# Mississippi Data Center Moratorium Tracker

Source: https://savrn.com/data-center-moratorium-tracker/mississippi
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

All 4 state-level data-center measures on record in Mississippi have failed or been vetoed. One city or county measure is tracked here and it is in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.

Last updated October 2026 4 state-level measures 1 local measure 5 primary sources

Mississippi

MS

Failed / vetoed

4

State-level measures on record

1

City and county measure, 1 in force

5

Primary sources cited on this page

#47

of 50 states with anything on record, by measure count

## State-level measures in Mississippi

Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Mississippi we can verify against a primary source. Strongest status first.

| Measure | Status | What it does | Source |
| --- | --- | --- | --- |
| HB 1429Tax exemptions; revise the requirements that a data center must meet to be eligible for. | Failed / vetoed 2019-03 | Mississippi HB 1429 (2019): Tax exemptions; revise the requirements that a data center must meet to be eligible for.. Last action 2019-03-19: Died In Committee. |  |
| SB 3106Tax exemptions; revise qualifying standards for business enterprises operating data centers. | Failed / vetoed 2024-04 | Mississippi SB 3106 (2024): Tax exemptions; revise qualifying standards for business enterprises operating data centers.. Last action 2024-04-16: Died In Committee. |  |
| HB 1239Data center enterprises; revise certain definitions and other provisions relating to tax exemptions. | Failed / vetoed 2025-03 | Mississippi HB 1239 (2025): Data center enterprises; revise certain definitions and other provisions relating to tax exemptions.. Last action 2025-03-29: Died In Conference. |  |
| HB 1635Mississippi: In Mississippi, HB 1635 was introduced to redirect 80% of local ad-valorem taxes collected above $1B from large projects (including data centers) | Failed / vetoed 2026-02 | In Mississippi, HB 1635 was introduced to redirect 80% of local ad-valorem taxes collected above $1B from large projects (including data centers) into a new state infrastructure and economic development fund, with 20% to local government and schools. Madison County Economic Development Authority director Joey Deason objected to the measure, warning it would slash his county's projected $70M/year in new Amazon data center tax revenue to just $20M/year. The author did not bring the bill to committee vote. |  |

## City and county moratoria in Mississippi

Most of the movement is local, where a building pause or permit halt does not need a legislative session. 1 tracked measure in Mississippi, each with its source.

City of Jackson

2026-07

In force

183-day data center moratorium

City Council voted 5-2 on July 14, 2026 for a 183-day citywide data center moratorium (candidate list had this as pending; it passed), the first in Mississippi; it took effect 30 days later.

## Would you like the weekly update?

Every week we re-verify every state and local measure on this map and publish what changed. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. [Privacy](https://savrn.com/privacy) ·

You're on the list. The next weekly update will land in your inbox when it publishes.

You are subscribed. [Read the latest tracker](https://savrn.com/data-center-moratorium-tracker)

### Where Mississippi stands

Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Mississippi accounts for 4 of the state-level measures and 1 of the local ones.

By total measures on record it is #47 of the 50 states and DC carrying any tracked action, and #49 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.

## Sources for Mississippi

5 citations behind the entries above. Each opens in a new tab.

- Statewide · HB 1429 — Tax exemptions; revise the requirements that a data center must meet to be eligible for. (Failed / vetoed, 2019-03) [billstatus.ls.state.ms.us →](http://billstatus.ls.state.ms.us/documents/2019/pdf/HB/1400-1499/HB1429PS.pdf)
- Statewide · SB 3106 — Tax exemptions; revise qualifying standards for business enterprises operating data centers. (Failed / vetoed, 2024-04) [billstatus.ls.state.ms.us →](http://billstatus.ls.state.ms.us/documents/2024/pdf/SB/3100-3199/SB3106PS.pdf)
- Statewide · HB 1239 — Data center enterprises; revise certain definitions and other provisions relating to tax exemptions. (Failed / vetoed, 2025-03) [billstatus.ls.state.ms.us →](http://billstatus.ls.state.ms.us/documents/2025/pdf/HB/1200-1299/HB1239PS.pdf)
- Statewide · HB 1635 — Mississippi: In Mississippi, HB 1635 was introduced to redirect 80% of local ad-valorem taxes collected above $1B from large projects (including data centers) (Failed / vetoed, 2026-02) [legiscan.com →](https://legiscan.com/MS/bill/HB1635/2026)
- City of Jackson — 183-day data center moratorium (In force, 2026-07) [mississippitoday.org →](https://mississippitoday.org/2026/07/14/jackson-data-center-moratorium/)

[See all 1419 sources across every state →](https://savrn.com/data-center-moratorium-tracker/sources)

## What does bind large loads in Mississippi

A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Mississippi sits in 2 footprints.

MISODominant

Faster parallel studies and a co-located generation fast track, not a pause.

Non-RTO utility territory

No RTO or ISO market here. Interconnection terms, study queues and curtailment rights for a large load are set by the individual utility and its state commission.

Entergy Mississippi (Jackson, central/west) in MISO; TVA serves northeast MS and Mississippi Power (Southern Co) serves the Gulf Coast, both non-RTO.

[See the full Data Center Grid Operator Watchlist →](https://savrn.com/data-center-grid-operator-watchlist)

## States next door

4 of the 4 states bordering Mississippi have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.

[Tennessee 42](https://savrn.com/data-center-moratorium-tracker/tennessee) [Alabama 21](https://savrn.com/data-center-moratorium-tracker/alabama) [Arkansas 17](https://savrn.com/data-center-moratorium-tracker/arkansas) [Louisiana 6](https://savrn.com/data-center-moratorium-tracker/louisiana)

## Data centers in Mississippi

The US Data Center Map identifies 14 facilities run by 6 operators in Mississippi, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.

[Open the Mississippi data center map →](https://savrn.com/data-center-map/mississippi) · [The US Data Center Map →](https://savrn.com/data-center-map)

[Alabama](https://savrn.com/data-center-moratorium-tracker/alabama) [Alaska](https://savrn.com/data-center-moratorium-tracker/alaska) [Arizona](https://savrn.com/data-center-moratorium-tracker/arizona) [Arkansas](https://savrn.com/data-center-moratorium-tracker/arkansas) [California](https://savrn.com/data-center-moratorium-tracker/california) [Colorado](https://savrn.com/data-center-moratorium-tracker/colorado) [Connecticut](https://savrn.com/data-center-moratorium-tracker/connecticut) [Delaware](https://savrn.com/data-center-moratorium-tracker/delaware) [Florida](https://savrn.com/data-center-moratorium-tracker/florida) [Georgia](https://savrn.com/data-center-moratorium-tracker/georgia) [Hawaii](https://savrn.com/data-center-moratorium-tracker/hawaii) [Idaho](https://savrn.com/data-center-moratorium-tracker/idaho) [Illinois](https://savrn.com/data-center-moratorium-tracker/illinois) [Indiana](https://savrn.com/data-center-moratorium-tracker/indiana) [Iowa](https://savrn.com/data-center-moratorium-tracker/iowa) [Kansas](https://savrn.com/data-center-moratorium-tracker/kansas) [Kentucky](https://savrn.com/data-center-moratorium-tracker/kentucky) [Louisiana](https://savrn.com/data-center-moratorium-tracker/louisiana) [Maine](https://savrn.com/data-center-moratorium-tracker/maine) [Maryland](https://savrn.com/data-center-moratorium-tracker/maryland) [Massachusetts](https://savrn.com/data-center-moratorium-tracker/massachusetts) [Michigan](https://savrn.com/data-center-moratorium-tracker/michigan) [Minnesota](https://savrn.com/data-center-moratorium-tracker/minnesota) [Mississippi](https://savrn.com/data-center-moratorium-tracker/mississippi) [Missouri](https://savrn.com/data-center-moratorium-tracker/missouri) [Montana](https://savrn.com/data-center-moratorium-tracker/montana) [Nebraska](https://savrn.com/data-center-moratorium-tracker/nebraska) [Nevada](https://savrn.com/data-center-moratorium-tracker/nevada) [New Hampshire](https://savrn.com/data-center-moratorium-tracker/new-hampshire) [New Jersey](https://savrn.com/data-center-moratorium-tracker/new-jersey) [New Mexico](https://savrn.com/data-center-moratorium-tracker/new-mexico) [New York](https://savrn.com/data-center-moratorium-tracker/new-york) [North Carolina](https://savrn.com/data-center-moratorium-tracker/north-carolina) [North Dakota](https://savrn.com/data-center-moratorium-tracker/north-dakota) [Ohio](https://savrn.com/data-center-moratorium-tracker/ohio) [Oklahoma](https://savrn.com/data-center-moratorium-tracker/oklahoma) [Oregon](https://savrn.com/data-center-moratorium-tracker/oregon) [Pennsylvania](https://savrn.com/data-center-moratorium-tracker/pennsylvania) [Rhode Island](https://savrn.com/data-center-moratorium-tracker/rhode-island) [South Carolina](https://savrn.com/data-center-moratorium-tracker/south-carolina) [South Dakota](https://savrn.com/data-center-moratorium-tracker/south-dakota) [Tennessee](https://savrn.com/data-center-moratorium-tracker/tennessee) [Texas](https://savrn.com/data-center-moratorium-tracker/texas) [Utah](https://savrn.com/data-center-moratorium-tracker/utah) [Vermont](https://savrn.com/data-center-moratorium-tracker/vermont) [Virginia](https://savrn.com/data-center-moratorium-tracker/virginia) [Washington](https://savrn.com/data-center-moratorium-tracker/washington) [Washington, DC](https://savrn.com/data-center-moratorium-tracker/washington-dc) [West Virginia](https://savrn.com/data-center-moratorium-tracker/west-virginia) [Wisconsin](https://savrn.com/data-center-moratorium-tracker/wisconsin) [Wyoming](https://savrn.com/data-center-moratorium-tracker/wyoming)

### How to read this page

In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.

This page is generated from the same primary-sourced dataset as the national [U.S. Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker) and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Mississippi? [Tell us](https://savrn.com/contact).

Companion references: the [Data Center Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the interconnection and curtailment rules that bind here, the [Data Center Water Tracker](https://savrn.com/data-center-water-tracker) for water mandates, and the [Data Center Delay Watchlist](https://savrn.com/data-center-delay-tracker) for named projects.

## Why Mississippi is pushing back

The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.

[See how a SAVRN factory works](https://savrn.com/system) [Talk to us about a Mississippi site](https://savrn.com/engage)