_aeluma.htm)sec.gov

[AMT 10-K American Tower Corporation](https://www.sec.gov/Archives/edgar/data/1053507/000105350726000035/amt-20251231.htm)sec.gov

[AMT 424B5 American Tower](https://www.sec.gov/Archives/edgar/data/1053507/000119312526385967/d116122d424b5.htm)sec.gov

[ANY 8-K Sphere 3D Corp.](https://www.sec.gov/Archives/edgar/data/1591956/000121390026099458/ea030536701ex99-1.htm)sec.gov

[APLD 10-K Applied Digital Corporation](https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm)sec.gov

[APLD 10-Q Applied Digital Corporation](https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm)sec.gov

[APUR 8-K Aperture AC](https://www.sec.gov/Archives/edgar/data/2093524/000121390026098971/ea030514301ex99-1.htm)sec.gov

[APUR 8-K Aperture AC](https://www.sec.gov/Archives/edgar/data/2093524/000121390026100601/ea030534901ex2-1.htm)sec.gov

[AZIO 10-Q AZIO AI HOLDINGS, INC.](https://www.sec.gov/Archives/edgar/data/1563568/000143774926028254/adom20260630_10q.htm)sec.gov

[BACC 8-K Blue Acquisition Corp/Cayman](https://www.sec.gov/Archives/edgar/data/2059654/000118518526004321/baccex99-1.htm)sec.gov

[BE 10-K Bloom Energy Corporation](https://www.sec.gov/Archives/edgar/data/1664703/000162828026006516/be-20251231.htm)sec.gov

[BE 10-Q Bloom Energy Corporation](https://www.sec.gov/Archives/edgar/data/1664703/000162828026050247/be-20260630.htm)sec.gov

[BGDE 10-Q Big Digital Energy, Inc.](https://www.sec.gov/Archives/edgar/data/1218683/000121390026089986/ea0299976-10q_bigdigital.htm)sec.gov

[BIAI S-1/A Bitari Inc](https://www.sec.gov/Archives/edgar/data/2091680/000118518526004027/bitaris1a1090926.htm)sec.gov

[BIAI S-1/A Bitari Inc](https://www.sec.gov/Archives/edgar/data/2091680/000118518526004385/bitaris1a2092826.htm)sec.gov

[BITF 10-K Keel Infrastructure Corp. (formerly Bitfarms Ltd.)](https://www.sec.gov/Archives/edgar/data/1812477/000121390026037514/ea0282809-10k_bitfarms.htm)sec.gov

[BKH 10-Q Black Hills](https://www.sec.gov/Archives/edgar/data/1130464/000119312526337444/bkh-20260630.htm)sec.gov

[BKH 8-K BLACK HILLS CORP /SD/](https://www.sec.gov/Archives/edgar/data/1130464/000119312526354167/bkh-ex99_1.htm)sec.gov

[BLSM 10-Q BlossomHill Therapeutics, Inc.](https://www.sec.gov/Archives/edgar/data/1839970/000119312526395043/blsm-20260630.htm)sec.gov

[BRZE 10-Q Braze, Inc.](https://www.sec.gov/Archives/edgar/data/1676238/000167623826000040/brze-20260731.htm)sec.gov

[BSAI 10-Q BLUSKY AI INC.](https://www.sec.gov/Archives/edgar/data/1416090/000149315226038234/form10-q.htm)sec.gov

[BTBT 10-K Bit Digital, Inc.](https://www.sec.gov/Archives/edgar/data/1710350/000121390026035544/ea0279621-10k_bitdigit.htm)sec.gov

[BTBT 10-Q Bit Digital](https://www.sec.gov/Archives/edgar/data/1710350/000121390026088709/ea0300693-10q_bitdigital.htm)sec.gov

[BTDR 20-F Bitdeer Technologies Group](https://www.sec.gov/Archives/edgar/data/1899123/000121390026049770/ea0282628-20f_bitdeer.htm)sec.gov

[BTDR 6-K Bitdeer Technologies Group](https://www.sec.gov/Archives/edgar/data/1899123/000121390026093742/ea030344101ex99-1.htm)sec.gov

[BW 10-Q Babcock & Wilcox Enterprises](https://www.sec.gov/Archives/edgar/data/1630805/000163080526000068/bw-20260630.htm)sec.gov

[BYOP S-1/A KiNRG, Inc.](https://www.sec.gov/Archives/edgar/data/95572/000121390026103116/ea0306428-s1a2_kinrg.htm)sec.gov

[CBDW 8-K 1606 CORP.](https://www.sec.gov/Archives/edgar/data/1877461/000147793226005256/cbdw_ex991.htm)sec.gov

[CBDW 8-K 1606 CORP.](https://www.sec.gov/Archives/edgar/data/1877461/000147793226005436/cbdw_ex991.htm)sec.gov

[CEG 10-K Constellation Energy Corporation](https://www.sec.gov/Archives/edgar/data/1868275/000186827526000032/ceg-20251231.htm)sec.gov

[CEG 10-Q Constellation Energy](https://www.sec.gov/Archives/edgar/data/1868275/000186827526000104/ceg-20260630.htm)sec.gov

[CEPL 10-Q Capstone Energy Plus (formerly Capstone Green Energy)](https://www.sec.gov/Archives/edgar/data/1009759/000110465926094889/cepl-20260630x10q.htm)sec.gov

[CEPL 424B5 Capstone Energy Plus (formerly Capstone Green Energy)](https://www.sec.gov/Archives/edgar/data/1009759/000110465926092475/tm2619464-7_424b5.htm)sec.gov

[CHRN 10-K ChronoScale Holdings Corp](https://www.sec.gov/Archives/edgar/data/1549084/000162828026058018/chrn-20260531.htm)sec.gov

[CIFR 10-K Cipher Mining Inc. (Cipher Digital Inc.)](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm)sec.gov

[CIFR 10-Q Cipher Mining Inc. (Cipher Digital Inc.)](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm)sec.gov

[CIFR 10-Q Cipher Mining Inc. (Cipher Digital Inc.)](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000028/cifr-20260331.htm)sec.gov

[CLSK 10-K CleanSpark, Inc.](https://www.sec.gov/Archives/edgar/data/827876/000119312525297510/clsk-20250930.htm)sec.gov

[CLSK 10-Q CleanSpark, Inc.](https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm)sec.gov

[CLSK 8-K CleanSpark](https://www.sec.gov/Archives/edgar/data/827876/000119312526402944/clsk-20260925.htm)sec.gov

[CMS 10-Q CMS Energy Corporation](https://www.sec.gov/Archives/edgar/data/811156/000081115626000028/cms-20260630.htm)sec.gov

[CNP 8-K CENTERPOINT ENERGY INC](https://www.sec.gov/Archives/edgar/data/1130310/000110465926106356/tm2625073d1_ex10-1.htm)sec.gov

[CNTM S-1/A ConnectM Technology Solutions, Inc.](https://www.sec.gov/Archives/edgar/data/1895249/000110465926109217/cntm-20260630xs1a.htm)sec.gov

[CNTM S-1/A ConnectM Technology Solutions, Inc.](https://www.sec.gov/Archives/edgar/data/1895249/000110465926109830/cntm-20260630xs1a.htm)sec.gov

[COHR 10-K COHERENT CORP.](https://www.sec.gov/Archives/edgar/data/820318/000082031826000020/iivi-20260630.htm)sec.gov

[CORZ 10-K Core Scientific, Inc.](https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm)sec.gov

[CORZ 10-Q Core Scientific, Inc.](https://www.sec.gov/Archives/edgar/data/1839341/000183934126000014/core-20260630.htm)sec.gov

[CORZ 8-K Core Scientific, Inc.](https://www.sec.gov/Archives/edgar/data/1839341/000183934126000021/core-20260825.htm)sec.gov

[CRWV 10-K CoreWeave, Inc.](https://www.sec.gov/Archives/edgar/data/1769628/000176962826000104/crwv-20251231.htm)sec.gov

[CRWV 10-Q CoreWeave, Inc.](https://www.sec.gov/Archives/edgar/data/1769628/000176962826000366/crwv-20260630.htm)sec.gov

[CWEN 424B5 Clearway Energy](https://www.sec.gov/Archives/edgar/data/1567683/000110465926092083/tm2622208-3_424b5.htm)sec.gov

[CWEN 8-K Clearway Energy](https://www.sec.gov/Archives/edgar/data/1567683/000110465926111423/tm2626209d1_8k.htm)sec.gov

[D 10-Q Dominion Energy, Inc.](https://www.sec.gov/Archives/edgar/data/715957/000119312526327487/d-20260630.htm)sec.gov

[D 8-K DOMINION ENERGY, INC](https://www.sec.gov/Archives/edgar/data/715957/000119312526390654/d107020dex992.htm)sec.gov

[DCI 10-K DONALDSON Co INC](https://www.sec.gov/Archives/edgar/data/29644/000002964426000085/dci-20260731.htm)sec.gov

[DGXX 10-Q Digi Power X Inc.](https://www.sec.gov/Archives/edgar/data/1854368/000121390026089940/ea0301731-10q_digipower.htm)sec.gov

[DLR 10-K Digital Realty Trust, Inc.](https://www.sec.gov/Archives/edgar/data/1297996/000110465926015365/dlr-20251231x10k.htm)sec.gov

[DTB 8-K DTE ENERGY CO](https://www.sec.gov/Archives/edgar/data/936340/000093634026000159/dtebusinessupdate92826fi.htm)sec.gov

[DUK 10-Q Duke Energy](https://www.sec.gov/Archives/edgar/data/1326160/000132616026000040/duk-20260630.htm)sec.gov

[DUK 424B5 Duke Energy](https://www.sec.gov/Archives/edgar/data/1326160/000110465926093014/tm2622403-1_424b5.htm)sec.gov

[DUK 424B5 Duke Energy](https://www.sec.gov/Archives/edgar/data/1326160/000110465926094253/tm2622403-2_424b5.htm)sec.gov

[DUOT 10-Q DUOS TECHNOLOGIES GROUP, INC.](https://www.sec.gov/Archives/edgar/data/1396536/000107997326001151/duos_10q-063026.htm)sec.gov

[DUOT 8-K DUOS TECHNOLOGIES GROUP, INC.](https://www.sec.gov/Archives/edgar/data/1396536/000107997326001150/ex99x2.htm)sec.gov

[DUOT 8-K DUOS TECHNOLOGIES GROUP, INC.](https://www.sec.gov/Archives/edgar/data/1396536/000155335026000118/ex99x1.htm)sec.gov

[EDGM 10-Q Edgemode, Inc.](https://www.sec.gov/Archives/edgar/data/1652958/000168316826006473/edgemode_i10q-063026.htm)sec.gov

[EGAN 10-K EGAIN Corp](https://www.sec.gov/Archives/edgar/data/1066194/000110465926106739/egan-20260630x10k.htm)sec.gov

[EMAT 8-K Evolution Metals & Technologies Corp.](https://www.sec.gov/Archives/edgar/data/1866226/000121390026105464/ea030725601ex99-1.htm)sec.gov

[EMAT S-1 Evolution Metals & Technologies Corp.](https://www.sec.gov/Archives/edgar/data/1866226/000121390026097822/ea0304499-01.htm)sec.gov

[EMAT S-1/A Evolution Metals & Technologies Corp.](https://www.sec.gov/Archives/edgar/data/1866226/000121390026102787/ea0304499-02.htm)sec.gov

[EOSE 10-Q Eos Energy Enterprises](https://www.sec.gov/Archives/edgar/data/1805077/000162828026052906/eose-20260630.htm)sec.gov

[EOSE S-3ASR Eos Energy Enterprises](https://www.sec.gov/Archives/edgar/data/1805077/000162828026059608/eos-sx3asr.htm)sec.gov

[EQIX 10-K Equinix, Inc.](https://www.sec.gov/Archives/edgar/data/1101239/000110123926000032/eqix-20251231.htm)sec.gov

[ETR 10-Q Entergy Corporation](https://www.sec.gov/Archives/edgar/data/65984/000006598426000283/etr-20260630.htm)sec.gov

[ETRA 424B4 Electra Therapeutics, Inc.](https://www.sec.gov/Archives/edgar/data/2088082/000119312526395670/d61940d424b4.htm)sec.gov

[ETRA S-1/A Electra Therapeutics, Inc.](https://www.sec.gov/Archives/edgar/data/2088082/000119312526389755/d61940ds1a.htm)sec.gov

[EVRG 10-Q Evergy](https://www.sec.gov/Archives/edgar/data/1711269/000171126926000100/evrg-20260630.htm)sec.gov

[EVRG 424B5 Evergy](https://www.sec.gov/Archives/edgar/data/1711269/000119312526353300/d19416d424b5.htm)sec.gov

[FCCN S-1/A SPECTRAL CAPITAL Corp](https://www.sec.gov/Archives/edgar/data/1131903/000121390026101431/ea0305611-s1a3_spectral.htm)sec.gov

[FCEL 10-Q FUELCELL ENERGY INC](https://www.sec.gov/Archives/edgar/data/886128/000110465926104501/fcel-20260731x10q.htm)sec.gov

[FCEL 8-K FUELCELL ENERGY INC](https://www.sec.gov/Archives/edgar/data/886128/000110465926104498/fcel-20260902xex99d2.htm)sec.gov

[FEAM 10-K 5E Advanced Materials, Inc.](https://www.sec.gov/Archives/edgar/data/1888654/000119312526394541/feam-20260630.htm)sec.gov

[FNGR 8-K FingerMotion, Inc.](https://www.sec.gov/Archives/edgar/data/1602409/000149315226039927/ex99-1.htm)sec.gov

[FNGR 8-K FingerMotion, Inc.](https://www.sec.gov/Archives/edgar/data/1602409/000149315226040492/ex99-1.htm)sec.gov

[FNGR S-1 FingerMotion, Inc.](https://www.sec.gov/Archives/edgar/data/1602409/000149315226041059/forms-1.htm)sec.gov

[FRMI 10-Q Fermi Inc.](https://www.sec.gov/Archives/edgar/data/2071778/000207177826000051/frmi-20260630.htm)sec.gov

[FRMI 8-K Fermi Inc.](https://www.sec.gov/Archives/edgar/data/2071778/000121390026089340/ea030201601ex10-1.htm)sec.gov

[FRMI DEF 14A Fermi America](https://www.sec.gov/Archives/edgar/data/2071778/000121390026106378/ea0307100-02.htm)sec.gov

[FRVO 8-K Fervo Energy Co](https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/exhibit991pressrelease9126.htm)sec.gov

[FSHP 8-K Flag Ship Acquisition Corp](https://www.sec.gov/Archives/edgar/data/1850059/000182912626010118/flagshipacq_ex2-1.htm)sec.gov

[GEDC 10-Q TerraVolt Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/1174891/000149315226038130/form10-q.htm)sec.gov

[GPUS 10-Q Hyperscale Data, Inc.](https://www.sec.gov/Archives/edgar/data/896493/000121465926010549/hd81126810q.htm)sec.gov

[GRDX 10-Q/A GridAI Technologies Corp.](https://www.sec.gov/Archives/edgar/data/1604191/000110465926108635/grdx-20260630x10qa.htm)sec.gov

[GRDX S-1/A GridAI Technologies Corp.](https://www.sec.gov/Archives/edgar/data/1604191/000110465926100274/tm2615795d8_s1a.htm)sec.gov

[GREE 10-K Vulcan Infrastructure & Power Inc. (formerly Greenidge Generation Holdings Inc.)](https://www.sec.gov/Archives/edgar/data/1844971/000184497126000011/gree-20251231.htm)sec.gov

[HCWC 8-K HEALTHY CHOICE WELLNESS CORP.](https://www.sec.gov/Archives/edgar/data/1948864/000149315226043135/ex99-2.htm)sec.gov

[HE 8-K Hawaiian Electric Industries](https://www.sec.gov/Archives/edgar/data/354707/000035470726000044/he-20260727.htm)sec.gov

[HIVE 10-K HIVE Digital Technologies Ltd.](https://www.sec.gov/Archives/edgar/data/1720424/000106299326002973/form10k.htm)sec.gov

[HIVE 10-Q HIVE Digital Technologies Ltd.](https://www.sec.gov/Archives/edgar/data/1720424/000106299326004434/form10q.htm)sec.gov

[HIVE 8-K HIVE Digital Technologies Ltd.](https://www.sec.gov/Archives/edgar/data/1720424/000106299326004970/exhibit99-1.htm)sec.gov

[HIVE 8-K HIVE Digital Technologies Ltd.](https://www.sec.gov/Archives/edgar/data/1720424/000106299326004996/exhibit99-1.htm)sec.gov

[HNUC S-1/A Holtec Nuclear Corp](https://www.sec.gov/Archives/edgar/data/2104277/000119312526384287/d40440ds1a.htm)sec.gov

[HNUC S-1/A Holtec Nuclear Corp](https://www.sec.gov/Archives/edgar/data/2104277/000119312526361496/d40440ds1a.htm)sec.gov

[HUT 10-K Hut 8 Corp.](https://www.sec.gov/Archives/edgar/data/1964789/000110465926019392/hut-20251231x10k.htm)sec.gov

[HUT 10-Q Hut 8 Corp.](https://www.sec.gov/Archives/edgar/data/1964789/000110465926090025/hut-20260630x10q.htm)sec.gov

[HVII 8-K Hennessy Capital Investment Corp. VII](https://www.sec.gov/Archives/edgar/data/1846416/000149315226039511/ex99-2.htm)sec.gov

[IDT 10-K IDT CORP](https://www.sec.gov/Archives/edgar/data/1005731/000143774926031469/idt20260731_10k.htm)sec.gov

[IHT 10-Q INNSUITES HOSPITALITY TRUST](https://www.sec.gov/Archives/edgar/data/82473/000149315226042806/form10-q.htm)sec.gov

[IOND 10-Q Ionic Digital Inc.](https://www.sec.gov/Archives/edgar/data/2007691/000200769126000012/ioni-20260630.htm)sec.gov

[IOND 8-K Ionic Digital Inc.](https://www.sec.gov/Archives/edgar/data/2007691/000200769126000016/ex991september102026pressr.htm)sec.gov

[IREN 10-K IREN Ltd](https://www.sec.gov/Archives/edgar/data/1878848/000187884825000063/iren-20250630.htm)sec.gov

[IREN 10-K IREN Ltd](https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm)sec.gov

[IREN 10-Q IREN Ltd](https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm)sec.gov

[IRM 10-K Iron Mountain Incorporated](https://www.sec.gov/Archives/edgar/data/1020569/000102056926000013/irm-20251231.htm)sec.gov

[JTAI 10-Q Jet.AI Inc.](https://www.sec.gov/Archives/edgar/data/1861622/000149315226038333/form10-q.htm)sec.gov

[LHSW 424B4 Lianhe Sowell International Group Ltd](https://www.sec.gov/Archives/edgar/data/2004024/000121390026096975/ea0304365-424b4_lianhe.htm)sec.gov

[LNT 10-Q Alliant Energy](https://www.sec.gov/Archives/edgar/data/352541/000035254126000043/lnt-20260630.htm)sec.gov

[LTGO 10-Q Latigo Biotherapeutics, Inc.](https://www.sec.gov/Archives/edgar/data/2056611/000119312526381969/ltgo-20260630.htm)sec.gov

[MARA 10-Q MARA Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/1507605/000150760526000022/mara-20260630.htm)sec.gov

[MARA 8-K MARA Holdings](https://www.sec.gov/Archives/edgar/data/1507605/000149315226035933/form8-k.htm)sec.gov

[MARA 8-K MARA Holdings](https://www.sec.gov/Archives/edgar/data/1507605/000095014226002607/eh260835247_8k.htm)sec.gov

[MESH 8-K Meshflow Acquisition Corp](https://www.sec.gov/Archives/edgar/data/2081468/000121390026097901/ea030475901ex99-2.htm)sec.gov

[MOVE 8-K Corvex, Inc.](https://www.sec.gov/Archives/edgar/data/1734750/000121390026096776/ea030434301ex99-1.htm)sec.gov

[MTRX 10-K MATRIX SERVICE CO](https://www.sec.gov/Archives/edgar/data/866273/000086627326000057/mtrx-20260630.htm)sec.gov

[NB 10-K NIOCORP DEVELOPMENTS LTD](https://www.sec.gov/Archives/edgar/data/1512228/000119312526402806/nb-ex96_1.htm)sec.gov

[NEE 8-K NEXTERA ENERGY INC](https://www.sec.gov/Archives/edgar/data/753308/000110465926107537/tm2625368d1_ex99-2.htm)sec.gov

[NI 10-Q NiSource Inc.](https://www.sec.gov/Archives/edgar/data/1111711/000111171126000088/nix-20260630.htm)sec.gov

[NMAD 8-K/A NOMAD POWER SOLUTIONS, INC.](https://www.sec.gov/Archives/edgar/data/1335105/000149315226043120/ex99-4.htm)sec.gov

[NNE 10-Q NANO Nuclear Energy](https://www.sec.gov/Archives/edgar/data/1923891/000149315226037345/form10-q.htm)sec.gov

[NRG 10-K NRG Energy, Inc.](https://www.sec.gov/Archives/edgar/data/1013871/000101387126000004/nrg-20251231.htm)sec.gov

[NRG 10-Q NRG Energy](https://www.sec.gov/Archives/edgar/data/1013871/000101387126000020/nrg-20260630.htm)sec.gov

[NUAI 10-Q New ERA Energy & Digital, Inc.](https://www.sec.gov/Archives/edgar/data/2028336/000121390026090138/ea0301610-10q_newera.htm)sec.gov

[NUAI 10-Q/A New ERA Energy & Digital, Inc.](https://www.sec.gov/Archives/edgar/data/2028336/000121390026090122/ea0301611-10qa1_newera.htm)sec.gov

[NUAI 8-K New ERA Energy & Digital, Inc.](https://www.sec.gov/Archives/edgar/data/2028336/000121390026090827/ea030246701ex99-1.htm)sec.gov

[NUAI 8-K New ERA Energy & Digital, Inc.](https://www.sec.gov/Archives/edgar/data/2028336/000121390026101642/ea0305716-8k_newera.htm)sec.gov

[NVDA 10-K NVIDIA Corporation](https://www.sec.gov/Archives/edgar/data/1045810/000104581026000021/nvda-20260125.htm)sec.gov

[NWE 8-K NorthWestern Energy Group, Inc.](https://www.sec.gov/Archives/edgar/data/1993004/000199300426000054/exh991barclaysconfpres26.htm)sec.gov

[OBDC 8-K Blue Owl Capital Corp](https://www.sec.gov/Archives/edgar/data/1655888/000119312526385210/d168192dex101.htm)sec.gov

[OKLO 10-Q Oklo](https://www.sec.gov/Archives/edgar/data/1849056/000162828026054571/oklo-20260630.htm)sec.gov

[OKLO 424B5 Oklo](https://www.sec.gov/Archives/edgar/data/1849056/000110465926106909/tm2625056-3_424b5.htm)sec.gov

[ORA 10-Q Ormat Technologies](https://www.sec.gov/Archives/edgar/data/1296445/000129644526000014/ora-20260630.htm)sec.gov

[ORCL 10-K Oracle Corporation](https://www.sec.gov/Archives/edgar/data/1341439/000119312526277521/orcl-20260531.htm)sec.gov

[OURA S-1/A Oura Inc.](https://www.sec.gov/Archives/edgar/data/2133022/000119312526396051/d119865ds1a.htm)sec.gov

[PAAC 8-K Proem Acquisition Corp. I](https://www.sec.gov/Archives/edgar/data/2087446/000121390026103789/ea030673101ex99-2.htm)sec.gov

[PEG 10-Q Public Service Enterprise Group](https://www.sec.gov/Archives/edgar/data/788784/000119312526332943/peg-20260630.htm)sec.gov

[PHR 10-Q Phreesia, Inc.](https://www.sec.gov/Archives/edgar/data/1412408/000141240826000223/phr-20260731.htm)sec.gov

[PL 10-Q Planet Labs PBC](https://www.sec.gov/Archives/edgar/data/1836833/000119312526382016/pl-20260731.htm)sec.gov

[PLMK 8-K Plum Acquisition Corp, IV](https://www.sec.gov/Archives/edgar/data/2030482/000121390026091866/ea030275401ex99-1.htm)sec.gov

[PLUG 10-Q Plug Power](https://www.sec.gov/Archives/edgar/data/1093691/000110465926093454/plug-20260630x10q.htm)sec.gov

[PNW 10-Q Pinnacle West Capital](https://www.sec.gov/Archives/edgar/data/764622/000076462226000041/pnw-20260630.htm)sec.gov

[PNW 424B5 Pinnacle West Capital](https://www.sec.gov/Archives/edgar/data/764622/000110465926090107/tm2621767-1_424b5.htm)sec.gov

[PNW 8-K PINNACLE WEST CAPITAL CORP](https://www.sec.gov/Archives/edgar/data/764622/000076462226000046/septemberinvestordeck.htm)sec.gov

[PNW 8-K PINNACLE WEST CAPITAL CORP](https://www.sec.gov/Archives/edgar/data/764622/000076462226000049/octoberinvestordeck.htm)sec.gov

[POR 10-Q Portland General Electric](https://www.sec.gov/Archives/edgar/data/784977/000119312526326379/por-20260630.htm)sec.gov

[PPL 10-Q PPL Corporation](https://www.sec.gov/Archives/edgar/data/922224/000092222426000044/ppl-20260630.htm)sec.gov

[PUMP 8-K ProPetro Holding Corp.](https://www.sec.gov/Archives/edgar/data/1680247/000168024726000112/propwrtargaannouncement.htm)sec.gov

[PWCM 8-K POWERCOMPUTE, INC.](https://www.sec.gov/Archives/edgar/data/1640384/000119312526408391/lmfa-ex99_1.htm)sec.gov

[QMLS 10-Q QumulusAI, Inc.](https://www.sec.gov/Archives/edgar/data/2084026/000143774926028924/quma20260630_10q.htm)sec.gov

[QMLS 10-Q/A QumulusAI, Inc.](https://www.sec.gov/Archives/edgar/data/2084026/000162828026059295/qmls-20260630.htm)sec.gov

[RBRK 10-Q Rubrik, Inc.](https://www.sec.gov/Archives/edgar/data/1943896/000194389626000060/rbrk-20260731.htm)sec.gov

[RIME 8-K Algorhythm Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/923601/000149315226043599/ex99-2.htm)sec.gov

[RIOT 10-Q Riot Platforms, Inc.](https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm)sec.gov

[RIOT 8-K Riot Platforms](https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810x8k.htm)sec.gov

[RIOT 8-K Riot Platforms](https://www.sec.gov/Archives/edgar/data/1167419/000110465926097330/riot-20260810x8k.htm)sec.gov

[ROZE 424B4 ROZE AI INC.](https://www.sec.gov/Archives/edgar/data/2075335/000121390026104150/ea0306875-424b4_roze.htm)sec.gov

[S-1 ADARx Pharmaceuticals, Inc.](https://www.sec.gov/Archives/edgar/data/1802369/000119312526383838/d903461ds1.htm)sec.gov

[S-1 Bitari Inc](https://www.sec.gov/Archives/edgar/data/2091680/000118518526003678/bitaris1082026.htm)sec.gov

[S-1 CoVolt Power, Inc.](https://www.sec.gov/Archives/edgar/data/2131613/000119312526361190/d25482ds1.htm)sec.gov

[S-1 NSCALE Ltd](https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-ex10_14.htm)sec.gov

[S-1 Oura Inc.](https://www.sec.gov/Archives/edgar/data/2133022/000119312526381855/d119865ds1.htm)sec.gov

[S-1 SB Energy, Inc.](https://www.sec.gov/Archives/edgar/data/2133037/000162828026059639/sbenergy-sx1.htm)sec.gov

[S-1/A ADARx Pharmaceuticals, Inc.](https://www.sec.gov/Archives/edgar/data/1802369/000119312526390724/d903461ds1a.htm)sec.gov

[S-1/A ADARx Pharmaceuticals, Inc.](https://www.sec.gov/Archives/edgar/data/1802369/000119312526396007/d903461ds1a.htm)sec.gov

[S-1/A KiNRG, Inc.](https://www.sec.gov/Archives/edgar/data/95572/000121390026099804/ea0304622-s1a1_kinrg.htm)sec.gov

[S-1/A SB Energy, Inc.](https://www.sec.gov/Archives/edgar/data/2133037/000162828026060761/sbenergy-ex1030xformofport.htm)sec.gov

[SBE S-1/A SB Energy, Inc.](https://www.sec.gov/Archives/edgar/data/2133037/000162828026062846/sbenergy-sx1a2.htm)sec.gov

[SEI 8-K Solaris Energy Infrastructure, Inc.](https://www.sec.gov/Archives/edgar/data/1697500/000119312526397255/d182097dex991.htm)sec.gov

[SGLY 10-K Singularity Future Technology Ltd.](https://www.sec.gov/Archives/edgar/data/1422892/000121390026104650/ea0305950-10k_singularity.htm)sec.gov

[SHAZ S-1/A SharonAI Holdings Inc.](https://www.sec.gov/Archives/edgar/data/2068385/000149315226039014/forms-1a.htm)sec.gov

[SHAZ S-1/A SharonAI Holdings Inc.](https://www.sec.gov/Archives/edgar/data/2068385/000149315226039475/forms-1a.htm)sec.gov

[SHPH 10-Q Shuttle Pharmaceuticals Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/1757499/000149315226044107/form10-q.htm)sec.gov

[SLNH 10-Q Soluna Holdings](https://www.sec.gov/Archives/edgar/data/64463/000162828026056702/slnh-20260630.htm)sec.gov

[SLNH 8-K Soluna Holdings](https://www.sec.gov/Archives/edgar/data/64463/000149315226041699/form8-k.htm)sec.gov

[SLNH 8-K Soluna Holdings](https://www.sec.gov/Archives/edgar/data/64463/000149315226042479/form8-k.htm)sec.gov

[SLNH DEF 14A Soluna Holdings](https://www.sec.gov/Archives/edgar/data/64463/000162828026058611/slnh-20260824.htm)sec.gov

[SMR 10-Q NuScale Power](https://www.sec.gov/Archives/edgar/data/1822966/000182296626000085/smr-20260630.htm)sec.gov

[SO 10-Q Southern Company](https://www.sec.gov/Archives/edgar/data/92122/000009212226000054/so-20260630.htm)sec.gov

[SRE 10-Q Sempra](https://www.sec.gov/Archives/edgar/data/1032208/000103220826000045/sre-20260630.htm)sec.gov

[SYTN S-1/A Syntiant Corp.](https://www.sec.gov/Archives/edgar/data/1718728/000119312526376166/ck0001718728-20260831.htm)sec.gov

[TLN 10-Q Talen Energy](https://www.sec.gov/Archives/edgar/data/1622536/000162253626000066/tln-20260630.htm)sec.gov

[TLN 8-K/A Talen Energy](https://www.sec.gov/Archives/edgar/data/1622536/000162253626000070/tln-20260615.htm)sec.gov

[TLN EX-99.1 Talen Energy Corporation](https://www.sec.gov/Archives/edgar/data/1622536/000162828025008641/)sec.gov

[TXNM 10-Q TXNM Energy (PNM Resources)](https://www.sec.gov/Archives/edgar/data/1108426/000110842626000048/pnm-20260630.htm)sec.gov

[TXNM 424B5 TXNM Energy (PNM Resources)](https://www.sec.gov/Archives/edgar/data/1108426/000110842626000053/a08312026txnm424b5.htm)sec.gov

[UEC 10-K URANIUM ENERGY CORP](https://www.sec.gov/Archives/edgar/data/1334933/000143774926031414/uec20260731_10k.htm)sec.gov

[UROY 10-Q Uranium Royalty Corp.](https://www.sec.gov/Archives/edgar/data/2143673/000119312526390681/uroy-20260731.htm)sec.gov

[VDTA S-1 Vertical Data Inc.](https://www.sec.gov/Archives/edgar/data/2033264/000149315226045574/forms-1.htm)sec.gov

[VIP 10-Q Vulcan Infrastructure & Power Inc.](https://www.sec.gov/Archives/edgar/data/1844971/000162828026057159/gree-20260630.htm)sec.gov

[VIP 8-K Vulcan Infrastructure & Power Inc.](https://www.sec.gov/Archives/edgar/data/1844971/000119380526001214/e665775_ex10-7.htm)sec.gov

[VIP 8-K Vulcan Infrastructure & Power Inc.](https://www.sec.gov/Archives/edgar/data/1844971/000162828026057243/vip_investorxpresentatio.htm)sec.gov

[VRHID S-1/A Veri MedTech Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/2078149/000109690626001366/vrhi_s1z.htm)sec.gov

[VRHID S-1/A Veri MedTech Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/2078149/000109690626001390/vrhi_s1z.htm)sec.gov

[VRHID S-1/A Veri MedTech Holdings, Inc.](https://www.sec.gov/Archives/edgar/data/2078149/000109690626001407/vrhi_s1z.htm)sec.gov

[VRT 8-K Vertiv Holdings Co](https://www.sec.gov/Archives/edgar/data/1674101/000119312526379306/d472406dex991.htm)sec.gov

[VST 10-K Vistra Corp.](https://www.sec.gov/Archives/edgar/data/1692819/000169281926000006/vistra-20251231.htm)sec.gov

[VST 10-Q Vistra](https://www.sec.gov/Archives/edgar/data/1692819/000169281926000019/vistra-20260630.htm)sec.gov

[VST 424B5 Vistra](https://www.sec.gov/Archives/edgar/data/1692819/000114036126036130/ny20081693x2_424b5.htm)sec.gov

[VST S-3ASR Vistra](https://www.sec.gov/Archives/edgar/data/1692819/000114036126035954/ny20081693x1_s3asr.htm)sec.gov

[VYLR 8-K Vylor Inc.](https://www.sec.gov/Archives/edgar/data/2128626/000119312526402928/ck0002128626-ex99_1.htm)sec.gov

[WEC 10-Q WEC Energy Group, Inc.](https://www.sec.gov/Archives/edgar/data/783325/000078332526000087/wec-20260630.htm)sec.gov

[WEC 8-K WEC ENERGY GROUP, INC.](https://www.sec.gov/Archives/edgar/data/783325/000078332526000099/a092026septemberfinal002.htm)sec.gov

[WEC 8-K WEC Energy Group](https://www.sec.gov/Archives/edgar/data/783325/000078332526000095/wec-20260814.htm)sec.gov

[WHK S-1 WhiteHawk Minerals Corp.](https://www.sec.gov/Archives/edgar/data/1921603/000119312526410790/whk-20261001.htm)sec.gov

[WULF 10-K TeraWulf Inc.](https://www.sec.gov/Archives/edgar/data/1083301/000108330126000031/wulf-20251231.htm)sec.gov

[WULF 10-Q TeraWulf Inc.](https://www.sec.gov/Archives/edgar/data/1083301/000108330126000166/wulf-20260630.htm)sec.gov

[WYFI 10-K WhiteFiber, Inc.](https://www.sec.gov/Archives/edgar/data/2042022/000121390026034341/ea0278305-10k_white.htm)sec.gov

[WYFI 10-Q WhiteFiber](https://www.sec.gov/Archives/edgar/data/2042022/000121390026088026/ea0300877-10q_whitefiber.htm)sec.gov

[WYFI 8-K WhiteFiber](https://www.sec.gov/Archives/edgar/data/2042022/000121390026090492/ea0302334-8k_whitefiber.htm)sec.gov

[WYFI 8-K WhiteFiber](https://www.sec.gov/Archives/edgar/data/2042022/000121390026092599/ea0302925-8k_white.htm)sec.gov

[WYFI 8-K WhiteFiber, Inc.](https://www.sec.gov/Archives/edgar/data/2042022/000121390026099424/ea030525701ex99-1.htm)sec.gov

[WYFI 8-K/A WhiteFiber](https://www.sec.gov/Archives/edgar/data/2042022/000121390026094022/ea0303443-8ka1_whitefiber.htm)sec.gov

[XEL 10-Q Xcel Energy Inc.](https://www.sec.gov/Archives/edgar/data/72903/000007290326000154/xel-20260630.htm)sec.gov

[XEL 8-K Xcel Energy](https://www.sec.gov/Archives/edgar/data/72903/000007290326000160/xel-20260819.htm)sec.gov

[XLAB 10-K Exascale Labs Holdings Inc.](https://www.sec.gov/Archives/edgar/data/2109869/000182912626010462/exascalelabs_10k.htm)sec.gov

[ZONE 10-K Zone Frontier Inc.](https://www.sec.gov/Archives/edgar/data/1956741/000121390026104157/ea0306318-10k_zone.htm)sec.gov

[ZONE 8-K Zone Frontier Inc.](https://www.sec.gov/Archives/edgar/data/1956741/000121390026105332/ea030695301ex99-1.htm)sec.gov

[ZS 10-K Zscaler, Inc.](https://www.sec.gov/Archives/edgar/data/1713683/000171368326000157/zs-20260731.htm)sec.gov

[ZSQR 8-K Z Squared Inc.](https://www.sec.gov/Archives/edgar/data/1759186/000118518526003984/zsqrex10-1.htm)sec.gov

## Government releases

17 sources

[Senate Bill 6, 89th Legislature, large load interconnection, operation, and cost of service, signed by the Governor](https://capitol.texas.gov/BillLookup/History.aspx?LegSess=89R&Bill=SB6)capitol.texas.gov

[Market Notice M-A080326-01, Update Regarding Batch Zero Timelines and Processes](https://www.ercot.com/services/comm/mkt_notices/M-A080326-01)ercot.com

[Market Notice M-B062326-01, Implementation of the Batch Zero Process, PGRR145 and NPRR1325](https://www.ercot.com/services/comm/mkt_notices/M-B062326-01)ercot.com

[Market Notice M-B062326-04, Ending the Large Load Interconnection Study process under PGRR115 and Batch Zero submission deadlines](https://www.ercot.com/services/comm/mkt_notices/M-B062326-04)ercot.com

[East Texas Data Center Withdraws After Falling Short of Governor Abbott's Standards](https://gov.texas.gov/news/post/east-texas-data-center-withdraws-after-falling-short-of-governor-abbotts-standards)gov.texas.gov

[Governor Abbott Announces Core Scientific, Vantage Data Centers and SB Energy Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-core-scientific-vantage-data-centers-and-sb-energy-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Edge ConneX and Stream Data Centers Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-edge-connex-and-stream-data-centers-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Galaxy, Compass Datacenters and Montera Infrastructure Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-galaxy-compass-datacenters-and-montera-infrastructure-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Google, Rowan and CleanSpark Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-google-rowan-and-cleanspark-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces Meta Commits to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-meta-commits-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Announces OpenAI Commits to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announces-open-ai-commits-to-comply-with-his-data-center-standards-8-10)gov.texas.gov

[Governor Abbott Announces PUC and ERCOT Actions Protecting Residential Ratepayers From Data Center Costs](https://gov.texas.gov/news/post/governor-abbott-announces-puc-and-ercot-actions-protecting-residential-ratepayers-from-data-center-costs)gov.texas.gov

[Governor Abbott Announces QTS Data Centers Will Meet Texas Standards](https://gov.texas.gov/news/post/governor-abbott-announces-qts-data-centers-will-meet-texas-standards)gov.texas.gov

[Governor Abbott Announces Skybox, Digital Realty and MARA Commit to Comply With His Data Center Standards](https://gov.texas.gov/news/post/governor-abbott-announcesskyboxdigital-realtymara-commit-to-comply-with-his-data-center-standards)gov.texas.gov

[Governor Abbott Directs Comprehensive Data Center Audit](https://gov.texas.gov/news/post/governor-abbott-directs-comprehensive-data-center-audit)gov.texas.gov

[Governor Abbott Directs PUC and ERCOT to Shield Texans From Data Center Infrastructure Costs](https://gov.texas.gov/news/post/governor-abbott-directs-puc-and-ercot-to-shield-texans-from-data-center-infrastructure-costs)gov.texas.gov

[Project 58481, Proposal for Publication of 16 TAC 25.194, large load interconnection standards](https://interchange.puc.texas.gov/Documents/58481_122_1600475.PDF)interchange.puc.texas.gov

Sources are collected from securities filings, regulatory dockets, litigation records, government statements, utility filings, and trade press, and reconciled into a single source of truth before publication. Return to the [Nationwide Data Center Delay Watchlist](https://savrn.com/data-center-delay-tracker) or the companion [Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker).
