# CloudHQ Data Centers: Locations by State and City
Source: https://savrn.com/data-center-map/operator/cloudhq
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Data center operator

# CloudHQ data centers

Listed below are 26 data centers operated by CloudHQ in the United States, identified from primary sources across 5 states and 7 cities.

Wholesale 26 buildings 5 states 7 cities [CloudHQ website ↗](https://www.cloudhq.com)

Data centers

26

identified from primary sources

States

5

each links to its own state page

Cities

7

cities and counties with at least one

Floor area published

24

of 26; shown per building, never summed

Power published

8

of 26; shown per building, never summed

The company

## What CloudHQ does, and what this map holds

Develops and operates large data center campuses and leases contracted megawatts of critical IT load to major technology companies. It also does developer_landlord (land acquisition and campus development). This map identifies 26 data centers operated by CloudHQ across 5 states and 7 cities. Its largest presence is Virginia, with 22 buildings.

After Virginia, CloudHQ has the most data centers in California (1), Illinois (1), Minnesota (1), Texas (1). Each state below links to that state's own page, which carries every operator in it, the grid operator, and the moratorium, water and delay record that applies there.

Disclosure is uneven and this page does not paper over it. 24 of the 26 publish a floor area, and 8 publish a power figure. Each figure is shown against the building it belongs to and never added into a single total, because operators do not measure the same thing: one states the floor area of one hall, another the full capacity of a campus it has only announced.

19 of these records are marked planned, permitted or under construction rather than operating, and each is labeled as such in the list below.

[CloudHQ's own site ↗](https://www.cloudhq.com)

The list

## Every CloudHQ data center, by state and city

All 26 CloudHQ data centers this map identifies, grouped by the state and then the city each one stands in. Every entry carries the source that names it.

### CloudHQ data centers in Virginia

[All Virginia data centers ↗](https://savrn.com/data-center-map/virginia)

CloudHQ has 22 data centers in Virginia, in Prince William County, Manassas, Loudoun County, Ashburn and Culpeper. 20 publish a floor area and 4 publish a power figure, shown against each one below.

#### Prince William County, Virginia12

1. CloudHQ Manassas Corporate Center (MCC) CloudHQ Manassas Corporate Center (MCC) stands in Prince William County, Virginia. The record puts it at 2,326,576 square feet. It is recorded as planned rather than operating. 2,326,576 sq ft
2. CloudHQ Manassas Corporate Center 3 10740 AIRMAN AVE CloudHQ Manassas Corporate Center 3 stands in Prince William County, Virginia. The record puts it at 317,944 square feet. It is recorded as planned rather than operating. 317,944 sq ft
3. CloudHQ Manassas Corporate Center 4 10849 AIRMAN AVE CloudHQ Manassas Corporate Center 4 stands in Prince William County, Virginia. The record puts it at 252,309 square feet. It is recorded as planned rather than operating. 252,309 sq ft
4. CloudHQ Manassas Corporate Center 5 10940 AIRMAN AVE CloudHQ Manassas Corporate Center 5 stands in Prince William County, Virginia. The record puts it at 317,944 square feet. It is recorded as planned rather than operating. 317,944 sq ft
5. CloudHQ Manassas Corporate Center 6B 10910 AIRMAN AVE CloudHQ Manassas Corporate Center 6B stands in Prince William County, Virginia. The record puts it at 317,944 square feet. It is recorded as planned rather than operating. 317,944 sq ft
6. CloudHQ Manassas Corporate Center 7 10101 HARRY J PARRISH BLVD CloudHQ Manassas Corporate Center 7 stands in Prince William County, Virginia. The record puts it at 343,583 square feet. It is recorded as planned rather than operating. 343,583 sq ft
7. CloudHQ Manassas Corporate Center 8 AIRMAN AVE CloudHQ Manassas Corporate Center 8 stands in Prince William County, Virginia. The record puts it at 860,788 square feet. 860,788 sq ft
8. CloudHQ Manassas Data Center (MDC) CloudHQ Manassas Data Center (MDC) stands in Prince William County, Virginia. The record puts it at 1,644,498 square feet. It is recorded as planned rather than operating. 1,644,498 sq ft
9. CloudHQ Manassas Data Center 2 10450 HARRY J PARRISH BLVD CloudHQ Manassas Data Center 2 stands in Prince William County, Virginia. The record puts it at 523,151 square feet. It is recorded as under construction. 523,151 sq ft
10. CloudHQ Manassas Data Center 3 10470 HARRY J PARRISH BLVD CloudHQ Manassas Data Center 3 stands in Prince William County, Virginia. The record puts it at 523,151 square feet. It is recorded as under construction. 523,151 sq ft
11. CloudHQ Manassas Hornbaker CloudHQ Manassas Hornbaker stands in Prince William County, Virginia. The record puts it at 247,608 square feet. It is recorded as planned rather than operating. 247,608 sq ft
12. CloudHQ MCC3 10900 AIRMAN AVE CloudHQ MCC3 stands in Prince William County, Virginia. The record puts it at 317,944 square feet. It is recorded as under construction. 317,944 sq ft

#### Manassas, Virginia4

1. CloudHQ MCC1 10880 AIRMAN AVE CloudHQ MCC1 stands in Manassas, Prince William County, Virginia. The record puts it at 460,248 square feet. 460,248 sq ft
2. CloudHQ MCC2 10100 HARRY J PARRISH BLVD CloudHQ MCC2 stands in Manassas, Prince William County, Virginia. The record puts it at 392,565 square feet. 392,565 sq ft
3. MCC Campus MCC Campus stands in Manassas, Prince William County, Virginia. The record puts it at 2,232,875 square feet and 382 MW. 2,232,875 sq ft382 MW
4. MDC Campus 10430 HARRY J PARRISH BLVD MDC Campus stands in Manassas, Prince William County, Virginia. The record puts it at 597,947 square feet and 300 MW. It is recorded as under construction. 597,947 sq ft300 MW

#### Loudoun County, Virginia3

1. CloudHQ LC14 CloudHQ LC14 stands in Loudoun County, Virginia.
2. CloudHQ LC5 CloudHQ LC5 stands in Loudoun County, Virginia.
3. CloudHQ LC8 22190 LOUDOUN COUNTY PKWY CloudHQ LC8 stands in Loudoun County, Virginia. The record puts it at 517,618 square feet. It is recorded as under construction. 517,618 sq ft

#### Ashburn, Virginia2

1. CloudHQ LC1 21955 Loudoun County Parkway CloudHQ LC1 stands in Ashburn, Loudoun County, Virginia. The record puts it at 8,500,000 square feet and 1256 MW. 8,500,000 sq ft1256 MW
2. CloudHQ LC10 22210 LOUDOUN COUNTY PKWY CloudHQ LC10 stands in Ashburn, Loudoun County, Virginia. The record puts it at 616,650 square feet. It is recorded as under construction. 616,650 sq ft

#### Culpeper, Virginia1

1. CLP Campus CLP Campus stands in Culpeper, Virginia. The record puts it at 954,190 square feet and 215 MW. It is recorded as planned rather than operating. 954,190 sq ft215 MW

### CloudHQ data centers in California

[All California data centers ↗](https://savrn.com/data-center-map/california)

CloudHQ has 1 data center in California, in Santa Clara. 1 publishes a floor area and 1 publishes a power figure, shown against each one below.

#### Santa Clara, California1

1. SJC Campus SJC Campus stands in Santa Clara, California. The record puts it at 300,000 square feet and 42 MW. It is recorded as planned rather than operating. 300,000 sq ft42 MW

### CloudHQ data centers in Illinois

[All Illinois data centers ↗](https://savrn.com/data-center-map/illinois)

CloudHQ has 1 data center in Illinois, in Mount Prospect. 1 publishes a floor area and 1 publishes a power figure, shown against each one below.

#### Mount Prospect, Illinois1

1. ORD Campus ORD Campus stands in Mount Prospect, Cook County, Illinois. The record puts it at 1,700,000 square feet and 252 MW. It is recorded as planned rather than operating. 1,700,000 sq ft252 MW

### CloudHQ data centers in Minnesota

[All Minnesota data centers ↗](https://savrn.com/data-center-map/minnesota)

CloudHQ has 1 data center in Minnesota, in Chaska. 1 publishes a floor area and 1 publishes a power figure, shown against each one below.

#### Chaska, Minnesota1

1. MSP Campus MSP Campus stands in Chaska, Carver County, Minnesota. The record puts it at 1,100,000 square feet and 200 MW. It is recorded as planned rather than operating. 1,100,000 sq ft200 MW

### CloudHQ data centers in Texas

[All Texas data centers ↗](https://savrn.com/data-center-map/texas)

CloudHQ has 1 data center in Texas, in San Antonio. 1 publishes a floor area and 1 publishes a power figure, shown against each one below.

#### San Antonio, Texas1

1. SAT Campus SAT Campus stands in San Antonio, Bexar County, Texas. The record puts it at 3,023,300 square feet and 600 MW. It is recorded as planned rather than operating. 3,023,300 sq ft600 MW

No data center matches that filter.

Floor area and power appear only where the operator or a government record publishes them, and are never added into one figure. A building a source describes without naming it is listed as a CloudHQ data center at the city or county it stands in.

Distribution

## Where CloudHQ data centers cluster

CloudHQ's 26 data centers across 5 states. Each state links to its own page, which carries every operator in that state alongside the grid operator and the policy record.

- [Virginia](https://savrn.com/data-center-map/virginia)22
- [California](https://savrn.com/data-center-map/california)1
- [Illinois](https://savrn.com/data-center-map/illinois)1
- [Minnesota](https://savrn.com/data-center-map/minnesota)1
- [Texas](https://savrn.com/data-center-map/texas)1

Questions

## CloudHQ data centers, answered

### How many data centers does CloudHQ have?

This map identifies 26 US data centers operated by CloudHQ, across 5 states and 7 cities. Each one is listed below with the city and county it stands in and the source that names it. This is a count of what primary sources describe in the United States, not a company-reported global total.

### Where are CloudHQ data centers located?

They are grouped below by state and then by city. CloudHQ's largest presence is Virginia with 22 buildings, followed by California (1), Illinois (1), Minnesota (1), Texas (1).

### How big are CloudHQ data centers?

24 of the 26 publish a floor area and 8 publish a power figure. Both are shown against the individual building rather than summed, because a floor area for one hall and an announced campus capacity are not the same measurement.

### Who is CloudHQ?

Develops and operates large data center campuses and leases contracted megawatts of critical IT load to major technology companies. It also does developer_landlord (land acquisition and campus development). On this map it is classified as wholesale. Its own site is at https://www.cloudhq.com.

[US Data Center Map](https://savrn.com/data-center-map) [All operators](https://savrn.com/data-center-map/operator) [Data centers in Virginia](https://savrn.com/data-center-map/virginia)[Data centers in California](https://savrn.com/data-center-map/california)[Data centers in Illinois](https://savrn.com/data-center-map/illinois)[Data centers in Minnesota](https://savrn.com/data-center-map/minnesota)[Data centers in Texas](https://savrn.com/data-center-map/texas)

Counts are what primary sources describe in the United States as of 2026-09-02: the operator's own published facility list, PeeringDB, OpenStreetMap, Wikidata, and county and state building registers. They are not company-reported global totals, and this page never states a figure the record does not carry.

### Sources