# Texas Data Center Moratorium Tracker

Source: https://savrn.com/data-center-moratorium-tracker/texas
Markdown alternate of the page above; the site index is https://savrn.com/llms.txt

---

Texas has 8 state-level data-center restrictions in force and 3 active pauses. 1 more bill is pending. 26 city and county measures are tracked here, 12 of them in force. Every entry below links to its primary source: a legislature page, a governor's office, a local government, or the reporting of record.

Last updated October 2026 12 state-level measures 26 local measures 38 primary sources

Texas

TX

In force

12

State-level measures on record, 11 in force

26

City and county measures, 12 in force

38

Primary sources cited on this page

#17

of 50 states with anything on record, by measure count

## State-level measures in Texas

Every statewide moratorium, pause, siting restriction, or tax-incentive rollback in Texas we can verify against a primary source. Strongest status first.

| Measure | Status | What it does | Source |
| --- | --- | --- | --- |
| SB 6Large-load interconnection standards and grid curtailment | In force 2025-06 | Enacted 2025 (PUCT rulemaking in 2026): interconnection standards and cost obligations on 75 MW+ loads plus authority for ERCOT to curtail or remotely disconnect data centers during grid emergencies. A grid-reliability restriction. |  |
| Texas (State Republican Executive Committee)Texas: The State Republican Executive Committee passed a near-unanimous resolution calling for 'rigorous independent assessments' of data center impacts | In force 2026-02 | The State Republican Executive Committee passed a near-unanimous resolution calling for 'rigorous independent assessments' of data center impacts on the grid and water supply before approval, and a pause on 'open loop' (high water use) data centers. Significant because it reflects growing intra-GOP opposition to data center development in Texas. |  |
| Texas (PUCT rulemaking)Texas: The Texas Public Utility Commission is implementing SB 6 through multiple rulemaking dockets. | In force 2026-03 | The Texas Public Utility Commission is implementing SB 6 through multiple rulemaking dockets. PUCT Chair Thomas Gleeson proposed rules to pare back proposed requirements for data centers seeking to connect to ERCOT, lowering fees for large loads and adding alternative standards developers can use to demonstrate site readiness. April 17, 2026 was the deadline for stakeholder comments on PUCT draft rule 16 TAC §25.194 implementing SB 6's interconnection standards for new loads of 75 MW or greater. The draft rule includes non-refundable interconnection fees of $50,000/MW of contracted peak demand, requires customers to pay 100% of direct interconnection costs (radial lines, substations), and demands additional security for transmission upgrades. ERCOT is tracking approximately 410 GW of large-load interconnection requests, ~87% from data centers. The PUCT approved ERCOT's 'Batch Zero' large-load interconnection framework, which batches large-load (75MW+) interconnection requests, roughly 89% of which are data centers. ERCOT is now tracking 438,000+ MW in the interconnection queue, up from ~410GW cited in March 2026 reporting. |  |
| Texas (Republican shift on data center regulation, Rep. David Cook commits 2027 county-authority legislation)Texas Tribune analysis found 82 data centers (~60% of planned/under construction) sit in Trump-voting Texas House districts. | In force 2026-05 | Texas Tribune analysis found 82 data centers (~60% of planned/under construction) sit in Trump-voting Texas House districts. Republican lawmakers signaling shift toward allowing county-level regulation and water/rate protections. Rep. David Cook committed to filing 2027 legislation giving counties 'reasonable authority' to regulate data centers. Falls County GOP precinct member Rena Schroeder switched to independent over party rejection of moratorium proposal. The legislator who committed to filing 2027 county-authority legislation is Rep. Cody Vasut (R-Angleton), NOT Rep. David Cook; Vasut filed a similar county-regulation bill last session. The 82-data-centers-in-Trump-districts figure and the Falls County GOP / Rena Schroeder details are confirmed. |  |
| Governor's directive to Texas Water Development Board (Sept. 14, 2026)Enforcement of data center water-use reporting requirements | In force 2026-09 | On September 14, 2026, Gov. Greg Abbott directed the Texas Water Development Board to use its statutory authority to compel large water users, including data centers, to file the water-use information required by the Texas Water Code. He told the board to refer violations to county or district attorneys and to notify the Texas Commission on Environmental Quality, since noncompliance can make a facility ineligible for certain Chapter 11 water permits, amendments or renewals. Abbott asked for a compliance update by October 14, 2026. This is an enforcement directive, not a moratorium. |  |
| Order to pause data center permits for audit | In force 2026-09 | Texas Gov. Greg Abbott ordered a pause on environmental permits for new data centers until an audit of the waitlist for grid connections is completed. This expands a previous moratorium on grid approvals and may impact the state's data center development pipeline. |  |
| Halt on Texas data center permits | In force 2026-09 | Governor Abbott directed state environmental regulators to stop issuing permits to data centers while an electricity audit is ongoing. This action was taken to address concerns about electricity demand. |  |
| Data Center Permit Halt | In force 2026-09 | Texas Governor Abbott ordered a halt to data center permit approvals. The order is intended to address concerns related to energy consumption and grid reliability. |  |
| Executive directive (Gov. Abbott)Freeze on new data center grid connections pending audit | Paused 2026-08 | Gov. Abbott directed PUCT and ERCOT on Aug 3, 2026 to audit every data center project advancing through the ERCOT interconnection process (1,800+ requests) before any of them moves forward. The directive has no carve-out: it asks each project to report projected consumption and any on-site generation it is building or procuring, and projects that fail compliance face denial of grid access. Non-ERCOT areas fall outside it only because ERCOT does not serve them. |  |
| Statewide moratorium on data centers until a condition is metGovernor's directive pausing ERCOT data center interconnection pending an audit (not a construction ban) | Paused 2026-08 | Gov. Abbott directed ERCOT and the PUC on Aug 3, 2026 to freeze data center interconnection progress pending a comprehensive audit. ERCOT halted its Batch Zero large-load study and suspended Aug 7 classification notices. The directive does not exempt projects with on-site generation; it requires them to report that generation as part of the audit. The hold runs until the audit is complete, which ERCOT is targeting for Dec 10, 2026. Same action as the Texas executive directive entry. |  |
| Governor's directive to TCEQ (Sept. 21, 2026)Halt on state environmental permits for data center projects pending audits | Paused 2026-09 | On September 21, 2026, Gov. Greg Abbott directed the Texas Commission on Environmental Quality to halt all permits sought by data center projects until ERCOT and the Texas Water Development Board complete their data center audits, and said no state agency should move forward with regulatory approvals for data center development until that information is in hand. TCEQ must report compliance to the Governor by October 19, 2026. The Texas Tribune reported that the order appears aimed at developers building behind-the-meter generation, who could otherwise avoid the ERCOT interconnection audit. It is statewide and not limited to the ERCOT region. |  |
| SB2888Relating to the temporary sales and use tax exemptions for certain tangible personal property related to data centers and large data center projects. | Proposed 2025-04 | Texas SB2888 (89th Legislature Regular Session): Relating to the temporary sales and use tax exemptions for certain tangible personal property related to data centers and large data center projects.. Last action 2025-04-07: Referred to Finance. |  |

## City and county moratoria in Texas

Most of the movement is local, where a building pause or permit halt does not need a legislative session. 26 tracked measures in Texas, each with its source.

Abbott

2026-09

In force

Abbott halts new Texas data center permits pending ERCOT audit

Governor Greg Abbott issued a directive halting all new data center permits from the Texas Commission on Environmental Quality until an ERCOT audit is completed. The audit is scheduled to be finished by December 2026.

Athens

2026-08

In force

Local moratorium on data centers with no end date

City Council voted 3-2 to permanently ban data centers within city limits. Defines data center as any facility over 500 sq ft used primarily to house servers. Not a moratorium -- a standing zoning ban. The measure has no end date by design and applies at a threshold of 500 sq ft.

Austin County

2026-07

In force

Moratorium on AI data centers and battery energy storage systems

Austin County Commissioners Court unanimously adopted a countywide moratorium on new AI data center and battery energy storage developments in unincorporated areas while the county evaluates impacts and a possible energy development zone.

Bell County (Murray Industries construction moratorium)

2026-07

In force

Bell County (Murray Industries construction moratorium) data center moratorium

Commissioners passed a two-year construction moratorium halting a project by Murray Industries, which had already begun clearing land. It is unclear whether the moratorium covers Meta's already-operational Temple facility nearby. This is a distinct company/action from the broader Rowan Digital Infrastructure / tax-abatement fight already tracked for Temple-area (Bell County) data centers.

Brownsville

2026-10

In force

Brownsville starts 90-day data center moratorium process

The Brownsville City Commission unanimously approved a 90-day moratorium on artificial intelligence data centers during its special meeting on October 12, 2026; the moratorium is scheduled to take effect November 5, pending a second and final reading at the November 4 special meeting, and may be extended for an additional 90 days pending Environmental Task Force review.

El Paso

2026-01

In force

Local moratorium on data centers with no end date

Council unanimously approved data center policy: 300-ft buffer from residential/ecological sites, special use permit, no more tax breaks. Developers must submit resource use, emissions, noise, and water treatment plans. The measure has no end date by design.

Harlingen

2026-05

In force

Local moratorium on data centers for a stated term

120-day moratorium on data center development within city limits, adopted in May 2026 after public hearings, running to mid-October; commissioners approved first reading of a 60-day extension to December in August, second reading pending. City hired Ambiotec Engineering to study water, wastewater and power impacts. The measure has a stated duration whose end date is not recorded.

Hill County Commissioners Court (first Texas county data center moratorium), TX

2026-05

In force

Hill County Commissioners Court (first Texas county data center moratorium), TX data center moratorium

Hill County Commissioners Court voted 3-2 for a 1-year pause on data center construction in unincorporated areas, appears to be the first Texas county moratorium. County officials expect lawsuits (demand letters arrived within 24 hours); State Sen. Paul Bettencourt asked AG Paxton to investigate, claiming counties lack authority. At least 8 more local projects reportedly in development.

Lewisville

2026-01

In force

Local moratorium on data centers with no end date

Council voted unanimously to require Special Use Permit for data centers; banned in all residential areas. Each proposal needs two public hearings. The measure has no end date by design.

Milam County

2026-01

In force

County moratorium on data centers

Resolution calling for stricter statewide standards on data centers: public disclosure of electrical demand, water consumption, cooling technologies, and infrastructure impact. Non-binding. The measure has no documented term.

Princeton

2026-01

In force

Local moratorium on data centers with no end date

City amended regulations to require a Specific Use Permit for data centers, updated definitions, and established per-project public review. The measure has no end date by design.

San Marcos

2026-06

In force

Zoning ban on data centers

City Council voted 4-3 on June 16, 2026 to define data centers and make them ineligible in all zoning districts, becoming the first Texas city to ban them; relies on home-rule authority.

Killeen

2026-10

Paused

Killeen leaders work to craft data center zoning requirements as Texas moratorium pauses new projects

Texas has paused new data center projects under a moratorium. Killeen city leaders are working to develop zoning requirements for data centers.

Austin

2026-08

Proposed

Proposed local moratorium on data centers

Council unanimously directed staff to draft Land Development Code rules for large-scale data centers (location, size, water, noise, heat, lighting) that could regulate or ban facilities above 75 MW, with the first ordinance due back by end of 2026. At least five members back a full ban on hyperscale sites. No moratorium is in effect. The measure has no documented term and applies at a threshold of 75 MW.

Corpus Christi

2026-01

Proposed

Proposed local moratorium on data centers

Council directed staff to pursue prohibiting data centers in all zoning districts; requires data centers to fully fund own infrastructure. Drought context: severe water crisis threatening city reservoirs. The measure has no documented term.

Denton

2026-09

Proposed

Proposed local moratorium on data centers

The Denton City Council held the first of two required public hearings on a proposed temporary data center moratorium on September 23, 2026, with no vote taken; the second hearing is scheduled for October 27.

Forney

2026-01

Proposed

Proposed local moratorium on data centers with no end date

Council directed staff to amend zoning to prohibit data centers in all districts -- effectively a proposed citywide ban. Escalation from April 2026 regulations requiring 5,000-ft setbacks. The measure has no end date by design.

Fort Worth

2026-08

Proposed

Proposed 90-day data center moratorium

City Council unanimously approved the first steps on Aug. 11, 2026 to initiate a 90-day moratorium on new data center applications, expected to take effect in early 2027; not yet in force.

Lubbock

2026-09

Proposed

Citizen-petitioned 18-month data center moratorium

On September 23, 2026, the Lubbock City Council voted 5-2 to initiate the state-required process for a 90-day moratorium on rezoning, building permit and annexation applications for large-scale data centers; two public hearings are required before it takes effect.

Mesquite

2026-01

Proposed

Proposed local moratorium on data centers

Proposed framework: 5-acre min lot, 65 dB noise limit, banned in residential/agricultural/commercial districts. Staff recommended ordinance over moratorium. Not yet enacted. The measure has no documented term.

Taylor

2026-10

Proposed

Taylor Set To Decide On Annexation, Zoning For Data Center

Taylor, Texas is considering annexation and zoning for a potential 664-acre data center campus. The decision is scheduled to be made on or around October 5, 2026.

Hays County

2026-02

Failed / vetoed

Hays County data center moratorium (failed)

Water advocates identified 5 data centers proposed for the Hays County, Texas, region during historic drought (proposed by CloudBurst Data Centers / Highlander SC One LLC) (1.2GW, $1.2B, 200 acres). County Judge Ruben Becerra proposed a 30-day moratorium on high-water-use building permits but was forced to table it after county attorneys warned it would trigger a lawsuit the county would likely lose. San Marcos City Council scored a major win Feb. 17, voting 5-2 at 2:14 AM to block a $1.5B Highlander SM One data center after 8+ hours of testimony from 100+ residents. Hays County aquifers are at historic lows. Hays County Judge Ruben Becerra proposed a moratorium on permits for large industrial water users (>20,000 gal/day) but the Commissioners Court tabled it on Feb 25 after county attorneys warned it would trigger a lawsuit the county would lose. State Sen. Bettencourt warned counties lack authority for moratoriums. Water advocates have identified 5 potential data center developments in the region and continue organizing.

Hill County

2026-06

Failed / vetoed

One-year data center moratorium (rescinded)

Hill County commissioners adopted a one-year moratorium on May 12, 2026 (the first by a Texas county) but rescinded it June 5, 2026 after a developer lawsuit.

Hood County

2026-02

Failed / vetoed

Hood County data center moratorium (failed)

Hood County (40 miles SW of Fort Worth) has received at least five data center applications (proposed by Sailfish Development). Commissioners voted down a proposed moratorium 3-2, twice, despite 8 hours of public testimony. The 2,100-acre Comanche Circle project sits in a recharge zone for the Upper Trinity Aquifer and could use 1M gallons/day. State Sen. Paul Bettencourt sent a letter to AG Paxton warning that counties lack constitutional authority to impose moratoriums, chilling local opposition. Residents are still adjusting to a nearby bitcoin mining operation in Granbury where neighbors report constant noise affecting people, pets, and wildlife. Hood County commissioners rejected the moratorium a second time on Feb 25, 2026, in a 3-2 vote. Instead, they voted to seek an opinion from TX Attorney General Ken Paxton on whether counties have authority to enact development moratoriums. State Sen. Paul Bettencourt warned counties lack constitutional authority for moratoriums. Residents called for commissioner resignations after the second block.

San Antonio

2026-08

Failed / vetoed

Data center moratorium not pursued

At an Aug. 26, 2026 session, the San Antonio City Council declined to move forward with a temporary moratorium on data center development requested by three council members, with four members in support. The council instead directed work on Unified Development Code amendments, with a council vote on those amendments planned for Oct. 15. No formal vote tally on the moratorium was reported.

Tom Green County

2026-01

Failed / vetoed

Rejected county moratorium on data centers

Commissioners rejected a 12-month moratorium on large-scale data centers, BESS, and power generation in Precinct 4; cited legal risk after Hill County's moratorium drew a $100M federal lawsuit. The measure has no documented term.

## Would you like the weekly update?

Every week we re-verify every state and local measure on this map and publish what changed. You get one email when it goes out.

Also send me

Receive a short introduction on days 3, 7 and 14, plus the updates you select. Unsubscribe in one click. [Privacy](https://savrn.com/privacy) ·

You're on the list. The next weekly update will land in your inbox when it publishes.

You are subscribed. [Read the latest tracker](https://savrn.com/data-center-moratorium-tracker)

### Where Texas stands

Across the whole tracker we hold 334 state-level measures in 49 states and 1253 city and county measures, against 1419 primary sources. Texas accounts for 12 of the state-level measures and 26 of the local ones.

By total measures on record it is #17 of the 50 states and DC carrying any tracked action, and #17 by city and county measures alone. Ranking is by count of sourced entries in this dataset, so it measures documented activity, not the size of the buildout.

## Sources for Texas

38 citations behind the entries above. Each opens in a new tab.

- Statewide · SB 6 — Large-load interconnection standards and grid curtailment (In force, 2025-06) [utilitydive.com →](https://www.utilitydive.com/news/texas-law-gives-grid-operator-power-to-disconnect-data-centers-during-crisi/751587/)
- Statewide · Texas (State Republican Executive Committee) — Texas: The State Republican Executive Committee passed a near-unanimous resolution calling for 'rigorous independent assessments' of data center impacts (In force, 2026-02) [kwtx.com →](https://www.kwtx.com/2026/02/13/texans-are-demanding-their-local-governments-push-pause-data-centers-can-they/)
- Statewide · Texas (PUCT rulemaking) — Texas: The Texas Public Utility Commission is implementing SB 6 through multiple rulemaking dockets. (In force, 2026-03) [ercot.com →](https://www.ercot.com/news/release/06182026-puct-approves-ercots)
- Statewide · Texas (Republican shift on data center regulation, Rep. David Cook commits 2027 county-authority legislation) — Texas Tribune analysis found 82 data centers (~60% of planned/under construction) sit in Trump-voting Texas House districts. (In force, 2026-05) [texastribune.org →](https://www.texastribune.org/2026/05/07/texas-republicans-data-centers-rural/)
- Statewide · Governor's directive to Texas Water Development Board (Sept. 14, 2026) — Enforcement of data center water-use reporting requirements (In force, 2026-09) [ksat.com →](https://www.ksat.com/news/texas/2026/09/14/gov-greg-abbott-orders-texas-water-agency-to-penalize-data-centers-that-dont-report-their-water-usage/)
- Statewide — Order to pause data center permits for audit (In force, 2026-09) [cnbc.com →](https://www.cnbc.com/2026/09/21/texas-governor-abbott-ai-data-center-permits.html)
- Statewide — Halt on Texas data center permits (In force, 2026-09) [politico.com →](https://www.politico.com/news/2026/09/21/abbott-texas-data-center-permits-halt-01086398)
- Statewide — Data Center Permit Halt (In force, 2026-09) [news.google.com →](https://news.google.com/rss/articles/CBMipgFBVV95cUxOTXlGeWxHRDY5V084SWRmNDJ2RjFDZU4yMTdpdlNDNVZ1NmphODJ0WkVrRFhUSjRzazdsSzFVVUloZU55ekhXTGdLWUp1YUl4SmUxdDNjWTZUcnFGVWU5OW5acjU5Y1VDRm85YUNXVE9yV0ZYdXBiMkYybWxtaFUwQzFGYXZuR19MT2hwa2ZoSGVOZ1ZET1o4a0Z6dS1BVGlzUHpfRy1n)
- Statewide · Executive directive (Gov. Abbott) — Freeze on new data center grid connections pending audit (Paused, 2026-08) [gov.texas.gov →](https://gov.texas.gov/news/post/governor-abbott-directs-comprehensive-data-center-audit)
- Statewide · Statewide moratorium on data centers until a condition is met — Governor's directive pausing ERCOT data center interconnection pending an audit (not a construction ban) (Paused, 2026-08) [texastribune.org →](https://www.texastribune.org/2026/08/03/texas-data-center-project-audit-greg-abbott/)
- Statewide · Governor's directive to TCEQ (Sept. 21, 2026) — Halt on state environmental permits for data center projects pending audits (Paused, 2026-09) [gov.texas.gov →](https://gov.texas.gov/news/post/governor-abbott-directs-tceq-to-halt-data-center-permits)
- Statewide · SB2888 — Relating to the temporary sales and use tax exemptions for certain tangible personal property related to data centers and large data center projects. (Proposed, 2025-04) [capitol.texas.gov →](https://capitol.texas.gov/BillLookup/History.aspx?LegSess=89R&Bill=SB2888)
- Abbott — Abbott halts new Texas data center permits pending ERCOT audit (In force, 2026-09) [datacenterdynamics.com →](https://www.datacenterdynamics.com/en/news/abbott-halts-new-texas-data-center-permits-pending-ercot-audit/)
- Athens — Local moratorium on data centers with no end date (In force, 2026-08) [kltv.com →](https://www.kltv.com/2026/08/25/athens-city-council-votes-3-2-favor-ordinance-banning-data-centers/)
- Austin County — Moratorium on AI data centers and battery energy storage systems (In force, 2026-07) [kwhi.com →](https://kwhi.com/2026/07/28/austin-co-commissioners-enact-moratorium-on-data-centers-battery-energy-storage-systems/)
- Bell County (Murray Industries construction moratorium) — Bell County (Murray Industries construction moratorium) data center moratorium (In force, 2026-07) [wymt.com →](https://www.wymt.com/2026/07/02/bell-county-passes-data-center-moratorium-halting-construction-2-years/)
- Brownsville — Brownsville starts 90-day data center moratorium process (In force, 2026-10) [utrgvrider.com →](https://www.utrgvrider.com/city-commission-approves-moratorium-on-ai-data-centers/)
- El Paso — Local moratorium on data centers with no end date (In force, 2026-01) [elpasomatters.org →](https://elpasomatters.org/2026/07/20/meta-data-center-el-paso-texas-policy-framework-rules-city-council/)
- Harlingen — Local moratorium on data centers for a stated term (In force, 2026-05) [krgv.com →](https://www.krgv.com/news/harlingen-city-officials-look-to-extend-moratorium-on-data-centers)
- Hill County Commissioners Court (first Texas county data center moratorium), TX — Hill County Commissioners Court (first Texas county data center moratorium), TX data center moratorium (In force, 2026-05) [texastribune.org →](https://www.texastribune.org/2026/05/12/texas-hill-county-approves-data-center-construction-pause-ai/)
- Lewisville — Local moratorium on data centers with no end date (In force, 2026-01) [keranews.org →](https://www.keranews.org/news/2026-06-25/lewisville-sets-proactive-limits-on-ai-data-centers-before-they-arrive)
- Milam County — County moratorium on data centers (In force, 2026-01) [multistate.us →](https://www.multistate.us/insider/2026/8/19/the-local-fight-over-data-centers-a-texas-case-study)
- Princeton — Local moratorium on data centers with no end date (In force, 2026-01) [princetonherald.com →](https://princetonherald.com/2026/06/11/council-plans-data-center-regulation/)
- San Marcos — Zoning ban on data centers (In force, 2026-06) [texastribune.org →](https://www.texastribune.org/2026/06/30/texas-san-marcos-data-center-ban-zoning-laws/)
- Killeen — Killeen leaders work to craft data center zoning requirements as Texas moratorium pauses new projects (Paused, 2026-10) [news.google.com →](https://news.google.com/rss/articles/CBMiiwJBVV95cUxPN2psTUZRVXVaU0RoaGdzVWtJT2hvdlVzd2djQmpGcWZla0gzWEJMcVhwSGhLRGxOLXdlRXFkNUQwMUJ3M1ZlMWljQi15UWVjUnZ4N1dJV2t4enZ4Zi1iNXFiWEpfVE9aNFBnQ0NIai1idGZEa3Jmd3RRZDIwSjN3SGdLSjZUUHdOdmc0cThfemxZd2ZsNnNWOE9IWElNSG5nNDBTOXY1VTIwWmg5ZzF0QzVVTE1MazliOW8zSG04QXBha3ZybmlwX09QWmtUNFA5UWVtMGZkSGM1VTBKbVh0eHpKYmZ4Zm1PTjNFWkhMY09jSjZpWU1rUzFzY1k4MUZGaVhuUUtiTVJHcmM)
- Austin — Proposed local moratorium on data centers (Proposed, 2026-08) [kut.org →](https://www.kut.org/austin/2026-08-27/austin-tx-data-center-rules-bans-city-council)
- Corpus Christi — Proposed local moratorium on data centers (Proposed, 2026-01) [kristv.com →](https://www.kristv.com/news/local-news/in-your-neighborhood/corpus-christi/corpus-christi-city-council-moves-to-develop-data-center-regulations-for-the-city)
- Denton — Proposed local moratorium on data centers (Proposed, 2026-09) [cbsnews.com →](https://www.cbsnews.com/texas/news/denton-data-center-moratorium-public-hearing-september-2026/)
- Forney — Proposed local moratorium on data centers with no end date (Proposed, 2026-01) [inforney.com →](https://www.inforney.com/business/forney-council-moves-to-ban-future-data-centers-a/article_33ab99f5-98c7-446c-80c9-40f5e7953141.html)
- Fort Worth — Proposed 90-day data center moratorium (Proposed, 2026-08) [keranews.org →](https://www.keranews.org/news/2026-08-12/data-center-moratorium-takes-first-steps-after-fort-worth-city-councils-unanimous-vote)
- Lubbock — Citizen-petitioned 18-month data center moratorium (Proposed, 2026-09) [tpr.org →](https://www.tpr.org/news/2026-09-23/lubbock-takes-first-step-toward-data-center-moratorium-questions-remain-with-approaching-legislative-session)
- Mesquite — Proposed local moratorium on data centers (Proposed, 2026-01) [keranews.org →](https://www.keranews.org/news/2026-06-02/mesquite-city-council-tighter-regulations-data-centers-north-texas)
- Taylor — Taylor Set To Decide On Annexation, Zoning For Data Center (Proposed, 2026-10) [bisnow.com →](https://www.bisnow.com/news/austin-san-antonio/data-center/taylor-deciding-annexation-zoning-data-center-campus-powerhouse)
- Hays County — Hays County data center moratorium (failed) (Failed / vetoed, 2026-02) [kut.org →](https://www.kut.org/energy-environment/2026-02-26/hays-county-tx-data-centers-water-resources)
- Hill County — One-year data center moratorium (rescinded) (Failed / vetoed, 2026-06) [texastribune.org →](https://www.texastribune.org/2026/06/05/texas-hill-county-moratorium-rescinded-data-centers/)
- Hood County — Hood County data center moratorium (failed) (Failed / vetoed, 2026-02) [texastribune.org →](https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/)
- San Antonio — Data center moratorium not pursued (Failed / vetoed, 2026-08) [sacurrent.com →](https://www.sacurrent.com/?p=419403)
- Tom Green County — Rejected county moratorium on data centers (Failed / vetoed, 2026-01) [sanangelolive.com →](https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium)

[See all 1419 sources across every state →](https://savrn.com/data-center-moratorium-tracker/sources)

## What does bind large loads in Texas

A moratorium is only one way a data center gets stopped. The grid operator decides whether it can connect at all, and on what terms. Texas sits in 4 footprints.

ERCOTDominant

New data-center interconnections paused pending a queue audit due December 2026.

SPP

Speed in exchange for curtailability under the approved HILL framework.

MISO

Faster parallel studies and a co-located generation fast track, not a pause.

Non-RTO utility territory

No RTO or ISO market here. Interconnection terms, study queues and curtailment rights for a large load are set by the individual utility and its state commission.

ERCOT ~90% of state load (ERCOT profile); Panhandle/South Plains (Xcel-SPS) and a NE corner in SPP; southeast TX (Entergy Texas) in MISO; El Paso Electric in WECC, non-RTO.

[See the full Data Center Grid Operator Watchlist →](https://savrn.com/data-center-grid-operator-watchlist)

## States next door

4 of the 4 states bordering Texas have at least one data-center measure on record. Restrictions tend to travel between neighbors, so this is usually where the next one comes from.

[Oklahoma 19](https://savrn.com/data-center-moratorium-tracker/oklahoma) [Arkansas 17](https://savrn.com/data-center-moratorium-tracker/arkansas) [New Mexico 16](https://savrn.com/data-center-moratorium-tracker/new-mexico) [Louisiana 6](https://savrn.com/data-center-moratorium-tracker/louisiana)

## Data centers in Texas

The US Data Center Map identifies 446 facilities run by 125 operators in Texas, each one placed from primary sources and listed by city and by operator, with the measures on this page beside them.

[Open the Texas data center map →](https://savrn.com/data-center-map/texas) · [The US Data Center Map →](https://savrn.com/data-center-map)

[Alabama](https://savrn.com/data-center-moratorium-tracker/alabama) [Alaska](https://savrn.com/data-center-moratorium-tracker/alaska) [Arizona](https://savrn.com/data-center-moratorium-tracker/arizona) [Arkansas](https://savrn.com/data-center-moratorium-tracker/arkansas) [California](https://savrn.com/data-center-moratorium-tracker/california) [Colorado](https://savrn.com/data-center-moratorium-tracker/colorado) [Connecticut](https://savrn.com/data-center-moratorium-tracker/connecticut) [Delaware](https://savrn.com/data-center-moratorium-tracker/delaware) [Florida](https://savrn.com/data-center-moratorium-tracker/florida) [Georgia](https://savrn.com/data-center-moratorium-tracker/georgia) [Hawaii](https://savrn.com/data-center-moratorium-tracker/hawaii) [Idaho](https://savrn.com/data-center-moratorium-tracker/idaho) [Illinois](https://savrn.com/data-center-moratorium-tracker/illinois) [Indiana](https://savrn.com/data-center-moratorium-tracker/indiana) [Iowa](https://savrn.com/data-center-moratorium-tracker/iowa) [Kansas](https://savrn.com/data-center-moratorium-tracker/kansas) [Kentucky](https://savrn.com/data-center-moratorium-tracker/kentucky) [Louisiana](https://savrn.com/data-center-moratorium-tracker/louisiana) [Maine](https://savrn.com/data-center-moratorium-tracker/maine) [Maryland](https://savrn.com/data-center-moratorium-tracker/maryland) [Massachusetts](https://savrn.com/data-center-moratorium-tracker/massachusetts) [Michigan](https://savrn.com/data-center-moratorium-tracker/michigan) [Minnesota](https://savrn.com/data-center-moratorium-tracker/minnesota) [Mississippi](https://savrn.com/data-center-moratorium-tracker/mississippi) [Missouri](https://savrn.com/data-center-moratorium-tracker/missouri) [Montana](https://savrn.com/data-center-moratorium-tracker/montana) [Nebraska](https://savrn.com/data-center-moratorium-tracker/nebraska) [Nevada](https://savrn.com/data-center-moratorium-tracker/nevada) [New Hampshire](https://savrn.com/data-center-moratorium-tracker/new-hampshire) [New Jersey](https://savrn.com/data-center-moratorium-tracker/new-jersey) [New Mexico](https://savrn.com/data-center-moratorium-tracker/new-mexico) [New York](https://savrn.com/data-center-moratorium-tracker/new-york) [North Carolina](https://savrn.com/data-center-moratorium-tracker/north-carolina) [North Dakota](https://savrn.com/data-center-moratorium-tracker/north-dakota) [Ohio](https://savrn.com/data-center-moratorium-tracker/ohio) [Oklahoma](https://savrn.com/data-center-moratorium-tracker/oklahoma) [Oregon](https://savrn.com/data-center-moratorium-tracker/oregon) [Pennsylvania](https://savrn.com/data-center-moratorium-tracker/pennsylvania) [Rhode Island](https://savrn.com/data-center-moratorium-tracker/rhode-island) [South Carolina](https://savrn.com/data-center-moratorium-tracker/south-carolina) [South Dakota](https://savrn.com/data-center-moratorium-tracker/south-dakota) [Tennessee](https://savrn.com/data-center-moratorium-tracker/tennessee) [Texas](https://savrn.com/data-center-moratorium-tracker/texas) [Utah](https://savrn.com/data-center-moratorium-tracker/utah) [Vermont](https://savrn.com/data-center-moratorium-tracker/vermont) [Virginia](https://savrn.com/data-center-moratorium-tracker/virginia) [Washington](https://savrn.com/data-center-moratorium-tracker/washington) [Washington, DC](https://savrn.com/data-center-moratorium-tracker/washington-dc) [West Virginia](https://savrn.com/data-center-moratorium-tracker/west-virginia) [Wisconsin](https://savrn.com/data-center-moratorium-tracker/wisconsin) [Wyoming](https://savrn.com/data-center-moratorium-tracker/wyoming)

### How to read this page

In force = a moratorium, siting restriction, or tax-incentive rollback that is currently enacted, by statute or executive order. Paused = a temporary hold on new incentives or applications. Proposed = introduced and still pending. Failed / vetoed = died in committee, was voted down, or was vetoed.

This page is generated from the same primary-sourced dataset as the national [U.S. Data Center Moratorium Tracker](https://savrn.com/data-center-moratorium-tracker) and is re-checked on the same weekly cycle, whether or not anything changed. Legislative status changes quickly; it is informational, not legal advice. Spot something out of date in Texas? [Tell us](https://savrn.com/contact).

Companion references: the [Data Center Grid Operator Watchlist](https://savrn.com/data-center-grid-operator-watchlist) for the interconnection and curtailment rules that bind here, the [Data Center Water Tracker](https://savrn.com/data-center-water-tracker) for water mandates, and the [Data Center Delay Watchlist](https://savrn.com/data-center-delay-tracker) for named projects.

## Why Texas is pushing back

The objections repeat from state to state: strain on the electric grid, water drawn for cooling, and the sense that a facility takes local resources without giving much back. SAVRN builds AI factories designed around those three objections: on-site power that does not lean on the public grid, direct-to-chip cooling that does not consume municipal water, and a training institute that puts local people to work inside the building.

[See how a SAVRN factory works](https://savrn.com/system) [Talk to us about a Texas site](https://savrn.com/engage)
