Every ruling, filing, queue figure, transmission project, and deadline in the Data Center Grid Operator Watchlist, with a direct link to its primary source — operator filings, FERC dockets, and reputable trade reporting. 1045 citations in all.

[Back to the interactive watchlist](https://savrn.com/data-center-grid-operator-watchlist)

Open data credits: Electric Reliability Council of Texas market notices; Electric Reliability Council of Texas news releases; Energy Central; Energy Storage News; Federal Energy Regulatory Commission eLibrary; Latitude Media; North American Electric Reliability Corporation; PJM Inside Lines; POWER Magazine; Public Utility Commission of Texas Interchange; Source New Mexico; T&D World; Utility Dive.

## ERCOT — Electric Reliability Council of Texas, Inc. (ERCOT)

583 rulings & filings · 4 transmission items · 8 dated milestones

- Queue: ~474 GW of large-load interconnection requests (ERCOT deck: 474.1 GW by 2031, 474.7 GW by 2033) — more than 5x the all-time peak demand record. Of that, only ~205 GW was preliminarily eligible for… · ~90% data centers — ERCOT's deck shows 90.2% (420,812 MW) of large-load MW identified as data center as of June 2026; ERCOT's June 18, 2026 release cited… (as of 2026-07-29) [ercot.com →](https://www.ercot.com/files/docs/2026/07/29/ERCOT-Senate-July-29-Panel-1-Assessing-The-Grid.pdf)
- Texas Senate Bill 6 — large-load interconnection, curtailment, and remote-disconnect standards (SB 6, 89th Texas Legislature (2025)) — (2025-06-20) [utilitydive.com →](https://www.utilitydive.com/news/texas-law-gives-grid-operator-power-to-disconnect-data-centers-during-crisi/751587/)
- Batch Zero large-load interconnection framework (PGRR145 + NPRR1325) (ERCOT Planning Guide Revision Request 145; Nodal Protocol Revision…) — (2026-06-18) [ercot.com →](https://www.ercot.com/news/release/06182026-puct-approves-ercots)
- PUCT proposed rule 16 TAC §25.194 — large load interconnection standards (SB 6 implementation) (PUCT Project No. 58481) — (2026-03-12) [dlapiper.com →](https://www.dlapiper.com/en-us/insights/publications/2026/03/texas-proposes-new-interconnection-standards-for-large-electric-loads)
- PUCT order in Docket 59220 — first SB 6 net-metering/co-location ruling, affirming curtailment authority over co-located data… (PUCT Docket No. 59220) — (2026-07-23) [utilitydive.com →](https://www.utilitydive.com/news/texas-approves-ai-data-center-co-location-next-to-wind-farm-with-curtailme/826617/)
- Gov. Abbott directive — comprehensive verification and audit of data centers in the ERCOT queue; pause on new data center… (Gubernatorial directive to PUCT Chairman Thomas Gleeson and ERCOT…) — (2026-08-03) [utilitydive.com →](https://www.utilitydive.com/news/texas-hits-pause-data-center-interconnections/827046/)
- ERCOT Market Notice M-A080326-01 — suspension of Batch Zero classification deadline (ERCOT Market Notice M-A080326-01) — (2026-08-03) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A080326-01)
- ERCOT good-cause-exception filing and PUCT approval; audit timeline set (RFIs now, reports due December 10, 2026) (PUCT Control No. 59142 (Item 42)) — (2026-08-10) [utilitydive.com →](https://www.utilitydive.com/news/ercot-texas-puc-data-center-audit/828472/)
- PUCT Project 58484 — evaluation of transmission cost recovery (4CP methodology) for large loads (PUCT Project No. 58484) — (2025-08-01) [klgates.com →](https://www.klgates.com/Request-for-Comments-on-Texas-PUCT-Draft-Report-Regarding-Transmission-Cost-Recovery-in-the-ERCOT-Region-3-30-2026)
- SB 6 companion rulemakings: Project 58479 (co-location net metering), Project 58480 (large-load forecasting, ≥10 MW definition),… (PUCT Project Nos. 58479, 58480, 58482) — (2026-01) [ashurstperkinscoie.com →](https://www.ashurstperkinscoie.com/en/insights/sb-6-implementation-shaping-data-center-future-in-texas/)
- ERCOT market notice M-A013126-02: Results of Final Ad Hoc Interim VRT Assessment for Large Loads (ERCOT Market Notice M-A013126-02) — (2026-06-26) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A013126-02)
- ERCOT market notice M-A052026-02: Impact Analysis - Incorrect consideration of ECRS Ramp Rate Telemetry for Non-Controllable Load Resources (ERCOT Market Notice M-A052026-02) — (2026-07-31) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A052026-02)
- ERCOT market notice M-A080326-02: PUC Approval of Good Cause Exceptions Relating To Batch Zero Process (ERCOT Market Notice M-A080326-02) — (2026-08-21) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A080326-02)
- ERCOT market notice M-A080326-03: Delayed Issuance of Batch Zero Conditional Classifications (ERCOT Market Notice M-A080326-03) — (2026-08-31) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A080326-03)
- ERCOT market notice M-A080326-04: Batch Zero Conditional Classification issued to Transmission and/or Distribution Service Providers (ERCOT Market Notice M-A080326-04) — (2026-09-03) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A080326-04)
- ERCOT market notice M-A090226-01: Workshop to share proposed operational framework for implementing SB6-related Large Load curtailments, including registration requirements (ERCOT Market Notice M-A090226-01) — (2026-09-02) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A090226-01)
- ERCOT market notice M-A090926-01: Issuance of Batch Zero Verification Requests for Information (ERCOT Market Notice M-A090926-01) — (2026-09-09) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-A090926-01)
- ERCOT market notice M-B062326-01: Implementation of the Batch Zero Process (PGRR145/NPRR1325) (ERCOT Market Notice M-B062326-01) — (2026-06-23) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B062326-01)
- ERCOT market notice M-B062326-02: Batch Zero follow-up for WLPUN/BYOG (ERCOT Market Notice M-B062326-02) — (2026-06-26) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B062326-02)
- ERCOT market notice M-B062326-03: Large Load Prerequisites for the Quarterly Stability Assessment with a Prerequisite Deadline of August 1, 2026 (ERCOT Market Notice M-B062326-03) — (2026-07-08) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B062326-03)
- ERCOT market notice M-B062326-04: Details for ending the Large Load Interconnection Study process under PGRR115 and submission deadlines for PGRR145 (Batch Zero) on July 10, 2026 (ERCOT Market Notice M-B062326-04) — (2026-07-08) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B062326-04)
- ERCOT market notice M-B062326-05: Batch Zero submissions of Dynamic Model files to ERCOT for July 10, 2026 deadline (ERCOT Market Notice M-B062326-05) — (2026-07-10) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B062326-05)
- ERCOT market notice M-B062326-06: Batch Zero Eligibility Submissions and Good Cause Exception Process for PGRR145 (ERCOT Market Notice M-B062326-06) — (2026-07-23) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B062326-06)
- ERCOT market notice M-B063026-01: Partial Implementation Details of PGRR145/NPRR1325, Batch Zero Process for Large Load Interconnections (ERCOT Market Notice M-B063026-01) — (2026-06-30) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-B063026-01)
- ERCOT market notice M-F073126-01: Revised Notice of Proposed Net Metering Arrangement Form relating to Net Metering Arrangements Involving a Large Load Customer Co-Located with an Existing Generation Resource (ERCOT Market Notice M-F073126-01) — (2026-07-31) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-F073126-01)
- ERCOT news release: PUCT Approves ERCOT's Batch Zero Process for Connecting Large Electricity Users While Protecting System Reliability for Texans (ERCOT News Release 2026-06-18 06182026-puct-approves-ercots) — (2026-06-18) [ercot.com →](https://www.ercot.com/news/release/06182026-puct-approves-ercots)
- PUCT Project 58481: Request for Control Number (PUCT Project 58481, Item 1) — (2025-07-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=1)
- PUCT Project 58481: Staff Memo and Questions for Comment w/Oct. 10 Comment Deadline (PUCT Project 58481, Item 2) — (2025-09-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=2)
- PUCT Project 58481: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 58481, Item 3) — (2025-09-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=3)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATE (PUCT Project 59142, Item 11) — (2026-02-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=11)
- PUCT Project 59142: TBC ERCOT Large Load Interconnection Batch Study Comments (PUCT Project 59142, Item 12) — (2026-02-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=12)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATE (PUCT Project 59142, Item 13) — (2026-02-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=13)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATE (PUCT Project 59142, Item 14) — (2026-03-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=14)
- PUCT Project 59142: PUC PROJECT NO. 59142 - BATCH STUDY CONSIDERATIONS AND PGRR145 (PUCT Project 59142, Item 15) — (2026-03-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=15)
- PUCT Project 59142: Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142 (PUCT Project 59142, Item 16) — (2026-03-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=16)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATE (PUCT Project 59142, Item 17) — (2026-03-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=17)
- PUCT Project 59142: Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142 (PUCT Project 59142, Item 18) — (2026-04-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=18)
- PUCT Project 59142: ONCOR ELECTRIC DELIVERY COMPANY LLC’S COMMENTS ON ERCOT’S PGRR 145 (PUCT Project 59142, Item 19) — (2026-04-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=19)
- PUCT Project 59142: CONTROL NUMBER REQUEST (PUCT Project 59142, Item 1) — (2025-12-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=1)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATE (PUCT Project 59142, Item 20) — (2026-04-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=20)
- PUCT Project 59142: PGRR145 & ERCOT BATCH ZERO CRITERIA CONSIDERATION (PUCT Project 59142, Item 21) — (2026-04-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=21)
- PUCT Project 59142: Staff Memo (PUCT Project 59142, Item 22) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=22)
- PUCT Project 59142: Joint Comments of Google LLC, Lancium LLC, and Eolic Development LLC (PUCT Project 59142, Item 24) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=24)
- PUCT Project 59142: TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026 (PUCT Project 59142, Item 25) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=25)
- PUCT Project 59142: Comments in Response to Staff Memo (PUCT Project 59142, Item 27) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=27)
- PUCT Project 59142: CyrusOne Project No. 59142 Batch Study Considerations and PGRR145 (PUCT Project 59142, Item 29) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=29)
- PUCT Project 59142: Joint Comments of Google LLC and Lancium LLC as it pertains to ERCOT's Large Load Process Reforms (PUCT Project 59142, Item 2) — (2025-12-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=2)
- PUCT Project 59142: Staff's April 29, 2026 comments on PGRR 145 (PUCT Project 59142, Item 30) — (2026-04-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=30)
- PUCT Project 59142: TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026 (PUCT Project 59142, Item 31) — (2026-05-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=31)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY UPDATE (PUCT Project 59142, Item 32) — (2026-05-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=32)
- PUCT Project 59142: Staff memo on Batch 0 entry criteria (PUCT Project 59142, Item 33) — (2026-05-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=33)
- PUCT Project 59142: DCC Comments on Net Metering Arrangements in Batch Zero (PUCT Project 59142, Item 34) — (2026-05-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=34)
- PUCT Project 59142: Comments on May 6th Staff Memorandum (PUCT Project 59142, Item 36) — (2026-05-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=36)
- PUCT Project 59142: Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of Directors (PUCT Project 59142, Item 37) — (2026-06-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=37)
- PUCT Project 59142: First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load Interconnections (PUCT Project 59142, Item 39) — (2026-06-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=39)
- PUCT Project 59142: Project Trailblazer - Request for Legacy and/or batch zero Interconnection Process Consideration (PUCT Project 59142, Item 40) — (2026-07-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=40)
- PUCT Project 59142: Notice of Withdrawal - This filing formally withdraws Trailblazer Infrastructure LLC's previously submitted Informational Memorandum in PUCT Project No. 59142. The notice advises the Commission that, due to ongoing discussions among the relevant parties. (PUCT Project 59142, Item 41) — (2026-07-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=41)
- PUCT Project 59142: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REQUESTS FOR GOOD CAUSE EXCEPTIONS RELATING TO BATCH ZERO DEADLINES AND STATUS UPDATE ON ADDITIONAL MATTERS INCLUDING THE LONG-TERM LOAD FORECAST (PUCT Project 59142, Item 42) — (2026-08-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=42)
- PUCT Project 59142: Letter regarding ERCOT's Requests for Exceptions Relating to Batch Zero Deadlines (PUCT Project 59142, Item 44) — (2026-08-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=44)
- PUCT Project 59142: Octa's Comments on ERCOT's August 10, 2026 Status Update (PUCT Project 59142, Item 45) — (2026-08-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=45)
- PUCT Project 59142: Public Comment - Audit Standards Required Under Governor’s Directive (PUCT Project 59142, Item 46) — (2026-08-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=46)
- PUCT Project 59142: Ionic Digital Inc.'s Comments Regarding ERCOT's Requests for Good Cause Exceptions Relating to Batch Zero Deadlines (PUCT Project 59142, Item 48) — (2026-08-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=48)
- PUCT Project 59142: Request for Commission Action on Batch Zero Eligibility (CloudPeak BZ-259 & BZ-180) (PUCT Project 59142, Item 49) — (2026-08-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=49)
- PUCT Project 59142: LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATE (PUCT Project 59142, Item 4) — (2026-01-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=4)
- PUCT Project 59142: ERCOT UPDATES - GOOD CAUSE EXCEPTIONS FOR PGRR 145, BATCH ZERO VERIFICATION AND AUDIT PROCESS, AND COMMUNITY IMPACT REVIEW PROCESS (PUCT Project 59142, Item 52) — (2026-08-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=52)
- PUCT Project 59142: ORDER GRANTING GOOD CAUSE EXCEPTIONS (PUCT Project 59142, Item 53) — (2026-08-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=53)
- PUCT Project 59142: SCHAPER ENERGY CONSULTING PROPOSED APPROACH TO PUBLIC BENEFIT DISCLOSURE IN THE COMMUNITY IMPACT COMPONENT OF THE LARGE LOAD AUDIT (PUCT Project 59142, Item 54) — (2026-08-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=54)
- PUCT Project 59142: ERCOT UPDATE FOR SEPTEMBER 11, 2026 OPEN MEETING - BATCH ZERO AND STATE AND COMMUNITY IMPACT RFI PROCESS (PUCT Project 59142, Item 55) — (2026-09-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=55)
- PUCT Project 59142: Request for Audit for Project Raptor (PUCT Project 59142, Item 56) — (2026-09-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=56)
- PUCT Project 59142: Synergen's Request for Good Cause Exception Relating To Batch Zero Eligibility Deadlines (PUCT Project 59142, Item 57) — (2026-09-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=57)
- PUCT Project 59142: LETTER RE FEBRUARY 3 2026 BATCH STUDY WORKSHOP (PUCT Project 59142, Item 5) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=5)
- PUCT Project 59142: LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATE (PUCT Project 59142, Item 6) — (2026-01-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=6)
- PUCT Project 59142: OPEN LETTER TO THE COMMISSION REGARDING ERCOT'S INTERCONNECTION PROCESS FOR LARGE LOADS (PUCT Project 59142, Item 7) — (2026-01-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=7)
- PUCT Project 59142: ERCOT LARGE LOAD BATCH STUDY PROCESS DRAFT FRAMEWORK PRESENTATIONS (PUCT Project 59142, Item 8) — (2026-01-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=8)
- PUCT Project 59142: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 59142, Item 9) — (2026-02-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=9)
- PUCT Project 58481: VOID SEE ITEM 205 (PUCT Project 58481, Item 204) — (2026-08-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=204)
- PUCT Project 58481: Memo Requesting CR Void Item No. 204 (PUCT Project 58481, Item 205) — (2026-08-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=205)
- PUCT Project 58481: Staff Memo w/Draft Recommended Changes to Proposed Rule (PUCT Project 58481, Item 206) — (2026-08-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=206)
- PUCT Project 58796: SOAH ORDER NO. 10 - EXTENDING BRIEFING DEADLINES (PUCT Project 58796, Item 99) — (2026-08-27) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58796&itemNumber=99)
- PUCT Project 59948: EPE's Proof of Notice (PUCT Project 59948, Item 11) — (2026-08-27) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59948&itemNumber=11)
- PUCT Project 58481: Comments of CenterPoint Energy Houston Electric, LLC (PUCT Project 58481, Item 10) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=10)
- PUCT Project 58481: ONCOR'S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTS (PUCT Project 58481, Item 11) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=11)
- PUCT Project 58481: RESPONSE TO QUESTIONS FOR COMMENT (PUCT Project 58481, Item 12) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=12)
- PUCT Project 58481: DCC Comments on Project 58481, Rulemaking to Implement Large Load Interconnection Standards (PUCT Project 58481, Item 13) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=13)
- PUCT Project 58481: Responses of Texas Electric Cooperatives, Inc. (PUCT Project 58481, Item 15) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=15)
- PUCT Project 58481: Sharyland Utilities, L.L.C's Comments to Commission Staff's Questions for Comments (PUCT Project 58481, Item 16) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=16)
- PUCT Project 58481: Eneus Response to Staff Questions on Project No. 58481 (PUCT Project 58481, Item 19) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=19)
- PUCT Project 58481: OPUC’S RESPONSES TO QUESTIONS FOR PUBLIC COMMENT RELATED TO THE IMPLEMENTATION OF PURA § 37.0561 (PUCT Project 58481, Item 20) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=20)
- PUCT Project 58481: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONS (PUCT Project 58481, Item 21) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=21)
- PUCT Project 58481: AEP Texas Responses to Questions for Public Comment (PUCT Project 58481, Item 22) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=22)
- PUCT Project 58481: TEBA Responses to Staff Questions on Project 58481 (PUCT Project 58481, Item 24) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=24)
- PUCT Project 58481: Texas-New Mexico Power Company's Comments to Commission Staff's Questions for Comment (PUCT Project 58481, Item 27) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=27)
- PUCT Project 58481: Lancium Comments on Project No. 58481 (PUCT Project 58481, Item 28) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=28)
- PUCT Project 58481: Enchanted Rock, LLC's Responses to Commission Staff's Questions for Comment (PUCT Project 58481, Item 30) — (2025-10-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=30)
- PUCT Project 58481: Discussion Draft w/12.19 Comment Deadline (PUCT Project 58481, Item 31) — (2025-12-01) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=31)
- PUCT Project 58481: SCHAPER ENERGY CONSULTING LLC RESPONSE TO PROJECT NO. 58481, COMMENTS TO STAFF’s QUESTIONS AND DRAFT 16 TAC §25.194 (PUCT Project 58481, Item 32) — (2025-12-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=32)
- PUCT Project 58481: Notice of January 9 Workshop (PUCT Project 58481, Item 33) — (2025-12-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=33)
- PUCT Project 58481: Cholla Comments on Draft Rule (PUCT Project 58481, Item 34) — (2025-12-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=34)
- PUCT Project 58481: Cholla Comments on Draft Rule Amended (PUCT Project 58481, Item 35) — (2025-12-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=35)
- PUCT Project 58481: Comments on proposed staff draft on large load interconnection standards. (PUCT Project 58481, Item 36) — (2025-12-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=36)
- PUCT Project 58481: Joint Comments of Google LLC and Lancium LLC to 58481 Large Load Interconnection Standards (PUCT Project 58481, Item 40) — (2025-12-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=40)
- PUCT Project 58481: TCPA Comments on Staff Questions & Discussion Draft (PUCT Project 58481, Item 42) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=42)
- PUCT Project 58481: Comments of Texas Electric Cooperatives, Inc. (PUCT Project 58481, Item 48) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=48)
- PUCT Project 58481: Comments of CenterPoint Energy Houston Electric, LLC (PUCT Project 58481, Item 49) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=49)
- PUCT Project 58481: SCHAPER ENERGY CONSULTING LLC RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 (PUCT Project 58481, Item 4) — (2025-09-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=4)
- PUCT Project 58481: NRG Energy, Inc.'s Comments on Staff's Discussion Draft (PUCT Project 58481, Item 50) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=50)
- PUCT Project 58481: BASF Comments on Rule Project 58481 (PUCT Project 58481, Item 52) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=52)
- PUCT Project 58481: RESPONSE TO QUESTIONS FOR COMMENT AND DRAFT NEW 16 TAC § 25.194 (PUCT Project 58481, Item 53) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=53)
- PUCT Project 58481: Comments on Staff new Draft 16 TAC §25.194 (PUCT Project 58481, Item 55) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=55)
- PUCT Project 58481: ERCOT Steel Mills' Comments on Staff's Discussion Draft for Project No. 58481 (PUCT Project 58481, Item 57) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=57)
- PUCT Project 58481: Cholla, Inc. Response to Staff Questions on Project No. 58481; Large Load Interconnection Framework Recommendations (PUCT Project 58481, Item 5) — (2025-10-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=5)
- PUCT Project 58481: ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S RULE 25.194 DISCUSSION DRAFT (PUCT Project 58481, Item 61) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=61)
- PUCT Project 58481: Provident Inc. comments on staff discussion draft (PUCT Project 58481, Item 62) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=62)
- PUCT Project 58481: OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON DISCUSSION DRAFT AND QUESTIONS FOR PUBLIC COMMENTS RELATED TO NEW 16 TAC § 25.194 (PUCT Project 58481, Item 64) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=64)
- PUCT Project 58481: DCC's Comments on the Discussion Draft (Project 58481) (PUCT Project 58481, Item 66) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=66)
- PUCT Project 58481: SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.194 (PUCT Project 58481, Item 69) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=69)
- PUCT Project 58481: TCPA Response to Staff Questions (PUCT Project 58481, Item 6) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=6)
- PUCT Project 58481: AEP TEXAS INC.’S COMMENTS ON STAFF DISCUSSION DRAFT (PUCT Project 58481, Item 71) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=71)
- PUCT Project 58481: Targa Resources LLC's Comments in Response to Commission Staff's Discussion Draft (PUCT Project 58481, Item 72) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=72)
- PUCT Project 58481: Texas-New Mexico Power Company’s Comments To Commission Staff’s Questions For Comment On Draft New 16 Tac § 25.194 (PUCT Project 58481, Item 73) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=73)
- PUCT Project 58481: CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S DRAFT DISCUSSION RULE 16 TAC § 25.194 (PUCT Project 58481, Item 75) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=75)
- PUCT Project 58481: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON DISCUSSION DRAFT (PUCT Project 58481, Item 76) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=76)
- PUCT Project 58481: TEBA's Comments on Commission Staff's Questions and Discussion Draft (PUCT Project 58481, Item 78) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=78)
- PUCT Project 58481: EDGECONNEX RESPONSE TO STAFF’S QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 (PUCT Project 58481, Item 7) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=7)
- PUCT Project 58481: SOLUNA DIGITAL’S SUPPORTIVE COMMENTS FOR COMMENTS SUBMITTED BY SATOSHI ENERGY ON STAFF'S DISCUSSION DRAFT NEW 16 TAC §25.194 (PUCT Project 58481, Item 81) — (2025-12-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=81)
- PUCT Project 58481: Staff Memo and January 9 Workshop Agenda w/Attachments (PUCT Project 58481, Item 82) — (2026-01-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=82)
- PUCT Project 58481: SATOSHI ENERGY COMMENTS ON STAFF'S SECOND DISCUSSION DRAFT ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 (PUCT Project 58481, Item 83) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=83)
- PUCT Project 58481: CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S SECOND DRAFT DISCUSSION RULE 16 TAC § 25.194 (PUCT Project 58481, Item 84) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=84)
- PUCT Project 58481: Google and Lancium Joint Comments to STaff Questions and 2nd Discussion Draft (PUCT Project 58481, Item 87) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=87)
- PUCT Project 58481: NRG Energy, Inc.'s Comments on PUCT Staff's Questions (PUCT Project 58481, Item 8) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=8)
- PUCT Project 58481: Texas Public Power Association (TPPA) Response to Questions for Comment (PUCT Project 58481, Item 9) — (2025-10-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=9)
- PUCT Project 59142: Request of audit for Project Raptor (PUCT Project 59142, Item 58) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=58)
- PUCT Project 59142: Audit Request- Project Raptor (PUCT Project 59142, Item 59) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=59)
- PUCT Project 59142: Audit Request- Project Raptor (PUCT Project 59142, Item 60) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=60)
- PUCT Project 59142: Audit Request- Project Raptor (PUCT Project 59142, Item 61) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=61)
- PUCT Project 59142: Audit Request- Project Raptor (PUCT Project 59142, Item 62) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=62)
- PUCT Project 59142: Audit Request- Project Raptor (PUCT Project 59142, Item 63) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=63)
- PUCT Project 59142: Audit Request- Project Raptor (PUCT Project 59142, Item 64) — (2026-09-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=64)
- PUCT Project 59142: Request for audit -Project Raptor (PUCT Project 59142, Item 65) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=65)
- PUCT Project 59142: Request for audit - Project Raptor (PUCT Project 59142, Item 66) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=66)
- PUCT Project 58481: OM Item No. 24 - (Staff Recommendation) Order Adopting New §25.194 (PUCT Project 58481, Item 208) — (2026-09-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=208)
- PUCT Project 58481: Vistra's Comments on Project 58481 Recommended Adoption Order (PUCT Project 58481, Item 211) — (2026-09-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=211)
- PUCT Project 58482: OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521 (PUCT Project 58482, Item 36) — (2026-09-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=36)
- PUCT Project 58482: TAEBA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521 (PUCT Project 58482, Item 38) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=38)
- PUCT Project 58482: ERCOT Steel Mills Comments Project 58482_Proposal for Publication (PUCT Project 58482, Item 39) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=39)
- PUCT Project 58482: GOOGLE COMMENTS FOR THE 58482 PROPOSAL FOR PUBLICATION (PUCT Project 58482, Item 40) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=40)
- PUCT Project 58482: Comments of Texas Electric Cooperatives, Inc. (PUCT Project 58482, Item 41) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=41)
- PUCT Project 58482: Data Center Coalition's Comment on Proposal for Publication (Project 58482) (PUCT Project 58482, Item 45) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=45)
- PUCT Project 58482: ENGIE North America Inc. Comments on Proposal for Publication (PUCT Project 58482, Item 46) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=46)
- PUCT Project 58482: COMMENTS OF AEP TEXAS INC. ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION (PUCT Project 58482, Item 47) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=47)
- PUCT Project 58482: COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC (PUCT Project 58482, Item 48) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=48)
- PUCT Project 58482: TCPA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521 (PUCT Project 58482, Item 49) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=49)
- PUCT Project 58482: COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW §25.521 (PUCT Project 58482, Item 52) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=52)
- PUCT Project 58482: ONCOR ELECTRIC DELIVERY COMPANY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.521 (PUCT Project 58482, Item 53) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=53)
- PUCT Project 58482: NRG Comments on Proposed Rule (PUCT Project 58482, Item 54) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=54)
- PUCT Project 58482: Vistra Corporate Services Company's Comments on the Proposal for Publication of new 16 TAC § 25.521 (PUCT Project 58482, Item 55) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=55)
- PUCT Project 58482: The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.521 (PUCT Project 58482, Item 58) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=58)
- PUCT Project 58482: TNMP'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521 (PUCT Project 58482, Item 59) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=59)
- PUCT Project 58482: TEBA Comments on Proposal for Publication for Project No. 58482 (PUCT Project 58482, Item 60) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=60)
- PUCT Project 58482: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON THE PROPOSAL FOR PUBLICATION (PUCT Project 58482, Item 62) — (2026-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=62)
- PUCT Project 58796: SOAH ORDER NO. 11- GRANTING MOTION TO ABATE (PUCT Project 58796, Item 101) — (2026-09-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58796&itemNumber=101)
- PUCT Project 58481: OPUC’S COMMENTS ON STAFF’S SECOND SET OF QUESTIONS FOR PUBLIC COMMENT AND SECOND DISCUSSION DRAFT RELATED TO NEW 16 TAC § 25.194 (PUCT Project 58481, Item 100) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=100)
- PUCT Project 58481: Tract Post-Workshop Comments on Staff's Second Discussion Draft (PUCT Project 58481, Item 104) — (2026-01-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=104)
- PUCT Project 58481: Comments of Texas-New Mexico Power Company (PUCT Project 58481, Item 105) — (2026-01-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=105)
- PUCT Project 58481: OM Item No. 27 - Staff Memo & PFP w/March 27 Comment Deadline (PUCT Project 58481, Item 107) — (2026-02-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=107)
- PUCT Project 58481: Comments regarding Fee recommendation by Staff (PUCT Project 58481, Item 108) — (2026-02-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=108)
- PUCT Project 58481: SCHAPER ENERGY ENERGY CONSULTING COMMENTS TO STAFF DISCUSSION DRAFT 16 (TAC) §25.194 DATED FEBRUARY 13, 2026 (PUCT Project 58481, Item 109) — (2026-02-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=109)
- PUCT Project 58481: Google and Lancium Joint Comments to Proposed PFP (PUCT Project 58481, Item 110) — (2026-02-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=110)
- PUCT Project 58481: Speed to Power Concept Paper for ERCOT Large Load Batch Study Proceedings (PUCT Project 58481, Item 111) — (2026-02-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=111)
- PUCT Project 58481: Monarch Energy Comments on Proposal for Publication (PUCT Project 58481, Item 113) — (2026-03-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=113)
- PUCT Project 58481: Provident, Inc. Comments on Proposed Proposal for Publication (PUCT Project 58481, Item 114) — (2026-03-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=114)
- PUCT Project 58481: JOINT REDLINES FOR THE PROPOSED PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 115) — (2026-03-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=115)
- PUCT Project 58481: CIPHER DIGITAL INC. COMMENTS TO STAFF PROPOSED PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 116) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=116)
- PUCT Project 58481: EDGECONNEX COMMENTS TO STAFF'S PROPOSED PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 117) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=117)
- PUCT Project 58481: CHAIRMAN GLEESON MEMORANDUM (PUCT Project 58481, Item 118) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=118)
- PUCT Project 58481: Engine 1's Comments on PUCT Staff's Proposal for Publication (PUCT Project 58481, Item 119) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=119)
- PUCT Project 58481: Hut 8 Comments on Staff's Proposal for Publication (PUCT Project 58481, Item 120) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=120)
- PUCT Project 58481: Nightpeak Energy Comments on Staff's Proposal for Publication (PUCT Project 58481, Item 121) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=121)
- PUCT Project 58481: PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194 (PUCT Project 58481, Item 122) — (2026-03-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=122)
- PUCT Project 58481: Texas Register Acknowledgement of Receipt - Comments Due 04/17/2026 (PUCT Project 58481, Item 123) — (2026-03-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=123)
- PUCT Project 58481: Staff Memo w/MS Word Version of PFP (PUCT Project 58481, Item 124) — (2026-03-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=124)
- PUCT Project 58481: Monarch Energy Additional Comments on Proposal for Publication (PUCT Project 58481, Item 125) — (2026-03-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=125)
- PUCT Project 58481: Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 58481 (PUCT Project 58481, Item 127) — (2026-03-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=127)
- PUCT Project 58481: PUC Project No. 58481 - Interconnection Agreement Standards Applicability to Batch Zero (PUCT Project 58481, Item 129) — (2026-03-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=129)
- PUCT Project 58481: Comments on Proposal for Publication of 16 TAC §25.194 - Project No. 58481 (PUCT Project 58481, Item 130) — (2026-03-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=130)
- PUCT Project 58481: CPV Comments on Proposal for Publication of 16 TAC §25.194 (PUCT Project 58481, Item 132) — (2026-04-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=132)
- PUCT Project 58481: Cholla comments on Proposal for Publication (PUCT Project 58481, Item 133) — (2026-04-07) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=133)
- PUCT Project 58481: Vistra Corp.'s Additional Comments on Planning Guide Revision Request 145 for Project 58481 (PUCT Project 58481, Item 134) — (2026-04-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=134)
- PUCT Project 58481: AEP COMPANIES’ COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 139) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=139)
- PUCT Project 58481: CCNG Comments and Redlines for the Proposal for Publication in Project 58481 (PUCT Project 58481, Item 140) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=140)
- PUCT Project 58481: TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S PROPOSAL FOR PUBLICATION TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS (“STANDARDS”) (PUCT Project 58481, Item 141) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=141)
- PUCT Project 58481: Project# Rule 25.194 The people demand full and extensive transparency on all water and gas studies, usage records and future plans pertaining to industrial use especially for large scale data centers in bell county (PUCT Project 58481, Item 142) — (2026-04-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=142)
- PUCT Project 58481: HUT 8 COMMENTS ON PUC PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 144) — (2026-04-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=144)
- PUCT Project 58481: Suplement filing to comment XYAWFICE - Updated analytic methodology attribution of SVI/TRI addition to research (PUCT Project 58481, Item 146) — (2026-04-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=146)
- PUCT Project 58481: COMMENTS ON THE PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 147) — (2026-04-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=147)
- PUCT Project 58481: COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC (PUCT Project 58481, Item 148) — (2026-04-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=148)
- PUCT Project 58481: STACK INFRASTRUCTURE COMMENTS TO PROPOSAL FOR PUBLICATION IN PROJECT NO. 58481 (PUCT Project 58481, Item 151) — (2026-04-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=151)
- PUCT Project 58481: SATOSHI ENERGY COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 (PUCT Project 58481, Item 156) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=156)
- PUCT Project 58481: INFINIUM'S COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDS PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 159) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=159)
- PUCT Project 58481: TCPA Comments on Large Load Interconnection PfP & Issues (PUCT Project 58481, Item 162) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=162)
- PUCT Project 58481: HUNT ENERGY NETWORK'S COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 164) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=164)
- PUCT Project 58481: Joint Comments of Google LLC, Lancium LLC, and TotalEnergies Renewables USA (PUCT Project 58481, Item 165) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=165)
- PUCT Project 58481: TEBA's Comments on Commission Staff's Proposal for Publication (PUCT Project 58481, Item 166) — (2026-04-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=166)
- PUCT Project 58481: Trammell Crow Company's Comments on Proposal for Publication of 16 TAC§ 25.194 (PUCT Project 58481, Item 169) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=169)
- PUCT Project 58481: PUCT 58481 Large Load Interconnection Standards PfP - NRG Comments - FINAL (PUCT Project 58481, Item 173) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=173)
- PUCT Project 58481: Targa Resources LLC's Comments and Proposed Redlines in Response to Proposal for Publication of 16 TAC § 25.194 (PUCT Project 58481, Item 175) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=175)
- PUCT Project 58481: Permian Basin Petroleum Association's Comments in Response to Proposal for Publication of 16 TAC § 25.194 (PUCT Project 58481, Item 176) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=176)
- PUCT Project 58481: BLACK MOUNTAIN POWER COMMENTS ON PROJECT NO. 58481 PROPOSAL FOR PUBLICATION (PUCT Project 58481, Item 177) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=177)
- PUCT Project 58481: CONSTELLATION ENERGY GENERATION, LLC’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 (PUCT Project 58481, Item 178) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=178)
- PUCT Project 58481: POST-WORKSHOP COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. (PUCT Project 58481, Item 88) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=88)
- PUCT Project 58481: Comments of CenterPoint Energy Houston Electric, LLC (PUCT Project 58481, Item 90) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=90)
- PUCT Project 58481: ETT’S COMMENTS ON STAFF’S 2ND DISCUSSION DRAFT (PUCT Project 58481, Item 92) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=92)
- PUCT Project 58481: CPS Energy's Response to Questions for Comment (PUCT Project 58481, Item 93) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=93)
- PUCT Project 58481: Comments on Staff's Second Draft Discussion Rule in 16 TAC 25.194 (PUCT Project 58481, Item 94) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=94)
- PUCT Project 58481: ONCOR ELECTRIC DELIVERY’S COMMENTS ON COMMISSION STAFF’S SECOND RULE 25.194 DISCUSSION DRAFT (PUCT Project 58481, Item 95) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=95)
- PUCT Project 58481: AEP TEXAS' COMMENTS ON STAFF’S SECOND DISCUSSION DRAFT (PUCT Project 58481, Item 97) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=97)
- PUCT Project 58481: Additional Comment's on Second Discussion Draft (PUCT Project 58481, Item 98) — (2026-01-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=98)
- PUCT Project 59142: My name is Chad Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically. (PUCT Project 59142, Item 69) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=69)
- PUCT Project 59142: My name is Heather Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically. (PUCT Project 59142, Item 70) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=70)
- PUCT Project 59142: My name is John Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically. (PUCT Project 59142, Item 71) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=71)
- PUCT Project 59142: My name is Rhonda Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically. (PUCT Project 59142, Item 72) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=72)
- PUCT Project 58481: SOLUNA HOLDINGS, INC. COMMENTS TO PROPOSAL FOR ADOPTION OF NEW 16 TAC § 25.194 (PUCT Project 58481, Item 212) — (2026-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=212)
- PUCT Project 58481: GOOD COMPANY ASSOOCIATES COMMENTS ON THE COMMISSION’S PROPOSAL FOR ADOPTION (PFA) (PUCT Project 58481, Item 213) — (2026-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=213)
- PUCT Project 58481: SATOSHI ENERGY COMMENTS ON STAFF'S RECOMMENDED ADOPTION ORDER ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561 (PUCT Project 58481, Item 214) — (2026-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=214)
- PUCT Project 58481: Comments of Lancium LLC on Project 58481 Recommended Adoption Order (PUCT Project 58481, Item 215) — (2026-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=215)
- PUCT Project 58796: Joint Status Report (PUCT Project 58796, Item 102) — (2026-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58796&itemNumber=102)
- PUCT Project 59948: PROTECTIVE ORDER CERTIFICATIONS (PUCT Project 59948, Item 12) — (2026-09-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59948&itemNumber=12)
- PUCT Project 59948: COMMISSION STAFF’S RECOMMENDATION ON FINAL DISPOSITION (PUCT Project 59948, Item 13) — (2026-09-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59948&itemNumber=13)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 112) — (2025-06-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=112)
- PUCT Project 54445: Staff Memo and Proposed Order (PUCT Project 54445, Item 113) — (2025-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=113)
- PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 114) — (2025-07-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=114)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 115) — (2025-09-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=115)
- PUCT Project 54445: ERCOT Request for Approval of 2026 Ancillary Service Methodology (PUCT Project 54445, Item 116) — (2025-10-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=116)
- PUCT Project 54445: Staff Memo and Proposed Order_1 (revision requests only) (PUCT Project 54445, Item 117) — (2025-10-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=117)
- PUCT Project 54445: Staff Memo and Proposed Order_2 (2026 AS Methodology) (PUCT Project 54445, Item 118) — (2025-10-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=118)
- PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 119) — (2025-11-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=119)
- PUCT Project 54445: ORDER APPROVING 2026 ERCOT METHODOLOGIES FOR DETERMINING MINIMUM ANCILLARY SERVICE REQUIREMENTS (PUCT Project 54445, Item 120) — (2025-11-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=120)
- PUCT Project 54445: Staff memo regarding ERCOT revision requests approval timelines (PUCT Project 54445, Item 121) — (2025-11-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=121)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 122) — (2025-12-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=122)
- PUCT Project 54445: Staff Memo and Proposed Order (PUCT Project 54445, Item 123) — (2026-01-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=123)
- PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 124) — (2026-01-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=124)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 125) — (2026-02-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=125)
- PUCT Project 54445: Staff Memo and Proposed Order (PUCT Project 54445, Item 126) — (2026-03-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=126)
- PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 127) — (2026-03-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=127)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 128) — (2026-04-28) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=128)
- PUCT Project 54445: Staff Memo and Proposed Order (PUCT Project 54445, Item 129) — (2026-05-21) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=129)
- PUCT Project 54445: PROPOSED ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 130) — (2026-05-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=130)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 131) — (2026-06-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=131)
- PUCT Project 54445: Commission Staff's Memo Regarding NOGRR282 (PUCT Project 54445, Item 132) — (2026-06-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=132)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 133) — (2026-06-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=133)
- PUCT Project 54445: Skybox Datacenters, LLC's Comments regarding Planning Guide Revision Request ("PGRR") 145 and Site Control Requirements for Batch Zero Large Load Interconnections (PUCT Project 54445, Item 134) — (2026-06-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=134)
- PUCT Project 54445: Staff Memo and Proposed Order for PGRR 145 and NPRR 1325 (PUCT Project 54445, Item 138) — (2026-06-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=138)
- PUCT Project 54445: COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. REGARDING NOGRR 282 (PUCT Project 54445, Item 142) — (2026-06-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=142)
- PUCT Project 54445: DCC Comments on NOGRR282 Large Computational Load Ride-Through Requirements (PUCT Project 54445, Item 148) — (2026-06-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=148)
- PUCT Project 54445: Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of Directors (PUCT Project 54445, Item 149) — (2026-06-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=149)
- PUCT Project 54445: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING NODAL OPERATING GUIDE REVISION REQUEST 282 (PUCT Project 54445, Item 150) — (2026-06-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=150)
- PUCT Project 54445: Data Center Coalition's Comments Regarding PGRR 145 (PUCT Project 54445, Item 154) — (2026-06-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=154)
- PUCT Project 54445: ERCOT LETTER REGARDING PGRR145 (PUCT Project 54445, Item 155) — (2026-06-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=155)
- PUCT Project 54445: First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load Interconnections (PUCT Project 54445, Item 157) — (2026-06-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=157)
- PUCT Project 54445: ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 158) — (2026-06-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=158)
- PUCT Project 54445: Staff Memos and Proposed Order (PUCT Project 54445, Item 160) — (2026-07-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=160)
- PUCT Project 54445: PROPOSED ORDER APPROVING ERCOT REVISION REQUESTS (PUCT Project 54445, Item 162) — (2026-07-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=162)
- PUCT Project 58481: ROWAN DIGITAL INFRASTRUCTURE LLC COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 (PUCT Project 58481, Item 179) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=179)
- PUCT Project 58481: Comments on Proposal for Publication on Proposed New 16 TAC §25.194 (PUCT Project 58481, Item 180) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=180)
- PUCT Project 58481: Comments of Texas Electric Cooperatives, Inc. (PUCT Project 58481, Item 182) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=182)
- PUCT Project 58481: The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.194 (PUCT Project 58481, Item 183) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=183)
- PUCT Project 58481: ONCOR ELECTRIC DELIVERY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194 (PUCT Project 58481, Item 184) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=184)
- PUCT Project 58481: ERCOT Steel Mills Comments on Proposal for Publication of New Rule 16 TAC §25.194 (PUCT Project 58481, Item 185) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=185)
- PUCT Project 58481: TXOGA Comments on Proposal for Publication on Proposed New 16 TAC §25.194 (PUCT Project 58481, Item 188) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=188)
- PUCT Project 58481: GVEC's Comments on Proposal for Publication (PUCT Project 58481, Item 189) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=189)
- PUCT Project 58481: Thor Equities’ Comments on PUCT Staff’s Proposal for Publication (PUCT Project 58481, Item 191) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=191)
- PUCT Project 58481: Tesla, Inc. Comments on Proposal for Publication on Proposed New 16 TAC §25.194 (PUCT Project 58481, Item 192) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=192)
- PUCT Project 58481: TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 (PUCT Project 58481, Item 193) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=193)
- PUCT Project 58481: Joint TSPs’ Comments on Proposal for Publication (PUCT Project 58481, Item 194) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=194)
- PUCT Project 58481: OPUC’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194 (PUCT Project 58481, Item 195) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=195)
- PUCT Project 58481: TNMP’s Comments To Proposal For Publication Of New 16 TAC § 25.194 (PUCT Project 58481, Item 197) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=197)
- PUCT Project 58481: CRUSOE TECHNOLOGIES LLC’S COMMENTS ON STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194 (PUCT Project 58481, Item 199) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=199)
- PUCT Project 58481: Vistra's Comments - Project 58481 (PUCT Project 58481, Item 200) — (2026-04-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=200)
- PUCT Project 58481: Cormint Data Systems Comments on Staff PforP in 58481 (PUCT Project 58481, Item 203) — (2026-04-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=203)
- PUCT Project 54445: Staff memo regarding ERCOT revision requests approval timelines (PUCT Project 54445, Item 163) — (2026-08-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=163)
- PUCT Project 58317: Request for control number (PUCT Project 58317, Item 1) — (2025-06-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=1)
- PUCT Project 58317: Notice of July 21 Workshop (PUCT Project 58317, Item 2) — (2025-07-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=2)
- PUCT Project 58317: July 21 Workshop Agenda (PUCT Project 58317, Item 3) — (2025-07-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=3)
- PUCT Project 58317: Response to Commission Request for Information Regarding Net Metering Arrangements Under PURA § 39.169 (PUCT Project 58317, Item 4) — (2025-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=4)
- PUCT Project 58317: Staff Memo and Roadmap (PUCT Project 58317, Item 5) — (2025-08-01) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=5)
- PUCT Project 59220: ORDER NO. 3- GRANTING MOTIONS TO INTERVENE (PUCT Project 59220, Item 10) — (2026-02-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=10)
- PUCT Project 59220: AMENDED APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC (GOODNIGHT WIND) AND CRUSOE ENERGY SYSTEMS LLC, AND ENSIGN INFRASTRUCTURE LLC (PUCT Project 59220, Item 11) — (2026-03-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=11)
- PUCT Project 59220: SUPPLEMENT TO AMENDED APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC (GOODNIGHT WIND) AND CRUSOE ENERGY SYSTEMS LLC, AND ENSIGN INFRASTRUCTURE LLC (PUCT Project 59220, Item 12) — (2026-03-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=12)
- PUCT Project 59220: ORDER NO. 4 - RESTYLING DOCKET (PUCT Project 59220, Item 13) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=13)
- PUCT Project 59220: PROTECTIVE ORDER CERTIFICATIONS (PUCT Project 59220, Item 14) — (2026-05-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=14)
- PUCT Project 59220: ERCOT NOTICE OF INTENT TO FILE STUDY RESULTS AND RECOMMENDATIONS (PUCT Project 59220, Item 15) — (2026-05-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=15)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FILING OF STUDY RESULTS AND RECOMMENDATIONS (PUCT Project 59220, Item 16) — (2026-05-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=16)
- PUCT Project 59220: CONFIDENTIAL - ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S FILING OF STUDY RESULTS AND RECOMMENDATIONS (PUCT Project 59220, Item 17) — (2026-05-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=17)
- PUCT Project 59220: ORDER NO. 5 - ESTABLISHING PROCEDURAL SCHEDULE (PUCT Project 59220, Item 18) — (2026-05-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=18)
- PUCT Project 59220: ENSIGN INFRASTRUCTURE LLC’S NOTICE OF FILING PROTECTIVE ORDER CERTIFICATIONS (PUCT Project 59220, Item 19) — (2026-05-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=19)
- PUCT Project 59220: JOINT APPLICATION FOR NET METERING APPROVAL BY FGE GOODNIGHT I, LLC AND CRUSOE ENERGY SYSTEMS LLC (PUCT Project 59220, Item 1) — (2026-01-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=1)
- PUCT Project 59220: Direct Testimony of Bharath Kumar Ravulapati (PUCT Project 59220, Item 22) — (2026-06-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=22)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S STATEMENT OF POSITION IN RESPONSE TO ORDER NO. 5 (PUCT Project 59220, Item 23) — (2026-06-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=23)
- PUCT Project 59220: Staff's Recommendation on Administrative Completeness and Sufficiency of Notice (PUCT Project 59220, Item 24) — (2026-06-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=24)
- PUCT Project 59220: ENSIGN INFRASTRUCTURE, LLC’S AND CRUSOE ENERGY SYSTEMS LLC’S NOTICE OF HEARING AND NOTICE OF INTENT TO REQUEST COURT REPORTER (PUCT Project 59220, Item 25) — (2026-06-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=25)
- PUCT Project 59220: ORDER NO. 6 - FINDING APPLICATION ADMINISTRATIVELY COMPLETE AND NOTICE SUFFICIENT, REQUIRING CORRECTED NOTICE OF HEARING, PROVIDING NOTICE OF PREHEARING CONFERENCE, AND REVISING PROCEDURAL SCHEDULE (PUCT Project 59220, Item 28) — (2026-06-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=28)
- PUCT Project 59220: ORDER NO. 7- CLARIFYING DEADLINE FOR APPLICANTS TO FILE CORRECTED NOTICE OF HEARING (PUCT Project 59220, Item 29) — (2026-06-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=29)
- PUCT Project 59220: Correction to the Joint Application for Net Metering Approval (PUCT Project 59220, Item 2) — (2026-01-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=2)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO OTHER PARTIES’ FILINGS (PUCT Project 59220, Item 32) — (2026-06-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=32)
- PUCT Project 59220: Commission Staff's Statement of Position and Recommendations (PUCT Project 59220, Item 33) — (2026-06-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=33)
- PUCT Project 59220: Commission Staff's Objections and Motion to Strike (PUCT Project 59220, Item 34) — (2026-06-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=34)
- PUCT Project 59220: ORDER NO. 8- DENYING REQUEST FOR A VIRTUAL PREHEARING CONFERENCE (PUCT Project 59220, Item 36) — (2026-06-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=36)
- PUCT Project 59220: ENSIGN INFRASTRUCTURE, LLC RESPONSE TO COMMISSION STAFF’S MOTION TO STRIKE (PUCT Project 59220, Item 37) — (2026-06-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=37)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO ENSIGN INFRASTRUCTURE, LLC’S INFORMAL FIRST SET OF REQUESTS FOR INFORMATION (PUCT Project 59220, Item 38) — (2026-06-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=38)
- PUCT Project 59220: Notice of Protective Order Certifications (PUCT Project 59220, Item 39) — (2026-06-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=39)
- PUCT Project 59220: ORDER NO. 1 - ESTABLISHING PROCEDURAL REQUIREMENTS AND ENTERING PROTECTIVE ORDER (PUCT Project 59220, Item 3) — (2026-01-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=3)
- PUCT Project 59220: ORDER NO. 9 - MEMORIALIZING PREHEARING CONFERENCE, CANCELING HEARING ON THE MERITS, AND ADOPTING REVISED PROCEDURAL SCHEDULE (PUCT Project 59220, Item 40) — (2026-06-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=40)
- PUCT Project 59220: CRUSOE ENERGY SYSTEMS LLC EXHIBIT LIST AND EXHIBIT (PUCT Project 59220, Item 41) — (2026-06-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=41)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S EXHIBIT LIST (PUCT Project 59220, Item 44) — (2026-06-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=44)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S NITIAL BRIEF (PUCT Project 59220, Item 45) — (2026-06-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=45)
- PUCT Project 59220: Commission Staff's Initial Brief (PUCT Project 59220, Item 47) — (2026-06-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=47)
- PUCT Project 59220: ONCOR ELECTRIC DELIVERY COMPANY LLC'S MOTION TO INTERVENE (PUCT Project 59220, Item 4) — (2026-01-21) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=4)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY BRIEF (PUCT Project 59220, Item 51) — (2026-07-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=51)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S AND COMMISSION STAFF’S JOINT PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW (PUCT Project 59220, Item 52) — (2026-07-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=52)
- PUCT Project 59220: Commission Staff's Reply Brief (PUCT Project 59220, Item 54) — (2026-07-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=54)
- PUCT Project 59220: JOINT PROPOSED ORDER (PUCT Project 59220, Item 56) — (2026-07-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=56)
- PUCT Project 59220: Commission Staff's Change of Counsel (PUCT Project 59220, Item 59) — (2026-07-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=59)
- PUCT Project 59220: NOTICE OF APPEARANCE OF COUNSEL ON BEHALF OF ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. (PUCT Project 59220, Item 5) — (2026-01-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=5)
- PUCT Project 59220: PROPOSED ORDER WITH MEMORANDUM (PUCT Project 59220, Item 60) — (2026-07-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=60)
- PUCT Project 59220: ENSIGN INFRASTRUCTURE, LLC’S AND CRUSOE ENERGY SYSTEMS LLC’S CORRECTIONS AND EXCEPTIONS TO PROPOSED ORDER (PUCT Project 59220, Item 61) — (2026-07-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=61)
- PUCT Project 59220: FGE Goodnight I, LLC's Corrections and Exceptions to the Proposed Order (PUCT Project 59220, Item 62) — (2026-07-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=62)
- PUCT Project 59220: NOTICE MEMORANDUM (PUCT Project 59220, Item 63) — (2026-07-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=63)
- PUCT Project 59220: PROPOSED ORDER MEMORANDUM (PUCT Project 59220, Item 64) — (2026-07-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=64)
- PUCT Project 59220: Amicus Brief (PUCT Project 59220, Item 65) — (2026-07-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=65)
- PUCT Project 59220: Commission Staff's Motion to Strike Amicus Briefs (PUCT Project 59220, Item 67) — (2026-07-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=67)
- PUCT Project 59220: CHAIRMAN GLEESON MEMORANDUM (PUCT Project 59220, Item 68) — (2026-07-23) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=68)
- PUCT Project 59220: ORDER (PUCT Project 59220, Item 69) — (2026-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=69)
- PUCT Project 59220: Protective Order Certifications for Crusoe Energy Systems and FGE Goodnight I, LLC (Goodnight Wind) (PUCT Project 59220, Item 6) — (2026-01-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=6)
- PUCT Project 59220: OUTGOING COMMISSION-SIGNED ORDER MAIL LOG (PUCT Project 59220, Item 70) — (2026-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=70)
- PUCT Project 59220: VOID SEE ITEM 72 (PUCT Project 59220, Item 71) — (2026-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=71)
- PUCT Project 59220: VOID LETTER (PUCT Project 59220, Item 72) — (2026-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=72)
- PUCT Project 59220: BALLOT MEMORANDUM (PUCT Project 59220, Item 74) — (2026-08-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=74)
- PUCT Project 59220: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S NOTICE OF COMMENCEMENT OF STUDY (PUCT Project 59220, Item 7) — (2026-01-29) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=7)
- PUCT Project 59220: ORDER NO. 2 - GRANTING MOTION TO INTERVENE (PUCT Project 59220, Item 9) — (2026-02-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59220&itemNumber=9)
- PUCT Project 58317: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 58317, Item 10) — (2025-09-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=10)
- PUCT Project 58317: Joint Comments of Google LLC and Lancium LLC on SB6 Implementation (PUCT Project 58317, Item 11) — (2025-12-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=11)
- PUCT Project 58317: OM Item No. 46 - Staff Memo and Updated Roadmap (PUCT Project 58317, Item 12) — (2026-01-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=12)
- PUCT Project 58317: Staff Memo_New Rulemaking Project (PUCT Project 58317, Item 14) — (2026-05-27) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=14)
- PUCT Project 58317: Staff Memo and Updated Roadmap (PUCT Project 58317, Item 15) — (2026-05-27) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=15)
- PUCT Project 58317: Governor Abbott's June 10, 2026 letter to PUCT and ERCOT re: Data Center Infrastructure Costs (PUCT Project 58317, Item 16) — (2026-06-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=16)
- PUCT Project 58317: Response to Governor Abbott's June 10, 2026 letter (PUCT Project 58317, Item 18) — (2026-07-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=18)
- PUCT Project 58317: SB6 Implementation Roadmap Updated July 2026 (PUCT Project 58317, Item 19) — (2026-07-21) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=19)
- PUCT Project 58317: CHAIRMAN GLEESON MEMORANDUM (PUCT Project 58317, Item 25) — (2026-08-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=25)
- PUCT Project 58317: Governor Abbott's August 3, 2026 letter to PUCT and ERCOT re: Verification of Data Center Information (PUCT Project 58317, Item 26) — (2026-08-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=26)
- PUCT Project 58317: ERCOT LETTER REGARDING PROJECT NO. 59142 FILING (PUCT Project 58317, Item 27) — (2026-08-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=27)
- PUCT Project 58317: SENATE BILL 6 IMPLEMENTATION WORKSHOP PROJECT NO. 58317 MONDAY, JULY 21, 2025 (PUCT Project 58317, Item 6) — (2025-08-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=6)
- PUCT Project 58317: ERCOT LETTER RE NET METERING STUDY DETAILS (PUCT Project 58317, Item 7) — (2025-09-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=7)
- PUCT Project 58317: ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATE (PUCT Project 58317, Item 9) — (2025-09-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=9)
- PUCT Project 58480: EDF comments on large load forecast proposed rule (PUCT Project 58480, Item 14) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=14)
- PUCT Project 58480: ERCOT STEEL MILLS’ COMMENTS ON PROJECT NO. 58480 - ERCOT LARGE LOAD FORECASTING CRITERIA (PUCT Project 58480, Item 15) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=15)
- PUCT Project 58480: Targa Resources LLC's Comments to Staff Recommendation for Proposal for Publication of New 16 TAC §25.370 (PUCT Project 58480, Item 16) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=16)
- PUCT Project 58480: NRG Energy, Inc.'s Comments on the Proposed Rule (PUCT Project 58480, Item 17) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=17)
- PUCT Project 58480: Texas Public Policy Foundation Comments on Proposal for Publication of New 16 TAC §25.370 (PUCT Project 58480, Item 18) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=18)
- PUCT Project 58480: Request for Control Number (PUCT Project 58480, Item 1) — (2025-07-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=1)
- PUCT Project 58480: OCSC and TCAP's Comments on Proposed Large Load Forecasting Criteria (PUCT Project 58480, Item 20) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=20)
- PUCT Project 58480: SCHAPER ENERGY CONSULTING LLC SUPPLEMENTAL RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58480; ERCOT LARGE LOAD FORECASTING CRITERIA UNDER PROPOSED 16 TAC §25.370 (PUCT Project 58480, Item 21) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=21)
- PUCT Project 58480: TCPA Comments and Recommendations on PfP (PUCT Project 58480, Item 22) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=22)
- PUCT Project 58480: TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504 (PUCT Project 58480, Item 23) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=23)
- PUCT Project 58480: OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370 (PUCT Project 58480, Item 24) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=24)
- PUCT Project 58480: TEBA's Comments on Project No. 58480 Proposal for Publication (PUCT Project 58480, Item 25) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=25)
- PUCT Project 58480: ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370 (PUCT Project 58480, Item 26) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=26)
- PUCT Project 58480: CenterPoint Energy Houston Electric Comments (PUCT Project 58480, Item 27) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=27)
- PUCT Project 58480: Comments of Texas Electric Cooperatives, Inc. (PUCT Project 58480, Item 28) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=28)
- PUCT Project 58480: AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATION (PUCT Project 58480, Item 29) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=29)
- PUCT Project 58480: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 58480, Item 2) — (2025-08-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=2)
- PUCT Project 58480: LCRA AND LCRA TSC COMMENTS (PUCT Project 58480, Item 30) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=30)
- PUCT Project 58480: Comments from the City of Red Oak on SB6 Rule Making Project 58480 (PUCT Project 58480, Item 31) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=31)
- PUCT Project 58480: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING PROPOSED 16 TAC § 25.370 (PUCT Project 58480, Item 32) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=32)
- PUCT Project 58480: Texas-New Mexico Power Company’s Public Comments Regarding Staff’s Proposal for Publication of New 16 TAC § 25.370 (PUCT Project 58480, Item 33) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=33)
- PUCT Project 58480: Data Center Coalition's Comments (PUCT Project 58480, Item 35) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=35)
- PUCT Project 58480: Sharyland Utilities, L.L.C.'s Initial Comments on the Proposal for Publication of New 16 TAC § 25.370 (PUCT Project 58480, Item 36) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=36)
- PUCT Project 58480: REPLY COMMENTS (PUCT Project 58480, Item 38) — (2025-10-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=38)
- PUCT Project 58480: REPLY COMMENTS (PUCT Project 58480, Item 39) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=39)
- PUCT Project 58480: Staff Memo and Notice of 9/2 Workshop (PUCT Project 58480, Item 3) — (2025-08-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=3)
- PUCT Project 58480: ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370 (PUCT Project 58480, Item 40) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=40)
- PUCT Project 58480: TCPA REPLY COMMENTS TO THE PFP REGARDING LARGE LOAD FORECASTING CRITERIA (PUCT Project 58480, Item 42) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=42)
- PUCT Project 58480: Joint Reply Comments of Wind Energy Transmission Texas, LLC; Cross Texas Transmission, LLC; and Lone Start Transmission, LLC on the Proposal for Publication of New 16 TAC § 25.370 (PUCT Project 58480, Item 43) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=43)
- PUCT Project 58480: OCSC and TCAP's Reply Comments (PUCT Project 58480, Item 44) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=44)
- PUCT Project 58480: REPLY COMMENTS (PUCT Project 58480, Item 45) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=45)
- PUCT Project 58480: OPUC’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370 (PUCT Project 58480, Item 48) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=48)
- PUCT Project 58480: CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTS (PUCT Project 58480, Item 49) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=49)
- PUCT Project 58480: Staff memo, workshop agenda, and discussion draft (PUCT Project 58480, Item 4) — (2025-08-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=4)
- PUCT Project 58480: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.370 (PUCT Project 58480, Item 50) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=50)
- PUCT Project 58480: Eolian L.P.'s Reply Comments on Proposal for Publication (PUCT Project 58480, Item 51) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=51)
- PUCT Project 58480: Data Center Coalition's Reply Comments (PUCT Project 58480, Item 52) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=52)
- PUCT Project 58480: OM Item No. 10 - (Staff Recommendation) Order Adopting New §25.370 (PUCT Project 58480, Item 53) — (2026-01-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=53)
- PUCT Project 58480: ERCOT’S PROPOSED COMPLIANCE PLAN FOR INCLUDING LARGE LOADS IN THE LOAD FORECAST FOR THE 2026 REGIONAL TRANSMISSION PLAN (PUCT Project 58480, Item 54) — (2026-01-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=54)
- PUCT Project 58480: COMMISSIONER HJALTMAN MEMORANDUM (PUCT Project 58480, Item 56) — (2026-01-28) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=56)
- PUCT Project 58480: OM Item No. 33 - Staff Memo with Proposed Redline Changes (PUCT Project 58480, Item 57) — (2026-02-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=57)
- PUCT Project 58480: ERCOT PRESENTATION ON SB 6 LOAD FORECASTING PROCESSES (PUCT Project 58480, Item 5) — (2025-09-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=5)
- PUCT Project 58480: OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING TO ESTABLISH LARGE LOAD FORECASTING CRITERIA (PUCT Project 58480, Item 6) — (2025-09-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=6)
- PUCT Project 58480: OM Item No. 10 - Staff Memo & PFP w/Oct. 17 Comment Deadline (PUCT Project 58480, Item 7) — (2025-09-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=7)
- PUCT Project 58480: PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370 (PUCT Project 58480, Item 8) — (2025-09-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=8)
- PUCT Project 58481: ORDER ADOPTING NEW 16 TAC §25.194 (PUCT Project 58481, Item 218) — (2026-09-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58481&itemNumber=218)
- PUCT Project 58479: SATOSHI ENERGY COMMENTS ON STAFF’S DRAFT DISCUSSION RULE § 25.205 (PUCT Project 58479, Item 10) — (2025-09-10) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=10)
- PUCT Project 58479: OM Item No. 9 - Staff Memo & PFP w/Oct. 17 Comment Deadline (PUCT Project 58479, Item 11) — (2025-09-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=11)
- PUCT Project 58479: LETTER & PRESENTATION REGARDING ERCOT STUDIES OF PROPOSED NET METERING ARRANGEMENTS (PUCT Project 58479, Item 12) — (2025-09-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=12)
- PUCT Project 58479: PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 (PUCT Project 58479, Item 13) — (2025-09-18) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=13)
- PUCT Project 58479: ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATE (PUCT Project 58479, Item 15) — (2025-09-19) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=15)
- PUCT Project 58479: SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.205 (PUCT Project 58479, Item 17) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=17)
- PUCT Project 58479: Request for Control Number (PUCT Project 58479, Item 1) — (2025-07-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=1)
- PUCT Project 58479: VOID SEE ITEM 35 (PUCT Project 58479, Item 20) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=20)
- PUCT Project 58479: Initial Comments of the Texas Advanced Energy Business Alliance on Commission Staff's Draft Rule §25.205 (PUCT Project 58479, Item 21) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=21)
- PUCT Project 58479: TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504 (PUCT Project 58479, Item 22) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=22)
- PUCT Project 58479: SATOSHI'S COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION (PUCT Project 58479, Item 23) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=23)
- PUCT Project 58479: EDGECONNEX COMMENTS ON COMMISSION STAFF'S DRAFT RULE 16 TAC § 25.205 (PUCT Project 58479, Item 24) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=24)
- PUCT Project 58479: CALPINE CORPORATION’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205 (PUCT Project 58479, Item 25) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=25)
- PUCT Project 58479: ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONS (PUCT Project 58479, Item 26) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=26)
- PUCT Project 58479: OFFICE OF PUBLIC UTILITY COUNSEL’S INITIAL COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 (PUCT Project 58479, Item 27) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=27)
- PUCT Project 58479: Comments of Texas Electric Cooperatives, Inc. (PUCT Project 58479, Item 28) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=28)
- PUCT Project 58479: LCRA RESPONSE TO PFP (PUCT Project 58479, Item 29) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=29)
- PUCT Project 58479: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 58479, Item 2) — (2025-08-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=2)
- PUCT Project 58479: Vistra Corp.'s Comments (PUCT Project 58479, Item 30) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=30)
- PUCT Project 58479: CORRECTION: RESPONSE TO STAFF QUESTIONS & RECOMMENDATIONS FOR PFP (PUCT Project 58479, Item 31) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=31)
- PUCT Project 58479: COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.505 (PUCT Project 58479, Item 32) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=32)
- PUCT Project 58479: COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC (PUCT Project 58479, Item 33) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=33)
- PUCT Project 58479: AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATION (PUCT Project 58479, Item 34) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=34)
- PUCT Project 58479: REQUEST TO VOID ITEM 20, FILED IN ERROR (PUCT Project 58479, Item 35) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=35)
- PUCT Project 58479: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO COMMISSION QUESTIONS AND COMMENTS REGARDING PROPOSED 16 TAC § 25.205 (PUCT Project 58479, Item 36) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=36)
- PUCT Project 58479: Eolian, L.P.'s Comments on the Proposal for Publication and Request for Hearing (PUCT Project 58479, Item 37) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=37)
- PUCT Project 58479: Data Center Coalition's Comments (PUCT Project 58479, Item 38) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=38)
- PUCT Project 58479: Texas-New Mexico Power Company’s Comments to Commission Staff’s Questions and Comments on Proposal For Publication (PUCT Project 58479, Item 39) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=39)
- PUCT Project 58479: Staff Memo and Notice of 9/2 Workshop (PUCT Project 58479, Item 3) — (2025-08-15) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=3)
- PUCT Project 58479: TCPA Reply Comments (PUCT Project 58479, Item 42) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=42)
- PUCT Project 58479: REPLY COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC (PUCT Project 58479, Item 45) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=45)
- PUCT Project 58479: ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONS (PUCT Project 58479, Item 46) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=46)
- PUCT Project 58479: Vistra Reply Comments (PUCT Project 58479, Item 47) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=47)
- PUCT Project 58479: Comments of Texas Electric Cooperatives, Inc. (PUCT Project 58479, Item 49) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=49)
- PUCT Project 58479: Staff memo, workshop agenda, and discussion draft (PUCT Project 58479, Item 4) — (2025-08-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=4)
- PUCT Project 58479: CALPINE CORPORATION’S REPLY COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205 (PUCT Project 58479, Item 52) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=52)
- PUCT Project 58479: CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTS (PUCT Project 58479, Item 54) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=54)
- PUCT Project 58479: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.205 (PUCT Project 58479, Item 55) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=55)
- PUCT Project 58479: Texas-New Mexico Power Company’s Reply Comments Regarding Proposal for Publication (PUCT Project 58479, Item 56) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=56)
- PUCT Project 58479: OPUC’S REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 (PUCT Project 58479, Item 57) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=57)
- PUCT Project 58479: ENCHANTED ROCK, LLC REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 (PUCT Project 58479, Item 58) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=58)
- PUCT Project 58479: Eolian's Reply Comments on Proposal for Publication (PUCT Project 58479, Item 59) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=59)
- PUCT Project 58479: ERCOT LETTER RE NET METERING STUDY DETAILS (PUCT Project 58479, Item 5) — (2025-09-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=5)
- PUCT Project 58479: Data Center Coalition's Reply Comments (PUCT Project 58479, Item 60) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=60)
- PUCT Project 58479: OM Item No. 26 - (Staff Recommendation) Order Adopting New §25.205 (PUCT Project 58479, Item 62) — (2026-02-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=62)
- PUCT Project 58479: OM Item No. 43 - Staff Memo with Proposed Redline Changes (PUCT Project 58479, Item 63) — (2026-03-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=63)
- PUCT Project 58479: CHAIRMAN GLEESON MEMORANDUM (PUCT Project 58479, Item 64) — (2026-03-11) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=64)
- PUCT Project 58479: Vistra Corp.'s Comments on Planning Guide Revision Request 145 (PUCT Project 58479, Item 65) — (2026-03-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=65)
- PUCT Project 58479: ORDER ADOPTING NEW 16 TAC §25.205 (PUCT Project 58479, Item 66) — (2026-03-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=66)
- PUCT Project 58479: Texas Register Acknowledgement of Receipt-Proposal for Adoption (PUCT Project 58479, Item 67) — (2026-03-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=67)
- PUCT Project 58479: ERCOT PRESENTATION ON SB6 NET METERING ARRANGEMENT REVIEW PROCESS (PUCT Project 58479, Item 6) — (2025-09-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=6)
- PUCT Project 58479: ONCOR'S COMMENTS ON STRANDED/UNDERUTILIZED ASSET COST TREATMENT (PUCT Project 58479, Item 7) — (2025-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=7)
- PUCT Project 58479: OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING FOR NET METERING ARRANGEMENTS INVOLVING A LARGE LOAD CO-LOCATED WITH AN EXISTING GENERATION RESOURCE (PUCT Project 58479, Item 8) — (2025-09-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=8)
- PUCT Project 58479: Crusoe's Comments on Staff's Draft Discussion Rule § 25.205 (PUCT Project 58479, Item 9) — (2025-09-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58479&itemNumber=9)
- PUCT Project 58480: ORDER ADOPTING NEW 16 TAC § 25.370 (PUCT Project 58480, Item 58) — (2026-02-06) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=58)
- PUCT Project 58480: Texas Register Acknowledgement of Receipt-Proposal for Adoption (PUCT Project 58480, Item 59) — (2026-02-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58480&itemNumber=59)
- PUCT Project 58482: Request for Control Number (PUCT Project 58482, Item 1) — (2025-08-01) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=1)
- PUCT Project 58482: Staff Memo_Restyle Request (PUCT Project 58482, Item 2) — (2026-03-23) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=2)
- PUCT Project 58482: Staff Memo and Questions for Comment w/April 8 Deadline (PUCT Project 58482, Item 3) — (2026-03-23) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=3)
- PUCT Project 58482: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 58482, Item 4) — (2026-03-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=4)
- PUCT Project 58482: DCC Comments Regarding the Large Load Demand Management Service (PUCT Project 58482, Item 10) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=10)
- PUCT Project 58482: RESPONSE TO QUESTIONS FOR COMMENT (PUCT Project 58482, Item 11) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=11)
- PUCT Project 58482: RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC. (PUCT Project 58482, Item 13) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=13)
- PUCT Project 58482: NRG Energy, Inc.'s Comments in Response to Staff's Questions (PUCT Project 58482, Item 14) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=14)
- PUCT Project 58482: VOLTUS RESPONSE TO PUCT STAFF'S QUESTIONS ON PROPOSED LARGE LOAD DEMAND MANAGEMENT SERVICE (PUCT Project 58482, Item 15) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=15)
- PUCT Project 58482: Texas Energy Buyers Alliance Response to Commission Staff Questions (PUCT Project 58482, Item 16) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=16)
- PUCT Project 58482: ONCOR ELECTRIC DELIVERY’S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTS (PUCT Project 58482, Item 18) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=18)
- PUCT Project 58482: Enchanted Rock, LLC's Comments to Commission Staff's March 23 Memo and Questions for Comment (PUCT Project 58482, Item 20) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=20)
- PUCT Project 58482: AEP Texas Inc.’s Responses to Commission Staff’s Memo and Questions for Comment (PUCT Project 58482, Item 21) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=21)
- PUCT Project 58482: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO COMMISSION STAFF’S LIST OF QUESTIONS (PUCT Project 58482, Item 22) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=22)
- PUCT Project 58482: Vistra Corporate Services Company's Comments in Response to Commission Staff's Questions (PUCT Project 58482, Item 23) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=23)
- PUCT Project 58482: EOLIAN, L.P.'s Comments to Commission Staff's March 23, 2026 Memo and Questions for Comment (PUCT Project 58482, Item 24) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=24)
- PUCT Project 58482: CyrusOne, LP Comments in Response to Commission Staff's Questions (PUCT Project 58482, Item 25) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=25)
- PUCT Project 58482: Public Comments in Response to Staff's Questions for Comment - Project No. 58482 (PUCT Project 58482, Item 28) — (2026-07-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=28)
- PUCT Project 58482: OM Item No. 29 - Staff Memo & PFP w/Sept. 4 Comment Deadline (PUCT Project 58482, Item 29) — (2026-07-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=29)
- PUCT Project 58482: PROPOSAL FOR PUBLICATION NEW §25.521 (PUCT Project 58482, Item 30) — (2026-07-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=30)
- PUCT Project 58482: Texas Register Acknowledgement of Receipt - Comment Deadline 09/04/2026 (PUCT Project 58482, Item 31) — (2026-07-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=31)
- PUCT Project 58482: Objection to rule change (PUCT Project 58482, Item 33) — (2026-08-03) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=33)
- PUCT Project 58482: ERCOT Steel Mills Comments_Project 58482_4.8.2026 (PUCT Project 58482, Item 6) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=6)
- PUCT Project 58482: TCPA’S RESPONSES TO STAFF’S QUESTIONS REGARDING THE LARGE LOAD DEMAND MANAGEMENT SERVICE (PUCT Project 58482, Item 7) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=7)
- PUCT Project 58482: Texas Public Power Association (TPPA) Response to Questions for Comment (PUCT Project 58482, Item 9) — (2026-04-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58482&itemNumber=9)
- PUCT Project 58484: CPS Energy's Response to Questions for Comment (PUCT Project 58484, Item 10) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=10)
- PUCT Project 58484: TCPA Response to Staff Questions (PUCT Project 58484, Item 11) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=11)
- PUCT Project 58484: Texas Public Policy Foundation's Response to PUC Staff Questions for Comment (PUCT Project 58484, Item 12) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=12)
- PUCT Project 58484: Sharyland Utilities LLC's Initial Comments to Commission Staff's Questions for Comment (PUCT Project 58484, Item 13) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=13)
- PUCT Project 58484: Comments of NRG Energy, Inc. in Response to Staff's August 5, 2025, Questions (PUCT Project 58484, Item 14) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=14)
- PUCT Project 58484: TEXAS ADVANCED ENERGY BUSINESS ALLIANCE RESPONSES TO COMMISSION STAFF QUESTIONS AUG. 5 2025 (PUCT Project 58484, Item 17) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=17)
- PUCT Project 58484: Texas Public Power Association (TPPA) Comments on Transmission Cost Recovery Questions for Comment (PUCT Project 58484, Item 18) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=18)
- PUCT Project 58484: LCRA AND LCRA TRANSMISSION SERVICES CORPORATION'S RESPONSE TO QUESTIONS FOR COMMENT (PUCT Project 58484, Item 19) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=19)
- PUCT Project 58484: Request for Control Number (PUCT Project 58484, Item 1) — (2025-08-01) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=1)
- PUCT Project 58484: Joint Comments of Wind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLC in Response to Commission Staff’s Request for Comments (PUCT Project 58484, Item 20) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=20)
- PUCT Project 58484: AEP COMPANIES’ COMMENTS ON QUESTIONS FOR PUBLIC COMMENT (PUCT Project 58484, Item 21) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=21)
- PUCT Project 58484: OPUC’S INITIAL COMMENTS ON QUESTIONS FOR PUBLIC COMMENT RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERY (PUCT Project 58484, Item 23) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=23)
- PUCT Project 58484: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONS (PUCT Project 58484, Item 24) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=24)
- PUCT Project 58484: CenterPoint Energy Houston Electric, LLC’s Responses to Commission Staff’s Request for Comments (PUCT Project 58484, Item 26) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=26)
- PUCT Project 58484: Staff Memo and First Set of Questions for Comment (PUCT Project 58484, Item 2) — (2025-08-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=2)
- PUCT Project 58484: OPUC NOTICE OF PARTICIPATION LETTER (PUCT Project 58484, Item 3) — (2025-08-08) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=3)
- PUCT Project 58484: ONCOR ELECTRIC DELIVERY'S RESPONSE TO COMMISSION STAFF'S FIRST SET OF QUESTIONS FOR COMMENTS (PUCT Project 58484, Item 5) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=5)
- PUCT Project 58484: ERCOT Steel Mills' Response to PUC Staff's Initial Request for Comments on Transmission Cost Recovery (PUCT Project 58484, Item 6) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=6)
- PUCT Project 58484: RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC. (PUCT Project 58484, Item 7) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=7)
- PUCT Project 58484: Joint Responses to Staff Questions of H-E-B and STEC (PUCT Project 58484, Item 8) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=8)
- PUCT Project 58484: Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Responses to Commission Staff's First Set of Questions for Comment (PUCT Project 58484, Item 9) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=9)
- PUCT Project 54445: NOTICE OF RECOMMENDED APPROVAL OF REVISION REQUESTS BY ERCOT BOARD OF DIRECTORS (PUCT Project 54445, Item 164) — (2026-09-21) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=54445&itemNumber=164)
- PUCT Project 58484: Texas REP Coalition Response to PUC Staff Request for Comments (PUCT Project 58484, Item 100) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=100)
- PUCT Project 58484: RWE Americas, LLC's Comments to Commission Staff's Draft Recommendations (PUCT Project 58484, Item 102) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=102)
- PUCT Project 58484: Vistra's Third Set of Comments in Response to Staff's Second Set of Questions (PUCT Project 58484, Item 103) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=103)
- PUCT Project 58484: ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S DRAFT SET OF RECOMMENDATIONS (PUCT Project 58484, Item 105) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=105)
- PUCT Project 58484: CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTS (PUCT Project 58484, Item 106) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=106)
- PUCT Project 58484: VOID SEE ITEM 114 (PUCT Project 58484, Item 107) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=107)
- PUCT Project 58484: AEP COMPANIES’ RESPONSE TO COMMISSION STAFF’S DRAFT REPORT (PUCT Project 58484, Item 108) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=108)
- PUCT Project 58484: Crusoe Technologies LLC's Responses to Staff's Request for Comments on Draft Recommendations (PUCT Project 58484, Item 110) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=110)
- PUCT Project 58484: TEBA Comments on Commission Staff's Draft Recommendations (PUCT Project 58484, Item 111) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=111)
- PUCT Project 58484: Eolian, L.P.'s Response to Commission Staff's Recommendations (PUCT Project 58484, Item 112) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=112)
- PUCT Project 58484: Joint Comments of Google LLC and Lancium LLC to PUC Staff Memo and Draft Report in 58484 (PUCT Project 58484, Item 113) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=113)
- PUCT Project 58484: PEC Responses to Commission Staff’s Request for Comments (PUCT Project 58484, Item 27) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=27)
- PUCT Project 58484: Vistra Comments (PUCT Project 58484, Item 29) — (2025-09-09) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=29)
- PUCT Project 58484: Staff's Request for Information to TDUs w/11.14 Response Deadline (PUCT Project 58484, Item 35) — (2025-10-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=35)
- PUCT Project 58484: Staff Memo & Notice of 11/10 Workshop (PUCT Project 58484, Item 36) — (2025-10-21) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=36)
- PUCT Project 58484: Staff Memo & Nov. 10 Workshop Agenda w/Nov. 21 Written Comment Deadline (PUCT Project 58484, Item 37) — (2025-10-28) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=37)
- PUCT Project 58484: Staff Memo Extending Comment Deadline to 11/25 (PUCT Project 58484, Item 38) — (2025-10-31) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=38)
- PUCT Project 58484: RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGES (PUCT Project 58484, Item 39) — (2025-11-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=39)
- PUCT Project 58484: TNMP Response to Staff Request for Information (PUCT Project 58484, Item 40) — (2025-11-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=40)
- PUCT Project 58484: VOID SEE ITEM 44 (PUCT Project 58484, Item 41) — (2025-11-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=41)
- PUCT Project 58484: ONCOR'S RESPONSE TO STAFF'S REQUEST FOR INFORMATION RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGES (PUCT Project 58484, Item 42) — (2025-11-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=42)
- PUCT Project 58484: SUPPLEMENTAL RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGES (PUCT Project 58484, Item 43) — (2025-11-17) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=43)
- PUCT Project 58484: Letter to Void Item #41 (PUCT Project 58484, Item 44) — (2025-11-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=44)
- PUCT Project 58484: CEHE’s Updated Response to Commission Staff’s Request for Information Issued October 17, 2025, Regarding Wholesale Transmission Service Charges (PUCT Project 58484, Item 45) — (2025-11-20) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=45)
- PUCT Project 58484: Comments and answers to staff questions (PUCT Project 58484, Item 50) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=50)
- PUCT Project 58484: ONCOR'S RESPONSE TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTS (PUCT Project 58484, Item 52) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=52)
- PUCT Project 58484: LCRA AND LCRA TSC'S RESPONSE TO COMMISSION STAFF'S SECOND SET OF QUESTIONS FOR COMMENT (PUCT Project 58484, Item 53) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=53)
- PUCT Project 58484: Joint Responses to Staff Questions of H-E-B, LP and South Texas Electric Cooperative, Inc. (PUCT Project 58484, Item 54) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=54)
- PUCT Project 58484: Comments of NRG Energy, Inc. in Response to Staff's Second Set of Questions on Transmission Cost Recovery (PUCT Project 58484, Item 55) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=55)
- PUCT Project 58484: Responses of Texas Electric Cooperatives, Inc. (PUCT Project 58484, Item 57) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=57)
- PUCT Project 58484: DCC's Comments in Response to Staff's Second Set of Questions (PUCT Project 58484, Item 59) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=59)
- PUCT Project 58484: TCA Comments on Staff Questions (PUCT Project 58484, Item 60) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=60)
- PUCT Project 58484: Texas Energy Association for Marketers' Response to Questions for Comment (PUCT Project 58484, Item 61) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=61)
- PUCT Project 58484: Vistra's Comments in Response to Staff's Second Set of Questions (PUCT Project 58484, Item 63) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=63)
- PUCT Project 58484: CPS Energy's Comments in Response to Second Set of Questions. (PUCT Project 58484, Item 64) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=64)
- PUCT Project 58484: ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO STAFF QUESTIONS (PUCT Project 58484, Item 65) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=65)
- PUCT Project 58484: TAEBA Response to Staff's Second Set of Questions Proj. No. 58484 (PUCT Project 58484, Item 67) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=67)
- PUCT Project 58484: CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTS (PUCT Project 58484, Item 68) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=68)
- PUCT Project 58484: RESPONSES TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTS (PUCT Project 58484, Item 69) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=69)
- PUCT Project 58484: OPUC’S COMMENTS ON THE SECOND SET OF QUESTIONS FOR PUBLIC COMMENT TO ATTACHMENTS A AND B RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERY (PUCT Project 58484, Item 70) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=70)
- PUCT Project 58484: ERCOT Steel Mills' Comments on Commission Staff Questions and Draft Report Outline for Project No. 58484 - Evaluation of Transmission Cost Recovery (PUCT Project 58484, Item 71) — (2025-11-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=71)
- PUCT Project 58484: CenterPoint Energy Houston Electric Second Updated Response to Commission Staff’s Request for Comments (PUCT Project 58484, Item 76) — (2026-01-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=76)
- PUCT Project 58484: Staff Memo and Draft Report w/April 13 Comment Deadline (PUCT Project 58484, Item 77) — (2026-03-16) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=77)
- PUCT Project 58484: Vitol Inc. comments in response Commission Staff's Draft Evaluation of Transmission Cost Recovery (PUCT Project 58484, Item 80) — (2026-04-12) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=80)
- PUCT Project 58484: Comments on Commission Staff Report Filed Jointly by Base Power Company, Octopus Energy, Rhythm Energy, and Tesla Energy Ventures, LLC (PUCT Project 58484, Item 82) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=82)
- PUCT Project 58484: Texas Public Power Association (TPPA) Comments on Draft Report and Recommendations (PUCT Project 58484, Item 84) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=84)
- PUCT Project 58484: H-E-B and South Texas Electric Cooperative, Inc.'s Joint Comments on Staff's Memorandum and Draft Report (PUCT Project 58484, Item 87) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=87)
- PUCT Project 58484: Comments of NRG Energy, Inc. in Response to Staff Memo and Draft Report on Transmission Cost Recovery (PUCT Project 58484, Item 88) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=88)
- PUCT Project 58484: Comments on Staff's Report and Recommendations (PUCT Project 58484, Item 89) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=89)
- PUCT Project 58484: COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC. (PUCT Project 58484, Item 90) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=90)
- PUCT Project 58484: Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Commission Staff’s Draft Report on Transmission Cost Recovery (PUCT Project 58484, Item 91) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=91)
- PUCT Project 58484: LCRA'S COMMENTS ON COMMISSION STAFF'S DRAFT RECOMMENDATIONS FOR TRANSMISSION COST RECOVERY (PUCT Project 58484, Item 92) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=92)
- PUCT Project 58484: ERCOT Steel Mills Comments on PUCT Staff's Draft Report_Project 58484 (PUCT Project 58484, Item 93) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=93)
- PUCT Project 58484: CPS Energy's Response to Staff's Draft Recommendations (PUCT Project 58484, Item 95) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=95)
- PUCT Project 58484: TCPA Comments on Staff Draft Report on Evaluation of Transmission Cost Allocation (PUCT Project 58484, Item 96) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=96)
- PUCT Project 58484: TCA Comments on Draft Report for Transmission Cost Recovery (PUCT Project 58484, Item 97) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=97)
- PUCT Project 58484: Texas-New Mexico Power Company's Comments to Commission Staff's March 16, 2026 Request for Public Comment (PUCT Project 58484, Item 98) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=98)
- PUCT Project 58484: GVEC's Comments Regarding Staff's Memo & Draft Report (PUCT Project 58484, Item 99) — (2026-04-13) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=99)
- PUCT Project 59142: ERCOT UPDATE - BATCH ZERO ELIGIBILITY VERIFICATION AND STATE AND COMMUNITY IMPACT RFI PROCESS (PUCT Project 59142, Item 73) — (2026-09-21) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=73)
- PUCT Project 58317: SB6 Implementation Roadmap Updated September 2026 (PUCT Project 58317, Item 69) — (2026-09-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=69)
- PUCT Project 58317: Governor’s audit (PUCT Project 58317, Item 71) — (2026-09-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=71)
- PUCT Project 58317: Public comments on data centers. 765kV Governor's audit (PUCT Project 58317, Item 74) — (2026-09-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=74)
- PUCT Project 58484: OPUC'S LETTER TO CENTRAL RECORDS- REQUEST TO VOID ITEM NO. 107 (PUCT Project 58484, Item 114) — (2026-04-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=114)
- PUCT Project 58484: OPUC’S INITIAL COMMENTS ON STAFF OF THE PUBLIC UTILITY COMMISSION OF TEXAS’S MEMORANDUM AND DRAFT EVALUATION OF TRANSMISSION COST RECOVERY (PUCT Project 58484, Item 115) — (2026-04-14) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=115)
- PUCT Project 58484: Staff Memo and Draft Report (PUCT Project 58484, Item 117) — (2026-05-04) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=117)
- PUCT Project 58484: Staff Memo_New Rulemaking Project (PUCT Project 58484, Item 118) — (2026-05-27) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=118)
- PUCT Project 58484: LETTER REGARDING EVALUATION OF TRANSMISSION COST RECOVERY (PUCT Project 58484, Item 119) — (2026-06-30) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58484&itemNumber=119)
- ERCOT market notice M-C092126-01: Batch Zero Verification and Community Impact RFIs: RIOO RFI Tool Update to Restrict Visibility of Other Respondents' Submissions, and Posting of Question Reference Guides on the ERCOT Website (ERCOT Market Notice M-C092126-01) — (2026-09-21) [ercot.com →](https://www.ercot.com/services/comm/mkt_notices/M-C092126-01)
- PUCT Project 59948: Joint Motion to Admit Evidence and Parties' Proposed Finding of Fact, Conclusions of Law, and Ordering Paragraphs (PUCT Project 59948, Item 14) — (2026-09-22) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59948&itemNumber=14)
- PUCT Project 58317: Public comments on data centers, 765 kV, and the Governor’s audit (PUCT Project 58317, Item 80) — (2026-09-23) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=80)
- PUCT Project 58317: data centers, 765 kV, and the Governor's audit. I’m Very concerned and upset to find out that 8,300 acres has been purchased for a proposed DATA CENTER JIM HOGG. Co Property is surrounded by farms, wildlife and historic sites. Drought has been declared. (PUCT Project 58317, Item 81) — (2026-09-23) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=81)
- PUCT Project 58317: Overwhelming the state with data centers. 765 kV, governors audit. 520 acres of data center near atmos gas line. Drought. Farm land/agriculture, wildlife and historical sites. (PUCT Project 58317, Item 83) — (2026-09-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=83)
- PUCT Project 58796: OPUC'S NOTICE OF CHANGE OF COUNSEL (PUCT Project 58796, Item 105) — (2026-09-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58796&itemNumber=105)
- PUCT Project 59948: ORDER NO. 5- FINDING NOTICE SUFFICIENT (PUCT Project 59948, Item 15) — (2026-09-24) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59948&itemNumber=15)
- PUCT Project 59142: Request for Audit for Project Raptor (PUCT Project 59142, Item 74) — (2026-09-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=74)
- PUCT Project 59142: Request for Audit for Project Raptor (PUCT Project 59142, Item 75) — (2026-09-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=75)
- PUCT Project 59142: Request for Audit for Project Raptor (PUCT Project 59142, Item 76) — (2026-09-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=76)
- PUCT Project 59142: Request for Audit for Project Raptor (PUCT Project 59142, Item 77) — (2026-09-25) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=59142&itemNumber=77)
- PUCT Project 58317: I oppose the data centers, 765 kV, and I have no faith in the Governor’s audit. We moved to rural area to avoid what you are bringin here. I will not pay for these data centers to ruin our state! (PUCT Project 58317, Item 87) — (2026-09-26) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=87)
- PUCT Project 58317: Public comments on data centers, 765 KV and Governors audit (PUCT Project 58317, Item 101) — (2026-10-02) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=101)
- PUCT Project 58796: SOAH ORDER NO. 12- ADMITTING EVIDENCE; REMANDING CASE TO THE COMMISSION; AND DISMISSING FROM SOAH’S DOCKET (PUCT Project 58796, Item 106) — (2026-10-05) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58796&itemNumber=106)
- PUCT Project 58317: Public comments on data centers, 765 kV, and the Governor’s audit. Specifically near La Grange, Tx (PUCT Project 58317, Item 102) — (2026-10-07) [interchange.puc.texas.gov →](https://interchange.puc.texas.gov/search/documents/?controlNumber=58317&itemNumber=102)
- Permian Basin Reliability Plan (including Texas's first 765 kV import paths) — approved; TSPs (including AEP Texas, LCRA) routing and constructing [utilitydive.com →](https://www.utilitydive.com/news/texas-regulators-approve-permian-basin-reliability-plan/728269/)
- Texas 765 kV Strategic Transmission Expansion Plan (STEP) — plan adopted via ERCOT 2024 RTP; component projects moving through Regional Planning… [epeconsulting.com →](https://epeconsulting.com/epe-intelligence/news/latest-updates-to-ercots-milestone-765-kv-permian-reliability-plan)
- 765 kV STEP Eastern Backbone (AEP Texas, CPS Energy, Oncor, CenterPoint Energy) — ERCOT Board approved Dec 9, 2025; CCN filings and construction phases follow [rtoinsider.com →](https://www.rtoinsider.com/121586-ercot-board-approves-9-4-billion-765-kv-project/)
- Batch Zero actionable transmission plan (large-load interconnection study output) — in progress; timeline under revision due to the audit pause [ercot.com →](https://www.ercot.com/files/docs/2026/07/29/ERCOT-Senate-July-29-Panel-1-Assessing-The-Grid.pdf)
- 2026-08-31 — Original deadline for developers to return corrected dynamic model data (no extensions under PGRR145) — subject to the good-cause-exception extension of deficiency notifications granted August 20,… [gibsondunn.com →](https://www.gibsondunn.com/what-governor-abbotts-data-center-audit-directive-means-for-ercot-and-the-batch-zero-study-process/)
- 2026-09 — ERCOT issues Requests for Information (RFIs) to data center developers through TSPs/DSPs for the Batch Zero eligibility audit (≥75 MW) and community impact review (≥25 MW computational loads);… [utilitydive.com →](https://www.utilitydive.com/news/ercot-texas-puc-data-center-audit/828472/)
- 2026-11-01 — Quarterly Stability Assessment — up to 17 large-load projects (mostly data centers, ~6.6 GW peak over a five-year ramp) may participate under the PUCT-approved good cause exception [utilitydive.com →](https://www.utilitydive.com/news/ercot-texas-puc-data-center-audit/828472/)
- 2026-12-10 — ERCOT's target to file the Batch Zero Eligibility Verification Report and Community Impact Review Report with the PUCT — the gate for the interconnection pause to lift and Batch Zero… [utilitydive.com →](https://www.utilitydive.com/news/ercot-texas-puc-data-center-audit/828472/)
- 2026-12-31 — SB 6 statutory deadline for the PUCT to amend wholesale transmission cost-allocation rules (4CP review, Project 58484) [ashurstperkinscoie.com →](https://www.ashurstperkinscoie.com/en/insights/sb-6-implementation-shaping-data-center-future-in-texas/)
- 2027 — Planned opening of Batch 1 applications (summer 2027) and publication of the final transmission plan for the entire batch (fall 2027), per ERCOT's June 18, 2026 announcement — timing now dependent… [ercot.com →](https://www.ercot.com/news/release/06182026-puct-approves-ercots)
- 2027-04-09 — Original Batch Zero Interconnection Study results deadline (2028–2032 MW allocations + transmission plan) — ERCOT has stated 'We will not have the study done by April 9, 2027'; replacement date not… [utilitydive.com →](https://www.utilitydive.com/news/ercot-texas-puc-data-center-audit/828472/)
- 2027-06-08 — Original deadline for Interconnecting Large Load Entities to execute interconnection agreements and meet financial security and site-control standards to confirm Batch Zero capacity allocations… [ercot.com →](https://www.ercot.com/files/docs/2026/07/29/ERCOT-Senate-July-29-Panel-1-Assessing-The-Grid.pdf)

## PJM — PJM Interconnection, L.L.C.

19 rulings & filings · 3 transmission items · 6 dated milestones

- Queue: 715 projects, 201.5 GW nameplate accepted for study (Cycle 1) · 811 proposals received before the window closed (as of Aug 3, 2026) [insidelines.pjm.com →](https://insidelines.pjm.com/over-700-new-generation-projects-accepted-into-pjms-new-cycle-1-interconnection-study/)
- PJM Interim Resource Adequacy Service (IRAS), Large Load Registry, and Bring Your Own New Capacity filing (ER26-3515-000) — (2026-08-13) [federalregister.gov →](https://www.federalregister.gov/documents/2026/08/18/2026-16808/combined-notice-of-filings-2)
- PJM Reliability Backstop Procurement (RBP) (ER26-3380-000) — (2026-07-31) [pjm.com →](https://www.pjm.com/pjmfiles/directory/etariff/FercDockets/9806/20260731-er26-3380-000.pdf)
- FERC show-cause order to PJM on large-load interconnection (FPA Section 206) (EL26-67-000) — (2026-06-18) [foley.com →](https://www.foley.com/insights/publications/2026/06/ferc-issues-six-tailored-show-cause-orders-to-accelerate-large-load-interconnection/)
- FERC order directing PJM co-located load tariff reform (EL25-49-000) — (2025-12-18) [bdlaw.com →](https://www.bdlaw.com/publications/ferc-orders-pjm-to-create-clear-rules-for-co-located-data-centers-and-large-loads/)
- FERC order on PJM co-location compliance filing (accepting in part, rejecting in part) (EL25-49-002) — (2026-06-18) [hklaw.com →](https://www.hklaw.com/en/insights/publications/2026/06/ferc-advances-new-oversight-framework-for-large-loads)
- PJM Expedited Interconnection Track (EIT) — (2026-06-09) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Talen-Amazon Susquehanna co-location saga (amended ISA rejection and front-of-meter restructuring) (ER24-2172) — (2024-11-01) [utilitydive.com →](https://www.utilitydive.com/news/ferc-interconnection-isa-talen-amazon-data-center-susquehanna-exelon/731841/)
- Capacity auction price records driven by data-center load (2025/26 through 2028/29 Base Residual Auctions) — (2024-07-30) [utilitydive.com →](https://www.utilitydive.com/news/pjm-interconnection-capacity-auction-prices/753798/)
- DOE emergency orders during July 2026 heat wave (data-center curtailment authority) — (2026-07) [utilitydive.com →](https://www.utilitydive.com/news/heat-wave-tests-power-grid-pjm-anticipates-new-record/824329/)
- PJM Proposes Reliability Standards to Manage Large Load Disconnection Events — (2026-09-10) [insidelines.pjm.com →](https://insidelines.pjm.com/reliability-standards-to-manage-large-load-disconnection-events-proposed-by-pjm/)
- PJM targets data centre demand with 6GW backstop auction; BESS expected to have competitive edge — (2026-09-08) [energy-storage.news →](https://www.energy-storage.news/pjm-targets-data-centre-demand-with-6gw-backstop-auction-bess-expected-to-have-competitive-edge/)
- PJM faces 2030 reliability crisis if data center load growth continues: report — (2026-09-15) [utilitydive.com →](https://www.utilitydive.com/news/pjms-reliability-could-start-failing-by-2030-if-data-center-growth-continu/830405/)
- PJM’s reliability could start failing by 2030 if data center growth continues: report — (2026-09-15) [utilitydive.com →](https://www.utilitydive.com/news/pjms-reliability-could-start-failing-by-2030-if-data-center-growth-continu/830405/)
- PUC Study Examines Electric Reliability Risks From Data Center Growth — (2026-09-21) [tdworld.com →](https://www.tdworld.com/utility-business/news/55406581/puc-study-examines-electric-reliability-risks-from-data-center-growth)
- Coal Plants Have a Role; Forcing Them to Remain Online is Bad Business and Bad Policy — (2026-09-25) [energycentral.com →](https://www.energycentral.com/fossil-thermal-ujoy2csr/post/coal-plants-have-a-role-forcing-them-to-remain-online-is-bad-business-jET8nJwlzeDQQoC)
- PJM Kicks Off Annual Process of Vetting Large Load Requests — (2026-09-29) [insidelines.pjm.com →](https://insidelines.pjm.com/pjm-kicks-off-annual-process-of-vetting-large-load-requests/)
- FERC chair slams PJM ‘mess’ as country’s largest grid operator delays power auction — (2026-09-30) [utilitydive.com →](https://www.utilitydive.com/news/pjm-delays-backstop-procurement-ferc-data-center/831751/)
- PJM’s ‘unexpected twist’ is a win for distributed capacity — (2026-10-01) [latitudemedia.com →](https://www.latitudemedia.com/news/pjms-unexpected-twist-is-a-win-for-distributed-capacity/)
- DOE presses PJM on ratepayer protections from large load costs — (2026-10-08) [utilitydive.com →](https://www.utilitydive.com/news/doe-pjm-ferc-ratepayer-protection-large-load-data-center/832479/)
- 2024 RTEP Window 1 awards (765-kV west-east backbone: MARL and Valley Link) — Approved Feb. 25, 2025; in development [utilitydive.com →](https://www.utilitydive.com/news/pjm-rtep-transmission-expansion-plan-aep-dominion-firstenergy/741097/)
- 2025 RTEP Window 1 awards ($11.8B, including Dominion 525-kV HVDC to Data Center Alley) — Approved Feb. 12, 2026; in development, completion by June 2032 (Dominion HVDC) [utilitydive.com →](https://www.utilitydive.com/news/pjm-rtep-transmission-expansion-plan-dominion-nextera-exelon/812311/)
- Cycle 1 interconnection process and queue acceleration (supply side) — In progress (cited in PJM's July 2026 EL26-67 informational report) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2026-09-03 — Comments due at FERC (5 p.m. ET) on PJM's Interim Resource Adequacy Service / Large Load Registry / BYONC filing, Docket ER26-3515-000 [federalregister.gov →](https://www.federalregister.gov/documents/2026/08/18/2026-16808/combined-notice-of-filings-2)
- 2026-09-16 — Interested-party responses due on the six RTO/ISO show-cause responses in EL26-67 through EL26-72, including PJM's EL26-67 filing [hklaw.com →](https://www.hklaw.com/en/insights/publications/2026/06/ferc-advances-new-oversight-framework-for-large-loads)
- 2026-09-30 — Reliability Backstop Procurement central bid window (ER26-3380), pending FERC approval; PJM said it would seek approval to run the backstop in September [electroneconomics.substack.com →](https://electroneconomics.substack.com/p/pjms-reliability-backstop-procurement)
- 2026-10-12 — Requested effective date for IRAS, Large Load Registry, and BYONC tariff revisions (ER26-3515) — FERC action expected on or before this date under PJM's 60-day request [federalregister.gov →](https://www.federalregister.gov/documents/2026/08/18/2026-16808/combined-notice-of-filings-2)
- 2026-12-02 — Reliability Backstop Procurement results due, before the next Base Residual Auction opens [electroneconomics.substack.com →](https://electroneconomics.substack.com/p/pjms-reliability-backstop-procurement)
- 2027-06-01 — New Large Load cutoff: loads entering service or adding incremental demand (≥50 MW at a single electrical site) after this date without sufficient capacity become subject to IRAS curtailment… [datacenterknowledge.com →](https://www.datacenterknowledge.com/energy-power-supply/pjm-s-new-deal-for-data-centers-bring-power-or-face-cuts)

## MISO — Midcontinent Independent System Operator, Inc. (MISO)

13 rulings & filings · 4 transmission items · 6 dated milestones

- Queue: Generation interconnection queue: 192 GW of pending interconnection requests plus 87 GW of signed GIAs not yet built (2026 OMS-MISO Survey). Large-load (data center) connection requests: no… · Not disclosed as a queue share. Forecast context: FERC's June 18, 2026 show cause order cited 43% compound annual growth in MISO data center capacity since… (as of 2026-07-09) [utilitydive.com →](https://www.utilitydive.com/news/oms-miso-survey-resource-outlook-generation/821973/)
- FERC Order to Show Cause on large-load integration (MISO) (EL26-70-000 (195 FERC ¶ 61,212)) — (2026-06-18) [akingump.com →](https://www.akingump.com/en/insights/blogs/speaking-energy/ferc-issues-show-cause-order-to-midcontinent-independent-system-operator-inc)
- MISO generation-adequacy informational report (EL26-70) (EL26-70-000) — (2026-07-20) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- MISO abeyance motion and FERC grant — show-cause response deadline moved to November 16, 2026 (EL26-70-000) — (2026-08-03) [pranavaraparla.com →](https://www.pranavaraparla.com/FERC-Orders-June-2026/)
- Zero-Injection Generator Interconnection Agreement (ZGIA) tariff filing (ER26-3552-000 (accession 20260818-5152)) — (2026-08-18) [govinfo.gov →](https://www.govinfo.gov/content/pkg/FR-2026-08-24/html/2026-17246.htm)
- Large Load Parallel Study Process (planned tariff filing) (Not yet assigned) — (2026-09) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Large Load Interconnection Reliability Requirements (LLWG-2026-3) tariff package (No FERC docket confirmed as of 2026-08-24) — (2026-06-29) [cdn.misoenergy.org →](https://cdn.misoenergy.org/20260716%20LLWG%20Item%2001c%20Minutes%2020260629769037.pdf)
- Expedited Resource Addition Study (ERAS) — generation fast lane (ER25-2454 (revised ERAS filing)) — (2025-06) [utilitydive.com →](https://www.utilitydive.com/news/miso-eras-fast-track-interconnection-study-gas/806747/)
- Attachment GGG (Merchant HVDC Connection Procedures) and Improvements (PAC-2024-6) (No 2026 docket confirmed) — (2026-05-12) [misoenergy.org →](https://www.misoenergy.org/engage/MISO-Dashboard/attachment-ggg-improvements/)
- 2026/27 Planning Resource Auction results (n/a (auction under Module E-1)) — (2026-04-28) [misoenergy.org →](https://www.misoenergy.org/meet-miso/media-center/2026---news-releases/misos-planning-resource-auction-shows-sufficient-capacity-for-coming-year)
- 2026 OMS-MISO Resource Adequacy Survey (n/a) — (2026-06-03) [utilitydive.com →](https://www.utilitydive.com/news/oms-miso-survey-resource-outlook-generation/821973/)
- State commissions' complaint against LRTP Tranche 2.1 benefits/cost allocation (EL25-109-000) — (2025-07-30) [utilitydive.com →](https://www.utilitydive.com/news/ferc-complaint-mvp-multi-value-project-transmission/756411/)
- FERC rulemaking: Interconnection of Large Loads to the Interstate Transmission System (RM26-4-000) — (2026-06-18) [ferc.gov →](https://www.ferc.gov/rm26-4)
- MISO proposes fast-track large load, generation study process — (2026-10-05) [utilitydive.com →](https://www.utilitydive.com/news/miso-large-load-generation-study-lars-ferc/832114/)
- LRTP Tranche 2.1 — 765 kV Midwest backbone — Approved by MISO Board December 12, 2024; state siting/regulatory approvals in progress;… [utilitydive.com →](https://www.utilitydive.com/news/miso-regional-transmission-expansion-plan-2024-mtep/735483/)
- MTEP24 total package (with Tranche 2.1) — Approved December 12, 2024 [utilitydive.com →](https://www.utilitydive.com/news/miso-regional-transmission-expansion-plan-2024-mtep/735483/)
- 2026 LRTP work — Midwest continuation and new LRTP South — In development through the Planning Advisory Committee, 2026 [zeroemissiongrid.com →](https://www.zeroemissiongrid.com/iso-rto-meeting-summaries/miso-pac-lrtp/)
- Expedited Project Review (EPR) — Active per MISO's Large Load Additions page [misoenergy.org →](https://www.misoenergy.org/planning/large-loads---container-page/large-load-additions/)
- 2026-09-08 — Comments due at FERC on MISO's Zero-Injection GIA filing (ER26-3552-000) [govinfo.gov →](https://www.govinfo.gov/content/pkg/FR-2026-08-24/html/2026-17246.htm)
- 2026-09-30 — MISO's target for filing the Large Load Parallel Study Process tariff changes at FERC [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2026-10-18 — Requested effective date of the ZGIA (ER26-3552-000) if accepted by FERC [govinfo.gov →](https://www.govinfo.gov/content/pkg/FR-2026-08-24/html/2026-17246.htm)
- 2026-11 — MISO Large Load Working Group meetings scheduled (framework items: firm service step-up, reliability requirements, telemetry/PMU, forecasting, reserve products) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2026-11-16 — MISO show-cause response due in EL26-70 under the granted 90-day abeyance (answers due December 16, 2026) — the deadline that will produce MISO's binding large-load tariff package [pranavaraparla.com →](https://www.pranavaraparla.com/FERC-Orders-June-2026/)
- 2027-08-31 — ERAS (generation fast-lane) sunset or 68-project cap, per third-party tracker — relevant to developers pairing new generation with large loads [interconnectionqueue.org →](https://interconnectionqueue.org/)

## SPP — Southwest Power Pool, Inc.

9 rulings & filings · 4 transmission items · 5 dated milestones

- Queue: ERAS (Expedited Resource Adequacy Study) fast-track generation queue: ~13.3 GW across 36 active requests; separately, SPP told FERC that large-load interconnection request submissions peaked at… · Per a consultant analysis (CES), ~26.4 GW of interconnection requests since 2020 from facilities >100 MW, of which ~9 GW are data centers specifically; ~7 GW… (as of 2026-07-20) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- High Impact Large Load (HILL) study process, HILLGA, and Load Limited Resource Interconnection Service (LLRIS) (ER26-247-000; order 194 FERC ¶ 61,031) — (2025-10-24) [spp.org →](https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf)
- Conditional High Impact Large Load Service (CHILLS) — non-firm bridge transmission service (ER26-1323-000; order 195 FERC ¶ 61,196) — (2026-02-10) [spp.org →](https://spp.org/documents/76880/20260605_order%20-%20revisions%20to%20add%20the%20conditional%20high%20impact%20large%20load%20service_er26-1323.pdf)
- Expedited Resource Adequacy Study (ERAS) — one-time fast-track generation interconnection process (ER25-2296-000; order 192 FERC ¶ 61,062) — (2025-07-21) [spp.org →](https://www.spp.org/documents/74369/20250721_order%20accepting%20tariff%20revisions%20subject%20to%20condition%20-%20expediated%20resource%20adequacy%20study_er25-2296-000.pdf)
- FERC Section 206 show cause order on large and co-located loads (one of six issued to all RTOs/ISOs) (EL26-68-000; order 195 FERC ¶ 61,213) — (2026-06-18) [spp.org →](https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf)
- SPP informational report on resource adequacy for large loads (EL26-68 compliance) (EL26-68-000) — (2026-07-20) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Price Adaptive Load / Price Adaptive Load Service (PAL/PALS) market participation model (none yet (FERC filing targeted on or before Nov 16, 2026)) — (2026) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Seasonal planning reserve margins — 36% winter / 16% summer (SPP Planning Criteria Rev. 4.6 (published Feb 10, 2026)) — (2026) [spp.org →](https://www.spp.org/news-list/spp-board-approves-new-planning-reserve-margins-to-protect-against-high-winter-summer-use/)
- Consolidated Planning Process (CPP) — merged transmission/interconnection/load planning (FERC accepted March 13, 2026; effective March 1, 2026 (filed…) — (2026-03-13) [hklaw.com →](https://www.hklaw.com/en/insights/publications/2026/03/ferc-approves-spps-consolidated-planning-process)
- CHILLS refinement revision requests RR767 / RR768 (SPP stakeholder revision requests (not yet a FERC filing)) — (2026) [epeconsulting.com →](https://epeconsulting.com/epe-intelligence/news/accelerating-project-opportunity-new-chills-tariff-revisions-in-spp-provide-critical-flexibility)
- 2025 Integrated Transmission Plan (ITP) portfolio — board-approved Nov 5, 2025; notices to construct being issued, with some 765-kV NTCs… [publicpower.org →](https://www.publicpower.org/periodical/article/spp-board-advances-regional-transmission-plan)
- 2026 ITP & CPP Transition Assessment — in progress (2026 study cycle) [spp.org →](https://www.spp.org/documents/74626/2026%20itp%20&%20cpp%20transition%20assessment%20scope%20v1.3.pdf)
- Western RTO expansion transmission integration — complete (effective April 1, 2026) [spp.org →](https://spp.org/news-list/spp-and-member-utilities-successfully-complete-historic-western-expansion/)
- Highway/Byway cost allocation and large-load network upgrades (EL26-68 scope) — under review in Docket EL26-68 (responses due Aug 17, 2026) [spp.org →](https://spp.org/documents/76996/20260618_show%20cause%20order%20on%20large%20and%20co-located%20loads_el26-68-000.pdf)
- 2026-09 — ERAS Generator Interconnection Agreements anticipated for execution (36 requests, ~13.3 GW of expedited resource-adequacy generation) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2026-09 — Next quarterly SPP HILL Q&A session for large-load customers (series scheduled through at least September 2026) [spp.org →](https://spp.org/markets-operations/high-impact-large-load-hill-integration/)
- 2026-09-16 — Interested-party comments on the Aug 17 show-cause responses (parties generally have ~30 days after the regional filings to respond in EL26-68) [microgridmedia.com →](https://microgridmedia.com/ferc-large-load-deadline-data-center-grid-rules/)
- 2026-11-16 — Target date (on or before) for SPP's PALS (Price Adaptive Load Service) FERC filing — new market participation model and lowest-priority non-firm service for flexible, price-responsive large loads [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2029 — Summer planning reserve margin requirement rises from 16% to 17%; SPP's 2025 Summer Resource Adequacy Report projects the existing-resources BA reserve margin at just 1.9% in 2029 and -1.6% by 2030… [spp.org →](https://www.spp.org/documents/74099/2025%20spp%20summer%20resource%20adequacy%20report.pdf)

## CAISO — California Independent System Operator Corporation (CAISO)

11 rulings & filings · 4 transmission items · 9 dated milestones

- Queue: CAISO runs no ISO-level large-load interconnection queue — load interconnects through the utilities. PG&E, where CAISO says data-center growth is most concentrated, reported a 12.7 GW data-center… · Pipeline figures are data-center-specific by PG&E's definition; CAISO's 2025-26 Transmission Plan attributes more than half of its 38 approved projects and… (as of 2026-06-30) [energyconnects.com →](https://www.energyconnects.com/news/utilities/2026/july/pge-s-data-center-pipeline-surges-in-second-quarter/)
- FERC Order to Show Cause and Instituting Section 206 Proceeding — CAISO large loads and co-located loads (EL26-71-000 (195 FERC ¶ 61,214)) — (2026-06-18) [caiso.com →](https://www.caiso.com/documents/jun-18-2026-order-instituting-proceeding-large-loads-and-co-located-loads-el26-71.pdf)
- CAISO Informational Report to FERC on large loads and co-located loads (EL26-71-000) — (2026-07-20) [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- CAISO Motion for Abeyance in EL26-71; FERC acceptance (EL26-71-000) — (2026-08-03) [caiso.com →](https://www.caiso.com/documents/aug-3-2026-caiso-s-motion-for-abeyance-regarding-lard-loads-el26-71.pdf)
- CAISO Large Loads Considerations Straw Proposal (FILI/FLIP, 50 MW definition) (Large Loads stakeholder initiative (feeds Section 205 filing in…) — (2026-08-11) [stakeholdercenter.caiso.com →](https://stakeholdercenter.caiso.com/InitiativeDocuments/Large-loads-Straw-Proposal-Aug-11-2026.pdf)
- CAISO Large Load Technical Requirements Straw Proposal and technical data request (Large Loads stakeholder initiative) — (2026-06-15) [stakeholdercenter.caiso.com →](https://stakeholdercenter.caiso.com/InitiativeDocuments/Large-Load-Technical-Requirements-Straw-Proposal-Jun-15-2026.pdf)
- CAISO comments on FERC ANOPR on interconnection of large loads to the interstate transmission system (RM26-4) — (2025-11-21) [caiso.com →](https://www.caiso.com/documents/nov-21-2025-comments-on-the-advanced-notice-of-proposed-rulemaking-interconnection-of-large-loads-to-the-interstate-transmission-system-rm26-4.pdf)
- CPUC Order Instituting Rulemaking on California Advanced Electric Rate Design (data-center rate design) (R.26-04-009) — (2026-04-09) [docs.cpuc.ca.gov →](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M604/K677/604677976.PDF)
- PG&E Electric Rule 30 — transmission-level interconnection tariff (interim approval and cost-allocation phase) (A.24-11-007) — (2024-11-21) [stoel.com →](https://www.stoel.com/insights/publications/cpuc-weighs-cost-recovery-for-interconnection-of-large-load-including-data-centers)
- CPUC approvals of site-specific PG&E data-center interconnection agreements (STACK, Microsoft, Google) (Resolution E-5420; Resolution E-5439; Advice Letter 7785-E) — (2025-10-30) [stoel.com →](https://www.stoel.com/insights/publications/cpuc-weighs-cost-recovery-for-interconnection-of-large-load-including-data-centers)
- SB 57 (Padilla) — data-center cost-impact assessment mandate (implemented through CPUC R.26-04-009) — (2025) [docs.cpuc.ca.gov →](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M604/K677/604677976.PDF)
- CPUC February 2026 procurement order — 6 GW of net qualifying capacity by 2032 for load growth (CPUC Integrated Resource Planning (per CAISO's EL26-71 report)) — (2026) [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- CAISO 2025-2026 Transmission Plan (Board-approved) — approved by CAISO Board of Governors May 19, 2026 (per CAISO news release) [caiso.com →](https://www.caiso.com/about/news/news-releases/iso-board-of-governors-approves-2025-2026-transmission-plan)
- Silicon Valley large-load transmission project in draft 2025-26 plan — carried into approved plan (as Bay Area corridor expansion) [rtoinsider.com →](https://www.rtoinsider.com/129706-caiso-draft-tx-plan-silicon-valley-large-loads/)
- 2026-2027 transmission planning process (higher load forecast) — in progress [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- PG&E transmission-level interconnection buildout for data centers (Rule 30) — active; interim tariff in effect, cost-allocation decision pending at CPUC [energyconnects.com →](https://www.energyconnects.com/news/utilities/2026/july/pge-s-data-center-pipeline-surges-in-second-quarter/)
- 2026-09-02 — Comments due on CAISO Large Loads Considerations straw proposal (FILI/FLIP, 50 MW definition) [caiso.com →](https://www.caiso.com/notices/large-loads-initiative-straw-proposal-posted-meeting-on-8-19-26)
- 2026-09-21 — CAISO posts draft final proposal in the Large Loads initiative [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- 2026-09-28 — Stakeholder meeting (hybrid) on the draft final proposal [stakeholdercenter.caiso.com →](https://stakeholdercenter.caiso.com/StakeholderInitiatives/Large-loads)
- 2026-10-12 — Comments due on draft final proposal [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- 2026-10-20 — Western Energy Market Governing Body meeting on the proposal (if necessary) [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- 2026-10-28 — CAISO Board of Governors vote on the Large Loads proposal [stakeholdercenter.caiso.com →](https://stakeholdercenter.caiso.com/StakeholderInitiatives/Large-loads)
- 2026-11-16 — CAISO Federal Power Act Section 205 filing at FERC responding to the EL26-71 show-cause order (the enforceable step following the abeyance FERC accepted August 14, 2026; abeyance capped at 90 days) [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- 2027 — CAISO cluster 17 generator interconnection application window opens; CAISO intends to launch IPE 6 stakeholder initiative in 2026 or early 2027 to have enhancements in place beforehand (relevant to… [caiso.com →](https://www.caiso.com/documents/jul-20-2026-informational-report-large-loads-and-co-located-loads-el26-71.pdf)
- 2027-01-01 — CPUC assessment due under SB 57 (Stats. 2025, ch. 647) on cost impacts of new large transmission-connected data-center loads; being executed in R.26-04-009 [docs.cpuc.ca.gov →](https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M604/K677/604677976.PDF)

## NYISO — New York Independent System Operator, Inc.

8 rulings & filings · 3 transmission items · 7 dated milestones

- Queue: ~12 GW of large-load demand (48 projects) as of Dec 31, 2025 per NYISO; ~11.9 GW across 48 projects as of June 22, 2026 per third-party tracker; up from 6 projects / 1 GW in 2022 · EO 62 recites nearly 12 GW of data-center load requests in the NYISO queue as of May 2026 — i.e., the large-load queue is essentially all data-center-driven;… (as of 2026-06-22) [harrisbeachmurtha.com →](https://www.harrisbeachmurtha.com/insights/nyiso-considers-revisions-to-large-load-interconnection-process/)
- FERC Section 206 show cause order to NYISO and NY transmission owners on large-load integration (EL26-69-000) — (2026-06-18) [ferc.gov →](https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration)
- NYISO informational report to FERC on resource adequacy for large loads (EL26-69-000) — (2026-07-20) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Abeyance motions by NYISO, New York Transmission Owners, and non-incumbent TOs in the show cause proceeding (EL26-69-000) — (2026-08-03) [federalregister.gov →](https://www.federalregister.gov/documents/2026/08/07/2026-16173/new-york-independent-system-operator-inc-central-hudson-gas-and-electric-corporation-consolidated)
- NYISO large-load interconnection process reform (stakeholder track, incl. BELL/BOLT concept) (none yet (NYISO stakeholder process; FERC filing planned)) — (2026-02-03) [harrisbeachmurtha.com →](https://www.harrisbeachmurtha.com/insights/nyiso-considers-revisions-to-large-load-interconnection-process/)
- NY PSC Order Instituting Proceeding — Interconnection Reforms for Large Loads (Energize NY Development) (Case 26-E-0045) — (2026-02-12) [gtlaw-environmentalandenergy.com →](https://www.gtlaw-environmentalandenergy.com/2026/02/articles/state-local/new-york/new-york-state-public-service-commission-initiates-new-proceeding-to-address-interconnection-reforms-for-large-loads-energize-ny-development/)
- New York Executive Order No. 62 — statewide moratorium on hyperscale data centers 50 MW+ (EO No. 62) — (2026-07-14) [governor.ny.gov →](https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops)
- Responsible Data Center Development Act (S.10642 / A.11560) — (2026-06-04) [gtlaw.com →](https://www.gtlaw.com/en/insights/2026/6/new-york-legislature-passes-data-center-moratorium-bill-awaits-governors-approval)
- 2026 Reliability Needs Assessment — preliminary results (NYISO comprehensive system planning process (ESPWG/TPAS)) — (2026-07-23) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Champlain Hudson Power Express (CHPE) — In service — commercial operation date May 13, 2026 (ahead of schedule); commercial… [spglobal.com →](https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/051326-1250-mw-chpe-transmission-line-into-nyc-reaches-commercial-operation-early)
- Propel NY Energy — Article VII permitting: application filed July 31, 2024; joint proposal submitted 2026… [propelnyenergy.com →](https://www.propelnyenergy.com/faqs)
- EO 62 DPS transmission/infrastructure workstreams — Working group establishment due ~September 12, 2026; DPS transmission report due… [clm.com →](https://www.clm.com/new-yorks-data-center-moratorium-a-practical-roadmap-through-the-one-year-pause/)
- 2026-09-12 — EO 62: DPS Data Center Interconnection Working Group to be established; ESD Community Investment Framework issued by mid-September [clm.com →](https://www.clm.com/new-yorks-data-center-moratorium-a-practical-roadmap-through-the-one-year-pause/)
- 2026-10-12 — EO 62: DPS transmission report due [clm.com →](https://www.clm.com/new-yorks-data-center-moratorium-a-practical-roadmap-through-the-one-year-pause/)
- 2026-11-15 — End of any FERC-granted abeyance window in EL26-69 — NYISO/NYTOs would need their show-cause response or Section 205 package on file around mid-November 2026 [bdlaw.com →](https://www.bdlaw.com/publications/ferc-moves-to-speed-interconnection-of-data-centers-and-other-large-loads/)
- 2027 — NYISO target for FPA Section 205 filing of its large-load integration framework (per its July 2026 informational report to FERC) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2027-02-12 — DPS Staff White Paper due in PSC Case 26-E-0045 — comprehensive proposal on large-load interconnection, cost allocation, and tariff structure [gtlaw-environmentalandenergy.com →](https://www.gtlaw-environmentalandenergy.com/2026/02/articles/state-local/new-york/new-york-state-public-service-commission-initiates-new-proceeding-to-address-interconnection-reforms-for-large-loads-energize-ny-development/)
- 2027-07-14 — EO 62 one-year moratorium outer boundary — DEC permitting for 50 MW+ data centers can resume only after the DPS Generic Environmental Impact Statement is complete [clm.com →](https://www.clm.com/new-yorks-data-center-moratorium-a-practical-roadmap-through-the-one-year-pause/)
- 2030 — Propel NY Energy targeted completion (construction mid-2026 through May 2030) [propelnyenergy.com →](https://www.propelnyenergy.com/faqs)

## ISO-NE — ISO New England Inc.

8 rulings & filings · 4 transmission items · 6 dated milestones

- Queue: 0.285 GW — two proposed large-load projects in the formal study phase could reach 285 MW combined maximum demand; forecast peak contribution ~110 MW (summer/winter) in the 2030s rising to ~130 MW in… · Effectively the entire large-load forecast; ~800 GWh/yr consumption 2030-2035 rising to ~1,000 GWh/yr in the 2040s; no system demand impact expected before… (as of 2026-05-01) [isonewswire.com →](https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/)
- FERC show cause order on large load and co-located load integration (195 FERC ¶ 61,215) (EL26-72-000) — (2026-06-18) [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100036/a05_tc_nepool_presentation_show_cause_order.pdf)
- ISO-NE Informational Report on resource adequacy for large loads (EL26-72-000) — (2026-07-20) [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- Joint ISO-NE/PTO abeyance motion and FERC grant in the show cause proceeding (EL26-72-000) — (2026-08-03) [isonewswire.com →](https://isonewswire.com/2026/07/21/update-on-iso-ne-compliance-with-ferc-large-and-co-located-loads-order/)
- Bring-your-own-new-generation (BYONG) requirement for new large loads (EL26-72-000 (notice expected in Nov 16, 2026 Section 205 filing)) — (2026-07-20) [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- Exclusion of new large loads from the Installed Capacity Requirement (ICR) (EL26-72-000 (notice expected in Nov 16, 2026 Section 205 filing)) — (2026-07-20) [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- Capacity Auction Reforms Phase 1 (CAR-PD): prompt auction and faster deactivation (ER26-925-000) — (2025-12-31) [isonewswire.com →](https://isonewswire.com/2026/03/31/ferc-accepts-iso-nes-1st-batch-of-capacity-market-reforms/)
- Capacity Auction Reforms Phase 2 (CAR-SA): seasonal auctions and accreditation (not yet filed) — (2026) [iso-ne.com →](https://www.iso-ne.com/committees/key-projects/capacity-auction-reforms-key-project)
- Pay for Performance rate reduction filing (ER26-3047-000) — (2026-07) [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- 2050 Transmission Study (first Longer-Term Transmission Study) — completed — final study published February 2024 [isonewswire.com →](https://isonewswire.com/2023/11/02/iso-nes-2050-transmission-study-identifies-potential-costs-solutions-to-support-reliability-throughout-the-clean-energy-transition/)
- Longer-Term Transmission Planning (LTTP) 2025 RFP — preliminary preferred solution (CMP/Avangrid + Eversource) — preliminary preferred solution selected July 28, 2026; draft report public comments ran… [isonewswire.com →](https://isonewswire.com/2026/07/31/iso-ne-selects-preliminary-preferred-solution-for-longer-term-transmission-effort/)
- Show-cause-driven large-load transmission service reforms — to be addressed in ISO-NE/PTO Section 205 filing due Nov 16, 2026 [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100036/a05_tc_nepool_presentation_show_cause_order.pdf)
- Surplus Interconnection Service reforms — stakeholder design underway in 2026 [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- 2026-11-16 — ISO-NE/PTO Federal Power Act Section 205 filing of large-load and co-located-load tariff changes in response to show cause order EL26-72 (all five reform categories), following the NEPOOL… [isonewswire.com →](https://isonewswire.com/2026/07/21/update-on-iso-ne-compliance-with-ferc-large-and-co-located-loads-order/)
- 2027 — Detailed implementing rules for the BYONG requirement and the exclusion of new large loads from the Installed Capacity Requirement to be filed with FERC after a full stakeholder process — the… [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- 2027 — First point at which ISO-NE's forecast shows proposed large loads (two projects, up to 285 MW) affecting regional system demand [isonewswire.com →](https://isonewswire.com/2026/05/18/iso-ne-establishes-forecast-framework-for-data-centers-other-large-loads/)
- 2028 — ISO-NE filing of updated net CONE and capacity market demand curve parameters ahead of the 2030-31 capacity commitment period [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- 2028-05 — First prompt (and, if CAR-SA is approved, seasonal) capacity auction, administered one to two months before the capacity commitment period beginning June 1, 2028 — replaces the three-year-forward FCA [iso-ne.com →](https://www.iso-ne.com/static-assets/documents/100037/nepool_counsel_memo_ra_informational_reports_summary.pdf)
- 2032 — Potential in-service date for the preferred northern Maine-southern New England transmission project [mainepublic.org →](https://www.mainepublic.org/climate/2026-07-28/new-cmp-power-line-selected-as-preferred-solution-to-improve-regional-power-flows)

## FERC — Federal Energy Regulatory Commission

311 rulings & filings · 3 transmission items · 6 dated milestones

- Queue: No single national large-load queue figure; per the July 20, 2026 reports: SPP's ERAS process holds 36 active requests (~13.3 GW); CAISO projects data-center load on its grid growing 1.8 GW by 2030… · Not uniformly quantified across the six reports; MISO has been reported as the fastest-growing data-center region, with data-center capacity growing at a 43%… (as of 2026-07-20) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Six FPA Section 206 show-cause orders on large-load integration — EL26-67 (PJM), EL26-68 (SPP), EL26-69 (NYISO), EL26-70 (MISO),… (EL26-67-000 through EL26-72-000) — (2026-06-18) [daypitney.com →](https://www.daypitney.com/ferc-issues-show-cause-orders-to-six-rtos/isos-on-large-load-integration)
- Generation-adequacy informational reports filed by all six RTOs/ISOs (EL26-67-000 through EL26-72-000) — (2026-07-20) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Show-cause responses due from six RTOs/ISOs and transmission owners (EL26-67-000 through EL26-72-000) — (2026-08-17) [mgrid.org →](https://mgrid.org/2026/08/18/caiso-answers-ferc-with-two-flexible-interconnection-services-and-a-50-mw-large-load-definition/)
- Large-load interconnection rulemaking docket (DOE-directed ANOPR) — no NOPR issued; docket held open (RM26-4-000) — (2025-10-23) [mcguirewoods.com →](https://www.mcguirewoods.com/client-resources/alerts/2025/10/ferc-establishes-proceeding-to-consider-doe-directive-on-large-load-transmission-interconnection-rulemaking/)
- PJM co-located load Section 206 proceeding instituted from technical-conference record (EL25-49-000 (record from AD24-11-000 technical conference, Large…) — (2025-02-20) [akingump.com →](https://www.akingump.com/en/insights/blogs/speaking-energy/ferc-clears-the-way-for-co-location)
- FERC order on PJM co-located load — tariff found unjust and unreasonable; new co-location framework ordered (EL25-49-000 et al.; 193 FERC ¶ 61,217) — (2025-12-18) [mayerbrown.com →](https://www.mayerbrown.com/en/insights/publications/2026/01/ferc-directs-pjm-to-facilitate-co-location-arrangements)
- FERC order partially accepting/rejecting PJM co-location compliance filing (ER26-1088 (compliance to EL25-49)) — (2026-04-16) [natlawreview.com →](https://natlawreview.com/article/ferc-provides-further-guidance-co-located-load-interconnection)
- FERC order on rehearing and compliance in PJM co-location proceeding — new transmission-service terms accepted in part (EL25-49-002, et al.) — (2026-06-18) [willkie.com →](https://www.willkie.com/publications/2026/07/ferc-greenlights-pjm-co-located-load-framework-in-part-calls-for-further-tariff-updates)
- Rejection of amended Talen/Susquehanna interconnection service agreement (Amazon co-located data center) (ER24-2172-000) — (2024-11-01) [utilitydive.com →](https://www.utilitydive.com/news/ferc-interconnection-isa-talen-amazon-data-center-susquehanna-exelon/731841/)
- SPP large-load service frameworks accepted — HILL/CHILLS effective; PALS filing planned (SPP tariff filings (HILL approved January 2026; CHILLS effective…) — (2026-07-01) [blog.hdata.com →](https://blog.hdata.com/2026-ferc-rulemaking-large-loads)
- PJM Expedited Interconnection Track (EIT) accepted (PJM Section 205 filing (accepted June 9, 2026)) — (2026-06-09) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- Order on Rehearing, Clarification, Compliance Filing, and Paper Hearing re PJM Interconnection, L.L.C. et al. under EL25-49. Commissioner Chang is concurring with a separate statement attached. (FERC EL25-49, Accession 20260618-3103) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3103)
- Vistra Corp. submits Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260720-5170) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5170)
- Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260720-5180) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5180)
- Constellation Energy Generation, LLC submits Limited Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260720-5181) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5181)
- Eolian, L.P., et. al. submit Request for Clarification or, in the Alternative, Rehearing of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260720-5199) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5199)
- The PJM Industrial Customer Coalition, et al. submit Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260720-5200) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5200)
- The Indicated PJM Transmission Owners submit Request for Rehearing and Clarification of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260720-5201) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5201)
- Motion for Extension of Time for Specified Compliance Requirements and Request for Expedited Treatment of PJM Interconnection, L.L.C. under EL25-49 et al. (FERC EL25-49, Accession 20260728-5072) — (2026-07-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5072)
- Motion for Extension of Compliance Deadline of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period under EL25-49 et al. (FERC EL25-49, Accession 20260728-5073) — (2026-07-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5073)
- Answer in Support of the PJM Industrial Customer Coalition to the Motions for Extension and Abeyance by PJM Interconnection, L.L.C. under EL25-49 et al. (FERC EL25-49, Accession 20260803-5106) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5106)
- Order Instituting Proceeding Under Section 206 etc. re PJM Interconnection, L.L.C. et al. under EL26-67. Chairman Swett and Comm'rs Rosner, See, Chang, and LaCerte are concurring w/ sep. stmts. attached. For errata see accession number (FERC EL26-67, Accession 20260618-3105) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3105)
- Notice of Institution of Section 206 Proceeding and Refund Effective Date re PJM Interconnection, L.L.C. et al. under EL26-67. (FERC EL26-67, Accession 20260618-3111) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3111)
- The Pennsylvania Office of Consumer Advocate submits Request for Clarification or, in the alternative, Rehearing of the 06/18/2026 Order under EL26-67. (FERC EL26-67, Accession 20260717-5246) — (2026-07-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260717-5246)
- The Maryland Office of People's Counsel, et al. submit Request for Rehearing of the 06/18/2026 Order under EL26-67. (FERC EL26-67, Accession 20260717-5258) — (2026-07-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260717-5258)
- Exelon Corporation and FirstEnergy Service Company submit Request for Rehearing of the 06/18/2026 Order under EL26-67. (FERC EL26-67, Accession 20260720-5172) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5172)
- The Indicated PJM Transmission Owners submit Request for Clarification, or in the Alternative, Rehearing of the 06/18/2026 Order under EL26-67. (FERC EL26-67, Accession 20260720-5198) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5198)
- PJM Interconnection, L.L.C. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-67. (FERC EL26-67, Accession 20260720-5203) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5203)
- Eolian, L.P. submits Limited Request for Clarification or, In the Alternative, Rehearing of the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act under EL26-67, et al. (FERC EL26-67, Accession 20260720-5218) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5218)
- Motion for Abeyance of the Indicated PJM Transmission Owners and Request for Expedited Action and Shortened Comment Period under EL26-67. (FERC EL26-67, Accession 20260728-5071) — (2026-07-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5071)
- Motion of PJM Interconnection, L.L.C. to Hold Proceeding in Abeyance and Request for Shortened Answer Period and Expedited Treatment under EL26-67. (FERC EL26-67, Accession 20260728-5084) — (2026-07-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260728-5084)
- Notice Establishing Answer Period re PJM Interconnection, L.L.C. et al. under EL26-67. (FERC EL26-67, Accession 20260730-3026) — (2026-07-30) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260730-3026)
- Order Instituting Proceeding under Section 206 of the Federal Power Act re Southwest Power Pool, Inc. et al. under EL26-68. Chairman Swett and Commissioners Rosner, See, Chang, and LaCerte are concurring with separate statements attached. (FERC EL26-68, Accession 20260618-3110) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3110)
- Notice of Institution of Section 206 Proceeding and Refund Effective Date re Southwest Power Pool, Inc. et al. under EL26-68. (FERC EL26-68, Accession 20260618-3112) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3112)
- Southwest Power Pool, Inc. submits request to update the service list under EL26-68. (FERC EL26-68, Accession 20260624-5106) — (2026-06-24) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260624-5106)
- Answer of Southwest Power Pool Transmission Owner Group to L.M. Marlowe's 07/08/2026 Motion for Settlement Procedures under EL26-68 et al. (FERC EL26-68, Accession 20260715-5116) — (2026-07-15) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260715-5116)
- Southwest Power Pool, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-68. (FERC EL26-68, Accession 20260720-5205) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5205)
- Answer of Southwest Power Pool, Inc. in opposition to Motion for the Establishment of Settlement Procedures and Convening of a Settlement Conference, or, in the Alternative, for the Appointment of a Settlement Judge of L.M. Marlowe (FERC EL26-68, Accession 20260722-5143) — (2026-07-22) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5143)
- Order Instituting Proceeding Under Section 206 of the Federal Power Act re New York Independent System Operator, Inc. et al., EL26-69. Chmn. Swett, Comm'r. Rosner, Comm'r. See, Comm'r. Chang, and Comm'r. LaCerte are concurring w/ sep. stmt (FERC EL26-69, Accession 20260618-3063) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3063)
- Notice of Institution of Section 206 Proceeding and Refund Effective Date re New York Independent System Operator, Inc. et al. under EL26-69. (FERC EL26-69, Accession 20260618-3084) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3084)
- New York Independent System Operator, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Order under EL26-69. (FERC EL26-69, Accession 20260720-5217) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5217)
- Order Instituting Proceeding under Section 206 of the Federal Power Act re Midcontinent Independent System Operator, Inc. et al. under EL26-70. Chairman Swett, Commissioners Rosner, See, Chang and LaCerte are concurring with separate (FERC EL26-70, Accession 20260618-3047) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3047)
- Notice of Institution of Section 206 Proceeding and Refund Effective Date re Midcontinent Independent System Operator, Inc. et al. under EL26-70. (FERC EL26-70, Accession 20260618-3085) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3085)
- Midcontinent Independent System Operator, Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Show Cause Order under EL26-70. (FERC EL26-70, Accession 20260720-5204) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5204)
- Order Instituting Proceeding Under Section 206 of the Federal Power Act re California Independent System Operator Corporation et al. under EL26-71. Chairman Swett, and Commissioners Rosner, See, Chang, and LaCerte are concurring w/separate (FERC EL26-71, Accession 20260618-3083) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3083)
- Notice of Institution of Section 206 Proceeding and Refund Effective Date re California Independent System Operator Corporation et al. under EL26-71. (FERC EL26-71, Accession 20260618-3095) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3095)
- The California Independent System Operator Corporation submits Informational Report in compliance with the Commission’s 06/18/2026 Order to Show Cause under EL26-71. (FERC EL26-71, Accession 20260720-5202) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5202)
- Order Instituting Proceeding Under Section 206 etc. re ISO New England Inc. et al. under EL26-72. Chairman Swett, and Commissioners Rosner, See, Chang, and LaCerte are concurring w/ sep. statements attached. For errara see accession (FERC EL26-72, Accession 20260618-3076) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3076)
- Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al. under EL26-72. (FERC EL26-72, Accession 20260618-3096) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3096)
- Vermont Electric Cooperative, Inc. submits Request for Issuance of an Errata re the Notice of Institution of Section 206 Proceeding and Refund Effective Date re ISO New England Inc. et al. under EL26-72. (FERC EL26-72, Accession 20260622-5134) — (2026-06-22) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260622-5134)
- Errata to the Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting the caption re ISO New England Inc. et al. under EL26-72. For order see accession number 20260618-3076. (FERC EL26-72, Accession 20260709-3012) — (2026-07-09) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260709-3012)
- ISO New England Inc. submits Informational Report in compliance with the Commission’s 06/18/2026 Order under EL26-72. (FERC EL26-72, Accession 20260720-5216) — (2026-07-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260720-5216)
- Joint Motion of ISO New England Inc. and the Participating Transmission Owners Administrative Committee o/b/o of the Participating Transmission Owners to Hold Proceeding in Abeyance and Request for Shortened Comment Period et (FERC EL26-72, Accession 20260803-5083) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5083)
- Motion for Leave and Answer of Constellation Energy Generation, LLC to Transmission Owner's Request for Rehearing or, in the Alternative, Clarification of the 04/16/2026 Order under ER26-1088. (FERC ER26-1088, Accession 20260602-5152) — (2026-06-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260602-5152)
- Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. in support of the request for clarification of the Indicated PJM Transmission Owners et al. under ER26-1088. (FERC ER26-1088, Accession 20260609-5119) — (2026-06-09) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260609-5119)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. under ER26-1088. (FERC ER26-1088, Accession 20260618-3003) — (2026-06-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260618-3003)
- Order Accepting Tariff Revisions, Subject to Condition re Southwest Power Pool, Inc. under ER26-1323. (FERC ER26-1323, Accession 20260605-3090) — (2026-06-05) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260605-3090)
- Southwest Power Pool, Inc. submits tariff filing per 35: Compliance Filing - Conditional High Impact Large Load Service to be effective 7/1/2026 under ER26-1323 Filing Type : 80 (FERC ER26-1323, Accession 20260706-5174) — (2026-07-06) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260706-5174)
- ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: ISO-NE; Revisions to Change the Capacity Performance Rate to $3,500 per MWh to be effective 9/1/2026 under ER26-3047 Filing Type : 10 (FERC ER26-3047, Accession 20260630-5201) — (2026-06-30) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260630-5201)
- Supplemental Comments of New England Power Pool Participants Committee on the 06/30/2026 revisions to the Pay-for-Performance market rules by reducing the Capacity Performance Payment Rate under ER26-3047. (FERC ER26-3047, Accession 20260721-5178) — (2026-07-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260721-5178)
- Protest of Constellation Energy Generation, LLC to the 06/30/2026 filing by ISO New England Inc. et al. under ER26-3047. (FERC ER26-3047, Accession 20260721-5214) — (2026-07-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260721-5214)
- PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026 under ER26-3380 Filing Type : 10 (FERC ER26-3380, Accession 20260731-5214) — (2026-07-31) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260731-5214)
- Supplemental Comments of Constellation Energy Generation, LLC on FERC's proposed Advanced Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4. (FERC RM26-4, Accession 20260605-5050) — (2026-06-05) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260605-5050)
- Supplemental Comments of FirstEnergy Service Company on FERC's proposed Advanced Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4. (FERC RM26-4, Accession 20260605-5169) — (2026-06-05) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260605-5169)
- Responsive Comments of Maven Solutions re the Supplemental Comments filed by Constellation Energy Generation, LLC on 06/05/2026 proposing Load-Contingent New Capacity at Existing Plants Service under RM26-4. (FERC RM26-4, Accession 20260608-5025) — (2026-06-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260608-5025)
- Responsive Comments of Maven Solutions re the Supplemental Comments filed by FirstEnergy Service Company on 06/05/2026 proposing that the Commission adopt a natural-gas-pipeline-style expansion rate for electric transmission upgrades (FERC RM26-4, Accession 20260608-5026) — (2026-06-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260608-5026)
- Supplemental Comments of the Working for Advanced Transmission Technologies Coalition in response to FERC's proposed Advanced Notice of Proposed Rulemaking on Large Load Interconnection under RM26-4. (FERC RM26-4, Accession 20260611-5015) — (2026-06-11) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260611-5015)
- Supplemental Comments of the Pennsylvania Office of Consumer Advocate et al. in response to FERC's proposed Advanced Notice of Proposed Rulemaking on Large Load Interconnection under RM26-4. (FERC RM26-4, Accession 20260615-5141) — (2026-06-15) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260615-5141)
- Supplemental Comments of Electricity Customer Alliance on FERC's Advance Notice of Proposed Rulemaking re Large Load Interconnection under RM26-4. (FERC RM26-4, Accession 20260615-5164) — (2026-06-15) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260615-5164)
- Transmittal Letter and Public Comments of James V. Cunningham on the Interconnection of Large Loads to the Interstate Transmission System under RM26-4. (FERC RM26-4, Accession 20260624-5020) — (2026-06-24) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260624-5020)
- Supplemental Comments of Ashkan Yousefi re Interconnection of Large Loads to the Interstate Transmission System under RM26-4. (FERC RM26-4, Accession 20260727-5102) — (2026-07-27) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260727-5102)
- Transcript of the 1137th Commission Meeting held on June 18, 2026 re Consent-Electric et al. (FERC Accession 20260622-4000) — (2026-06-22) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260622-4000)
- Comments of Nikki Gerber in response to FERC's Notice of Technical Conference regarding PJM Interconnection, L.L.C.'s Governance and Stakeholder Reforms under AD26-7. (FERC AD26-7, Accession 20260722-5156) — (2026-07-22) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260722-5156)
- Environmental Impact Statement for Tennessee Gas Pipeline Company, LLC's et al. Mississippi Crossing Project et al. under CP25-514 et al. (FERC CP25-514, Accession 20260626-3002) — (2026-06-26) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260626-3002)
- Alabama Rivers Alliance, et al. submit Request for Rehearing of the 07/31/2026 Order and Motion for Stay under CP25-514, et al. (FERC CP25-514, Accession 20260831-5281) — (2026-08-31) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-5281)
- Joint Comments of Sierra Club, et al. on the Environmental Assessment for the Mountain Valley Pipeline Boost Project under CP26-14. (FERC CP26-14, Accession 20260908-5312) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5312)
- Fourth Supplemental Comments of Justin Kulovsek re Columbia Gulf Transmission, LLC's 06/23/2026 response to data request re the Maysville Pipeline Project under CP26-25. (FERC CP26-25, Accession 20260625-5107) — (2026-06-25) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260625-5107)
- Fifth Supplemental Comments of Justin Kulovsek with formal exhibit re Columbia Gulf Transmission, LLC's 06/23/2026 response to data request re the Maysville Pipeline Project under CP26-25. (FERC CP26-25, Accession 20260708-5031) — (2026-07-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260708-5031)
- Tenth Supplemental Comments of Justin Kulovsek on the 08/11/2026 Environmental Assessment re the Maysville Project under CP26-25. (FERC CP26-25, Accession 20260910-5045) — (2026-09-10) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260910-5045)
- Order Authorizing Disposition of Jurisdictional Facilities re Morgantown Power, LLC under EC26-58. (FERC EC26-58, Accession 20260729-3047) — (2026-07-29) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260729-3047)
- Answer of the Independent Market Monitor for PJM to Voltus, Inc. and Mission:data's 06/01/2026 Motion to File Supplement to Complaint under EL26-4. (FERC EL26-4, Accession 20260616-5073) — (2026-06-16) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260616-5073)
- Order Granting Complaint in Part and Establishing Paper Hearing Procedures re Voltus, Inc., et al. v. PJM Interconnection, L.L.C. under EL26-4. Commissioner LaCerte is dissenting with a separate statement attached. (FERC EL26-4, Accession 20260729-3077) — (2026-07-29) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260729-3077)
- Comments of Delegate Lorig Charkoudian et al. of the Maryland General Assembly in support of a complaint filed by the Maryland Office of People's Counsel, to stop PJM Interconnection, LLC, from charging billions of dollars to Maryland (FERC EL26-63, Accession 20260617-4001) — (2026-06-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260617-4001)
- Comments of members of the Maryland Congressional Delegation in support of the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63. (FERC EL26-63, Accession 20260727-5193) — (2026-07-27) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260727-5193)
- Answer of Sierra Club in support of the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63. (FERC EL26-63, Accession 20260727-5240) — (2026-07-27) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260727-5240)
- Comments of Pennsylvania Office of Consumer Advocate in response to 05/07/2026 complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC et al. under EL26-63. (FERC EL26-63, Accession 20260727-5267) — (2026-07-27) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260727-5267)
- Protest of the Data Center Coalition in opposition to the complaint filed by the Maryland Office of People's Counsel v. PJM Interconnection, LLC under EL26-63. (FERC EL26-63, Accession 20260727-5274) — (2026-07-27) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260727-5274)
- Motion for Leave to Answer and Answer of Citizens Utility Board of Wisconsin to the Answer of Midcontinent Independent System Operator, Inc. and the Protests of Viridon Services LLC and the Electricity Transmission Competition Coalition (FERC EL26-83, Accession 20260909-5169) — (2026-09-09) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260909-5169)
- Order Accepting Construction Service Agreement re The Dayton Power and Light Company under ER26-2303. (FERC ER26-2303, Accession 20260623-3083) — (2026-06-23) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260623-3083)
- Order Accepting Transmission Security Agreement re Commonwealth Edison Company under ER26-2566. (FERC ER26-2566, Accession 20260717-3025) — (2026-07-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260717-3025)
- Order Accepting Transmission Security Agreement re Commonwealth Edison Company under ER26-2615. (FERC ER26-2615, Accession 20260717-3026) — (2026-07-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260717-3026)
- Protest of Powerhouse Hillwood Holding LLC and Request for Confidential Treatment under ER26-3257. (FERC ER26-3257, Accession 20260814-5241) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5241)
- Protest of Powerhouse Hillwood Holding LLC and Request for Confidential Treatment under ER26-3257. (FERC ER26-3257, Accession 20260814-5242) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5242)
- Motion for Leave to File Comments Out of Time, Comments, and Limited Protest of Data Center Coalition in response to American Transmission Company LLC's 07/24/2026 tariff filing under ER26-3265. (FERC ER26-3265, Accession 20260817-5204) — (2026-08-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260817-5204)
- Comments and Limited Protest of Citizens Utility Board of Wisconsin in response to American Transmission Company LLC's 07/24/2026 tariff filing under ER26-3265. (FERC ER26-3265, Accession 20260821-5321) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5321)
- Limited Protest of Sierra Club et al. to one aspect of PJM Interconnection, LLC’s proposed Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260821-5180) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5180)
- Comments of Equinix Inc. on the PJM Interconnection, LLC filing re Reliability Backstop Procurement to Address Resource Adequacy Concerns Stemming from Large Loads under ER26-3380. (FERC ER26-3380, Accession 20260821-5243) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5243)
- Comments of the Data Center Coalition in response to PJM Interconnection, L.L.C.’s 07/31/2026 proposed tariff filing to establish the Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260821-5306) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5306)
- PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Revisions to OA, Schedule 12 & RAA, Schedule 17 RE: 2Q 2026 Member Lists to be effective 7/1/2026 under ER26-3496 Filing Type : 10 (FERC ER26-3496, Accession 20260812-5082) — (2026-08-12) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260812-5082)
- PJM Interconnection, L.L.C. submits tariff filing per 35.13(a)(2)(iii: Proposal to Establish Interim Resource Adequacy Service & a Large Load Registry to be effective 10/12/2026 under ER26-3515 Filing Type : 10 (FERC ER26-3515, Accession 20260813-5118) — (2026-08-13) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260813-5118)
- Comments of Neil P. Osnato d/b/a Persistence Analytics Group LLC concerning PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a Large Load Registry under ER26-3515. (FERC ER26-3515, Accession 20260814-5009) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5009)
- Limited Protest of Public Interest Organizations requesting narrow modifications of the proposed Interim Resource Adequacy Service by PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260903-5159) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5159)
- Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate on PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5190) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5190)
- Comments of ACORE on PJM Interconnection, L.L.C.'s 08/13/2026 proposal to establish Interim Resource Adequacy Service and a large load registry under ER26-3515. (FERC ER26-3515, Accession 20260903-5197) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5197)
- Protest and Comments of Constellation Energy Generation, LLC addressing PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability under ER26-3515. (FERC ER26-3515, Accession 20260903-5201) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5201)
- Comments of the Pennsylvania Public Utility Commission to the Proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry to address System Reliability under ER26-3515. (FERC ER26-3515, Accession 20260903-5206) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5206)
- Protest and Comments of Joint Consumer Advocates on the 08/13/2026 filing by PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260903-5212) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5212)
- Comments and Limited Protests of Ohio Energy Leadership Council in response to the Interim Resource Adequacy Service and Large Load Registry proposed by PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260903-5224) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5224)
- Comments of the PJM Industrial Customer Coalition in response to the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and A Large Load Registry to Address System Reliability under ER26-3515. (FERC ER26-3515, Accession 20260903-5231) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5231)
- Protest of Google LLC regarding PJM Interconnection, L.L.C.’s Interim Resource Adequacy Service and Large Load Registry proposal under ER26-3515. (FERC ER26-3515, Accession 20260903-5233) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5233)
- Comments of Microsoft Corporation to the proposal of PJM Interconnection, L.L.C. to establish Interim Resource Adequacy Service and Large Load Registry under ER26-3515. (FERC ER26-3515, Accession 20260903-5240) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5240)
- Comments of Voltus, Inc. on PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish an Interim Resource Adequacy Service and Large Load Registry under ER26-3515. (FERC ER26-3515, Accession 20260904-5010) — (2026-09-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5010)
- Protest, Request for Clarification, and Comments of Equinix Inc. on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy Service and a Large Load Registry to Adress System Reliability under ER26-3515. (FERC ER26-3515, Accession 20260904-5013) — (2026-09-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5013)
- Motion for Leave to File Comments Out-of-Time and Comments of CyrusOne, LP on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260911-5298) — (2026-09-11) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260911-5298)
- Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-08-18_Zero Injection Generator Interconnection Agreement to be effective 10/18/2026 under ER26-3552 Filing Type : 10 (FERC ER26-3552, Accession 20260818-5152) — (2026-08-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260818-5152)
- Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-08-28_Interconnection Reliability Requirements for Large Loads to be effective 12/4/2026 under ER26-3650 Filing Type : 10 (FERC ER26-3650, Accession 20260828-5278) — (2026-08-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5278)
- Southwest Power Pool, Inc. submits tariff filing per 35.13(a)(2)(iii: Revisions to Clarify the Conditional High Impact Large Load Policy to be effective 12/31/9998 under ER26-3685 Filing Type : 10 (FERC ER26-3685, Accession 20260902-5062) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5062)
- ITC Midwest LLC submits tariff filing per 35.13(a)(2)(iii: ITCMW RS 239 Contribution in Aid and Construction Agreement to be effective 11/2/2026 under ER26-3689 Filing Type : 10 (FERC ER26-3689, Accession 20260902-5110) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5110)
- The Dayton Power and Light Company submits tariff filing per 35.13(a)(2)(iii: Construction Service Agreement - Piqua Initial Service to be effective 11/9/2026 under ER26-3752 Filing Type : 10 (FERC ER26-3752, Accession 20260910-5277) — (2026-09-10) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260910-5277)
- Request to file Out of Time Comments of Sierra Club members and supporters re the Desert Southwest Expansion Project under PF26-9. (FERC PF26-9, Accession 20260810-5014) — (2026-08-10) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-5014)
- Supplemental Comments of Relentless Energy Systems LLC to update the Geometric Phase Isolation technical and patent record filed on 07/13/2026 re Interconnection of Large Loads to the Interstate Transmission System under RM26-4. (FERC RM26-4, Accession 20260908-5076) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5076)
- Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C's Motion for Extension of Time under EL25-49 et al. (FERC EL25-49, Accession 20260803-5236) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5236)
- Motion for Leave and Answer of Constellation Energy Generation, LLC to Indicated PJM Transmission Owner's Rehearing Request under EL25-49 et al. (FERC EL25-49, Accession 20260804-5163) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-5163)
- Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to the Answer of Constellation Energy Generation, LLC filed on 08/03/2026 under EL25-49 et al. (FERC EL25-49, Accession 20260810-5120) — (2026-08-10) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-5120)
- Notice of Extension of Time re PJM Interconnection, L.L.C. et al. under EL25-49 et al. (FERC EL25-49, Accession 20260814-3005) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3005)
- Motion for Leave to Answer and Answer of Vistra Corp. to Northern Virginia Electric Cooperative, Inc.'s 07/29/2026 Motion for Clarification of the 06/18/2026 Order under EL25-49, et al. (FERC EL25-49, Accession 20260818-5146) — (2026-08-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260818-5146)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. v. Constellation Energy Generation, LLC under EL25-49 et al. (FERC EL25-49, Accession 20260820-3008) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3008)
- Answer of Constellation Energy Generation, LLC in support of PJM Interconnection, L.L.C.'s Motion for Abeyance under EL26-67. (FERC EL26-67, Accession 20260803-5234) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5234)
- Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of Silver Run Electric, LLC under EL26-67. (FERC EL26-67, Accession 20260803-5261) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5261)
- Notice Establishing Answer Period re PJM Interconnection, L.L.C. et al. under EL26-67. (FERC EL26-67, Accession 20260804-3065) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3065)
- Answer of Constellation Energy Generation, LLC in response to Transmission Owner's 07/20/2026 Request for Clarification under EL26-67. (FERC EL26-67, Accession 20260804-5159) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-5159)
- Answer of Corporate Energy Buyers Association in support of PJM Interconnection, L.L.C.'s et al. 07/28/2026 Motion for Abeyance under EL26-67. (FERC EL26-67, Accession 20260807-5219) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5219)
- Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et al. under EL26-67, et. al. (FERC EL26-67, Accession 20260810-5108) — (2026-08-10) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260810-5108)
- Errata to the 06/18/2026 Commission issued Order Instituting Proceeding Under Section 206 of the Federal Power Act; correcting footnote 13 re PJM Interconnection, L.L.C. et al. under EL26-67. For order see accession number 20260618-3105. (FERC EL26-67, Accession 20260813-3025) — (2026-08-13) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260813-3025)
- Letter order granting PJM Interconnection, L.L.C.s et al. 07/28/2026 filing of an Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-67. (FERC EL26-67, Accession 20260814-3059) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3059)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re PJM Interconnection, L.L.C. et al. under EL26-67. (FERC EL26-67, Accession 20260820-3006) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3006)
- Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance under EL26-68. (FERC EL26-68, Accession 20260803-5209) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5209)
- Amended Joint Motion of Southwest Power Pool, Inc. et al. to Hold Section 206 Proceeding in Abeyance under EL26-68. (FERC EL26-68, Accession 20260803-5265) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5265)
- Notice Establishing Answer Period re Southwest Power Pool, Inc. et al. under EL26-68. (FERC EL26-68, Accession 20260804-3066) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3066)
- Comments of the Southwest Power Pool Regional State Committee in support of Southwest Power Pool, Inc.’s request for an extension of time until 11/20/2026 to respond to the FERC's 06/18/2026 Order to Show Cause under EL26-68. (FERC EL26-68, Accession 20260807-5123) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5123)
- Comments of the Public Service Commission of the State of Missouri in support of Southwest Power Pool, Inc.'s et al. request for abeyance filed 08/03/2026 under EL26-68. (FERC EL26-68, Accession 20260807-5150) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5150)
- Answer of Corporate Energy Buyers Association in Support of the Amended Motion for Abeyance filed on 08/03/2026 by Southwest Power Pool, Inc. et al. under EL26-68. (FERC EL26-68, Accession 20260807-5220) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5220)
- Letter order granting Southwest Power Pool, Inc.'s 08/03/2026 filing of an Abeyance Motion to hold this proceeding in abeyance until 11/20/2026 under EL26-68. (FERC EL26-68, Accession 20260814-3060) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3060)
- Request for Abeyance of the New York Transmission Owners and Request for Expedited Commission Action and Shortened Comment Period under EL26-69. (FERC EL26-69, Accession 20260803-5210) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5210)
- Motion of New York Independent System Operator, Inc. for Abeyance, Request for Shortened Comment Period and Request for Expedited Action under EL26-69. (FERC EL26-69, Accession 20260803-5229) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5229)
- Motion for Abeyance and Request for Shortened Answer Period and Expedited Treatment of LS Power Grid New York Corporation I and New York Transco LLC under EL26-69. (FERC EL26-69, Accession 20260803-5241) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5241)
- Notice Establishing Answer Period re New York Independent System Operator, Inc. et al. under EL26-69. (FERC EL26-69, Accession 20260804-3067) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3067)
- Letter order granting New York Independent System Operator, Inc.'s et al. 08/03/2026 filing of an abeyance motions to hold this proceeding in abeyance for 90 days under EL26-69. (FERC EL26-69, Accession 20260814-3068) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3068)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re New York Independent System Operator, Inc. et al. under EL26-69. (FERC EL26-69, Accession 20260820-3007) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3007)
- Motion of Midcontinent Independent System Operator Inc. and the MISO Transmission Owners to Hold Proceeding in Abeyance and Request for Shortened Comment Period and Expedited Treatment under EL26-70. (FERC EL26-70, Accession 20260803-5249) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5249)
- Notice Establishing Answer Period re Midcontinent Independent System Operator, Inc. et al. under EL26-70. (FERC EL26-70, Accession 20260804-3068) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3068)
- Answer of the Organization of MISO States, Inc. in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion to Hold Proceeding in Abeyance under EL26-70. (FERC EL26-70, Accession 20260807-5186) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5186)
- Answer of American Municipal Power, Inc. in Response to the Motion to Hold Abeyance filed by Midcontinent Independent System Operator, Inc. et al. under EL26-70. (FERC EL26-70, Accession 20260807-5199) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5199)
- Answer of Corporate Energy Buyers Association in Support of Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 Motion for Abeyance under EL26-70. (FERC EL26-70, Accession 20260807-5216) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5216)
- Comments of Sparkfund on Midcontinent Independent System Operator Inc.’s Informational Report filed on 07/20/2026 under EL26-70. (FERC EL26-70, Accession 20260812-5036) — (2026-08-12) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260812-5036)
- Letter order granting Midcontinent Independent System Operator, Inc.'s et al. 08/03/2026 filing of Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-70. (FERC EL26-70, Accession 20260814-3058) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3058)
- Comments of the Organization of MISO States, Inc. on the Informational Report of the Midcontinent Independent System Operator, Inc. filed on 07/20/2026 under EL26-70. (FERC EL26-70, Accession 20260814-5198) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5198)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re Midcontinent Independent System Operator, Inc. et al. under EL26-70. (FERC EL26-70, Accession 20260820-3009) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3009)
- Request for Abeyance of Southern California Edison Company, et al. in response to the Order issued on 06/18/2026 under EL26-71. (FERC EL26-71, Accession 20260803-5166) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5166)
- Motion to Hold Filing Obligation in Abeyance of DCR Transmission, L.L.C. under EL26-71. (FERC EL26-71, Accession 20260803-5170) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5170)
- Motion for Abeyance of the California Independent System Operator Corporation under EL26-71. (FERC EL26-71, Accession 20260803-5206) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5206)
- Conditional Motion for Abeyance on Behalf of the Cities of Anaheim, Azusa, Banning, Colton, Pasadena, and Riverside, California, under EL26-71. (FERC EL26-71, Accession 20260803-5227) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5227)
- Notice Establishing Answer Period re California Independent System Operator Corporation et al. under EL26-71. (FERC EL26-71, Accession 20260804-3069) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3069)
- Notice of Shortened Answer Period re California Independent System Operator Corporation et al. under EL26-71. (FERC EL26-71, Accession 20260804-3091) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3091)
- Answer of Corporate Energy Buyers Association in Support of California Independent System Operator Corporation's et al. 08/03/2026 et al. Motion for Abeyance under EL26-71. (FERC EL26-71, Accession 20260807-5215) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5215)
- Answer of Morongo Transmission LLC in response to the Order to Show Cause issued on 06/18/2026 under EL26-71. (FERC EL26-71, Accession 20260812-5158) — (2026-08-12) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260812-5158)
- Order Granting Rescission and Abeyance Requests re California Independent System Operator Corporation et al. under EL26-71. (FERC EL26-71, Accession 20260814-3061) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3061)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re California Independent System Operator Corporation et al. under EL26-71. (FERC EL26-71, Accession 20260820-3010) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3010)
- Notice Establishing Answer Period re ISO New England Inc. et al. under EL26-72. (FERC EL26-72, Accession 20260804-3070) — (2026-08-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260804-3070)
- Answer of the New England States Committee on Electricity in Response to Joint Motion for Abeyance filed by ISO New England, Inc. et al. under EL26-72. (FERC EL26-72, Accession 20260807-5196) — (2026-08-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260807-5196)
- Letter order granting ISO New England Inc.'s et al. 08/03/2026 filing of the Abeyance Motion to hold this proceeding in abeyance for 90 days under EL26-72. (FERC EL26-72, Accession 20260814-3056) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-3056)
- Notice of Denial of Rehearing by Operation of Law and Providing for Further Consideration re ISO New England Inc. et al. under EL26-72. (FERC EL26-72, Accession 20260820-3020) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3020)
- Comments of Enel North America, Inc. o/b/o Enel X North America, Inc. in support of ISO New England Inc.’s revisions to its Transmission, Markets and Services Tariff to change the Capacity Performance Payment Rate under ER26-3047. (FERC ER26-3047, Accession 20260803-5174) — (2026-08-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260803-5174)
- Motion for Leave to Answer and Answer of ISO New England Inc. to the Protest of Constellation Energy Generation, LLC et al. under ER26-3047. (FERC ER26-3047, Accession 20260805-5184) — (2026-08-05) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260805-5184)
- Comments of East Kentucky Power Cooperative re PJM Interconnection’s recent proposals to FERC for addressing capacity needs in the short and long terms under ER26-3380. (FERC ER26-3380, Accession 20260811-4003) — (2026-08-11) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260811-4003)
- PJM Interconnection, L.L.C. submits tariff filing per : Supplemental Filing of Croop Affidavit in ER26-3380 to be effective N/A under ER26-3380 Filing Type : 150 (FERC ER26-3380, Accession 20260814-5244) — (2026-08-14) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5244)
- Comments of the Illinois Commerce Commission in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260819-5134) — (2026-08-19) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260819-5134)
- Notice Rescinding Prior Notice re PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260820-3043) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-3043)
- PJM Transmission Owners submits Notice of Partial Compliance with the Commission’s 06/18/2026 order under EL25-49, et al. (FERC EL25-49, Accession 20260820-5187) — (2026-08-20) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260820-5187)
- Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the 08/18/2026 Answer et al. of Vistra Corp. under EL25-49, et al. (FERC EL25-49, Accession 20260828-5273) — (2026-08-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5273)
- Order Accepting Tariff Revisions re ISO New England Inc. et al. under ER26-3047. (FERC ER26-3047, Accession 20260831-3020) — (2026-08-31) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-3020)
- Comments of the Organization of PJM States, Inc. in support of PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5096) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5096)
- Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5105) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5105)
- Partial Protest and Comments of Dominion Energy Services, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5120) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5120)
- Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260821-5125) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5125)
- Comments of Public Service Commission of West Virginia in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5145) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5145)
- Comments of Institute for Policy Integrity at New York University School of Law on PJM Interconnection, L.L.C.’s Section 205 filing to implement Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260821-5155) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5155)
- Comments of PJM Industrial Customer Coalition on PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5176) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5176)
- Protest, Motion to Reject, and Alternative Request for the Imposition of Conditions of Delaware Division of the Public Advocate et al. under ER26-3380. (FERC ER26-3380, Accession 20260821-5183) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5183)
- Comments of New Jersey Board of Public Utilities in response to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5192) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5192)
- Comments of the Public Utilities Commission of Ohio's Office of the Federal Energy Advocate re PJM Interconnection, L.L.C.'s 07/31/2026 revisions to the Open Access Transmission Tariff and the Reliability Assurance Agreement (FERC ER26-3380, Accession 20260821-5197) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5197)
- Comments of Google LLC re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement Proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5206) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5206)
- Comments of American Municipal Power, Inc. re PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5215) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5215)
- Protest of the Pennsylvania Office of Consumer Advocate to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5217) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5217)
- Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5220) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5220)
- Comments of Southern Maryland Electric Cooperative, Inc. re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5263) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5263)
- Limited Protest of Constellation Energy Generation, LLC re PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5266) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5266)
- Limited Protest of the NRG Companies re PJM Interconnection, L.L.C.’s 07/31/2026 filing proposing a Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260821-5273) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5273)
- Protest of the Indicated PJM Transmission Owners re PJM Interconnection, L.L.C.’s proposed tariff amendment under ER26-3380. (FERC ER26-3380, Accession 20260821-5274) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5274)
- Comments and Protest of FirstEnergy Service Company re PJM Interconnection, L.L.C.'s 07/31/2026 filing proposing to establish a Reliability Backstop Procurement mechanism under ER26-3380. (FERC ER26-3380, Accession 20260821-5276) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5276)
- The Ohio Consumers' Counsel submits Protest and Request for Rejection of Filing or in the Alternative for Evidentiary Hearings and/or Settlement Proceedings re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing (FERC ER26-3380, Accession 20260821-5281) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5281)
- Limited Protest of American Electric Power Service Corporation to PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and Reliability Assurance Agreement Among Load Serving Entities under ER26-3380. (FERC ER26-3380, Accession 20260821-5283) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5283)
- Protest of East Kentucky Power Cooperative, Inc. on the 07/31/2026 filing of PJM Interconnection, L.L.C. proposing revisions to the Open Access Transmission Tariff and Reliability Assurance Agreement under ER26-3380. Erroneously filed. (FERC ER26-3380, Accession 20260821-5290) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5290)
- Comments of Ohio Energy Leadership Council on the Reliability Backstop Procurement proposed by PJM Interconnection, L.L.C. under ER26-3380. (FERC ER26-3380, Accession 20260821-5296) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5296)
- Comments of North Carolina Electric Membership Corporation re PJM Interconnection, L.L.C.'s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5297) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5297)
- Limited Protest of Vistra Corp. re PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement mechanism under ER26-3380. (FERC ER26-3380, Accession 20260821-5299) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5299)
- Comments of Calibrant Energy requesting clarification re the PJM Interconnection, LLC’s proposed revisions to the Open Access Transmission Tariff and the Reliability Assurance Agreement Among Load Serving Entities under ER26-3380. (FERC ER26-3380, Accession 20260821-5300) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5300)
- Comments of Blue Ridge Power Agency re PJM Interconnection, L.L.C.'s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5304) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5304)
- Protest of Northern Virginia Electric Cooperative, Inc. to the PJM Reliability Backstop Procurement Proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5307) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5307)
- Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s Reliability Backstop Procurement filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5314) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5314)
- Protest of the Independent Market Monitor for PJM re PJM Interconnection, LLC's 07/31/2026 proposed Reliability Backstop Procurement filing under ER26-3380. (FERC ER26-3380, Accession 20260821-5317) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5317)
- Comments of Voltus, Inc. on the PJM Interconnection LLC’s Federal Power Act Section 205 filing requesting the approval of tariff amendments to establish a Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260821-5318) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5318)
- Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s Reliability Backstop Procurement proposal under ER26-3380. (FERC ER26-3380, Accession 20260821-5322) — (2026-08-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260821-5322)
- Comment, Protest, and Motion for Leave to File One Day Out of Time of E-Cubed Policy Associates, LLC in response to PJM Interconnection, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260824-5017) — (2026-08-24) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260824-5017)
- Motion for Leave to Answer and Answer of the Attorney General of the Commonwealth of Kentucky to the comments and protests of PJM Interconnections, L.L.C.’s 07/31/2026 filing under ER26-3380. (FERC ER26-3380, Accession 20260902-5075) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5075)
- Supplemental Comments of Persistence Analytics Group LLC re Cost-Causation Revalidation related to PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement under ER26-3380. (FERC ER26-3380, Accession 20260902-5087) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5087)
- Motion for Extension of Time of the Organization of PJM States, Inc. to submit comments in response to PJM Interconnection, L.L.C.'s 08/13/2026 proposal under ER26-3515. (FERC ER26-3515, Accession 20260828-5287) — (2026-08-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5287)
- Notice Shortening Answer Period re PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260831-3082) — (2026-08-31) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-3082)
- Answer of Google LLC in Support of the Organization of PJM States, Inc.’s 08/28/2026 Motion for Extension of Time under ER26-3515. (FERC ER26-3515, Accession 20260831-5121) — (2026-08-31) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260831-5121)
- Answer of the Pennsylvania Public Utility Commission in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing under ER26-3515. (FERC ER26-3515, Accession 20260901-5028) — (2026-09-01) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260901-5028)
- Answer of East Kentucky Power Cooperative, Inc. in support of the Organization of PJM States, Inc.’s motion for extension of time to submit comments in response to PJM Interconnection, L.L.C.’s filing under ER26-3515. (FERC ER26-3515, Accession 20260901-5250) — (2026-09-01) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260901-5250)
- Notice Denying Extension of Time re PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260902-3019) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-3019)
- Supplemental Comments of Persistence Analytics Group LLC re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260902-5055) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5055)
- Comments of Hans Royal re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260903-5020) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5020)
- Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5060) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5060)
- Limited Comments of Buckeye Power, Inc. on PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. (FERC ER26-3515, Accession 20260903-5125) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5125)
- Comments of the Public Service Commission of West Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5133) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5133)
- Comments of Dominion Energy Services, Inc. o/b/o its affiliate, Virginia Electric and Power Company d/b/a Dominion Energy Virginia re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5134) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5134)
- Comments and Limited Protest of NRG Business Marketing LLC, et. al. re the Interim Resource Adequacy Service proposed by PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260903-5156) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5156)
- Protest of PJM Power Providers Group re the Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5157) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5157)
- Motion of Michigan Environmental Justice Coalition, et al. for Extension of Time to Submit Comments on the 08/18/2026 filing by the Midcontinent Independent System Operator, Inc. under ER26-3552. (FERC ER26-3552, Accession 20260828-5285) — (2026-08-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260828-5285)
- Answer of Southern Regulators in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026 under ER26-3552. (FERC ER26-3552, Accession 20260902-5107) — (2026-09-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260902-5107)
- Notice Denying Extension of Time re Midcontinent Independent System Operator, Inc. under ER26-3552. (FERC ER26-3552, Accession 20260903-3033) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-3033)
- Answer of Mississippi Public Service Commission et al. in Support of Motion for Extension of Time filed by the Public Interest Organizations filed on 08/28/2026 under ER26-3552. (FERC ER26-3552, Accession 20260903-5021) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5021)
- Limited Protest and Comments of Constellation Energy Generation, LLC in response to PJM Interconnection, L.L.C.'s 08/17/2026 Compliance Filing under EL25-49 et al. (FERC EL25-49, Accession 20260908-5326) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5326)
- Motion for Leave to File Limited Answer, and Limited Answer, of East Kentucky Power Cooperative, Inc. in support of Protest filed by American Electric Power Service Corporation et al. under ER26-3380. (FERC ER26-3380, Accession 20260904-5056) — (2026-09-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5056)
- Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to certain comments and protests re the PJM Reliability Backstop Procurement Proposal et al. under ER26-3380. (FERC ER26-3380, Accession 20260908-5260) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5260)
- Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. to Comments and Protests re the 07/31/2026 revised Open Access Transmission Tariff filing et al. under ER26-3380. (FERC ER26-3380, Accession 20260910-5296) — (2026-09-10) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260910-5296)
- Motion for Leave to Answer and Answer of PPL Electric Utilities Corporation to the 09/10/2026 Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. under ER26-3380. (FERC ER26-3380, Accession 20260915-5145) — (2026-09-15) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260915-5145)
- Comments of Tesla, Inc. re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5167) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5167)
- Supportive Comments and Limited Protest of the New Jersey Board of Public Utilities re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5170) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5170)
- Limited Protest of American Municipal Power, Inc. to PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. (FERC ER26-3515, Accession 20260903-5176) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5176)
- Protest of Office of the Ohio Consumers' Counsel to PJM Interconnection, L.L.C.'s 08/13/2026 Interim Resource Adequacy Service Filing under ER26-3515. (FERC ER26-3515, Accession 20260903-5189) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5189)
- Comments of the Chief Energy Officer Josephus M. Allmond et al. of the Commonwealth of Virginia re the PJM Interconnection, L.L.C.'s proposed Interim Resource Adequacy Service Filing under ER26-3515. (FERC ER26-3515, Accession 20260903-5195) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5195)
- Comments and Limited Protest of Southern Maryland Electric Cooperative, Inc. regarding PJM Interconnection, L.L.C.’s 08/13/2026 filing under ER26-3515. (FERC ER26-3515, Accession 20260903-5204) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5204)
- Limited Protest and Comments of FirstEnergy Service Company et al. in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service mechanism under ER26-3515. (FERC ER26-3515, Accession 20260903-5207) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5207)
- Comments of Calibrant Energy requesting clarifications of PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. (FERC ER26-3515, Accession 20260903-5209) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5209)
- Limited Comments of North Carolina Electric Membership Corporation on PJM Interconnection, L.L.C.’s filing proposing revisions to the Open Access Transmission Tariff et al. under ER26-3515. (FERC ER26-3515, Accession 20260903-5218) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5218)
- Protest of America's Power re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5219) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5219)
- Protest of Vistra Corp. regarding PJM Interconnection, L.L.C.’s proposed Interim Resource Adequacy Service filing under ER26-3515. (FERC ER26-3515, Accession 20260903-5221) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5221)
- Protest of the Electric Power Supply Association to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5222) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5222)
- Limited Protest of East Kentucky Power Cooperative, Inc. to PJM Interconnection, L.L.C.’s 08/13/2026 proposed revisions to the Open Access Transmission Tariff et al. under ER26-3515. (FERC ER26-3515, Accession 20260903-5229) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5229)
- Comments and Request for Clarification of American Electric Power Service Corporation re PJM Interconnection, LLC’s proposed revisions to the PJM Open Access Transmission Tariff et al. under ER26-3515. (FERC ER26-3515, Accession 20260903-5230) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5230)
- Comments of Advanced Energy United in response to PJM Interconnection, L.L.C.’s 08/13/2026 filing to establish Interim Resource Adequacy Service et al. under ER26-3515. (FERC ER26-3515, Accession 20260903-5236) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5236)
- Comments of Old Dominion Electric Cooperative re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5241) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5241)
- Protest of the Independent Market Monitor for PJM to the 08/13/2026 filing by PJM Interconnection, L.L.C. proposing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260903-5243) — (2026-09-03) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260903-5243)
- Comments, Request for Clarification, and in the Alternative, Request to Sever of the Organization of PJM States, Inc. re PJM Interconnection, L.L.C.’s proposal filed on 08/13/2026 under ER26-3515. (FERC ER26-3515, Accession 20260904-5003) — (2026-09-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5003)
- Motion of Equinix Inc. for Leave to Protest, Seek Clarification on and Comment Out-of-Time on the Proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260904-5197) — (2026-09-04) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260904-5197)
- Motion for Acceptance of Late-Filed Comments and Comments of the Virginia State Corporation Commission on the proposal of PJM Interconnection, L.L.C. to Establish Interim Resource Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260908-5273) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5273)
- Comments of the Industrial Energy Consumers of America in response to PJM Interconnection, L.L.C.’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260915-5111) — (2026-09-15) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260915-5111)
- Motion for Leave to Answer and Answer of Josh Shapiro, Governor of the Commonwealth of Pennsylvania in Support of PJM Interconnection, LLC’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260916-5131) — (2026-09-16) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260916-5131)
- Comments of the Solar Energy Industries Association in Support of Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement under ER26-3552. (FERC ER26-3552, Accession 20260908-5257) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5257)
- Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Zero Injection Generator Interconnection Agreement proposal under ER26-3552. (FERC ER26-3552, Accession 20260908-5266) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5266)
- Comments of Advanced Energy United in response to the Midcontinent Independent System Operator’s proposal to establish a Zero Injection Generator Interconnection Agreement framework under ER26-3552. (FERC ER26-3552, Accession 20260908-5332) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5332)
- Protest of Community Collaboration on Climate Change, et al. re the Midcontinent Independent System Operator, Inc.’s filing proposing revisions to establish the Zero Injection Generator Interconnection Agreement under ER26-3552. (FERC ER26-3552, Accession 20260908-5341) — (2026-09-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260908-5341)
- Motion for Acceptance of Late-Filed Comments and Comments in Conditional Support of the Organization of MISO States, Inc. re Midcontinent Independent System Operator, Inc.’s proposed tariff revisions under ER26-3552. (FERC ER26-3552, Accession 20260911-5203) — (2026-09-11) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260911-5203)
- Answer of PJM Power Providers Group in response to PJM Interconnection, L.L.C.'s 09/10/2026 Motion for Leave to Answer and Answer under ER26-3380. (FERC ER26-3380, Accession 20260917-5316) — (2026-09-17) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260917-5316)
- Motion for Leave to Answer and Answer of Data Center Coalition to the Comments, Protests and Answers filed by American Transmission Company LLC et al. under ER26-3265. (FERC ER26-3265, Accession 20260918-5324) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5324)
- Motion for Leave to Answer and Answer of Buckeye Power, Inc. to certain Comments and Protests re PJM Interconnection, LLC’s proposal to Establish Interim Resources Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260918-5262) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5262)
- Motion For Leave to File Second Limited Answer and Second Limited Answer of East Kentucky Power Cooperative, Inc. under ER26-3380. (FERC ER26-3380, Accession 20260918-5364) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5364)
- Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the protests and comments of Buckeye Power, Inc., et al. under ER26-3515. (FERC ER26-3515, Accession 20260918-5365) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5365)
- Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Interconnection Reliability Requirements for Large Loads Proposal under ER26-3650. (FERC ER26-3650, Accession 20260918-5386) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5386)
- Comments of Verrus LLC in Support of Midcontinent Independent System Operator, Inc.'s proposed Interconnection Reliability Requirements for Large Loads under ER26-3650. (FERC ER26-3650, Accession 20260918-5391) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5391)
- Comments of Rowan Digital Infrastructure, LLC re the 08/28/2026 filing by Midcontinent Independent System Operator, Inc. proposing Interconnection Reliability Requirements for Large Loads under ER26-3650. (FERC ER26-3650, Accession 20260921-5084) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-5084)
- Order Dismissing Request for Rehearing and Clarification re PJM Interconnection, L.L.C. et al. under EL26-67. (FERC EL26-67, Accession 20260921-3020) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3020)
- Order Dismissing Request for Rehearing and Clarification re New York Independent System Operator, Inc. et al. under EL26-69. (FERC EL26-69, Accession 20260921-3021) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3021)
- Order Dismissing Request for Rehearing and Clarification re Midcontinent Independent System Operator, Inc. et al. under EL26-70. (FERC EL26-70, Accession 20260921-3047) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3047)
- Order Dismissing Request for Rehearing and Clarification re California Independent System Operator Corporation et al. under EL26-71. (FERC EL26-71, Accession 20260921-3019) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3019)
- Order Dismissing Request for Rehearing and Clarification re ISO New England Inc. et al. under EL26-72. (FERC EL26-72, Accession 20260921-3056) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-3056)
- Motion for Leave to Answer and Answer of American Electric Power Service Corporation to PJM Interconnection, L.L.C.'s 09/10/2026 Answer under ER26-3380. (FERC ER26-3380, Accession 20260918-5413) — (2026-09-18) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260918-5413)
- Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. (FERC ER26-3380, Accession 20260921-5148) — (2026-09-21) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260921-5148)
- Motion for Leave to Answer and Answer of Indicated PJM Transmission Owners to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. (FERC ER26-3380, Accession 20260922-5110) — (2026-09-22) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260922-5110)
- FERC rejects ComEd’s cancellation of PowerHouse Hillwood data center contract — (2026-09-23) [utilitydive.com →](https://www.utilitydive.com/news/ferc-exelon-comed-powerhouse-hillwood-data-center/831127/)
- Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. (FERC ER26-3380, Accession 20260923-5060) — (2026-09-23) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5060)
- Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20260923-5114) — (2026-09-23) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5114)
- Motion for Leave to Answer and Answer of Northern Virginia Electric Cooperative, Inc. to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. (FERC ER26-3380, Accession 20260923-5149) — (2026-09-23) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5149)
- Motion for Leave to Answer and Answer of Midcontinent Independent System Operator Inc. to the comments and protests in response to the 08/18/2026 proposed tariff revisions under ER26-3552. (FERC ER26-3552, Accession 20260923-5148) — (2026-09-23) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260923-5148)
- Motion for Leave to Answer and Limited Answer of ON Energy Storage, Inc. in response to comments and protests re Midcontinent Independent System Operator, Inc. proposal to establish Interconnection Reliability Requirements for Large Loads (FERC ER26-3650, Accession 20260924-5153) — (2026-09-24) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260924-5153)
- Coal Plants Have a Role; Forcing Them to Remain Online is Bad Business and Bad Policy. — (2026-09-25) [energycentral.com →](https://www.energycentral.com/energy-biz-2ogxjzvz/post/coal-plants-have-a-role-forcing-them-to-remain-online-is-bad-business-JRZEFgFOKDo5PsI)
- The North Dakota Public Service Commission et al. submit additional Request for Expedited Action re the 07/30/2025 Complaint v. Midcontinent Independent System Operator, Inc. under EL25-109. (FERC EL25-109, Accession 20260925-5055) — (2026-09-25) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260925-5055)
- Motion for Leave to Answer and Answer of the New Jersey Board of Public Utilities to the Answer et al. of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. (FERC ER26-3380, Accession 20260924-5183) — (2026-09-24) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260924-5183)
- Motion for Leave to Reply and Reply Comments of American Electric Power Service Corporation under ER26-3515. (FERC ER26-3515, Accession 20260925-5186) — (2026-09-25) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260925-5186)
- Answer and Motion for Leave to Answer of the Independent Market Monitor for PJM Interconnection, L.L.C. to the Answer of PJM Interconnection, L.L.C. filed on 09/10/2026 under ER26-3380. (FERC ER26-3380, Accession 20260925-5208) — (2026-09-25) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260925-5208)
- Motion for Leave to Answer and Answer of Corporate Energy Buyers Association to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Establish Interim Resource Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260928-5172) — (2026-09-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260928-5172)
- Motion for Leave to Answer and Answer of Vistra Corp. in response to certain pleadings and answers filed under ER26-3515. (FERC ER26-3515, Accession 20260928-5175) — (2026-09-28) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260928-5175)
- Order Accepting Reliability Backstop Procurement and Establishing Further Procedures re PJM Interconnection, L.L.C. under ER26-3380 et al. Chairman Swett and Commissioners Rosner, See, and LaCerte are concurring with a separate statement (FERC ER26-3380, Accession 20260929-3099) — (2026-09-29) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-3099)
- Supplemental Comments of Voltus, Inc. in response to PJM Interconnection, L.L.C.'s 09/23/2026 et al. Answers re the Proposal to Establish Interim Resource Adequacy, et al. under ER26-3380 et al. (FERC ER26-3380, Accession 20260929-5071) — (2026-09-29) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5071)
- Motion for Leave to Answer and Answer of Advanced Energy United to PJM Interconnection, L.L.C.'s 09/23/2026 Answer re the Proposal to Establish Interim Resource Adequacy, et al. under ER26-3515. (FERC ER26-3515, Accession 20260929-5145) — (2026-09-29) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5145)
- Motion for Leave to Answer and Answer of Constellation Energy Generation, LLC to the Answers filed by Pennsylvania Governor Josh Shapiro et al. re the Interim Resource Adequacy Service proposed by PJM Interconnection (FERC ER26-3515, Accession 20260929-5169) — (2026-09-29) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260929-5169)
- Answer of Google LLC in response to pleadings re PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service under ER26-3515. (FERC ER26-3515, Accession 20260930-5211) — (2026-09-30) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260930-5211)
- Motion for Leave to Answer and Answer of Data Center Coalition to the answer of PJM Interconnection, L.L.C. and certain other comments and answers re the proposal to establish Interim Resource Adequacy Service et al. under ER26-3515. (FERC ER26-3515, Accession 20261001-5356) — (2026-10-01) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261001-5356)
- Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2026-10-02_Large Load Addition Resource Study (LARS) to be effective 12/2/2026 under ER27-25 Filing Type : 10 (FERC ER27-25, Accession 20261002-5074) — (2026-10-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261002-5074)
- Motion for Leave to Answer and Limited Answer of FirstEnergy Service Company to PJM Interconnection, L.L.C.’s 09/23/2026 Answer re Interim Resource Adequacy Service filing under ER26-3515. (FERC ER26-3515, Accession 20261002-5153) — (2026-10-02) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261002-5153)
- New Mexico AG challenges federal commission’s review of proposed Project Jupiter gas pipeline — (2026-10-06) [sourcenm.com →](https://sourcenm.com/2026/10/06/new-mexico-ag-challenges-federal-commissions-review-of-proposed-project-jupiter-gas-pipeline/)
- Motion for Leave to Answer and Limited Answer of PPL Electric Utilities Corporation to the 09/23/2026 Answer et al. of PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20261006-5150) — (2026-10-06) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261006-5150)
- Motion for Leave to File Limited Answer and Answer of Southern Maryland Electric Cooperative, Inc. to PJM Interconnection, L.L.C.'s 09/23/2026 Answer under ER26-3515. (FERC ER26-3515, Accession 20261007-5161) — (2026-10-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5161)
- Motion for Leave to File Answer, and Answer, of East Kentucky Power Cooperative, Inc. to the 09/23/2026 Answer of PJM Interconnection, L.L.C. under ER26-3515. (FERC ER26-3515, Accession 20261007-5190) — (2026-10-07) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261007-5190)
- Supplemental Technical Comments of Christian C. Nzeanorue concerning the timely, orderly, and reliable interconnection of large loads to the interstate transmission system under RM26-4. (FERC RM26-4, Accession 20261008-5170) — (2026-10-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5170)
- Motion for Leave to File Supplemental Comments and Supplemental Comments of Persistence Analytics Group LLC re Validated Project State, Evidentiary Currency, and Revalidation under ER26-3515. (FERC ER26-3515, Accession 20261008-5058) — (2026-10-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5058)
- Motion for Leave to Answer and Answer of Community Organizations and Clean Energy Advocates to Midcontinent Independent System Operator, Inc.’s 09/23/2026 Answer under ER26-3552. (FERC ER26-3552, Accession 20261008-5175) — (2026-10-08) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261008-5175)
- Letter informing Midcontinent Independent System Operator, Inc. that the 08/18/2026 filing is deficient and requesting additional information to be filed within 45 days under ER26-3552. (FERC ER26-3552, Accession 20261009-3000) — (2026-10-09) [elibrary.ferc.gov →](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261009-3000)
- Order No. 1920 / 1920-A long-term regional transmission planning compliance — compliance filings in progress through 2026; appellate challenge pending [utilitydive.com →](https://www.utilitydive.com/news/ferc-2026-agenda-outlook-data-centers-transmission/810596/)
- New PJM co-located-load transmission service classes — framework accepted in part; further compliance pending [mayerbrown.com →](https://www.mayerbrown.com/en/insights/publications/2026/01/ferc-directs-pjm-to-facilitate-co-location-arrangements)
- Susquehanna front-of-the-meter transmission reconfiguration (Talen/AWS) — expected completion spring 2026 (per June 2025 announcement) [ir.talenenergy.com →](https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon)
- 2026-09-16 — Comment window closes for interested parties on the six RTO/ISO show-cause responses in Dockets EL26-67 through EL26-72 — data-center developers' primary opportunity to shape large-load… [whitecase.com →](https://www.whitecase.com/insight-alert/ferc-orders-grid-operators-promptly-revise-or-justify-interconnection-rules-data)
- 2026-09-30 — MISO Large Load Parallel Study Process Section 205 filing at FERC [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2026-11-16 — SPP Price Adaptive Load Service (PALS) Section 205 filing target [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2026-11-16 — CAISO Large Loads Stakeholder Initiative compliance filing target (follows its August 12, 2026 straw proposal with two flexible interconnection services and a 50 MW large-load definition) [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- 2027 — NYISO Section 205 filing target for large-load planning reforms, including accelerated interconnection for reliability resources and potential large-load responsibility assignments [climatesolutionslaw.com →](https://www.climatesolutionslaw.com/2026/07/rtos-and-isos-answer-a-national-preview-of-how-all-six-grid-operators-plan-to-respond-to-the-large-load-surge/)
- No date set — FERC decisions on the six show-cause responses (EL26-67 through EL26-72) and on PJM's May 18, 2026 further co-location compliance filing (ER26-1088-001) — FERC has announced no decision deadline for… [bracewell.com →](https://www.bracewell.com/resources/ferc-show-cause-orders-data-center-interconnection/)

## NERC — North American Electric Reliability Corporation (NERC)

76 rulings & filings · 2 transmission items · 11 dated milestones

- Queue: NERC does not operate an interconnection queue. Forecasts submitted by registered entities responding to the September 2025 Level 2 Alert indicate large-load demand could increase by as much as 300… · Data centers (traditional, AI, and crypto mining) make up the overwhelming share of the forecast growth, per the aggregated Level 2 Alert report (as of 2026-03-17) [nerc.com →](https://www.nerc.com/globalassets/programs/bpsa/alerts/2025/aggregated-report-level-2-large-load-interconnection-study-commissioning-and-operations.pdf)
- Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions (July 10, 2024 Virginia event) — (2025-01-08) [nerc.com →](https://www.nerc.com/globalassets/our-work/reports/event-reports/incident_review_large_load_loss.pdf)
- LLTF White Paper 1: Characteristics and Risks of Emerging Large Loads — (2025) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/whitepaper-characteristics-and-risks-of-emerging-large-loads.pdf)
- Level 2 Alert — Industry Recommendation: Large Load Interconnection, Study, Commissioning, and Operations — (2025-09-09) [certrec.com →](https://www.certrec.com/resources/recent-nerc-alerts/nerc-level-2-industry-recommendation-large-load-interconnection-study-commissioning-and-operations/)
- NERC comments in FERC large-load interconnection ANOPR docket (RM26-4-000) — (2025-11-21) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/legal--regulatory/filings--orders/nerc-filings-to-ferc/2026/nerc_accelerated-ll-action-plan_rm26-4_signed.pdf)
- 2025 Long-Term Reliability Assessment — (2026-01-29) [nerc.com →](https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf)
- Aggregated Report on Level 2 Alert responses — (2026) [nerc.com →](https://www.nerc.com/globalassets/programs/bpsa/alerts/2025/aggregated-report-level-2-large-load-interconnection-study-commissioning-and-operations.pdf)
- LLWG White Paper 2: Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large Loads — (2026-03-11) [nerc.com →](https://www.nerc.com/globalassets/our-work/guidelines/reliability/white-paper---assessment-of-gaps.pdf)
- Project 2026-02 Computational Loads — SAR accepted, drafting team appointed (NERC Project 2026-02) — (2026-03-18) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/sar-comment-period/2026-02-computational-load-alignment-phase-1-sar_sc-approved.pdf)
- NERC Accelerated Large Load Action Plan (supplemental letter to FERC) (RM26-4-000) — (2026-03-20) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/legal--regulatory/filings--orders/nerc-filings-to-ferc/2026/nerc_accelerated-ll-action-plan_rm26-4_signed.pdf)
- Rules of Procedure revisions — registration of Computational Load Entities (Appendices 2, 5A, 5B) (NERC Rules of Procedure, Appendix 5B Statement of Compliance…) — (2026-04-01) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- Level 3 Alert — Essential Actions on computational loads — (2026-05-04) [utilitydive.com →](https://www.utilitydive.com/news/nerc-issues-rare-level-3-alert-over-data-center-load-losses/819295/)
- Reliability Guideline: Risk Mitigation for Emerging Large Loads — (2026) [nerc.com →](https://www.nerc.com/globalassets/our-work/guidelines/reliability/RG_Risk-Mitigation-For-Emerging-Large-Loads.pdf)
- 2026 Summer Reliability Assessment — (2026-05-19) [nerc.com →](https://www.nerc.com/globalassets/our-work/assessments/nerc_sra_2026.pdf)
- 2026 State of Reliability report — computational load events section — (2026-06-24) [rtoinsider.com →](https://www.rtoinsider.com/135162-nerc-state-of-reliability-report-grid-performed-well-2025/)
- FERC order directing NERC computational-load standards and registration (RD26-7-000) — (2026-07-16) [troutmanenergyreport.com →](https://www.troutmanenergyreport.com/2026/07/ferc-directs-nerc-to-submit-rules-addressing-risks-associated-with-integration-of-computational-loads-into-bulk-power-system/)
- Draft Reliability Standards CLO-001-1, CLO-002-1, CLO-003-1 posted for comment and ballot (NERC Project 2026-02) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- NERC Industry Recommendation: Large Load Interconnection, Study, Commissioning, and Operations (NERC Alert 2025-09-09, Large Load Interconnection, Study, Commissioning, and Operations) — (2025-09-09) [nerc.com →](https://www.nerc.com/globalassets/programs/bpsa/alerts/2025/nerc-alert-level-2--large-loads.pdf)
- NERC Essential Actions to Industry: Level 3 Computational Load Alert: Level 3 Computational Load Alert (NERC Alert 2026-05-04, Level 3 Computational Load Alert) — (2026-05-04) [nerc.com →](https://www.nerc.com/globalassets/programs/bpsa/alerts/level-3-computational-load-alert.pdf)
- NERC Large Loads Action Plan: Aggregated Report Level 2 Large Load Interconnection Study Commissioning and Operations (NERC Large Loads Action Plan, Aggregated Report Level 2 Large Load Interconnection Study Commissioning and Operations) — (2026-03-17) [nerc.com →](https://www.nerc.com/globalassets/programs/bpsa/alerts/2025/aggregated-report-level-2-large-load-interconnection-study-commissioning-and-operations.pdf)
- NERC Large Loads Action Plan: Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large Loads (NERC Large Loads Action Plan, Assessment of Gaps in Existing Practices, Requirements, and Reliability Standards for Emerging Large Loads) — (2026-03-11) [nerc.com →](https://www.nerc.com/globalassets/our-work/guidelines/reliability/white-paper---assessment-of-gaps.pdf)
- NERC Large Loads Action Plan: Checklist for Computational Load Entities (NERC Large Loads Action Plan, Checklist for Computational Load Entities) — (2026-05-28) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/checklist-for-computational-load-entities.pdf)
- NERC Large Loads Action Plan: CLE ROP Comments (NERC Large Loads Action Plan, CLE ROP Comments) — (2026-05-28) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/cle-rop-comments_redacted-5-26-revision-3.pdf)
- NERC Large Loads Action Plan: Computational Load Disturbance Performance SAR (NERC Large Loads Action Plan, Computational Load Disturbance Performance SAR) — (2026-08-26) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/draft_sar_computational_load_disturbance_performance-1.pdf)
- NERC Large Loads Action Plan: Disturbance Performance Computational Loads Comment Matrix (NERC Large Loads Action Plan, Disturbance Performance Computational Loads Comment Matrix) — (2026-08-26) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/comment_matrix_sar_disturbanceperformance_computationalloads.xlsx)
- NERC Large Loads Action Plan: FERC Order on Computational Loads - July 16 (NERC Large Loads Action Plan, FERC Order on Computational Loads - July 16) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/ferc-order-on-computational-loads.pdf)
- NERC Large Loads Action Plan: Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions (NERC Large Loads Action Plan, Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions) — (2025-01-08) [nerc.com →](https://www.nerc.com/globalassets/our-work/reports/event-reports/incident_review_large_load_loss.pdf)
- NERC Large Loads Action Plan: Incident Review: Voltage-Sensitive Crypto Load Reductions (NERC Large Loads Action Plan, Incident Review: Voltage-Sensitive Crypto Load Reductions) — (2026-01-13) [nerc.com →](https://www.nerc.com/globalassets/our-work/reports/event-reports/incident_review_considering_voltage-sensitive_crypto_load_reductions.pdf)
- NERC Large Loads Action Plan: Large Loads Frequently Asked Questions (NERC Large Loads Action Plan, Large Loads Frequently Asked Questions) — (2026-08-21) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- NERC Large Loads Action Plan: LL Action Plan - Q1 2026 (NERC Large Loads Action Plan, LL Action Plan - Q1 2026) — (2026-04-06) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/llap-quarterly-update-q1-2026.pdf)
- NERC Large Loads Action Plan: LL Action Plan - Q2 2025 (NERC Large Loads Action Plan, LL Action Plan - Q2 2025) — (2026-03-10) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/ll-action-plan-quarterly-update.pdf)
- NERC Large Loads Action Plan: LL Action Plan - Q2 2026 (NERC Large Loads Action Plan, LL Action Plan - Q2 2026) — (2026-07-07) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/llap-quarterly-update-q2-2026.pdf)
- NERC Large Loads Action Plan: LL Action Plan - Q3 2025 (NERC Large Loads Action Plan, LL Action Plan - Q3 2025) — (2026-03-10) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/llap-quarterly-update-q3-2025.pdf)
- NERC Large Loads Action Plan: LL Action Plan - Q4 2025 (NERC Large Loads Action Plan, LL Action Plan - Q4 2025) — (2026-03-10) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/lltf-quarterly-update-q4-2025.pdf)
- NERC Large Loads Action Plan: NERC Comments to FERC, March 2026 (NERC Large Loads Action Plan, NERC Comments to FERC, March 2026) — (2026-04-29) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/legal--regulatory/filings--orders/nerc-filings-to-ferc/2026/nerc_accelerated-ll-action-plan_rm26-4_signed.pdf)
- NERC Large Loads Action Plan: Primer for Computational Loads (NERC Large Loads Action Plan, Primer for Computational Loads) — (2026-06-09) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/primer-for-computational-loads.pdf)
- NERC Large Loads Action Plan: Risk Mitigation For Emerging Large Loads (NERC Large Loads Action Plan, Risk Mitigation For Emerging Large Loads) — (2026-05-01) [nerc.com →](https://www.nerc.com/globalassets/our-work/guidelines/reliability/RG_Risk-Mitigation-For-Emerging-Large-Loads.pdf)
- NERC Large Loads Action Plan: Standard Authorization Request (NERC Large Loads Action Plan, Standard Authorization Request) — (2026-05-14) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/sar-comment-period/2026-02-computational-load-alignment-phase-1-sar_sc-approved.pdf)
- NERC Large Loads Action Plan: Timeline of Actions Completed (NERC Large Loads Action Plan, Timeline of Actions Completed) — (2026-06-11) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/timeline-of-actions-completed.pdf)
- NERC Large Loads Action Plan: White Paper Characteristics and Risks of Emerging Large Loads (NERC Large Loads Action Plan, White Paper Characteristics and Risks of Emerging Large Loads) — (2026-03-16) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/whitepaper-characteristics-and-risks-of-emerging-large-loads.pdf)
- NERC Large Loads Working Group: Computational Loads Standard Authorization Request Roadmap (NERC Large Loads Working Group, Computational Loads Standard Authorization Request Roadmap) — (2026-09-03) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/llwg/llwg-sar-roadmap.pdf)
- NERC Large Loads Working Group: LLWG Scope (NERC Large Loads Working Group, LLWG Scope) — (2026-05-07) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/llwg/llwg_scope.pdf)
- NERC news: Lauby Briefs FERC on NERC Actions to Address Reliability Impacts from Large Load Integration (NERC News 2025-04-16, Lauby Briefs FERC on NERC Actions to Address Reliability Impacts from Large Load Integration) — (2025-04-16) [nerc.com →](https://www.nerc.com/newsroom/lauby-briefs-ferc-on-nerc-actions-to-address-reliability-impacts-from-large-load-integration)
- NERC news: NERC Files Comments in Response to FERC’s Large Loads ANOPR (NERC News 2025-11-21, NERC Files Comments in Response to FERC’s Large Loads ANOPR) — (2025-11-21) [nerc.com →](https://www.nerc.com/newsroom/nerc-files-comments-in-response-to-fercs-large-loads-anopr)
- NERC news: NERC Q2 Standards Quarterly Outlook: Ride-Through Revisions, Large Loads, Compliance Dates, and How to Engage (NERC News 2026-04-22, NERC Q2 Standards Quarterly Outlook: Ride-Through Revisions, Large Loads, Compliance Dates, and How to Engage) — (2026-04-22) [nerc.com →](https://www.nerc.com/newsroom/nerc-q2-standards-quarterly-outlook-ride-through-revisions-large-loads-compliance-dates-and-how-to-engage)
- NERC news: NERC Issues Level 3 Alert, Reliability Guideline Focused on Large Load Challenges (NERC News 2026-05-04, NERC Issues Level 3 Alert, Reliability Guideline Focused on Large Load Challenges) — (2026-05-04) [nerc.com →](https://www.nerc.com/newsroom/nerc-issues-level-3-alert-reliability-guideline-focused-on-large-load-challenges)
- NERC news: FERC Sets Year-End Deadline for NERC to Finalize Registry Criteria and Standards for Computational Loads (NERC News 2026-07-16, FERC Sets Year-End Deadline for NERC to Finalize Registry Criteria and Standards for Computational Loads) — (2026-07-16) [nerc.com →](https://www.nerc.com/newsroom/ferc-sets-year-end-deadline-for-nerc-to-finalize-registry-criteria-and-standards-for-computational-loads)
- NERC news: Letter to CEOs Outlines Near-Term Actions on Large Loads and Standards Development Process (NERC News 2026-08-18, Letter to CEOs Outlines Near-Term Actions on Large Loads and Standards Development Process) — (2026-08-18) [nerc.com →](https://www.nerc.com/newsroom/letter-to-ceos-outlines-near-term-actions-on-large-loads-and-standards-development-process)
- NERC news: Reliability Insights | Large Computational Load Risks Due to Voltage Sensitivity (NERC News 2026-09-08, Reliability Insights | Large Computational Load Risks Due to Voltage Sensitivity) — (2026-09-08) [nerc.com →](https://www.nerc.com/newsroom/reliability-insights--large-computational-load-risks-due-to-voltage-sensitivity)
- Project 2026-02 Computational Loads: draft CLO-001-1 posted (Formal Posting 1) (NERC Project 2026-02, CLO-001-1, Formal Posting 1) — (2026-08-18) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/formal-posting-1/formal-posting-1/project-2026-02-clo-001-1-draft-1-clean.pdf)
- Project 2026-02 Computational Loads: draft CLO-002-1 posted (Formal Posting 1) (NERC Project 2026-02, CLO-002-1, Formal Posting 1) — (2026-08-18) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/formal-posting-1/formal-posting-1/project-2026-02-clo-002-1-draft-1-clean.pdf)
- Project 2026-02 Computational Loads: draft CLO-003-1 posted (Formal Posting 1) (NERC Project 2026-02, CLO-003-1, Formal Posting 1) — (2026-08-18) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/formal-posting-1/formal-posting-1/project-2026-02-clo-003-1-draft-1-clean.pdf)
- Project 2026-02 Computational Loads: Drafting Team appointed (NERC Project 2026-02, Drafting Team appointed) — (2026-03-18) [nerc.com →](https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads)
- Project 2026-02 Computational Loads: draft FAC-001-5 posted (Formal Posting 1) (NERC Project 2026-02, FAC-001-5, Formal Posting 1) — (2026-08-18) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/formal-posting-1/formal-posting-1/project-2026-02-computational-loads-fac-001-5-clean.pdf)
- Project 2026-02 Computational Loads: draft FAC-002-5 posted (Formal Posting 1) (NERC Project 2026-02, FAC-002-5, Formal Posting 1) — (2026-08-18) [nerc.com →](https://www.nerc.com/globalassets/standards/projects/2026-02/formal-posting-1/formal-posting-1/project-2026-02-computational-loads-clean-fac-002-5.pdf)
- Project 2026-02 Computational Loads: Initial posting authorized (NERC Project 2026-02, Initial posting authorized) — (2026-08-19) [nerc.com →](https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads)
- Project 2026-02 Computational Loads: The Standards Committee accepted the SAR (NERC Project 2026-02, The Standards Committee accepted the SAR) — (2026-03-18) [nerc.com →](https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads)
- Project 2026-02 Computational Loads: The Standards Committee authorized standard(s) drafting (NERC Project 2026-02, The Standards Committee authorized standard(s) drafting) — (2026-05-20) [nerc.com →](https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads)
- NERC Rules of Procedure: Appendix 2 Clean - April 2026 Posting (NERC Rules of Procedure, Appendix 2 Clean - April 2026 Posting) — (2026-04-02) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/appendix-2-clean---april-2026-posting.pdf)
- NERC Rules of Procedure: Appendix 2 Clean - August 2026 Posting (NERC Rules of Procedure, Appendix 2 Clean - August 2026 Posting) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/appendix-2-clean---august-2026-posting.pdf)
- NERC Rules of Procedure: Appendix 5A Clean - April 2026 Posting (NERC Rules of Procedure, Appendix 5A Clean - April 2026 Posting) — (2026-04-02) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/appendix-5a-clean---april-2026-posting.pdf)
- NERC Rules of Procedure: Appendix 5A Clean - August 2026 Posting (NERC Rules of Procedure, Appendix 5A Clean - August 2026 Posting) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/appendix-5a-clean---august-2026-posting.pdf)
- NERC Rules of Procedure: Appendix 5B Clean - April 2026 Posting (NERC Rules of Procedure, Appendix 5B Clean - April 2026 Posting) — (2026-04-02) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/appendix-5b-clean---april-2026-posting.pdf)
- NERC Rules of Procedure: Appendix 5B Clean - August 2026 Posting (NERC Rules of Procedure, Appendix 5B Clean - August 2026 Posting) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/appendix-5b-clean---august-2026-posting.pdf)
- NERC Rules of Procedure: August Posting Technical Reasoning (NERC Rules of Procedure, August Posting Technical Reasoning) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/august-posting-technical-reasoning.pdf)
- NERC Rules of Procedure: CLE Technical Reasoning (NERC Rules of Procedure, CLE Technical Reasoning) — (2026-04-02) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/cle-technical-reasoning-april-2026-posting.pdf)
- NERC Rules of Procedure: Computational Load Entity Summary of Changes April 2026 Posting (NERC Rules of Procedure, Computational Load Entity Summary of Changes April 2026 Posting) — (2026-08-18) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/computational-load-entity-summary-of-changes-april-2026-posting.pdf)
- NERC Rules of Procedure: Computational Load Owner or Operator Summary of Changes August 2026 Posting (NERC Rules of Procedure, Computational Load Owner or Operator Summary of Changes August 2026 Posting) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/computational-load-owner-or-operator-summary-of-changes-august-2026-posting.pdf)
- NERC Rules of Procedure: Response to Comments Document for August Posting (NERC Rules of Procedure, Response to Comments Document for August Posting) — (2026-08-19) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/response-to-comments-document-for-august-posting.pdf)
- NERC news: Computational Loads Standards Advance Following Initial Ballot (NERC News 2026-09-19, Computational Loads Standards Advance Following Initial Ballot) — (2026-09-19) [nerc.com →](https://www.nerc.com/newsroom/computational-loads-standards-advance-following-initial-ballot)
- Bringing a Power Plant’s Worth of Load Onto the Grid: NERC’s Interconnection Reckoning — (2026-09-17) [powermag.com →](https://www.powermag.com/bringing-a-power-plants-worth-of-load-onto-the-grid-nercs-interconnection-reckoning/)
- NERC Rules of Procedure: CLO/CLOP ROP Comments - August Posting (NERC Rules of Procedure, CLO/CLOP ROP Comments - August Posting) — (2026-09-22) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/comments-on-computational-loads-rop---sept.pdf)
- NERC Large Loads Action Plan: CLE ROP Comments - April Posting (NERC Large Loads Action Plan, CLE ROP Comments - April Posting) — (2026-09-24) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/cle-rop-comments_redacted-5-26-revision-3.pdf)
- NERC Rules of Procedure: CLE Technical Reasoning - April Posting (NERC Rules of Procedure, CLE Technical Reasoning - April Posting) — (2026-09-24) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/cle-technical-reasoning-april-2026-posting.pdf)
- NERC Rules of Procedure: Consideration of Comments on April Posting (NERC Rules of Procedure, Consideration of Comments on April Posting) — (2026-09-24) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/response-to-comments-document-for-august-posting.pdf)
- NERC Rules of Procedure: Consideration of Comments from August Posting (NERC Rules of Procedure, Consideration of Comments from August Posting) — (2026-09-30) [nerc.com →](https://www.nerc.com/globalassets/who-we-are/rules-of-procedure/proposed/consideration-of-comments-from-august-posting.pdf)
- NERC news: North American Collaboration, Large Loads Standards Key Topics at Board Meeting (NERC News 2026-10-08, North American Collaboration, Large Loads Standards Key Topics at Board Meeting) — (2026-10-08) [nerc.com →](https://www.nerc.com/newsroom/north-american-collaboration-large-loads-standards-key-topics-at-board-meeting)
- Not applicable — NERC does not plan or build transmission — context [utilitydive.com →](https://www.utilitydive.com/news/nerc-10-year-peak-demand-forecast-jumps-24-on-new-data-center-loads/810955/)
- System capacity context from 2026 Summer Reliability Assessment — published May 19, 2026 [nerc.com →](https://www.nerc.com/globalassets/our-work/assessments/nerc_sra_2026.pdf)
- 2026-09-03 — Deadline (8:00 p.m. Eastern) to join the Project 2026-02 ballot pool to vote on draft standards CLO-001-1, CLO-002-1, and CLO-003-1 [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- 2026-09-15 — NERC Large Loads Working Group (LLWG) meeting; the Load Modeling Working Group hosts a Data Center Modeling workshop September 15-16 [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- 2026-09-18 — Comments due (8:00 p.m. Eastern) on draft standards CLO-001-1/002-1/003-1 (ballot runs the final 10 days of the period), and close of the second 30-day comment period on revised Rules of Procedure… [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- 2026-09-18 — Comment Period closes: Project 2026-02 Computational Loads, Formal Posting 1 (Aug 19, 2026 to Sep 18, 2026) [nerc.com →](https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads)
- 2026-09-18 — Computational Loads: NERC comment period closes (Aug 19, 2026 to Sep 18, 2026) [sbs.nerc.net →](https://sbs.nerc.net/)
- 2026-09-18 — Initial Ballots and Non-binding Polls closes: Project 2026-02 Computational Loads, Formal Posting 1 (Sep 9, 2026 to Sep 18, 2026) [nerc.com →](https://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads)
- 2026-09-18 — Registry Criteria: NERC comment period closes (Aug 19, 2026 to Sep 18, 2026) →
- 2026-09-24 — Disturbance Performance for Computational Loads: NERC comment period closes (Aug 26, 2026 to Sep 24, 2026) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/draft_sar_computational_load_disturbance_performance-1.pdf)
- 2026-11-17 — NERC Load Modeling Working Group meeting (ongoing work on the computational-load modeling reference document and the data-center model quality tool) [nerc.com →](https://www.nerc.com/globalassets/initiatives/large-loads-action-plan/large-loads-faqs.pdf)
- 2026-12-31 — FERC-ordered deadline (Docket RD26-7-000, order issued July 16, 2026) for NERC to file new or modified Reliability Standards, Glossary changes, registry criteria, and Rules of Procedure revisions… [powermag.com →](https://www.powermag.com/ferc-orders-mandatory-nerc-reliability-standards-for-data-center-and-other-computational-loads/)
- 2027-03-01 — NERC informational filing due at FERC detailing its workplan for additional computational-load Reliability Standards (Phase II of the RD26-7 directive) [troutmanenergyreport.com →](https://www.troutmanenergyreport.com/2026/07/ferc-directs-nerc-to-submit-rules-addressing-risks-associated-with-integration-of-computational-loads-into-bulk-power-system/)