# Maryland Data Center Moratorium Tracker

Source: https://savrn.com/data-center-moratorium-tracker/maryland
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Maryland has 3 state-level data-center restrictions in force and 1 active pause. 3 more bills are pending. 32 city and county measures are tracked here, 25 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.

Last updated October 2026 12 state-level measures 32 local measures 43 primary sources

Maryland

MD

In force

12

State-level measures on record, 4 in force

32

City and county measures, 25 in force

43

Primary sources cited on this page

#12

of 50 states with anything on record, by measure count

## State-level measures in Maryland

Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Maryland we can verify against a primary source. Strongest status first.

| Measure | Status | What it does | Source |
| --- | --- | --- | --- |
| Maryland (Veto Override - Impact Study)Maryland: The Maryland General Assembly overrode Governor Moore's veto (Senate 44-0, House 111-24), enacting a law requiring a comprehensive environmental | In force 2025-12 | The Maryland General Assembly overrode Governor Moore's veto (Senate 44-0, House 111-24), enacting a law requiring a comprehensive environmental and economic analysis of data center expansion. The report is due September 2026 and must examine the cumulative impact of data center growth on electricity generation needs, grid capacity, water resource demands, and greenhouse gas emissions. |  |
| HB 1532Maryland: Governor Wes Moore signed HB 1532, the Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act, into law on or about April 15 | In force 2026-04 | Governor Wes Moore signed HB 1532, the Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act, into law on or about April 15, 2026, the day after the General Assembly passed it on the final day of session (April 13/14). The bill's data center provisions create a large-load registry program for grid management, require data centers to pay for transmission, distribution, interconnection, and new capacity costs (preventing cost-shifting to other ratepayers), and incentivize data centers to bring their own clean energy generation with battery backup (effective 2028). Top-tier projects receive 12-month expedited environmental permitting and priority interconnection. Critics including Food & Water Watch criticized provisions they characterized as pro-industry. The law saves Maryland families an estimated $150/year on energy bills. |  |
| Executive Order 01.01.2026.16Responsible Data Center Development framework and review task force | In force 2026-09 | Gov. Wes Moore signed an executive order on Sept. 23, 2026, effective immediately, creating a Maryland Data Center Task Force that reviews every data center of 25 MW or more that seeks any state action, rates each as Aligned, Conditionally Aligned or Not Aligned with a five-part framework, and publishes a monthly public dashboard. It does not pause construction; state permits, approvals and incentives are to be informed by each project's alignment with the framework. |  |
| Executive Order on Data Centers | Paused 2026-09 | An executive order creates a review process for large data centers, adds a public dashboard and a task force, and signals a push to end a key tax exemption. The order comes as the costs of data centers are under scrutiny nationwide. |  |
| SB 596Demand response and storage for large-load customers | Proposed 2026 | Would incentivize large-load customers of 25 MW or more to participate in demand response and onsite power storage programs. Introduced; pending. |  |
| Frederick County (Pippy state moratorium bill)Maryland: Frederick County Delegate Jesse Pippy introduced a bill proposing a data center moratorium specifically for Frederick County while the state conducts | Proposed 2026-03 | Frederick County Delegate Jesse Pippy introduced a bill proposing a data center moratorium specifically for Frederick County while the state conducts a comprehensive study of data center impacts. The legislation responds to growing community concern after the Frederick County Council voted 5-2 to adopt a 2,615-acre 'Critical Digital Infrastructure' overlay zone, which prompted residents to launch a referendum petition campaign that gathered over 22,000 signatures. Maryland counties more broadly have been calling on the data center industry to slow down. Fcdcreferendum.org does NOT display a live signature count; the 22,169 figure was removed. The 21,029 figure was the Board of Elections certified count at ballot qualification (CCAN source). Signature goal was 18,000 by March 15 per the committee's own site. Pippy's state moratorium bill died at MD sine die Apr 13, but the citizen referendum on the data center overlay zone was certified for the Nov 2026 ballot Apr 3 with 21,029 valid signatures (now facing legal challenges). |  |
| New data centers in neighboring Maryland to get additional scrutiny under governor's order | Proposed 2026-09 | Governor Wes Moore is creating a state task force to examine new data center proposals in Maryland and advise local jurisdictions on whether they meet state standards. However, he stated that the final decision on data center projects will remain with local governments. |  |
| HB 905Sales and Use Tax Exemption, Qualified Data Center Personal Property, Eligibility | Failed / vetoed 2024-02 | Maryland HB 905 (2024): Sales and Use Tax Exemption, Qualified Data Center Personal Property, Eligibility. Last action 2024-02-08: Hearing 2/29 at 1:00 p.m. (Ways and Means). |  |
| HB 120Moratorium on construction of new data centers | Failed / vetoed 2026 | Would prohibit new data centers statewide until co-location and generation legislation is enacted; heard in committee Feb 3 but did not advance before sine die. |  |
| HB 560Maryland HB 560 (Del. Palakovich Karr, D - Ways & Means) would repeal the existing exemption from sales/use tax and property tax for personal property used | Failed / vetoed 2026-01 | Maryland HB 560 (Del. Palakovich Karr, D - Ways & Means) would repeal the existing exemption from sales/use tax and property tax for personal property used at qualified data centers in Maryland. Part of a 2026 wave of state-level legislation rethinking data center tax incentives, over 300 state data center bills have been filed across 30+ states in just six weeks of the 2026 session. Maryland separately overrode a Moore veto to mandate a comprehensive data center impact study (due Sept 2026), reflecting growing legislative skepticism of data center subsidies as energy costs rise. HB 560 (repeal data center tax exemptions) never advanced past its Feb 12 Ways & Means hearing; MD adjourned sine die Apr 13, 2026. |  |
| HB 1595Maryland HB1595 authorizes Baltimore City and county governing bodies to establish a special personal property tax subclass for qualified data centers and set | Failed / vetoed 2026-02 | Maryland HB1595 authorizes Baltimore City and county governing bodies to establish a special personal property tax subclass for qualified data centers and set a rate up to 2.5x the standard real property tax rate. The bill emerged from Frederick County's push for local taxing authority over data center equipment after the county discovered data centers' vast server farms were taxed at the same rate as other business personal property. The legislation was introduced February 15, 2026 and referred to the Ways and Means Committee. HB 1595/SB 427 (local property-tax authority over data centers) did not pass; MD sine die Apr 13, 2026. |  |
| HB 1411Maryland: In Maryland, HB 1411 would require large-scale data center operators to report environmental and resource impacts publicly. | Failed / vetoed 2026-03 | In Maryland, HB 1411 would require large-scale data center operators to report environmental and resource impacts publicly. Mandates jurisdictions with 10,000+ residents create formal data center management plans by 2027. Includes $1,000/MW payment into EmPOWER program for low-income assistance. HB 1411 did not pass the 2026 Maryland session (sine die April 13, 2026). The community's stated objective was to mandate public environmental reporting from data centers (HB 1411). |  |

## City and county moratoria in Maryland

Most of the movement is local, where a building pause or permit halt does not need a legislative session. 32 tracked measures in Maryland, each with its source.

Baltimore City

2026-05

In force

One-year moratorium on data centers of 10 MW or more

The City Council passed a one-year moratorium in early May 2026 on construction of data centers projected to use 10 MW or more of electricity annually, and Mayor Brandon Scott signed it. Introduced by Council President Zeke Cohen and sponsored by 12 of the 15 members, it also requires a nine-month study of impacts on energy infrastructure, ratepayers, the economy, and environmental and public health.

Baltimore County

2026-09

In force

Freeze on data center permits pending planning study

The County Council, which adopted a data center moratorium in February 2026, voted unanimously on September 22, 2026, to extend it through December 31, 2027.

Calvert County

2026-08

In force

Six-month data center moratorium

The Board of County Commissioners voted unanimously on Aug. 18, 2026 for a six-month moratorium on site plan approvals for data center projects, effective Aug. 28, 2026.

Caroline County

2026-07

In force

One-year moratorium on new data centers

County commissioners voted in July 2026 to establish a one-year moratorium on new data centers in the county's unincorporated areas while officials research impacts and consider regulations.

Carroll County

2026-02

In force

One-year data center moratorium

The Board of County Commissioners approved a one-year moratorium on data centers on Feb. 19, 2026 to allow study of economic and environmental impacts and drafting of regulations. Commissioners have since directed staff to continue work on zoning rules before the deferral expires, weighing water limits and electricity costs.

Chesapeake Beach

2026-01

In force

Local moratorium on data centers with no end date

Town Council voted 4-0 to pass ordinance prohibiting data centers in all zones. Calvert County waterfront municipality acted preemptively, no known developer interest. Concerns over environmental impact and tourism economy. The measure has no end date by design.

Dickerson (Montgomery County)

2026-02

In force

Dickerson (Montgomery County) data center moratorium

California-based Atmosphere Data Centers plans a $2 billion, 300MW data center complex on 170 acres at the site of a decommissioned coal-fired power plant in Dickerson, Maryland,. Atmosphere filed for water withdrawal and discharge permits from the Potomac River upstream from the WSSC water intake that serves millions in the DC metro area. The Sugarloaf Citizens Association and a coalition of 20+ environmental organizations are calling for a moratorium on data center approvals until the County Council approves regulations. County Executive Elrich said the developers 'have a right to go forward' in the planning process, though he has floated a six-month moratorium. The data center debate has fueled election-year tensions.

Dorchester County

2026-06

In force

Local moratorium on data centers for a stated term

1-year moratorium. Part of the Eastern Shore moratorium cluster. The measure has a stated duration whose end date is not recorded.

Federalsburg

2026-08

In force

City moratorium on data centers through August 4, 2029

Town Council unanimously passed a 3-year moratorium on data center development (5-0); also introduced ordinance to ban data centers entirely. The measure runs to August 4, 2029.

Frederick County

2026-07

In force

Data center permitting pause through end of 2026

County Executive Jessica Fitzwater signed an order July 1, 2026 pausing new data center permitting and approvals through year-end; it does not affect previously approved projects.

Harford County

2026-06

In force

Permanent ban on data centers in all zoning districts

Bill 26-011, proposed by County Executive Bob Cassilly, passed the County Council unanimously after a public hearing and was signed on June 10, 2026. It removes data centers as a permitted use in every zoning district, making Harford the first Maryland county to adopt an outright permanent ban. The law's drafting has drawn legal threats and supporters have acknowledged it may face a court challenge.

Howard County

2026-06

In force

S.M.A.R.T. Siting Act moratorium through Nov. 2, 2027

The County Council voted unanimously in early June 2026 to suspend new data center development through Nov. 2, 2027 and to create a task force that has one year to report findings and recommendations. Existing facilities and projects already approved for construction are not affected.

Howard County (temporary data center moratorium through Nov 2027), MD

2026-06

In force

Howard County (temporary data center moratorium through Nov 2027), MD data center moratorium

The Howard County Council passed CB31-2026, a temporary moratorium pausing data center development through November 2027 to modernize the county's roughly 1993-era zoning regulations covering energy, water, and siting. Sponsored by Councilmember Christiana Rigby.

Hurlock

2026-09

In force

Three-year moratorium on AI data center development

The Hurlock Town Council (Dorchester County) voted for a three-year moratorium on AI data center development, effective immediately, as reported September 10, 2026. Council President Russell Murphy said the town will watch what Dorchester County decides for the long term.

Montgomery County

2026-06

In force

18-month data center moratorium

County Executive Marc Elrich's initial six-month pause (June 2026) was extended to an 18-month moratorium on data center permits.

Montgomery County (Executive Elrich 6-month data center moratorium EO), MD

2026-06

In force

Montgomery County (Executive Elrich 6-month data center moratorium EO), MD data center moratorium

On June 13, 2026 Montgomery County Executive Marc Elrich signed an executive order imposing a six-month moratorium on new data center permits, directing the Department of Permitting Services to stop accepting or processing applications, effective immediately, including the prospective data center at the decommissioned Dickerson power plant site. Elrich stressed 'it's not a ban' but a window to set clear rules.

Prince George's County

2026-07

In force

Two-year hyperscale data center moratorium

The County Council passed a two-year moratorium on hyperscale data center development on July 8, 2026 to draft comprehensive siting legislation, following opposition to a Landover Mall campus plan.

Prince George's County (Landover)

2025-09

In force

Prince George's County (Landover) data center moratorium

The Qualified Data Center Task Force released a 460+ page report with 14 recommendations. Key proposals include ending 'permitted-by-right' approvals for data centers, requiring special-exception or planned-development processes with community hearings, tightening zoning restrictions, protecting environmentally sensitive areas, and increasing buffer distances from homes.

Prince George's County Council (2-year data center moratorium)

2026-07

In force

Prince George's County Council (2-year data center moratorium) data center moratorium

County Council approved a 2-year pause on new data center development applications, giving officials time to develop a zoning framework for where/how data centers can be built; the pause can end early if that framework is adopted sooner. One clear 'no' vote (Councilmember Tim Adams, objecting to the 2-year length) plus some abstentions. The moratorium grew out of the county's Qualified Data Center Task Force, formed after a proposed hyperscale conversion of the Landover Mall site drew protests. Prince George's is now Maryland's most restrictive data-center jurisdiction, joining Montgomery, Frederick, and Baltimore counties in pausing development.

Queen Anne's County

2026-06

In force

12-month moratorium on data center applications

The County Commissioners approved a temporary 12-month moratorium on the application, processing and approval of data centers, effective immediately on adoption on June 4, 2026, to give the county time to evaluate impacts and develop policies, performance standards and zoning regulations. It may be modified or extended by the commissioners.

Ridgely

2026-08

In force

Local moratorium on data centers through August 31, 2027

1-year moratorium; part of an Eastern Shore wave of local action after a controversial Federalsburg data center proposal. The measure runs to August 31, 2027.

Talbot County

2026-09

In force

Twelve-month moratorium on data center applications

A one-year data center moratorium was introduced before the Talbot County Council with a public hearing set for Sept. 8, 2026. At its Sept. 8, 2026 meeting the council unanimously approved a 12-month moratorium on new data center applications while the county considers regulations.

Washington County

2026-06

In force

12-month data center moratorium

Commissioners voted 4-1 on June 30, 2026 for a yearlong moratorium halting acceptance, review and approval of new data center applications after residents raised water and infrastructure concerns.

Wicomico County

2026-08

In force

County moratorium on data centers through August 6, 2027

County Council unanimously imposed a 1-year moratorium on construction of data centers. The measure runs to August 6, 2027.

Worcester County

2026-01

In force

County moratorium on data centers through July 21, 2027

Resolution No. 26-18 placing a 12-month moratorium on permits for data centers and cable landing stations. The measure runs to July 21, 2027.

Anne Arundel

2026-09

Paused

Anne Arundel Steps Back From Ban on Data Center Development

The Anne Arundel County government paused a proposed ban on data center development. This action was taken on 2026-09-25.

Easton

2026-08

Proposed

Proposed one-year data center moratorium

The Easton Town Council on August 3, 2026 instructed the town's legal team to draft a one-year moratorium on data centers. The moratorium would have to be voted on by the council once drafted.

Frederick

2026-10

Proposed

Two-year moratorium on data center legislation amendments

Frederick City Council members and residents debated a proposed two-year moratorium on data center-related amendments to the land management code, introduced by Council Member Derek Shackelford; the ordinance would prevent the city from moving forward on such amendments and includes a clause allowing extensions as needed.

Harford County Executive Bob Cassilly (proposed legislation to permanently ban data centers countywide; public hearing May 18, vote June 1), MD

2026-05

Proposed

Harford County Executive Bob Cassilly (proposed legislation to permanently ban data centers countywide; public hearing May 18, vote June 1), MD data center moratorium (proposed)

Harford County Executive Bob Cassilly proposed legislation to permanently ban data centers countywide, going beyond Council Member Bennett's 90-day moratorium (Bill 26-005). Public hearing set May 18; County Council vote scheduled June 1, 2026. May 19, 2026: County Council withdrew the competing 180-day moratorium (Bill 26-005) and voted unanimously to convert Cassilly's permanent ban (Bill 26-011) into emergency legislation. New public hearing June 9; if approved, ban takes effect immediately on signature.

Pocomoke City

2026-09

Proposed

Proposed one-year data center moratorium

The Pocomoke City Mayor and Council (Worcester County) introduced a proposed moratorium on data centers at a September 8, 2026 meeting. The pause would last about one year, with the ability to modify or extend it, and the planning and zoning department would not accept or process data center applications while it is in effect. No adoption vote is reported.

Salisbury

Proposed

Proposed local moratorium on data centers

Planning Commission recommended 1-year moratorium on data center development (Aug 14, 2026); City Council vote pending. Mayor supports the pause. The measure has no documented term.

Somerset County

2026-01

Proposed

Proposed county moratorium on data centers

One-year moratorium on data center siting recommended to county commissioners; outcome not confirmed. The measure has no documented term.

## Would you like the weekly update?

Every week we re-verify every state and local measure on this map and publish what changed. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. [Privacy](https://savrn.com/privacy) ·

You're on the list. The next weekly update will land in your inbox when it publishes.

You are subscribed. [Read the latest tracker](https://savrn.com/data-center-moratorium-tracker)

### Where Maryland stands

Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Maryland accounts for 12 of the state-level measures and 32 of the local ones.

By total measures on record it is #12 of the 50 states and DC carrying any tracked action, and #14 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.

## Sources for Maryland

43 citations behind the entries above. Each opens in a new tab.

- Statewide · Maryland (Veto Override - Impact Study) — Maryland: The Maryland General Assembly overrode Governor Moore's veto (Senate 44-0, House 111-24), enacting a law requiring a comprehensive environmental (In force, 2025-12) [marylandmatters.org →](https://marylandmatters.org/2025/12/16/general-assembly-climate-veto-overrides/)
- Statewide · HB 1532 — Maryland: Governor Wes Moore signed HB 1532, the Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) Act, into law on or about April 15 (In force, 2026-04) [governor.maryland.gov →](https://governor.maryland.gov/news/press/pages/Governor-Moore,-Senate-President-Ferguson,-and-House-Speaker-Pe%C3%B1a-Melnyk-Announce-Agreement-to-Pass-Utility-RELIEF-Act.aspx)
- Statewide · Executive Order 01.01.2026.16 — Responsible Data Center Development framework and review task force (In force, 2026-09) [governor.maryland.gov →](https://governor.maryland.gov/media/1083)
- Statewide — Executive Order on Data Centers (Paused, 2026-09) [govtech.com →](https://www.govtech.com/policy/maryland-governor-draws-new-boundaries-for-data-centers)
- Statewide · SB 596 — Demand response and storage for large-load customers (Proposed, 2026) [afslaw.com →](https://www.afslaw.com/perspectives/alerts/state-regulation-data-centers-2026-shifting-landscape)
- Statewide · Frederick County (Pippy state moratorium bill) — Maryland: Frederick County Delegate Jesse Pippy introduced a bill proposing a data center moratorium specifically for Frederick County while the state conducts (Proposed, 2026-03) [fredericknewspost.com →](https://www.fredericknewspost.com/news/continuing_coverage/data_centers/pippy-proposes-data-center-moratorium-bill-for-frederick-county/article_a31f3fc5-5c63-5255-9dae-2077932ea181.html)
- Statewide — New data centers in neighboring Maryland to get additional scrutiny under governor's order (Proposed, 2026-09) [penncapital-star.com →](https://penncapital-star.com/2026/09/25/repub/new-data-centers-in-neighboring-maryland-to-get-additional-scrutiny-under-governors-order/)
- Statewide · HB 905 — Sales and Use Tax Exemption, Qualified Data Center Personal Property, Eligibility (Failed / vetoed, 2024-02) [mgaleg.maryland.gov →](http://mgaleg.maryland.gov/mgawebsite/Legislation/Details/hb0905?ys=2024RS&search=True)
- Statewide · HB 120 — Moratorium on construction of new data centers (Failed / vetoed, 2026) [mgaleg.maryland.gov →](https://mgaleg.maryland.gov/mgawebsite/Legislation/Details/hb0120)
- Statewide · HB 560 — Maryland HB 560 (Del. Palakovich Karr, D - Ways & Means) would repeal the existing exemption from sales/use tax and property tax for personal property used (Failed / vetoed, 2026-01) [stateline.org →](https://stateline.org/2026/02/24/data-center-tax-breaks-are-on-the-chopping-block-in-some-states/)
- Statewide · HB 1595 — Maryland HB1595 authorizes Baltimore City and county governing bodies to establish a special personal property tax subclass for qualified data centers and set (Failed / vetoed, 2026-02) [mgaleg.maryland.gov →](https://mgaleg.maryland.gov/2026RS/bills/hb/hb1595f.pdf)
- Statewide · HB 1411 — Maryland: In Maryland, HB 1411 would require large-scale data center operators to report environmental and resource impacts publicly. (Failed / vetoed, 2026-03) [legiscan.com →](https://legiscan.com/MD/bill/HB1411/2026)
- Baltimore City — One-year moratorium on data centers of 10 MW or more (In force, 2026-05) [baltimorefishbowl.com →](https://baltimorefishbowl.com/stories/baltimore-city-council-passes-one-year-moratorium-on-data-centers/)
- Baltimore County — Freeze on data center permits pending planning study (In force, 2026-09) [wypr.org →](https://www.wypr.org/wypr-news/2026-09-22/data-center-moratorium-extended-in-baltimore-county)
- Calvert County — Six-month data center moratorium (In force, 2026-08) [calvertcountymd.gov →](https://www.calvertcountymd.gov/m/newsflash/home/detail/3201)
- Caroline County — One-year moratorium on new data centers (In force, 2026-07) [wboc.com →](https://www.wboc.com/news/caroline-county-commissioners-approve-a-one-year-moratorium-on-new-data-centers/video_2c049da6-3254-5d23-9740-21af1935fc97.html)
- Carroll County — One-year data center moratorium (In force, 2026-02) [baltimoresun.com →](https://www.baltimoresun.com/2026/05/08/carroll-data-centers-commissioners-research/)
- Chesapeake Beach — Local moratorium on data centers with no end date (In force, 2026-01) [southernmarylandchronicle.com →](https://southernmarylandchronicle.com/2026/08/26/data-centers-face-bans-moratoriums-across-bay-region/)
- Dickerson (Montgomery County) — Dickerson (Montgomery County) data center moratorium (In force, 2026-02) [bethesdamagazine.com →](https://bethesdamagazine.com/2026/02/25/dickerson-data-center-developers-have-right-to-go-forward-elrich-says/)
- Dorchester County — Local moratorium on data centers for a stated term (In force, 2026-06) [stardem.com →](http://www.stardem.com/news/data_centers/dorchester-county-council-hopes-to-get-ahead-on-regulating-data-center-proposals/article_af7ff49c-f072-4e08-85e9-1cd10bf1ca33.html)
- Federalsburg — City moratorium on data centers through August 4, 2029 (In force, 2026-08) [stardem.com →](http://www.stardem.com/news/caroline/federalsburg-approves-3-year-moratorium-on-data-centers/article_4a7def84-f11b-4da0-b5c5-c3743796beec.html)
- Frederick County and 1 other locality — 2 separate measures, cited together (In force, 2026-06 to 2026-07) [southernmarylandchronicle.com →](https://southernmarylandchronicle.com/2026/08/11/counties-scramble-to-respond-to-data-centers-setting-moratoriums-a-ban/)
- Harford County — Permanent ban on data centers in all zoning districts (In force, 2026-06) [harfordcountymd.gov →](https://www.harfordcountymd.gov/m/newsflash/Home/Detail/1700)
- Howard County — S.M.A.R.T. Siting Act moratorium through Nov. 2, 2027 (In force, 2026-06) [thebanner.com →](https://www.thebanner.com/politics-power/local-government/howard-county-data-center-development-suspended-7VP3IZDJBZHKLK6MF6YR2SIVR4/)
- Howard County (temporary data center moratorium through Nov 2027), MD — Howard County (temporary data center moratorium through Nov 2027), MD data center moratorium (In force, 2026-06) [foxbaltimore.com →](https://foxbaltimore.com/news/local/howard-county-council-temporary-pause-data-center-development-energy-water-zoning)
- Hurlock — Three-year moratorium on AI data center development (In force, 2026-09) [wmdt.com →](https://www.wmdt.com/2026/09/hurlock-discusses-moratorium-on-data-centers/)
- Montgomery County (Executive Elrich 6-month data center moratorium EO), MD — Montgomery County (Executive Elrich 6-month data center moratorium EO), MD data center moratorium (In force, 2026-06) [montgomerycountymd.gov →](https://www.montgomerycountymd.gov/news/montgomery-update-county-executive-signs-data-center-moratorium-executive-order-preserving-affordable-housing-upcoming-red-line-disruptions)
- Prince George's County — Two-year hyperscale data center moratorium (In force, 2026-07) [marylandmatters.org →](https://marylandmatters.org/2026/07/08/prince-georges-county-extends-pause-on-hyperscale-data-center-development/)
- Prince George's County (Landover) — Prince George's County (Landover) data center moratorium (In force, 2025-09) [foxbaltimore.com →](https://foxbaltimore.com/news/local/prince-georges-county-data-centers-zoning-electric-grid-energy-maryland)
- Prince George's County Council (2-year data center moratorium) — Prince George's County Council (2-year data center moratorium) data center moratorium (In force, 2026-07) [wtop.com →](https://wtop.com/prince-georges-county/2026/07/prince-georges-co-extends-pause-on-hyperscale-data-center-development/)
- Queen Anne's County — 12-month moratorium on data center applications (In force, 2026-06) [qac.org →](https://qac.org/m/newsflash/home/detail/3243)
- Ridgely — Local moratorium on data centers through August 31, 2027 (In force, 2026-08) [stardem.com →](http://www.stardem.com/news/caroline/ridgely-passes-one-year-moratorium-on-data-centers/article_97ec1ae7-4a05-4e9e-9551-4bc8b650043a.html)
- Talbot County — Twelve-month moratorium on data center applications (In force, 2026-09) [talbotspy.org →](https://talbotspy.org/2026/09/09/talbot-county-council-highlights-speed-cameras-data-centers-and-strs/)
- Washington County — 12-month data center moratorium (In force, 2026-06) [thedailyrecord.com →](https://thedailyrecord.com/2026/07/01/washington-county-approves-yearlong-data-center-moratorium/)
- Wicomico County — County moratorium on data centers through August 6, 2027 (In force, 2026-08) [baltimoresun.com →](https://www.baltimoresun.com/2026/08/06/wicomico-federalsburg-data-center-moratoriums/)
- Worcester County — County moratorium on data centers through July 21, 2027 (In force, 2026-01) [worcestermd.gov →](https://worcestermd.gov/news/worcester-county-enacts-moratorium-data-centers-and-cable-landing-stations-while-new)
- Anne Arundel — Anne Arundel Steps Back From Ban on Data Center Development (Paused, 2026-09) [news.google.com →](https://news.google.com/rss/articles/CBMinwFBVV95cUxOYXBKemN1VFp3MlJJTlNyYzhaWldZWHQ0MU1EX1Bpc1NJNHZrZXBNN2h2ZGJDMzdQRjllc1ZjU3RmNVUzaDM1ZHY3eldOZEhLeXdnb1lVdW9HUUx4NzBqMlNzQ2M0OTlqYi1pRi1CUUZnZlQxNURyQXY0bl9Ycll5bVBray1RNHRTc2puS2lYd3kxUGhhblJPYndCQWh5VUU)
- Easton — Proposed one-year data center moratorium (Proposed, 2026-08) [stardem.com →](https://www.stardem.com/news/local_news/easton-to-draft-one-year-moratorium-on-data-centers/article_30cf5340-3cd7-4ffd-84fe-27033e7105a8.html)
- Frederick — Two-year moratorium on data center legislation amendments (Proposed, 2026-10) [yahoo.com →](https://www.yahoo.com/news/politics/articles/city-residents-weigh-length-data-035900068.html)
- Harford County Executive Bob Cassilly (proposed legislation to permanently ban data centers countywide; public hearing May 18, vote June 1), MD — Harford County Executive Bob Cassilly (proposed legislation to permanently ban data centers countywide; public hearing May 18, vote June 1), MD data center moratorium (proposed) (Proposed, 2026-05) [baltimoresun.com →](https://www.baltimoresun.com/2026/05/07/cassilly-proposes-permanent-data-center-ban/)
- Pocomoke City — Proposed one-year data center moratorium (Proposed, 2026-09) [wmdt.com →](https://www.wmdt.com/2026/09/pocomoke-city-introduced-potential-moratorium-on-data-centers/)
- Salisbury — Proposed local moratorium on data centers (Proposed, ) [wboc.com →](https://www.wboc.com/news/salisbury-planning-commission-recommends-one-year-data-center-moratorium/article_2778f1dd-058a-44d5-95af-5d90e9a09207.html)
- Somerset County — Proposed county moratorium on data centers (Proposed, 2026-01) [baytobaynews.com →](https://baytobaynews.com/stories/moratorium-on-data-centers-recommended-for-somerset-county,333833)

[See all 1419 sources across every state →](https://savrn.com/data-center-moratorium-tracker/sources)

## What does bind large loads in Maryland

A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Maryland sits in 1 footprint.

PJMDominant

Large loads must bring new capacity or be curtailed first. Filed, pending at FERC.

Entire state in PJM (BGE, Pepco, Delmarva, Potomac Edison).

[See the full Data Center Grid Operator Watchlist →](https://savrn.com/data-center-grid-operator-watchlist)

## States next door

4 of the 5 states bordering Maryland have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.

[Pennsylvania 64](https://savrn.com/data-center-moratorium-tracker/pennsylvania) [Virginia 45](https://savrn.com/data-center-moratorium-tracker/virginia) [Delaware 8](https://savrn.com/data-center-moratorium-tracker/delaware) [West Virginia 2](https://savrn.com/data-center-moratorium-tracker/west-virginia) [Washington, DC none](https://savrn.com/data-center-moratorium-tracker/washington-dc)

## Data centers in Maryland

The US Data Center Map identifies 48 facilities run by 20 operators in Maryland, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.

[Open the Maryland data center map →](https://savrn.com/data-center-map/maryland) · [The US Data Center Map →](https://savrn.com/data-center-map)

[Alabama](https://savrn.com/data-center-moratorium-tracker/alabama) [Alaska](https://savrn.com/data-center-moratorium-tracker/alaska) [Arizona](https://savrn.com/data-center-moratorium-tracker/arizona) [Arkansas](https://savrn.com/data-center-moratorium-tracker/arkansas) [California](https://savrn.com/data-center-moratorium-tracker/california) [Colorado](https://savrn.com/data-center-moratorium-tracker/colorado) [Connecticut](https://savrn.com/data-center-moratorium-tracker/connecticut) [Delaware](https://savrn.com/data-center-moratorium-tracker/delaware) [Florida](https://savrn.com/data-center-moratorium-tracker/florida) [Georgia](https://savrn.com/data-center-moratorium-tracker/georgia) [Hawaii](https://savrn.com/data-center-moratorium-tracker/hawaii) [Idaho](https://savrn.com/data-center-moratorium-tracker/idaho) [Illinois](https://savrn.com/data-center-moratorium-tracker/illinois) [Indiana](https://savrn.com/data-center-moratorium-tracker/indiana) [Iowa](https://savrn.com/data-center-moratorium-tracker/iowa) [Kansas](https://savrn.com/data-center-moratorium-tracker/kansas) [Kentucky](https://savrn.com/data-center-moratorium-tracker/kentucky) [Louisiana](https://savrn.com/data-center-moratorium-tracker/louisiana) [Maine](https://savrn.com/data-center-moratorium-tracker/maine) [Maryland](https://savrn.com/data-center-moratorium-tracker/maryland) [Massachusetts](https://savrn.com/data-center-moratorium-tracker/massachusetts) [Michigan](https://savrn.com/data-center-moratorium-tracker/michigan) [Minnesota](https://savrn.com/data-center-moratorium-tracker/minnesota) [Mississippi](https://savrn.com/data-center-moratorium-tracker/mississippi) [Missouri](https://savrn.com/data-center-moratorium-tracker/missouri) [Montana](https://savrn.com/data-center-moratorium-tracker/montana) [Nebraska](https://savrn.com/data-center-moratorium-tracker/nebraska) [Nevada](https://savrn.com/data-center-moratorium-tracker/nevada) [New Hampshire](https://savrn.com/data-center-moratorium-tracker/new-hampshire) [New Jersey](https://savrn.com/data-center-moratorium-tracker/new-jersey) [New Mexico](https://savrn.com/data-center-moratorium-tracker/new-mexico) [New York](https://savrn.com/data-center-moratorium-tracker/new-york) [North Carolina](https://savrn.com/data-center-moratorium-tracker/north-carolina) [North Dakota](https://savrn.com/data-center-moratorium-tracker/north-dakota) [Ohio](https://savrn.com/data-center-moratorium-tracker/ohio) [Oklahoma](https://savrn.com/data-center-moratorium-tracker/oklahoma) [Oregon](https://savrn.com/data-center-moratorium-tracker/oregon) [Pennsylvania](https://savrn.com/data-center-moratorium-tracker/pennsylvania) [Rhode Island](https://savrn.com/data-center-moratorium-tracker/rhode-island) [South Carolina](https://savrn.com/data-center-moratorium-tracker/south-carolina) [South Dakota](https://savrn.com/data-center-moratorium-tracker/south-dakota) [Tennessee](https://savrn.com/data-center-moratorium-tracker/tennessee) [Texas](https://savrn.com/data-center-moratorium-tracker/texas) [Utah](https://savrn.com/data-center-moratorium-tracker/utah) [Vermont](https://savrn.com/data-center-moratorium-tracker/vermont) [Virginia](https://savrn.com/data-center-moratorium-tracker/virginia) [Washington](https://savrn.com/data-center-moratorium-tracker/washington) [Washington, DC](https://savrn.com/data-center-moratorium-tracker/washington-dc) [West Virginia](https://savrn.com/data-center-moratorium-tracker/west-virginia) [Wisconsin](https://savrn.com/data-center-moratorium-tracker/wisconsin) [Wyoming](https://savrn.com/data-center-moratorium-tracker/wyoming)

### How to read this page

In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.

This page is generated from the same primary-sourced dataset as the national [U.S. Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker) and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Maryland? [Tell us](https://savrn.com/contact).

Companion references: the [Data Center Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the interconnection and curtailment rules that bind here, the [Data Center Water Tracker](https://savrn.com/data-center-water-tracker) for water mandates, and the [Data Center Delay Watchlist](https://savrn.com/data-center-delay-tracker) for named projects.

## Why Maryland is pushing back

The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.

[See how a SAVRN factory works](https://savrn.com/system) [Talk to us about a Maryland site](https://savrn.com/engage)
