Data centers identified

14

14 plotted

Target for MS

25

17 counted against it (14 identified plus 3 in the pipeline), 68.0%

Grid operator

MISO

also NON-RTO

Moratorium

None statewide

0 state measures · 1 local pause

Delayed projects

1

delay watchlist

Capital sites

5

$68.8B announced

The map

## Where Mississippi's data centers stand

Facilities 14Delayed projects 1Capital sites 5Local restrictions 3

### Key facts

Data centers identified

14 from the operators' own facility lists, PeeringDB, OpenStreetMap and Wikidata, of which 5 are mapped buildings that carry no name

Target count

25 facilities in the industry reference count for Mississippi; this map holds 17 of them (68.0 percent), 8 still to identify

Largest cluster

Madison County with 7 facilities

Largest operator

Amazon Web Services with 4 facilities

Grid operator

MISO and NON-RTO

State measures

no statewide moratorium or pause on record

Local pauses

1 city or county moratoria · 2 local restrictions on the delay watchlist

Water measures

0 state and local, plus the federal measures that apply everywhere

Mississippi

## Mississippi data centers, in short

Mississippi has 14 data centers identified from primary sources, spread across 9 cities and counties and run by 6 operators. The largest concentration is Jackson, with 2 data centers, followed by Canton with 1 and Clinton with 1.

The operators with the most data centers in Mississippi are Amazon Web Services (4), Lumen (1), USNX (1), Compass (1), Vulcan Infrastructure and Power (1). Colocation and interconnection providers appear most often because they publish building-level detail; hyperscale campuses appear where the operator or the county names the individual buildings.

Not every operator discloses size. In Mississippi, 2 publish a power figure, and each figure is shown against the data center it belongs to rather than added into one number. They are not the same measurement: one operator states the floor area of a single building, another the full capacity of a campus it has only announced.

MISO runs the wholesale power market and the high-voltage grid for most of Mississippi. No statewide measure governing data centers is on record, alongside 1 local pause. 1 named project in Mississippi is delayed, blocked or under challenge, and the capital atlas records 5 sites here carrying $68.8B in announced commitments.

The list

## Mississippi data centers by city

Every data center identified in Mississippi, grouped by the city or county it stands in, 14 of them across 9 places. Each entry names the operator and links to the source that states it.

### Data centers in Jackson, Mississippi

Jackson, Mississippi has 2 data centers on this map, run by Lumen and USNX.

1. Lumen Network Colocation market: Jackson, MS Lumen
2. U.S.NEXT Data Center USNX

### Data centers in Canton, Mississippi

Canton, Mississippi has 1 data center on this map, run by Amazon Web Services.

1. Madison County data center campus (Canton) Amazon Web Services

### Data centers in Clinton, Mississippi

Clinton, Mississippi has 1 data center on this map, run by Amazon Web Services.

1. Hinds County data center facility (former Delphi plant, Clinton) Amazon Web Services

### Data centers in Columbus, Mississippi

Columbus, Mississippi has 1 data center on this map, run by Vulcan Infrastructure and Power. 1 publishes a power figure, shown against each one below.

1. Columbus, Mississippi powered land site Vulcan Infrastructure and Power 40 MW

### Data centers in Meridian, Mississippi

Meridian, Mississippi has 1 data center on this map, run by Compass. 1 publishes a power figure, shown against each one below.

1. Meridian campus Compass 320 MW

### Data centers in Ridgeland, Mississippi

Ridgeland, Mississippi has 1 data center on this map, run by Amazon Web Services.

1. Amazon Web Services Amazon Web Services

### Data centers in Starkville, Mississippi

Starkville, Mississippi has 1 data center on this map, run by C Spire.

1. C Spire Mississippi C Spire 401 Research Blvd

### Data centers in Unincorporated Madison County, Mississippi

Unincorporated Madison County, Mississippi has 5 data centers on this map.

1. Data center building
2. Data center building
3. Data center building
4. Data center building
5. Data center building

### Data centers in Warren County, Mississippi (exact location not published)

Warren County, Mississippi (exact location not published) has 1 data center on this map, run by Amazon Web Services.

1. Warren County data center (planned) Amazon Web Services

No data center matches that filter.

Floor area and power appear only where the operator or a government record publishes them. A building the sources describe without naming it is listed as a data center building at its county.

Counties and operators

## Where they cluster, and who runs them

### Facilities by county 6

- Madison County7
- Hinds County3
- Lauderdale County1
- Lowndes County1
- Oktibbeha County1
- Warren County1

### Operators 6

- Amazon Web Services4
- Lumen1
- USNX1
- Compass1
- Vulcan Infrastructure and Power1
- C Spire1

### Cities 7

- Jackson2
- Clinton1
- Meridian1
- Columbus1
- Ridgeland1
- Canton1
- Starkville1

What applies here

## The rules and the pipeline in Mississippi

Mississippi has 0 state measures on record, 1 local pause, and 0 state or local water measures. MISO runs the grid there. Each tracker below holds the full record for Mississippi, with every entry sourced.

[Mississippi Data Center Moratorium Tracker0 state measures · 1 local pause](https://savrn.com/data-center-moratorium-tracker/mississippi) [Data Center Water Tracker0 measures in Mississippi, plus the federal layer](https://savrn.com/data-center-water-tracker) [Grid Operator WatchlistMISO and NON-RTO](https://savrn.com/data-center-grid-operator-watchlist) [Nationwide Data Center Delay Watchlist1 project delayed or blocked · 2 local restrictions](https://savrn.com/data-center-delay-tracker) [Data Center Capital Atlas5 sites · $68.8B announced](https://savrn.com/data-center-capital-atlas) [US Data Center MapAll 4,767 counted, state by state](https://savrn.com/data-center-map)

Nearby states

## Mississippi's neighbors

[Tennessee75 placed · 50 records](https://savrn.com/data-center-map/tennessee)[Alabama32 placed · 25 records](https://savrn.com/data-center-map/alabama)[Louisiana22 placed · 18 records](https://savrn.com/data-center-map/louisiana)[Arkansas13 placed · 30 records](https://savrn.com/data-center-map/arkansas)[All statesthe national map](https://savrn.com/data-center-map)

Questions

## Mississippi data centers, answered from the record

How many data centers are in Mississippi?

The industry reference count for Mississippi is 25 facilities. This map places 14 of them from primary sources, each with a source record you can open, and every entry names the operator, the county, and the grid operator that serves it. The rest are mostly small regional colocation providers and enterprise buildings that no public register describes.

Where are Mississippi's data centers?

They are listed on this page city by city. By city: Jackson (2), Clinton (1), Meridian (1), Columbus (1). By county: Madison County (7), Hinds County (3), Lauderdale County (1). Every data center identified in Mississippi appears under the city or county it stands in, with its operator and the source that names it.

Who operates data centers in Mississippi?

6 operators appear in the registers for Mississippi. The largest by facility count: Amazon Web Services (4), Lumen (1), USNX (1), Compass (1), Vulcan Infrastructure and Power (1). Interconnection-heavy providers are over-represented because PeeringDB records where networks meet; hyperscalers appear where contributors have mapped their buildings.

Does Mississippi have a data center moratorium?

No statewide moratorium, pause, or data center tax measure is on record for Mississippi. 1 city or county pause is on record locally. The Mississippi Data Center Moratorium Tracker carries each measure with its primary source and a weekly changelog.

Which grid operator serves Mississippi data centers?

MISO runs the wholesale power market and the high-voltage transmission system for most of Mississippi; NON-RTO covers the rest. Entergy Mississippi (Jackson, central/west) in MISO; TVA serves northeast MS and Mississippi Power (Southern Co) serves the Gulf Coast, both non-RTO.

Are new data centers being built or delayed in Mississippi?

1 named project in Mississippi is delayed, blocked, or under challenge, with 2 local restrictions, 0 jurisdictional actions, 0 utility dockets, and 0 flagged queue row or large-load studys. The capital atlas records 5 named sites in Mississippi with $68.8B in announced commitments and 0 projects blocked, delayed, or halted.

Facility layer: PeeringDB (Acceptable Use Policy), OpenStreetMap (ODbL, © OpenStreetMap contributors), Wikidata (CC0), US Census Bureau boundaries. Tracker layers: the SAVRN Moratorium Tracker, Water Tracker, Grid Operator Watchlist, Delay Watchlist, and Capital Atlas, each primary-sourced. Method on the [national map](https://savrn.com/data-center-map#method).

The reference set

## Mississippi across the SAVRN trackers

The same state followed through the money, the policy, the water and the delays. Each page is primary-sourced and refreshed on its own schedule, and each links back here.

[Open the Mississippi power pagePlanned and operating power plants, the grid operator, utilities and prices, jobs since 2019 and every county in Mississippi](https://savrn.com/power-supply-chain-map/mississippi) [Mississippi Data Center Investment TrackerCapital Atlas: named sites, capital providers, financing, and the blocked or delayed record in Mississippi](https://savrn.com/data-center-capital-atlas/mississippi) [Mississippi Data Center Moratorium TrackerEvery state measure and local moratorium on record in Mississippi, each one cited](https://savrn.com/data-center-moratorium-tracker/mississippi) [Data Center Water TrackerWater measures that touch a data center, with the fifty-state water ledger](https://savrn.com/data-center-water-tracker) [Data Center Delay WatchlistNamed projects delayed, blocked or under challenge, with the dockets behind them](https://savrn.com/data-center-delay-tracker)

### Sources